operatorWe appreciate your holding and are glad to have you on the Coronado Global Resources first quarter investor call. Everyone joining is currently muted for listening only. Our CEO and CFO will walk through the results, and after that we'll open it up for questions. To submit a question, simply hit the star key and then the number one on your phone's keypad. At this point I'll pass the line to Andrew Mooney, Vice President, Investor Relations and Communications. The floor is yours.
Andrew Mooney
executiveThanks, operator, and thanks to all of you for being on Coronado's first quarter investor call. Earlier today we issued our quarterly report to the ASX and SEC, and in it we lay out the volumes we produced and sold, along with other key details on our safety results, coal markets, and financial performance. A fuller picture of our financial position and results will go to the market on the ninth of May, together with our Form 10-Q earnings release. With me today are Gerry Spindler, our Managing Director and CEO, Gerhard Ziems, our Group CFO, and Douglas Thompson, our Australian COO. In the report you'll find our notice about forward-looking statements and reconciliations of certain non-US GAAP financial measures. We encourage you to review these statements alongside our other filings with the ASX and SEC. I'll also remind everyone that unless otherwise stated, Coronado quotes all numbers in U.S. dollars and metric tons. With that, I'll turn the call over to Gerry.
Gerry Spindler
executiveThank you, Andrew. During the March quarter, the Coronado team delivered strong results — quarter-on-quarter revenue came in higher, liquidity and balance sheet strength both improved, and safety outcomes got better. On top of that, the team finished substantial rehabilitation work at our Logan mine, wrapped up key maintenance activities at Curragh, and kept moving our organic growth plans forward successfully. Production and sales volumes for the March quarter came in below the prior quarter yet stayed firmly on plan. Production and sales in January and February were lower quarter-on-quarter, driven by the maintenance activities at the Curragh mine as well as unforeseen effects from elevated wet weather and issues in the rail logistics chain. March monthly production volumes were strong as wet weather eased in Queensland, which allowed better operating conditions. In March, Curragh achieved run-of-mine coal production of 1.2 million tons and saleable production of just short of 1 million tons. That month, the overland conveyor set a new record by transporting 1 million tons of material to the preparation plants from the Curragh North operation. With more dry weather forecast and key maintenance activities now behind us, we anticipate solid production rates from Curragh over the coming quarters. Progress was made on our organic growth projects during the quarter, with capital works continuing at the Buchanan mine to expand the rock hole storage area and install a second set of skips.
Gerry Spindler
executiveAt Curragh, we kept advancing the Curragh North underground met coal project along with our gas pilot project aimed at cutting emissions. Those projects are the foundation of our organic growth strategy, which targets 20 million metric tons per annum of saleable production by 2025. Both remain on target. Coronado's annual general meeting takes place on the 25th of May 2023, Australian Eastern Standard Time. At that AGM, Douglas Thompson will formally be appointed to succeed me as Managing Director and Chief Executive Officer of the company. Once more, I congratulate Douglas on his appointment, and I look forward to collaborating with him and the board in my new position as Executive Chair. Before I discuss our operations in detail, I want to start with an overview of our safety results. The safety and well-being of our people remains Coronado's number one priority. In Australia, the 12-month rolling average total reportable injury frequency rate as of 31 March stood at 3.18, versus 3.92 as of December 31, 2022. Year-to-date rates show a 19% improvement over the year-end 2022 rates and are the lowest since April 2022. In the U.S., the 12-month rolling average total reportable incident rate as of March 31 was 2.43, versus 2.42 at the end of December 2022.
Gerry Spindler
executiveThe group's total reportable incident rate came in at 1.31, an improvement from 1.41 as of the close of 2022. I'm happy to report that during the quarter, the Buchanan Mine Preparation Plant reached one million hours and 10 years without an injury. That reflects a tremendous effort from the team, and I congratulate them for their ongoing strong dedication to safety. Beyond that, we've been informed that numerous U.S. operations of ours earned industry awards recognizing strong safety performance in 2022. New and updated health and safety programs keep being rolled out across Coronado's operations each quarter. At Curragh in Australia, upgrades have been made to the digital platform supporting the safety health management system, and the site keeps putting measures in place to strengthen its safety culture. Training programs have been expanded at Curragh and the U.S. mines, with greater emphasis on identifying hazards and mitigation plans. Over the past year and continuing into 2023, the Curragh team has focused on a dragline proximity awareness project aimed at developing and deploying technological solutions that improve proximity awareness within the operating area of the dragline fleet. This technology draws on radar and LiDAR imagery to warn a dragline operator whenever people or equipment enter the machines' operational areas.
