Coronado Global Resources Inc. (CRN) Earnings Call Transcript & Summary
January 22, 2024
Earnings Call Speaker Segments
Operator
operatorAppreciate everyone joining, and thanks for being with us on the Coronado Global Resources Fourth Quarter Investor Call. Everyone is connected in listen-only mode right now. Our CEO and CFO will walk through the results, and after that we'll open things up for questions and answers. To ask a question, just press the star key and then the number one on your phone's keypad. At this point I'll turn the conference over to Andrew Mooney, Vice President, Investor Relations and Communications. Andrew, over to you.
Andrew Mooney
executiveThanks, operator, and thanks to all of you for being on Coronado's investor call for the fourth quarter. Earlier today we put out our quarterly report to the ASX and SEC, and in it we lay out our production and sales volumes along with other details on our safety results, coal markets, and financial performance. A fuller picture of our financial position and results will go to the market on the twentieth of February together with our Form 10-K and full year earnings release. We'll hold another call at that point to walk through our financial outcomes and forward plans in more depth. With me today are our Managing Director and CEO, Douglas Thompson; Group CFO, Gerhard Ziems; and our Chief Operating Officer, Jeff Bitzer. In the report, you'll find our notice regarding forward-looking statements and reconciliations of non-U.S. GAAP financial measures. We encourage you to review these statements alongside our other filings with the ASX and SEC. I'd also remind everyone that Coronado quotes all numbers in U.S. dollars and metric tons unless otherwise stated. With that, I'll hand over to Douglas.
Douglas Thompson
executiveThanks, Andrew, and hello everyone. I appreciate you taking the time to be on the call today. Coronado Global Resources closed out the fourth quarter of 2023 with ROM coal and saleable coal production volumes that were higher than in the previous quarter. Those stronger production rates came about because of greater coal availability at Curragh, consistent with the mine plan, after record waste movement, and this occurred even though all coal producers in Queensland were substantially affected by the severe weather events and rainfall during November and December. I think it is fitting for us to pause and acknowledge the communities and families so heavily affected by the devastating weather in Queensland in late 2023. Coronado will keep supporting the communities and impacted employees as needed. These significant weather events at Curragh deferred approximately 150,000 tons into 2024, and 120,000 tons was deferred at Buchanan because the team slowed production in December so that we could safely traverse a geotechnically challenging area by installing additional support. Those rectification works were finished in mid-December, and longwall production went back to normal. Our quarterly sales profile at Curragh was further affected by significant delays at RG Tanna Coal Terminal in Queensland. This stemmed from labor issues that caused ship schedules to rise dramatically, by as many as 40 vessels.
Douglas Thompson
executiveLater delays hurt our quarterly sales volumes, which meant 5 vessels were pushed into 2024. Even so, operational performance came in above the production rates needed to hit our revised guidance for 2023, and cost performance stayed on target — aside from the port constraints that caused shipping delays. Group run-of-mine production for 2023 totaled 25.4 million tons, a slight increase over 2022, while group saleable production was 15.8 million tons. It should be noted that inventory levels at Curragh as of the thirty-first of December 2023 stayed above average, with roughly 650,000 tons of saleable coal sitting on stockpile because of the late December wet weather just mentioned and major port delays. Quarter four kept marking planned milestones as we moved forward with our plan to grow Coronado into a +20 million ton producer. In particular, during the quarter we delivered the second highest annual revenue result in the company's history. We closed out the quarter and the year with the group's lowest total recordable incident rate since listing, at 0.77. We kept making substantial progress on our fully funded organic growth projects, which will see Coronado produce approximately 20.5 million tons by 2025. Both Buchanan and Curragh have hit substantial milestones in our plans to ensure these fully permitted assets enjoy sustained returns and reduced costs.
Douglas Thompson
executiveBuchanan’s development work in the new Southern District is finished. All of the new longwall equipment has now been delivered, and longwall mining began in that new area in early January. At Curragh, we hit another major milestone under the One Curragh Plan by recovering historic pre-strip deficits. The extra fleets and the costs tied to them will be taken out in early 2024, in line with the mine plan. We’ve also achieved concrete progress on our plans for cutting emissions and for rehabilitation. Every one of Coronado’s fully funded organic growth plans, Buchanan’s expansion works, and Curragh’s Underground Project is still on target. As we head into 2024, the business’s near-term and longer-term outlook both excite us. At Curragh, we’ll capture cost and ongoing operational efficiency gains from the investment we made over the past two years. Curragh will take out three fleets that we brought to site to recover the pre-strip deficit, which lowers costs and, as a result, cost per ton. Now that longwall development work in Curragh’s Southern District is complete, we’ll be able to run an additional underground district, giving us more operational flexibility, and the development costs will now carry associated longwall tons and bring down our cost per ton.
