executiveOkay, everyone, good morning, and thanks for joining the Calix FY '25 Results Webinar. I'm Christineh Grigorian, and I handle Investor Relations here at Calix. In a moment we'll be hearing from Phil Hodgson, Calix MD and CEO, along with Darren Charles, the Company CFO. Before we get started, though, a little housekeeping. <<operator_script>> this session is being recorded. So with that out of the way, let me turn things over to our presenters.
Philip Hodgson
executiveGreat. Thank you so much, Christine, and welcome everyone to the presentation of Calix's annual results for the financial year '25. Looking ahead, this pack is of course available on the ASX platform. So — it's — whenever we want to go back and check it, you can download it from the ASX platform. First of all, just an acknowledgment of country. We do acknowledge the First Nations people and the traditional custodians of the land on which we live and work, and recognize that deep and ongoing connection to the land and water and community, and pay our respect to elders and leaders past and present, and extend that respect to all First Nations people. Just in terms of a quick introduction to Calix, before we jump into the financials for those who are less familiar with us, it's technology, Australian homegrown technology. It's focusing on some very large industries in terms of decarbonization. And so cement and lime, iron and steel, critical minerals, including lithium, alumina, and even direct air capture, and also a growing revenue water business, which we'll talk about as well. Interestingly enough, about 12% of the company is owned by staff and management and directors. A lot of that's our own money, too.
Philip Hodgson
executiveWe have a team that is very deeply invested in this company's future. Now, turning to the core technology—we've made the diagram simpler here, so hopefully folks can take a look at the core technology and kind of get a handle on it. Essentially, we—it's a different method for heating things up, if you will, a new kind of <<inaudible>> furnace. We were the biggest steel tube—we've already reached a sort of scale for that as well. There's never a need for us to build a larger tube. Everything we do to scale from this point is to have multiple tubes. We heat that tube from the outside, using whatever energy you prefer; it could be burning waste, biomass, fossil fuels, or it can be renewable electrons. And whatever we're heating travels down the center of the tube. It's going to be a relatively small particle size. Picture dust still flowing, picture dropping that industrial clout on the floor and watching it drift down—that's all that happens inside our tube. We've got a red hot tube. The material simply floats down over 20 to 30 seconds, and the red hot walls of the tube radiate into the particles, and that's how we heat things up. Why do it that way?
Philip Hodgson
executiveWith limestone, close to 50% of its weight is CO2 locked inside the rock, and if we can heat it in this manner, the CO2 released from that rock is what cement and lime industry processes presently generate by heating that material. That CO2 isn't released into the air. It remains within the tube and comes out as a fairly pure stream. So that was the initial use case we began building carbon catcher for, essentially serving cement and lime producers. Naturally, though, additional businesses have started emerging for us too, sustainable processing, and among the largest opportunities there are some of the biggest industries globally. Iron and steel, alumina, plus a growing sector, clearly lithium, also a highly important industry. The final technology feature growing steadily more significant is this energy flexibility. I'll say a little more on that. Being able to switch between fossil fuels or waste and renewable electrons is increasingly part of the value proposition. As for the business itself, we've really devoted a fair amount of time to ensuring we stay focused, we have a simplified structure, and Darren will discuss how that simplification and focus affect the business's cost performance.
Philip Hodgson
executiveWe're concentrating really hard on 3 lines of business. One sits in the carbon capture space, handling everything related to limestone. The second is sustainable processing, which has to do with industrial processes, and iron and steel, alumina, and lithium are the 3 key examples there. Then finally, the Magnesia portion of our business, which centers on water. We did have some biotech that we were developing in that area. We've made the decision to put that on hold so that we can really focus on growing that water business in revenues and gross profit. So the key message is that we're simplifying our businesses. We're making sure we have the right size and cost to focus on our biggest opportunities, and those changes that we implemented during FY '25, Darren will cover in a bit more detail now. So without further ado, Darren, I'll hand over to you.
Darren Charles
executiveThank you so much, Phil — I appreciate the introduction. Let me move on to my next slide. First off, good morning to everyone, and many thanks for taking the time, of course, and for your interest in the company and in how things have gone over the last 12 months. As for the next few slides I'll be walking through, essentially there are 3 key messages we want to get across: continued strong revenue growth throughout the business; cost reduction that is tightly managed and focused; and extending our cash runway so we have the time to carry out the strategy for funding our projects and our subsidiaries at that project and subsidiary level. That's basically what we've been focused on over the course of the last 6 months, and it's really pleasing to see both that continued revenue growth, tight cost management and that extended runway. Now, in terms of — I'll jump in now and dig into each of those 3 elements in detail as I go through the next few slides. So, on overall revenue growth: our revenue came in at just a smidge under $34 million for the year, just complete, and we saw great contribution and strong growth right across Magnesia and Leilac and even a little bit of revenue within a sustainable processing line of business.
Darren Charles
executiveIt's genuinely encouraging to see solid revenue coming from every area. One more point I'd make: once you have a chance to review the financial reports we released this morning, the segment note lets you see revenue and costs broken out by line of business, covering both the year that just ended and a comparison year for FY '24. So going forward, we'll be able to show you more and more how each of our business lines is performing. We achieved that revenue growth at a healthy gross margin, and we're definitely very pleased with how our revenue is turning into an excellent gross profit result too. Now on revenue itself, I'll walk through it line by line and perhaps zero in on Magnesia, which makes up the biggest share of our revenue — contributing close to 85% of it. Once again, truly strong revenue growth. And as you can see, it's speeding up. I think coming out of '21 and '22, when we had some disruption from COVID and what we were able to do with our U.S.
