Hello and welcome, whether it's morning, afternoon, or evening wherever you happen to be tuning in from. I appreciate everyone being here with me. Joining us right now are Contango Ore's CFO, Mike Clark, along with our CEO, Rick Van Nieuwenhuyse, and we're here to walk through Contango's Q1 financial results. Mike is taking the lead spot since the focus today is on the numbers, so he'll be kicking things off. What's going to happen is he'll run through a short presentation that recaps what we put out yesterday. After that, I have some questions lined up, though this is very much meant to be an interactive session. <<operator_script>> One more note — this event is being recorded, and you'll likely find it in your inbox by mid-afternoon, Eastern time; it will also be posted on events.6ix.com as well as our YouTube channel. So with no further delay, I'll step off camera and turn things over to Mike for a recap of yesterday's press release.

Mike Clark

executive
#2

Appreciate that, Romeo, and hello everyone, good morning and good afternoon. What I'll do is take just a few minutes to walk through the quarter that closed on March 31, 2025, touching on both the statement of operations and the balance sheet. Starting with the statement of operations: income from operations came in at $19 million, and that figure includes $22.3 million of equity income from the Peak Gold JV, which represents our 30% ownership stake in Manh Choh. For the quarter, we posted a net loss of $22.5 million, and within that is an unrealized loss of $40.5 million tied to the hedge contracts. The main reason behind this is that gold opened the year at $2,600 and finished the quarter at roughly $3,100. We also booked $2.7 million in interest and finance charges connected to debt. Over at Manh Choh, we sold slightly more than 17,000 ounces of gold, with an additional 3,800 ounces sitting in recoverable inventory. Cash costs came in at approximately, or $1,334 per ounce of gold sold, while our ASIC was $1,374 per ounce of gold sold. Guidance for 2025 is unchanged at 60,000 ounces of gold, with an ASIC of roughly $1,625, since we do anticipate that the ASIC will rise in the later quarters as sustaining capital increases, which relates to replacing tractors along the ore haul route, plus a $5.7 million exploration drill program. Turning to the balance sheet: we closed out the quarter holding $35 million in cash. Marketable securities stand at about $900,000. Since the quarter ended, those have grown to roughly US$4 million, and that relates to our investment in Onyx Gold Corp. Trade payables came to $9 million at quarter end, and that's mainly tied to a gold shipment that took place on March 31, since we had to pay the Peak Gold after the quarter closed. During the quarter, we made principal repayments totaling $13.8 million on the facility. Then after the quarter ended, we paid an additional $8.2 million, which brings the facility balance down to $30 million as of today. On the derivative liability side, the hedge balance technically stayed flat during the quarter. We began the quarter with 86,000 ounces, and that same figure was our ending balance at quarter close. Now, since gold rose, the liability did go up; but I want to point out that we executed what's known as a Carry Trade; and as a result we effectively locked in the April hedge price during the quarter. So we wound up selling that on April 30. And then lastly, we've begun delivering into the July hedges, and roughly 2,800 ounces have been delivered into those so far. With that, I'll turn things over to Rick.

Rick Van Nieuwenhuyse

executive
#3

Right. Thank you, Mike. It's been a solid quarter, in my view, and we are in fact about to kick off the second campaign — well, it actually got underway yesterday, so that one becomes our May campaign. It should last about 30 days, so once that campaign wraps up, we'll aim to report the total production we expect from it. The finish line is likely around mid-June, and at that point we'll give a bit of an update — not gold sales, though; instead it'll be an estimate of the gold produced. After that, our Q2 results will most likely land in — Mike, I'll leave that one to you, probably when? July or August?

Mike Clark

executive
#4

Yes, yes, early August.

Rick Van Nieuwenhuyse

executive
#5

Okay, the situation is positive. Essentially, what I can say is that performance has come in slightly ahead of what we had anticipated. The overall quantity of gold we turned out exceeded expectations, by around 30% for Q1. That gold is indeed sitting in inventory. The way our campaign works, the gold gets processed roughly during the middle month of a quarter — well, not precisely the middle month. So it spills over. And gold sales, as you'd expect, lag behind that by approximately 30 days. So just bear that in mind — whenever you look at our financials, you'll notice there's likely always some gold inventory that has been produced yet not necessarily sold. With that said, perhaps Romeo, I'll hand it back to you so we can begin Q&A.

