Coronado Global Resources Inc. (CRN) Earnings Call Transcript & Summary

July 21, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 36 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we're glad to have you join Coronado Global Resources' investor call for the second quarter. <<operator_script>> Our CEO and CFO will walk through the results, and after that we'll open things up for a question-and-answer session. <<operator_script>> At this point I'd like to pass the conference to Andrew Mooney, Vice President, Investor Relations and Communications. Andrew, please go ahead.

Andrew Mooney

executive
#2

Thanks, operator, and thanks to all of you for being on Coronado's second quarter investor call. Earlier today we published our quarterly report to the ASX and SEC, and in it we laid out our production and sales volumes, along with other key details on our safety results, coal markets and financial performance. A fuller picture of our financial position and results will go to the market on the 8th of August, together with our Form 10-Q and half year earnings release. Joining me today are our Managing Director and CEO, Douglas Thompson, and our Group CFO, Gerhard Ziems. In the report you'll find our notice about forward-looking statements and reconciliations of certain non-U.S. GAAP financial measures. We encourage you to review those statements alongside our other filings with the ASX and SEC. I'd also remind everyone that Coronado quotes all numbers in U.S. dollars and metric tonnes unless otherwise stated. With that, I'll hand over to Douglas.

Douglas Thompson

executive
#3

Thanks, Andrew, and I appreciate everyone taking the time to be with us on today's call. In the June quarter, the Coronado team turned in a solid performance. We're still executing in line with our business plan, and a number of milestones were reached during the quarter. Those accomplishments position the company favorably both for the rest of 2023 and beyond. Quarter-on-quarter, the business achieved greater production, waste movements and sales volumes, and all the while we kept our balance sheet strong and liquidity healthy, while continuing to advance our growth initiatives. On top of that, the team achieved a further year-on-year improvement in our recordable safety rate. We also published our fifth sustainability report, which shows a year-on-year decrease in emissions. At Curragh, we successfully negotiated new 4-year enterprise agreements, and we keep putting capital into our organic growth pipeline and into emissions reduction projects. And I'm happy to share today that the Board of Directors has given official support, through their approval, to developing the Curragh North Underground Met Coal project. That project is foundational to our organic growth strategy. By 2025, it delivers 13.5 million tonnes of saleable production from Curragh. The project also fits with our diversity strategy. From this complex, we'll aim to obtain coal supply from both our open cut and underground operations, and in doing so reduce risk.

Douglas Thompson

executive
#4

Coronado brings a wealth of know-how when it comes to operating underground mines. For many years we have run Longwall and Bord and Pillar operations across the U.S., and done so with a great deal of success. I am glad to share as well that the Buchanan expansion project is tracking both on program and on budget. Once fully ramped up, the Curragh and Buchanan expansion projects aim to have the business delivering saleable production of 20.5 million tonnes by 2025. During the June quarter, the Board likewise gave approval to a change in our operating model. That change — which will make sure we capture the full potential of this business — is notably an organizational change creating a Global Chief Operating Officer. Gerhard will go into more detail on our financial position shortly, but I want to point out that the business brought in nearly $1.5 billion of revenue during the first half of 2023. That ranks as the second highest first half revenue performance since the group's inception. Before we turn further to financial and production results, I would like to direct our attention to safety. Our people are our business. Keeping them safe and well is Coronado's #1 priority. I am pleased to report that the tireless efforts of our people management leadership are reflected in our improved results, and in the fact that recordable rates at our businesses remain well below the relevant industry averages.

Douglas Thompson

executive
#5

Looking at Australia, the 12-month total recordable injury frequency rate was 2.52 as of June, versus 3.18 at the end of March — a 21% improvement. That's 38% better than the same time last year. In the U.S., the 12-month total reportable incident rate came in at 2.05, compared with 2.43 at the end of March, which is a 16% improvement quarter-on-quarter. Moving to the group level, our total reportable incident rate at the end of June stood at 1.09 versus 1.29 at the same time last year, again a 16% improvement. During the quarter, our Logan Complex reached 1 million man hours lost time free — the first time this complex has hit that milestone since inception. Mining began at the Logan Complex in 2005, and this is truly a tremendous effort by our team. In the quarter, our Curragh team kept working on the driveline proximity awareness program. Its purpose is to lower the risk of personnel and equipment interactions with our draglines, promoting an enhanced work safe environment. Roll-out of the technology will keep going across all the draglines, and we expect it to be finished by the end of the year.