Darren Charles
executiveOn the business side, it's genuinely encouraging to watch that sort of expansion begin to turn into meaningful, delivered outcomes — in the U.S. and in Australia too. We've noted that toward the latter part of FY '25, from an Australian standpoint, we locked in some fairly substantial contracts for the Magnesia business in Queensland. And we're quite pleased with how the Magnesia business has performed in building revenues, both across Australia and in the United States. In the U.S., as you know, over the past couple of years we've put money into broadening our footprint and our manufacturing or production capacity in Texas and in Wisconsin. And once again, the contribution from that investment toward growing U.S. revenues is beginning to show. So as for what lies ahead in FY '26, again, continued growth in revenue and gross profit. And we're currently expanding our production facility in the Calandria — a comparatively modest investment on our part. not big dollars by any means, somewhere in the hundreds of thousands, to boost the capacity of the Calaundra facility so we can serve those new contracts in Southeast Queensland.
Darren Charles
executiveSo Magnesia was a real revenue success story. Now I’d like to focus on what we’ve achieved regarding costs as well. And I want to spend a bit of time explaining this, because it may not be immediately apparent when you examine the costs in FY ’24 and compare them with the reported costs in FY ’25. We’ve cut our cost base substantially through actions we took toward the latter part of calendar year ’24, and that impact is now carrying through into ’25. So you can see there that our second half cost base of $17.1 million is 23% lower than it was in the first half of FY ’25. And again, that isn’t necessarily visible when you look at the full year figures. We’ve made some very difficult choices to streamline the organization, as Phil mentioned, around a focus on key markets. And the actions we’ve taken over the last 6 to 9 months have removed an accumulation of roughly $10 million in operating costs on an annualized basis from the business. And again, that won’t really become clear until you look at the FY ’26 first half and FY ’27 numbers.
Darren Charles
executiveWhat's evident in that second half of FY '25 is the shift, and as I mentioned, we will definitely be in a position to show those changes — decisions that were very hard and challenging, but ones we had to take so we'd have the chance to pursue our strategy of funding both the business and the technology development at the subsidiary level. Another thing I'd note on this slide is that I hope it's now fairly clear that the heavy capital investment cycle we went through across roughly the last 24 months is definitely wrapping up. CapEx investment will drop significantly over FY '26, assuming we finish those funding rounds at the subsidiary level, so we can start examining items like the ZESTY demonstration plant and the other projects Phil will discuss. But in terms of our head count level, our investment cycle is done, and there will also be a substantial cut in CapEx spend in FY '26. So that's my final slide before I hand things back to Phil. Once more, we have a business whose revenues are growing, growing strongly across Magnesia.
Darren Charles
executiveIt's keeping a close grip on expenses and making sure we have the proper focus and discipline in place to hit those key revenue targets and the key projects that will help reduce risk on our technology and let us serve customers in those really big addressable markets. Our cash runway has been extended, and we're carrying out our strategy to fund the business and those projects at the subsidiary level, and we've allowed ourselves the time to do that. Phil, I'll pass it back to you now to take us through the next few slides.
Philip Hodgson
executiveGreat, thank you so much, Darren. Let's continue moving ahead. And look, even with plenty of emphasis on expenses and revenue growth—which is terrific—this isn't solely about cost of revenue, since major commercial milestones were also reached in FY '25. We mentioned lithium as one of those business lines. Sure, we experienced a temporary halt on a lithium project we're working on with PLS around October last year, but we're happy to report that we could announce the restart of that project, backed by an extra $15 million in funding from the Western Australian government in February 2025. That project is still expected to finish construction in the December quarter of this year and is still within budget. So it isn't only the chance, I suppose, with full minerals in the lithium market here that's compelling. There are additional opportunities with other lithium companies kind of entering the sustainable processing pipeline, which are genuinely quite compelling. And that pipeline isn't merely about, I guess, having a conversation—that pipeline is about beginning and generating some revenues and sustaining growth in sustainable processing revenues from paid studies. So it's encouraging to watch lithium truly beginning to expand that way, not only with <<inaudible>> but with other opportunities that are beginning to surface.
Philip Hodgson
executiveIron and steel, clearly, in a balanced state afterward. We're really happy that we can announce the grant from ARENA. So that has been executed. It does call for match funding, which, obviously, we're going through the process right now of getting in place. But that was very pleasing to happen. There are a number of other proof points that have happened with ZESTY technology. There's -- we did a deep dive on ZESTY with the Super Power Institute and we published a report on the greenfield opportunity. Australia joined us on that deep dive, there are details in the appendix of this pack, if you want to go and take a look at that. But significant validation and significant due diligence to achieve their validations happened on ZESTY over the course of the financial year '25. And it was great to see that show up at last in the public recognition via this ARENA grant. I mentioned first revenues into sustainable processing. So hopefully sustainable processing can follow in Leilac's footsteps and start to build a nice pipeline there and a nice earning line with respect to paid studies and engineering work. Just in cement and lime as well. Obviously, the -- again, we were quite successful with some grant funding there back in July at the start of the FY '25 year, and that $15 million, some of that is coming into the company now.
