Calix Limited (CXL) Earnings Call Transcript & Summary

February 25, 2025

Australian Securities Exchange AU Materials Chemicals earnings 48 min

Earnings Call Speaker Segments

Moderator

operator
#1

Chief Financial Officer Darren Charles. Before I pass things along to Phil and Darren so they can walk through the presentation that's up on your screen, I'll just remind everyone that questions can be submitted using the Q&A button at the bottom of your Zoom screen, and we'll get to the ones that get posted into the presentation. Phil, over to you. Thanks.

Phil Hodgson

executive
#2

Great, thank you so much, Simon, and thank you everyone for being with us this morning. Let's move straight to the intro slide covering the technology, Simon — I'm talking to you from Houston. As always, I've got my small flat pack version of the technology with me, which is the old toilet roll. It's getting a bit ragged at this point, but I want to explain something in a little more detail. One topic we covered at the November annual general meeting was the progress achieved on the electrification side of our technology. Previously, what we did was discuss having electric elements positioned around the exterior of our tube or furnace, along with the capability to heat using conventional fossil fuels, or by burning waste or biomass. At the AGM in November, we discussed the shift for our electric approach — moving away from electric elements toward electrifying the tube directly. We apply a low voltage with high current, and that genuinely enables us to deliver hybrid energy where the furnace is concerned. We're able to switch from electrons over to fuel very rapidly. That matters a great deal, and I'll explain why it matters when we get into some of the other benefits of the kiln beyond decarbonisation a bit further along in the pack.

Phil Hodgson

executive
#3

Beyond that, let me move briskly to the financials — those are the key items I'd like Darren to walk through regarding how we performed in the first half year, and after that I'll provide an update on each project.

Darren Charles

executive
#4

Thanks, Phil, and good morning, everyone. I'm in Sydney, so not quite in Houston, and it's my pleasure to chat through some of the key highlights of the first half, which kind of the key messages from my perspective are continued revenue growth, significant activity to reduce our costs, which I'll talk through, some CapEx spend primarily on the midstream project, which now is almost complete in terms of our capital contribution, and I'll touch about that, and then the cap raise that we did late last year and the SPP that was completed a few weeks ago that's really given us a strong cash runway to deliver on our strategies over the next 18 months. I might just flick to the next slide and talk in more detail about those key thematics. Firstly, again, strong revenue growth, both in terms of in our water business, predominantly in the United States, which has delivered good growth, double-digit revenue growth at good margin, really strong growth in our Leilac services, engineering paid services revenue, which was up strongly in the first half. Importantly, we've got good line of sight for that revenue growth to continue into the second half as well, with contracts that we've secured and we're beginning to execute now.

Darren Charles

executive
#5

Revenue growth is showing some very encouraging signals. Regarding costs, we said at the AGM that we were sharpening our attention toward a limited set of near-term commercial activities and opportunities. We noted then that a restructuring of the business had been finished. Through that restructuring, our headcount came down from a peak — it reached roughly 160 people near the middle of the year. Today we sit at approximately 117. A considerable amount of work went into refocusing and restructuring the business. Because of that pivot, we incurred some one-off costs during the first half. Roughly $3 million in costs landed in the first half that will not recur as we move ahead, mainly across admin and research and development. That should convert into annualized savings of around $6 million, which will begin flowing through the accounts from January onwards. None of that is captured in the first half. Naturally, the extra costs tied to that restructure do appear in the first half, while the savings we achieved will show up from this point forward. When it comes to expanding revenue streams and reducing our cost base, we have made genuinely strong progress toward a sustainable financial foundation for growth going forward.

Darren Charles

executive
#6

I'll go over that once more: the contribution from magnesia, the contribution from Leilac, and also on the sustainable processing side, a genuinely strong contribution tied to the gain we've booked from our work with Pilbara Minerals and the midstream project. That work produced an $8.8 million gain in the P&L during the first half. Let me move on to the next slide now, if that's alright. Turning again to the balance sheet, we had roughly $36 million in the bank as of 31st of December. The share purchase plan wrapped up a few weeks back in February, so that adds another $2 million on top. Our balance sheet genuinely gives us the flexibility to go after this focused commercialisation strategy across our large addressable markets: cement and lime, the magnesia business of course, and iron and steel. As we go through the slides further down, Phil will bring everyone up to date on the progress we've achieved — the commercial progress we've achieved — on each of those projects. This strong cash runway really helps us deliver on that strategy. And finally, moving to the next slide from me, thanks, Simon.