Gerry Spindler
executiveWhat we've achieved with this project is a meaningful cut in the danger of people and machinery coming into contact with the draglines, which supports a safer working environment overall. By year's end, we expect to have rolled this technology out across the entire dragline fleet at Curragh. Moving on to how we operated, Coronado finished the first quarter with group run-of-mine coal production of 6.2 million tons, saleable production of 3.7 million tons, and sales volume of 3.7 million tons. It was an excellent production quarter for the U.S. operations, with run-of-mine coal production and saleable production coming in 14% and 10% higher quarter-on-quarter, respectively. Adverse weather conditions did not affect the Buchanan and Logan mines during the quarter. What did affect them was some rail logistics chain delays at the end of March, which meant some sales slipped into April. At Logan, the Eagle No. 1 mine and Winifrede mines each set new production records in March. From the Australian operations came run-of-mine coal production of 2.7 million tons and saleable production of 2.1 million tons, respectively, with both lower than the December quarter while remaining on plan. Over the March quarter, the Curragh Mine carried out major maintenance activities on the overland conveyor, the shovel, and the mine's largest and most productive dragline.
Gerry Spindler
executiveThose maintenance efforts, along with the effects of heavy rain across the Bowen Basin falling on ground that was already saturated in January, drove the quarter-on-quarter decline in production. Group sales volumes during the March quarter came to 3.7 million tons, which was 8% below the December quarter. Australian operations sold 2.2 million tons, while the U.S. operations sold 1.5 million tons. Late in the quarter the U.S. operations built up inventory, with certain sales tonnages slipping into the June quarter. Curragh's sales profile in the March quarter came in lower because of reduced production and a train derailment on the Blackwater line late in January, which disrupted the coal supply chain running to the Port of Gladstone. The Curragh Mine relies on the Blackwater line, so it was unable to rail any coal to port for two weeks while repairs to the rail line were carried out. After a slow ramp-up, the rail line is now operating again at normal capacity. Even though sales and production rates were lower in January and February owing to completed maintenance, wet weather, and train derailments, March turned out to be a far more positive month for the company, as weather conditions at Curragh improved and the mine began to benefit from the maintenance works program finished earlier in the quarter.
Gerry Spindler
executiveMarch's group saleable production came in strong, and when annualized it surpassed the upper bound of our full-year production guidance. Coronado expects to keep delivering better production results, and we are holding our existing guidance steady provided that drier conditions persist through the June and September quarters. At this point I'll pass things over to Gerhard, who will cover our financial position and the market outlook.
Gerhard Ziems
executiveThanks, Gerry, and hello everyone. As Gerry mentioned when he kicked things off, during the first quarter we brought in revenues that were higher quarter on quarter and produced cash flows to further, you know, bolster our balance sheet and our liquidity. Group revenue for the March quarter came to $766 million, which was a 7% rise compared with the prior December quarter. That higher revenue stems from better pricing even though sales volume was lower. The group's realized met coal price in the quarter stood at $240 per ton. That's an 8% quarter-on-quarter gain and mirrors the blended realized price across all qualities of met coal sold on an FOB, FOR and domestic pricing term basis. At 31st March, the company's net cash position had grown to $256 million, up from $92 million at the close of 2022, and we hold available liquidity of just under $600 million. Our net cash position was made up of a closing cash balance of $298 million and outstanding bonds totaling $242 million. For the first quarter, average mining costs per tonne sold across the group were $101.6 per tonne. The higher costs per tonne come out of the denominator here. Production at Curragh will be at higher levels in the quarters that follow the maintenance work, the above-average wet weather generally, and particularly the subsequent train derailment down the line, along with the ongoing effects of higher inflation.
Gerhard Ziems
executiveCapital expenditure for the first quarter came in between $30 million and $42 million, which marked a 5% decline from the December quarter just before it. Most of that capital spending during the quarter went toward sustaining and growth projects at our U.S. operations. At Curragh, capital expenditure fell short of what we had planned for the quarter because of wet weather effects, and certain works have moved into subsequent quarters. As of today, Coronado is reaffirming the full year 2023 guidance it previously announced — saleable production ranging from 16.8 million to 17.2 million tonnes for the year. Average mining costs of $84 to $87 per tonne sold, along with capital expenditure between $260 million and $290 million U.S. dollars, barring any unexpected weather events of course. Turning to coal markets, met coal pricing rose across the board during the March quarter. The benchmark Australian premium low-vol hard coking coal average index price for the March quarter stood at $344 U.S. dollars per tonne, compared with an average of $278 U.S. dollars per tonne in the December quarter — roughly a 25% increase. On the US East Coast, the average index price for the March quarter was $313 per tonne, versus an average $272 per tonne in the December quarter. With index prices higher in the March quarter, we expect met coal price realization in the June quarter to exceed the March quarter, reflecting the average three-month lag in price realizations that I always mention.