Douglas Thompson

executive
#6

We're sharing what we've learned on this front openly with the entire industry, since both we and the industry are working to make our workplaces safer for everyone. Now to how we performed operationally. Coronado closed the second quarter with group run-of-mine coal production of 7.2 million tonnes. That's an improvement of more than 15% over the March quarter, and salable production came in at 4.5 million tonnes. That represents a 22% improvement on the March quarter. The Curragh Complex posted an excellent quarter, carrying forward momentum from a solid March. The mine turned out ROM coal production of 3.8 million tonnes and saleable production of 3 million tonnes. Those figures are improvements of 41% and 44%, respectively. Over the last 4 months, Curragh has averaged a saleable production run rate of roughly 1 million tonnes per month, and the 3.8 million tonnes of ROM production delivered by Curragh in the June quarter is its best result since September 2020. Beyond that, Curragh pushed its waste movement works considerably further ahead during the quarter. Waste movement in the June quarter ran 25% above the March quarter, positioning the mine well for continued coal exposures through the second half of the year. One point worth highlighting: in the June quarter, prime waste movement reached its highest level in almost the 40-year history of the Curragh Complex.

Douglas Thompson

executive
#7

Those strong results come from two things: the team concentrating on carrying out the improvement steps laid out in the One Curragh plan, and better weather than we had in earlier quarters. On 6 July, the company reached a successful new 4-year enterprise agreement with the workforce at Curragh. That new EA gives us workforce stability, and it also shows Coronado's commitment to our employees by recognizing the valuable contribution they make and their overall well-being. The U.S. operations kept up their performance and delivered another very strong quarter. ROM coal production came in at 3.4 million tonnes, with saleable production of 1.6 million tonnes. During the quarter, Buchanan completed a successful Longwall move and needed only 4 days of outage to get it done. That is substantially shorter than any of our peers in the underground environment, and it comes from the good capitalization we have at Buchanan with the 2 Longwalls. We are also pleased with how the Logan Complex performed. Eagle #1, once again this quarter, set a new production record in May, and its performance remains strong. Rail performance improved as well during the quarter, after some delays we saw in late March. Sales volumes across our group for the June quarter were 4 million tonnes.

Douglas Thompson

executive
#8

That marks an 8.3% gain versus the quarter before. And in Australia and the U.S. respectively, sales came to 2.5 million tonnes and 1.5 million tonnes. With robust June production rates plus some slippage into July, Curragh ended June carrying a large inventory build. That stock will be sold over the course of July, and we expect stockpile levels to return to average during the September quarter. Coronado expects to keep delivering better production performance, and our existing production guidance stays unchanged. Clearly, this reflects factors outside our control, such as weather conditions in September and December. With that, I'll pass things to Gerhard, who will walk you through our financial position and some market outlook.

Gerhard Ziems

executive
#9

Thanks, Douglas, and hello everyone. As Douglas noted before, Coronado finished the half year with a solid balance sheet and healthy liquidity. Revenue for the June quarter came to USD 728 million, while half year revenues were slightly under USD 1.5 billion. First half revenues are below last year at this point because of a 37% drop in the premium global benchmark FOB Index, yet we still posted the group's second highest first half revenue result since the company was founded. The group's realized met coal price year-to-date was USD 229 per tonne. That figure blends FOB and FOR and domestic pricing contracts, and it works out to a 78% realization against the average Australia hard coking coal index price over the 6 months to June, which averaged $294 per tonne. As of 30 June, the company's net cash position stood at USD 192 million, and we kept available liquidity of USD 534 million. Our net cash position was made up of a closing cash balance of USD 434 million and outstanding bonds on the order of USD 242 million. During the quarter, we also successfully executed an agreement to refinance our ABL facility. Under that refinancing, we raised the facility limit from USD 100 million to USD 150 million and pushed out the maturity date to July 2026.

Gerhard Ziems

executive
#10

We anticipate that the agreement will be finalized in July. For the year to date, the group's average mining cost per tonne sold came to USD 97 per tonne. Inflation is pushing mining costs per tonne higher, and the effect of reduced output in the March quarter was pushed into later quarters after the above-average wet weather in January and the train derailment on the Blackwater line during that period. The company anticipates that average mining cost per tonne in the second half will be lower, since production plans are weighted toward the latter half of the year. And year-to-date CapEx of USD 89 million was 3% lower than in the same period a year earlier, with certain works deferred into the second half because of wet weather and maintenance programs during the first quarter. As previously guided, FY '23 CapEx is expected to be higher in 2023 as the group puts capital into organic growth projects, including Buchanan's expansion works in the Curragh underground and gas pilot projects. And today, we reaffirm the market guidance previously announced, subject to any wet weather and extraordinary events that may arise in the second half of the year. For the rest of the year, the focus is on delivering second half weighted production plans so that guidance is met.