Romeo Maione

executive
#6

Great. There are several questions I want to ask, and a few of them have already shown up in the chats. Where I can, I'll combine them. Mike, let's begin with you — I was interested in whether you might offer a bit more detail on the carry trade as well as the hedge delivery schedule. This ties to something said in the chat, where Wesley asks about hedges that are still outstanding. At what point do you get freed up?

Mike Clark

executive
#7

Yeah, that's a fair question, and it comes up often. Honestly, it's fairly complex, but we've shifted how we handle it, and that shift has been underway since the start. Let me just take it from the top. The core issue is that you've got a hedge delivery schedule, roughly one per quarter, with a maturity date, and that was set up based on the feasibility plan or study. What really occurs, though, is that you receive shipments each week, essentially across the entire year, though they're larger during the middle campaigns. So to handle cash better, we moved toward what's known as the Carry Trade, letting us sell gold at the spot price when shipments happen and apply that money to pay the JV for the gold, then wait roughly a month for the distribution and use the additional proceeds to cash-settle that hedge with our lenders. That makes it a superior cash management instrument for us, at a fairly low cost. Essentially, it's an inexpensive financing method. So what took place this quarter is, as you might remember, we cash-settled our January 31 hedge back in December, meaning effectively no hedges matured in the quarter. Yet we began producing in February. So what we did was deliver — essentially we — set — delivered 100% of the April hedge into those carry trades over the quarter. That amounted to roughly 12,000 ounces of gold. We entered the quarter with 86,000 ounces of hedges. We exited the quarter with technically 86,000; however, factoring in the carry trade, the hedge balance sits just under 75,000. And as of today, we're likely nearer 71,000 as we keep delivering in July. Does that more or less address what you were asking?

Romeo Maione

executive
#8

Yeah, that's excellent. I'd say that's helpful additional detail, so thank you for it. One thing — just for those who aren't familiar, and it's also come up a bit in the chat — where are the Onyx shares coming from that are currently valued at that $5 million?

Mike Clark

executive
#9

Right. So HighGold, when we bought them, had 5 million shares of Onyx in their possession. Onyx had been spun out from HighGold about 1.5 years earlier. Those shares were sitting on our books. At the time of the acquisition, I believe their value was somewhere near $500,000 or $600,000, and by the end of the quarter they had reached $900,000. As of today, those shares sit at roughly CAD 5 million — meaning they're now valued at over CAD 5 million. So we figured we'd mention it in the press release to make clear there's an additional capital source available to us.

Romeo Maione

executive
#10

Somebody in the chat asked…

Rick Van Nieuwenhuyse

executive
#11

Let me bring Romeo in here as well — Darwin and the group at Onyx have a project that looks pretty interesting, so that's something we'll be watching. They've just brought in additional funding to support further drilling. So I'd say for us, it's certainly an asset on the books.

Romeo Maione

executive
#12

A few people in the chat were seeking clarification on one point — does that stake now sit within available-for-sale securities for contango?

Mike Clark

executive
#13

It does come with certain restrictions attached, tied to lockups. So that's the situation — though in my view, nothing is off the table, should we genuinely choose to pursue it. That said, at this moment we find ourselves in a...

Rick Van Nieuwenhuyse

executive
#14

Actually — I think I actually consider it in friendly hands.

Romeo Maione

executive
#15

Alright, that's it. Yeah, I'm grateful for that. There's a question I received: regarding the PR, could you talk about that lawsuit that got dismissed and what it signifies for Manh Choh, and more broadly for Contango?

