Core Lithium Ltd (CXO) Earnings Call Transcript & Summary

January 24, 2024

Australian Securities Exchange AU Materials Metals and Mining earnings 32 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone joining us. This is the Core Lithium Q2 FY 2024 Quarterly Update Conference Call. For now, everyone is in listen-only mode. Following the presentation from our speaker, we will hold a question and answer session. Questions will be taken by telephone today. Details on the dial-in numbers for the teleconference are available in the stock exchange release from yesterday. If you would like to ask a question during the session, press star one one on your phone. An automated message will then confirm that your hand is raised. Please note that this conference is being recorded today. I will now pass the call to our first speaker, Mr. Gareth Manderson, CEO. Thank you. Please go ahead.

Gareth Manderson

executive
#2

Thank you very much, and I appreciate everyone who took the time to join us by phone this morning. Thank you for your interest in Core Lithium. From an operational standpoint, it was a very solid quarter, so the results were quite strong. However, we also have to recognize that spodumene prices fell 54% during the quarter, and that has led your board and management to decide to pause mining operations. We can go into a bit of detail on that. Looking at how operations performed during the period, ore stocks on the ROM rose 50%, which was a deliberate approach aimed at separating the mining operation from the processing facilities ahead of the upcoming wet season. We have also seen some really solid performance from the mining team, with all of the preparations for the wet season. So we had close to about double the average rainfall in November, and we saw mining run very smoothly during that period and, as I said, an increase in ore stocks. We have seen recovery rise 20%, so a 60% recovery average for the quarter, an increase of close to 40% in spodumene production, and a grade of 4.7%.

Gareth Manderson

executive
#3

The average realized price came in at $1,418 per tonne. That figure remains subject to a couple of QPs, which we flagged in the quarterly report earlier this year. In addition, we have halted lithium fines shipments, and there are two reasons for that. The first is the wet season. We had also forecast that we would neither produce nor sell fines during the wet season. That said, we will also need to see market conditions improve before we would regard that as a reasonable product going forward. BP33 made very good progress over the period. We will go into some detail on that shortly. That said, we did pause in order to preserve cash as we entered the wet season, since we need to consider the timing of that particular project given current market conditions. Quite pleasingly, though, we have seen a 35% increase in the Measured and Indicated Resource for BP33. We issued an announcement earlier indicating that we now have 9.4 million tonnes at 1.52% at that Measured and Indicated level. As for the overall exploration program for CY 2023, results are coming in, and we will provide an update on that in due course. The cash balance at the end of the quarter was close to AUD 125 million. You will note that our capital and cost guidance has been lowered, which reflects the suspension of mining and the cost reduction program that is well and truly underway.

Gareth Manderson

executive
#4

In that timeframe, there was a single recordable injury involving an arm—the specifics are laid out there—and the team has taken some robust steps and responded strongly on that front. It needed sutures, or stitches, to address, and the gentleman is recovering well and was back at work nearly right after that incident. CRM and getting ready for the wet season were a major area of attention this quarter. We also gave out eight community grants. Choosing to halt mining leaves us in the strongest cash and cost position to ride out the present market circumstances. It safeguards value. We examined several alternatives aimed at continuing mining operations, yet doing so wound up raising the expense of getting back into mining. So a pause in fact lets us safeguard the worth of the ore still left in the Grants Pit. It additionally affords us flexibility commercially when it comes to placing any product available beyond the resolved agreement with one of our offtake partners. We can now devote time to charting our way ahead, grasping BP33, and moving the emphasis away from being schedule driven toward the finest economic result for that project.

Gareth Manderson

executive
#5

So when I walk through the strategic review of operations, I’ll give you a bit of detail on that. Operations at Grants Pit have been put on hold for the time being. That said, we will process stockpiles, and we expect to be able to keep processing stockpiles until roughly the middle of this year. That leaves us best placed to keep our costs down, protect our cash position, and make sure we can sustain that long-term business plan for Core Lithium. Concentrate prices fell 54% over the quarter, and they are down close to 85% since January of 2023. On a lithium units basis, production should come in broadly in line with guidance. We’ll keep processing those stockpiles, and we should have enough ROM to carry us through to the middle of this year. We’ve cut our sustaining capital. We’ve reviewed all of the study costs, exploration costs, and corporate costs, and we’ve made a series of changes there, and we’ll keep working on that over the coming months. That has brought our unit cash operating costs down to $800-$900 a tonne, which in fact lets us sell product under the shipping schedule we’ve agreed with one of our customers. For any additional shipments, we can either sell into the market if we’re comfortable with the pricing terms, or we can wait until we’re comfortable with market conditions.

