operatorWe appreciate everyone being on the line, and we're glad to have you join the Coronado Global Resources investor call for the fourth quarter. Everyone attending is currently muted and can only listen in. Our CEO and the team will walk through the results, and after that we'll open things up for questions and answers. Should you want to pose a question, please hit the star button and then the number one on your phone's keypad. At this point I'll turn the conference over to Chantelle Essa, Vice President of Investor Relations. The floor is yours.
Chantelle Essa
executiveThank you, Operator, and thanks to all of you for being on Coronado's Fourth Quarter Investor Call for 2024. Earlier today, we published our quarterly report to the ASX and SEC, and in it we lay out our production and sales statistics along with key information on safety, coal markets, and financial performance. A more detailed picture of our financial position and results is due to be released to the market on the 20th of February together with our Form 10-K. Joining me today is our Managing Director and Chief Executive Officer, Douglas Thompson. In our report, you'll find our notice regarding forward-looking statements and reconciliations of certain non-U.S. GAAP financial measures. We encourage you to review these statements alongside our other filings with the ASX and SEC. I'd also remind everyone that Coronado quotes all numbers in U.S. dollars and metric tons unless otherwise stated. Now, I'll hand the call over to Douglas.
Douglas Thompson
executiveThanks, Chantelle, and a belated Happy New Year to everyone, plus thank you for making time to be with us today. To sum up, this quarter has been an improvement for us. We marked the opening of our Mammoth Underground Mine, and that included cutting first coal, which we achieved on schedule and within budget, and each of our business units turned in a strong quarter. We completed the new series of notes, which drew oversubscription along with better pricing and terms, and our safety performance stayed ahead of industry averages, and we closed out the year with mining costs once again under $100 a ton, a robust finishing inventory position, and a solid balance sheet. The key metrics we hit in Quarter Four were group ROM production of 6.9 million tons, saleable production of 4 million tons, and a sales volume of 4.1 million tons. At the group level, our total recordable injury rate came in at 1.18, still well beneath industry averages in both the United States and Australia. Our improvement journey remains positive and is continuing. Turning to page two, you'll find our operations and sales summary. On a year-to-date basis, as of December, Coronado delivered ROM coal production of 26.6 million tons, roughly 5% higher than 2023 and than 2022, which reflects better planning and efficiencies throughout all of our operations.
Douglas Thompson
executiveThe Australian business unit had a stronger December quarter. At Curragh Complex, ROM coal production came in at 3.4 million tons, 29% above the previous quarter. However, during the final week of December, unplanned electrical outages hit Curragh, affecting our coal processing plants and the overland conveyor. Output was disrupted for roughly one week while we carried out the repair work needed following the outages and their knock-on effects. Because of the outage, we accumulated ROM inventory during that period that we were unable to process, and we expect that to work in our favor in Quarter One for both production and sales — and in fact it is. Thanks to better productivity from our dragline system, the additional fleet we announced earlier was idled in late October. That idled fleet was made up of a company-owned shovel, T282 trucks, and the related ancillary equipment. It marks the fifth fleet taken out of our open-cut operations since April 2024. The results we've achieved stem from actions taken over the last 18 months to enable our productivity. Our mine site cash costs fell by 37% to $90 a ton in the quarter. This demonstrates that our people's efforts to follow our plan in a determined and disciplined manner are delivering opportunities for improvement, and that plan is focused on optimizing performance by enabling productivity and removing system complexity.
Douglas Thompson
executiveDuring the quarter, we concentrated on further boosting productivity from our dragline dozer and coal supply system, and that dragline system keeps surpassing our improvement goals, with the ratio of waste moved by draglines versus truck and excavator now standing at 52%. That figure is 8% higher than our 2024 plan and represents an increase from 37% back in 2023. In the quarter, we delivered the next major milestone in this plan, which was securing an alternative coal source at a lower cost per ton than our existing operations. The now operational Mammoth Underground provides that milestone. First coal was mined on time and within budget, and we are currently in the ramp-up phase. Turning to our U.S. business unit, we carried out our planned longwall move and associated maintenance during November at Buchanan. Throughout 2024, the U.S. has kept improving quarter on quarter, delivering greater production, higher sales volumes, and a lower cost per ton, and U.S. operations achieved ROM production of 3.5 million tons, a positive and sustained trend. Following work undertaken earlier in the year, Buchanan continued to achieve better skip efficiencies, with skip counts holding at their best rate in the last two years, and the ROM production from our U.S.
