operatorWe appreciate everyone being on the line, and we're glad to have you join the Coronado Global Resources Second Quarter Investor Call. <<operator_script>> Our CEO and CFO will walk through the results, and after that we'll open things up for a question-and-answer session. <<operator_script>> At this point I'd like to turn the conference over to Andrew Mooney, Vice President, Investor Relations and Communications. Please go ahead.
Andrew Mooney
executiveThanks, operator, and thanks to all of you for being on Coronado's investor call for the second quarter of 2024. Earlier today we published our quarterly report to the ASX and SEC, and in it we laid out our production and sales statistics along with other key information covering safety, coal markets and financial performance. A fuller outline of our financial position and results will go to the market on the 6th of August, together with our Form 10-Q and half year earnings release. Joining me today are our Managing Director and CEO, Douglas Thompson, and Group CFO, Gerhard Ziems. In our report, you'll find our notice regarding forward-looking statements and reconciliations of non-U.S. GAAP financial measures. We encourage every listener to review these statements alongside our other filings with the ASX and SEC. We also remind all participants that, unless otherwise stated, Coronado quotes all numbers in U.S. dollars and metric tonnes. With that, I'll hand over to Douglas.
Douglas Thompson
executiveAll right, thanks, Andrew, let's dive in. During the June quarter, the Coronado team stayed committed to our plan and hit the outcomes and milestones that plan laid out, delivering substantially better production, sales, cost and revenue results. It's a pleasure to report that our business achieved greater group ROM coal production of 7.4 million tonnes, a rise of 24% versus the March quarter. We also saw higher saleable production of 4.1 million tonnes, up 22%, greater sales volumes of 4.1 million tonnes, up 8%, materially reduced group mining costs of $91 a tonne, down 27%, and increased total revenues of $674 million, up 1%, plus a number of other underlying and enabling milestones in our plan. These outcomes are the product of 18 months of hard work by everyone in the business to push the business forward and generate positive results. That said, the job isn't done. There's more our plan can deliver. We'll keep pushing for additional operational and cost improvements in the quarters ahead through the safe implementation of further productivity gains and the development of our organic growth pipeline, and I'm excited about the benefits that lie ahead for our shareholders as we advance our Mammoth Underground project and the expansion works at Buchanan, both of which carry extremely positive prospects and continue to be developed out of the operational cash flows of our business, with no need to raise additional debt or equity from the market.
Douglas Thompson
executiveBut before I go into detail about our operations, let me begin with a look at how we're doing on safety. As we said in a public announcement earlier, on May 31, the company halted work temporarily at the Buchanan mine after one of our team members, Brock Jackson, died. The accident happened as the evening shift was starting. This event has left us deeply saddened. I want to use this moment to again offer our sympathies and condolences to Brock's family, his friends, and his colleagues. An investigation into what happened is in progress. And until that investigation wraps up, we can't say anything more beyond noting that we continue to support his family and his coworkers. Buchanan mine started operating again on June 3, and no directives or restrictions apply to the mine. This tragic event reminds all of us that nothing that comes out of our workday matters more than getting home to family and friends safely. Now turning to our safety statistics as of June 30. At the group level, our total recordable injury rate stood at 1.01, versus 1.18 at the same point this year.
Douglas Thompson
executiveNow, looking at it by segment, for Australia our 12-month rolling average total recordable incident frequency rate stood at 1.29 as of June 30, versus 2.52% a year earlier. In the U.S., the 12-month rolling total recordable injury rate came in at 2.26, against 2.56 the year before. Both figures are down year over year and sit below industry averages. Moving on to how we performed operationally. Our Australian and U.S. segments both posted better production rates, higher sales volumes and reduced costs relative to the March quarter. At the Curragh Complex in Australia, ROM coal production reached 3.8 million tonnes and saleable production was 2.7 million tonnes, which represents gains of 37% and 23% respectively over the March quarter. Those materially better results come from several factors and are outcomes of our plan, though they stem mainly from finishing the historic prestrip waste deficits and the resulting removal of 4 fleets in late March, along with better productivity from our dragline fleet as we benefit from enhanced pictometry achieved through engineering changes made over the last 18 months. Our dragline fleets keep hitting our improvement targets, with the share of waste removal handled by draglines versus truck and excavator now at 44%, up from 37%.