Darren Charles

executive
#7

To reiterate, on this front — clearly, we did spend funds during the first half on restructuring the business. On capital spending, we're reporting $8.1 million of CapEx for the first half. Most of that represented our cash contribution toward the midstream project. From the standpoint of the heavy lifting and our capital contribution, that work is nearly finished. Only about AUD 2.5 million remains between now and completion of that plant, which we expect in the December quarter. As you know, we announced the restart just a few weeks back — last week, or the week before — and we gained from grant support provided by the WA government, which built on the original backing we received from the federal government. There's a modest amount of CapEx tied to some work at Leilac plus some production capacity expansion in our magnesia business. That again supports new contracts we've secured and will begin delivering on shortly — in fact, starting next week. Regarding capital and CapEx spending for the remainder of this calendar year, at least, apart from the two and a half and a small amount here and there, we are essentially done.

Darren Charles

executive
#8

Our cash runway is solid enough to carry out the strategy, and revenue is on the rise. Once more, the heavy lifting and hard work are behind us in what I'd call right-sizing the business around the particular opportunities we're chasing, which Phil will walk through over the next few slides. Phil, back to you.

Phil Hodgson

executive
#9

Great, thank you Darren. I’ll give a fast walk-through of the focus series — those focus projects we’re advancing — using the format we first brought in with the full-year results and then used again at the AGM. It takes each of the main projects we’re concentrating on and places it on what we refer to as the blue slide. Starting with the midstream demonstration plant: major development there, clearly, with the Western Australian government providing AUD 15 million of support for the project. More recently, as everyone knows, both boards approved restarting the project based on that extra backing from the Western Australian government. Support for this project is coming from both the federal and state governments. This grant means no further capital expenditure is needed this year. As Darren noted, capital expenditure of roughly two and a half will fall in the next financial year as the project progresses toward commissioning and startup, which is conservatively scheduled for the December quarter. It’s very pleasing to see this project back up and under construction once more. On the following slide, there are some good pictures showing what’s going on. You can see the large tube there, wrapped in our Calix logo, that was transported to site last year.

Phil Hodgson

executive
#10

As you’re able to observe, a number of the modules have been set out at the site and are prepared for this construction stage. It’s genuinely possible for the project to progress into construction fairly swiftly. As I said earlier, we’re conservatively aiming at the December quarter for commissioning. It’s very pleasing to see this project operating again. Moving to the following slide, regarding ZESTY, work on ZESTY has kept going. Our aim is to reach what is effectively a project start, and ARENA has supported us so far in completing the FEED study and all of the test work. We’ve kept carrying out some test work, and we’ve kept working on developing the project site and details of that kind. We keep advancing ZESTY. Clearly, the substantial effort involved in getting a 50,000 tonne per annum green line facility for this particular project up and running will need some extra capital. As we’ve said already, that capital is being pursued at the subsidiary level through either a financing or an equity-type arrangement. We keep working on that too, obviously. The capital raise we finished in November definitely provides us with ample runway to proceed with that strategy.

Phil Hodgson

executive
#11

Alright, let's walk through the various projects. Direct air capture with Heirloom is progressing nicely. The project you see here involves kicking off construction on the next Heirloom plant during this fiscal year. Interestingly, I believe within just the past 24 hours, a deal worth $500,000 per tonne of CO2 was struck between Heirloom and United Airlines. In the end, that CO2 could be turned into synthetic aviation fuels at Heirloom's direct air capture facility. I want to stress that the Heirloom projects — or should I say, projects — simply add revenue for us. We're compensated for engineering work, and royalties will come our way once the plants are built. No capital is needed from our side to keep advancing this particular opportunity. As noted previously, Heirloom is aiming for more than a billion tons of CO2 captured by the mid-2030s, and at a minimum of $2 or $3 per tonne in royalties, that's actually quite an attractive business. I've probably mentioned this many times — even if they achieve a hundredth of that, it remains a tremendous opportunity for this business. This fresh contract with United, which has only just come in, further confirms that direct air capture is regarded as highly important, including in the U.S.

