At this point, I'd like to pass the call to Chantelle Essa, our Vice President of Investor Relations. Chantelle, over to you.

Chantelle Essa

executive
#2

Thanks, Operator, and thanks to all of you for being on Coronado's First Quarter Investor Call for 2025. Earlier today we put out our quarterly report to the ASX and SEC, and in it we lay out our production and sales statistics along with our other key information on safety, coal markets, and financial performance. A more detailed outline of our financial position and results is expected to be released to the market on the 9th of May with our Form 10-K. Today I am joined by our Managing Director and CEO, Douglas Thompson, and our CFO, Barrie van der Merwe. Within our report, you will see our notice regarding forward-looking statements and reconciliations of certain non-U.S. GAAP financial measures. We encourage you to review these statements in conjunction with our other filings with the ASX and SEC. I also remind everyone that Coronado quotes all numbers in U.S. dollars and metric tons unless otherwise stated. I'll now hand over the call to Douglas.

Douglas Thompson

executive
#3

Thanks, Chantelle, and thanks to everyone for taking the time to be with us again today. All in all, we delivered a solid quarter against what is a particularly tough met coal market right now. We carried out our plan, and the gains we've spoken about in earlier quarters showed up in our own output staying on plan even with weather events across both regions. Our costs came down significantly quarter over quarter, and we've recorded cost reductions versus the prior year that stem from the work done throughout last year. We'll achieve substantial volume increases in H2, since our high-return Mammoth and Buchanan growth projects remain on schedule. In light of the prolonged market conditions, we are progressing through a set of steps intended to optimize liquidity. Among these is a restructured or new ABL facility, and we'll go into more detail on that once I've finished walking through our key performance overview, which I'll move to now. Key metrics for Q1: Group ROM production came in at 5.8, sellable production at 3.5, and sales volumes at 3.4. At the group level, our total recordable injury rate stood at 0.95, still well under industry averages for both the U.S. and Australia. Turning to page two, you'll find our operations and sales summary.

Douglas Thompson

executive
#4

The March quarter came in as planned. What you’re seeing versus the previous quarter reflects the seasonality this industry usually gets at this point in the year, plus the shutdowns we scheduled as we finish work during the first half of the year to get ready for higher output levels expected in the second half thanks to our growth projects. We made the decision to put met coal export production ahead of thermal domestic output so we could maximize realized price during the quarter, and stockpiles left over from the end of last year helped with that. We did encounter a few outside delays affecting sales volumes, so nothing here is beyond recovery in upcoming quarters. The specific issues are a coal shipper delay in Australia, some rail delays in the United States caused by weather events there, and a mechanical delay at the very end of the quarter involving the port. As I said, we’re moving through a set of steps aimed at optimizing liquidity, starting with the actions inside our own control. In Australia, we examined our contractor services at all three mines.

Douglas Thompson

executive
#5

We finished the productivity initiative across our business in 2024, and it cut both truck and excavator fleets while lowering costs significantly at the mining cost level. Under our plans, one more truck and excavator fleet will be idled in Q2 of this year. In the United States, we're phasing development works at Buchanan, which brings reductions in labor and mining costs. Our surface operations at Logan will be idled. Group-wide, we'll be rephasing sustaining capital expenditure. The growth projects will deliver more lower cost production, which is the reason we've carried on with them. As I said earlier, we're well advanced in restructuring or replacing our existing ABL. Now to the operations for the quarter specifically. Starting with the Australian business unit, we hit ROM production targets even with the major weather events that others in Queensland have reported. That shows the resilience we've invested in and have discussed throughout the year with the changes made at our coal operations. The quarter also came in better than the same period last year despite the weather events and despite having fewer digger units deployed this year, 45% less digging capacity in truck excavate.