Gerhard Ziems
executiveStarting in March, met coal prices have declined, and right now today the Australian HCC index sits at $232 per tonne, down from $250 yesterday, though still considerably above the $191 per tonne long-term average. The latest price drop ties back to more supply coming out of Australia as the Bowen Basin moves past the wet weather season. I have to say, prices could stay volatile near term. According to the SGX forward curve, average prices are projected to hold at roughly $240 per tonne, or perhaps even above that, through the rest of the year. The war in Ukraine and persistently high inflation rates keep weighing on the global economic environment and the outlook for steel demand. Coronado anticipates met coal prices will stay above long-term historical averages, with support from elevated thermal coal prices — PCI prices included — along with Russian met coal being removed from key markets and the expected pickup in steel demand during this year's second half. Australian met coal exports to China have resumed, with 418,000 tonnes of product shipped from Australia to China in the first quarter. China's renewed importing of Australian met coal is expected to displace lower quality and higher cost Chinese domestic or other US met coal production, especially for Chinese steelmakers in the southern regions, where Australian met coal enjoys a significant seafreight advantage.
Gerhard Ziems
executiveWe anticipate that demand for the US Buchanan brand from Coronado will stay robust in China too, since that coal has low ash and low sulfur traits and a lengthy record of dependable, steady supply into the Chinese market. We expect that Australian met coal imports resuming into China will enhance market dynamics around the track, along with more competition for Australian coal, and that will probably keep C1 prices elevated in the near term. Met coal from Coronado is still in strong demand, customer offtake is holding firm, and annual contracts with long-term customers have been renewed for both our Australian and US products. I'll now hand back to Gerry to talk through how our growth projects are progressing. Gerry?
Gerry Spindler
executiveThanks, Gerhard. From its inception, Coronado has expanded through a series of purchases of high-quality met coal mines, and it keeps looking into opportunities to acquire met coal assets. The company has a demonstrated record of successfully integrating and operating new assets. It has delivered over $1.5 billion in distributions to shareholders since listing on the ASX in 2018. Coronado seeks assets in Australia and North America that are cash accretive from day one, move the group down the cost curve, and hold the potential to deliver above average returns to shareholders. So that the company can maintain maximum balance sheet flexibility, cash is conserved and no dividends have been declared this quarter. Subject to the company's dividend policy, which includes assessments and outcomes of potential inorganic growth options in the future and ongoing operational performance and market conditions, the board may declare dividends in future quarters. Turning to our organic growth pipeline. Capital works at our Buchanan Mine continued during the March quarter. We are currently investing in the construction of a new surface rock hole storage area to increase the mine's capacity and reduce the risk of the mine becoming stock-down by any potential logistics chain delays. The mine is also progressing with the construction of a second set of skips to ultimately increase the mine's hoisting capacity to the surface.
Gerry Spindler
executiveOur U.S. operations are still on track to hit 7 million tons by 2025 under the growth plans there. Now on Curragh underground. If we turn to Curragh, pre-feasibility study work at the Curragh North Underground Met Project wrapped up in late 2022. The study's results came back positive, and it concluded the project was worth advancing and, as a result, ranked above the mine's other organic open cut expansion choices. That underground project is now included in the mine's plans for reaching 13.5 million tons per annum by 2025. First coal is expected in late 2024, with met coal quality comparable to what the existing Curragh North open cut operating area produces. Direct access to the coal seams will come through the final open cut highwall, which cuts capital expenditure needs and startup risk considerably. Two continuous miners working a bord and pillar operation will be used in Phase 1. Exploration work is underway to build up information on gas, geotechnical qualities and coal reserves. A team for operational readiness is in place, made up of specialists in project management, engineering, environmental, geotechnical design and procurement. In the quarter, Coronado drilled 1,200 meters of exploration across 6 drill holes to gather gas, geotechnical and washability information.
