Capital Power Corporation (CPX) Earnings Call Transcript & Summary

July 30, 2025

Toronto Stock Exchange CA Utilities Independent Power and Renewable Electricity Producers earnings 70 min

Earnings Call Speaker Segments

Operator

operator
#1

Hello there, and thanks for being with us today. You're listening to Capital Power's analyst call for the second quarter of 2025. <<operator_script>> Kindly be aware that this call might be recorded. At this point I'll turn things over to your host, Roy Arthur, Vice President, Strategy Planning and Investor Relations. The floor is yours, sir.

Roy Arthur

executive
#2

Hello, everyone, and good morning. I’m Roy Arthur, Vice President, Strategy, Planning and Investor Relations. We appreciate you being here as we go over Capital Power’s second quarter 2025 results, which came out earlier today. The second quarter report and the presentation for this conference call can be found on our website. On today’s call, our President and CEO, Avik Dey, is going to give an update on the business. After that, Sandra Haskins, SVP, Finance and CFO, will take you through the quarter end and year-to-date financials for the company, as well as our revised guidance for 2025. Avik will then wrap up the formal part of the presentation before we open the floor to questions from analysts and our interactive Q&A. Before we begin, I want to remind everyone that certain statements about future events made on the call are forward-looking in nature and are based on certain assumptions and analysis made by the company. Actual results could differ materially from the company’s expectations due to material risks and uncertainties associated with our business. Please refer to the cautionary statement on forward-looking information on Slide 3 or our regulatory filings available on SEDAR Plus. In today’s discussion, we will be referring to various non-GAAP financial measures and ratios also noted on Slide 3.

Roy Arthur

executive
#3

The following metrics aren't defined under GAAP, nor do they carry standardized meanings that GAAP sets out, so they probably won't line up with similarly named metrics that other companies report. We offer these metrics as a supplement to the GAAP figures, which appear in the review of the company's financial results as management sees them. You can find reconciliations between these non-GAAP financial measures and the closest GAAP measures in our quarterly financial statements. We recognize that Capital Power's head office in Edmonton sits within the traditional and contemporary home of many indigenous peoples of the <<inaudible>> region and the <<inaudible>> Nation of Alberta Region for -- we recognize the diverse indigenous communities present in these areas, whose presence keeps enriching the community and our lives as we learn about the indigenous history of the land where we live and work. With that, I'll pass things over to Avik.

Avik Dey

executive
#4

Thanks, Roy. Good morning, all, and I appreciate you being with us today. During 2025's second quarter, we announced and completed the biggest acquisition in our history, which added 2.2 gigawatts of capacity. That deal forms part of a major reshaping of our company across the last 3 years, and we'll dig into that further as the presentation goes on. Notable Q2 2025 items include hitting commercial operation at our Goreway upgrade project, with the contract term extended through 2035; advancing growth projects amounting to roughly 610 megawatts of capacity; generating 9 terawatt hours of electricity from our well-positioned portfolio, including output from the PGM assets we just acquired. And finally, we kept up our strong operational performance by optimizing and maintaining our facilities, finishing 62% of the scheduled outage days planned for this year. That covers 18 planned turnarounds — 14 at our flexible generation assets and 4 across our renewable fleet. To sum up, we're still achieving concrete headway on our strategy. All of this depends on the huge efforts of our people, from our outstanding operational staff through our corporate services team and everyone in between. Capital Power genuinely stands as a leading North American independent power producer of scale.

Avik Dey

executive
#5

The transformation we've recently completed has produced a business that is more resilient, more diversified, and more oriented toward growth, and it rests on one of North America's most efficient gas fleets. That fleet, together with our capacity to run, grow, and optimize operations in a safe, efficient, and economical way, keeps us distinct from others in our peer group. Our operations now span 5 core markets, so the portfolio carries less exposure to volatility in any one market, which strengthens the steadiness of our cash flows and supports our investment-grade credit rating. Over the last 3 years, we have kept up our record of producing attractive risk-adjusted returns, and we are positioned better than ever to grow and to build long-term shareholder value. From 2022 through 2025, we achieved impressive growth in our U.S. flexible generation portfolio, which places us among the top 5 natural gas independent power producers in North America. We have grown our flexible generation asset base by roughly 5 gigawatts, and we now hold more than 10 gigawatts of flexible generation capacity across Canada and the U.S. That growth has come mostly through M&A and has been concentrated in core markets with strong fundamentals. We still see opportunities to buy generation capacity at a cost significantly below what new builds would require. Thanks to our considerable growth and our entry into new markets, total capacity now stands at 12 gigawatts, with no single market accounting for more than 30% of our portfolio.

Avik Dey

executive
#6

Fundamentals remain robust in every one of our core markets, as we see it. Demand growth has been running ahead of new supply additions, and that has pushed up capacity and energy prices in places like PJM and MISO, while in Ontario continued demand growth has led to more calls for power. Recontracting remains a top priority for our business across the portfolio. As we work to maximize the value of the existing generation, today's fundamentals give us confidence that we can recontract at compelling prices and for longer duration than we have seen in the past. We are in multiple negotiations to extend our current contracts, given the growing need for reliable and affordable power across North America. In PJM, where we have recently added 2.2 gigawatts of generation, there is strength in both capacity and energy pricing. Capacity payments typically represent about 1/3 of the total gross margin from our PJM business, with the remainder coming from energy sales. PJM is the most liquid power trading market globally, an important factor for maximizing value for an organization like ours. This liquidity means access to a broad, high-quality set of counterparties and enables us to transact across a wide range of durations in this rising price environment.

