COMSYS Holdings Corporation (1721) Earnings Call Transcript & Summary
November 7, 2025
Earnings Call Speaker Segments
Toru Mashimo
executiveI want to thank everyone for being with us today as we present our results for the first half of the fiscal year that ends in March 2026. Turning to the financial highlights, the COMSYS Group set new records for net sales, operating profit, and net profit. To be specific, sales rose 2.3% compared with a year earlier, and operating profit grew 9.7%. We hit several other milestones as well on the ESG side and in shareholder returns. Let's begin with the overview of results for the first half of the fiscal year ending March 2026. This is the results overview. As you can see, we posted year-over-year growth across the board, with the only exception being orders received, which saw a modest decrease. We'll walk through the details shortly. This page addresses orders received and net sales. Orders came in at JPY 321.5 billion, a modest drop from JPY 325.7 billion in the same period a year ago, which was our strongest performance in the company's history. In essence, orders were basically flat year over year. The JPY 4.2 billion decrease mirrors tougher comparables, caused by a very large project in the social systems-related business during the same period last year. We also saw a few delays in order recognition within the social systems-related business, where order volume fell by JPY 19.6 billion.
Toru Mashimo
executiveOn the other side, we landed a sizable project within the IT solutions business, which let us book the largest first-half order volume ever recorded in the company's history. Turning to NTT-commissioned projects, we saw robust growth there on the mobile side, and that drove results and let us offset the substantial gap that the social systems-related business created. To recap the net result, that gap comes to JPY 4.2 billion less in overall order volume, and it stemmed from tough comparables caused by a one-off factor — a large project last year. So although orders declined year over year, results at the end of the first half in fact came in well above internal company targets. Net sales reached JPY 270.3 billion, equal to 43.6% of the full-year target. Again, that marks the strongest first-half performance in the company's history. We expect orders to recover, and net sales set new records. Fueled by that sales strength, operating profit reached JPY 18 billion, another record. Net profit landed at JPY 12.6 billion, which led us to increase the size of our share buyback program, and I'll go into that shortly. Let me add some further color on the profit results.
Toru Mashimo
executiveWe posted JPY 18 billion in operating profit, and that's a year-over-year gain of JPY 1.5 billion. Keep in mind that last year we had a tailwind of JPY 1.8 billion in total, coming from a reversal of allowances for doubtful accounts as well as changes in accounting standards. Those one-off items lifted the first-half results in the prior fiscal year. If we adjust for that JPY 1.8 billion tailwind, our real earnings capacity grew not merely by JPY 1.5 billion but by a full JPY 3.3 billion. Net profit followed the same pattern, having gotten a boost of roughly JPY 1.2 billion from one-off factors last year. Once you adjust for those, net profit was in fact up a full JPY 3 billion year over year. Profitability in the NTT engineering business was powered by operational efficiency, as our in-housing push advanced considerably. To be specific, when our network construction teams carry out these projects in-house at COMSYS, we can take advantage of the existing platform that we've built and honed over the years. Through these in-housing efforts, we're able to process these orders as cost-efficiently as possible. Another important strategy involves taking the best practices found within the COMSYS Group and rolling them out across our subsidiaries. We're also moving forward on integrating back-office functions.
Toru Mashimo
executiveOur contract backlog reached JPY 316.1 billion, setting a new record. That's a gain of more than JPY 50 billion versus where we started the fiscal year, which speaks to the strength of our order backlog. One central focus for the second half is executing the projects in that backlog flawlessly so we can turn them into sales and profits for the company. On this slide you'll see four major orders we booked during the first half. I'll go through the specifics in a moment. Next, an analysis of the business environment and our business strategy. Our full-year forecasts are unchanged across the board for orders received, net sales, and operating profit. Returning to a point I made earlier: order volume was down year-on-year in the first half, yet once you adjust for one-off factors, our underlying performance improved. Importantly, projects won in the second half of this fiscal year may or may not be finished by March 31st, 2026, depending on the project. That shaped our choice to keep the forecasts as they are, but at the same time we'll keep pushing proactively to work through the order backlog during the second half as we strive to unlock sales and profits. Let's turn now to an overview of results by business, beginning with the carrier-related business.
