Contango Ore, Inc. (CTGO) Earnings Call Transcript & Summary
November 14, 2025
Earnings Call Speaker Segments
Romeo Maione
executiveOr hello there, whatever time of day it happens to be where you're listening from. I've got Contango Ore's chief executive, Rick Van Nieuwenhuyse, and its chief financial officer, Mike Clark, with me right here in person at the Deutsche Goldmesse in Frankfurt, Germany, and we're going to talk about how Contango did in Q3. Sirs, how are you both doing?
Rick Van Nieuwenhuyse
executiveGood to see you here in Frankfurt, Romeo.
Romeo Maione
executiveGreat. I wish everyone were gathered together, though we're only a few feet apart because of what it takes to pull off movie magic on webinars. Here's how things will unfold today, for those of you in the room. I have several questions lined up, and I'm keen to dive into these rather excellent Q3 reports. I'm also keen to field questions from those attending live. Should any question come to mind while today's event is underway, you'll find a chat button at the bottom right of your screen. Feel free to chime in whenever you like. Whatever I don't manage to reach — today's event will be fairly brief. Any questions I don't manage to reach, I'll make certain to pass along to Rick and Mike and the Contango team afterward, and they'll respond to you as promptly as they can. I wanted to dive straight into the protein as fast as possible. Rick, clearly we're seeing record operating income of $25 million this quarter, while I think nearly as impressively, or perhaps more so, AISC stayed under that $1,625 target, at $15.97/oz. Two comments and a question. First, that's a lot of money. Congratulations. What's kept AISC in check?
Rick Van Nieuwenhuyse
executiveYes, that represents a record amount of money for us. Our Q3 output came in roughly 2,000 oz above what we had planned. The key point is that AISC is landing below the $1,625 figure we provided as guidance. Naturally, Kinross sets our guidance. In my view, a major factor there is the mine plan we laid out — we are either hitting it or doing better than it. That strikes me as fairly characteristic of Kinross as a large organization; they prefer to promise less and deliver more. That works in our favor since it keeps us from getting too far ahead of our skis. Another element overall, I believe, that has genuinely benefited our project in particular is that oil prices remain low and diesel costs have stayed flat. We are all aware that a rising gold price backdrop signals to us that inflation persists no matter what the government says on the record. We understand that this is what it is anticipating. What sets this period apart is that we are not seeing oil prices climb in Alaska. At the pumps, diesel has held at the same quite steady level for a number of years now. That is beneficial; it is particularly beneficial for our project since, clearly, the transportation side of moving ore from the mine site to the mill makes up a substantial portion of our cost structure. That, I think, and I also think the other piece is, look, Kinross is performing excellently simply by executing the plan they have set out. When you are, in a manner of speaking, firing on all cylinders is how I like to put it.
Romeo Maione
executiveThat's completely clear. Mike, I'd like to bring you in on the financial specifics. I'm aware that our cash balance rose sharply, going from $20 million at the close of 2024 to a striking $107 million by September 30th, including $87 million in distributions we've received so far from the Peak Gold JV. Could you take us through how we're prioritizing capital allocation? At this point you've reduced a significant amount of debt and resolved the carry trade. What's the strategy driving those decisions?
Mike Clark
executiveHonestly, compared with the prior couple of quarters, things look pretty similar. Delivering into the hedges has been our aim the whole time — capturing those payoffs as fast as we can and reducing the debt according to plan. As of now, our production consistently runs roughly a quarter ahead. We're typically handing over output around three months early, which is the reason we employ the carry trade. When gold prices climb, that approach has protected us; this quarter, I believe it translated into savings of roughly $2.4 million. The approach is delivering results. We intend to keep at it. Right now, I'd say we're delivering into the December hedges. Basically, the aim is to have these delivered in full by September of next year; we're still awaiting the 2026 plan for Manh Choh, though as it stands, that's our internal target.
Romeo Maione
executiveNo, I appreciate that. Mike, there's one thing — I saw that you included adjusted net income for this period. For everyone here, and honestly for myself as well, could you give us some insight into it? What exactly are we looking at here?
Mike Clark
executiveSure, credit Rick for that final point. Essentially, our income statement remains quite robust. You keep seeing these derivative hedge losses that tend to cloud the picture. What that actually represents is an unrealized loss on derivatives, driven by the forward curve for gold prices. Since it climbed so sharply in September, reaching around $4,300, the derivative loss increased substantially. That had a $30 million effect on our P&L, which shifted us from what would truly be a typical recurring net income position into a net loss. We included it there so shareholders could see what the business would look like once those items are removed and what our normal business looks like. Rick, anything to add to that?