Gareth Manderson

executive
#6

I'm genuinely happy about how much the team has accomplished when it comes to boosting recoveries. What we've observed — I suppose from the point we began commissioning the plant — is that we went from a recovery rate in the mid-40s, roughly 47%, all the way up to 60%. As a matter of fact, during the past month or so, December actually delivered 63% recovery. That came about through the optimization effort aimed at making the crush size bigger, taking it from about 6 mm up to 10 mm, plus tuning of feed and plant parameters, a bit of debottlenecking, and — quite significantly — reliability improvements that made operations more stable. You can clearly see a pretty healthy jump in recovery and excellent plant performance from that angle. So our attention is very firmly on steering the business through today's market conditions, and we're doing that on two fronts. The first is securing the strongest cash result possible for the business across the coming six months. That means cutting down concentrates, lowering costs, safeguarding value, getting a clear picture of the BP33 project, and refocusing on that project's economics and its timing. It had been driven by schedule. You've in fact watched us finish the box cut excavation during the quarter. We've additionally begun finishing part of the stabilization work at the portal end, along with some early setup of foundations for the tunnel liners.

Gareth Manderson

executive
#7

We had the option to keep going. Completing the box cut was what we intended. But if you consider the wet season and some of the cash and cost risks from that angle, and the fact that, really, when you think about when BP33 is scheduled, pausing it and moving it to care and maintenance actually gives the business its best cash result, protects the value, and keeps us from being exposed to the risk of further cash outlay. So through the middle of the year, until those stockpiles are finished, our focus is on cost and production optimization. Once market conditions get better, we'll look at restarting mining operations and going on to produce concentrate from the ore available there. The BP33 study and the Carlton study are both still underway. All of the exploration work for the 2023 exploration season is complete. We're currently gathering that data. We're awaiting assays, and we'll carry out a review to figure out the process and the forward plan for exploration across Finniss, Shoobridge, and Anningie and Barrow Creek over the next year. And we'll get the business ready to respond. So we'll watch market conditions, and we'll make decisions that fit those conditions when it comes to restarting mining operations, processing, and making choices about our growth project options and exploration.

Gareth Manderson

executive
#8

With that said, I’ll stop here now and open things up so folks can pose a few questions.

Operator

operator
#9

Thank you. We'll now start the question-and-answer portion. To ask a question by phone, kindly press star one one on your telephone and wait until your name is announced. Please hold while we put together the Q&A roster. Just a moment for the first question. Our first question is from Tim Hoff at Canaccord. Please go ahead.

Tim Hoff

analyst
#10

Hi Gareth, thanks for taking my question. On the recoveries, that's a strong result for the plant. Given the material you have on the ROM, would you anticipate recoveries staying near that 60% going forward, or does that represent a structural shift? Do you feel you now have better control over the material?

Gareth Manderson

executive
#11

Yeah, no, that's a really good question, Tim. What we intend to do is keep that recovery at roughly 60% or above, so we'll keep working on improving recovery. I think the... You're probably hinting at possible variability in the stockpile. So we've done everything we can to make sure we understand that and to think through how we actually manage how the feed is presented from ROM stocks or ore stocks into the plant.

Tim Hoff

analyst
#12

Great. Now, regarding cash operating costs, could you take us through what falls inside that figure and what doesn't?

Gareth Manderson

executive
#13

I think I’ll turn that question over to Doug so he can respond.

Doug Warden

executive
#14

Absolutely, Tim. So from the standpoint of what it costs to run a site, royalties are really the sole item excluded there. Freight is in it, along with every site expense, though royalties—those are guided too, and fairly straightforward to figure out; we've kept them out of that figure so people can work them out according to the oil price.