Gerhard Ziems

executive
#11

We're also staying vigilant about the ongoing inflationary pressure in the industry. In core markets, the benchmark Australian premium low-volatile hard coking coal FOB average index price during the June quarter came in at USD 243 per tonne, a 30% decline from the March quarter's average benchmark price of $344 per tonne. During the June quarter, we additionally observed a 25% quarter-on-quarter decrease for the U.S. East Coast low-vol average price, with that quarter's average index price at USD 233 per tonne. The June quarter price decline stems mainly from better Australian supply thanks to improved conditions, along with an absence of robust restocking demand from steelmakers across Japan, Korea, Europe and India. The worldwide economic climate and a soft steel demand outlook keep weighing on steel margins, and steelmakers continue cutting steel prices while postponing raw material procurement. Chinese steel output is still elevated. Yet soft domestic demand conditions keep squeezing steel margins in China. Those conditions are pushing steamers to shift volume into the export market. Anticipation of additional stimulus measures and incentives aimed at strengthening China's real estate and infrastructure markets should lift demand and price sentiment late in quarter 3, possibly quarter 4, as will Indian restocking demand, which is forecast to come back after the country's monsoon season, along with sustained growth for planned infrastructure projects.

Gerhard Ziems

executive
#12

We also expect that bearish near-term sentiment around steel will keep weighing on metallurgical coal demand and prices during July and August, and after that restocking demand should make market conditions better from that point forward. That said, it seems the present price level is — it appears to be a fresh floor for the met coal benchmark price, and that remains a very, very solid. It is an exceptionally strong price at today's level. So in spite of those short-term headwinds just mentioned, we anticipate pricing will stay above the long-term average of USD 192 per tonne, with the SGX forward curve showing prices above $225 per tonne through the rest of 2023, and even rising past $250 at a later point this year. So I'll turn it back to Douglas to talk about our growth projects. Douglas?

Douglas Thompson

executive
#13

Thanks, mate. First, I want to highlight the project we're currently working on. As I said during my opening remarks, we secured Board backing for it in late June. Developing this project is foundational to our strategy of achieving 13.5 million tonnes of saleable production from the complex by 2025. Our schedule calls for first coal in late 2024. The project will produce coal of a similar quality to the highly sought-after product currently coming from our Curragh North open cut. So comparable products will be generated by the underground project. This project will make use of the final highwall, which in turn gives us direct access to the coal seams. That significantly lowers capital expenditure as well as cutting start-up costs. Phase 1 would employ 3 continuous miners using a Bord and Pillar mining method, and once at full production we're targeting saleable output of between 1.5 million and 2 million tonnes. The resource estimate comes to roughly 48 million ROM tonnes. Later phases will also tap coal reserves sitting beneath the existing open-cut waste dumps. Through the June quarter, our drilling program carried on and the results have been favorable. We completed 34 holes covering almost 8 kilometers of drilling, and this work will continue into the third quarter as the project matures.

Douglas Thompson

executive
#14

Moving on to the gas project now. The Gas Pilot Project is designed to capture waste coal mine gas and utilize it as a replacement for diesel across our operating fleets. Our intention is to run a fleet of 5 to 6 trucks on this gas. As things stand with our planning and how the program is progressing, that has been scheduled for delivery in the first half of 2024, once the wells come online and generate enough gas to operate those trucks. In the quarter, we successfully commissioned our first June fuel truck. That truck will therefore operate on both diesel and gas. This trial is set to last roughly 8 to 12 weeks. So far, this project has been a success — or at least this portion of the trial has been successful. During the quarter, we also completed drilling the primary wells. So RAMP 1 and RAMP 2 are done, and we have additionally drilled the unseen wells that intersected with them. And in quarter 3, we will be commissioning the gas gathering equipment. Once it is fully commissioned, the project will release and cut our emissions from Curragh, while also lowering our costs by switching diesel usage over to gas usage for these fleets. Turning now to our projects in the United States.