Rick Van Nieuwenhuyse
executiveWell, I was about to make the point that, in my view, the accounting standards are a bit off when it comes to how they characterize this and the way they essentially compel you to characterize things. So it's called unrealized, which means that if we fail to deliver that gold and that future gold, then we've got a problem. We'd better either go purchase gold on the market or do something along those lines, since it's a contract into which we must deliver. That's the reason it's labeled unrealized. Something along the lines of potential loss would have been my preference. In any case, the accounting standards are what they are. We're only a small company. Changing them isn't something we're going to do. We do our best to at least make the reality clear to the shareholder.
Romeo Maione
executiveNo, appreciate that very much. I think that's helpful context.
Mike Clark
executiveThe unrealized piece represents those hedges still carried on our books as of September 30th. Whenever we settled hedges in the quarter and booked that loss, those become recognized losses. The split was roughly even, close to $50 million on each side for the quarter.
Romeo Maione
executiveThanks. Yeah, I really appreciate that. There's one item I was hoping to get your take on — something that caught my eye in the PR: the test batch that blended Manh Choh's low-grade oxide ore together with the Fort Knox ore. It hit a 94% recovery, and it should contribute roughly 1,300 oz during Q4. From where I sit, that struck me as a fairly meaningful technical accomplishment. What I'd like is your view on this: when a met test works out, what does that indicate about our ability to treat more Manh Choh material — the kind that possibly wouldn't have made economic sense in an earlier period?
Rick Van Nieuwenhuyse
executiveWe can't give you a definite answer at this point, since the only figure we have is the test's net outcome. We put 44,000 tons through at an approximate grade of 0.1 oz/ton, equal to 3 g. Calling it low grade means low grade compared with the 8 g/ton average grade. That needs to be framed properly. You're correct that this test is meant to show what that marginal ore would look like simply blended with Fort Knox. It's oxide material. There's quite a lot of this low-grade material, and to understand why, you have to look back at the original mine plan, the feasibility study mine plan, which was put together when gold was at $1,400, roughly 3 years back. Of course, the gold price, well, it's taken a sharp drop today, but it's still over $4,000. That's simply a different mine plan. Testing this low-grade, approximately 3 g material marks the beginning of exploring whether there's another approach to processing this low-grade material, simply blending it with Fort Knox. Fort Knox ore, which is far, far lower grade, runs somewhere between 0.6 g and 0.7 g/ton. That's what typical Fort Knox ore looks like; at Fort Knox it isn't really oxide ore. It simply contains no sulfide. Blending our oxidized low-grade 3 g material, while doing that, you operate the mill at 2,500 tons per day. That's how they run the mill for Fort Knox. That's the situation. When it's run for Manh Choh on a batch basis, output falls to 10,000 tons per day. It's all about capturing those economies of scale. We don't yet have the results covering all of that, plus the consumables and the cost, the power cost, every detail that goes into working out the milling cost. Within the next month, we ought to have them, and we'll make some calls about moving forward on whether it makes sense to process this low-grade material on a blended basis rather than only a batch basis. The batches will keep going. That applies to the higher grade; we're down in the sulfide portion of the material. Everything we're discussing is sitting at the surface in stockpiles, the oxide, the low-grade oxide. Does that make sense?
Romeo Maione
executiveRight, definitely. Thanks for clarifying that — it helps quite a bit. So at Manh Choh, in Q3 you ran 287,000 tons through at 0.214 oz/ton with 92.5% recovery. Relative to what the reserve grade would suggest, how does that stack up? And how much visibility do you have into the ore bodies that are laid out in that mine plan sequence?
Rick Van Nieuwenhuyse
executiveOkay, so a comprehensive mine plan for 2026 should be ready in a few more weeks. After the budget meeting happens and both the budget and that mine plan get approved, we will definitely make it public. So I'd say keep an eye out for it. The grade is somewhat below what the feasibility study showed, which was around 8 g/ton. That's happening because we're mixing in material of lower grade. Since gold isn't priced at $1,400 anymore—it's at $4,000—the inclination when you introduce more low-grade material is for the overall grade to drop, yet profits go up since the gold price is over twice what had been anticipated. What matters most, I believe, is to watch for the 2026 mine plan. And if you look back at the feasibility study, that year was always expected to have the least gold output across the whole mine life. So far, we've taken some steps. Some extra trucks have been bought. Clearly, we're evaluating this blending approach. In the coming couple of weeks, we'll know what the mine plan looks like. Another podcast or interview here on the platform will be necessary so we can lay out what that plan involves.