Rick Van Nieuwenhuyse

executive
#16

Alright, I'll jump in on that. So, as you might be aware, we definitely did report about Citizens for Safe Communities — that's a local group in Fairbanks that's against development and against mining — they filed a lawsuit. Their aim was to put a stop to the truck call program. That case has been sitting there for, I believe, more than a year — actually it's been nearly 2 years at this point. Originally they brought 4 arguments before the court. The court threw out 3 of those 4. This was the one remaining that hadn't been dismissed, but there wasn't really much follow-through coming from the Citizens for Safe Communities side; so, a little while back we found out they were thinking about dropping it; and as it turns out, you can't simply walk away from a lawsuit. You've got to reach a settlement; so that process took — I'm not sure — a bit more than a month, perhaps 2 months, somewhere around there, for them to settle it without prejudice. So, it's finished. I mean, clearly, that's a positive for the project and for Manh Choh; but I'd also say it's a positive for mining broadly, since if anti-mining groups — ones that oppose ore trucking — can't be allowed to mean you can't haul concentrates, and maybe you can't haul this or that which serves the mine; so I think it's a good outcome that this has disappeared, and I believe it benefits not only our project but mining across Alaska as a whole.

Romeo Maione

executive
#17

Thanks. That added detail is helpful. I did have one question: by year-end, what will the facility's balance come to?

Mike Clark

executive
#18

The facility will finish the year around $15 million just under.

Romeo Maione

executive
#19

Thanks, I really appreciate that. I should also mention, of course, congratulations on surpassing the quarterly guidance — that is genuinely impressive. You brought up the incremental PR gains in transportation and processing at Fort Knox. And Mike, I know you definitely hinted at this, but what is it that helps achieve that much lower ASIC of 13 74 compared with the 16 25 target?

Mike Clark

executive
#20

You want me to start on this and then Rick you can...

Rick Van Nieuwenhuyse

executive
#21

Yes. Yes. Go ahead, Mike, and I'll weigh in my Fort...

Mike Clark

executive
#22

I'm going to hand it over to you to discuss those gradual gains. I just want to make a remark that our outlook for ASIC stays at 16 25. The primary reason is that additional sustaining capital is coming in during the quarter. Q1 didn't include much of that, and an exploration drill program is also on the way; as a result, the cost base will rise. So that's basically what's pushing the increase. Also, we turned out more gold in Q1, and my expectation is a robust Q1, Q2 and Q3, followed by somewhat lower output in Q4. When you combine all of those, you'll land at approximately $1600. We continue to hope we can do better than that, yet we still consider it a sensible estimate.

Rick Van Nieuwenhuyse

executive
#23

Alright, yes. So regarding those step-by-step gains. I'd say first off, the bridge rate limits haven't changed. That remains a piece of the everyday hauling by truck. What's actually improved centers on water — specifically whether it turns to ice during winter. Clearly, Q1 is when winter operations happen, and really all they were doing was clearing snow and ice from the trucks. As they descend from the Manh Choh mine site — Manh Choh sits atop a hill — there's essentially a 20-mile route linking it to the Alaska Highway. That stretch is where the bulk of snow and ice gets collected; it's basically a mine access road, not a paved highway. So at its far end, they'd installed some guards that removed a portion of the ice and snow, and then workers would literally go around with a large sledgehammer to knock it loose, prior to entering the highway. Once on the highway, you don't accumulate much ice and snow, unless it happens to be snowing — but since it's interior Alaska, you simply don't receive much snow. So that was one — that has been one step-by-step gain. The ore's moisture level is another. Naturally, during winter, things freeze, so you don't gather much moisture. During summer, which is when we're running right now, what you pick up is mud. So they've set up some wash plants — essentially truck wash stations — just before entering the highway too. So those are every one of the step-by-step items. I suppose the remaining one, which will kick in for summer, is that we — within the pit, I believe there's simply greater water management inside the pit to keep water distant from where you're digging and keep water distant from where you're stockpiling. Last year was a ramp-up year. And I think folks occasionally overlook that this wasn't your typical mine sequencing of feeding material straight into the mill immediately. It goes to a stockpile, then it's moved and stockpiled at the Fort Knox facility. So it was a candidate — in that regard it was somewhat of a lengthy ramp-up from the point of switching on the mill and determining how that functions. Yet even the mill usually follows a three to six-month ramp-up plan. So in any case, to put it briefly, you learn as you operate — you learn where things are going right, you learn where things are going wrong, and then you implement adjustments to achieve step-by-step gains; and that's precisely what has occurred. And it clearly shows up in generating more gold and at a lower cost than guidance; so I believe it's all been quite favorable.