Douglas Thompson

executive
#6

This shows how much more productive our operations have become. As I mentioned, our cost profile has improved considerably. Ramp-up at the Mammoth underground mine is still going according to plan — the ROM stacker conveyor and the permanent ventilation fans are now finished, and the second mining unit began producing in early April, as expected. During the June quarter, we'll keep receiving more mining equipment as additional panels are brought into service. Turning to the U.S. business unit, we carried out our planned longwall move during the quarter, and we had shutdowns at Buchanan. The U.S. is still achieving incremental gains each quarter, with higher ROM production and sellable production than at the same point last year, even with those extra shutdowns. That shutdown marked another significant milestone in completing the expansion project, and the underground conveyor works are now finished so they can handle the second set of skips. Our Buchanan project now stands at 90% complete and is still on budget and on schedule. The underground works are essentially done, with only final checks left. In the shaft, installation of structural and electrical steel plus hoist construction work is ongoing. Final surface infrastructure is moving forward, including conveyor works and hoist house testing. The project completion date is still within the June quarter, and it's great to see the progress our team has been making.

Douglas Thompson

executive
#7

At this point I'll bring in Barrie van der Merwe and pass things over. Among our team, I suspect I'm in a small group who can say Barrie van der Merwe's last name the right way. Barrie is going to walk us through where we stand financially for the quarter.

Barrie van der Merwe

executive
#8

Thank you so much, Douglas, and good morning to all of you. I'm delighted to have come on board at Coronado fairly recently. This is a business whose assets are long-life and located in Tier 1 jurisdictions. We serve long-term customers across key markets, and demand for our products is strong within an industry whose long-term demand outlook is very healthy. Since I joined, I've spoken with a great many people across the company, and their capability has impressed me, as has the healthy culture of the organization. Over the last 23 years working in mining, I've come to understand that commodity cycles and volatility are simply part of life in this industry. We're currently in the tougher portion of the cycle in met coal, but it will turn, and it will produce strong returns in a business with very high operational leverage. Our role as management is to manage the controllables. As Douglas described earlier, the March quarter's performance illustrates well how we're doing that — by positioning the business to be more resilient, along with the steps we're taking in response to the low-price environment. Historically, the March quarter is our lowest quarter for production. Besides the rain impact, which exceeded what we had planned for, we also had planned downtime in order to prepare for the extra production coming from the expansion projects.

Barrie van der Merwe

executive
#9

So as a result, output levels will rise through the remainder of the year even before we factor in the expansions, and the cost base is going to come down thanks to the business restructuring Douglas mentioned earlier. The PLV index has also climbed, from a bottom of $166 per ton on 20 March to $190 per ton yesterday, which points to better market sentiment. That's $5 per ton above the March quarter's average price index. Each $1 move in the index translates into $8-$9 million of revenue and cash across the rest of the year. The average Australian dollar exchange rate during the March quarter traded in line with the AUD 0.63 assumption in our guidance. With the Mammoth and Buchanan expansions finished in Half One, as Douglas noted earlier, Half Two CapEx cash flows will be materially lower, and production will step up in Half Two. During the March quarter we had already used roughly 45% of the full-year low end of CapEx guidance, and by the end of April that figure will be about 55%, all of it driven by expansion project capital, while we will stay within our total capital expenditure guidance for the full year. As we've said before, we expect Mammoth to finish the year at an exit run rate of 1.5 to 2 million tons, and the Buchanan expansion at around 1 million tons.

Barrie van der Merwe

executive
#10

Mining costs came in $76 million below the prior-year period, mostly because we took five excavator and truck fleets out of Cara. Measured per ton sold, that's a 10% improvement versus a year ago. With the seasonal shape of our production, expansion projects ramping up, and the additional cost cuts of as much as $100 million we announced today, cost per ton will come down further in 2025. We keep looking at every option we have to maximize liquidity and financial flexibility through this downturn in met coal markets and this period of global macroeconomic uncertainty and volatility. We're also continuing work on restructuring the ABL with our current lenders, and we have well-advanced options ready to replace it with a new facility from other parties we're talking to. We're actively engaged with the government and Stanwell on the near-term timing for paying royalties and rebates, and if the parties can agree, that would make a material difference to our cash flows. At March quarter achieved prices, our monthly Stanwell rebate comes to roughly $7 million and state royalties roughly $10 million. As of 31 March, total liquidity stood at $325 million, comprising $229 million of cash and $96 million under the ABL.