Phil Hodgson

executive
#12

Actually, we'll spend a little time discussing the U.S., policy, and matters of that kind. I'm here partly to gather additional information too. In a few weeks I'll be able to speak more openly, but we certainly have some views at this point regarding where the U.S. is headed. Let's move quickly to the next slide, Project ZETA — this is our South Australian lime facility project, where the CO2 will be used together with energy from Vast Solar and hydrogen production from that facility by a company called Mabanaft to make an e-methanol. E-methanol is also an excellent precursor for synthetic aviation fuel. Advancing a CO2 use case, particularly here in Australia, is a quite exciting project. We're going through a pre-feed phase, and the goal is to finish that by the end of this calendar year. The project is progressing very nicely, and we're working well with both Vast and Mabanaft to keep that project moving forward. May I have the next one, please? Leilac-2 continues apace in Germany. I was in Germany just last week and visited Heidelberg. Site works have begun. There has been some clearing. There have been some utilities that have started to be moved.

Phil Hodgson

executive
#13

Seeing the Leilac-2 project enter that stage is really encouraging. Moving to the next slide, Leilac-3s. Naturally, this ties in somewhat with what I mentioned earlier regarding the U.S. and the developments taking place there. We're delighted to announce two studies—one for a full-scale cement facility and one for a large lime facility here in the U.S.—with backing from the Department of Energy. Teton Cement and Mississippi Lime Company, two projects there. Those specific grants remain subject to review by the new administration under the new president. Hopefully we'll see that review conclude successfully within the next month or two. Needless to say, a great deal has been up in the air with the new administration. One point we'll discuss concerning the U.S. is that there's considerable support for CO2 capture, aside from which the bipartisan backing from the Republican side, many of these projects located in Republican states generating jobs in Republican states, and CO2 being an important material, not only for fuels but also for enhanced oil recovery.

Phil Hodgson

executive
#14

This is one of the areas we believe carries the least risk from the recent administrative shifts, and from some of the color and movement, I suppose, that's been taking place on the policy side over here. Let's just advance to the following slide, if we may. Finally, magnesia, as Darren said, is growing quite well. That business keeps expanding at a healthy pace. We have a major contract in Australia with Unitywater, which is among the biggest users of MHL. That contract is now entering its operational phase. It would be great to see revenue beginning to be generated here in Australia. Naturally, the U.S. keeps growing well for us too. There are seasonal factors, naturally, that come into play in the US. We're certainly anticipating solid growth in the coming half year in revenues from the U.S. business as well. Everything is going very well in magnesium. Let's keep moving through — this slide summarizes everything I've just discussed in one place. I won't walk through it in any further detail, but this gives the overview of what we're focused on. Anything that isn't on here, we aren't focusing on.

Phil Hodgson

executive
#15

Our attention is squarely on getting these projects delivered. Only a handful of them call for capital. At some stage, the ZESTY project is going to require some capital. At some stage, we get into heavy lifting. A modest amount of capital will be needed for the Leilac-2 project. Beyond that, and on through 2026 to 2027, the ZETA project also has to be advanced. As for the rest, none. PLS, as Darren mentioned, is almost done. A further couple of million, perhaps $2.5 million, still has to go in there. On the Heirloom projects, everything is simply revenue accredited for us. A great deal is happening and a great deal is what we are striving to accomplish across Leilac, sustainable processing, and magnesia. Let's go to the following slide. The reason I am here is shown on the right-hand side. Decarb Connect takes place in Houston tomorrow and the day after. We are a finalist for the NextGen Awards here, and a finalist for that specific element of the technology I referenced at the very start of this presentation. I will say a little more on that soon. Naturally, at the previous AGM, I had only just returned from Baku with one COP29 award, the Net Zero Industry Award for the ZESTY technology. There you can see me alongside the ministers from Australia and from Finland.