Douglas Thompson
executiveSo overall waste movements for the June quarter and year-to-date are tracking to plan. In the June quarter, Curragh saw fewer production interruptions as well, with rainfall lower quarter-on-quarter. That said, heavy rain late in June meant roughly 100,000 tonnes of ROM production got pushed into July. Curragh's railings to port were also disrupted for a short time by a traffic accident on the Blackwater line late in June, which caused a rail outage of about 5 days. Curragh's cost structure has improved substantially quarter-on-quarter, thanks to the fleet removals, productivity gains and contractor rationalization. For the June quarter, the Australian segment's average mining cost per tonne sold came in at $81.70 per tonne, a 36% quarter-on-quarter improvement driven by the operational improvements I mentioned earlier plus higher production. That cost per tonne gain works out to roughly 100 million tonnes of gross mining cost improvement in the quarter, and it's the lowest cost per tonne rate at Curragh since the March quarter of 2022. At Curragh, we're aiming for more productivity and cost gains in the September quarter, with an additional contractor fleet slated for removal. That's around 13 pieces of equipment coming out of operations. Taking out this extra fleet isn't expected to affect Curragh's current or future production plans.
Douglas Thompson
executiveOnce demobilization is complete, that brings the count of contractor fleets taken out of Curragh to five. On top of that, we have the new Coronado Komatsu PC7000 excavator coming in, and it is helping drive our productivity improvements overall at the site as well as our coal exposures. From an operational standpoint, Curragh wrapped up the June quarter in a solid position, with stockpiles running high. The positive momentum we built during that quarter has carried over into July, and we are working hard to keep delivering in line with our plan. Our U.S. operations likewise had a good June quarter, posting better production, stronger sales volumes and a lower cost per tonne. Those U.S. operations turned out ROM coal production of 3.6 million tonnes and Saleable production of 1.4 million tonnes, which represents quarter-on-quarter increases versus March of 11% and 18%, respectively. ROM and sales production in the June quarter came in higher at Buchanan, where we are still mining our newly developed southern panels. Mining conditions got better over the quarter and, as we had forecasted, yield improvements began to show up. As a result, Buchanan's ROM production rose 11% and Saleable production rose 21% quarter-on-quarter. The mine kept seeing better skip efficiencies after the maintenance work done early in the year, and our conveyor belt systems are still performing well, so skip counts remain at their best rates in the last 2 years.
Douglas Thompson
executiveFor the September quarter, our current plan has the next panel in the Northern District being developed and ready for mining. And there's a stretch of time when we might be able to operate both longwall sections simultaneously. We expect this to lift product yields further at Buchanan, since the Northern District has a section with higher yields. At Logan, ROM and Saleable production for the June quarter rose 11% and 14%, respectively, versus the March quarter. Those production gains stem from mining being reestablished at the Powellton mine plus incremental tonnes from highwall mining at our surface operations. The U.S. operations saw a meaningful cost-per-tonne improvement in the June quarter, mainly because of the higher production rates we achieved. For the U.S. segment, average mining cost per tonne in the June quarter came in at $110 a tonne, a 10% improvement quarter-on-quarter. Given these strong June results and our forward plans, we are today reaffirming the 2024 guidance metrics we previously announced. I'll now pass things to Gerhard, who will walk us through our financial position and give us a bit of a market update.
Gerhard Ziems
executiveThanks, Douglas, and hello, everyone. I'll keep my remarks brief today. Revenue for the June quarter came in at USD 674 million, which is 1% higher than the prior March quarter, driven mainly by increased sales volumes even though prices declined. Year-to-date revenue was $1.3 billion, a 10% decrease versus the same time last year, primarily due to weaker met coal index pricing. Coronado's met coal sales revenue as a share of total coal revenues year-to-date came in at close to 96%. That met coal sales percentage was above the prior year figure of about 90%, and the reason is the delivery in the prior year of certain U.S. thermal coal contracts that we negotiated at a time when thermal coal pricing was far higher than met coal prices. That was sort of a pattern across the industry. So we moved from 90% up to 96%. The group's realized met coal price for the quarter was USD 195 per tonne, which blends FOB, FOR and U.S. domestic pricing contracts, and reflects an 80% average realized price against the Australian premium low vol index. As of 30 June, the company had a net debt position of $5 million, made up of a closing cash balance of $264 million.