Douglas Thompson
executiveThat figure represents a 10% increase over 2023. Turning now to the financial position and some market outlook, group revenue for the December quarter came in at $558 million, while year-to-date group revenue through December was slightly above $2.5 billion. These revenues mirror an 18.9% decline in the PLV, Hard Coking Coal, Free On Board Australian Index, along with reduced annual U.S. domestic contract pricing when measured against December 2023. Within the December quarter, the PLV index averaged $203, and the group's average realized price per ton of met coal sold during that quarter stood at $163 a ton. Export sales volumes accounted for 69.6% of total sales volumes, and met coal revenues made up 95.2% of total revenues. Group sales volumes year-to-date at December 2024 reached 15.8 million tons, which matches the comparable period in 2023. We keep observing pressure on steel markets and demand for raw coal material, with the PLV index sitting at a three-year low since early September. So far, China's stimulus measures have not restored confidence in the steel market. Steel raw material prices stay subdued, with the main met coal index range-bound around that $200 level, and during the quarter, the positive momentum anticipated from India did not materialize.
Douglas Thompson
executiveHot metal output outside China didn't recover either. Our long-term view on seaborne met coal is still very positive, grounded in the fundamentals we observe in the market. Now to the financials: we closed the year with net debt of $85 million, a closing cash position of $339 million and available liquidity of $468 million, and we successfully issued $400 million of senior secured notes at 9.25% due in 2029 in an offering that was many times oversubscribed. Those proceeds went toward redeeming the remaining $242 million of the original senior secured notes due in 2026 and gave us added balance sheet strength. Worth noting, the extension's tenure pushes the finance date past the expiry of the coal supply agreement with Stanwell, and after that point Coronado's earnings and cash flow are expected to improve significantly. During the quarter, we also announced our new Chief Financial Officer, Florian Maag, who joins us on the 1st of April 2025. Finally, a brief update on our projects, beginning with Mammoth. The Mammoth Underground project at the Curragh Complex is now operational, we're in the execution phase, and we'll be ramping up over the remainder of 2025.
Douglas Thompson
executiveMammoth Underground gives the Curragh Complex a number of strategic ways to improve. First, lower the cost per ton. The cost per ton from Mammoth Mine is forecast to come through in the second quarter, and that will bring down the complex's overall cost per ton. Diversified coal production. The underground mine will de-risk production continuity, since it provides an extra coal supply to our processing plants, and that additional supply is not affected by wet weather the way the open cuts are, plus increased capacity. Once fully operational, the project is expected to deliver 1.5 to 2 million tons per annum of saleable production in the first phase, and further expansion is possible and will be evaluated once the results from the first phase are determined. Mammoth Mine has substantial high-quality met coal. The reserve base is more than 41 million ROM tons, with a coal quality expected to mirror the existing products that we get from Curragh North open-cut. Now, if I turn to the U.S. and give you a quick update on our organic expansion projects at Buchanan, both of these projects remain on budget and on schedule. In the December quarter, major components installation on the second set of skips project progressed, and the shaft collar foundation was completed on this project, and then, with the excavation works completed, the construction of the reclaim tunnel and the screening building on the new surface raw coal storage area was ongoing.
Douglas Thompson
executiveBoth projects are fully funded within budget and remain on schedule for completion during Quarter Two of this year, 2025. In the end, the added hoisting capacity and storage space will lower the chance of bottlenecks, letting our northern longwall and southern longwall districts and equipment run at greater capacity with better productivity, and with that, I'll pass things to the operator, Mel, and take your questions.
Operator
operatorThanks. Should you want to pose a question, hit * 1 on your phone and hold until your name is called. To withdraw that request, hit * 2. In case you're using a speakerphone, kindly lift the handset before asking your question. A few members of the team are also connected with us to field whatever questions you might have. Our first question is from Paul Young at Goldman Sachs. The line is yours.