Romeo Maione

executive
#24

Perfect. There's one more thing I'd like to ask about overall strategy, then I'll move to a brief Johnson Tract question. I'm interested—gold prices clearly climbed a lot in Q1, right? In what way does the company weigh the advantages of spot pricing versus its hedging commitments? Might there be any changes to the hedging approach, or what's your current thinking?

Mike Clark

executive
#25

That is certainly what I wanted to ask about. It isn't something I'm eager to — clearly, we spend a great deal of time examining this. Right now, for this year, 30% of the gold we sell goes at essentially the spot price, while 70% goes into the hedges. One option is to attempt something clever, like replacing hedges with gold prepays. Ultimately, the outcome ends up being the same, only it looks different. So I suppose what I'm focused on at the moment — and I can't speak for Rick — is simply continuing to deliver into those hedges, getting ahead of them as much as possible, trying to manage the carry trades, and attempting to hold that 70 to 30 ratio as we deliver throughout this year, making sure we're ahead of schedule by the time we reach the end of the year. We'll wrap up the year with roughly 43,000 ounces in the hedges. Our debt will be down to $15 million. By the time we reach the end of the year, I believe this will matter less, and we'll show another solid year of production. And those — they simply won't carry as much weight on our balance sheet. Rick, is there anything you'd like to add?

Rick Van Nieuwenhuyse

executive
#26

Right. I would simply state that we are not a major producer. Betting on the gold price in some clever way isn't something I believe we should pursue. That wouldn't serve our shareholders well. It's not what they're asking of us, in my view. What they're after, I believe, is for us to — well, those hedges exist since that was the sole method of securing capital 2 or 3 years back, when equity markets had essentially gone quiet; so it's baked into who this company is; and like Mike mentioned, we'll simply continue reducing the debt and continue meeting the hedges. Let's avoid trying to be clever and wagering heavily that gold will climb, only for it to fall and leave you worse off, so essentially standard operations; and I believe we'll end up in a solid position. I believe we're already in a solid position, though clearly we'll be in an even better one once the hedges are gone; so that moment will arrive before long.

Romeo Maione

executive
#27

Liberated as they say in the comments.

Rick Van Nieuwenhuyse

executive
#28

Liberated.

Romeo Maione

executive
#29

Right. So I'd like to shift over to Johnson Tract briefly, since I realize we discussed it not long ago, but I truly want to stress the really remarkable NPV that comes in above $400 million at today's gold prices. So as the people here in this room, I'm wondering what the upcoming major milestones are for advancing Johnson Tract? And to be more precise, when it comes to permitting that tunnel for underground access, what does the schedule look like?

Rick Van Nieuwenhuyse

executive
#30

Yeah, so permitting definitely isn't the exciting chapter of this story. Still, that's what comes next for Johnson Tract. That's the reason we were eager to release the initial assessment. I keep — well, I try not to label it a PEA, but get the assessment out. So folks understand this is a fairly valuable asset. That said, as we mentioned, the following phase involves permitting the tunnel, and that falls under a sustainable Alaska mine operating permit — technically you're a mine once you begin driving the tunnel; you might not be producing more, but you are mining, you're beneath the ocean, all of that. So we figure roughly a year for that; it's a state permit. There's no specific federal permit needed for this. The access road that links the camp to where the tunnel is planned already holds its permit. So in theory, we could build it at any time — but it doesn't make much sense to spend money on a road only to have it sit there unused. Our plan, then, is to obtain the permits, which we figure will take roughly a year. In the meantime, we're working on permits for the easement and the barge landing site that the federal government gave to CIRI. When an easement is granted, that typically indicates the permit is already in hand. So this comes down to the special arrangement between CIRI and the federal government under which they got those easements — meaning we have to pin down exactly how the road alignment runs. After that, you go through the usual requirements for getting permits. Wetlands are a major factor here, specifically for the Wetlands 404 permit, and the objective is to limit how much damage is done to them. As a responsible mining company building roads, you also keep an eye on other things, like minimizing the effects on moose and fish. That means fish passages — making sure any stream with fish in it, or fish-bearing stream, allows them to swim back and forth under the road, whether across the river or the water below it. As for the barge landing site, I think we've generally chosen the best location, but more work is needed, especially on where exactly it will go and how it will be designed. We're going to do some work within the trusted panel, and the main goal there is figuring out the Blue Whales' locations and the spots they tend to congregate. We also want to know whether the channel gets used by them. Do they stay on its northern side or its southern side? It's known that they're usually found around that area and that they don't belong to a dangerous species. Clearly, gaining a better understanding of this matters a great deal to us, so that's another thing we'll be working on during this summer. Turning to this year's priorities, when it comes to the road access leading down to the bar ringside, and simply to give full coverage of it, the road stretches roughly 20 miles, which is nearly identical to what Manh Choh has, so the scale is really quite comparable. So throughout this year, we'll be pulling together all of that information, and after that, next year, we can begin issuing those permits in a formal way.