Toru Mashimo
executiveAs you're aware, the NTT Group is experiencing enormous demand for its 10-gigabit optical fiber internet offerings. In addition, infrastructure enhancement projects for NTT Docomo produced very strong results for us. We posted solid first-half results, and we expect to keep up that momentum through the second half too. Conversely, CapEx from NCCs has decelerated, so we aren't anticipating meaningful growth from telecommunications infrastructure projects. Even so, we've managed to lock in peripheral projects, including data center infrastructure work, and we're also receiving inquiries about base tower sharing infrastructure construction from non-carrier entities. Consequently, for the carrier-related business overall, our guidance is JPY 283 billion in net sales for fiscal year 2026. A central question here is how much construction work we can carry out to enhance Docomo's infrastructure during the second half. We'll be pushing forward with efforts to unlock efficiencies by integrating and standardizing back-office functions and by deploying RPA solutions. At the same time, we're negotiating with building owners to secure base station installation sites on their properties. Those negotiations are the crucial starting point. To tackle this, we've grown our negotiation team by 50% year-over-year.
Toru Mashimo
executiveThanks to that added capacity, we're going to make sure Docomo's expectations are met across the second half. On this slide, you can see how well our teams have done in winning projects in other domains. Our telecom carrier-related teams are being used to win work in the social and IT infrastructure domains. We're also going after orders on projects that go beyond foundational networking infrastructure for our telecom carrier clients. The aim here is to keep growing the platform that COMSYS has built up over the years and to monetize that asset to the fullest, which lets us improve margins. By bringing in these social and IT infrastructure projects, we think we can grow orders to JPY 43 billion, and that figure covers all construction projects that use our telecom carrier-related structure. We've put together a list of projects in these new domains, and it's shown here on the right. First are the projects tied to data centers. That means, for instance, networking projects in Inzai, Chiba. We've set up a new local base of operations in Inzai so we can move faster and with more flexibility when executing these projects. Second are power distribution projects. In this area, we're seeing more and more infrastructure projects coming from energy companies, so we'll keep developing our skillset in the high-voltage domain and carry out strategic CapEx in SPVs used for that purpose.
Toru Mashimo
executiveCOMSYS operates a training facility in the Tokai region. Several years ago, we decided to renovate that site—which had originally been built for telecommunications—so it could support electrical construction work. Thanks to this retooling, we can now run intensive training programs focused on power distribution work. Third, there are base station sharing projects. As mentioned earlier, inquiries have risen considerably. By putting forward efficiency frameworks that draw on the mobile construction know-how we have built up over the years, we are earning the trust of sharing operators. Going forward, we will keep pursuing these initiatives while also bolstering our capacity to respond to change. At the same time, we will strengthen our execution capabilities and our ability to roll out this infrastructure. Next comes the IT solutions business. In this segment, the solutions category produced outstanding results, and we intend to stay focused on steady execution of large-scale projects. One important development is a change in how our services are viewed. In the past, COMSYS worked in a subcontractor role. Now, however, our strong performance means we are increasingly chosen as prime contractor on these projects. That is to say, we are being entrusted with carrying out large-scale projects directly instead of as a subcontractor.
Toru Mashimo
executiveWe’ll keep strengthening what we can do in this space, and at the same time we’ll stay focused on unlocking more added value by allocating resources strategically. More specifically, in the carrier-related business we’re moving physical work—things like cabling—over to our engineering teams. That frees our IT solutions team to concentrate on higher-level upstream processes, which strengthens what we offer in terms of value. On the software side, we expect to keep seeing private-sector clients pursue digital transformation, along with large-scale government efforts to modernize systems. Those efforts are a source of demand that lasts over the long term, and we will work to secure that demand going forward. Finally, since we are the ones who actually build these systems, we are in the best position to operate them and handle maintenance. That lets us combine operation and maintenance functions with construction services, and in this way we have successfully expanded our recurring business. Let me cover two key topics. The first key topic is the reorganization of internal software development functions within the COMSYS Group. Until now, our software development work had been handled by the following three companies: COMSYS JOHO SYSTEM Corporation Group, TSUKEN ADVANCED SYSTEMS CORPORATION, and VACSLAB Co., Ltd. As of July 1, 2025, all software development operations have been integrated into COMSYS JOHO SYSTEM.