Avik Dey

executive
#7

After completing the acquisition, we have acted swiftly to put in place substantial hedges and other contracts that cover the rest of 2025 and beyond. Those deals were struck at price levels consistent with our business case, and we did so at a speed that would be far out of reach in Alberta. Looking at single-variable sensitivity to energy price shifts in our merchant markets makes the advantages of a diversified portfolio particularly evident. Take an illustration: with no hedging at all, a $5 per megawatt hour shift in PJM prices would produce a 4% to 5% change in full year adjusted EBITDA. By comparison, that same price move in Alberta would have a smaller effect of roughly 3% to 4% in the future. That marks a meaningful decline from roughly 7% to 8% in 2023. Our remaining merchant markets in the U.S. are smaller and add even less to overall volatility. As a result, even though the portfolio holds more merchant capacity, we anticipate less volatility in our cash flows. Steps are already underway, and we will keep taking them, to actively manage risk via hedging in both Alberta and PJM. Our Genesee repowering project stands as a great illustration of how our growth efforts have helped produce our superior portfolio positioning.

Avik Dey

executive
#8

Starting in 2023, pricing in the Alberta pool has fallen roughly 70%. Even with that drop, our clean spark spreads at Genesee 1 and 2 for 2025 year-to-date are up, thanks to better efficiency, reduced carbon intensity and hedging. The repowered units we operate are now Canada's most efficient. We have additionally brought their carbon intensity under the Alberta tier benchmark threshold, so at present these units incur no carbon tax. Lastly, we keep actively hedging power pricing along with input costs in order to stabilize returns. All told, thanks to our resilient asset base, Alberta stays a market in which we can capture returns over both the short and long term. That takes in data center opportunities. Genesee stands in a strong position to gain from any data center demand arriving in the province. Having said that, we still consider it 1 of the most compelling sites in North America for a gigawatt scale data center to be co-located. It provides a comprehensive solution that balances affordability and reliability concerns and lets a gigawatt scale data center proceed in a timely fashion, which matters greatly in today's market. Within ASO's large load interconnection process, a 1-gigawatt project cannot proceed under Phase I.

Avik Dey

executive
#9

Even so, we'll keep moving forward with the 1-gigawatt option via Phase II and additional talks with government. We also decided against a smaller project at Genesee. That said, we'll look for chances to supply PPAs to other DC projects needing a generation partner that has dispatchable power available today. The Genesee repowering effort, which shifted us off core, along with our accretive acquisitions, has strengthened how well our assets are positioned versus industry peers. Our fleet is younger and more efficient, a significant edge in merchant markets, where greater efficiency means better returns through the cycle. Also, because our assets are younger, they have a longer remaining useful life, boosting our ability to compete for long-term contracting opportunities. Such contracts are essential for achieving both better returns and more stable cash flows. With that, I'll pass it to Sandra to cover our funding considerations and financial results before I wrap up the call and take questions.

Sandra Haskins

executive
#10

Thank you, Avik. Our expansion is something we take pride in, along with the way we've financed it. We've taken a balanced approach, grounded in our capacity to tap several sources of inexpensive capital. Most recently, we were pleased to complete our first U.S. debt issuance, made possible by securing a third investment grade credit rating — BBB- — from Fitch. That $1.2 billion private offering drew multiple times the subscription demand across both the 3-year and 10-year tranches. Our debt maturity schedule remains nicely staggered, which lowers refinancing risk in any single year. On the equity side, we've had considerable success raising discrete common equity. Being able to pay sustainable, growing dividends while keeping our capital structure low-risk and putting money into high-quality growth distinguishes us from our IPP peers. Looking back at what we've recently accomplished, we're proud to have finished our biggest growth project and brought it into commercial operation, completed the largest acquisition in our company's history, and entered a new U.S. market — and to have raised our dividend by 6%, all while staying inside our guardrails on payout and leverage. These accomplishments highlight how strongly positioned we are for continued growth. Let's now turn to our Q2 2025 results. Capital Power turned in strong financial and operational performance.

Sandra Haskins

executive
#11

Adjusted EBITDA came in at $322 million, essentially unchanged from a year earlier. The diversification of our U.S. flexible generation contributions drove that result, though it was offset by the sell-down of PDN and quality wind in Q4 2024, and by lower renewable resource in 2025 reaching $235 million — a $57 million increase over Q2 2024, driven by lower income tax, reduced sustaining capital and settlement of coal compensation. Those gains were partly offset by higher financing costs stemming from recent debt issuances and by lower joint venture contributions. All in all, the quarter shows how we execute on our strategic priorities and made macroeconomic uncertainty. This slide lays out the adjusted EBITDA variance across our 4 new reporting segments. U.S. flexible generation rose 10% in Q2 2025, driven by partial contributions from PGM assets and strong dispatch performance. Canadian flexible generation gained 2%, supported by strong Alberta dispatch and lower emissions costs. Repowered Genesee units, which incurred minimal carbon tax, enabled margin expansion despite a $5 per megawatt hour drop in captured price. And lastly, our renewables portfolio keeps contributing meaningfully, so adjusted EBITDA declined year-over-year due to lower wind resource in Canada and the U.S. For comparability purposes with prior periods, the values in this table are fully consolidated.