Philip Hodgson
executiveMatch funding is going to be needed for the heavy liftings that begin on that specific project, and that will happen next year, toward the end of this financial year. But definitely, right now, we're carrying out some co-work with matched funding and continuing to develop that project beyond prefront engine design, which was largely about commercial milestones for last year. Also interesting, we've finished an upgrade of the Leilac-1 facility. The tube is electric-ready. So to show that hybrid operation, switching between different fuels, we've done some work at Leilac-1. And we've also carried out some test runs there with some -- with Heidelberg Cement on additional proof points for the technology, testing out the new tube, and those test runs went excellently. And with Leilac as well, paid studies and engineering work keeps growing in terms of the overall revenue number. So significant, I guess, commercial progress despite the fact that, obviously, there's a lot of focus around costs and priorities. But in these very large potential markets, some great progress is being made. So just in terms of what we're looking at. Obviously, Darren's covered revenue. We're happy to put a stamp on it and say we're going to target continued revenue growth.
Philip Hodgson
executiveEvery one of our business lines will contribute to that revenue. We expect a substantial cut in CapEx. We'll keep managing our costs very tightly on an ongoing basis, as always, and we'll pursue equity or funding into subsidiaries, much as we did with the <<inaudible>> Group and Carbon Direct in 2021. Our focus will remain on securing funding for the subsidiaries, whether through project financing or equity into a sub. The runway Darren mentioned is really about giving us ample opportunity to do that. So, regarding our specific projects, what are we aiming to accomplish? Obviously, we're aiming to complete construction of the midstream demonstration plant with PLS. We'll keep advancing and secure the financing, with the target of putting the filing together for the ZESTY demonstration plant so it matches that ARENA funding. Work on the project is progressing, but once we begin construction, the heavy lifting stage, we'll need to find that matching funding for ARENA. We'll keep pursuing permitting and funding for the Leilac-2 plant, and I'll say a bit about that in a moment.
Philip Hodgson
executiveAnd we've finished the front-end engineering and design work for Project ZETA, our lime project in South Australia. On this slide you can see the full slate of projects. Toward the back of the pack there are the blue slides, which essentially give a summary of each of our projects. On Leilac-2 permitting, we still don't have a clear line of sight yet. Unfortunately it's still moving month by month in Europe, where not much gets done. So there's a bit of a question mark over permitting and over when Leilac-2 permitting could allow the project to proceed. Site works have begun, but construction can't start until that permitting is clear. And obviously we're also seeking matched funding for Leilac-2 as part of the joint venture with Heidelberg Materials to build that facility. We also still lack a clear line of sight on the DOE funding. As you'll recall, the DOE grants we announced back in February — or late January, I think — were reassessed and are being reassessed by the Trump administration. We're not clear yet. They said end of summer. I think it's almost end of summer in the U.S.
Philip Hodgson
executiveWe still can't see those grants on the horizon. So there are a couple of small uncertainties there. Beyond that, though, the rest of our projects are still aiming at the schedules we last updated. Moving swiftly through topics like headwinds and tailwinds. Obviously, the clean tech sector has had a rough couple of years. There's plainly been something of a slowdown or a pause in how decarbonization is perceived. And that's mostly driven, I suppose, by sentiment regarding the U.S. and its administration. I'd like to note that Europe has kept doubling down and stepping up -- its acceleration targets. Places like Germany, for instance, with $5 billion, $10 billion of that fund earmarked for climate and economic transformation. They're bringing onshore CCUS to their parliament, which a few years back would have been unthinkable. So there's considerable progress in the U.S. that's genuinely a tailwind for us there. Even within the U.S. there's an enhanced 45Q in the big beautiful great bill that Trump introduced, there's an enhanced 45Q, meaning there's a stronger incentive when it comes to capturing CO2. And so even in the U.S., despite the general sentiment, there's still plenty of tailwind supporting CO2 capture in industrial processes such as cement and lime.
Philip Hodgson
executiveClearly, in Australia and Asia, the government staying in power has been quite favorable for keeping the programs announced before the current government term running without interruption. And finally, in Asia, China has broadened its ETS to cover heavy industries like steel and cement. And many other nations across the Asia-Pac region — India, Japan, Malaysia, Indonesia, Thailand, Vietnam — are putting regulatory frameworks in place. So the U.S.A. and all of that, it's 5% of steel and cement production. And the remainder of the world is definitely pressing forward with decarbonization. So there are certain headwinds, yet there are also fairly powerful tailwinds elsewhere in the world. So just to recap briefly before we take some questions. As we mentioned, the financial highlights, which Darren went through: revenues up, cost base down, cash runway extended. So 18 months cash runway, again declared. We're concentrating on lithium, iron and steel, cement and lime when it comes to our commercialization milestones, obviously expanding our revenues and gross profit in the magnesia lines of business, but some meaningful commercial milestones reached in spite of the emphasis on removing some costs from the business and those kinds of things. And so that shouldn't be dismissed lightly.
Philip Hodgson
executiveWe'll keep moving forward, reducing risk and bringing the technology to market with the team we have in place here, and it's a very focused group now around these themes. So just regarding the outlook for '26, we are calling further revenue growth in Magnesia, and we're confident about that. We're going to see the cost savings take effect. And those cost savings taking effect in line with the revenue growth that we're confident in calling out and the significantly reduced CapEx is what gives us confidence to give a 18-month runway forecast -- or not forecast our 8 month runway statement at this point in time. And regarding the focus on continuing to achieve those commercial milestones, especially Leilac and sustainable processing via paid studies. So those are the focus for FY '26. So I'll pause there, Christine, and happy to take some questions.
Christineh Grigorian
executive<<operator_script>> A few responses are beginning to come in. So I'll begin with what we have here in the queue. The first question asks whether you can discuss how the marketing effort for the lithium midstream product is progressing, and whether there's a possibility that it could generate revenue in the June 2026 quarter.