Rob Stein
analystThank you. Good morning, Doug. Happy New Year to you as well. Doug, my first question concerns Curragh — specifically how it performed when it comes to mining costs, and also that power disruption. To begin with the power disruption, which hit you late in the December quarter, may I just confirm: was that outage confined to Curragh, or was it in fact broader across the region?
Douglas Thompson
executivePaul, we actually had quite a few events. As those storms moved through Queensland, a regional outage hit us and affected the supply going to the mine, and we also saw some impacts on-site. We actually took — and this was the lingering effect of the event — because when a power outage happens, as you know, it brings your prep plants to a halt, and they get crash stopped, so you've got to bring them back up in a methodical way and clean up some of the mess that unfortunately gets created. That's been handled well. The impact on us was that we had a direct strike on our rejects bin and on the overland conveyor, which affected the control systems on both and had a lingering effect. We got that repaired after the first one. That first major outage happened on Boxing Day, and then the second one came on New Year. Another big storm came through and knocked out power in the area, which impacted us for that period, and we kept mining. So it was a combination of direct impact on-site, but then also regional.
Paul Young
analystOkay, got it. Thanks, Doug. Moving on to mining costs. If I look at it quarter over quarter, there's a really strong reduction at Curragh—roughly $35 million lower quarter over quarter, or about 6% on site cash costs alone. And I know you mentioned the rise in dragline mining, which is clearly a positive since those costs are far below truck shovel. So in this environment, where you still have some CapEx program ahead of you this half—noting CapEx did decline in the quarter, but I believe you're guiding to or expecting some step up this half—with coking coal prices where they are right now, Curragh is still struggling on cash flow, and I know you have some inventories that have built up. But on mining costs, what more can you do regarding removing truck shovel, etc.? And what are your expectations this half for dragline percentage on mining and for mining costs? So I'm just looking for the trajectory into this half regarding what you can do, what's controllable around reducing your costs this half?
Douglas Thompson
executiveWithout looking ahead at this point, I'd say consider Q2 of last year — how we did on volumes, plus the cost-reduction work — which carried into Q3, though the denominator meant it didn't show up in the results. Q2 and Q3 are likely a baseline you can use to track where we want costs to land, thanks to the initiatives we've introduced to make Curragh more productive and cut the absolute cost base by removing those fleets. That's point one. What do we anticipate going forward? Dragline performance keeps coming in at the levels we planned. For this year's outlook, we haven't actually held the percentages we're currently hitting. We've dialed that back somewhat so we can deliver the dragline ratio. We're referring to 52% of waste moved by draglines rather than truck and excavator. Our mine plan sits a little below that to keep it sustainable. So we're comfortable there. Those results have held up in the months to date. On cost reduction, we still see opportunities in what I'd call taking the complexity out of Curragh operations.
Douglas Thompson
executiveWhat I mean by that is the prior owners operated a model that was heavily outsourced in nature. There were numerous contracts in play, margins stacked on margins, a lot of overheads, crossover. Thinning out our contractor services in a fairly disciplined way was part of what we did last year, and that carries a lingering effect, since you have to give notice and people must go through a contractual turn-off period. That work now sits behind us, so we're looking to begin reaping the rewards of that benefit, so you should see it flow through into our costing. Then in Quarter One, our mine plan — because the draglines have performed better than what we had in the 2024 plan, and we brought that into the plan for 2025 — gives us a chance to temporarily idle one more truck and excavator fleet, which we're in the middle of analyzing, and that will hand us a further opportunity to tackle our costs. So those are the sustainable long-term changes: put them in your mine plan, engineer them, and have a systemic shift in your cost base that we've been working through. There are obviously other levers we can pull. The first is making sure we've entered the year with a strong cash position, and the discipline we've maintained as a business around our balance sheet, I think, shows up in the liquidity.