Gerhard Ziems
executiveWe had $242 million of senior secured notes that remained outstanding. And then there was $27 million in interest-bearing liabilities tied to closing the Curragh housing arrangement. As we discussed last quarter, the business took a negative hit in the first half from the extra payment made in March to the Queensland revenue Office of AUD 79 million, which included interest connected to Coronado's acquisition of the Curragh mine in March 2018. As of 30 June, Coronado had available liquidity of USD 414 million, made up of cash, short-term deposits and undrawn available borrowings under the ABL Facility. Year-to-date, capital expenditure came in at USD 137 million, with most of that spend tied to our organic growth works at Buchanan and Curragh. On coal markets, the met coal markets, both the Australian and U.S. met coal index prices moved lower in the second quarter. The benchmark Australian premium low vol average index price stood at USD 242 per tonne, a 21% decline from the March quarter, when it was $308 per tonne. The benchmark index, the average U.S. East Coast index, was $218 per tonne, 15% lower than the March quarter, when the average price was $256. So it went from $256 in the March quarter down to $218. Prices dropped during the quarter owing to an increase in seaborne supply out of Australia, given drier operating conditions.
Gerhard Ziems
executiveHowever, we did observe a price rise starting in late June after operational problems at some peers in the Bowen Basin and in the U.S. hurt supply. Then, of course, in July prices fell back again — that's a separate matter. Coronado anticipates that during the September quarter, pricing will stay elevated, supported by Indian restocking demand once the monsoon season ends, which likely begins around early September. Over that same stretch, met coal supply should be constrained, given mine production troubles among our peers plus railway maintenance taking place, especially in July and August across the Queensland network. As one data point, the SGX forward curve as of 12th July implies an index price of $255 per tonne for the rest of this year. Such pricing projections keep pointing to a higher-for-longer pricing setting than the forward pricing environment, well above the long-term average price of $199 per tonne. I'll now hand back to Douglas. Douglas?
Douglas Thompson
executiveThanks, Gerhard. So during Q2, we kept putting money into organic growth initiatives at Mammoth Underground and Buchanan, and we used cash flow produced inside the company to pay for that expansion. Coronado holds over 800 million tonnes of met coal reserves along with 2 billion tonnes of resource to draw from. Beyond the growth projects currently underway, we have also pinpointed further possible organic growth opportunities inside that reserve base, and over the long term those could offer our shareholders more attractive metrics than what the market currently provides. What's more, our existing organic growth investments are still within budget and on schedule, and they continue to be valued at multiples substantially below recent market opportunities, which we believe will generate significant value for shareholders over time. Now turning to the Mammoth Underground project. It is still on schedule, though it depends on regulatory approval. In the June quarter, we lodged the statutory approvals required for this project. Procurement work is all moving ahead according to plan, with equipment orders placed and delivery schedules agreed with the suppliers, and those delivery dates come before the planned start dates for the project. Mammoth currently has a complete leadership team in place, and that team is supporting construction of the project.
Douglas Thompson
executiveThe feedback we received after inviting interest for staff and workforce has been very encouraging. All required earthworks at S-Pit were finished in June, and highwall stabilization has begun ahead of portal development. Our discussions with regulators and the communities remain positive. As a reminder, Mammoth holds a substantial high-quality met coal reserve of 41 million tonnes of ROM coal, with coal qualities anticipated to match the existing Curragh North open cut. When fully operational, the project is targeting an incremental increase of 1.5 million to 2 million tonnes per annum of Saleable production in its first phase. Subject to receiving regulatory approvals, first coal from Mammoth is expected in December of 2024. Organic growth plans in our U.S. operations are also on target, with capital works at Buchanan continuing during the quarter to invest in building a new surface raw coal storage area that will raise the mine's storage capacity, ultimately lowering the risk of bottlenecks and enabling our longwall equipment to operate at higher capacities. During the June quarter, excavation works carried on, with access roads and bridge extensions completed. The scheduled completion date for the new stockpile facility remains on plan at April 2025.