Douglas Thompson

executive
#15

Work at Buchanan on the capital side keeps moving along nicely. As I mentioned before, building our new surface raw storage stockpile remains on schedule. That gives us more operating capacity and lowers the chance we get stock bound should any potential delays hit the logistics chain later on. The second set of skips is likewise coming together according to plan, which will boost how much we can hoist from underground. Combined, these will expand the U.S. operations to 7 million tonnes by 2025. Before we get to Q&A, I want to point you toward last week's announcements, when we named Jeff Bitzer our Group Chief Operating Officer. During the past 2 years, Jeff has shown exceptional leadership and experience serving as Chief Operating Officer of our U.S. operations. His career points to the great results he will deliver for us in this new group role, and I'm delighted he accepted it, and I know the rest of the team are delighted by <<inaudible>>. I'll now hand things to the operator, who will take any of our questions.

Operator

operator
#16

<<operator_script>> Our initial question is from Paul Young at Goldman Sachs.

Paul Young

analyst
#17

Well, first off, to concentrate on Curragh, it’s genuinely good to see that performance showing up on the production side, and also what I believe you highlighted, Doug, the record waste movements. On that point, I’m just wondering about the outlook for Curragh in the second half, specifically regarding waste movements. Have you now caught up on all of those waste movements? Or are you expecting higher waste movements once again in the second half?

Douglas Thompson

executive
#18

Paul, thank you very much for acknowledging the performance. As we've communicated over roughly the past 18 months, we have a mine plan that we've been investing in to secure sustained core flow that aligns with our long-term stripping ratios. At this point we aren't quite there yet, but we're close, and we will have the mine plan stabilized at the long-term stripping ratio. So higher waste movements should continue, with particular emphasis on that prime waste movement, since that is what drives the coal exposures.

Paul Young

analyst
#19

All right, that's excellent. Now regarding the coal inventory — if I look at what you produced against what you sold across the past 3 or 4 quarters, my rough math suggests you may have accumulated something like 0.5 million tonnes. Is that roughly accurate as far as the finished product inventory you're holding at Curragh?

Douglas Thompson

executive
#20

That's roughly accurate.

Paul Young

analyst
#21

Alright, great. And then just carrying on with a few quick chart questions. Specifically on CapEx. I mean, spending money in the Bowen has been tough with all the wet weather — the rain and so on — during the first half. You're looking at roughly a USD 200 million spend, or thereabouts, at the top end of guidance for the second half. Does that mostly go toward sustaining? Or does most of it go into Buchanan and the early works on the underground at Curragh?

Gerhard Ziems

executive
#22

Yeah. Paul, it’s Gerhard. I’d say it’s roughly 50-50 on CapEx, though we’re expecting it to land on target—the first half was somewhat challenging. We’ve spent $90 million, and in the second half we’ll see considerably more CapEx, partly due to drier conditions in the Bowen Basin. And I wouldn’t say another $200 million; I’d probably point toward the lower end of guidance. A lot of maintenance work has been pushed into the second half, or was in fact already scheduled for the second half.

Paul Young

analyst
#23

Understood. Finally, on the operations side, it's encouraging to see the underground get the green light at Curragh. I believe you provided additional specifics regarding output there, and you laid out a resource. You mentioned it will bring your costs down there, though I think that was mainly about the gas diesel — the nuance on the fleet, I suppose. But one thing I wanted to ask about is simply what the capital budget for this project is. And from an operating cost standpoint, if costs at Curragh have been sitting at AUD 130, AUD 140 per tonne FOB, what can the underground actually do to your weighted average cost at Curragh? And what's the capital budget for this project?

Gerhard Ziems

executive
#24

Regarding the capital budget for that item, I don't believe we've disclosed it specifically. What I can tell you, Paul, is that if I look at the — let's shift over this way — it's probably fairly inexpensive. Put it that way. I'll stop there.

Paul Young

analyst
#25

Right. So in that scenario, those 3 or 4 continuous miners, that's really just development — it's development that's going to be — go ahead capitalized? Should we expect that as we go <<inaudible>>?

Gerhard Ziems

executive
#26

If you take a look at the average cost — I don’t want to state it as a hard figure necessarily, but in Australia you could say the typical development cost for each tonne of capacity is roughly between $300 and $400 per tonne. We’re able to achieve that at far less. And I mean far less. The reason is simply that the way we access the underground via the highwall also makes it much cheaper. Other operators have to construct costly box cuts and so on. So I’m not going to set new guidance for that project, but establishing it will be considerably cheaper. And then what effect does that have on the long-term cost? Again, we don’t provide guidance, but it will certainly bring down the overall cost at Curragh and consequently at Coronado as well. Probably single digits, not double digits, single digits for Curragh.