Philip Hodgson
executiveYes. There are probably a few questions in there, so I'll try to break them down. First, on marketing for the product—or, if you prefer, demand for it. I think when we initially announced a lithium phosphate product, which has been the product for the midstream project with PLS, not many people had heard of it. So lithium phosphate differs from lithium carbonate and lithium hydroxide. Those are sort of the 2 most common battery grade materials—or chemicals—that are being produced at the moment. With lithium phosphate, we felt it was an easier product to make at a mine site and concentrate up to lithium. That way you take costs out of the supply chain and leave the waste at the mine site. The other thing is that phosphate, or lithium ion phosphate, is 1 of the fastest-growing battery chemistries and still is in China. And so we felt the phosphate part of the lithium phosphate salt was a neat solution to that. We're only seeing growing interest in lithium phosphate specifically. Obviously, we can't discuss commercial conversations that are confidential right now, but we believe we've chosen the right product here.
Philip Hodgson
executiveIt's pretty straightforward to turn that into a mine — the process concentrates the lithium, and demand for it in the marketplace keeps growing. As for the project itself, you'll find the details in the blue slide pack stored in the appendices. Naturally, when it comes to kicking off the lithium facility with Pilbara, we'd want that to happen as soon as we possibly can. Market conditions will be the deciding factor, though — right now, lithium is showing something of a recovery. It's certainly not back to historical averages yet. And we sort of needed to be there to get that project started in <<inaudible>>. Obviously, we'll take a look at what we do regarding commissioning and testing. But for that project to start annually, lithium prices need to return to roughly their longer-term averages. So who knows? It might happen fast? It might happen a bit more slowly. We'll just have to wait and see how the market unfolds from here.
Christineh Grigorian
executiveAll right, moving on to the next question — Leilac's revenue came in weaker in the second half compared with the first half. Was that because less engineering work was needed during the June half?
Darren Charles
executivePhil, I can take that one. And yes — as we said in — well, let me start back at January. On the Leilac pipeline, we were in January feeling really good about how far we'd come with the pipeline and the opportunities we'd locked in. Leilac and its U.S. partners received 2 USD 1.5 million grants to move engineering and feasibility work forward on those U.S. projects. That would likely have added $2 million to $3 million of extra revenue for Leilac across the next 6 to 12 months, with some of it landing in the first half. And as Phil said, once the administration changed, the DOE obviously ran those projects through a review process, and that review is still going on. So we felt very good about Leilac's progress. We were very pleased to get that extra funding, or all of those extra grant awards, and then everything got paused. So I believe in May or June, since that pause had stretched to the 3 or 4 months we'd been told it would take, we made a decision — and as Phil said earlier, the latest word now is the end of summer.
Darren Charles
executiveWe made the call to basically go through the resourcing at Leilac and make additional adjustments to our cost base, so that the revenue Leilac was bringing in lines up more closely with the costs we're carrying there. So yes, on the second half, I think we had noted that some revenue we'd been hoping to lock in was essentially paused, and we acted on the cost side of the business. So regarding the first half versus second half split at Leilac, that decision by the Trump administration to pause those projects had a significant impact. But we've responded appropriately by managing and controlling costs tightly and directing Leilac's resourcing toward the paid studies they currently have in hand. So I think that hopefully answers your question, Christineh.
Christineh Grigorian
executiveThanks. Moving to the next question: could you give us additional detail on what's holding up permitting for the Leilac-2 plant? And is that now moving the critical path later?
Philip Hodgson
executiveYes. I wish that were possible. Naturally, these matters often end up taking more time than anyone hopes or expects. To be sure, in August there was minimal engagement with the authorities, since once Europe takes its summer break, it becomes very hard to keep pushing things ahead. So regrettably, we lack visibility on that at present. For this project, permitting sits on the critical path. The bulk of the work, clearly, will depend on a portion of funding, and our aim is to secure our funding and move it forward during this financial year — starting EPCM by the close of this financial year — yet right now, permitting remains the critical path. And so yes, we will keep the market updated whenever we can on that. The simple fact is that we have no visibility at present, and we believed it was necessary to inform the market that such visibility is absent.
Christineh Grigorian
executiveOkay, a few questions came in ahead of time, so I'll address those. Previously, you would provide a project pipeline. What's the reason it's no longer part of your disclosures? And what does it look like at present?
Philip Hodgson
executiveYeah, it wouldn't be all that different from the last time we laid it out. So we have 86 projects in the pipeline. I believe we had 82 at the last one — with that pipeline, in terms of the companies in there with specific projects we're working on, we're covering close to 45% of global cement and lime production. So I think it's more important to show progress down the pipeline, and that shows up through the paid study work. And so as the pipeline starts to move forward and we're able to talk about it, which we can, during the year with Mississippi Lime or MLC. And of course, with TTN as well, with the Rowan Oak Cement facility and other projects we're developing through there, obviously Heidelberg Materials, et cetera. Those particular aspects, I guess, in the pipeline are the more important ones now. So the pipeline has grown a little since last time. The key thing is how fast we move things down now. So that's what we'll be focusing on and talking about.
Christineh Grigorian
executiveAll right, turning to a related topic, could you give us an update on what you expect regarding patent and IP protection, along with the timing, for the primary product lines?