Douglas Thompson
executiveAnd that's something we've consistently said matters to us. As a business, that $200 million is probably now growing along with the underground, and $250 million is the liquidity discipline we intend to maintain on our balance sheet. We've carried that into the new year, and from September onward you'll see — even looking at low pricing in the fourth quarter — that we've kept a solid cash position quarter to quarter, which demonstrates that discipline. That said, there are other levers available to us, capital management being one example. All of us are reviewing our capital programs, but those aren't levers you want to pull systemically, because doing so sets you up for difficulty down the road — including some of the challenges we've worked very hard at Curragh to resolve, such as the COVID maintenance deficit on key infrastructure like our four draglines. We spent a lot of money on those, bringing them up to spec and restoring reliability, which we can now see in the system across our prep plants and overland conveyors. Naturally, those are levers one can pull, but we have others too, and the efficiencies within our systems plus cost reduction are the systemic ones I'd like us to concentrate on.
Paul Young
analystAlright, thanks Doug. That was genuinely useful detail—I appreciate it. And one final thing about realized pricing in the U.S., which I believe was centered on domestic sales—I just want to understand the reason. Was it simply a matter of delivery timing? Because I saw that the Buchanan export price rose quite a bit during the quarter, so it's a shame you weren't able to get it into the export market in that period. Could you perhaps walk us through why those deliveries to domestic steel mills showed that variability instead of going to the seaborne market?
Douglas Thompson
executiveI believe I should double-check that I have the figures correct, but based on my assessment, it comes down to timing — so it involves contract volumes and timing, along with seaborne availability, and hopefully we'll see that unfold somewhat further this year given what we're observing in the United States with the positive sentiment in that market.
Paul Young
analystSure, no problem. Thanks, Doug. I appreciate that.
Douglas Thompson
executiveAppreciate it, Paul.
Operator
operatorThanks. Our following question is from Rob Stein at Macquarie. Go right ahead.
Rob Stein
analystHey everyone. To build on what Paul asked about pricing, could you give me some background on how the sales mix shifted between Q1 and Q2, and on whether we should expect mid-75s met coal to be roughly the average going forward, the way it trended in 2023 and so on?
Douglas Thompson
executiveYes, I’d say that share of met coal is correct. A great deal of it comes down to timing. So providing that figure would be quite hard for me. Even with the market under pressure, our customers have continued taking their volumes. They clearly want the product we offer. As a result, our sales volumes to contractors remained steady against our plan. So I believe the fluctuations you’d observe would have stemmed from timing. If you think back to last year, the gap between this year and last year would have reflected some of the arbitrage benefit we captured from thermal pricing at that time, and those contracts or opportunities were wound down going into this year, but on a quarter-on-quarter basis it would have been timing.
Rob Stein
analystRegarding Mammoth, could you give us an update on the ramp-up and on how you expect that to affect costs and production going forward?
Douglas Thompson
executiveHappy to address that. First, regarding costs: as that volume increases and we move more of it into Curragh — which happens in the second half — we'll begin to see meaningful tonnage coming through under the ramp-up program. From a whole-of-complex standpoint, that will start to help bring the cost base down. The ramp-up schedule we've put together is as follows. In the first phase we've planned three continuous mining units, and right now we're building out the initial panel for unit one. Work on that began in mid-December, when we announced the project. It will progress, and then unit two is due for delivery late in Quarter One, with that second panel built out during Quarter Two. Then, around the middle of the year, we'll build out panel three. That work will also take in the mine's core infrastructure — installing the conveyor belt lines and similar items. The opportunity that begins to materialise in the second half, mainly during ramp-up, comes from a coal seam that is five meters thick. So in production you take the top cut, bolt and secure it, commit a fair share of your capital in primary development, and afterward you come back and rip the floor.
Douglas Thompson
executiveAnd those are extremely productive, low-cost tons that get added into the system as you continue retreating on those floors containing the coal seam we have. So that gives us those opportunities. What we also discuss regarding expansion is that if it turns out to be as productive as it currently is, there's a second phase we could see ramping up, where additional units could be brought in. Roughly 18 to 24 months from now, once the mine has been developed enough to be productive, adding more tons, and then from a processing standpoint too, through our plant, we have opportunities in our bypass circuit as well, which would assist us with processing costs. All of that will be assessed as part of phase two of the project, so we see a fair amount of upside opportunity here that we'll be pursuing, but we don't want to commit to it until we see it demonstrated in this first phase.
Rob Stein
analystI appreciate that a lot.
Douglas Thompson
executiveHappy to be here.