Sandra Haskins

executive
#12

During the first six months of 2025, adjusted EBITDA came in at $689 million, which is $77 million higher than what we saw in the corresponding stretch of 2024. The main factors behind that included bigger contributions from our U.S. flexible generation portfolio, which reflected a full period of results from La Paloma Hakala, that closed in February 2024, along with the addition of Hummel Station and Rolling Hills, both of which closed in June 2025. We also saw lower emissions costs from our Canadian flexible generation portfolio, thanks to the Genesee repowering, plus reduced corporate expenses, largely from lower salary costs. AFFO reached $454 million, an increase of $126 million compared with a year earlier, and that was driven by the same items we mentioned in the Q2 variance. Most notably, tax recovery, lower sustaining capital and the coal compensation settlement, partly offset by higher financing costs. Because Hummel and Rolling Hills have now joined our portfolio, we have updated our guidance for the full year 2025. The revised adjusted EBITDA range is now expected to land between $1.5 billion and $1.65 billion, and that reflects close to 7 months of contributions from the newly acquired PGM assets. That range remains supported by our solid long-term contracts and careful risk management work across our uncontracted assets. For AFFO, the revised range is anticipated to fall between $950 million and $1.1 billion, which is a meaningful increase over the original guidance, thanks to the favorable tax impacts and the assets we recently acquired.

Sandra Haskins

executive
#13

We now expect sustaining capital to land somewhere from $215 million to $245 million, and that covers more than 40 outages we have planned. These adjustments strengthen how confident we are in the strategy and in our capacity to produce solid financial results. So with that, I'll pass it back to Avik to wrap up the call.

Avik Dey

executive
#14

Thanks, Sandra. So to sum things up, the way we've reshaped this company has given us a platform that's more resilient, more diversified, and built for growth, and it includes one of North America's most efficient natural gas fleets. What sets us apart from others in the sector is how safely, efficiently, and economically we run our operations. Looking ahead, there are numerous paths to success for us, in terms of both organic and inorganic growth. Ours is a young, efficient fleet, placed deliberately in markets with solid fundamentals. Our track record of delivery rests on disciplined capital allocation and a strong balance sheet, and that has produced compelling 10-year total shareholder returns of roughly 15% per year. As a leading independent power producer in North America, we're positioned to capture value in markets that are growing. We're excited about what lies ahead and the opportunities we see emerging in this sector. Before we begin Q&A, I'm happy to share that our 2025 Investor Day event will take place on December 9&10 in Toronto. More details will follow in due course. Capital Power's leadership team is eager to engage with our investors at that event. Thank you for your continued support of our business. I'll now pass it to the operator to begin Q&A.

Avik Dey

executive
#15

I appreciate it.

Operator

operator
#16

<<operator_script>> The first question we have is from Robert Hope at Scotiabank.

Robert Hope

analyst
#17

On the Genesee side, with respect to the data center remarks, they aren't going after a smaller opportunity in that area. Can you monetize the allocation you have there? And within that, is it possible to structure something contingent so that it gets folded into some form of PPA alongside the eventual buildout at that site? Then, second, how should we be thinking about the timing for Phase II there?

Avik Dey

executive
#18

I'll begin by noting that our Alberta operations are Genesee, and Genesee is Capital Power. If I had to describe our Alberta business, I'd point to two things: it's resilient, and it's positioned for growth when growth arrives in Alberta. The slide demonstrated our capacity to take advantage of lower prices while growing spark spread. That matters for this data center discussion because we began this data center journey 2 years ago in the U.S. We've been very fortunate to learn from our partners among data center providers and hyperscalers about what it takes to build hyper data centers. So with that as a preamble, we have tremendous flexibility at the Genesee site. As a leading generator in Alberta, providing power is our core business. With this Phase I, we do expect to monetize our capacity by supplying power to other data center projects, since that's our role in the province, and in doing so actually preserve optionality on our site. Our physical site at Genesee is extraordinarily advantaged for a large hyper data center. We decided not to deploy that 375 megawatts on a smaller data center project, because our site offers the advantage of redundant fiber access, which is critical for a large data center.

Avik Dey

executive
#19

Our site can tap into transmission and distribution infrastructure without needing any bulk system upgrades, which brings down electricity costs for Albertans. So keeping that optionality in place mattered. But let's be clear—we're going to participate, since we're a preeminent generator in this province. And when it comes to those data center projects that need generation partners via PPAs, we'll likely be involved. Hopefully that covers the question. Still, this is a significant positioning point for us, because from our perspective data centers represent a new customer for our generation capacity on both sides of the border. In Alberta it's distinctive, given that we happen to hold a very unique physical site.

Robert Hope

analyst
#20

Okay, thanks for that. Let me shift topics a bit. With everything happening inside the company right now — the PJM integration plus the data centers — when it comes to additional M&A, do you feel you've got sufficient capacity to concentrate on doing deals in the near term? And how would you describe that market at the moment?

Avik Dey

executive
#21

Is that only within PJM, or does it extend more widely?

Robert Hope

analyst
#22

On a broader level,

Avik Dey

executive
#23

Look, I believe we've got a 15-year record of buying plants, bringing them into the fold, getting them running better, and identifying uprates and expansions. That hasn't changed. As far as this expansion journey goes, we flagged it as an opportunity back at our January 2024 Investor Day, and we've delivered on it. I told our team this week that in my career, as someone who's been a serial acquirer and investor in assets and companies, I've never been part of a deal where we announced the financing, closed the transaction of this size, all within the same quarter. So our capacity to execute, I think, is well proven. On the forward opportunity side, we keep seeing inbounds, both bilateral and auctions. And I think what really sets us apart is our capacity to execute and to operate efficiently and safely, because two things underpin the opportunity to acquire assets today. The gap between what it costs to purchase these assets and what new entry costs continues to widen. But to capture that value, you have to be able to come in, take ownership of these assets, and steward operational efficiencies, upgrades, expansions and recontracting, and the broader universe of investors currently does not.