Douglas Thompson
executiveDuring the quarter, we also moved forward with building our second set of skips, which will boost the mine's hoisting capacity to surface. As of 30 June, excavation work on the shaft and concrete lining are finished through to the shaft bottom. The following phase, shaft equipping, is on track with the plan. We expect this project to be fully complete in quarter 2 2025. Turning now to emissions reduction: we kept advancing our gas pilot project at Curragh over the quarter. The aim of this project is to capture open cut waste mine coal gas and put it to beneficial use, with downstream applications under investigation, among them power generation and diesel substitute uses in our mine fleet. Gas production from the Europa 1 and Europa 2 wells began in January of this year, and we have kept monitoring gas flow from those wells in order to build our data record and gain understanding of how the reservoir is performing. In the June quarter, Coronado and its partners started a second trial of a gas converted truck to evaluate how a 793F truck engine performs with upgraded conversions. Early results are positive and consistent with what we had expected from the trial. This trial is set to run over the next 8 weeks.
Douglas Thompson
executiveBecause the Ventilation Air Methane, or VAM, unit at Vent Shaft 16 worked well in cutting emissions, we made the decision to install another VAM unit at Vent Shaft 18. Building that second VAM unit wrapped up in April, and we ran testing during May and June, and I'm happy to report today that the Virginia Energy Oil and Gas Board gave its approval for the new VAM unit at Vent Shaft 18 to operate on the 18th of June, and it is now running at full capacity and actively lowering emissions at our Buchanan mine. Adding a second VAM unit should bring Coronado's emissions down even further. All of this fits within our strategic roadmap toward a 30% reduction in emissions by 2030. Coronado sees itself as a leader in the industry when it comes to deploying these emissions technologies. With that, I'll turn things over to the operator for your questions. Thanks, Darcy.
Operator
operator<<operator_script>> The initial question is from UBS's George Eadie.
George Eadie
analystThe first question concerns our outlook for this year. At the point when the guidance was issued, had the two weeks of rail downtime on the Blackwater line already been factored in?
Douglas Thompson
executiveYes. So clearly, the motor vehicle accident that happened and cost roughly 5 days late in June was not known at the time, and we are working to mitigate that. I have to say that the rail providers above and below rail have cooperated very well with the industry to mitigate it. And then the maintenance work that was planned for the month of July has been known for some time, and we have been working to mitigate that. So that is taken into account. It's not helpful for us, but it's common to everybody in the industry that use that rail corridor.
George Eadie
analystYes, I just wanted to confirm it wasn’t 1 way shifting to 2. Awesome. And then perhaps also regarding Curragh. So at this point you’ve removed 5 fleets from operation, and you’ve added more dirt into the dragline system. Both of those are extremely beneficial on the cost side, and we’ve observed that, which is great. But when it comes to coal on <<inaudible>>, are there risks here? I suppose how many strips ahead of pre-strip have you completed by now, and what kind of <<inaudible>> risk exists in 3 to 4 years that you’d need to bring a contractor fleet back for another big double strip pre-strip campaign or something like that.
Douglas Thompson
executiveNo. What we're aiming for with this plan we've been carrying out is to establish the mine with a sustainable stripping ratio over the long term, and one designed around dragline operations. So over the last 18 months, we brought extra fleets onto the site to make up the waste deficits that had built up, but also to configure the geometry of the various pits so they have a longer strike length and a better setup for dragline productivity. And that's where our gains have come from. Our plan sits at 44%. We're hoping to get a bit more out of it as time goes on. But that's the ratio we're running for dragline, truck and excavator. And it holds up as sustainable at the stripping ratios we have. The plan does hold further tricks, clearly putting an underground mine into operation, which is lower cost and gives us derisked supply because it isn't exposed to wet weather, and it gives us options further down the line that will further mitigate the risk of having to bring additional contracted fleets onto site for what you described.