Phil Hodgson

executive
#16

It was really great to receive that award as well. The recognition for the technology is genuinely beginning to put us on the international stage, and that's wonderful to see. Let's keep going. We'll continue onward beyond sustainability. Incidentally, every one of these slides can be accessed on the ASX platform. Do go in and read through them thoroughly when you get the chance. Regarding policy support, we've simply attempted to set out what backing remains available for decarbonisation and many of the objectives we're pursuing through our projects here. You can still observe Europe progressing with its EU ETS. In the USA, there's the 45Q tax credit system, which backs CCUS. That system was strengthened during the original Trump administration. We regard it as relatively low risk that the new administration here in the U.S. will affect it. Australia keeps advancing with the safeguard mechanism. Numerous initiatives were announced just recently, including the present activity, I suppose, surrounding the South Australian Whyalla Steelworks and the possibilities that could arise from it following the announcement of the fund regarding green iron here in Australia. China is pressing ahead with its emissions trading scheme for sectors such as cement and steel.

Phil Hodgson

executive
#17

What's interesting is that India, Japan, and Brazil are likewise pressing forward with approaches resembling emissions trading schemes for handling carbon. The global picture hasn't been completely reversed. Decarbonisation still has policy support and considerable stakeholder backing, and those efforts keep advancing. Our sense is that these policy tailwinds, I suppose, persist even though there's been something of a bit of a lull in investment and in the pace, I guess, of decarbonisation, owing to inflationary pressures along with policy and administrative shifts. The backbone remains in place. The regulatory backbone that drives these changes remains in place. All right. If we could go to the following slide. Earlier, at the top of the hour, I went through a new element of the technology we've created and announced at the AGM, namely the hybrid technology. Our goal there is to make it possible for an industrial process that can pull a lot of megawatts of power to be switched on and off rapidly. That's the box colored blue on the right side here. Grid stabilisation is a genuinely interesting advance for our technology and is distinctive to our technology. Large cement plants, large aluminum plants, large iron and steel facilities — being able to switch between electrons and standard fuels or waste fuels could truly be a very interesting and valuable feature of the technology.

Phil Hodgson

executive
#18

We're pushing that forward as fast as we possibly can. The remaining columns lay out a few of the other areas where we believe — setting decarbonisation aside — this is a seriously impressive piece of equipment. It's a genuinely excellent kiln. It handles fines. Thanks to the electrification approach we're developing, it allows energy to be used more efficiently. Less maintenance, reduced OpEx. In our view, it's simply a very good kiln. Even without any decarbonisation angle, we'll be strongly promoting what this technology offers and going after those opportunities. The CO2 and decarbonisation side is the bonus on top, whenever our customers need it. We're convinced there's a substantial business case here that goes well beyond decarbonisation alone. All right. Let's carry on. For a brief summary and outlook, as Darren set out, we're certainly very happy to see revenues rising across the half. That cost-based reduction is quite an achievement, I'd say. It lets us keep chasing every one of those projects I described, with a cost base trimmed by roughly AUD 6 million per annum going forward. As for the runway that gives us to keep pursuing those projects, as we said, it's a minimum of 18 months.

Phil Hodgson

executive
#19

On the balance sheet side, we have what’s needed to fund that runway. On commercialisation, as we said, we keep pressing hard to get the lithium plant running with PLS. That restart has been genuinely good news for us and for Pilbara Minerals. The iron and steel, cement, and lime projects I listed earlier keep advancing. We’re checking off those commercial milestones. We can finally discuss a couple of additional plays in cement and lime, Mississippi Lime and Teton Cement, and more will follow. Same goes for iron and steel. If we look at this half year, further revenue growth is clearly what we’re after. We expect those cost savings to kick in, giving us the runway to chase all those projects. Also the subsidiary capital strategies we’ve discussed many times. We negotiate from a position of strength. We’ll stay focused on those commercial milestones, turning opportunities across all these pipelines into more license arrangements. Plenty going on, as always, but I’ll stop there for questions. Back to you, Simon.