Avik Dey

executive
#24

That isn't to claim they couldn't construct it, but at present they lack comparable capability and capacity—meaning, the personnel needed to carry out that work. So we're feeling quite good about the acquisition pipeline, the expansion pipeline, and the recontracting pipeline. Every one of those keeps becoming more favorable for us as a company.

Operator

operator
#25

The next question comes from Julien Dumoulin-Smith at Jefferies.

Tanner James

analyst
#26

Tanner here, filling in for Julian. Thanks for the comments on the recontracting opportunity. I just want to follow up on that. With the recent inflationary readings on electricity prices, has the tone of discussions with current customers changed at all? Last quarter, Avik, you noted that you're constantly weighing options and that if commercial terms can't be agreed, you might consider expansion or colocation. Has that thinking developed further?

Avik Dey

executive
#27

The only way it has changed is that we're seeing greater appetite for recontracting, and more counterparties are engaging with us across our various facilities. What's different in the context, though, is that our conversations can now be more comprehensive about what a recontracting might involve — whether that's term, whether that's pricing, whether that's how we discuss additional partnerships with prospective offtakers. And how do we turn those conversations into wider discussions, whether through expansions or upgrade projects. So I'd say the tailwinds of rising demand, declining reliability, and the significance of tackling near-term grid firming needs are creating a broader set of opportunities for recontracting. All of that depends on utilities and their IRPs and, most importantly, on our having strong working relationships with those utilities and load-serving entities, but the opportunity set has us excited. We can't announce anything at this moment, but I'd say matters are advancing and we continue — we're holding more conversations, and they're heading in a positive direction.

Tanner James

analyst
#28

Thanks. Moving on to a different topic. Regarding the PJM acquisition — since the PJM assets are now part of the portfolio and you've gotten a closer look at them, might there be additional chances for upside beyond the accretion numbers you gave at the outset? Maybe in particular, considering how old Rolling Hills is and how it's put together, could there be an opportunity for some kind of optimization or enhancement compared with what you originally expected?

Sandra Haskins

executive
#29

Yes. Thanks for that question, Tanner. Yes, what we're observing at present is that after owning these assets for a little more than 6 weeks, their performance matches the business case. But, as we mentioned when the acquisition happened, we do see room for us to optimize and enhance them, and after that to carry out upgrades at the site too. So although nothing there is planned for the near term, we do expect those assets to present the same kinds of opportunities we saw with other acquisitions, where we could simply identify some improvements and boost the accretion on them. And when we consider capital allocation for operating expansions and so forth, as we head into 2026, and integration with these assets keeps going extremely well, the current development projects — now that repowering is complete, Halkir2 and our solar projects in Ontario operate — mean we're entering 2026 expecting to have more than $1 billion of discretionary cash flow that we can deploy toward upgrades, acquisitions, and expansion. So with that, and by leveraging it up, we're able to pursue $2 billion in growth opportunities next year.

Sandra Haskins

executive
#30

We can do that even without tapping the equity market. So over the coming 18 months, you should expect plenty of opportunity for us to announce growth initiatives that are highly accretive.

Operator

operator
#31

We'll take our next question from Mark Jarvi, who is on the line from CIBC.

Mark Jarvi

analyst
#32

To circle back to the comments and Rob's question about Genesee and the path ahead. The choice not to accept the Phase I allocation — was that simply because you felt you couldn't secure sufficient capacity at the start to satisfy customer demand? Or was it on the customer side, where you said you feel you're gaining traction and decided to pass on the opportunity for now, at least as far as taking that allocation goes?

Avik Dey

executive
#33

Thanks, Mark. Both our partner and we couldn't find a way to lock in the 1,000 megawatts under Phase I, which was needed for the project to proceed. So, as I mentioned, we'll keep pushing for it and chasing it alongside our partner in Phase II and beyond. That's the reason we chose the route we took.

Mark Jarvi

analyst
#34

On the point about supplying power to other data center operators, how do you weigh locking in some offtake against preserving the flexibility for a larger gigawatt-scale opportunity at Genesee?

Avik Dey

executive
#35

Thanks for that. The AESO counted 1,200 megawatts as available for generation serving large loads beginning in 2027. Capacity we already have installed at Genesee above the 466 MSCC limit isn't part of that figure. So this returns to the earlier point I raised about resilience and our position for growth in Alberta. As a large generator running the biggest and most efficient power plant in Alberta, we're right in the middle of supplying critical baseload power, and we have the flexibility to contract that capacity. In our view, considering where we stand on T&D and the reality that co-locating a data center at our site doesn't demand significant T&D investment, we believe we hold substantial flexibility — not only to offer PPAs to others over the short to medium term, but also to advance the larger project at our site together with a partner. The key point through all of this: it isn't really about the data center. It's about delivering power generation to customers. That has been our core competency for 15 years across every market where we operate, and predominantly in our home market, Alberta.

Avik Dey

executive
#36

For us, that was the thinking behind choosing whether to elect, to go after additional megawatts, and the choice we ultimately reached, which is that we can offer a PPA and take part in Phase I simply as a straightforward power provider, requiring no capital from us, only monetizing megawatts while we keep working with government and chasing what we believe would be a transformative project, not only for Alberta but for the country.