Philip Hodgson
executiveThat's a solid question. We — I don't have the exact dates at my fingertips for what's coming through and when. So at times it goes into an approval phase across various jurisdictions, and a patent family follows different timelines. So, for instance, pursuing a patent in China might take a different amount of time than pursuing one through the European Union and each of its member states, or in the States. And so the patent list, if you will, is — it's a fairly complex question to answer in a fairly short time. The key patent for the cement and lime industry, for example, the Leilac patent, and that patent has several layers to it as well. They've made their way through a lot of the major jurisdictions. ZESTY's a little younger, the iron and steel. And so it's entering its public phase right now. And so it's probably about 2 years behind the Leilac patent. So — and the core patent itself, which was first submitted in about 2006, updated again in 2016, and we've continued to update that patent. And so we continue to enrich and, I guess, with the latest advances in the technology, broaden the core patent as well.
Philip Hodgson
executiveThat's a pretty extensive question to attempt to address in such a brief window. Still, our patent is moving along well across the various jurisdictions.
Christineh Grigorian
executiveI have a few questions about Green iron. Regarding capital access from North Asian partners, would steelmakers that pair an equity placement with offtake be viewed favorably?
Philip Hodgson
executiveYes, absolutely. And I think you can find instances of certain players active in that area beyond Asia-Pac too. There are steel and iron ore businesses more widely that, you might say, run venture arms. So those kinds of strategic investors are appealing when it comes to moving forward, so to speak, an equity raise into a ZESTY special purpose vehicle. So absolutely, they're on the radar.
Christineh Grigorian
executiveRegarding a note on conversion from Australian Super, is a capital raise being contemplated for the green steel?
Philip Hodgson
executiveNot really. That's not a matter we've really talked about. Clearly, Australia Super ranks as our biggest investor. But honestly, the emphasis behind what we're doing with ZESTY mirrors Leilac — we've got a special purpose vehicle aiming to bring in capital from strategics along with impact funds. Impact funds, generally speaking, are those venture capital arms and earlier-stage investors that usually steer clear of the public markets. So the approach we took with Leilac is precisely the same one we're considering for ZESTY.
Christineh Grigorian
executiveCould a three-party joint venture — say, an Australian iron ore producer paired with a steelmaker from China or Korea — actually succeed?
Philip Hodgson
executiveYes, certainly. So when you examine a number of the subsidiary or capital projects that have been assembled successfully abroad, I’d say, those bring in iron companies, iron ore companies, steel companies, end-user customers, and supply chain participants. All of that is desirable, if you will — if your aim is to assemble a solid consortium to keep advancing technology. So yes, every bit of that is on the cards.
Christineh Grigorian
executiveSwitching over to lithium, there are a couple of questions on that front too. Beyond PLS ore, are you testing any other spodumene ores?
Philip Hodgson
executiveCorrect.
Christineh Grigorian
executiveThe spodumene ore sourced from Brazil and Canada is compatible.
Philip Hodgson
executiveGeography isn't really the deciding factor here. Geology is what matters — some ore types will break down very nicely for us. Other ores will tend to crush into bigger particle sizes during beneficiation, and there may be far fewer fines, or none at all, that suit our process. So if those specific ore bodies were to be processed, you'd have to consider some billing, so to speak, to make them a fit for our technology. It's driven much more by geology than by geography.
Christineh Grigorian
executiveAll right, and this one blends geology with geography a bit. Is it possible to use Chinese <<inaudible>> delight alongside this technology?
Philip Hodgson
executiveThat is a fair question. I’ll raise my hand on that one, so we have not yet run any tests on Chinese ores. And once more, geology and geography will both play a part there. So it remains to be determined.
Christineh Grigorian
executiveAnd finally, regarding the lithium series, what kind of international interest are you seeing for the midstream product? Scope 2 emissions and carbon border taxes are relevant here. In what way could this serve as a springboard for the company to bring in revenues via JVs or licenses?
Philip Hodgson
executiveYeah. So this is a bit of a — if I kind of go back to the earlier discussion, or the <<inaudible>> lithium phosphate that was sold. For sure, it's picking up plenty of traction and interest. And clearly, we would love to say more, but we simply can't at this stage. One of the areas drawing interest, aside from the utility, the phosphate power of the salt, is the fact that you're able to use renewable energy at a mine site. And believe it or not, renewable energy might be the cheapest energy form available at the mine site. Energy tends to be very expensive — to reach a mine site. Then you can make a lower-cost and, b, a lower-carbon product. And once you're able to make a lower-carbon product and it also carries lower carbon in the transport chain through to the chemical converter, then obviously, you've got a product that is, I guess, in terms of carbon footprint, lower, because one of the key threats here is that carbon carries a price. And you've already seen Europe begin to do this, looking at carbon border adjustment mechanisms to stop high-carbon products from being dumped where you've specified lower-carbon production processes.
Philip Hodgson
executiveAustralia was in fact discussing a carbon border adjustment mechanism. Once those take effect, products with lower carbon will naturally gain an edge. And another point concerns lithium sources: the 2 primary sources are hard rock, like spodumene, and salar brines, such as those from South America. Right now, salar brines carry a smaller carbon footprint than lithium derived from spodumene. That's due to the calculation step, or the heating step, that spodumene requires. So again, once you're able to shift that spodumene and conversion toward a renewable energy conversion, then you can flip the tables back on the salar brine when it comes to carbon footprint. So it's an important -- it's a very important step, if you like, for spodumene and those hard rock derived lithium sources to be able to consider lower carbon options if they're going to compete globally with these carbon border adjustment mechanisms.
Christineh Grigorian
executiveLet me pick up on that — thanks, Phil. You pointed out that grant money for ZESTY and ZETA depends on matching funds being obtained. Calix announced ZETA in July '24, yet twelve months on, that matched funding still hasn't been secured. For the FEED study you've placed among your FY '26 priorities, is this money required?