Romeo Maione

executive
#31

Great, and obviously I'm thankful for the JT update. I've got a final question — I realize you've sort of addressed it already, but I'd like it spelled out plainly before we get into the million questions from the audience. Given that you've strengthened the cash position and brought down debt, what are the priorities for the rest of this year?

Rick Van Nieuwenhuyse

executive
#32

I believe Mike pretty much addressed that — continue reducing what we owe, continue fulfilling the hedges. We'll be going over our budget before long. Next week, Mike and I will be seated facing one another, and we can examine it. Is there enough funding to consider a drill program at Lucky Shot during this year? I'd like that, but I also want to stay prudent and ensure we have ample cash on hand for the primary operations here — getting Johnson Tract permitted, fulfilling the hedges, and bringing the debt down. There are several additional items we could consider, but I think those represent the key priorities at present.

Romeo Maione

executive
#33

Great. I'll hop into the chat now; a few of these we've already touched on, though there are quite a few questions, so please be patient with me. I'll work through as many as possible. This has come up somewhat already, but Jan wants to know where Contango will most likely drill next?

Rick Van Nieuwenhuyse

executive
#34

I'd say it was likely a fortunate hit. My belief is that if we don't have a drill program underway during this year, I'm quite sure we will be drilling in the next year. Everything is ready on our end. The underground portion has its permits, so technically speaking, it qualifies as a mine. At present we've placed it on care and maintenance, though we are indeed taking care of and maintaining it. That's my best assessment. To be clear, I'm referring to something distinct from Manh Choh. We have — I believe the figure is a $5.7 million joint venture program over at Manh Choh. The aim of that drilling effort is to assess targets within and surrounding the existing pit; a small amount of work will happen farther out. Still, my sense is that the bulk of the exploration work sits in and around that pit. Naturally, the feasibility-level pit was engineered assuming, I believe, $1,450 gold. With gold nearly $2,000 higher, it would strike me as very odd if that pit failed to grow somewhat larger, extend somewhat deeper, and expand somewhat further, simply chasing the material that clearly didn't qualify for inclusion in the pit plan at a $1,400 gold price. So I expect — we won't see results before later in the year; and my belief is that with that $5.7 million budget, we won't be positioned to upgrade a resource. Should we uncover some intriguing things, though, I suspect we'll very likely keep directing our efforts there as we move ahead.

Romeo Maione

executive
#35

All right. So, following up on that same point Tate raised in the chat — Tate with the Max Group — regarding that $5.7 million: does that amount come out of your portion of the JV's sales, or is it paid by you separately?

Rick Van Nieuwenhuyse

executive
#36

Mike can respond as well, though this all falls under an annual budget. Once that's approved, the cash sweeps are essentially baked in before any dividend comes into play, I suppose that's how I'd phrase it.

Mike Clark

executive
#37

Yes. So at present, our guidance is for roughly $80 million in cash distributions from the JV for this year, representing our 30%. That's calculated at approximately $2,800 gold. So that encompasses, sort of, our 30% share of that $5.7 million program.

Romeo Maione

executive
#38

Alright, thank you. There's an internal question from T. Decker <<inaudible>> in the chat. What's behind the rise in shorts — who exactly are these people? That's a fascinating thing to ask.