Gerry Spindler
executiveBack in March, we brought a fourth exploration drill rig onto the site to compensate for hold-ups caused by wet weather and site access. Coronado has also advanced the gas pilot project at Curragh over the quarter. That project aims to capture waste mine coal gas and put it to use as a diesel substitute across our operating fleets. Our drill contractors have finished 2 vertical drill wells, which are cased and suspended. A third vertical well and lateral wells are being drilled at present. The plan is for a fleet of 5 to 6 trucks running on the extracted gas in the first half of 2024, once the wells come online and produce enough gas to run the fleet. We expect this to deliver lower emissions, and also lower costs, since gas will replace diesel to power the fleet. The gas pilot project is part of Coronado's broader strategy for cutting emissions from open-cut mining operations and lowering energy costs by investigating potential investment strategies in wind, solar and/or gas projects. Further details on the gas pilot project will be in our 2022 sustainability report, which we expect to release in May.
Gerry Spindler
executiveAt this point I'll turn things back to the operator so we can take questions.
Operator
operatorThanks. To ask a question, hit star one on your phone and hold until your name is called. Should you want to withdraw that request, just press star two. When using a speakerphone, lift the handset before posing your question. Our first question is from Chen Jiang of Bank of America. You may proceed.
Chen Jiang
analystMorning, Gerry and Gerhard — thanks for taking my question. Looking at your cash costs, they've risen each quarter over quarter across, I'd say, the recent quarters, and they just keep climbing. I'm wondering how we should expect those costs to normalize. I understand about the derailment and the weather impact, and proportionally, how much of that is from supply disruptions in the first quarter versus inflation, labor, and so on. More clarity on that would be great. Thank you.
Gerhard Ziems
executiveSure. I'll take that one. Chen, first off, morning — good to hear you, and nice to see you online. The way I'd frame it is that right now this is really about the denominator, at least on a quarter-over-quarter basis. Take the $101.6 per ton; if you adjust it for the volume we turned out in the previous quarter and then look at this quarter, we have to assume most costs are fixed. On that basis the cost would come out at roughly $85 per ton. Compared with the same quarter a year ago, that's an 11% rise in unit cost. Inflation is clearly playing a part there, and that 11% lines up neatly with the inflation story we're seeing pretty much everywhere, in Australia and the U.S., especially the U.S. The quarter-on-quarter cost result comes down to the denominator of tons. So when you assess cost performance, we remain comfortable with the guidance we've given the market for the full-year outlook.
Chen Jiang
analystAppreciate it, Gerhard. I hear what you're getting at. When I look at the coming three quarters and what it takes to hit your guidance, it feels quite stretchy to me, since you're looking at a 17% quarter-over-quarter cost increase.
Gerhard Ziems
executiveRight, yeah. At this point, honestly, it comes down purely to the denominator. It really hinges on, you know, the weather coming through the way we anticipate. Everybody says they're exiting a strong season. They're exiting La Niña. We're all familiar with weather forecasters. Things look quite encouraging, especially when we look at March. If we perform the way we did in March, and every indicator suggests we will, we see no problems whatsoever with the cost guidance.
Chen Jiang
analystOkay, thanks Gerhard. Perhaps I can just add to that point. Going forward, how ought we to view your cost structure over the long term? As you know, over the past few years, costs have, I'd say, been on the rise.
Gerhard Ziems
executiveCorrect.
Chen Jiang
analystThe results you've delivered previously.
Gerhard Ziems
executiveThat's correct.
Chen Jiang
analystFrom a modern standpoint, that's no longer a reliable signal. Thank you.
Gerhard Ziems
executiveYes. No, look, I get the concern. First off, we're aligned with our competitors on this. You can see that isn't some Coronado-specific thing. It really matches what we're seeing everywhere. What we're seeing everywhere is inflationary pressure. The unproductive effects come from things such as weather and maintenance problems. To the point where, when you look over a few years, we have to see what inflation is going to be. Right now, we do see inflation probably easing somewhat. This year we keep seeing fairly high, elevated inflation. At this point it all hinges on that. You also have to look at one of the biggest input factors in mining for us and for everyone else: it's labor, it's energy, it's explosives. All of those are tied to inflation. We just have to watch that space carefully. At the same time, before we get too worried about margins here, of course costs play the big role. The thing is that we see it everywhere in the Bowen Basin, but in the U.S. as well.
Gerhard Ziems
executiveFor the two largest met coal producers, they've experienced inflationary pressures—not just on mining costs, but we're also seeing other cost effects, and royalties in Queensland have risen, correct? What would worry me regarding margins is that this would apply in other regions—for Australia, the biggest met coal exporter globally, that's 55%-60%. All of this will end up embedded in the price base, right? Every inflationary impact will show up in the price. We're observing the long-term price climb from $178 per ton to $191 per ton now. I think, I think looking ahead, $200 or $210 is likely the former $178 per ton long-term price, or floor, you know. Barring, naturally, certain economic factors—you know, if you, if you get economic downturns, that could be, you might witness somewhat more volatility there.