Douglas Thompson
executiveWe keep putting money back into the business to grow it through organic plans. Our first coal plans, pending approvals from Curragh Underground, are still on track for late 2024. We're also continuing to make significant headway on the expansion works at Curragh. It's important to note that every one of our organic growth projects is fully funded by cash the business generates. These projects are moving forward as planned and on target, with no need to take on extra debt or raise equity. These growth investments, which will lift sales volumes of our highly sought-after met coals, will drive better returns for shareholders. Before I go further into the results, I'll give an overview of how we're performing on safety. I'm pleased once again to report that recordable rates in both Australia and the U.S. remain well below the relevant industry averages. In Australia, the twelve-month rolling average of Total Recordable Incident Rate frequency rate, as at 31st December, was 1.83, versus 3.92 the prior year. That's a 53% year-on-year improvement. It also marks the lowest Australian rate since May 2018. Over the last three years, the Australian business unit's rate has improved by 81%, and in the U.S., the 12-month rolling average of Total Recordable Incident Rate, as at the 31st of December, was 1.44, versus 2.42 the prior year.
Douglas Thompson
executiveThat's a 40% improvement year-on-year, and it's the lowest rate in the U.S. since Coronado acquired the mines. At the group level, the Total Recordable Incident Rate came in at 0.77 versus 1.41 in the prior year — a 45% improvement and the group's lowest figure since April 2018. I congratulate our teams on how they performed on safety in 2023, but I'd remind everyone that the work of improving safety is never finished. Moving to operational performance: Coronado finished the fourth quarter with production volumes and stockpiles higher than in the prior quarter. Group run-of-mine coal production reached 6.1 million tons, up 3%, while group saleable production came to 3.9 million tons, up 6%. For the full year, group run-of-mine coal production totaled 25.4 million tons, slightly above the prior year, and group saleable production was 15.8 million tons, 1% below the prior year. Turning first to Australia: Curragh's run-of-mine production for the December quarter was 3.4 million tons, 17% higher, and saleable production was 2.7, 16% higher than in the September quarter. Over the full year, Curragh's run-of-mine production was 12.8 million tons, 4% higher, and Curragh's saleable production was slightly more than 10 million tons, 2% higher than the prior year.
Douglas Thompson
executiveDuring the December quarter, coal production rates at Curragh were higher. That was mainly because more coal was available in line with our mine plan, after record pre-strip waste movement for the year to date, and because of the return on investment from finishing planned maintenance at the two coal processing plants on this asset. Those higher December quarter production rates at Curragh were achieved even though heavy rain severely affected all coal producers in the Basin. Blackwater, the town closest to Curragh, got 314 millimeters of rain in the quarter — a record for a quarter based on the statistics available — and that rainfall level was nearly double the 10-year average for the area. The significant rain in the March quarter and the December quarter, together with delays early in the year after the rain-related rail derailment on the Blackwater line and the mechanical failure of one of our draglines in September, which is now fully repaired and operational, have been key contributors to lower production volumes and higher mining costs per ton than guidance. Despite the impacts in 2023, Curragh kept executing to the mine plan, specifically in relation to waste movement.
Douglas Thompson
executiveIn 2023, we achieved a record for waste movement during the year, with 184 million tons moved. BCMs — sorry, moved. Our Curragh team will keep carrying out the plan so that Curragh captures the benefits of the productivity gains we've identified in fleet rationalization, procurement initiatives, and cost management activities. For our U.S. operations, run-of-mine coal production in the December quarter came to 2.7 million tons, and saleable production was 1.2, with both figures 10% below the prior quarter. For the full year, U.S. operations' run-of-mine coal production was 12.6, down 3%, and saleable production was 5.8, down 6% versus 2022. December production for the U.S. business unit was affected by localized poor geological conditions at Buchanan Mine, particularly at the 14E panel. Our team reduced production in December so we could move through this area safely, and production is back to normal. Roughly 120,000 tons of the December production impact was deferred into 2024 as a result of these activities. U.S. production levels are below the prior year because of the effects of the geological challenges at the 14E panel and the impact of the rock intrusion in September, which slowed production rates and hurt yield from this area. We have successfully addressed both of these events, and normal longwall operations were restored within the quarter.
Douglas Thompson
executiveFinishing development at the Southern District during the quarter, along with longwall mining getting underway in January 2024, marks a vital milestone for Buchanan's growth strategy. Group sales volumes came in at 4.1 for the December quarter, which is in line with the September quarter. Australian operations accounted for 2.6 of sales volumes, while U.S. operations contributed 1.5. Curragh's sales profile would have been stronger in the December quarter were it not for heavy rain across the Bowen Basin in November and December, plus sales impacts from shipping slippages that pushed five vessels into 2024 because of port constraints. Ship queues at RG Tanna Coal Terminal in Queensland grew considerably over the quarter, climbing from 20 vessels in early October to roughly 40 vessels by late December. Waiting times at the port rose from six days in October to about 28 days by the end of December. These longer waits affected Coronado's December and full year sales and also raised our quarter four demurrage costs. The heavier vessel queuing stemmed from labor and skills issues at the port, and we continue to keep a sharp focus on the rectification plans that RG Tanna's management have committed to.
Douglas Thompson
executiveCurragh finished the year with inventory still higher than usual — roughly 650,000 tons of saleable product sitting on hand because of those port problems. Now I'll pass things to Gerhard, who will walk us through where we stand financially and share a bit of a market update.