George Eadie
analystYeah. And then just quickly on Buchanan — you mentioned the next panel up in the Northern District would be ready this quarter, in September, with better yields. Could we get a bit more detail on that? Is it ready at this point? And what do overall yields look like coming out of Buchanan? Are we talking roughly 60%, or more like the mid-to-high 60s?
Douglas Thompson
executiveSo no, it’s not really at that point just yet. Work on that panel has moved along quite nicely. In fact, we’re running a little ahead of the plan we started with. The team has performed well. So we’re busy getting it set up. It will be ready to begin mining in this quarter, though not right now. And the yield gain between the South and the North is roughly 6% at the moment. It may end up somewhat higher than that, but what we’re looking at is mid-50s from the north.
Operator
operatorDaniel Roden of Jefferies has the next question.
Daniel Roden
analystI was hoping to get a clearer picture on the Mammoth Underground approvals and where things stand with those. And could you also update us on when the public review period closes and how long the regulatory approval takes once that's done?
Douglas Thompson
executiveDaniel, what works in our favor is that going through Des's process is pretty clearly laid out. That means we're able to establish timelines. And in our program schedule, what we've done is put outer limits on Des's design program, which gives us an approval delivery date in late November. So that's what we're aiming at right now. Obviously there are gate stops as you move through it, and as you pointed out, public consultation is one of them. I think what I can comfortably say at this point — I don't work against anything in Des's information that they'd want to manage publicly more than I would — is that our request for information has gone very well with them so far, and we're actually running a little ahead of the time schedule we planned for the project.
Daniel Roden
analystYeah. All right. Great. And with the expectation that it closes in November, do you still feel good about first production in the December quarter? And I'd imagine that will be quite modest <<inaudible>>.
Douglas Thompson
executiveCorrect, that's accurate. It won't be large, yet reaching it is a milestone we're aiming for. On the other elements, our civil work is coming along very nicely and is in fact slightly ahead of schedule. Highwall stabilization is also going well at this point. That has actually placed us where really substantial works can begin as soon as they're available. And our second delivery is fully directed toward that first fleet right now. So we're in genuinely good shape.
Daniel Roden
analystGreat, that’s good to hear. And I just wanted to say — I suppose the balance sheet looks like it will be in a stronger position thanks to the improvement in costs and production. I would be remiss if I didn’t ask about M&A. So, Anglo’s first tender is due in the next few weeks. I suppose you want to update expectations regarding how you’re thinking about that M&A. There are plenty of coal assets for sale right now. Yes.
Douglas Thompson
executiveYou're right about that. The market has seen a fair amount of activity so far, and plainly there is more to come. Those are solid assets. Still, what sits before me and the team, and what our plan holds right now, is considerably more appealing for our investors and shareholders. We have organic growth projects whose risk we are able to manage. We understand those projects clearly, and at multiples far below any of the opportunities showing up in the market at present. So that is where our focus as a business lies — on our organic growth opportunities. As for the Anglo process, I would prefer not to comment on the assets and their process at this point. Our attention is on our organic growth.
Operator
operator<<operator_script>> Chen Jiang with Bank of America has our next question.
Chen Jiang
analystAnd congratulations on a solid quarter with significantly reduced costs. Just a quick follow-up on that point. Regarding the mining fleets and personnel, 30 major pieces of equipment were taken out in the March quarter, with another 13 anticipated in the September quarter. I suppose, for the people and equipment currently operating at Curragh, will this become the standard going forward? Are you satisfied with the mine plan, and so on? I guess, as you said earlier, this isn't a temporary removal, and you won't be bringing them back at some point down the road? I'm just trying to work out whether this — the improvement in your cost — is mainly a result of taking out those people and fleets?