Romeo Maione
executiveRight, that's clear. Thanks for that. So, in the press release you brought up that sustaining capital for replacing tractors plus continuous exploration drilling at Manh Choh played a part in the higher AISC. Should we treat this as the new normal for sustaining costs, or do you think those will come down once we more or less wrap up the capital replacement cycle?
Rick Van Nieuwenhuyse
executiveSure, I believe this is something we could perhaps address more from an accounting angle, but when you look at it through a mining lens, seeking out ways to improve how the project’s transportation is handled was always intended as part of the overall strategy.
Mike Clark
executiveRight, my guess is we should hold off until the 2026 budget comes out to see where next year lands. As things stand, I'd say that's a solid reference point to use. And of course, it will always — it'll taper off toward the end of the mine's life. Yeah, my expectation is that we stay under $1,600 AISC for this year and probably hold steady the following year, but after that it should drop considerably in the mine's later years.
Rick Van Nieuwenhuyse
executiveYeah, perhaps I could just build on what was said there. What I mean is, with the feasibility-level mine plan, we're finishing up work at the north pit. Once that happens, you begin extracting more from the main pit. You're bringing in your layback, correct? A great deal of pre-stripping is involved in making that happen. That, in my view, explains why our own sustaining costs sit at the higher end of the average. After that, 2027, 2028, or 2029 will come in lower.
Romeo Maione
executiveGreat. I’d like to touch on Lucky Shot briefly, since I know you’ve moved the drill rig into place for that 15,000 m underground infill program. From what I understand, the feasibility study is expected in 12 months to 18 months, with a production decision possible as early as 2027; annual output is estimated at 30,000 to 40,000 oz using the classic Contango DSO method, so how does Lucky Shot align with your broader portfolio, and what gives you confidence in this really exciting yet aggressive schedule?
Rick Van Nieuwenhuyse
executiveWell, I mean, look — this isn't the world's largest mine, but the grade is genuinely excellent. We've drilled enough to publish a modest resource. I realize 100,000 oz to 110,000 oz of resource doesn't grab everyone's attention or get people excited. The grade ought to get them excited. It sits at 14 g/ton. We're underground. Our underground infrastructure is already there; we've been carrying and maintaining the mine throughout the year. We've been waiting until we had the cash buildup we now have. Now we can carry out the plan already in place to complete the drilling. The drill is on site as we speak. Whether it's turning today, I can't say, but if not today, then tomorrow or the day after. The plan calls for 15,000 m of underground drilling. That should take roughly a year to finish. These holes are relatively short. We drill what I'd describe as a fan shot from underground, going from a near vertical hole out to about a 10 to 20 degree angle. Essentially you're just spraying the rock. The vein sits there and you drill straight into it. Holes average 30 m. So drill results ought to begin arriving by mid-January. We're using a photon assay, basically. The lab sits in Fairbanks, so we simply box up the rocks, bring them to the lab, and have them analyzed. I figure we'll begin putting out results around mid-January sometime. And it should be fairly steady throughout the year. We'll know, and the market will grasp, that our goal here is to outline 400,000 to 500,000 oz; this mine yielded 0.25 million ounces at very high grade — a 40 g/ton average grade. That was mined the old way, a narrow-beam mine that frankly wasn't terribly safe. We intend to mine at a 3 m average width and dilute that grade across that width. On a mine diluted basis, we expect a grade closer to 10 to 12. We hold all our permits. Essentially, give us a year to finish the drilling, plus another six months to produce a feasibility level mine plan. I call it feasibility light because, once again, we aren't constructing a mill, a tailings facility, or a power plant. It's really just a mine plan and a transportation plan. Under the transportation plan, we haul it down to the railroad. We can choose whether we head north to Fort Knox or south to Seward. We've had overseas interest in shipping this to a smelter. That could work out as well as, or better than, sending it up to Fort Knox. We have plenty of options. When you've got grade, you've got far more options. Another thing I like about our DSO model is that we concentrate on things that have grade. They might not rank as the largest gold mine globally, yet they will generate returns for our shareholders. That, in my view, is the business we should concentrate on: owning mines that truly turn a profit and can be brought into production fast. Through the DSO model, we are able to achieve exactly that.
Romeo Maione
executiveExcellent. I still believe we ought to create "rocks in a box" T-shirts as well. To me, that's simply an enjoyable concept for later on. Each time you bring it up. I'd like to discuss Johnson Tract briefly, since at least according to historical drilling, it may be the highest-grade asset within your portfolio. Might you give us an update regarding the permitting efforts for the underground exploration drift, plus the transportation infrastructure? Essentially, what comes next? Which items on the critical path decide where this project is headed?