Barrie van der Merwe

executive
#11

To push the Covenant Testing waiver out from 30 April to 31 May, $22 million of guarantees drawn under the facility are going to be cash backed, and the lenders can alter the committed term of the facility at their choosing. Our view is that the steps we are taking regarding cost reduction and financing facilities are suitable and will prove sufficient once they are in place. We will continue to update the market on material developments. At this point I will return the call to Douglas for a market overview.

Douglas Thompson

executive
#12

Thanks, Barrie. As noted in our report, steel markets and demand for raw materials are still under pressure, in our view. Market uncertainty keeps being compounded by the tariffs. At this point in the year, India's imports of met coal are running roughly 40% under expected import levels. China's steel industry still confronts structural difficulties stemming from its domestic real estate market as well as mounting trade barriers. Over the past quarter, we have witnessed the erosion of the price floor in seaborne coal. Heavily discounted spot prices have prompted mills and traders to resell, a move driven by tariffs. That said, H2 holds potential, backed by a number of factors: the anticipated recovery in global steel production outside China, higher tariffs on Chinese export steels, the persistent prospect of supply rationalization, and the strong indices we continue to observe in steel production and demand coming out of India. Based on this, along with the long-term fundamentals we observe in the market, we consider the long-term outlook for seaborne met coal to remain very positive, and that translates into a result for our business, given our long-life assets that we have invested in and are positioning for the future. With that, we will now pass things to Mel, who will walk us through some questions.

Operator

operator
#13

Thanks. To ask a question, hit star one on your phone and hold until your name is called. To withdraw your request, hit star two instead. Should you be using a speakerphone, lift the handset before posing your question. Our first question is from Paul Young at Goldman Sachs. Go right ahead.

Paul Young

analyst
#14

Morning, Doug and Barrie. Doug, there's quite a lot happening right now, obviously, between the market conditions and what you announced today regarding the possible refinancing and cost cuts. I have a few questions on that, if I may. First, on the asset-backed loan — the ABL — and the possible refinancing there and the review of other counterparties, could you expand a bit on the options you're considering and what the likely cost effects might be on interest and so on? And within that, at a very high level, it seems to me you simply have to make it through to the end of 2026, which is what you're attempting to do when the Stanwell rebate disappears. Another question I had on the refi is: are you looking at, or have you looked at, a prepayment for coal delivery beyond 2026, just to carry yourselves through to that point?

Barrie van der Merwe

executive
#15

Yeah, thanks, Paul. This is Barrie. Yeah, appreciate the question. I mean, like we mentioned in the release and when I spoke earlier, every option is on the table. In certain of those areas, I'll include a few of the examples that you cited of things that could be done. We're leaving all of those possibilities open so that the liquidity position gets strengthened. If you look at the ABL, the alternatives under consideration remain ABL in nature, but we're examining something that fits the business somewhat better and gives us a bit more flexibility than what currently exists. There are a couple of solid options in play. They're fairly advanced. You should, I think, anticipate that the cost is going to exceed that of the existing ABL. In part, that's because of where credit markets stand. It's because of where the met coal markets stand. Relative to the benefit of having that liquidity, I think the cost is palatable. Given that we have a couple of options in play, we can negotiate and secure the best possible outcome for the organization. Once those things crystallize, we'd be in a position to say more, and we'd come to market with announcements about precisely what they are, what the tenure is, and what the cost implications are.

Barrie van der Merwe

executive
#16

My view is that when you weigh liquidity against cost right now, liquidity sits at the top of our list of priorities.

Douglas Thompson

executive
#17

Yes, Paul, to add to what was just said, as we move toward 2026, everyone is in agreement and it is clear to all that the transformation in the business is extremely significant. That is the thing that will shape much of the strategy and the investment going into the businesses. What lies ahead, what we are currently working through and making a diligent effort to accomplish — and taking our time with, honestly, to make sure we get it right — is that any agreements we enter into will serve as the extra buffer we require for liquidity, since we have plenty of levers available and we can discuss those. I believe this ties into your question about what we are able to do within the business and what we are actively doing inside the business that falls within our control to make it through this downturn period. I have no desire to place yet another millstone around the neck of the business. This has been a contract that came to us by inheritance. It is a contract we will honor. It is a supply contract, but it weighs very heavily on the business. We want to make sure we can reach the other side of it as swiftly as possible and as effectively as we can. There are also opportunities inside that arrangement which we intend to explore.