Toru Mashimo
executiveThat lets us further improve software development capabilities and unlock synergies via strategic integration. Moving forward, all operations will be managed and optimized by COMSYS JOHO SYSTEM. As it stands, the COMSYS JOHO SYSTEM Corporation Group has 1,450 employees and brings in roughly JPY 35 billion in revenue annually. In software, scale matters greatly. Only big, top-tier firms are seen as quality enterprises, with software that offers the proper quality assurances. With that in mind, this integration represents a solid opportunity for our growth. We have consistently said that combining hardware and software will increasingly prove a valuable tool for tackling social challenges and building a more vibrant world. We are proud to announce a project that validates and embodies this vision, secured together with Sony Network Communications Inc. Our selection for this landmark project — the first-ever local wireless 5G infrastructure project on the Shuto Expressway — builds on the trust earned through our construction work for the Sony Group's NURO Service. This upgrade to the Shuto Expressway's infrastructure will leverage Sony's advanced dynamic spectrum access, or DSA, technology. Thanks to our prior construction and engineering work, the Sony Group approached us as joint partners to execute this infrastructure project.
Toru Mashimo
executiveFor quite some time now, local 5G has been a technology people have eagerly awaited. Successful deployment does come with tough engineering obstacles, yet COMSYS carries out dozens of such projects every year, which highlights how we get past these technical hurdles. A major reason we were chosen for this project was our depth of technical expertise. The road sector sits at the leading edge of where software meets hardware, and that shift is producing dramatic changes throughout the whole mobility landscape. We're delighted to sit at the center of this transformation and to play a direct part in it. Now let's turn to the social systems-related business. That business has expanded significantly, and we've now set a net sales target of JPY 207 billion for the entire fiscal year finishing in March 2026. In the past, we combined infrastructure together with others. But the others category was in fact bigger than the other one, so the earlier classification was somewhat confusing. We've now split these segments apart, putting our teams and businesses tied to civil engineering projects into the infrastructure category and consolidating revenues from businesses such as Fujiki Tekko Co., Ltd. in the steelworks field and Tokyo Gas Lifeval Kando Co., Ltd.
Toru Mashimo
executiveMoving on to the others category. This new infrastructure segment has produced very strong results, and so has the electricity and telecom segment. To be specific, infrastructure is experiencing robust demand for burying power lines for data center interconnect projects as well as gas-related engineering projects. At the same time, the electricity and telecom segment is growing substantially, fueled by a range of projects, most notably within the data center sector. Stakeholders frequently request more detail about the type of work we perform for data centers. This diagram shows the scope of our work on these projects. To be specific, it consists of the core technologies and hardware that underlie these structures. Prominent general contractors typically take care of building the shell of the building, while our subsidiary, Fujiki Tekko Co., Ltd., provides high-grade steel frames used in these buildings. In addition, we perform a variety of other construction work involving electrical infrastructure and infrastructure related to air conditioning, servers, and routers, among others. The COMSYS Group also handles work related to burying cabling infrastructure and other civil engineering work. When it comes to orders from hyperscalers, we frequently carry out these projects through joint ventures with prominent general contractors. At other times, these general contractors subcontract us to build and install the necessary infrastructure.