Douglas Thompson
executiveGerry, let me jump in and add something here. What sets us apart structurally from a few of our competitors is that our Stanmore royalty structure changes by 2026. That will make our cost curves different relative to others.
Chen Jiang
analystYeah. Yes, thank you. Appreciate it, Gerhard. This might be one for Gerry, please, if you're able to say something about acquisitions. When I look at the acquisition announcements you've made over the last 12 months, it appears the discussions centered on the U.S., and all of them were, like, U.S. coal mines or companies rather than Australia. Australia offers plenty of opportunities. I'm curious, what's the thinking, you know, from this point, and what's, you know, your view on growing your portfolio in Australia? Thank you.
Gerry Spindler
executiveOur investment dollars are going to go where we believe the strongest returns can be achieved. Australia stays at the center of our attention, though I should note that those Queensland royalties, along with the other cost pressures you know about, have made the U.S. more appealing for every producer out there, and not only for us.
Operator
operatorThanks. We’ll take the next question from Paul Young at Goldman Sachs. Paul, go ahead.
Paul Young
analystThank you. Yes, good morning to Gerry, Gerhard, Doug, and Andrew. I have a handful of smaller questions regarding the quarterly results themselves, but I actually want to begin with something about inorganic growth, and I suppose no Coronado call happens without a question on that topic. So I guess the first thing is: Gerry, thank you for laying out and articulating the approach to M&A a bit, particularly with respect to being cash accretive from day one. That is helpful. May I ask my first question? It concerns this morning's news about ACNR's Oak Grove underground mine in Alabama. Yes, that's a 4 million ton per annum mine, and it appears to serve both export and domestic markets. Alabama is a long way from West Virginia, and ACNR does produce roughly 50 million tons a year from quite a few operations. I'm curious about what the attraction is for Coronado in looking at this mine in Alabama?
Gerry Spindler
executiveDoug, Gerhard, would you like to—
Douglas Thompson
executiveAbsolutely, happy to.
Gerry Spindler
executiveAny remarks on that? I’ll pick things up from there.
Douglas Thompson
executiveTo start, I appreciate it. So, Alabama is physically distant from the places where we operate. As you’re aware, we have a capable U.S.-based crew that is highly skilled at operating underground mines. That group has a demonstrated record of success, and we’ve been steadily adding more capacity as we expanded the team over time. Stretching ourselves and bringing on more mines is something we’re quite capable of handling. We’ve been doing this deliberately because we’ve been intending to expand the business. As for what makes the operation appealing, several factors contribute to that appeal. We took a look at it, and as our release noted, we’ve concluded that we won’t be moving ahead with that opportunity at this point. The coal would fit well as an addition to our business. The blending is favorable. There are synergies in how we operate and in places where we’ve previously seen operations and been able to benefit through better mine planning, how we assess ventilation at mines, our mining methods, and our approach to how a mine like this can be moved up the production curve. We’ll evaluate every one of our operations using similar criteria.
Douglas Thompson
executiveLike most people today, we've taken a look, and at this point we've stopped talking with them, and that's going to stay the case. We're out examining operations, so engagement is going to happen.
Paul Young
analystYeah. Okay. Thanks, Doug. Now on organic projects, there are just a few, I guess, questions to clear up a few things. First, on Buchanan, with the second set of skips, when is completion actually due on that project? From a run-of-mine standpoint, could you remind us what run-of-mine production will increase at Buchanan as well after completion?
Douglas Thompson
executiveOnce the projects we currently have underway are complete, operations will rise to 7.5 — meaning we go from the usual six up to seven sellable. Our aim is to wrap these projects up by 2025. The work really centers on 3 areas. First is the above-ground storage, which is meant to remove the rail logistics constraint at the mine, making sure we never have to halt operations due to anything affecting ground streaming from the mine. The extra hoisting capacity is there to align with the underground capacity. We've demonstrated quite clearly that the mine can produce at a rate that turned hoisting capacity into the bottleneck. This project addresses that constraint, so it's a solid step forward. You don't need to run operations while you're actually enabling them. The final piece of the project sits in the prep plant, aimed at gaining additional throughput that will line up with the capacity coming out of the mine.