Rick Van Nieuwenhuyse
executiveOkay, so Johnson Tract is really a strong asset. We acquired it just over 12 months back through the High Gold purchase. Right now we're in that tedious phase of the Lassonde Curve. It's all about permitting. We've been engaged with the state government regarding permits for the underground tunnel. Essentially, we're doing the same thing we just completed at Lucky Shot: get the underground tunnel established, and we need to permit it first. Those permits come from the state of Alaska. There are essentially two key permits: a mine operating permit, since technically it's a mine. We're still exploring, but technically it is a mine. Then, since it's a mine and there's potential for water discharge, a water discharge permit is required. We anticipate getting both of those by Q1 of next year. If that happens, we'd mobilize next summer, moving equipment to construct the road. That road is roughly 5 km or 3 mi, connecting the camp to the proposed portal location. A few bridges need to be installed. Again, those are temporary bridges, because it's still exploration. We use what are known as Bailey bridges; they simply span the creek and let you get your materials to the other side. At this stage, the road isn't permitted for mining operations. That will come later. We want to get equipment mobilized to begin tunnel construction; we want a winterized camp so we can operate throughout the year; that's roughly a $20 million program. Again, we're funded to do that; that's our plan. Naturally, once the permits come through, we'll announce it, and as we begin mobilizing equipment next summer, there's a lot of work ahead on all of that. Meanwhile, we're in the process of permitting with federal government agencies, the transportation road route on the transportation easement and the port site easement, which for us is a barge landing site. We're also, in parallel, permitting the road and the barge landing site. A lot of work is happening behind the scenes. We're eager to get the drills turning for drilling and blasting to build the tunnel next, probably starting next September is what we're aiming for. Getting the camp winterized is a crucial step so we can work year-round.
Romeo Maione
executiveAlright, that context around the browsing is genuinely useful. Before I turn to what the audience has asked, though, I want to pull back and look at the bigger picture for a moment. I'll probably talk up Contango here more than I normally would while we do that. This business has moved from being an explorer to a producer that generates cash, with $107 million sitting in the treasury, very little debt at this stage, and 2 development projects moving forward. When you consider the coming 5 years and the chance that this stretches into a longer-range plan, what would count as success? Is your attention on growing organically via Lucky Shot and Johnson Tract? Or does the fresh financial strength mean you can now weigh consolidation opportunities in other places?
Rick Van Nieuwenhuyse
executiveWell, the way I prefer to put it is that we've got a five-year plan that's genuinely executable, and the funding is there to carry it out. The reason I call it executable is that we also have the people who can deliver it. Alaska is familiar ground for us—it's right in our backyard. We understand what it takes to accomplish things in this region. So at this point we're beginning to ask ourselves: fine, that five-year plan is strong, but why not stretch a five-year plan into one covering 10 years or 20 years? For that kind of expansion, we'd want to be examining M&A. We're reviewing opportunities, though we won't wander too far from home. Alaska, BC, Yukon—that's more or less our backyard. We're experienced working in that area; every one of us has worked there previously; that's where I'd tell you we're focused. There are roughly half a dozen distinct opportunities on our radar that suit the DSO model. Each of them will fit that model. This model appeals to us; we've shown that it delivers results. We're seeing another half a dozen opportunities comparable to Johnson Tract, similar to Lucky Shot, that would let us keep investing and keep expanding the company past those five to seven years using the resources we already have. I don't want to overlook this—I mean, we won't be overlooking exploration at Johnson Tract and Lucky Shot. We can run a five-year plan at Lucky Shot, and we can run a five-year plan stretching over the coming 10 years-15 years, exactly the way the Kensington mine has done; it's been in operation for 25 years and has never had more than five years of mine life in front of it. That's just how an underground mine operates. Once the mine is up and running, we'll be putting money into exploration. The first priority is to get the mines up and running.
Romeo Maione
executiveGreat, that really helps. I was trying to understand what's planned going forward. Mike, I'll bring you in on one. Six months back, I gave you my word you'd get a single hedges question at most during each webinar. So here it is, your one hedges question. A person in the chat wanted to know, at what point do you think those legacy hedges will be fulfilled and reach 100% of market price?
Mike Clark
executiveRight. What we want is to clear those hedges out at the earliest opportunity. Everything we ship is going entirely into these carry-trade structures, since our position is consistently one quarter forward. If we can produce 50,000 oz of gold in 2026, then the plan is to try to satisfy those hedge commitments by September — every one of them by September. Technically, the final contracts don't expire until mid-2027, but I believe we ought to have enough cash to back that strategy. Assuming the 2026 budget comes in where we expect, I think we can fulfill these obligations and wrap them up by September. Does that cover what you were asking?