Operator
operatorThanks. As a reminder, if you’d like to ask a question, press star one on your phone and wait for your name to be announced. Our next question is from Glyn Lawcock at Barrenjoey. Please go ahead.
Glyn Lawcock
analystMorning. I wanted to ask what normalized costs at Curragh looked like during the quarter, since you capitalized. It seems somewhat similar to Q2 last year, when costs were gapping around a fair amount. So what would the quarter's normalized costs have been if the inventory move hadn't been capitalized?
Douglas Thompson
executiveInventory is also part of what drove the quarter-over-quarter movement. We drew down inventory in both cases during quarter four, so that accounts for a portion of it. I think that will settle down as the underground comes online and we stop seeing some of these events that hit us. As our plan has been unfolding, you can see the magnitude of those impacts beginning to level off, and Curragh will be steadier. So my sense is that it's denominator inventory that likely shifts it around. As for quoting a figure, I don't want to get ahead of what we'll be doing in a couple of weeks, but if you were thinking about 105 with some of that normalized out, that's probably where the number would land.
Glyn Lawcock
analystAll right. So when I look at how things unfolded through 2024 — you had a huge inventory capitalization in Q2, the reverse of that in Q3, and then Q4 again — that figure you just mentioned, is that roughly the correct base effect for Curragh, around 105 or so?
Douglas Thompson
executiveI'd put it at just under 105 for the first half, and then, as you mentioned, once those projects go live and the capital unwinds, the payoff from that capital begins to come through — that will shift things.
Glyn Lawcock
analystAll right.
Douglas Thompson
executiveI have no intention of stepping outside my comfort zone here.
Glyn Lawcock
analystYeah, no, no. Thanks for that. I mean, it's clearly just the swings in market cap. When you're moving between $120 a ton and $90 a ton, the reality lands somewhere in between, more or less, it appears.
Douglas Thompson
executiveYes, and that’s the inventory you’re working with.
Glyn Lawcock
analystYeah. And then regarding cash flow — I know it's quite small, but with this company it's a game of inches, it feels like, on cash flow. You reduced net debt by a very small amount. Was that simply a working capital contribution during the quarter that helped you achieve a positive reduction in net debt? And if we consider today's environment, I mean, prices are clearly somewhat weaker than all of us would like. At today's prices, as things stand right now, is the business generating cash?
Douglas Thompson
executiveWhen it comes to bringing our net position down initially, that involves a mix of the effort and the costs decreasing, but yes, working capital plays a part in that. You brought up inventory. The first quarter will be difficult, and in this pricing environment, I think for everyone, as you said, it will be difficult. The fact that we have a fairly large capital program during the first six months of this year will also make things difficult. We've set the business up, and we keep holding the business to the long-term intent of playing out in 2025 or completing these capital projects, maintaining discipline on what was needed to resolve the productivity and efficiencies at Curragh in particular, and drawing benefit from those. So that work is largely done, but it needs to bear fruit in this first half. So the first half will be hard while we finish these projects off and where we're seeing pricing at the moment.
Glyn Lawcock
analystRight, so will capex be higher than it was in 2024, or should we hold off until the guidance comes out next month?
Douglas Thompson
executiveIf you wouldn't mind holding on for some guidance.
Glyn Lawcock
analystAll right, that's excellent. Thank you so much.
Douglas Thompson
executiveAppreciate it.
Operator
operatorThanks. The next person in the queue is Chen Jiang from Bank of America. Go right ahead.
Chen Zhang
analystMorning, Doug, and happy new year. Thanks for the question. To follow up on Australian mining costs quarter over quarter — I know you talked about the dragline, the inventory, capitalizing inventory, and so on. But when you look at how volatile it's been from quarter to quarter, for instance in Australia in Q1 mining cost came in at $126, then fell a lot in Q2 to $91, rose again in Q3 to $123, and in Q4 it was $90. So what exactly happened over the last 12 months? The cost has swung that much between quarters, and maybe give us some confidence too. I know you'll give guidance next month for the FY25 mining cost average, and perhaps offer us some reassurance that you can keep Australian mining costs at a comparatively low level — let's say under $100. And also the levers to get there. Thank you.