Mark Jarvi

analyst
#37

Looking only at the Phase I allocations, with your decision not to proceed at this moment and perhaps a somewhat longer timeline at Genesee, how confident are you that data centers in Alberta will actually absorb that 1,200 megawatts of excess generation by the 2829 timeframe?

Avik Dey

executive
#38

I can't speak to what other companies are up to. My sense is that we've been working alongside quite a few commercial organizations, and we're confident that others will be able to carry out some smaller projects — which we welcome, and we see as great news for the province and for the industry. And look, any new demand that arrives, any new industry that comes in, creating jobs and bringing capital into Alberta, is a positive for the Alberta power industry. And with Genesee in particular, it's positive for consumers when it comes to electricity pricing, which is where we're focused. So I think projects will get done. We'll see how that lands relative to the 1,200. But our business in Alberta is resilient, and I'll return to the point that 60% of our business is concentrated in thriving and growing U.S. markets. So as we showed in 2025, our business — we grew our spark spread even with the 70% drop in price in 2025. And why that matters is it puts us in a strong position to provide offtakes to new customers here in this province.

Mark Jarvi

analyst
#39

Turning now to the U.S. business, you mentioned opportunities to recontract. We are likewise observing that on the gas supply side, certain producers and infrastructure companies are getting more engaged when it comes to power. How do you see that playing out for gas supply and spark spread realization — are you taking a longer-term view, where if you secure the power supply, you would essentially pair it with gas supply, and is that under active discussion?

Avik Dey

executive
#40

There is definitely ongoing, active dialogue throughout the whole chain — gas to molecule to computed megabyte. We're a strong proponent of that, since, as we put it in January 2024, everything comes down to balanced energy solutions and the way you unite that value chain. Specifically, I'd point to gas supply midstream contracts and to shoring up the infrastructure needed to deliver gas generation capacity. That leans more toward IRP requests or new generation capacity. We aren't seeing it matter as much when it comes to upgrades and expansions. So when you look at our business, which mainly centers on buying mid-merit CCGTs and peakers and on finding ways to run, expand, and recontract those — the gas supply, for the most part, because our strategy over 15 years has historically been to go where there's firm gas supply, to go where there's existing T&D — it's less of a worry at the plants we're targeting. Still, I believe it will be an essential piece of the wider ecosystem as that ecosystem grows. Midstreamers will need a seat at the table for new build, upstream companies will need a seat at the table as we keep examining new builds, and utilities are weighing that at this moment.

Avik Dey

executive
#41

They're reviewing their IRPs and working to solidify infrastructure expansion across the coming ten years. This is a pivotal moment—that's the kind of dialogue taking place among load-serving entities and RTOs at present.

Operator

operator
#42

We'll take our next question from Maurice Choy at RBC Capital Markets.

Maurice Choy

analyst
#43

I'd like to return to the Alberta data center topic for a moment. It's obvious that Phase II matters a great deal to you and to your stock, and you've written about that before. There were aspects of Phase I that were suboptimal. As you look at Phase II, what specifically do you believe has to change for your gigawatt scale data center opportunities to actually materialize?

Avik Dey

executive
#44

Maurice, I appreciate the question. In my view, Phase II will hinge on two factors. First, the amount of capacity still left over from Phase I that gets addressed during Phase II, since Phase II will essentially center on the glide path toward installed capacity. In Phase I, data centers and their providers must place a deposit in order to carry out projects, yet the real long-term prize is figuring out how to build an ecosystem that permits new generation to be constructed and large-scale data centers to be set up and built within the province. The reason we concentrate so heavily on our site as a hyper data center is that, from the customer's perspective, every ingredient is already in place; ultimately, this opportunity exists only because it makes economic sense, with market access available in a timely manner. We cannot build such a business unless we establish the economic conditions that let those customers come in at scale and for a duration suited to an investment running into the tens of billions of dollars. So we will take an active part in Phase I; the government and the AESO have made clear that, in their allocation process, they believed smaller allocations were the preferable approach, and we back that.

Avik Dey

executive
#45

Through the participation we're aiming for, we won't ease up on pushing for that 1,000-megawatt site. So be it Phase II or be it additional talks and dialogue aimed at finding a route for that 1,000-megawatt site, we'll keep going down that road. And I think it also matters to acknowledge that we aren't a data center provider. We're not in the data center business. What we're attempting to do — what we're attempting to do is solidify bringing new demand into the Alberta market, whether that's at our site or at somebody else's; we believe these large sites serve the best interest of every market participant.

Maurice Choy

analyst
#46

Perhaps a brief follow-up on that point. I understand the system operator will start its work on a long-term framework, possibly later this year. Given that schedule, would it be fair to say that any gigawatt-scale DC announcement from you might be more of a mid-2026 <<inaudible>> event?

Avik Dey

executive
#47

Okay, so Maurice, I see a couple of distinct pieces here. And I've made this point publicly, at conferences, and in many investor meetings: what Alberta offers right now is a route to a big data center that could be operational by 2028. Over the past 2 years, as this business has matured quickly, we've been very lucky to have deep conversations with quite a few hyperscalers and data center providers. And one thing has become obvious to us — the market isn't paying attention to in-service dates in 2029, 2030, or 2031. When it comes to AI-related compute, hyperscalers and data center providers are directing all their focus toward 2027, 2028, and possibly the first half of 2029. That's the reason preserving the option value and keeping up this advocacy matters to us, since we have a 12 gigawatt fleet throughout North America. We're watching this unfold in various markets. And our view is that the best move for us is to keep advocating for a fast in-service date, because at Genesee we have the ingredients to make that case. That said, I'd return to the question of materiality for our business: Alberta is resilient and positioned for this growth, whether the data center is ours or somebody else's.