Moderator

operator
#20

Perfect, thank you Phil. Just a quick reminder that if you do want to ask something, there's a Q&A button at the bottom of your screen. Our first question: does the new German government show the same commitment to decarbonisation as the previous one did? And do you see any regulatory risk in Europe?

Phil Hodgson

executive
#21

Look, the new German government is something we’re still only beginning to understand. Germany and Europe have definitely kept moving forward and ratified the policy goals I described a few slides earlier. Nobody has walked away, or even spoken about walking away, from those commitments. Inflation, immigration and refugees were among the main issues on which the German administration was elected. I still believe there is a very powerful drive to carry out decarbonisation in Germany. It’s likely that coalitions will have to be formed — coalitions with parties that are especially strong in this area. There certainly isn’t some blank slate available for rewriting the rules regarding what the EU is attempting to achieve or what Germany is attempting to achieve on decarbonisation. That said, it’s early days, and this is just my first impression.

Moderator

operator
#22

Perfect, Phil, thank you. Moving to the next question. You mentioned an 18-month runway on cash as things stand. Would you call that a cautious estimate?

Phil Hodgson

executive
#23

Absolutely. That’s exactly right. We’re breaking right past them.

Moderator

operator
#24

How interested are they in investing at the subsidiary level? Is there any reassurance you can give us that those investments will eventually come to fruition?

Phil Hodgson

executive
#25

Yeah, there's been a lot of interest. As I think I've said before, the counterparties who usually put money into this area—and obviously Carbon Direct joined the Leilac Group in 2021. Those kinds of impact funds, or strategics too, companies, firms that operate in the industry and back potentially new technologies to help them along. Many of those funds hold plenty of cash, but they're parked on the sidelines waiting. They're waiting to find out, I suppose, which direction the new administration in the U.S. will take. They're waiting for interest rates to get under control. On both of those points, I think the U.S. administration probably won't prove as disruptive as people expect. On interest rates, we're beginning to see some relief come through in Australia, certainly, and globally too. Although it's been difficult across the last 12 to 18 months, in fact, if you look at investment going into decarbonisation or clean technologies, I believe 2024 was the weakest year since roughly 2020. In 2025, certainly, we're starting to see a bit more optimism enter the market.

Phil Hodgson

executive
#26

Should 2025 not turn out to be that year, then 2026 might be. We have the runway in place to ensure we are positioned to get funding for those projects. An 18-month runway is available to us for that purpose. Yes, confidence is still high—and definitely higher than in 2024, a year that was especially difficult.

Moderator

operator
#27

Right. You used to disclose how many opportunities were progressing through the Leilac pipeline. That figure hasn't shown up for more than 12 months now. In the past, it gave shareholders visibility into interest in the new technology. Where does that pipeline stand at present? Is there any reason it was dropped?

Phil Hodgson

executive
#28

Yes, absolutely. There was no other reason for taking it out besides folks commenting that there were simply too many slides up there—too many items being presented. As I see it, the pipeline is at roughly 82 projects. The Teton and Mississippi Lime are certainly the ones we're able to discuss, and they've now progressed into that pre-feed stage. Right, nothing else led to us removing that, other than wanting to squeeze everything into as simple a format as we could. Instead, we've discussed Leilac-2s and Leilac-3s within the blue slides. Let me add a few more remarks on that. Regarding the question, one point we raised when we last showed that slide was the wish to advance pipeline opportunities toward pre-feed, feed, and so on. That is genuinely what's taking place. Leilac's revenue growth, in the first half and in what we have line of sight to, stems from that effort of moving opportunities further down the pipeline. Leilac isn't just bringing in revenues from its transactions with Heirloom—we also have a couple of additional customers in the U.S.