Tim Hoff

analyst
#15

And at that point, would CapEx be part of it as well, such as sustaining capital?

Gareth Manderson

executive
#16

No, well, for the coming six months anyway, sustaining capital is going to be basically zero. That figure doesn't include it.

Tim Hoff

analyst
#17

All right, great. That covers everything on my end, I believe. I'll pass it along now. Thanks.

Operator

operator
#18

Thanks for those questions. Give us a second while we line up the following one. Our next questioner is Adam Baker with Macquarie. The floor is yours.

Adam Baker

analyst
#19

Morning, Gareth and team. Perhaps just one question about the offtake partners, and, you know, given the curtailment going forward, I was wondering whether you could give us some insight into the discussions you've had with them and, yeah, whether they're supportive as you move ahead with your decisions to curtail production?

Gareth Manderson

executive
#20

Yeah, so the conversations with offtake partners have gone pretty well. You may remember that during the last quarterly, we mentioned a shift in grade and timing. Those talks were very productive, and they've carried on in this particular area. The EGM commercial and I were actually in China during the October, November period, and we sat down with all of our customers and prospective customers in that space. They keep engaging with us and feel at ease with the approach we're taking, and we're delivering according to the schedule that has been agreed with one of those partners. We have a number of parties who are interested in the remaining shipments.

Adam Baker

analyst
#21

Thanks a lot. Perhaps just a single question about royalties. Has anything moved forward on that with the Northern Territory Government? There's been plenty of coverage in the press recently, following the drop in critical metals prices. But yes, any progress on that side, on crafting a more attractive arrangement for royalty payments in the Northern Territory?

Gareth Manderson

executive
#22

No, look, there isn't any real update on royalties from that angle. What I'd say, though, is that when we announced the pausing of mining, I actually sat down with several parts of the NT Government, the mining minister included. And the NT Government keeps being very supportive of the operations, appreciates the market conditions that we're faced with, and, you know, for us and for the NT Government, they're focused on the medium to long term.

Adam Baker

analyst
#23

Thanks, Gareth. I’ll pass it along.

Operator

operator
#24

Thanks for those questions. Just a moment while we get to the next ones. Our next question is from Jon Bishop at Jarden Group Australia. Please go ahead.

Jon Bishop

analyst
#25

Hi, Gareth. Thanks for taking my question, and congratulations to the site team — it’s clearly encouraging to see them lift production and throughput. I have a couple of questions on sustaining capital. You’ve obviously managed to trim that somewhat in your full year guidance. Assuming prices stay where they are over the next 12 months, what does care and maintenance capital look like? And looking at your feasibility, I believe sustaining capital was put at AUD 69 million. That’s probably out of date by now, but could you give us a sense of how sustaining capital compares with care and maintenance?

Doug Warden

executive
#26

Thanks, Jon. Doug here, and I'll handle that — though Gareth may want to chime in. In the quarterly, at the bottom of page 4, there's a footnote in the fine print regarding operating unit cost. This also speaks to Tim's question: it excludes AUD 3 to 3.5 million for the half — or rather, for the second half — covering care and maintenance and demo costs. Now, that isn't assuming the entire site goes onto care and maintenance, obviously. It only assumes what we've announced, namely that mining is suspended. So it's really about the cost of demobilization and the expenses tied to keeping up safety and the like around the pit, and trying to keep that pit in shape so we can get back in and mine as effectively as possible. As for ongoing care and maintenance, if things change and the mine — or the operation — goes fully onto care and maintenance, we haven't provided guidance on that. And we're certainly hoping that doesn't happen, of course. But we'll work through those figures in due course if, if, if and when it's needed.

Jon Bishop

analyst
#27

Right, no, that helps. So the way I'd look at it, if I take something in the range of that care and maintenance figure from your footnote — say AUD 7 million annually — compared with the 22 you're guiding to for the full year, would that be a reasonable rough estimate for, sort of, keeping things ticking over?

Doug Warden

executive
#28

Yeah. Keep in mind that the 22 we’re guiding for the full year has, in essence, already been used up.