Toru Mashimo
executiveMoving forward, our goal is to execute these projects with real skill and to broaden the scale of our operations even more. The process closely mirrors what takes place in a telecommunications building. Equipment, air conditioning, cooling and ventilation systems, power supplies, servers, and routers. Telecom carriers use precisely the same kind of equipment. That makes this an area where our deep knowledge and expertise across each of these technological components can be brought to bear. That expertise now enables us to win projects in the data center space. Another question we hear often concerns the order volume and revenue scale of these data center projects. The diagram shows that, as of the end of the first half, orders received stood at JPY 22.1 billion and sales at JPY 16.4 billion. Counting projects we are fairly confident of securing, we anticipate a cumulative total of roughly JPY 50 billion in orders received for the fiscal year ending March 2026, along with roughly JPY 32 billion in sales. We intend to maintain this momentum and accelerate it further into next year as well. Please let me draw your attention to the table on the right-hand side of the page.
Toru Mashimo
executiveThis part concerns an initiative from TOSYS Corporation, a group company of ours that operates in the Nagano and Niigata regions. In February 2026, TOSYS Corporation intends to launch a containerized data center in Nagano City. People in the industry expect that data centers will increasingly appear in rural areas, so this Nagano data center is a way for us to get ahead of that trend. We have set up a Generative AI Center. Over the last couple of years, AI has dominated social discourse. With that in mind, we aim to apply AI to our corporate operations and ultimately take the know-how gained through that effort into a client-facing context. This is a joint effort between Nippon COMSYS, a core component of our larger operating group, and Hokuriku Denwa Kouji Co., Ltd., another of our group companies that specializes in niche development projects and phone line installation projects in the Hokuriku area. We use Exabase to develop RAG, Retrieval-Augmented Generation, systems. As an example, we have used RAG to cut inquiries about our internal systems by 20%. This center also helps clients determine the technical feasibility of using AI to accomplish a number of tasks and to develop workflows suited to those needs.
Toru Mashimo
executiveWe see this as a chance to get employees using AI every day for work tasks as well. To be specific, of roughly 1,000 enterprise licenses, 76% — the majority at Nippon COMSYS — already apply AI to daily work functions. That figure sits well above the market average, with usage rates at other companies hovering around 40%-50%. There is a lot of room for optimization, so we want to push employees to take advantage of AI to unlock efficiency and, in the end, turn this expertise into products and services we can offer. Right now we are using multimodal AI models to transcribe audio data and pull information out of handwritten documents. Through these efforts, we aim to unlock operational improvements. This section highlights a few examples of recognition from third parties when it comes to our sustainability initiatives. Let us now turn to shareholder returns. We have authorized an additional JPY 2 billion in share buybacks. Our initial program was set at JPY 8 billion, and about 81% of that had been repurchased by the end of October. As mentioned earlier, although first-half orders dipped slightly year-over-year, performance is tracking well ahead of our internal plans. Specifically, while large-scale social system projects were delayed into the second half, and revenue from these projects may not be fully recognized within this fiscal year, we now have a clear outlook through to the first half of the next fiscal year.
Toru Mashimo
executiveThat confidence is exactly why we decided to increase the size of our buyback program. As part of this scope, on March 31st, 2026, we will cancel 15 million shares of treasury stock. Once that cancellation is done, we will hold approximately 2.95 million shares, which represents roughly 2.5% of outstanding shares. We have canceled treasury stock before, but this choice to cancel more than 10% of the total number of shares outstanding is a first and marks a departure from previous efforts, which were decidedly of an incremental nature. Since we do not anticipate immediate strategic utilization of these shares for M&A, as we did in the past, we have decided to allocate a portion to employees and cancel the remainder. In terms of returning value to employees, starting this April, we raised the employer match within our stock-based compensation program from 5%- 20% at select subsidiaries, primarily Nippon COMSYS. Our goal is to align employee interests with the stock market and our corporate growth. As a result, enrollment rates and the average employee plan contribution have roughly doubled. Building on this success, we plan to introduce an ESOP trust to grant a portion of our treasury stock to employees. We are currently finalizing the details, which we will promptly share with stakeholders as soon as the terms and specifics have been set.