Gerhard Ziems
executiveThanks, Douglas, and good morning, everyone. During 2023, our revenue came to $2.9 billion, and met coal sales accounted for 92% of what we sold. The group's realized met coal price for the year stood at $216 per ton — and let me remind you that this covers FOB, FOR, and domestic U.S. domestic pricing contracts. That works out to a 73% realization against the average Australian hard coking coal benchmark index for the year, in line with the prior year. So although 2023 revenues rank as the second highest in Coronado's history, they came in below the prior year, reflecting a 27% decline in the premium global benchmark index during the year as well as lower sales volumes. In the December quarter, group revenues reached $668 million, 5% below the prior September quarter, owing to a combination of significant port constraints and the product mix Douglas already mentioned. In addition, Coronado's sales profile would have been materially stronger in the December quarter were it not for the effects of heavy rain across Queensland in November and December, along with the slippage of 5 vessels into 2024 caused by port constraints at RG Tanna. As of the thirty-first of December last year, Coronado had 432,000 tons of coal stockpiled at the port at RG Tanna, reflecting the loading delays experienced.
Gerhard Ziems
executiveRoughly 60% of those tonnes are hard coking coal and 40% PCI, and the whole lot will shift into quarter one — the current quarter. Look, these delays are unfortunate, sure, but we anticipate better performance in quarter one of this year, along with a more normalized vessel queue by mid-2024. So we're talking with RG Tanna, probably on a weekly basis. On this matter, I speak with them every week, and they've committed to improving things. Moving to cash and liquidity, Coronado keeps a strong balance sheet. As of the first of December last year, our net cash position stood at almost $100 million, and we held liquidity of just under $500 million. That net cash position consists of a closing cash balance of $339 million plus outstanding bonds of $242 million in total. Regarding our costs, for full year 2023, average mining cost per ton sold across the group came to $107.6 per ton. Our mining costs per ton here are higher owing to industry-wide inflationary pressures that ought to fade this year, but largely because of lower sales volumes. So when you consider sales volumes — the denominator in the cost per ton calculation — five items here have affected us.
Gerhard Ziems
executiveTo start, our Australian operations saw much heavier rain than usual during the first quarter of 2023, and on top of that, a train derailment on the Blackwater line dealt a substantial blow to both production and sales. Next, difficult geological conditions at Buchanan and a mechanical breakdown affecting our Curragh dragline during the third quarter pushed production and sales damages into later quarters. Third, poor geotechnical conditions at Buchanan in December caused our U.S. business to lose 10 days of production. Fourth, Curragh saw record rainfall in the December quarter, which deferred nine days of coal mining. Fifth, logistics hold-ups at RG Tanna stemming from labor issues and long vessel queues deferred damages into 2024. I'll simply echo what Douglas said earlier — on average, the vessel queue rose from 6, with delays climbing from 6 days to more than 20 days at present. In fact, looking back half a year, it's likely gone from an average delay of two to four days to over 20 days now. Douglas brought this up earlier, of course, but had it not been for the port problems at RG Tanna and the heavy November and December rain events together, we would have achieved the revised cost and production guidance for 2023.
Gerhard Ziems
executiveWhen it comes to CapEx, our capital expenditure sits at $28 million under the revised guidance we've laid out. As we've said before, CapEx during FY 2023 went mainly toward organic growth, specifically the capital works at Buchanan and Curragh, and every one of those projects remains on schedule. At Buchanan, our focus has been the investment in extra hoisting capacity along with the new surface raw coal storage area, which are meant to boost the mine's capacity and lower the chance that the mine gets stockbound because of possible delays anywhere in the logistic chain. At Curragh, we've incurred spending on longer lead items for the Curragh Underground mine, on top of expenditure for the Curragh Gas Pilot Project. We'll officially put our complete set of financial results out to the market on 20th February alongside our Form 10-K, including the EBITDA and net profit positions. On that same date, we'll also give market guidance covering production costs and CapEx for 2024. Now, if you look at the coal markets today, met coal index prices rose in the fourth quarter in both Australia and the U.S. The benchmark Australian Premium Low Vol Index averaged $333 per tonne, a 27% gain versus September, when the average price was $264 per tonne.
Gerhard Ziems
executiveThe benchmark hard coking coal U.S. East Coast Index averaged $264 per tonne, which represents a 17% rise from the prior September quarter's roughly $226 US dollars per tonne. Met coal prices started climbing in mid-September, driven mainly by a mix of factors: tight Australian supply, hurt by negative supply effects tied to Cyclone Jasper plus lower port throughput increases overall, and strong demand from Indian and Asian steel makers who were rebuilding inventories from lower levels for the year. Steel margins remain under pressure from the global economic environment and a weak steel demand outlook, and steel makers continue managing softer demand via lower hot metal production and by cutting raw material requirements. Even with end user demand weakness, we forecast that market optimism coming from an improving global economy along with the Chinese government's easing policies and anticipated new stimulus, especially in infrastructure and housing, will insist on improving steel prices and margins. We expect that sustained strong demand from China and India will keep met coal prices supported in quarter one, 2024, particularly since Australian supply stays constrained by recent weather events in the Bowen Basin, as well as ongoing port constraints.