Jon Bishop

analyst
#29

All right.

Doug Warden

executive
#30

So that was tied to wrapping up and completing the Finniss project. And mine water dams make up a big part of it during the quarter, as we point out in the quarterly. But basically, it's just whatever carryover exists from November and December when it comes to cash flow or cash outflow, though we aren't planning to spend really anything. So you shouldn't extrapolate that figure going forward. If we get back up and mining, sustaining capital would obviously need to be reviewed with a fresh lens and re-guided in for FY 25. So I think it's important to note that most of that is effectively spent in the first half.

Jon Bishop

analyst
#31

Yeah, that's useful. So for your site all-in sustaining cost in the second half, we ought to use the AUD 800 to 900 guidance for treating stockpiles, then add roughly AUD 3.5 for site care and maintenance plus demo costs. Is that roughly correct?

Doug Warden

executive
#32

Right, right. And one detail I should have mentioned when answering Tim's question: the freight cost to China isn't part of that. The terms are FOB Darwin.

Jon Bishop

analyst
#33

Yeah.

Doug Warden

executive
#34

... so beyond royalty payments, freight costs to China are also excluded.

Jon Bishop

analyst
#35

Alright.

Doug Warden

executive
#36

When you're looking at a CIF equivalent, an estimate for freight has to be included.

Jon Bishop

analyst
#37

Yeah, that helps. So if I follow that all the way through — obviously things are pretty bearish right now — are you obliged to deliver, and so keep processing those stockpiles at present? Or, if prices keep sliding, do you have the discretion to halt processing of those stockpiles too when they're uneconomic?

Gareth Manderson

executive
#38

Well, I think that's something to discuss with the offtake partner. They work pretty closely alongside us. It's been a solid relationship. As I mentioned earlier, you've seen that change to timing and grade. And it's also important to understand that this is a whole market, so the offtake partners are likewise affected by the supply and demand dynamic we're seeing right now.

Jon Bishop

analyst
#39

Yeah, got it — that's fine. And look, if I could, just one last question. Is there anything you can say about where matters stand with the Tesla arbitration or mediation?

Gareth Manderson

executive
#40

Yeah, Jon, nothing much new since the last time we spoke. Both companies are talking things through so they can resolve this without going to court.

Jon Bishop

analyst
#41

Great. Okay, I appreciate you guys answering my questions.

Gareth Manderson

executive
#42

Appreciate it, Jon.

Operator

operator
#43

Appreciate the questions. We'll take a brief pause before the next ones. Our next question is from Milan Tomic at J.P. Morgan. Your line is open.

Milan Tomic

analyst
#44

Yes, thank you. Regarding BP33 construction being halted and the FID pushed back, how do you view the possible knock-on consequences for project sequencing beyond Grants that could follow from this?

Gareth Manderson

executive
#45

That's a great question, Milan, and it'll be part of the analysis and planning effort we'll undertake over the coming couple of months. Ultimately, I think Core's value lies in that growth profile, but it also lies in matching the timing to the market appropriately. So, you know, Grants is cash generation. It also serves as a strong lead-in to a project such as BP33 when it comes to setting up commercial operations, processing operations, et cetera, and in de-risking the entry to the mine. So I think that thesis still holds, and we simply need to figure out the timing in line with the BP33 project.

Milan Tomic

analyst
#46

Yeah, and just — I noticed that the earlier FY 25 production guidance had pointed out a three-month gap in ore supply. I believe that was during the wet season. Does the curtailment at the Grants Pit extend that possible gap or push it out?

Gareth Manderson

executive
#47

My view is that the mining sequence really is affected by this. So I'd put it this way: that guidance is stale at this point, and once mining starts up again, we have to examine the new ore schedule.

Milan Tomic

analyst
#48

That’s excellent — thanks so much.

Gareth Manderson

executive
#49

There's one more thing I'd likely tack onto that, Milan — quite a lot of effort has gone into the BP33 project, its schedule and mine plan, to determine whether we can bring tonnes forward. And substantial work has been done around Grants to see whether there's a chance to extend the ore body. We know ore exists beneath the mine plan. Capturing it is feasible, and that would close those kinds of gaps. So those levers remain live and open to us.