Philip Hodgson
executiveActually, that isn't required for the FEED study. What we have, so to speak, is in-kind support, and that is recognized. So the expense of our engineers and similar items—the work we're doing on these projects—is currently being matched through ZETA funding. As a result, we're improving revenue, in a manner of speaking, from some grant funding, and that depends on the stage milestones according to how that funding gets rolled out. The real effort comes when match funding is needed. So once we get beyond the feed, if we proceed past financial or final investment decision and move into construction and procurement, that is the point at which match funding is required. So we have plenty of time. That means we aren't sitting idle. Clearly, we're examining various options for funding how ZETA advances, including project financing, or through the Leilac Series B that we've discussed. But there's ample time for us to do that. And right now, we're benefiting from grant work coming in for our in-kind contribution so we can keep developing that project.
Christineh Grigorian
executiveAll right. Tied to that, given ZESTY is 3x the size of what they do, why should we have confidence that Calix can secure a substantial amount of funding over the next 12 months?
Philip Hodgson
executiveYeah, that's a fair question, since clearly the capital markets have been quite difficult over the past 2 years. Clean tech in particular has had a hard time — not just, obviously, in the public markets for companies like ours, but in the private space as well. Our firm belief is that this won't go on forever. There's a perception out there regarding how fast decarbonization is moving, especially with the new administration in the U.S., and we can understand that perception. But based on what we've observed, and what I've discussed about tailwinds emerging and continuing to gain strength in regions such as Europe and APAC, we believe the markets will swing back again. And we haven't been sitting idle while waiting — as we laid out in our commercial milestones during today's presentation, we've kept moving the projects and the technology forward. We've kept derisking the technology and hitting some commercial milestones and securing some pretty solid third-party verification of how the technology is advancing and its potential, particularly on its steel, particularly recently for that as well. So there are 2 things happening that sort of dictate the timing here. We need the markets to improve a bit.
Philip Hodgson
executiveSome green shoots are showing up for us. A few deals at an earlier stage are getting done in clean tech. At the same time, we aren't standing still. The derisking work and the commercial milestones we keep ticking off make those investments more appealing as we go. So we have intentionally set aside an 18-month runway for ourselves. Our view is that this is quite solid when it comes to opening up chances to bring funding in at the project and/or subsidiary level, and that is the company's core strategy.
Christineh Grigorian
executiveAnd on that point, regarding one of those most recent remarks about tax—could you clarify what definition you use for cash runway when you refer to runway?
Philip Hodgson
executiveYes — that one's best handled by Darren.
Darren Charles
executiveYes. I suppose when we talk about cash runway, what we mean is this: we currently have a certain level of working capital, revenues are increasing, costs are declining, and CapEx is also going down. And what that gives us is fairly clear visibility that we have enough time — the runway — to carry out the strategy Phil described, in terms of getting funding into the subsidiaries so those projects can move ahead. At the moment, we have a Magnesia business that is growing and successful and performing quite well, both when it comes to generating revenue and generating gross profit, and even in terms of earning its own way through its contribution. We hold a strong conviction that we have a highly compelling technology with Leilac, and it is very strongly competitively positioned. We also feel strongly that we have a highly competitive technology when it comes to iron and steel decarbonization. And clearly, we have also made solid progress with the midstream application of the technology, working in partnership with Pilbara. Now we believe it is worthwhile for us to keep investing in moving those technologies forward and to secure the funding needed to reach the next stage — from pilot to commercial demonstration to full commercialization of those technologies.
Darren Charles
executiveWe believe those technologies in those markets offer a compelling opportunity for our company. And for all of us as shareholders — as Phil mentioned, we are all shareholders in the business. Now we want to allow ourselves as much time as possible to essentially make those strategies, to bring those strategies to life. An alternative strategy, which is simply to run a very successful Magnesia business, just minimizes the company's upside. And so that is what we mean when we talk about runway — giving ourselves the chance to essentially take what we consider a very competitive technology in iron and steel decarbonization and a very compelling technology in cement and lime decarbonization, and turn it into significant value for our shareholders. So I think that is what we are referring to when we discuss runway. Each day, we examine our revenue and we examine our revenue growth, and each day, we examine our costs. And at the same time, we are continuing to make progress on a lot of those other strategies. And so the runway is simply giving us the time to carry out that strategy.
Christineh Grigorian
executiveThe following question is this: for quite some time now, we have kept hearing about efforts to raise funds at the sublevel, yet no real progress has materialized. Could you discuss the capital market dynamics that you are currently encountering?
Philip Hodgson
executiveYeah. I believe I addressed part of this earlier, Christineh. Just to keep it brief, the capital markets have been really difficult, particularly within cleantech — a lot of indices are flat versus '21, it has simply been a continuous slide, and the most recent financial year is likely the weakest for cleantech investment since 2020, roughly around then. So it is a hard market. There are some positive signals, though. I mentioned certain Series As and Bs we have started to see flowing into decarbonization technologies. That has happened just over the past few months, which is encouraging. That is a good indicator. And naturally, the second thing, as I said, is that another active area is our continued work to derisk the technology and push it forward commercially. Combining those two factors will only improve the odds that we make progress on that specific strategy. We are not standing idle or waiting around. Clearly, we are quite deeply involved in both of those particular opportunities, in Leilac and in ZESTY. So yes, it takes time. Nobody is claiming otherwise — it is definitely taking longer than anyone would have expected even 2 years or 18 months back, and deals are taking longer.
Philip Hodgson
executiveInvestors have grown far more selective, yet our view is that as we keep reducing risk and bring the technology to market, that will turn into a far stronger value proposition for those funds once the market shifts.