Paul Young
analystYeah. Okay, thanks. For what it's worth, I'm still running my own model with Buchanan loading treated separately, which is why the run-of-mine figure out of Buchanan interests me — you know, I can follow up with Andrew on that afterward. Now, maybe turning to Curragh — the Curragh Underground Project — and it's great that you've provided that first production target of late 2024, and Gerry, you walked us through some of the scope on that project. I'm still, you know, scratching my head over the fact that this project has effectively been approved, yet we have no CapEx estimate, no unit cost estimate, no impact to Curragh and no volume estimate. Could you help us with those three, if possible, please?
Douglas Thompson
executiveRight now, we don't want to take the project to market and discuss it publicly, since we're in the middle of final approvals with the board, and I'll go into that a bit further. By next quarter, we'll be well placed to provide the information you're after. As you know, roughly 12 months ago we talked about developing the Winifrede mine in the United States, and as has been reported, that mine is now operating and during the last quarter set a record. That demonstrates the company's ability to take projects such as this from the ground up and deliver them within CapEx and production profiles. We're confident that the business possesses the means and the expertise to deliver projects of this kind. As we've mentioned before, late last year, the pre-feasibility work we carried out showed that this project came out ahead of our other opportunities. Z Pit remains a study and growth opportunity for us, and so does X-Pit, and those will be progressed over time. The underground at Curragh comes out on top for the reasons you've raised. From a capital standpoint, starting up the highwall project — and we've done this previously, as with Winifrede — we have proven capability and an understanding of what such a project would cost.
Douglas Thompson
executiveWe'll kick off the project with two continuous miners doing pillar work. In phase one, the portion of the mine we're going after holds roughly 13.5 million tons within scope. The rationale for that target is simple: we understand the gas conditions there. Gas content is low, and the cover is shallow. So we're adopting a low-risk approach, and we'll keep things modular as the project advances from phase one into phase two and phase three. As Gerry said, we're still in the process of gathering some information. Our geological model, as you're aware, backs an open-cut mine. What this infill drilling does is make sure the data behind our pre-feas and the current mine plan is better informed. After that, the final step is obviously making certain all of our approvals are in place, and we're working through that diligently too. That puts the primary timeline at late 2024 for first coal, which is a reasonable expectation where approvals are concerned.
Paul Young
analystAlright, thank you. Yes, that is genuinely useful. We will hold off until the next quarter for additional details. And my final question, which may be directed at Gerhard, concerns the free on rail and the low price in the U.S. compared with what Buchanan typically averages on an FOB basis for Buchanan benchmark coal, which I believe exceeded $300 a ton during the quarter. There is clearly that interaction between domestic sales and export sales. Still, I am simply wondering whether you can offer any color on what is happening with rail and port charges in the U.S., expressed as a percentage?
Douglas Thompson
executiveThat's right.
Paul Young
analystThat doesn't cover the headline price, the dollar-per-ton figure, or anything like that. Thanks.
Gerhard Ziems
executiveYeah. Without revealing where that figure comes from, I'd say broadly speaking, you could almost put it this way: rail charges come to roughly 18% of the FOB price. That said, it also hinges on the way you negotiate with the railroads. You can lock it in at lower levels too.
Paul Young
analystGot it — that’s straightforward.
Gerhard Ziems
executiveHowever, that is—
Paul Young
analystWas that rail and port together, or only rail?
Gerhard Ziems
executiveYeah, just rail.
Paul Young
analystOkay, thank you so much, Ger. That's all I had.
Operator
operatorMuch appreciated. The following question is from George Eadie of UBS. The line is yours.
George Eadie
analystThanks, Sam. I just want to ask a follow-up about capital at Buchanan once more. You mentioned it would be finished by 2025. I was wondering whether you could give us some color on the CapEx profile. Is it spread evenly across 2023, 2024, and 2025? Perhaps I could also check on CapEx further out at Logan, in case there is anything else down the road we ought to be considering?
Douglas Thompson
executiveGer, why don’t you start us off on that, and I’ll jump in if needed.
Gerhard Ziems
executiveCapEx guidance for individual sites isn't something we provide, but you should expect the majority of that CapEx to be spent from now through 2024. We need to examine whether we might give additional guidance regarding the CapEx profiles at Buchanan and Curragh.
George Eadie
analystAll right, thanks, Gerhard. Logan, maybe just for you. Beyond the obvious maintenance spending, is there any notable CapEx on the horizon we should be looking at?
Douglas Thompson
executiveThe bulk of that spending is maintenance-related.
George Eadie
analystOkay, that's great. Thank you, George.
Operator
operatorThanks. Our following question is from Glyn Lawcock at Barrenjoey. Go right ahead.