Toru Mashimo
executiveOn page 23, you'll find our policy on shareholder returns. Page 24 illustrates how dividend payments have trended over time. That brings my presentation to a close. Thank you for your time.
Operator
operatorWe'd like to open the Q&A portion now. The first question is going to come from Mr. Hamakawa at Nomura Securities.
Yugo Hamakawa
analystHamakawa here from Nomura Securities. Thanks for the presentation. I have a couple of questions. The first concerns the JPY 3.3 billion rise in underlying profit for the first half. Could you break down how much each segment contributed to that profit? Second, because the full-year forecast hasn't changed, my read is that this implies profit will decline in the second half. NTT Docomo intends to triple the pace at which it deploys new 5G base stations, so I'd like to know whether those plans are already fully reflected in the forecast. Put another way, is there any upside potential for the second half or for the full-year plan? Please take us through your thinking on why the forecast figures were left as they are.
Toru Mashimo
executiveThanks for the question. Each of our segments maps to one of our regional subsidiaries, so my assumption is that you're after a breakdown by business. Mobile telecommunications was the main factor behind the profit gain in the first half. We do monitor profitability internally, but I'm not able to share those internal metrics, so pointing to strength in mobile telecommunications is as far as I can go on disclosure here. I can add that we anticipate continued very strong results from the NTT business in the second half. On your point, NTT Group just announced last week its commitment to tripling the deployment rate of new 5G base stations in the second half, and they have said they expect this dynamic to carry on into next fiscal year and beyond. With that in mind, in the second half we aim to sharpen our execution capability so we can capture this demand and hopefully exceed our plan. That said, we have not revised the specific figures at this time. The reason is that base station construction is a very slow process with many moving parts: getting building owners to green-light the project, designing the project, and then procuring and installing the equipment.
Toru Mashimo
executiveRight now, we have a sizable backlog of projects that are stuck in this early negotiation stage with building owners. How many of those can actually be finished and booked as revenue during the March 2026 fiscal year is not at all clear. On top of that, we keep seeing demand from NTT East and West grow for our optical fiber engineering installations. Our expertise and track record in this area can be leveraged, which means these projects carry high margins. The moving season usually peaks around April and May, so activity typically slumps during the summer months. That did not happen in 2025, since this project category turned in very strong results in the summer as well, and we expect it to contribute to our bottom line on a full-year basis too. To sum up, although we see potential upside in the carrier-related business for the second half, these timing uncertainties and demand variables tied to fiber optic keep us from building this potential strength into the forecasts. I apologize for the lack of specifics, but broadly speaking, this is our current outlook.
Operator
operatorThanks. The next question comes from Mr. Nakagawa at Mizuho Securities.
Yoshihiro Nakagawa
analystNakagawa here, from Mizuho Securities. That diagram on page 17 was quite useful — it gives a thorough picture of the kinds of infrastructure projects COMSYS handles for its data center clients. You touched on a number of areas there. Could you tell us which areas you're concentrating on when it comes to expanding the business, and where you feel you hold a strong competitive edge? My second question is about NCCs. The outlook for NCCs seems a bit muted relative to what we see for projects contracted by NTT. Also, you brought up data center projects from NCCs, so I'd like to hear your view of demand from clients outside data center infrastructure.
Toru Mashimo
executiveThanks for asking that. Regarding data center initiatives, each item shown on this slide represents an area where we've built substantial expertise through our carrier work. We don't put any single area first, since we're fully confident in our know-how and competitive edge across these various areas. Trying to zero in on just one niche would be a losing approach; instead, we aim to establish ourselves as a comprehensive subcontractor. So the winning move is to close any performance gaps and keep building our image as a company hyperscalers and major general contractors can count on for their infrastructure needs. We think we can further strengthen our capabilities, which will let us win more orders. Our approach has been to concentrate on data center projects in the Tokyo metropolitan area, with Nippon COMSYS leading the way. That said, given the Watt-Bit integration initiative and a trend toward regional decentralization, we're currently bringing staff from our regional group companies into the Tokyo metropolitan area for on-the-job training so they're ready to handle the expected surge in demand for regional data centers. Going back to what I mentioned earlier, part of our regional decentralization efforts involves the containerized data centers that TOSYS is offering.