Milan Tomic

analyst
#50

Much appreciated. I'm glad you took the time to reach out.

Gareth Manderson

executive
#51

Appreciate that, Milan.

Operator

operator
#52

Appreciate the questions. We now have a question from Hugo Nicolaci, who is on the line from Goldman Sachs. Please go ahead with your question.

Hugo Nicolaci

analyst
#53

Morning, Gareth and Natalie. I appreciate the update today. Let me begin with an easy question that has a hard answer: at what spodumene price level that can be sustained do you believe the mine would restart on its own?

Gareth Manderson

executive
#54

That's a great question, Hugo. Honestly, the way I'd frame it is that a wide set of considerations comes into play, and price would be one of them when we're deciding whether to re-enter mining. We've spoken a bit about when projects might come online. We have to examine what the ore schedule looks like. And arguably the most important piece is grasping how the market is behaving, because, you know, if there's a spike in price, how lasting is it, and how steady do we expect it to be over time?

Hugo Nicolaci

analyst
#55

Right, understood. So there’s likely additional work needed there. That’s fair enough. Then perhaps just one more, I suppose, on how you’re viewing the balance sheet and funding. I mean, clearly, we saw Liontown this week regarding their commercial debt syndicate, cutting the borrowing capacity as lithium prices fall. I mean, Finniss retains major project status with the Australian Government through February. I mean, at this stage, do you potentially have any options around other capital sources for the project?

Gareth Manderson

executive
#56

Right. We carry no debt at all, and our cash position was strong and healthy when the quarter closed, sitting at just about AUD 125 million. Everything we've done has been aimed at safeguarding those funds for the company and keeping our choices open going forward. On the project funding side, quite a few parties have actually reached out to us over the past couple of weeks — simply to keep the lines of communication open — and they remain keen to discuss, you know, offtake arrangements and financing possibilities tied to that around BP33. So, Hugo, I'd say that's a question we'll focus on answering once we have somewhat greater clarity regarding the timing of BP33.

Hugo Nicolaci

analyst
#57

Understood. So to make sure I have this right — is it possible for you to sign offtake agreements for BP33 in the near term, or would those volumes instead need to be directed into the offtakes you already have, before any new offtakes begin to be filled?

Gareth Manderson

executive
#58

Under the plan as it stands, the partners we currently have offtake arrangements with would in fact be supplied with product from BP33 to meet those agreements. As I mentioned earlier, one partner's offtake agreement has been settled, while the other remains unresolved. So going forward, that has to factor into our thinking, along with where and how we slot product into the ore schedule. To address your question in a more direct way, the original thesis for Core Lithium is unchanged: both Grants and material from BP33 will serve those offtakes.

Hugo Nicolaci

analyst
#59

Let me squeeze in one more. You mentioned recording an impairment around the shutdown. I believe the asset carried roughly AUD 250 million of book value as of June. Could you tell us what spot spodumene price was applied in that earlier assessment?

Gareth Manderson

executive
#60

Regarding the impairment assessment for the entire year, you're asking about 30 June 2023 — is that right?

Hugo Nicolaci

analyst
#61

Yeah. Well, I mean, basically, I’m just trying to get a sense of how large that impairment is. I understand you’re likely still working through it, but perhaps just to begin with, what lithium prices were used when you carried out your book valuations at the time of the FY 2023 result?

Gareth Manderson

executive
#62

Honestly, I can't remember right off the top of my head, but when we put the accounts together, it would in effect have been either consensus pricing or Woodmac pricing, or some mix of the two. So obviously—

Hugo Nicolaci

analyst
#63

Understood. All right.

Gareth Manderson

executive
#64

We've made some progress on that front. But yeah, we're still working our way through it — first internally, and after that with our auditors.

Hugo Nicolaci

analyst
#65

Okay, thank you. I should probably have handed that over to someone else on our side. Thanks.

Gareth Manderson

executive
#66

Pardon me, Hugo — could you repeat that?

Operator

operator
#67

Oh, thanks a lot.

Hugo Nicolaci

analyst
#68

I don’t have anything to ask. I’ll hand it over. Thanks.