Maurice Choy

analyst
#48

Got it. Perhaps just to wrap things up with a strategy question. During your prepared remarks, you said you still see chances to buy generation capacity at a cost much lower than building new. There obviously are additional PGM assets available in the market right now. So I'd just like your perspective on what the gating factors are when you evaluate those opportunities. For instance, how large do you expect PJM to be as a share of your portfolio? Or do you first need to see the Hummel and Rolling Hills thesis play out before you proceed further?

Avik Dey

executive
#49

As I've mentioned previously, our approach to allocating capital—we've been quite explicit about the way we deploy capital and what return thresholds we require, and that is what primarily determines where our capital goes. We identified the strategic opportunity in PGM due to the market's structure, its size, the complexity of its jurisdictions, and the tailwinds from several avenues to succeed when it comes to rising demand. That has obviously unfolded as expected, and we've been lucky in our capacity to negotiate and complete a sizable bilateral deal in that market. We still see opportunities for growth there. However, I wouldn't characterize us as saying PJM is going to be 4 gig or 5 gig. What we're saying is let's go locate those opportunities involving high-quality assets—young CCGTs with a strong heat rate, or peaker sites offering considerable optionality where existing gas supply access to T&D exists and there's a chance for us to wholesale. That's the kind of thing we seek. So as we've upgraded our portfolio over time, I believe we keep seeing those opportunities across PJM, MISO and LIC. Naturally, we feel the opportunity in PJM is improving. The market signals there are outstanding.

Avik Dey

executive
#50

What really guides how we allocate capital will be the economics at the plant level, in terms of our outlook on delivering against three things: upgrades, expansions, and recontracting. Simple.

Operator

operator
#51

NBF's Patrick Kenny is on the line now with our next question.

Patrick Kenny

analyst
#52

Regarding Avik, going back to the recent PJM capacity auction that cleared above the price cap, do you still see a risk that the cap comes down over the next two auctions through '26? Or would you perhaps have a bias toward the price cap continuing to move higher? And also, if you had an update on the Rolling Hills unit coming back online later this year and just how that facility is positioned to participate in future capacity auctions.

Avik Dey

executive
#53

Yes. Thanks for the question, Pat. Look, I think our answer hasn't changed from last quarter to this quarter in terms of our expectation for the PJM market. Obviously this last auction coming out at the high end of the range was a surprise to many but I think the market signals from the last auction, the delay and what we're seeing on the demand side, certainly, as we said last year, we were comfortable with the bookends of the floor and the cap. And I think this auction demonstrated that, that floor in the cap was reasonable. At this point, I don't expect to see a change in that range. And I think we're in the same market construct of that $175 million to $325 million. Now with respect to the second part of your question, whether it's to the mid or to the high -- mid to high, I would reaffirm where we were, like that midpoint when we gave our guidance on 5-year average, we think is reasonable when you parlay all of the market factors, design factors around what's happening in the market. We, on Rolling Hills I would say, 6 weeks into closing, we continue to maintain the same schedule that we had.

Avik Dey

executive
#54

We've now had the opportunity to evaluate the facility and the opportunities surrounding it. Our balanced energy solutions team has already submitted DC packages and taken those to market — so we feel fairly good about our underwriting. I think at the time we announced the deal, we said it would take 1 to 2 quarters for us to determine, quantify, and qualify what the growth opportunity set at Rolling Hills was. So I can't say definitively at this point. We expect this level of how we'll participate in auction versus offtake or future expansions, but all indications suggest things look favorable for us there.

Patrick Kenny

analyst
#55

Alright. That's great. Thanks for the update there. And then moving on to operate...

Avik Dey

executive
#56

And one final thing on that, Pat: we need to begin early. I don't believe we thought we'd be able to close within the same quarter that we announced. So I'd say we're ahead of schedule on integration compared with our earlier time lines, and on being able to frame up the opportunity set.

Patrick Kenny

analyst
#57

Right, that's a fair question. Turning to Alberta power prices — the market is small and it's still fairly soft here. The forward curve seems to have recovered at least partially as of late. I can't say whether that's purely because of certain REM design modifications that got confirmed last month, or whether there are other market forces at work. Then, as a second question, could you say whether the REM design changes make you more inclined to keep diversifying your portfolio beyond Alberta? Or do those changes give you an incentive to hold your present level of exposure to the Alberta market?

Avik Dey

executive
#58

Yes. Thank you. Regarding the first part of your question, obviously in '26, '27 and '28 we all witnessed the strip rise following a substantial load allocation. Our view, therefore, is that this was the main factor behind prices moving higher, and we keep seeking methods to hedge out, just as we have done historically in that market. On the market as a whole, our stance regarding REM is that we require clarity. We do have concerns about locational marginal pricing as well as transmission rights. That remains a focus for us. We have made our complete submission with feedback to the government on this, which we will flag, and the specifics of our feedback will ultimately be made public at some point next quarter. But I believe the market generally is aware that this is a concern among generators. As for our position on Alberta, we have a resilient business. We own the most efficient, largest gas plant in the province, which is critical for baseload power, and we take that responsibility very seriously. And it is a resilient portfolio that lets us maximize and optimize whatever value may arise over the medium to long term.