Gerhard Ziems
executiveYou can also look at the most recent — you know, the monsoon that’s forecast to hit the coast, the Queensland coast, which might affect infrastructure in Queensland. As of late last week, the SGX Forward Curve projects benchmark prices averaging $300 per tonne in 2024. Such price projections point to a higher pricing environment lasting longer, and a pricing environment far above the long-term average price of $197 per tonne, for quite a while ahead. I’ll now hand back to Douglas to talk about how our organic growth projects stand. Douglas?
Douglas Thompson
executiveThanks, Mate. The money we've put into our organic growth projects and emission reduction projects will underpin better, more sustained returns for shareholders over time. At both Buchanan and Curragh, our growth projects are still on target, and they're built on the certainty that we can fully fund them from existing operational cash flows, with no need to raise debt or additional equity from the market. In the quarter, Buchanan finished critical longwall development works in the Southern District of the mine. As I said earlier, those works let us run an additional underground district and give us more operational flexibility, since we'll be mining from both the north and the South Districts going forward, and the new longwall equipment and short conveyor systems will drive optimal performance from this new mining district. We'll also keep investing in building the new surface raw coal storage area to boost the mine's storage capacity, which lets our longwall equipment run at higher capacity. Excavation works are scheduled for completion in April 2024, with the full project expected to be complete in early 2025. The team also made progress building a second set of skips to raise the mine's hoisting capacity to surface.
Douglas Thompson
executiveSo those excavation works are coming along nicely — roughly 40% done and tracking to plan. When they're finished, we'll be able to produce 7 million tons of saleable production each year, and we've spotted some potential upside within that plan that we'll look to unlock further. The Curragh Underground Project is still on schedule. Over the December quarter, we kept moving forward on the critical path items — environmental approvals and getting the mining equipment procured. Both made good headway during the quarter, and the team, the project team, has started moving to site to get the final pit and high wall location ready for construction works and to develop the key mining, operating, and management systems. When this project is fully up and running, we expect the underground to yield around 2 million tons per annum of saleable met coal at a substantially lower cost, which moves the whole Curragh complex down the cost curve. Now to our rehabilitation efforts in 2023. The business finished 60 hectares of seeded rehabilitation across our U.S. operations, mainly at the Logan surface operations. At Curragh, rehabilitation works also made good progress, with substantial work done on reshaping and topsoiling the land. However, seeding there will be finished in early 2024, after the significant weather events.
Douglas Thompson
executiveAnd lastly, regarding the steps we're taking to cut emissions. With the first VAM unit having demonstrated success and emissions having been lowered at Vent Shaft 16, Coronado has begun putting in a second unit at Vent Shaft 18. Building work is moving along nicely, with completion anticipated around mid-2024. Adding this second VAM unit should significantly push forward our goal of a 30% reduction in emissions by 2030. Over at Curragh, we're still advancing our emissions reduction efforts through the Gas Pilot Project, which aims to capture open cut waste mine gas from our operations and put it to beneficial use, mainly for power generation downstream or as a diesel substitute across our mining fleet. Gas well completions wrapped up in the December quarter, and installations at the surface production facility were finished as well. We anticipate final site acceptance, testing, and commissioning will wrap up in early 2024. With that said, I'll turn things over to the operator for questions.
Operator
operatorThanks, everyone. To ask a question, hit star one on your phone and hold until your name is called. Should you want to withdraw that request, just press star two. And if you're using a speakerphone, lift the handset before posing your question. Our first question is from Paul Young at Goldman Sachs. Go ahead, please.
Paul Young
analystMorning, Doug and Gerhard, and happy New Year. Appreciate you taking the call. I'll start with a handful of operational questions. First, on Curragh: the wet weather, plus the difficulties at Gladstone — that's just how it is, and the entire industry is feeling some effect from it too. But I want to dig a bit deeper into waste movements and the strip ratio, and also into the plan for taking out three of the fleets. Doug, maybe we start there. As I understand it, you have 16 truck and shovel fleets across Curragh North and Curragh Main. If three fleets are being removed, can you give us any sense of what the benefits look like in terms of absolute cost reduction?
Douglas Thompson
executivePaul, we clearly don't want to be issuing guidance during this call, obviously. That's something we'll handle on the next call. I'm also fortunate to have our COO, Jeff, here with us, and Jeff, feel free to chime in on anything I say about this. Jeff is currently leading this plan. Looking at the bigger picture, we've noted on several calls that we've been putting investment into the mine by bringing in extra fleet to make up for historical shortfalls. Dating back to the COVID era, and even to Wesfarmers' ownership of the asset, there was a shortfall in establishing the mine as a dragline-predominant operation. We had to open up strike length so the draglines could reach optimal performance, and beyond that, pit geometry needed to be sorted out, plus there was a pre-strip deficit that we've been investing in and working to recover. So additional fleet has been brought in. We actually have four fleets mobilized. We've already turned one off during the latter part of this year, and then the remaining three will come out early in the year, per the plan. And that's plainly a step change in cost. It's not just the contracted cost for those fleets we've brought in — once you turn them off, they come out.