Toru Mashimo
executiveRight now, we're in the middle of getting these operations up and running at local group companies that already exist, so they can produce and run these containers, and we plan to keep pushing those efforts moving forward. To sum up, instead of focusing narrowly on a niche competitive edge, our aim is to raise our overall resource baseline. On the NCCs, your read is accurate. Figures from the Ministry of Internal Affairs and Communications indicate that SoftBank and au hold a substantial lead over the Docomo Group when it comes to 5G base station density. As a result, we don't anticipate a jump in CapEx from the NCCs in the near term — that would only come once Docomo closes the gap. That said, we're starting to see some promising early signs in certain areas. To be specific, per their arrangement with au, KDDI's roaming services will be wound down as Rakuten Mobile rolls out its own network in certain areas next year. That opens a door for COMSYS. Looking further out, Docomo and the NCCs alike will eventually move to Sub-6 GHz and EHF operations. In short, we remain in this holding pattern, with some headwinds facing our company, but we expect the broad deployment of EHF infrastructure to break it. Because those signals travel shorter distances and penetrate poorly, the industry will need far denser base station networks — indoors as well as on streets and roads.
Toru Mashimo
executiveSo because of that, we're keeping ourselves operationally ready for that demand down the road, and at the same time we're carrying out projects in other areas. And lastly, since it's getting harder and harder for signals to penetrate indoors, infrastructure sharing is going to play a bigger role, and along with that, sharing operators will matter more too. We're raising the count of touchpoints we have with those operators, and we're even seconding our people to real estate developers who are involved in urban planning projects and joint use building projects, which lets us get valuable information when it comes to telecom infrastructure. To sum up, even though we're facing a lull in the short term, we keep up steady execution efforts and we're positioning ourselves for the significant wave of demand that's on the horizon.
Operator
operatorThanks. The next question is going to come from Mr. Teraoka at Daiwa Securities.
Hideaki Teraoka
analystMy name is Teraoka from Daiwa Securities, and I have two questions. First, I do think visibility is solid regarding the mobile infrastructure construction project outlook through next fiscal year, thanks to demand for capacity improvement work. That said, how do you see things for the March 2028 fiscal year and afterward? Are you expecting a seamless shift into Sub-6 GHz and mmWave projects, or do you think demand will peak out? My second question concerns data center projects. JPY 50 billion in orders received this fiscal year represents a very significant jump. Could you give more detail on your execution structure? You noted considerable overlap between work at these data centers and at telecommunications buildings. With that in mind, do you plan to leverage COMSYS' NTT network infrastructure engineering staff? Please also tell us about the company's plan for sustaining growth beyond this JPY 50 billion threshold.
Toru Mashimo
executiveThanks for asking. Let me say a bit more about how we see mobile infrastructure buildout going forward. As we mentioned previously, NTT Docomo intends to triple how quickly it deploys new 5G base stations during fiscal year 2026. My view is that demand won't stop there. Although the near-term emphasis is on capacity measures right now, the industry as a whole, NCCs included, will probably push toward broader Wi-Fi 6 and mmWave availability. At present, NCCs' work on the Sub-6 GHz and mmWave side consists of tuning network settings within their base stations so they can deliver more advanced performance. After that RF optimization stage wraps up, we anticipate a move into the next stage of physical infrastructure upgrades. NTT Docomo will of course respond to keep pace, so this cycle of technological evolution and competition will likely keep going indefinitely. On top of that, network quality sits at the core of the NTT Group's brand identity. So I see the present investment push as a catalyst for a lasting long-term commitment to robust network construction, rather than a temporary one-year spike. As this dynamic unfolds over the years ahead, we expect mmWave and Beyond 5G to roll out, though that depends heavily on what form mobile apps and mobile devices take in the future.