Phil Hodgson

executive
#29

As we discussed, there are customers in the Middle East and Asia. Leilac is now bringing in revenue and is making significant progress toward a financially sustainable footing for growth, which makes it attractive from an investment standpoint. I think substantial effort is underway to push those opportunities through the pipeline, and that is showing up in the financial performance we're reporting as well. We can definitely bring the slide back if it's a crowd favourite. That's no problem for me. I enjoy showing that slide, but anyway.

Moderator

operator
#30

We'll come back to the scoreboard at a later point. Just one more question regarding ZESTY. The ARENA-backed FEED study was finished more than 18 months ago, and a number of players appear to be progressing and involved in the industry in evaluating the technology. Is there any update on that?

Phil Hodgson

executive
#31

Yes. What we’re really aiming for in this financial year is to reach that key financing decision so we can move ahead. A great deal of work is going on behind the scenes on that. Certainly, I’m looking forward to updating shareholders on how it’s progressing as and when I can. There are many sites under consideration, and discussions are taking place. Yes, it’s one of those areas I’m very excited about, Simon, and I do look forward to updating shareholders when I can. I suppose that’s about all I can say.

Moderator

operator
#32

That covers it nicely. One more question about Heidelberg. They are using a range of technologies. What is Heidelberg's ultimate strategy regarding carbon capture, and how does trialing these various technologies fit in? evoZero appears to be quite far along.

Phil Hodgson

executive
#33

Regarding evoZero — I should double-check that, because I hadn't even come across evoZero before. Actually, wait, no — I have. evoZero is simply the brand name attached to their cement. Right. So what's going on is that they're bringing their Norcem facility online in Norway. That involves 400,000 tons of CO2 separation, roughly equivalent to four Leilac-2s. It relies on amines. Around 80% of the funding has come from the Norwegian government. Something in the region of EUR 400 million, very, very roughly, for the plant alone. Extremely costly. Their claim will be that 40% of the clinker produced at that facility has, in effect, had its CO2 captured. It's essentially a net-zero proposition. 40% of output from that site will carry the evoZero name. That's a brand name for cement with low emissions. We've consistently noted that Heidelberg is placing bets across various technologies, so I wouldn't argue with them. One bet, that's what A represents. My sense is they're aware it will be extremely expensive. It's one of those cases where A has existed for 60 years, and their plant is only now coming online. As I said, the first full-scale cement plant employing it is just starting up in Norway.

Phil Hodgson

executive
#34

Seeing how that turns out will be quite fascinating. Cryocap is another technology on their radar. Sorry — Oxyfuel. With Oxyfuel, air gets split into oxygen and nitrogen, and only the oxygen is used. They've also done some initial work with plasma. Heidelberg is examining a handful of different technologies. I wouldn't pick a fight with them. Second, Leilac — why does Leilac belong in this mix? Because it could end up being the least expensive. No gas is being separated from another gas. No large chemical plant is involved. We form a key piece of Heidelberg's strategy. Naturally, we're also in discussions with lots of other cement and lime companies. As I said, 82 projects are in the pipeline. We could discuss Mississippi Lime. We could discuss Teton at this point. Nearly every cement company out there has multiple strategies. As I mentioned, most of them, I suppose, would be cement companies based outside China. Yes, we've definitely been in touch with practically all of them. So Leilac has strong name recognition and represents a highly workable option for those companies.

Moderator

operator
#35

Thanks, Phil. In what ways could we work together with cement producers in Australia?

Phil Hodgson

executive
#36

Yeah. We had an article come out in World Cement — I believe that was six months back — about the work we're doing with Boral. That specific piece focused on calcine clays, though our collaboration with Boral goes back a number of years now. The other cement company here, obviously, is Adbri, and we've worked with them as well. Both of those firms present opportunities for us here in Australia, obviously, and we keep working on them. I mean, in the grand scheme of things, I think Australia has three cement plants, versus 5,000 globally. Australia is certainly a good place to get projects up. We've got Project ZETA up, as I mentioned, in South Australia, and it's starting to move. Really, the biggest opportunities lie overseas. Most of our focus is around Europe and potential opportunities in the States. As I say, we have Project ZETA up and running here in Australia, so that's progressing nicely.

Moderator

operator
#37

Right, thanks, Phil. Just on Heidelberg in Germany — when do you actually break ground there?