Rick Van Nieuwenhuyse

executive
#39

Regarding the shorts — we're fans of the shorts. I don't wish for the guy to get strung up, though that's a separate matter. The brief response is, I mean, there — see, I mean the — my belief is this is entirely guesswork on my end, and Mike, if I had it wrong, I mean Mike would be nudging me; but see, we were — back in November we took a beating because of the smaller quantity of gold output and the higher expense compared to what the feasibility indicated, and again, that feasibility is now 3 years old. So my thinking is that's where these matters began. My thinking is there was a push to — after we had dropped to a lower point. My thinking is there was a push to remove us from the Russell; so my thinking is that has led to some continuing downward shorting of the stock aimed at getting us off the Russell, and after that there's 1,000,000 shares that the Russell is required to sell. My thinking is that has disappeared for them in the sense that our share price has risen since we've done better than guidance and we keep delivering more gold than planned and at reduced costs. And my thinking on the other side is that the Trump tariff talks have worked against the Russell valuation, and then the Russell has declined. So even as the Russell has declined, we've climbed on a relative basis, which means that the lower threshold on the Russell sits below us being on the cost, sort of thing; so my thinking is the shorts are in difficulty and my thinking is today is a fine illustration of that.

Romeo Maione

executive
#40

Alright, someone in the chat mentioned that a short squeeze would be wonderful. Is that something we all agree on? There you have it. Even in the chat, it says so. Congrats on an amazing quarter — I'm hoping for just a little clarification regarding something from the previous call. I put forward that you would fund Johnson Tract through bank debt along with free cash flow, provided gold prices stay strong; I just want to confirm that this is correct.

Rick Van Nieuwenhuyse

executive
#41

Sorry, you just came in a bit broken there Romeo can you repeat that?

Romeo Maione

executive
#42

Everything's fine. I was simply wondering about Johnson Tract. During the last call, you indicated that as long as gold prices stay elevated, you would fund a project using bank debt along with free cash flow—I just want to confirm that this is correct.

Mike Clark

executive
#43

Yeah, I believe that's right — I mean, that choice is still a couple of years off for us. Let me just walk through how it lays out. Assuming permits come through for the tunnel this year, then hopefully next year we'd begin thinking about constructing it. After that comes 1 year to actually build the tunnel, plus 1 year to get the underground drilling installed and finished within a mine plan. So plainly speaking, we're at minimum 3 years out. That gives us plenty of runway. If I jump ahead 3 years, our hedge position will be gone. Our debt will sit at 0. That opens the door for taking on additional debt, and we'd be turning out roughly 60 — still producing somewhere around 60,000 ounces of gold each year from Manh Choh. Using that as a kind of anchor and working assumption, we'd be well positioned to debt finance the rest of the road construction and the barge landing facility there. And once more, under the DSO model, there's no mill being built, no tailings facility, none of that. As I said earlier, we might simply purchase one instead. That's something we'll keep evaluating. We'll examine chances to run a DSO direct shipping model into Asia, which could serve as another option. It's one path for us to weigh. But there are at minimum 3 or 4 other mills worth holding talks with, and those talks are already underway. There's no rush on our end. Getting the decisions right matters to us. I somewhat favor the notion of owning a mill and running the DSO model with what you might call a hub-and-spoke variation — feeding our own ore into that mill, while perhaps locating other advanced stage projects that could complement them and stretch out the mine life, or better grades would push out lower grade material. So should we locate something superior out there, we'll definitely pursue it. Still, I anticipate finding plenty of assets far better than Johnson Tract, which is an outstandingly strong project from a mining perspective — simple and with good grade.

Romeo Maione

executive
#44

There's a question that came in through the chat. What is it that makes you personally confident that the mine life at Manh Choh could go past 2029?