Paul Young

analyst
#27

Right, and I'm a bit nervous, so I'll hand it over and ask just one final question. What's behind the sensitivity around this project's capital cost?

Gerhard Ziems

executive
#28

Could you repeat that?

Paul Young

analyst
#29

What's the reason the CapEx for this project isn't being disclosed?

Gerhard Ziems

executive
#30

Right now, I’d rather not provide guidance, but we can point back to the earlier announcement we made about this. And we also guided toward approximately $105 million.

Paul Young

analyst
#31

That figure is one you already provided.

Gerhard Ziems

executive
#32

Absolutely.

Douglas Thompson

executive
#33

Earlier, we issued guidance of $105 million.

Paul Young

analyst
#34

All right, my apologies — I overlooked that one. I’ll make sure it gets forwarded.

Operator

operator
#35

<<operator_script>> Our following question is from Barrenjoey's Glyn Lawcock.

Glyn Lawcock

analyst
#36

If I could, perhaps a bit more detail on Curragh underground. Could you walk me through what the permitting side requires? And does the timeline leave sufficient time to complete it? It appears you've approved this project, and you're going to begin spending on purchasing all the equipment required. What exactly are the risks surrounding permitting?

Douglas Thompson

executive
#37

Yes, we’ve identified that in the project, and it’s one of the critical-path items. Equipment procurement and approvals are what sit on our critical path. We’ve put together a team that, in my view, is the best, including our U.S. expertise, but from an Australian perspective, some of the best people to help us understand our time lines. The approval we’re seeking is a change in mining method approval. The areas have proved to be mined. We can mine that area from an open cut perspective. It makes more sense that we mine it from an underground perspective. And using the mining method that we’re looking to deploy being Bord and Pillar, there will be no surface substance in particularly this area that we’re going into. So we’re on a program for approval. We’ve already engaged the authorities and explained to them what we’re seeking to do. And we will work through that time line. But we are comfortable with the best information we have at this stage that the time lines you set are realistic. From a procurement perspective of a fleet, we’re going through the procurement phase at this stage. We can see that we can secure fleet well within time.

Douglas Thompson

executive
#38

And the way we're buying gives us complete protection from risk should any delays occur, though at this point we feel quite at ease with what we have lined up.

Glyn Lawcock

analyst
#39

And apologies — could I perhaps dig a bit further into the permitting side of things? Is there any requirement for it to return for public review, or something along those lines? Or does the mines department simply make the call? How much rigor does that involve?

Douglas Thompson

executive
#40

Right now, what we'll be doing is taking this through the appropriate mine departments to secure their approval, and then through the government authorities for theirs.

Glyn Lawcock

analyst
#41

Still, you don't figure that gets pushed back out into the open — it doesn't leave you exposed to public scrutiny again or anything along those lines?

Douglas Thompson

executive
#42

Right now, the guidance is no — it could — but as things stand, no.

Glyn Lawcock

analyst
#43

That's possible. But as things stand, the answer is no. All right. Perhaps we can remain with Curragh, including the underground side of it. Do you intend to relocate your staff from America? I mean, sure, it sounds fine to claim underground expertise, yet those people are located halfway across the globe. So is that the plan? Or how would you actually transfer that American know-how over to Curragh underground in Australia?

Douglas Thompson

executive
#44

A couple of points. Jeff is actually here in the room with us today. So we've already had some of our SMEs—our experts based in the U.S.—working alongside us on this project for more than a year now. So we're drawing on the best capabilities available within the business. Yes, a number of those individuals will be relocating to assist us with getting the project started up. But we have a mobilization team that is fully established and fully staffed right now, with the appropriate skills to launch a project of this kind. And those skills exist within Australia at the scale we're beginning with. As I mentioned, we're ramping up during the first phase to 3 continuous miners. So the workforce size, or the skills we need, is not large, but that forms part of our planned ramp-up phase, and we can see a pool of people available.

Glyn Lawcock

analyst
#45

All right, that's excellent. And regarding the wage increase you implemented, roughly what kind of rates are you required to provide, in percentage terms?

Douglas Thompson

executive
#46

This deal runs for 4 years, and we’ve been able to secure a 4, 3, 3, 3 arrangement with our employees.

Glyn Lawcock

analyst
#47

Alright, and sorry — regarding the safeguard mechanism, is Curragh covered by it?

Douglas Thompson

executive
#48

Correct — that's the case for us.