Douglas Thompson
executiveSure. Chen Jiang, a lot of what you mentioned, I believe, helped me address the question, and the earlier answer too — the volatility across those quarters came from several factors. The first quarter, as you noted, was about inventory balances first. Yes, that accounts for the swing in the quarter, and then there's the denominator. When you look at Curragh over the past year, we began it with the Australian East Seaboard getting hit by those major storms, and then the cyclones, which affected our input inventories and our opening inventories for processing and producing product. So on the sales side, the denominator took a severe hit in the first quarter, and ROM production did as well. In the second quarter, the mine was set up and we generated really solid ROM production and sales production as a result, and that began showing the sort of numbers we were targeting in our plan. That's also when we began removing tangible cost from the business. When you take fleets out, you're not just removing that cost — you're also removing all the people tied to those costs and the knock-on effects. That showed up as we announced, when we parked up the first two fleets.
Douglas Thompson
executiveThat was the point when we completed the historic work of recovering the pre-strip and establishing the new working areas for dragline efficiencies. And then, as the productivity of that system played out, we could park up the second two fleets, and then in the last quarter, unplanned at that stage, but a fifth fleet that came out of the system as the efficiencies played out, so that's the underlying costs coming out of the business. The third quarter was, once again, August had, I think, the highest rainfall from 2013 that impacted operations, and then we had our overland conveyor damaged with a belt ripping, a belt getting ripped by a crusher plate coming loose and a substantial amount of damage that took volume out of it as well, so those are the key items that played out that then took the denominators out. So that's why I'm saying, look at Q2 and look at Q4, and you can kind of see the system's capacity that it can produce at the moment, and you can also start seeing what the cost that it can operate with the cost out that we've been doing. So then to answer your question on the look forward, yeah, that for 105, probably below that, and then particularly in the second half, as the volume starts coming through post the investments that we've made in capital, we'll start enjoying the return on it.
Douglas Thompson
executiveThe other thing is that having that extra volume gives you system stability. This isn't laborious, and it entertains my mind, but it's an engineering solution that we've designed, and we're executing it with discipline as we can afford it to get the business there. For us, time is the most valuable commodity. We've been working through it as quick as we can to get the system stability, but this engineered solution for Curragh, and we can see the results. We've demonstrated the results. We just need it to be sustainable going forward. That'll play out in the cost.
Chen Zhang
analystAlright, Doug, thanks for laying all that out. I really appreciate it. I’ll make sure to share it. Thanks.
Douglas Thompson
executiveAbsolutely. As we’ve said before, we’d be glad to have you visit us on-site and walk you through this.
Operator
operatorThanks. Our following question is from Daniel Roden at Jefferies. You have the floor.
Daniel Roden
analystHello there, and good day everyone. Appreciate you fitting my question in. Thanks, and congratulations on the quarter. What I'm hoping to get a handle on is this: you mentioned the possibility of taking out one more load and haul fleet, given the dragline performance you saw through December. Basically, I'd like to understand what goes into the decision to switch those fleets off, and then what brings them back on, and also what happens with the fleets themselves. Do they stay on site, or do you move them to another site or contractor? The thinking behind my question is really just trying to grasp what the medium-term risk looks like if you end up falling behind on the pre-strip requirements for coal uncovering over the medium term.
Douglas Thompson
executiveYeah. Good point to raise. So to address that, and let's frame it around Curragh as an asset. There are 3 mines there now. Across the group, that gives us 10 operations. 5 sit in the Logan Complex — 4 underground, 1 open cut, the Canon, the two — and then 3 in Australia. So bringing in the underground and the extra tons it can deliver, where you have a fully permitted long-life asset with the reserve base sitting in front of us, provides what I've described before as a smorgasbord of opportunities for an engineering mind, or what can we do. Some of that has to be matched to what the market's doing. So the opportunity exists. Should the market move, we can add capacity. We can ramp up production. And that'll always be our goal. Does it make sense in the market to bring additional capacity through, and I think for Curragh, volume does work, so we will be pushing that lever. I think we've signaled that before. What we've done disciplinedly to date is simplify the operations, get them really focused, and drive productivity, and to do that, you pull back.