Douglas Thompson
executiveBroadly speaking, you've got it right. Clearly, a whole set of activities underneath is what drives productivity and makes those 2 lots possible. The first chunk of work was, let's say, catching up on the historical shortfalls, and that involved extra fleet we'd put capital into during the prior period; those higher costs have now dropped away since that work sits behind us, precisely as you laid out. Beyond that come the efficiency gains we flagged as achievable in our plan and which we've begun to see delivered — take, for instance, the gains we're realizing from our dragline fleets, which are allowing this supplementary contracted fleet to be freed up, and that will fall away too. Still, to maintain our dragline profile moving forward and the stripping ratios we intend to hold as a long-term fit with our long-term mine plan designs, the fleets we have at site are now more or less stable going forward. We'll keep searching for efficiency gains. And should those gains come through, especially on our draglines, that's the place I'll be watching — can we move more volume with draglines — and cast blast may be another area where we're examining a few projects.
Douglas Thompson
executiveThat could free up additional fleet capacity for us. However, we aren’t seeing that right away—those are projects we execute over time and use to capture either an incremental tonne gain or a cost-reduction gain.
Chen Jiang
analystYeah, yeah. Perhaps one more question. You brought up a strip ratio. So right now, is Curragh hitting the improved strip ratio over the long term, or the long-term one? Just as a reminder for us, what's the long-term strip ratio at Curragh?
Douglas Thompson
executiveAs a mining engineering engineer, I need to qualify my answer by saying you must average it out, because instantaneously, month to month, things will change and rise or fall depending on the pit's geometry or what you're doing in a pit. But over time, you want to average that. And to answer your question with that caveat, yes, we are at our average long-term stripping ratio. There is potential to drive that down over time, but it will be short-term downs and ups.
Chen Jiang
analystOkay, absolutely. Then perhaps for a final question, let's discuss your price realization and what is going on in the macro market. So if we look at Curragh, the price realization for the June quarter is near 90% of the POV, the premium low volatile hard coking coal. So I am curious: is this 90% price realization mostly due to shipment timing starting to lag for 3 months, or is there something else? And also, Gerhard, it would be great if you could share your observations on supply and demand for PCI coal or second-tier quality met coal in the CEBA market. In particular, what is driving the PCI discount narrowing to 20% in July from the 32% discount averaged in the June quarter?
Gerhard Ziems
executiveYes. Okay, that's a fair question. So when it comes to our price realization, it has gotten better, and the reason is straightforward: we were in a very high price environment during quarter 1. So there's a lag effect. In quarter 1 it was $308 per tonne, and in quarter 2 it's $50 lower. As I've always said, when prices are falling, we actually gain on price realization, and when prices are rising, our realization drops, with roughly a 3 months delay. And that ties into your question too — over recent weeks and months, we've observed a dramatic improvement in PCI relativity. It's currently around 88% to the premium global index. So there's only a very small discount on PCI in the market at the moment, and what's mainly behind that is the embargo on Russian coal businesses. Those Russian coal businesses were targeted by the U.S. Chinese banks pulled back right away, halting financing for any deals involving Russian -- leasing from Russian coal businesses that typically export to China and India and South Korea and Brazil. So it's a bit harder. I view it as temporary. I think some time will be needed before the Russians locate alternative routes into the market for that type of coal, of which, naturally, there's plenty available in Russia at present, stockpiled.
Gerhard Ziems
executiveAnd whenever Russia offloads this kind of coal, the price is roughly $160 per tonne, $170 per tonne. That's a substantial discount versus the current $200 per tonne, or $197 per tonne. So my sense is it will take some time, though they could discover a method to get around these embargos during this year. I think there's another factor we're seeing — and honestly, that obviously works strongly in our favor. A significant portion of our coal is listed on the secondary indices, which benefits us considerably, and we'll gain from that in the third quarter and beyond. Now, on the primary benchmark index, we've obviously watched it decline to $225 per tonne. What's causing that? Well, the chief factor behind that elevated price — and anything beyond $200 per tonne is quite high, yet we saw levels above $240 per tonne for an extended period — was mainly India, India's monsoon, which won't return before the end of August or perhaps September, before they begin rebuilding real momentum in their appetite for metallurgical coal from Australia. We are observing what I'd call quite subdued demand for met coal across the market, which is a plus, considering how depressed the steel markets are; $225 per tonne isn't a poor price — it's a very good one.