Douglas Thompson
executiveThere are costs tied to that—maintenance, camp facilities, and similar items—and those will show up in the cost profile. It's all part of the One Curragh Plan, which was always intended to happen. So those are the changes, and they'll span both mines, Curragh Main and Curragh North. That capacity isn't needed anymore, and we'll be raising volumes on the draglines. We've already seen productivity gains from the draglines, and more efficiencies will follow. But also, with the pre-strip finished, we now have room in the pits, which frees us to capture productivity from our fleets. For instance, fewer trucks will run on the same haul routes, haul distances will be shorter, and dump stacking will be better—things the mine design and plan can now deliver starting in 2024 and beyond. So that's the major milestone at Curragh from a cost standpoint. The next major step will clearly be the underground coming online. As I said, the cost production from it—per the material we released with the underground announcement—will be substantially cheaper, and that will lower the asset's overall cost once again.
Paul Young
analystAlright, thank you, Doug. Let me work through some figures on that. From what I remember, you're roughly at 40% dragline and 60% truck shovel. What kind of percentage would this involve — say, taking three or four fleets? Would that push the dragline share up from 40% to 50% or to 60%?
Jeff Bitzer
executiveSo it's going to take your dragline — and when I mention dragline, we're grouping dragline together with cast blast, that sort of thing. Those are your lower-cost production techniques, but it'll push it up to roughly 44%, and I believe last year it was about 37%.
Paul Young
analystAll right, excellent. Appreciate the detail on those figures. Yeah, let me shift away from Curragh, that asset. Turning to the port, Doug — could you walk us through the demurrage you took on during the quarter? Can you give us any kind of feel for, you know, what demurrage expenses could look like over the coming couple of quarters, assuming, you know, clearing out that congestion and the stockpile is going to take a while?
Douglas Thompson
executivePaul, again, I’m not going to provide any guidance, but Gerhard has been deeply involved in this through weekly management. So, Gerhard, I’ll turn it over to you first, and then I’ll add anything I have to say.
Gerhard Ziems
executiveYeah, so Paul, there's no question that demurrage costs are affected by this, but we're talking with RG Tanna about ways to reduce or get rid of the extra demurrage charges that come from the port rather than from us. So it's too soon to say anything about it, but we're working on it.
Paul Young
analystSo apologies, Gerhard—your point is that RG Tanna is the party carrying those demurrage costs?
Gerhard Ziems
executiveNo, no — that part is really clear right now. The shippers are the ones bearing it, but we're collaborating with RG Tanna to reduce how much that hits us. I got— so it's quite early to say anything about it, but from a legal standpoint, these port contracts are set up so that the cost falls on the shippers.
Paul Young
analystYeah, got it. Okay, and here's my final question, guys. Regarding those talks with Sev.en GI, the new shareholder — is there anything more you can share? For instance, have you met with them, discussed a fresh strategy, or talked about how they could genuinely help you moving forward? Anything you're able to give us?
Douglas Thompson
executivePaul, this is an arrangement involving our shareholders, and that's where we've left matters. Our team has done its job in backing the DD, and they're moving their approvals forward. At this point, EMG holds the majority of the shares, and our strategy as a team hasn't shifted, nor will it shift because of the board.
Paul Young
analystOkay. Sounds good. Appreciate it.
Douglas Thompson
executiveFrom the two of them, as far as our plans go.
Operator
operatorThanks. Our following question is from Chen Jiang at Bank of America. Go ahead, please.
Chen Jiang
analystMorning, Doug. Appreciate you taking my questions. Both of them concern the market. I know you shared some insights on the POV HCC market. I was hoping you could give us some detail on the coal-quality spread that widened and showed up in your price realization. You were at a 60% — sorry, a 40% discount to the index. Looking ahead, when do we expect that quality spread to narrow? Thank you. And also, apologies — what's the driver-
Gerhard Ziems
executiveThat’s a fair question.
Chen Jiang
analystWhen you speak with your customers, is that due to the discounted PCI call out of Russia — is there an oversupply in the PCI market? Or is it based on what you've seen or heard from your customers? Thank you.
Douglas Thompson
executiveOkay, so you're highlighting that 60% realization figure for quarter four. I'd just like to remind everyone that over the full year we achieved roughly 73%, same as last year, and if I recall correctly, a comparable range in earlier years on met coal price realization. So it's a mix of several effects, and you've identified one, but let me add, as I consistently mention, that when prices rise, we do take a bit of a hit on price realization. So looking at the quarter four price, it came in at roughly $336 per ton, while quarter three was just $264, so 79%. That means a price about 21% lower. And as we always note, we mostly realize the price from the price quarter. So that's a significant impact there, much lower prices in the price quarter. Then moving to quarter two. It was lower still, probably 30% below what we saw in quarter four. So whenever prices climb, we consistently observe weaker price realization. Beyond that, at Curragh we have a product mix of 60% hard coking coal and 40% PCI. So had you sold this, our price realization would have come out higher.