Avik Dey

executive
#59

From a capital allocation standpoint, then, as we've shown, we're plainly steering our capital toward markets where investment can be turned into megawatts generated swiftly, efficiently, and economically. So for us, that means playing the arbitrage of purchasing capacity at a far lower cost than what new entry would cost, then investing in it to run, grow, and either repower or recontract. That's where we're focused, which today means PJM, MISO and WAC. As for Alberta, we have a very important business here, and it's very resilient thanks to the investment we made in repowering it, and it's well positioned for upside when new demand arrives in this market. But I'd stress that we need to get through REM, and we need to address some of the concerns that we and others hold, so that we can give the broader market clarity on how you invest in new generation in Alberta. And I think this connects back to the data center point. The data centers that get built in Alberta before 2029 will be ones that draw on existing installed generation in the province, because new generation can't be built until REM gets resolved.

Patrick Kenny

analyst
#60

Right, that’s logical. Now, on the U.S. renewable development side—bringing Roger aboard adds real capacity, which is excellent. But given the sunset of U.S. tax credits, I’m curious how that could affect your 20% capital allocation target through 2029, at least until there’s more clarity on government subsidies. Or, conversely, does choosing not to move forward with the Phase 1 Alberta data center opportunity free up somewhat more dry powder for U.S. renewables?

Avik Dey

executive
#61

So Roger, who joined us as the new Head of U.S. Renewables and Corpdev in early June—we're currently working through an evaluation of what opportunities are available to us in the U.S. at this moment. As I've mentioned during prior quarters, our view is that once the bid-ask spread narrows on renewables, especially regarding operating assets, this could become a competitive market where we'd want to play, since we're able to bring our repowering, development, and contracting expertise to bear. That bid-ask spread hasn't narrowed yet—so for me, the real question on renewables comes down to whether we can meet our return thresholds, and whether it positively contributes to creating shareholder value for our company. So I think we'll have greater clarity on that between now and year-end. That said, speaking broadly, volatility in markets tends to generate opportunity for investors. And given our edge in comprehending market structure, our capacity to trade and originate across short, medium, and long term, plus our ability to develop and operate, this ought to yield compelling opportunities. Still, I'd note that throughout our history we've gained tremendously from remaining highly disciplined when it comes to renewables.

Avik Dey

executive
#62

We never went after gigawatts just to have installed gigawatts on the books—we only take on projects that clear our return hurdles, and that approach is unchanged. So today I can't say whether our capital allocation will shift, because on a directional basis it could move either way, depending on the opportunities the market presents to us. If renewable—if operating renewable assets with an average contract life of two to 14 years, with solid transmission and distribution access, were somehow trading at 8x to 9x, which is roughly where I believe they ought to trade, given their margin relative—on an EBITDA per KW basis relative to gas—then we could—we might be a buyer. So I've likely given you more detail than you were expecting, but that's just a glimpse into how I think about value.

Patrick Kenny

analyst
#63

All right. No, that's excellent. I appreciate that. I'll stop there.

Operator

operator
#64

We'll now take our next question from John Miller at TD Cowen.

John Miller

analyst
#65

Turning back to your partner at Genesee, perhaps — you've emphasized how important speed to market is for this wider data center opportunity in the province. I'd just like some clarity regarding your partner's time line. I understand you likely don't want to speak on their behalf, but what time line would they require for a 1 gigawatt facility at Genesee to stay viable? Presumably, at some point they'll look at flare, and this 1 gigawatt opportunity does not come with an unlimited expiry date. Could you comment on that?

Avik Dey

executive
#66

Well, John, I think the way to look at this is that if we aren't able to add capacity in North America, that timeline just keeps getting pushed out. So next year, '28 turns into '29. As long as the economics work and we can bring something online in that 2- to 3-year window, I think that opportunity will still be there for us in Alberta. The risk is simply that other markets catch on to this and offer incentives and put money into infrastructure that makes large-scale investment easier. So there isn't really a cliff in 2028. It's just a question of who can bring capacity online. And part of this issue is the following: when you're signing — if you have a 1 million square foot hyperdata center, those data centers are faced. It's not like you go build a — it's all modular and clusters. So it's not like you build a 1 million square foot haul and then you're piling in racks starting COD. What happens is and what's required is the hyperscaler requires the right to have access up to that total capacity or the commensurate power because on a rolling basis, they're ordering and procuring the chips and the racks to scale with the requirement.

Avik Dey

executive
#67

So this is the data center opportunity's chicken-and-egg problem: if your requirement for scale is 1,000 megawatts or 1 million square feet, you need to know you have the transmission and distribution and generation to meet that timeline and that ramp schedule. It really all comes down to the ramp and the guarantee of access to power, and how you match capital and equipment coming in on a timely basis. So I don't think it goes away in 2018. It's just that we have this advantage because of how much generation we, as the market participants, have collectively installed, and what access we have on the installed transmission and distribution infrastructure in the province.

John Miller

analyst
#68

All right, and I’m sorry if I’m covering the same ground here, but to return to the Phase II timelines you mentioned—you said you want to keep your option value intact and keep pushing there, advocating for a fast in-service date. From the talks you’ve had with AESO and the government up to now, how confident are you that Phase 2 could lead to that fairly quick in-service date, with the glide path that a larger-scale project of that kind would require?