Glyn Lawcock
analystMorning, Gerry. Perhaps I misheard part of what you said in response to Paul, and of course we'll hold off until we have the full picture on the underground. You're saying it will now be included within the 13.5 million tons. So what activities are we no longer pursuing? In other words, what have you set aside in order to shift focus and proceed with the underground at Curragh?
Douglas Thompson
executiveGlyn Lawcock, perhaps I’ll jump in here, and Gerry Spindler can chime in as well. The plan to reach 13.5 and go past that — what we had in scope went to 15 — we have not given up on that yet. To be clear, there was an opportunity assessed for developing another box cut. We’ve weighed the two projects side by side, and at this point, on a capital basis and on how quickly product gets to market, the underground comes out ahead, because as you’d expect, when we start the underground from the highwall, we go straight into coal. We’re producing product. With Z Pit, we’d need to dig the box cut. That’s the—
Glyn Lawcock
analystSo, let me start off by saying—
Douglas Thompson
executiveThat's the call we've made.
Glyn Lawcock
analystCould you potentially retain those and pursue both, or are there infrastructure constraints on your end?
Douglas Thompson
executiveThe first item is the CHPP. So, you know, once we reach 13.5, that's the maximum for the C-CHPP. As we've said before, going past that point would require us to invest capital in our coal processing plants to reach our next constraint, the rail loop at 15. That remains within scope, but we've deferred it past the 2025 horizon, and we want to take Curragh through what we've termed the Curragh One Curragh plan, where we've been pursuing this improvement initiative to deal with some of the mine's geometry from the past, where stripping ratios had to be addressed. We discussed the investment we made in the mine last year to achieve a more sustainable production profile backed by a stripping ratio profile. That work is complete. A number of people have visited the site, and I invite anyone to come up and visit and see what we spent the money on. We now have a production profile that is more sustainable from the existing open cuts that we have. This underground project gives us that structural step change in the volume profile going forward. Beyond that, obviously, we have the Z pits and X pits.
Douglas Thompson
executiveBoth of those fall inside the life of mine plan. That section will be developed as part of the life of mine over the coming 20 years. We have the option to bring them forward and then add to them, and that is something that will be looked at a bit after 2025.
Glyn Lawcock
analystAt this point, does going the underground route not sterilize anything?
Douglas Thompson
executiveDefinitely not. Last year we capitalized on the mining operation as a whole to extract beneath the overland conveyor and, in doing so, recover coal that had been trapped under that infrastructure. What the underground can ultimately provide us at Curragh North as well is this: we'll be extracting coal underground that sits beneath out-of-pit dumps, coal we wouldn't have considered economic owing to the stripping ratio required to relocate those dumps. For investors, that's the effect of this underground project — it brings all of that coal back into scope.
Glyn Lawcock
analystYou mentioned that permits are required, of course. What I'm getting at is whether there's anything unusual involved in securing those permits for the shift to this underground alternative?
Douglas Thompson
executiveNothing out of the ordinary. Obviously, you have to go through the regulators and through DES to secure approvals for a change in your mining method. The mining method concerns open cutting that section of the mine. We are looking to change the mining method. Those are the main approvals we need. We are well along on the work the regulator requires, and we have allowed sufficient time in our schedule to make sure we give them what they need so our production profile is met.
Glyn Lawcock
analystAll right, let me shift topics here, and this may be directed at Gerry and Gerhard. So there's no dividend this quarter and cash keeps accumulating. You're clearly examining every possible avenue to create value, perhaps via acquisitions. Could it be that part of this is you're now stockpiling cash? The BHP assets are obviously up for sale. Maybe you could help me get a clearer picture — is that the way you're thinking about it? Accumulating somewhat more cash, since borrowing for coal assets has gotten tougher. Where do things stand with the BHP process? Does that remain something you're interested in, or did you take a look and decide to walk away? Thanks.
Gerhard Ziems
executiveRight, Glyn, let me come back to you on that capital management approach — basically it hasn't changed. Above all, we want a balance sheet that stays strong. At this point I'd say that goes without saying. With the cash we hold in the bank, you can plainly see it's a strong balance sheet. Point two: distributions remain on the table. We haven't abandoned that. Our dividend policy still stands at distributing 60% to 100% of free cash flow. Then there are growth projects, of course. Right now — well, look, we aren't accumulating a war chest, but at this moment we have to weigh all of these factors together, and I won't comment on the BHP process. I think what Gerry said probably sums it all up. We continue to examine opportunities, and that includes the obvious ones — the obvious assets that are available out there.