Douglas Thompson
executiveTurning to the impact you raised, on the PCI market question — right now I'd put us at roughly 52% below the benchmark premium, versus 70, 73, 75% historically. So there's a bit of softness there at present, and the simple reason is that Russia is the largest PCI exporter in that market. They're selling at a discount, so demand for Australian PCI isn't strong, and that holds the realization back. That doesn't affect us at all, but if you look at semi-soft, realizations there are very poor — again, we're not affected — but it currently sits in the 40s. That's extremely low. Still, you can see the benchmark is heading in a different direction from PCI at the moment. But mainly, as always, when prices rise, that's when our realization takes a hit — negatively, on paper. Over the full year, though, we're at 73%.
Chen Jiang
analystAll right, thank you. Thanks for that, Doug. I’d like to ask a follow-up, given that you brought up PCI, because when we look at how PCI coal has been doing over the last six months compared with the hard coking coal rally—or hard coking coal—and, you know, continuing to hold up well. But PCI coal appears to be in a separate market. 40% of the coal you get from Curragh is PCI. Could you remind us of the coal quality from the U.S. and which benchmark we ought to be watching? Should we be comparing the PCI coal, you know, against your coal from the U.S.? Thank you.
Gerhard Ziems
executiveWell, honestly, the U.S. is doing quite well right now. If you break out our U.S. segment — and we do publish that split, though I don't have those figures in front of me at the moment — you can find the numbers yourselves. Our mix there includes hard coking coal, PCI, and then high vol, especially the High Vol A's. In my view, the product we currently sell in the U.S. as PCI is incredibly well received — it has very low ash. The market really likes it. To be frank, it commands very strong premiums and there's probably room for portions of it to be indexed. As it stands, it's tied to the hard coking coal indices. So that's a positive. Another point: with the High Vol A's, I wasn't much of a believer in them previously, but they seem to have gained traction, especially in India. Looking at India today, 19% of U.S. exports now head there, which I was hearing about, and, particu...
Operator
operatorLadies and gentlemen, the conference operator here. Gerhard's line has just dropped for the moment. We'll simply proceed to the following questioner. The next question is from Chris Drew at Jefferies. Please go ahead. Your next question is from Chris Drew at Jefferies. Please go ahead. Ladies and gentlemen, this is the operator once more. Kindly stay on the line while we reconnect Gerhard. Gerhard, your line has now been restored. Please go ahead. My apologies, Gerhard, your line is live at this moment. Please go ahead.
Gerhard Ziems
executiveMy apologies — I got disconnected.
Operator
operatorThanks. Go ahead with what you were asking.
Gerhard Ziems
executiveHi there, am I connected at this point?
Andrew Mooney
executiveYes, Gerhard, go ahead. Operator, could we move on to the following question, please?
Operator
operatorLachlan Shaw from UBS has the next question — go right ahead.
Lachlan Shaw
analystYeah. Morning, Doug, Gerhard. Thanks for the call. Happy New Year. I have a couple from me. Maybe just to start with, the issues at RG Tanna. You're saying that's expected to be resolved by mid-2024. Why the delay, and are there options — are there port options available?
Gerhard Ziems
executiveOkay, so let me address that point. Look, this really falls more under RG Tanna's remit. What they're telling us is that the personnel are now all in place — the operator is in place — to sort out the problems. It ought to have happened sooner. We're being somewhat conservative at the mid-year mark. My suspicion is there's a solid chance it gets fixed in the early part of quarter two, or that they manage to fix it in the early part of quarter two. There are alternatives we're talking through with them, but it's premature — making it public would be premature. But there are alternatives, since other ports sit idle, and the government — RG Tanna being government-owned — could redirect ships toward other ports that have capacity. We're also in discussions with the government. Let me remind you that on every call where we don't ship, no royalty is earned either. So the government feels that impact too, and fixing it serves everyone's best interest. There are potential solutions out there, but pinning that down on the score would be premature.
Lachlan Shaw
analystYeah. All right, great. Thanks. Moving to the next one. So regarding the effects of rainfall, yeah, could you perhaps share what you're observing? I mean, Tropical Cyclone Kirrily is kind of bearing down on us and possibly generating quite a lot more rain over the next few days. How, how ready are you? How much headroom exists within the system when it comes to water storages, you know, creeks, rivers, pumping, all of that kind of thing?
Douglas Thompson
executiveOh, welcome, and thanks for your patience while we dealt with a few technical problems on the line. Regarding readiness for wet weather, unfortunately I think everyone in the Bowen Basin has gotten plenty of practice alongside us over the past couple of years. Specifically, the initiatives we've implemented include mine planning, where we make sure we have high coal and low coal — a localized or colloquial term we use at the mine, in the business — to ensure that if we get rain, and we may have a pit where water comes in through the rain, we still want coal exposed on the upper benches, so we can try to keep production flow and revenue flow going. So that has been built into mine planning for a while. Over the past couple of years, we have increased our wet weather allowance in the plan, so in our time usage model, we've allowed for more rain impacts, and that is coming into the mine plan for 2024. Again, we generally plan on a 10-year average, and we've recognized the impacts of more recent years, particularly around the first and last quarters. From an infrastructure standpoint, we've invested in building a new outer pit dam over the past couple of years, so that gives us additional storage capacity so we can pump water out of our working areas away from where we're conducting works, and store it, and then evaporate it, use it on our roads, use it in construction works.