Gareth Manderson

executive
#69

Oh, thank you so much, Hugo.

Operator

operator
#70

We appreciate the questions. The next one is from Andrew Harrington of Petra Capital. Go ahead, Mr. Harrington — your line is open now. You can unmute on your local device.

Andrew Harrington

analyst
#71

Apologies for that. Hello, everyone. Regarding the capex that’s still left, you laid out the gap between the original and revised FY 2024 figures. Should we understand that the bulk of it has already been used, based on what you said earlier when answering a question?

Gareth Manderson

executive
#72

Right, that's accurate. Mostly it will simply be cash flowing out as a carryover during January, and possibly some in February, tied to work performed in November and December.

Andrew Harrington

analyst
#73

Turning to the first half. Yeah. Okay. And a broader pricing question: while prices are dropping, that qualification period really works against you, and customers seem able to game that 2-month window. Isn't there some option or chance to sell on FOB — meaning the price they're glad to pay you today is the price they actually pay — instead of sailing a vessel around in circles as prices decline, just so they can get the biggest discount out of the qualification period?

Gareth Manderson

executive
#74

Yes, Andrew, that observation is entirely right. The QP period measured from the shipping date does genuinely work in the customer's favor when the market is falling, though it equally works in the supplier's favor when the market is rising. We have that agreement in place with one of the offtake partners, and it's settled on that shipping schedule, and as I hinted earlier, a couple of shipments in the coming half give us room to consider some of those kinds of options.

Andrew Harrington

analyst
#75

So I suppose what I'm asking is this: when the market's dropping, they can afford to sail slowly, and when it's climbing, they'll move as fast as they can — so either way, they come out ahead. As far as I know, FOB pricing would be preferable and is standard for other commodities. So is it that no one's doing that, or is it, you know, something you're moving toward?

Gareth Manderson

executive
#76

Okay, so, with our offtake partner, there's an agreement in place where that QP period has been defined. So really, it comes down to how the shipping schedule is positioned toward the late end, and then delivering according to that schedule. The schedule has been agreed, and it's set. Andrew, was there anything else?

Andrew Harrington

analyst
#77

Oh, sorry — I believe I lost the connection for roughly the final 30 seconds there. I'm not sure whether that affected everyone, but my apologies. Would you mind saying that last part again?

Gareth Manderson

executive
#78

The QP arrangements are in place, and the delivery timeline has been finalized with the customer, and we're collaborating with them regarding delivering against it. So from that standpoint, Andrew, it's essentially locked in.

Andrew Harrington

analyst
#79

Okay, thanks a lot.

Gareth Manderson

executive
#80

Appreciate it, Andrew.

Operator

operator
#81

Thanks for those questions. As a reminder, if you'd like to ask something, just press star one one and hold until your name is called. Right now, the line has no more questions. I'll now turn the call back over to management for closing remarks.

Gareth Manderson

executive
#82

Thanks, and welcome, everyone joining the call. We appreciate your interest in Core. Right now, unfortunately, this market is really tough for any spodumene producer to steer through. Together, the board and management have acted to secure the strongest cash and cost position we can achieve for the business, one that protects value. Then, as market conditions get better, we want the business positioned so it can seize that opportunity going forward. But I do want to point out — and I'm genuinely pleased by this — the progress achieved on site in both mining and processing, seeing recoveries improve so substantially, reaching as much as 20% above where they stood last quarter. And to see the mining operation head into the wet season very successfully, with above-average rainfall in November, and essentially without missing a beat through the quarter. So I'm extremely pleased and proud of what that work has delivered for the team. Over the months ahead, we'll keep working carefully to make sure we preserve value for Core, so we can move forward, get ourselves into the strongest cash position, and make the best use of those stockpiles we've managed to build up over the last quarter.

Gareth Manderson

executive
#83

Thanks once more for spending part of your day with us on this call. I'm grateful for the questions. All the best.

Operator

operator
#84

That brings today’s conference call to a close. We appreciate everyone joining us. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Core Lithium Ltd transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Core Lithium Ltd earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Core Lithium Ltd or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.