Douglas Thompson
executiveWith the draglines now delivering where they’re able to, we can begin examining the truck and excavator fleet, as you suggested—specifically, in a given market, can you scale it back without losing revenue from the business, and then when can you scale it back up? So to get to the heart of the next part of your question: is that fleet still accessible to you if the opportunity arises? The shovel is ours—we own it. That equipment sits on site and will stay there. So yes, that capital is available. Every other fleet we’ve parked has been contractor-owned, and those fleets have been demobilized and taken off-site. The fleets under consideration this year are probably a 400-ton class fleet. So it isn’t a primary pre-strip fleet. The 600 and 800-ton fleets are our primary fleet, but it still carries a substantial cost base that can be removed with the draglines sitting at what we’re planning for them to do this year. That pre-strip can be completed by draglines instead of that fleet. It likely will be finished by the back end of quarter two if performance continues the way it is.
Douglas Thompson
executiveThat will continue through the remainder of 2025, though it should return to production, likely at some point in 2026, when we review our stripping ratio profiles and pre-strip ahead of draglines. So we will aim to keep that fleet accessible. However, in our ongoing procurement processes, there is fleet available in the market. Everyone is currently taking cost out of their business. So there are avenues to pursue fleet within a reasonable amount of time if you can pre-plan it properly. So none of these decisions being made at the moment, in our view, will impact us long-term in managing the mine's stripping ratio.
Daniel Roden
analystYeah. No, that's great. Yeah, that's great. That works. But thanks, Doug. I really appreciate it, and I'm looking forward to getting up to the site to see the rocks.
Douglas Thompson
executiveThat's great, thanks.
Operator
operatorThanks. We move now to a question from Luca Maiorana at Nuveen. The line is yours.
Luca Maiorana
analystHi folks, thanks for taking the question. Yeah, I just wanted to get some clarity regarding cash generation. So with the new issuance last quarter on a pro forma basis, what did effective cash burn come to quarter over quarter? And is there some minimum cash level you're looking to maintain during the first half of 2025?
Douglas Thompson
executiveI'd rather not dive too far into the specifics on that, since we're about to close out the month and release all of our financials, so we don't want to get ahead of ourselves on the first part of your question. But what we as a team and our board believe, and what we've been telling the market, is that roughly the $200 mark in liquidity is what we've been running the business with as we grow, including the expansion in the US and Australia. We're probably looking at 250 as the sort of liquidity level we'd like to carry as a business. And right now we're sitting at just on $470 million in liquidity, with cash at just under or just on $340 million. So we have a comfortable position on both of those, and the discipline around managing the balance sheet and our cash positions and the strategies there is working.
Luca Maiorana
analystUnderstood — thanks.
Operator
operatorMuch appreciated. That brings the Q&A portion of today's session to an end. I'll turn things over to Douglas now, in case he has any closing comments to share.
Douglas Thompson
executiveWith one year closing and another beginning, you pause to think about chances to learn and improve. Reviewing the long-term plan across all our assets is the correct approach. Our strategic direction is sound. We have Logan, with its five mines. They have performed reliably and consistently, an excellent and highly experienced team producing solid results. At Buchanan, with both longwall operations running in 2024, we have now shown it works and that we can run the mine much better, especially on yields going forward with both operating. I am genuinely excited for 2025 about debottlenecking as we open up extra throughput through the system and gain the flexibility that will let the Buchanan team succeed. Then at Curragh, many of the milestones we discussed with the team have been achieved. We now operate three mines. The regulators approved three mines. The complexity has been removed. We have taken out a substantial portion of our cost base, which has helped simplify things, and we are seeing the results show up in our productivities and our costs. So I do not expect the first half of 2025 to be easy for anyone by any measure, with factors outside our control such as the market that we must respond to and have a business responsibly ready for, and then the work to complete these capital projects, since building a coal mine in Queensland on budget and on time is fairly unprecedented. I am incredibly proud of what the team has put in, but we know there is more to do, and these assets have more to give, and that is where our focus lies, and that is what makes me excited about the year ahead.
Douglas Thompson
executiveAs I mentioned before, I'd really encourage you to accept that invitation. We want to bring you out to see these mines firsthand and show you the work we're doing. Showing you is much simpler than trying to describe it. With that, thanks so much.
Operator
operatorThat brings today’s conference to a close. We appreciate your participation. You’re welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.