Glyn Lawcock

analyst
#49

Do you have any views on that, given that in my view it releases a substantial amount of CO2? Where do you think the cost barrier will ultimately land with that? Any sense of it?

Gerhard Ziems

executive
#50

Right, Glyn — it hasn't arrived yet. Not yet. Still, we're seeing a few encouraging signals, and they're likely stronger than what we had 3 weeks back. That said, at this point the picture isn't fully clear; we're working on it.

Douglas Thompson

executive
#51

On the U.S. side, we’re making strong use of VAM units at our underground mines, and they’re producing excellent results. So for underground operations, our plan is to apply that technology and the lessons we’ve already demonstrated across the business. On the open cut side, we have the gas pilot program, where we’re drilling into coal seams that will later be mined using open cut methods, capturing that gas ahead of mining, and treating it as a valuable resource. So we haven’t been standing still. While this has been moving through the government processes, we’ve been advancing projects that will help reduce the impact, and those are well progressed.

Glyn Lawcock

analyst
#52

So, just hearing what Gerhard had to say, it does sound like we'll hit an impasse — though maybe, considering the government's actions and some changes that could be on the way, that impasse won't end up being as big as we first assumed...

Gerhard Ziems

executive
#53

That's the reason the — it appears they aren't separating underground from open cut. So underground operations now sit at the same level as open cuts. And because of that, it could look a lot better. So — but again, at this point, too early to give guidance on this.

Douglas Thompson

executive
#54

That is right.

Glyn Lawcock

analyst
#55

All right, and then just one last question, if I may. On the BMA sales process, I realize you can’t reveal too much, but are you still in the tent looking at the BMA’s assets?

Douglas Thompson

executive
#56

Regrettably, we’re not in a position to provide any commentary on that.

Operator

operator
#57

Paul Young with Goldman Sachs has the next question.

Paul Young

analyst
#58

Gerhard, I’ve got a few questions about the coal market — specifically realized pricing and coal mix. I understand you sold a small amount of met coal into the thermal market back when we had that arbitrage between the 2. What price did you actually get for those met coal sales into the thermal market? And how much additional volume remains to go? Or is that finished?

Gerhard Ziems

executive
#59

No, no. Pay attention — we aren't changing over anymore. That's done with. What I mean is, no switching is taking place during this year. So I believe that wrapped up at the close of last year. Definitely, nothing — nor any switching whatsoever in quarter 2. When you look at price realization, during quarter 1 it was exceptionally strong. In quarter 2, it's affected somewhat by — if you examine the details, it's affected somewhat — well, it's affected by a greater share of FOR sales alongside domestic sales within the U.S.

Paul Young

analyst
#60

Right, got it. On the U.S., it could be slightly premature to discuss early talks with U.S. steel mills. The U.S. steel market still looks fairly tight, I mean, though output is rising a bit, steel prices are lower, profitability for your steel is still quite solid, and the U.S. met coal market remains fairly tight. So where do you think — when do you begin discussions with U.S. steel mills regarding negotiations for next year? Or is that still too early?

Gerhard Ziems

executive
#61

It's a bit too soon. I believe the U.S. <<inaudible>> are trying to knock on the door a little, but it's too early. These discussions typically begin in September. I think we're a little -- a few -- 1 month, perhaps a bit more away, but some folks are knocking at the door, though nothing concrete yet.

Paul Young

analyst
#62

Yes. All right. And just one final question, this one about costs. You brought that up a moment ago regarding labor — the labor cost and how it's trending — and we also briefly discussed strip ratios. But focusing on the transportation side, first off, how has rail availability and productivity been in the <<inaudible>>? And then as well, what do rates for — how are they shaping up in the second half for both rail and port?

Gerhard Ziems

executive
#63

Yeah. I don’t have those rates on hand. But look, I’d say the Blackwater line has gotten significantly better in the second quarter. So absolutely, we had problems in the first quarter, and those probably carried into April too, but that performance has improved. So at the moment, transportation issues aren’t affecting us much — or actually, they aren’t affecting us at all.

Operator

operator
#64

That brings us to the end of the question-and-answer session. I'll turn things back over to Douglas now for any closing comments.

Douglas Thompson

executive
#65

Well, I just want to say thanks to everyone for joining us today. And if any follow-up questions come up, please feel free to reach out to our Investor Relations team.

Operator

operator
#66

We appreciate all of you joining us on today's call. With that, our conference has now finished. Thanks for being with us. You're welcome to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.