Toru Mashimo
executiveHaving said that, a plateau at 2025 levels for these technologies is very unlikely. We're pretty bullish in this area. The Shuto Expressway project I mentioned earlier is a great illustration of this new use case—using technology to tackle social challenges. It will be the first local 5G infrastructure and construction project ever on the Shuto Expressway, and we think we'll begin to see more and more initiatives that leverage 5G to address social issues. In our view, combining telecommunications and IoT to solve social challenges is a field set for substantial growth, and we plan to capture opportunities of this kind. Earlier, I pointed out the similarities between building data center infrastructure and telecommunications facilities. One key difference, though, is scale, and it's vastly different. Work at these telecommunications exchange facilities usually means installing the same collection of smaller power equipment pieces at many locations. Our profitability there comes from high-volume execution and the proficiency that repetition builds. Data center projects, in contrast, mean installing massive infrastructure in one concentrated effort. This gap in scale therefore demands a fundamental change in mindset. That said, we're discovering that these data center projects suit our strengths, because sales generated per engineer and overall project scale are considerably larger.
Toru Mashimo
executiveSo because of that, we're moving resources aggressively out of the engineering teams tied to our carrier-related business and into our data center infrastructure division. That approach lets us get the most sales and profit out of each employee. In the past, Nippon COMSYS had typically taken on most of the large-scale projects in the Tokyo metropolitan area, which is Japan's core market. But with data center demand now spreading to regions such as Hokkaido, Tohoku, Tokai, and Kyushu, we have to be prepared. With that shift in mind, we're right now bringing a substantial number of engineers over from our regional group companies to Tokyo and putting them into live data center project sites for on-the-job training, which is quickly boosting our ability to execute nationwide. A lot of our partner companies are at capacity right now, or they don't have the experience needed for projects of this scale or ones that involve cutting-edge technologies. So we're stepping in now to guide those partners, using our expertise as a prime contractor to organize workflows or to bring in specialized firms for particular tasks. In short, we've managed to expand our execution capacity by drawing on our strengths to grow our partner network. Going forward, as AI use becomes widespread, we expect that to push demand for data center infrastructure even higher.
Toru Mashimo
executiveBecause of the power supply limitations in the Tokyo metropolitan area, we expect a move toward decentralization across regions. By rotating our workforce and developing partners, we're putting the groundwork in place to capture this demand that's bound to come, across every location and format.
Operator
operatorThanks. The next question is going to come from Mr. Yagi at Morgan Stanley MUFG Securities.
Ryo Yagi
analystThank you for the presentation. This is Yagi from Morgan Stanley MUFG Securities. I’ve got two questions; the first one follows up a little on the data center project topic. Earlier you went into more detail about your approach to supplying infrastructure services for data centers. Apart from the sales forecast of roughly JPY 32 billion for this fiscal year, do you see a possible ceiling for this business as we look ahead? Is there a particular capacity limit you have in mind, or a revenue target for the future? And if you can, please comment on how profitable these data center projects are. Second, gross profit margin rose to 13.7% in the first half compared with a year earlier, thanks to the carrier-related business. Should we expect additional improvement in the second half and in the next fiscal year? And if so, will segments other than the carrier-related business also add to that margin expansion?
Toru Mashimo
executiveThanks for asking. We see plenty of room to expand during the fiscal year ending March 2027 and afterward when it comes to data center-related work. That said, there are no particular numerical targets I'm able to provide at this point, because right now we're in the middle of evaluating market trends along with client needs. Conversely, this market is a target-rich environment, and we're stepping up our execution capabilities further so we can capture additional growth. Turning to profitability, since these projects are contracted, I'm afraid I can't offer a single margin percentage that fits all of them. What I can tell you, though, is that the substantial scale of these projects gives us room for operational efficiency. Even in the event that we merely break even during the initial construction phase, we lock in profitable follow-up work, including cabling and maintenance, via our specialized teams. To give one example, our dedicated cabling team in Inzai is doing very well, delivering high-quality cabling work to our clients. To sum up, by looking at the project lifecycle in its entirety, including follow-up projects in areas such as cabling and maintenance, we've been able to secure robust profits. As you pointed out, our core carrier-related business is highly profitable thanks to the expertise we've accumulated over the years.