Romeo Maione
executiveI think that's right. That's all the hedging done. Take it easy. There won't be any more hedging for the remainder of this webinar. Another person in the chat posed a question, and this one I believe is directed at you as well, Mike. What's the size of the net operating loss carry forward?
Mike Clark
executiveWhen it comes to losses, the situation in the U.S. is somewhat more involved, since there are non-operating losses of a kind that can only be used to offset 80% of net income. Our structure allows any costs that Lucky Shot incurs to be applied against the profits we make each month. We don't expect to be in a tax position, and we don't expect to pay taxes either this year or next year. As we continue to advance Johnson Tract, I think the plan is to use those costs as an offset. It's my hope and my goal that taxes tied to Manh Choh will never actually have to be paid by us. To make that a reality, we'll need to keep spending on Lucky Shot and JT. At this point, we don't expect anything this year. If we ended up paying next year, that would surprise me; our loss positions in the U.S. are beginning to dwindle. Eventually, we will be in a taxable position, though that's a good problem to have, since it means we're making money.
Rick Van Nieuwenhuyse
executivePaying taxes means you're making a lot of money. So I'm good with it.
Romeo Maione
executiveIn a way, that's a problem only success brings, no doubt about it. Turning to the question that arrived moments ago, will there actually be an earnings presentation for Q3, as someone just inquired?
Mike Clark
executiveWe updated the presentation on the website. There's not going to be anything else.
Romeo Maione
executiveGreat. Thank you.
Rick Van Nieuwenhuyse
executiveShould you go check out the site, we've just put the Q3 results up there not long ago. Right. Simply head over and have a look at the site. It ought to be posted there.
Mike Clark
executiveMy hope is that by December, we can provide our outlook for 2026. When that time comes, we'll refresh it, and in all likelihood hold a call then as well.
Rick Van Nieuwenhuyse
executiveAs usual, should anything come up, feel free to send a message to our general address, info@contangoore.com. Should you already have our individual addresses, I won't be sharing those openly here. However, if you happen to have our addresses or telephone numbers, feel free to ring us too.
Romeo Maione
executiveOkay, thank you. Yann sent in a question through the chat. He could have been referring to either of two possibilities, but what he's asking is the number of ounces in Q4 2024. I don't know whether you remember the total ounces from 2024.
Mike Clark
executiveI'm aware of the ounce total from 2024. My recollection is that roughly 42,000 oz came out during a six-month stretch. Q4 saw us complete two batches. The precise figure isn't something I have on hand, but what I do recall is that across those two quarters, the amount was 42,000 oz.
Rick Van Nieuwenhuyse
executiveJust remember, we began mining close to 12 months prior to that point. Once the mine was opened, we weren't immediately hauling using every truck. You're accumulating a stockpile while beginning to move ore. During that initial 6-month production period, we had a decent amount of ore accumulated. What I'd characterize now with the 60,000 oz figure is closer to a steady state approach. Also, 2026 was always expected to be a weaker year owing to stripping work happening at the main pit. In a few weeks, we'll provide the specifics regarding that 2026 mine plan. Keep watching for it.
Romeo Maione
executiveGreat. I realize today's event was supposed to be brief. Let me finish with just one fast question; that's Rick, what has you most enthusiastic about what's ahead? At this point, what about Contango Ore has you so excited you can't sleep?
Rick Van Nieuwenhuyse
executiveWe're really pleased to be back underground at Lucky Shot, drilling once more. What I'd say is this: we view Lucky Shot as a modest operation — it won't ever rank as the world's largest mine. Nobody on our side will ever claim otherwise. Still, our belief is that it will generate substantial profits. The drill is spinning. Keep watching for those assay results. There's nothing quite like the thrill of spotting free gold hosted in a quartz vein below surface. Honestly, for someone trained as a geologist, this is the heart of why we do it. Keep watching.
Romeo Maione
executiveGreat. I truly appreciate that. Thank you all. There’s quite a large crowd with us right now. You folks have no idea how hard it can be to get things arranged for a conference, though Rick and Mike certainly do. Many thanks for being here, for making it possible to take care of this today, and for fielding everyone’s questions. I’m very grateful for the time you’ve given. Should anyone still have further questions, please be sure to send them our way. If not, I hope each of you wraps up your day on a good note.
Rick Van Nieuwenhuyse
executiveThanks, Romeo.
Romeo Maione
executiveCheers.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Contango Ore, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Contango Ore, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Contango Ore, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.