Phil Hodgson

executive
#38

We’ve broken ground. Work at the site has begun. Utility lines are beginning to be moved to new routes. That work is underway at this moment.

Moderator

operator
#39

Great. Regarding the magnesium business, what's the outlook when it comes to new customers, and how much of the revenue will it account for over the next 12 to 18 months?

Phil Hodgson

executive
#40

Magnesium is going to remain our biggest revenue driver across the coming 12 to 18 months. Leilac, of course, is growing its engineering revenues at a healthy clip, but during the timeframe we're discussing, magnesium will still, I'd say, account for the majority. Yes, the growth prospects in the States remain pretty strong. Regarding the plants we built in Texas and Wisconsin, there are some really substantial opportunities we're pursuing there. Even in the regions where our other four manufacturing facilities sit, there are still huge opportunities. These aren't necessarily, I'd say, opportunities that involve taking business away from other magnesium hydroxide producers. They're what I call greenfield opportunities in caustic replacement. Yes, we typically view the U.S. market as roughly a $100 million market in size for magnesium hydroxide, and then likely multiples of that when it comes to caustic replacement. If you look at the size of our US business, it's around 13% or so of the current opportunity, and a considerably smaller percentage of the potential opportunity once you factor in caustic as well.

Phil Hodgson

executive
#41

There’s definitely a lot of upside in our US business.

Moderator

operator
#42

Great. One question that tends to come up often is about Cemex, which was announced to the market a couple of years back. As far as a license goes, is there any news, or where do things currently stand with Cemex?

Phil Hodgson

executive
#43

Yes. The situation with Cemex is in good shape. Cemex is involved in Leilac-2. Discussions with Cemex continue extensively. I'm eager to provide updates on when we could potentially finalize something with Cemex. Yeah, I suppose it's somewhat frustrating for everyone that Cemex chose to announce projects they were pursuing alongside us. You can be sure we're putting in serious effort to negotiate and secure a solid agreement, so that whenever Cemex signs a license agreement, the terms are favorable for Leilac. Considering the remaining pipeline, considering these other companies are now beginning to advance, Cemex isn't the only thing that matters. Maybe some of these other companies beginning to move will also prompt Cemex to speed up a little if they're after the best deal. In any case, we'll handle that one. We'll handle that one as we ought to, with commercial robustness.

Moderator

operator
#44

Thanks, Phil. Just a few last questions regarding the midstream project that goes into production next calendar year. Could you remind us what the revenue share is for the JV, and how is the marketing of the new product coming along through Pilbara?

Phil Hodgson

executive
#45

Yeah. Yeah. That's a good question. Calix has 45% of the revenue share and Pilbara Minerals has 55%. The product gets marketed via Pilbara Minerals and via their contacts over there. Just as the core technology, I suppose, gets marketed by us to other potential spodumene players. That's how we've sort of divided up the marketing activities. We're selling the tech. They're moving the phosphate sold. Pilbara handles that. Obviously, lithium markets remain somewhat depressed right now. What matters here is the chemical margin. What's achievable in terms of the lithium phosphate price versus the spodumene, I guess, sort of typical spodumene price. Chemical margins are a bit compressed at the moment, but if they come back to historical levels, then yeah, effectively, the plant does pretty well. We've got a bit of time, a bit of water to go under the bridge, and we'll see how the lithium market unfolds over the course of the next sort of nine months or so. It's going to be interesting to see how well this lithium phosphate salt does in the market.

Moderator

operator
#46

Okay, thank you, Phil. We have three last questions. First, I'd like to ask about how the Trump administration is affecting Calix and what it does in the U.S.