Douglas Thompson
executiveWe've also improved every part of our infrastructure, which lets us shift water across our sites much more efficiently. Having two mines, Curragh North and Curragh Main, is a real advantage for us. Because of how old the mine is, you have pits that are no longer operating, and we can send water there and clear it away quickly so work can start again. And finally, we hold permits allowing discharge into the creeks. That side is tightly regulated. We've made sure the equipment at our release points is the best available, so that whenever the chance comes, we put water back into the river systems responsibly and remove it from our sites. In any mine plan, drill and blast tends to be among the toughest elements — you prepare your drill and blast, you drill the ground, and then rain comes in and affects it. Our team has factored that in too. On the cyclone heading our way that you mentioned, the difficulty the industry will face is wet conditions following wet conditions. Right now everything in the Bowen Basin is saturated. I believe we're already at 30 mils for the month to date. So additional rainfall will have an impact.
Douglas Thompson
executiveRight now there's no way for us to quantify that, but I can promise you that, sadly, thanks to what we've learned over the past couple of years, we are extremely well equipped to handle these effects.
Lachlan Shaw
analystThanks, Doug. That really is a lot of useful detail. Perhaps one final question before I hand things over. On the cost side, just to revisit it: with the pre-strip fleet beginning to demobilize and dragline's portion of total material moved going up, if we consider the FY 2023 cost of $107 versus $88 in FY 2022, how far down do you think FY 2024 could actually come — back under $100, perhaps to $95 or $90? Is that a realistic expectation, or are we still in a setting where costs tend to be fairly sticky?
Douglas Thompson
executiveProviding guidance isn't something we intend to do. It wouldn't be appropriate. Sorry, Gerhard — I'll hand it over to you, but guidance is not something we're going to offer. As Gerhard mentioned, we're beginning to see inflationary pressures ease. What we highlighted is that our mine plan contains these step change events through which costs will be removed. Clearly, taking out these fleets and the costs tied to them counts as a step change event. At Buchanan, we've been putting investment into development with no corresponding tons as we get the Southern District ready for the mine's long-term future, so we have both the North and the South. All of that work had to be completed, and now the longwall tons tied to that development will begin to come through. So a cost reduction will show up there as well. And then we've been managing costs very diligently, and that will carry on into the coming year, with procurement strategies and cost-out strategies that we've identified in our budget for the year. Gerhard, I'll toss it to you, mate.
Gerhard Ziems
executiveRight, no, look, it's exactly like this. Listen, I believe the crucial question here is whether it drops under 100. Yeah. I mean, that's certainly possible. Just take a look at the previous quarter — you know, just the stockpile sitting at RG Tanna. Had we shipped all of it, we'd probably be much nearer, far nearer to guidance, around $103-$104 per ton. And then, once you strip out every geotechnical, mechanical, and wet weather problem that we've encountered, and on top of that, the initiatives that we, you know, have implemented by cutting the three fleets, we're going to be far more productive. Going below 100 is definitely achievable, even under 95. Getting to 88, into the 80s, would probably demand — that's a steep challenge, you know, though the low 90s are achievable. But guidance is something we're providing, we're giving guidance next month on this.
Douglas Thompson
executiveI should also highlight the long-term investment we've been putting into the business. These capital projects are fully funded — we're taking revenues we generate ourselves and putting them back into the business. The payoff from that will arrive, as with the underground. Jeff and his team have constructed a lot of these operations across the United States previously. Our team understands how to execute this, they've worked out the costs, and they have a clear picture of what the production rate will be when we start up the underground. Those first tons will arrive at a rate far below what we produce today. So again, in 2025, the 2 million tons will come and bring the entire Curragh complex down once more. And then in 2026, as we've said before, that's when our tonnage commitment to the power station drops from 3 million tons to 2 million tons. That means another cost reduction, but we'll also see revenue move higher, and that will be one more meaningful shift in Curragh's profile over the long term. So we have genuinely exciting, clearly identified initiatives that will move Curragh onto a sustainable cost curve for the long term.
Lachlan Shaw
analystThat's really great detail. Thanks, Doug, and thanks, Gerhard. I'll share it with both of you.
Operator
operatorThanks. We move now to Chris Drew from Jefferies, whose question is next. Please proceed.
Chris Drew
analystGood morning, everyone. Thanks. I got disconnected earlier, so I apologize if you already addressed this during the pricing discussion, but I wanted to revisit those realizations. I believe you noted a greater share of PCI, especially from Australia. I assume that's your standard spec PCI. Is there anything about the quality of that PCI that we should be concerned about? And second, could you give us some commentary on what to expect regarding that mix in the current quarter? Should we anticipate it returning to a more normal level, with more hard coking coal as you work through some of those inventories, or will PCI stay somewhat elevated for a while longer? Thanks.