Mike Clark

executive
#45

Yes, I suppose I'm largely restating my earlier point, but once again, that feasibility study pit — I can't recall whether it was 14 or 14.50, yet it was one of those two figures at the bottom of the one it was run on. And our costs haven't risen dramatically. I believe our life of mine cost will stay at 1,400. This year will be somewhat of a high year. As Mike mentioned, we're purchasing additional tractors — the trucks, or as they're called, tractors, which pull part of the truck and trailer assemblage. So we'll be acquiring more of those this year. And we also have a — this is a higher stripping year than average. This year and next year are considerably higher than average, and after that they decline. So I think we'll keep seeing very strong cash flows out of Manh Choh for the next four years. And if gold prices are anywhere near where they are, we're going to generate a hell of a lot of free cash flow; so we're in a very strong position. I mean, we only have 12 million shares outstanding; so when you do this on a cash flow per share basis it's — I don't see anybody else that's our near neighbor.

Romeo Maione

executive
#46

That's a good sign. So, keeping my word, I'll ask just a single bridge question regarding webinars, which means I'm merging several bridge questions together. Since you noted it's already present, the restriction still applies. However, could there be an opportunity for that wait restriction to get sorted out with the states within a period you're able to discuss?

Rick Van Nieuwenhuyse

executive
#47

Yeah. What I can tell you is that, as things stand, the plan — now that the yearly budget, meaning the Department of Transportation's budget, has gotten the green light from the federal government, along with the matching funds and everything else — as far as I know, it's on the schedule to be repaired and — well, "repairs" isn't quite the right word, since it isn't actually broken, it's more that it's just being updated — the bridge updates that had been planned can now go ahead — they'll happen 1 year after the original plan, so that would be in 2026.

Romeo Maione

executive
#48

Okay, so once the bank debt has been fully repaid, would Contango then be in a position to approve a modest buyback, say, of $10 million?

Mike Clark

executive
#49

Yeah; it's talking about the buyback program. Rick?

Rick Van Nieuwenhuyse

executive
#50

Yeah. Sorry, yeah.

Romeo Maione

executive
#51

I've got a single question that's specifically about the company's marketing. As far as sell-side coverage and roadshows, et cetera, is there anything coming up that we should be looking forward to?

Rick Van Nieuwenhuyse

executive
#52

Right. So we're off to Las Vegas next week for the Canaccord Genuity conference. My understanding is that we've already scheduled more than 20 meetings, and it's mostly institutional investors who are going to be there, so it should be a solid one. Things slow down for the bulk of June, and July is quiet too, and then we get to August. After that we'll kick off with Beaver Creek, which is kind of the beginning of the road show season, if you want to call it that, running from then through the close of the year. It begins with the Beaver Creek conference, which will take place at the Denver Gold Show in Colorado City — Colorado Springs, sorry. Then I believe we have a handful of other events. And I think that's how we wrap up the year. We have some marketing activities in Europe that we're doing. And then we close out the year, I believe, with the conference in New Orleans.

Mike Clark

executive
#53

So yes, we'll be traveling quite a lot this — beginning in September. There will certainly be the summer break, no doubt.

Romeo Maione

executive
#54

And racking up miles from Beaver Creek through the end of the year?

Rick Van Nieuwenhuyse

executive
#55

Yes exactly…

Romeo Maione

executive
#56

We have a question from the chat, any plans to initiate dividend?

Rick Van Nieuwenhuyse

executive
#57

No, absolutely not. Once again, the core order business is what handles debt repayment and comes through with the hedges. That, I believe, has to be what we stick to—staying glued to that ticker and that fundamental plan. Share buybacks are intriguing. They represent yet another way of rewarding your shareholders. So those are the matters we'll be considering.

Romeo Maione

executive
#58

Okay, I have two hard questions to handle. I'll answer them as well as I can. The first one is the one that never goes away: what's your view on the value of the stock?

Rick Van Nieuwenhuyse

executive
#59

I don't think we're supposed to say that. Can we, Mike?

Mike Clark

executive
#60

You're going to do what you want to do, so.

Rick Van Nieuwenhuyse

executive
#61

More than $15. How is that?

Romeo Maione

executive
#62

That covers it. Nice response. And then Jan posed something else that I don't think anyone could really answer: at this moment, does Contango have any takeover offers actually on the table?

Rick Van Nieuwenhuyse

executive
#63

Yeah. Short answer is not aware of any.

Romeo Maione

executive
#64

Great. What CIRI's stake in Johnson Tracts?