Toru Mashimo
executiveSpecifically, as the volume of mobile infrastructure projects increases, it becomes simpler for us to lock in better margins. Operating leverage is another element—higher order and sales volume spreads fixed costs, which drives margin gains. At the same time, we're enhancing margins in the social systems-related and IT solutions segments. We're choosing orders more carefully to safeguard profitability, and we've put strict contract risk management guardrails in place so we avoid the kind of large-scale losses we saw a few years back. Put differently, this is a two-pronged strategy built to minimize the risk of large losses while raising profit margins. On top of that, our consistent efficiency gains—driven by the Generative AI Center, RPA deployment to assist with on-site processes and workflows, and the integration of companies and projects into larger units—are gradually beginning to bear fruit. We expect these factors to contribute to gradual margin improvement in the second half as well.
Ryo Yagi
analystAppreciate that response.
Operator
operatorThe next question is going to come from Mr. Kawashima at SMBC Nikko Securities.
Hiroki Kawashima
analystI'm Kawashima from SMBC Nikko Securities. I'd like to ask about the plan by NTT East and West, announced in a press release roughly a month ago, to retire the copper infrastructure supporting their landline telephone service by 2035. What effects do you expect this transition to have? Do you think there will be a surge in demand stemming from the decommissioning of that legacy copper network? Will this shift toward optical fiber have an influence on construction volumes overall? And since the timeline stretches all the way to 2035, how is the COMSYS Group getting its construction workforce ready for this particular change?
Toru Mashimo
executiveA lot of customers are still on those analog copper lines, so moving them over to optical fiber gives us several ways to earn revenue. First, we anticipate being given the job of going out to customers, telling them that legacy copper lines are going to be sunset by 2035, and persuading them to switch over to optical fiber. After that comes the actual work of building the infrastructure. When a given area has been fully migrated, we'll move on to taking out the legacy copper cables. On top of that, these telephone switching centers contain MDF, main distribution frames, and getting that equipment organized and removed is a big undertaking all by itself. Importantly, once that space is cleared, telecom carriers can repurpose these facilities for data center use, which creates additional downstream opportunities for us. The key difficulty is keeping enough engineers on hand who have the skill set needed to work on this legacy copper infrastructure. Because optical fiber became widespread during the early 2000s and 2010s, copper infrastructure projects have largely become obsolete, which has led to fewer engineers possessing the required skill set. From a human resources standpoint, 2035 is an extremely challenging deadline. Trying to train new staff from scratch for a technology that is being phased out is quite unreasonable.
Toru Mashimo
executiveSo our approach is to put our existing veteran workforce into action, managing this migration and removal as a top priority. Even so, it will be a race against time. Finally, moving to optical fiber brings with it all sorts of social challenges — for instance, guiding elderly users through the process, or even determining whether the phone hardware itself works with the new system. On top of that, some areas don't have optical fiber service available, and those places will need alternatives such as fixed wireless access solutions. There are plenty of ways the COMSYS Group can contribute meaningfully at the operational level, particularly through the processes I just described. We anticipate that other challenges will come up, but one of our competitive advantages is working side by side with carriers and local communities to clear these hurdles. To sum up, we will draw on the expertise and adaptability of COMSYS employees throughout Japan to overcome these challenges as they arise, thereby contributing to the company's top and bottom lines. We see this transition as a sustained revenue driver over the next decade. I hope I've managed to give you a basic outline of our strategic approach in this area. Thank you.
Operator
operatorLooks like we have no more questions. Let us wrap up this presentation of COMSYS Holdings' financial results for the first half of the fiscal year ending March 2026. Thank you for setting aside time from your busy schedules to watch today's presentation.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete COMSYS Holdings Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to COMSYS Holdings Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in COMSYS Holdings Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.