Glyn Lawcock
analystAll right. Gerhard, one last thing, though — do you think securing cash is more difficult at this point, then, when it comes to coal?
Gerhard Ziems
executiveNo. I think, well, I'm looking across the market, and my view is that for met coal — well, there's a huge gap between met and thermal. On thermal, it's clear to me that things are getting harder and harder, though it's not impossible, just extraordinarily tough. When it comes to met coal, we're actually seeing demand out there, especially on the debt side. The equity side, you know, that's a different matter. We don't pay much attention to it. On the debt side, bond investors tell me, "Listen, whenever you want to head to the debt market seeking funding, come to us first." One bond investor alone offered me thousands of millions of dollars. Of course, none of that is free — there's a cost attached. You have to weigh it and consider the broader market. Even in these conditions, for met coal I'd say it isn't impossible. In fact, it's not too hard. It's probably easier. It all boils down to price, you know, especially with the market as it stands now, with interest rates climbing because of inflation. For our sales, we're seeing a lot of interest. Much of that interest in the economics originates from the U.S.
Glyn Lawcock
analystOkay, that's excellent. Many thanks for the extra detail.
Gerhard Ziems
executiveThat's right.
Operator
operatorThanks. Our following question is from Alex Ren at Credit Suisse. You have the floor.
Alex Ren
analystMorning, Gerry, Gerhard, and the team. Apologies — Glyn got in ahead of me on the Curragh underground question. I've just got one, and it's really about digging a bit deeper into capital allocation. I'm wondering what the plan is regarding the bond buyback, since I believe the callback constraint is close to expiring, correct? What's the thinking on that buyback and refinance? And then, I suppose, for you: is there any clause such that, you know, if you decide to repurchase that portion, the remaining amount, do you then have to make a matching dividend payment again, the way we've seen previously? That's all.
Gerhard Ziems
executiveHonestly, I'd say we're staying the course we've been on. Up to now, we've cut our bond by over $100 million, and we're continuing along that same route. If a chance comes up in November to repurchase bonds, well, that fits with keeping a solid balance sheet and holding a very strong net cash position. Don't count on us veering away from that approach. Right now, the bond remains long-term and there's no need to refinance it. We feel pretty comfortable with where we stand at this point.
Alex Ren
analystGot it. So just speaking hypothetically here — suppose you decide to repurchase a chunk of it. In that case, would you still be required to pay out a dividend that matches?
Gerhard Ziems
executiveYes. Yes, it does — it depends on the conditions, but the answer is yes. As has happened before, under particular circumstances, you're required to put forward an offer that matches.
Alex Ren
analystGot it. Sorry—just one more on M&A. Judging from the earlier merger news and what came out this morning, it looks like your attention has been leaning toward the U.S. market. What's the thinking when it comes to the Aussie market? Are you basically concluding that price tags there are too high to offer value, or what's behind that?
Gerhard Ziems
executiveLet me address that quickly. To echo what Gerry said — first off, there's only just been a leak, and probably, like with all the others, people jump to assumptions before the facts are out. At bottom, of course, our interest in the Australian market hasn't gone away. As Gerry put it, every Australian asset has grown slightly less appealing right now, while U.S. assets have grown more appealing. The reason is the volatility we're seeing in the Australian market. I mean, I've had U.S. investors asking me, "Look, what is going on in Australia?" Over the last 12 months you've had the Safeguard Mechanism brought in, you've had a huge royalty increase in Queensland. Granted, we're not in thermal coal, but people view that as an economy-wide thing — you've had a tax brought in on thermal coal prices in New South Wales, and even a 10% confiscation of thermal coal in New South Wales. That's a fair amount of volatility for anyone putting money into Australia, so it has to be carefully assessed. The attractiveness has gone down in Australia, and the attractiveness of U.S. assets has gone up. That doesn't mean we won't look at Australian assets.
Gerhard Ziems
executiveUltimately, we examine specific assets in a highly dispassionate manner, and everything boils down to net present value — you know, all the data at our disposal, including expenses, royalties, and every other factor.
Alex Ren
analystGot it. Crystal clear. I’m done on my end. Thanks, Ger.
Gerhard Ziems
executiveYeah.
Operator
operatorThanks. At this point we don't have any more questions. I'll turn things back over to Gerry for some closing comments.
Gerry Spindler
executiveThanks to all of you for joining today's call. Appreciate it, operator. If anything else comes up that you'd like to ask about, feel free to contact our investor relations team. Thanks.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.