Rick Van Nieuwenhuyse

executive
#65

I didn't — sorry, I didn't understand the question.

Romeo Maione

executive
#66

What's CIRI's stake in Johnson Tracts?.

Rick Van Nieuwenhuyse

executive
#67

CIRI, right? So CIRI is the landowner. They hold both the mineral and surface rights over the tract where that deposit — the current resource — sits. On top of that, they've got special arrangements with the federal government concerning access, and that's the reason they've already received the easement for the road leading to the coast, plus for a barge facility, or port facilities, which is technically the correct description. So that's the fundamental setup between us and CIRI. They're entitled to take part as an equity owner in the project, and I'm certain we'll be sitting down to talk about that at some point. My guess, though, is that's likely 1 year off.

Mike Clark

executive
#68

And they have royalties.

Rick Van Nieuwenhuyse

executive
#69

Yes. Sorry. The royalties, as a landlord they have royalties, yes.

Romeo Maione

executive
#70

Thanks. I’ve got one very specific question regarding Johnson Tract. If you run into archaeological sites while you’re carrying out exploration at the project, what happens?

Rick Van Nieuwenhuyse

executive
#71

Permitting covers a lot, and one major piece involves looking at archaeological and cultural sites. Naturally, we coordinate closely with CIRI on that front. Once more, that land belongs to them. It's their ancestral territory. So, in essence, there's a defined procedure for assessing the access route, the easement so to speak, and it's run and supervised by what we call ship — a state historical, let me recall what those letters represent, office. Anyway, that body handles historical and cultural matters of some significance. Yet frankly, CIRI matters more than ship does. The land is theirs, along with their traditional and cultural heritage. That's what drives us. And that will guide how we determine the optimal location for the road. Briefly put, if you locate CIRI, and you grasped where CIRI actually sits, it isn't along a major trading route or anything for — CIRI itself has informed us of this; therefore, the coastal zones are likely where the bulk of people would have lived, though certainly at the mine site it's truly remote, and you're positioned immediately beside extremely steep mountains. Consequently, you won't come across an old village in that spot or anything of the sort. Still, that's a significant component of the permitting work, no question.

Romeo Maione

executive
#72

Thanks for that. That helps. I realize we've gone past our scheduled time and are nearing the point where we have to wrap up. So I'll ask two more questions. Someone in the chat wants to know whether the derivative liability will drop by roughly $20 million each quarter for the remainder of the year.

Mike Clark

executive
#73

My sense is that number comes in somewhat above that. When I reviewed the hedge position as of April 30, my read is it amounts to roughly $13 million, which equated to around 12,000 ounces. So assuming gold holds at its current level, I'd expect our hedge liability to be reduced by 50% come year-end. That works out to approximately $50 million across the year. From that point, it should decline steadily.

Romeo Maione

executive
#74

Alright, thank you. We’ve got a final question here from Roger. You’ve observed that Contango has no publicly listed options right now. Should we anticipate that options could become listed before long?

Rick Van Nieuwenhuyse

executive
#75

The options market isn't something we have any say over — it operates on its own, correct? And we never grant options to our staff. That's the reason you won't find any options there. We do have certain warrants, though — Mike, I'm not sure — do you happen to know whether those are traded?

Mike Clark

executive
#76

No, I'm not — I don't believe they do at all, they do.

Rick Van Nieuwenhuyse

executive
#77

The number of those is fairly limited. That's likely why they're reluctant to

Mike Clark

executive
#78

Roughly 700,000 remain, and at this point every one of them sits well out of the money, with approximately 2 years still to run.

Romeo Maione

executive
#79

Alright. I’ll just mention a few remarks that came through the chat. Folks wrote, what a transformation of the balance sheet, keep up the great work. So I value the time you gave, Rick and Mike. Thank you very much for being with us, speaking with people, and responding to their questions. I truly appreciate that a lot, and I hope we can speak again soon when we have additional updates. Thanks.

Rick Van Nieuwenhuyse

executive
#80

Thanks Romeo. Good afternoon to you. Take care.

Romeo Maione

executive
#81

Have a good afternoon, guys.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Contango Silver & Gold Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Contango Silver & Gold Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Contango Silver & Gold Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.