Phil Hodgson

executive
#47

Right. I believe I brought up those DOE grants that were secured and are clearly being reviewed at the moment. Our view is that this sits in a reasonably low-risk zone given where the administration's priorities lie. As I said, that applies to the projects and also to direct air capture at Heirloom. Support from both parties for projects of this kind has consistently been there. 45Q got strengthened during the first Trump administration. I'd say it falls into the lower-risk sorts of categories in terms of impact on what we're doing with Heirloom, and likewise regarding the DOE grants. Low to medium is how I'd characterize the chances they get affected, apart from the timing and the review process they're currently going through. As for our States-based decarbonisation business, that's very much toward the lower risk end of the curve. If our aim were securing large subsidies for hydrogen or similar things in the States, I'd put that considerably further up the risk curve. Much of the policy that has come through is withdrawing favorable loans from large renewables and big renewable infrastructure projects, which once again have no direct effect on us whatsoever.

Phil Hodgson

executive
#48

Tariffs are clearly another item on the Trump administration's agenda. Some of the raw materials we use for our operations in the U.S. do come from Canada. A Canadian tariff is something we're monitoring closely, and naturally we're coordinating very closely with our Canadian suppliers and their lobbyists. We also have lobbyists of our own, to ensure that these matters don't get caught up in some kind of blanket approach. Magnesium is a critical material—not only in ag and water treatment, but ultimately in defense and aerospace as well. Once again, we think that notwithstanding the bluster and the shifting tone of the figurehead, there are people within the bureaucracy who are very sensible and who handle these matters sensibly. Yes, it's a watch point, no question about it, but I don't see it as a high risk to our business and to what we're trying to achieve there.

Moderator

operator
#49

Thanks, Phil. I have two last questions. First, I recently purchased additional shares through the SPP, and I'm disappointed that the stock is now trading below that price. What is going on, and what steps are you taking about it?

Phil Hodgson

executive
#50

Look, I suppose every one of us finds this disappointing. That's undeniable. Every member of the board and all the directors got behind the SPP, and over many years each of us has purchased shares too. For us, the present share price is deeply frustrating. Although this isn't a matter we can sway directly, our view is that the smartest course is to keep our attention on what we are already doing — growing revenues, cutting costs, sharpening our focus, hitting the commercialisation milestones within our reach, and following the equity approaches we've described previously to draw equity into the subsidiaries so those specific projects there can go ahead. By doing that and delivering on it, I believe that gives the company the strongest chance of eventually being recognised, we hope, by the share market. Once more, clearly, macro forces are in play. Considerable sums left exchange-traded funds focused on ESG. Renewable funds have been battered by high interest rates. We've ended up in that same basket. Getting all of this done — accomplishing everything I listed — will matter enormously to us. You'd have noticed a slide in the deck covering the remaining elements of the value proposition for the tech.

Phil Hodgson

executive
#51

We unfurled a large spinnaker, so to speak, and rode the decarbonisation tailwinds wonderfully. Once people start to see those tailwinds as having eased, there are some other elements of the technology that we will now make certain folks grasp and appreciate — among them, not least, the chance that exists in areas like load balancing, where grid instability and similar problems can be addressed through large industrial sinks for electrons, for example cement plants along with iron and steel plants that rely on our technology. Truly drawing on those further elements of what the technology is worth is going to matter to us, Simon, and, I suppose, leave us better able to withstand sentiment surrounding decarbonisation.

Moderator

operator
#52

All right, that wraps up the question-and-answer portion. Phil, perhaps I should just pass it back to you for the closing remarks.

Phil Hodgson

executive
#53

Great, thank you so much, Simon. And once more, I appreciate everyone’s interest in Calix and your support. As I said at the start, the areas we’ll be concentrating on are growing our revenues, holding our costs down, and realizing the gains from the cost-reduction measures we’ve carried out, while pursuing our equity strategy. Now that we have the runway, we really need to make sure we secure the best deals to bring money in to pursue ZESTY, to pursue the Leilac business, and to really check off those commercial milestones, making sure that across each of those different lines of business, we’re demonstrating commercial progress despite the fact that decarbonisation may not be flavor of the month right now, but demonstrating commercial project despite that because of the other value proposition, I suppose the broader value proposition that the technology brings is going to matter to us. Those are the four things we’ll really be focusing on this year.

Moderator

operator
#54

Okay, thank you, Phil, and thank you, Darren, and I appreciate everyone joining us.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Calix Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Calix Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Calix Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.