Christineh Grigorian
executiveAll right. The following question concerns <<inaudible>> — can we offer any perspective regarding the new administration, imagine U.S., and where things stand with Project Cypress? Has it been halted or paused? Or is funding still coming through?
Philip Hodgson
executiveYeah, that's essentially tied to the pause, so when we announced things regarding the DOE review that was underway, <<inaudible>> was definitely included in that. And so we're still waiting for the result of it. So that falls into the same bucket. It's all under examination there. So it's definitely a pause.
Christineh Grigorian
executiveAlright, here's another question about Australian Super and the microscope. <<inaudible>> in the graphite space, is it reasonable to expect comparable backing during tough market conditions as a fallback?
Philip Hodgson
executiveRegarding Australian Super and the moves they might make, Christine, I’m afraid I’ll have to leave that one for others to speculate about.
Christineh Grigorian
executiveCorrect. A question did come in. Would you mind giving more detail on the paid study, specifically regarding the point where it came up during the description of the feasibility projects with the cement and lime groups?
Darren Charles
executiveLet me address that, since it ties pretty directly to revenues. What we're really describing here, I think, is getting customers and prospects to fund the work we carry out on their behalf as we essentially build out projects. To put it another way: when a customer has an idea — say they want to explore an opportunity to decarbonize a specific cement operation or a steel operation — they'll come to us. As Phil said, we have a pipeline of engagement with these customers, and they'll ask us to perform some work for them. What we're making clear, I think, is that this is fine — but you need to pay us for that work. As I've said previously, our confidence keeps growing in the technology and in its capacity to operate — to deliver the lowest cost solutions in these areas, whether for decarbonization or electrification or the many other value propositions this technology offers. So in these engagements with our customers, we're taking the position: "That's fine. We're glad to do that work for you, but payment from you is required. You need to pay us for that work so the costs are covered."
Darren Charles
executiveBasically, that's the source of revenue for both Leilac and sustainable processing. Revenue comes from paid feasibility studies and paid testing work at <<inaudible>> too. Obviously, we have those testing facilities at Bakes, where a customer sends us a material and pays us to test it and write reports for them. That's basically what we're referring to when we talk about paid studies in sustainable process and in Leilac.
Christineh Grigorian
executiveOkay, so the next question is about the PLS project — commissioning is scheduled to start in December. With the modest rise in lithium prices we've seen lately, is that timeline still holding? And how much earnings upside does this project offer?
Philip Hodgson
executiveYes. So certainly, what we are observing is that completion of construction is still on schedule for the December quarter. And when it comes to commissioning and operation, that really hinges on lithium pricing. So it depends on what takes place in the market at the point we finish construction — which remains on time and on budget, as previously advised, for the December quarter — and it stays on hold until market conditions improve. Running the unit at a loss would be silly. And so it will effectively be go button-ready. So for when market conditions improve again. Now, as I mentioned earlier, that could happen quickly. It is a very volatile market, or it may take a little bit of time. But obviously, we want to get the project into go button ready. So that is the target.
Christineh Grigorian
executiveAll right. And the other half of what you asked was this: after the PLS JV is up and running, how would the revenue and cost model look from Calix's point of view?
Philip Hodgson
executiveYes. So Calix holds a 5% stake, right? As a member in a joint venture with PLS, which holds 55%. What that basically means is that 45% of the costs, of cash generated, and so on, falls to Calix. So it's a really straightforward revenue and cost model. Obviously, when it comes to operating the facility and matters of that kind, we've discussed previously the historical average spot — meaning the historical average lithium carbonate equivalent — and as a result, the historical average chemical margins, we would anticipate those to be the market conditions prior to running the plant in Ag — so yes, hopefully that addresses the question about the cost revenue model.
Darren Charles
executivePhil, let me just add a brief comment on that too. Clearly, this relates to how the midstream commercial demonstration plant is operated. More broadly, regarding our partnership with Pilbara Minerals as we transition past the commercial demonstration plant toward commercializing the technology, we don't intend to put money into a plant and run it ourselves. Our clear intention is to run a capital-light model throughout every one of our business lines. We put capital into the commercial demonstration plant simply to get it up and running. But the concept is that once the technology is proven at that scale, what Calix gets is a share of the royalties tied to licensing the technology and its utilization across the industry. So once more, the commercial demonstration is a significant milestone for us, yet the far bigger opportunity for Calix lies in licensing the technology to the industry to make low carbon products and not committing any further capital to that — to development in that application — but instead earning royalties later on from licenses connected with people, other Pilbara as well as other industry participants, gaining access to that technology. Naturally, that's the ultimate medium- to longer-term goal, and that's the model — a royalty — a light touch royalty stream sort of business model for us.
Christineh Grigorian
executiveAlright, thanks Darren. There are only a few remaining questions and, mindful of the clock, I’ll go through them. So regarding ZESTY, will you construct the demonstration plan at a site belonging to one of the major steel companies? If that isn’t the case, how will Calix ensure it is connected into the value chain for Australian steel production?
Philip Hodgson
executiveIt's kind of a Site A, Site B, Site C situation that we're moving through. Every one of those sites sits in Australia, and each considers a range of factors — things like renewable electron availability, hydrogen availability, land, utilities, and of course the iron ore and iron out. So all those elements, if you like, come into play regarding where a facility gets located. This is a demonstration facility. Obviously it would be great to watch it keep growing as others invest and want capacity in green generation. But this is the only planned heavy lifting portion of the CapEx piece, so from that point on it becomes a license model. What's interesting for us is seeing the SuperPower Institute's report on green steel potential for Australia and how they examine and analyze the different regions of Australia regarding where, if you like, a green oil industry would be located. It could be Queensland, Gladstone. There could be South Australia in the Gulf area, Pilbara — some fairly obvious choices there. Yes, one thing that was quite interesting to us is the fact that a flexible green iron production unit, particularly in terms of energy utilization, has the ability to suck electrons down when they're cheap and not suck them down when they're not.