Gerhard Ziems
executiveEven so, Chinese exports remain at record levels, in our view. Indonesia is shipping coke at elevated volumes as well. So this benchmark index is under considerable pressure. That explains why prices have fallen to $225 per tonne. That price likely faces some additional pressure — perhaps another $5 per tonne to $10 per tonne of downside — before the CFR arbitrage comes into play and Chinese buyers step in.
Chen Jiang
analystThanks for that detail, Gerhard, particularly regarding the Russia sanction. To recap, the 90% price realization at Curragh for the POV stems from the 3-month lag. And the PCI discount narrowing is mostly a result of the Russia coal sanction. Then I'm curious: for those PCI coal volumes out of Russia, do you typically view them as competitors to Australian coal? I mean, will they ultimately head to China or India? And do you see that price discount putting downward pressure on Australian coal?
Gerhard Ziems
executiveAbsolutely. This is a worldwide marketplace, and there's competition at all times. Australia remains the largest PCI exporter, though Russia is right behind it. Of the roughly 60-odd million tonnes that the seaborne market carries in PCI, Russia accounts for approximately one-third. And yes, competition is present. Australia, you know, is a longstanding supplier to China, India, South Korea and other regions. That is exerting downward pressure on prices. Naturally, though, if Russian coal is embargoed, you've removed it from the supply chain. So that pushes prices upward. That also means this situation will stay in effect for a few more weeks, perhaps even months. Yet in the end, Russia will find — those Russian coal producers will find a route back into the market by other means. And after that, the — I believe the relativities will return to normal. Keep in mind, the relativity of PCI to benchmark is typically around 70%, 73%, rather than the 88% we're seeing at present.
Operator
operatorNathan Martin with The Benchmark Company has the next question.
Nathan Martin
analystI’d like to return to the cost side of things, if we could. Congratulations again on quite a notable sequential drop. At Curragh in particular, it went from $127 per tonne in the first quarter to roughly $82 per tonne here in the second quarter, it appears. There was some commentary about aiming for additional productivity and cost gains at Curragh during the third quarter. I suspect much of that relates to the planned removal of one more fleet. Still, it would be helpful to hear your view on how repeatable that $82 per tonne figure from the second quarter might be in the back half. Or perhaps there is even room to improve it through some of the productivity efforts tied to that fleet?
Douglas Thompson
executiveThat figure comes from what you laid out in our plan, and I've been discussing it — it's genuinely important to us as a team that we have a plan and that we're diligently carrying it out. As for removing this fleet, we always understood it would create a step change in our cost, and that cost has now been taken out. So the cost is out of the business, and it will remain out of the business. There are further gains, as you noted this quarter — we'll remove some additional cost on the back of productivity gains by standing down another fleet. And then there's another factor, which is always a denominator. And we've had a good quarter, which has driven that number. So if we can sustain things — and our plan does support continued good production and sustained performance — then we will enjoy the numbers we have this quarter, and that's what we're focusing on. To the second part of your question, is there more opportunity? Yes, there is, and that's part of our plan, where we're busy driving out costs and seeking opportunities to offset costs that have been imposed on the business, for example, the royalty impost.
Douglas Thompson
executiveAnd after 2026, once the Stanmore royalty falls away, that takes another $15 per tonne per year out of Curragh's cost profile — which is one more substantial step change in our costs. So near term, you get incremental cost differences. And then over the longer term, there are major step changes in the cost position of the asset and complex.
Nathan Martin
analystThanks for that context, Douglas. Regarding your point about the denominator — I believe you noted that inventories at Curragh rose somewhat over the quarter. What's the expected timing for shipping those inventories? And as we look toward the back half, might that lift the 2.7 million tonnes sold at Curragh in the second quarter and push that run rate higher?
Douglas Thompson
executiveThat's right, Nathan. Stockpiles did get built up, since the rain made it hard for us to move product to port. The rain was the first obstacle. After that, a rush on coal came at the very end of the month, and that's what left us with ROM coal sitting in stockpiles. On top of that, we had product at port that will be drawn down during this quarter.