Avik Dey

executive
#69

I can't give you a confidence interval on that. What I would say, though, is that I believe everyone here is after the same outcome. In our discussions with the government — yes, we agree — we had a disagreement about how large loads get allocated in Phase I, but I think every party involved, whether that's the AESO, the utilities commission, or the government more broadly, is eager to attract this industry to the province. Our perspective on the right way to allocate differs — yet I think everybody is working toward the same end game. And I'll acknowledge that the AESO and the utilities, the utilities Ministry and the government, are juggling many needs and considerations. So we view things through the lens of optimizing for ourselves and also benefiting consumers, thanks to the advantage we hold at Genesee. Still, I think everyone is eager to bring the industry here. So I'm optimistic, but we had a time line prior to this large load allocation that could have delivered at 27 or early '28. And so now we have to go back to the drawing board, and not because of the project's technical requirements.

Avik Dey

executive
#70

When it comes to negotiating the way a customer gains access to co-locate a 1,000 megawatt site at Genesee, though.

John Miller

analyst
#71

Okay. And apologies in advance if I got this wrong. Just to clarify the allocation — I believe you said it's roughly 370 megawatts. Is it that you're turning it down, so it returns to the pool for other proponents, or selling it to a different party that you think will make the best use of it and bring that load into the province?

Avik Dey

executive
#72

At this point, what I'd say is that we're aiming to make sure that load is utilized. And the way we'll monetize it is by providing power — so we're eager to see the industry get moving. So we're trying to be a constructive participant in this Phase 1 process. Providing power is what will benefit us.

John Miller

analyst
#73

Understood. Alright, perhaps I'll slip in just one additional question, since you mentioned that no new generation can be constructed before the REM issue is resolved. I'm simply curious about the clean electricity regulations—what sort of discussions have you had with the government now that leadership has changed, and how does that factor into your readiness to put money into gas in Canada at present.

Avik Dey

executive
#74

Look, I think where Alberta is concerned, the uncertainty applies equally to REM and the clean electricity regulations. At the federal level, it's clearly the clean electricity rates. So that restriction applies across the country to new gas generation. Our worries about the clean electricity rigs haven't changed. We back the concept, but we still need to see critical changes to the CER that allow for offsets, that deal with emissions caps, and that specifically deal with end of life, end of prescribed life. So we've had conversations. I think our current government gets what the constraints are around CR. But I think we'll see how and whether that turns into a legislative change. But I think we have an engaged and willing federal government that is listening and understands what the concerns are, for sure.

Operator

operator
#75

<<operator_script>> Next up, we have a question from Benjamin Pham at BMO.

Ben Pham

analyst
#76

I have a couple of clarifying questions, since quite a bit has already been covered regarding Phase I and Phase II. So here are just a few from my side. With respect to that one gate you're aiming at, is the expectation that you'll be dealing with it across a number of years, or do you expect to clear it right away?

Avik Dey

executive
#77

Yes. What about Alberta specifically?

Ben Pham

analyst
#78

You've got it right.

Avik Dey

executive
#79

It's always been phased. I mean, that's the reason I brought up in response to John's question — this entire process with hyper data centers, none of them is COD on day 1, fully deliverable at 100%. There's always a ramp schedule that gets negotiated on the customer's behalf, in coordination with them and their requirements. So it's not as if they're going out and purchasing 0.5 million Navidea chips, all of it meant for rack delivery on day 1. And every customer has different requirements depending on location and use, but that ramp could span over 2 years, 3 years, 4 years, depending on what the customers' needs are. So even in this case — and actually that holds true for pretty much all data centers.

Ben Pham

analyst
#80

All right, so I suppose, in theory, you did have decent visibility into that first phase — this 100-megawatt build — and what's really driving things is more your absence of clarity on the phases that come after, what you needed to see.

Avik Dey

executive
#81

That's right.

Ben Pham

analyst
#82

All right. Turning to Phase 2, how competitive do you expect that market to become, given the many large-scale projects lined up — I believe it's 20 gigawatts at this point — which arguably gives rivals time to close the gap with you. But would you say your real edge there is simply how fast you reach the market? Is that still your foremost advantage?

Avik Dey

executive
#83

So if things go our way, there's room for plenty of projects. From a market standpoint, that's the goal. The scale that AI demands, plus what inference computing will need, along with quantum computing, cloud and edge computing supporting that inference work — that rising tide lifts every boat. Other big projects don't worry us, because in the end it comes down to location, location and location. Whichever one is cheapest and fastest gets built first. And as of today, we think that's our site, mainly thanks to transmission and distribution and how the fiber is laid out in Alberta, which lets us meet redundancy requirements. That said, two years from now it could look different, but fine. If someone puts up a 1,000-megawatt center somewhere other than Genesee and they beat us to it or match our timeline, honestly, that ends up benefiting us. Still, the long-term growth of this business will hinge on adding new generation next to that new capacity. That's why we keep returning to this point: given where Capital Power has built and established generation with capacity and a T&D connection, while we're working through this REM process, our project is one that can be underwritten, and we can get shovels in the ground for a customer while REM gets sorted out.

Operator

operator
#84

At this point, there are no additional questions showing in the queue. I'll now hand the call back to Roy Arthur for any closing remarks.

Roy Arthur

executive
#85

That wraps up the question portion, and with that we'll bring this conference call to a close. We appreciate everyone joining us and for the interest you've shown in Capital Power. A recording of today's presentation and webcast will be posted on our website. We hope the rest of your day goes well.

Operator

operator
#86

That brings us to the end of today's call. Thanks for joining us, and you're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Capital Power Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Capital Power Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Capital Power Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.