Gerhard Ziems
executiveYes. So, as I mentioned before, the quality of our PCI—especially from the U.S.—is extremely high, and that's why it commands a premium over the PCI indices. So no, we have absolutely no worries about the quality of our PCI. As a matter of fact, we do get a very strong premium for these products. What I said earlier, I think, is that what we're seeing in the market at the moment is more that there's a lot of Russian supply coming into the PCI segment, and as a result, the relativities have come down. On product mix, yes, it will normalize. As I mentioned earlier, at RG Tanna we had 433,000 tons of product sitting in stock that we couldn't ship, and 60% of that is hard coking coal. So if we had shipped it, the mix would have been skewed more toward hard coking coal. Finally, on the product mix for thermal coal, it's still well below 10%. But part of the figure we're seeing this year is also affected by agreements we struck in 2022 to ship met coal—if you recall, high quality met coal—into the thermal coal market, because it fetched higher prices.
Gerhard Ziems
executiveThere's roughly—well, I don't want to put too fine a point on it—but around 300,000 tons of met coal got shipped as thermal coal, and that sort of pushed the thermal coal mix higher. So that's going to normalize as we move through 2024.
Chris Drew
analystAll right, many thanks indeed.
Operator
operatorThanks. Our following question is from Glyn Lawcock at Barrenjoey. Go ahead, please.
Glyn Lawcock
analystMorning, Douglas. I was wondering whether you might give us a bit more detail on Curragh and those three fleets. If wet conditions persist, is there a chance you'll need to keep holding on to those three fleets — and what would the timing look like? Should we expect the benefit of them going away to show up more in the second half of the year, or ought we to see some of it in the first half? Thanks.
Douglas Thompson
executiveThe easiest piece is the first part of the question. Our plan is to shut them down gradually over the course of the first quarter. So under the mine plan, those fleets get turned off toward the back end of the first quarter, with a later start in the second quarter being what we intend. The idea is, no, those fleets aren't needed anymore. Getting them demobilized in a systematic, planned manner is our objective, since the pre-strip deficit has been recovered. At this point the rain event shouldn't have an impact on the mine geometry of where we currently sit, and the draglines are able to handle the additional volumes.
Glyn Lawcock
analystAll right, that's helpful. Could you give us a bit more detail on Buchanan? A quarter back, we were sitting here discussing geotechnical problems, and you told us those were behind us. Now we've seen them crop up again during December. Is it simply the specific zone we're working in, or — we're going to shift into a different area this year, I believe you said that — so will that make a difference, or has this simply become a normal part of Buchanan given the mine's age and the location where we are?
Douglas Thompson
executiveNo, sadly it's just something that comes with underground mining. You do encounter intrusions. Those were two separate events, yet both occurred on the same panel. So 14E is the area the longwall has been mining through. From our development works, we knew an intrusion was there, but the size of it, as we communicated, came through in September, and that slowed production down. We did that for a couple of reasons: you don't want to damage your equipment while mining through it, so that once you restart, you can launch again. And the second is, when you're mining that much rock coming through with your material, you end up with material handling that can bog your conveyor belts from that. If you slow all of it down, you generally clear it quicker, and you can get up going a lot quicker. The team executed that plan, and pleasingly, it performed well. The geological challenges we had in December were a fault area that we traversed, and we decided to slow down and bolt that area and secure it and make sure that it, it's safe for the operations, and did a full set of rectification works before we went on.
Douglas Thompson
executiveAt the moment, 14E is busy with cut-out work, and we are transitioning into the southern portion of the mine in the new district. I'd also like to highlight that the northern section of the mine and the southern section will function together, meaning our draglines and our longwalls will gain the advantage of having two mining districts that we can establish and operate as efficiently as possible, with separate ventilation systems and separate material handling systems, so that we can achieve optimal performance from both the longwall and longwall mining districts as we advance. And the payoff we're going to realize going forward is that all the development work we've been doing over the last year or so to set up the Southern District will now come with associated production tons and thereby bring down the cost of production. Jeff, is there anything you'd like to add?
Jeff Bitzer
executiveNo, honestly, Douglas, I think you did a great job with that. To put it simply, the Northern District and the Southern District are not the same. The intrusions we encounter up in the Northern District don't show up down in the Southern District. The belt system in the Northern District runs considerably longer than the one we see in the Southern District. On top of that, the longwall panels in the Northern District have a face width of roughly 700 feet. Once we move into the Southern District, that face width becomes 1,000 feet. So as we advance into the Southern District, we see quite a few benefits and helpful advantages.
Glyn Lawcock
analystThanks, that's helpful. Douglas, based on what you just said, can I check something — the development work that's now been done in the south, obviously there's never a way to be fully sure, but it really does seem as though many of the problems we've just been discussing simply don't exist down there?
Douglas Thompson
executiveYou're right about that. It's impossible to flag every single item, but given the cover drilling we've completed along with the development work, we have a clear picture of what the Southern District looks like, and we're in a strong position.
Glyn Lawcock
analystOkay, thanks a lot — I really appreciate it.
Douglas Thompson
executiveMuch appreciated, Glyn.
Operator
operatorThanks. That brings the Q&A portion of today's call to a close. I'll now turn things back over to Douglas for some closing remarks.
Douglas Thompson
executiveOkay, thanks to all of you, and sorry about the technical problems that cropped up partway through the call. Especially Chris, for staying with us so we could get to your questions. Thanks for joining us today. Should you have any additional questions, as always, feel free to contact us via our investor relations team. Have a good day.
Operator
operatorThat brings today's conference to a close. We appreciate you joining us. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.