Operator
operatorRob Stein from Macquarie has the next question.
Rob Stein
analystYou'd have noticed a number of mine outages across the sector, and that's affected operations, but also permitting and approval processes. Could you perhaps give us your view on how relatively complex Mammoth Underground is compared with, say, a typical geologically complex and fractured underground system in Queensland — like where do you see the risks, how are you managing it, noting the different mining method? And then in that same context, similarly, can you talk to the U.S. underground risk? And really we're just after a relative view, not skewed one way or the other.
Douglas Thompson
executiveThe mining approach we plan to use at Mammoth is bord and pillar. Both the geology and the depth of cover are well suited to bord and pillar. As a result, extraction ratios from this project will be very favorable. Another point we announced is that the mine starting straight-off highwall will eliminate civil costs from the project. S-pit has now reached a limit, though not an economic one. From an open cut standpoint we hold full permits to mine all of that coal, but our overland conveyor would need to be relocated. So had it been coal, we would have mined right to the end of the life, but this allows us to bring production forward within the mine's life and extract through an underground method. Comparatively speaking to the U.S.: in our U.S. operations, I believe we have one of the best teams anywhere for managing high cover, since they mine in the Appalachian region, where cover is deep and gas levels are high. Buchanan is a mine with very high gas levels. And our team brings a vast bank of experience, with the capability to handle those complexities, and has done so very successfully over a long stretch of time.
Douglas Thompson
executiveBuchanan operates a 2 longwall mine, so it uses a completely different extraction approach than the bord and pillar method we're putting in place here. In the project's first phase, gas levels are quite low, meaning breakout gas is limited. As time goes on, though, that gas will rise, and we'll apply what we've learned. That's the advantage of running a business with solid open-cut and underground capabilities and expertise built up over the years, which we can bring to bear on developing this mine. And as we've grown the business over time with all these skills combined, the team can evaluate other opportunities, given a demonstrated history of successfully integrating operations and extracting more value from sites that existed previously. I believe you mentioned permitting compared with others. This is a mine area that holds full permits. All of this coal is mineable by us. What we're asking of Des amounts to a change in mining method. We have the option to mine it via open cut. What we're applying for is a modification under our permits, so we intend to extract it using another method—underground mining—but that requires us to go through an approval process with Des.
Douglas Thompson
executiveThat’s far less complicated than starting a brand-new mine and securing every permit for it from scratch.
Rob Stein
analystAnd only as a follow-up on that, the consequences of Grosvenor and what happened with the outage there, plus, I suppose, a possible rise -- no, sorry, a lower tolerance for risk on the part of the regulator up in Queensland. Your view is that this won't really matter, mainly because of the mining method. Is that a fair way to put it?
Douglas Thompson
executiveI believe it's the whole industry's responsibility to learn from one another and to make sure that anything we can gain from Anglo that's worth learning gets taken through the industry and shared out. So that's what we're doing at Anglo. To date, it has been fairly open-handed with useful information for the industry that will learn. Different mining methods, different gas, different circumstances. Our interactions with the regulator so far have been encouraging. We've made certain we spoke with them early, and we brought along all of our technical information, and our team has left those meetings feeling fairly upbeat about how the regulator responded to the way we're approaching this project. We have great people in country backing us up. And we have a very strong team, and we're drawing on the skills within that team to make sure we understand the risks and that we have engineered controls in our plan covering every one of them. So, encouraging feedback from the regulator is what we've seen.
Operator
operatorThat brings the Q&A portion of today's call to a close. I'll now return the floor to Douglas for any closing remarks he'd like to make.
Douglas Thompson
executiveTo start, I want to thank everyone for making time to be with us today. On previous calls I've mentioned a few times that the team has put together both a near-term and a long-term plan to position the assets we hold for success. We're fortunate in terms of the resources and the people we have, and we have a plan we're working hard to carry out so we can make the most of the 800 million tonnes of resource in front of us and ensure we capture the greatest value possible for shareholders. I'm looking forward to bringing you updates on how our plan is progressing and on positive results going forward. Thank you.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone joining us. You’re free to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.