Philip Hodgson
executiveSo being able to turn things on and off inside a few minutes is something they regard as a major plus. And where the plant sits, so that we can truly capitalize on that characteristic of our technology to make green iron at the lowest cost, is another element that factors into how we're thinking there. So a handful of different possibilities, or rather we'll be in every one of those possibilities in Australia — let me just make that clear. And there are a few fairly obvious locations we're examining, particularly when you take into account the SuperPower Institute report.
Christineh Grigorian
executiveRight. And there was another question along those lines. China leads when it comes to natural resources and is well placed for ZESTY technology — are you in talks with Chinese steelmakers?
Philip Hodgson
executiveYeah, that's an interesting one. China, of course — let's just put a rough figure on it and say about 50% of global steel output, clearly a hugely significant market for the ore producers we have here in Australia. And obviously, the other point is that China is expanding renewables and low-cost renewable supply. So China is one of those places with high potential for applications of ZESTY technology, and the other thing, of course, as I said earlier, is that the titer is bringing in an emissions trading scheme. But we don't go into China lightly. Obviously, many of the people we're working with here in Australia — some of the biggest iron ore producers in the world — have a great deal of experience in China. And so instead of simply heading into China on our own, a partnership-style approach is probably among the best ways to examine the Chinese opportunity.
Christineh Grigorian
executiveAlright, thanks, Phil. We have time for one more question, and this one is financial, Darren. You mention that lowering the operating cost base is among the levers for lengthening the cash runway. How should I think about the cost base for FY '26? Do I begin in the second half of '25 and subtract the annualized savings reached after the balance date? Will there be one-off — sorry, will FY '26 include one-off costs tied to these reductions?
Darren Charles
executiveYes, I'd say that's likely a reasonable place to begin. You can't simply take the second-half cost base and multiply it by two. As we mentioned, we essentially put additional changes in place after what we announced around May, June, and into early July. In terms of those changes in FY '26, there really aren't any material one-off costs coming through. So regarding what lies ahead, as I said, you take the second half, subtract certain of the adjustments made late in the year, and you arrive at roughly a current annualized cost base. That is basically our starting point for the year, and it lets us pursue the opportunities we discussed — both growing revenues within the Magnesia business and servicing those projects we're actively advancing, which we covered with our project timeline slides, and clearly the effort to move funding forward at the subsidiary level too.
Christineh Grigorian
executiveAll right. The latter portion of that question also concerned revenue growth, and you’ve just addressed that in relation to Magnesia — but if there’s anything more you’d like to add regarding current visibility on revenue growth, and whether you think product and services revenues are capable of increasing by an amount comparable to what occurred in FY '25.
Darren Charles
executiveYes. Again, we've made a point of avoiding anything like a forecast, but here's what I can say: parts of our business are expanding off a very small base, which makes projecting a growth rate somewhat difficult. In a similar vein, we've encountered situations such as the Biden administration's choice regarding grants and the Trump administration's move to halt those projects. Those are among the dynamics we're dealing with. That said, if you look at the Magnesia line of business, hopefully we've demonstrated a record of expanding it. We're quite happy with how that business is doing. A number of the projects we've mentioned in Australia really only appeared on our slate in the final quarter of last year — fewer projects, I'd say, but more customers, new customers and new contracts. So I believe that gives us considerable confidence regarding how the Magnesia business performs. As I said, what we're concentrating on at Leilac is basically ensuring our costs don't outrun our revenue and generate an opportunity.
Darren Charles
executiveThat's really the main thing we're concentrated on. There are opportunities sitting in the pipeline, and we're moving those forward. Paid studies are something we're actively working on at the moment. Still, a central priority at Leilac is ensuring our costs are right — properly sized to align with the revenue opportunity we're pursuing. So we're quite happy with how revenue is progressing, and as Phil mentioned, we're aiming for ongoing revenue growth along with continued growth in gross profit. That's our primary emphasis for the year, together with keeping a tight grip on our costs.
Christineh Grigorian
executivePerfect. That actually brings us to the end of the time allotted for questions, and we've reached the conclusion of the Q&A. So I'll turn things over to you, Phil, in case you'd like to offer any closing remarks.
Philip Hodgson
executiveThanks, Christineh. And thank you all very much for paying attention to our annual results presentation. The slide pack and so on are available on the ASX platform, and I'll just restate that our focus is on costs that are absolutely right-sized as we go forward. It's definitely about growing revenue, and as we look specifically at the Magnesia business, we're confident when we talk about growing revenues there and, obviously, about raising the paid study share of those revenues as far as sustainable processing and our Leilac business are concerned. Keeping that cash runway going from today for another 8 months matters as well, so we have the best chance of effecting the strategy regarding securing equity and/or project financing to move those particular projects ahead. So with all of that, and continuing to advance our technology with commercial milestones, it's going to be quite an exciting FY '26. Especially as, hopefully, fingers crossed, we begin to get a bit more realism about where tailwinds actually sit with respect to decarbonization and the opportunities that will bring. So I'm looking forward to FY '26. And thank you again very much for your attention.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Calix Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Calix Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Calix Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.