Douglas Thompson

executive
#18

Those talks are underway. Now, regarding your second question on reducing costs—what we've done is establish a plan, and we've consistently said there is a plan in place. We are carrying out that plan with diligence. I believe the quarterly reporting demonstrates that the growth projects in particular are proceeding as planned and producing results—the productivity gains we've been pursuing, our cost reductions, especially at Curragh, and the streamlining of operations, with these three mines now showing what that plan delivers. During the First Quarter we adjusted our plan, since it was clear the pricing environment and the recovery would take longer. We began cutting costs throughout the business. That started with contractors and with examining how flexible the services being provided could be. The First Half of this year involves a substantial workload tied to a ramp-up, during which we are carrying out shutdowns. We have reviewed some of that shutdown and sustaining capital work in order to move it out of this period of heavy capital intensity, as the mining equipment arrives at Mammoth and we complete the project in the U.S. You heard Barrie's remark about the financials. We have essentially spent all of that growth capital.

Douglas Thompson

executive
#19

So where do things stand right now? We phased part of that. In the U.S., we're phasing the development capital since we actually have a fairly solid buffer on our development work at Buchanan. Phasing it will help on the costing side. It pushes some of those costs out of this First Half, when we're still investing heavily. We're idling the surface works at Logan. Those high-cost operations have faced several challenges, especially with the weather late in the year, and this First Quarter was tough. We decided we'll idle them, probably through the remainder of this year, and then reassess where things sit. Those moves take big chunks of cost out of the business, and they're among the levers we've pulled internally to deal with our cost base. Beyond that, the buffer that liquidity gives us is the breathing room we want so we have the certainty to reach 2026, as you put it.

Paul Young

analyst
#20

Yes. Yeah, no, thanks for providing that additional color. Doug, going back over a few of those cash flows, I saw that your net debt rose by $100 million from one quarter to the next. There's clearly a bit of working capital release and interest in what Barrie is thinking there. When I look at your overall cost base, what's interesting is that in the quarter, Australian mining costs actually climbed quarter on quarter even though volumes fell. That one is a bit puzzling to me, frankly. If you look at the total cost of the business, it runs at roughly $1.6 billion annually, and you've announced a $100 million cost reduction. That's a little over 5% in cost savings. I realize that's a major undertaking, since these decisions aren't easy to make, and things are shifting quite fast. Even so, the Aussie dollar met coal price, in my opinion, remains fairly healthy. I know we've discussed the choice not to high-grade Cara, because fundamentally doing so would dilute or destroy value. Is this the most you can do? I suppose that's the question, in the sense that this decision, what you've announced today, does not involve high-grading Cara. You could push harder if you truly had to.

Paul Young

analyst
#21

Perhaps the real question is whether the plan you announced today is designed around coal prices remaining at their current level, or whether it is in fact getting ready for coal prices to fall further.

Douglas Thompson

executive
#22

It's preparing for the conditions where coal prices have been pretty much through the first quarter of this year. Obviously, we've had some relief with pricing coming up. To your point, exactly, we put a lot of effort and time into setting CORA up so it's a productive dragline mine. What we don't want is to get ourselves into a situation where we destroy value there. We've taken advantage of our stripping ratio and our plan this year, but it isn't value destructive in the sense that you're describing. To cut to the chase, are there other levers we can pull? Yes, there always are, and we will deploy those if we need to. What we're seeing in the planning we've done is that this gets us to where we need to be. As of last night, we had $200 million of cash in the bank. We have significant cash reserves. We're working on getting the additional buffer by ABL that will work for us. As you guys know, we haven't drawn on that in the past because it hasn't really worked for us. We're working on ensuring we have a tool that works for us as we go forward, and then pulling as many of the levers we have within our control within the business.

Paul Young

analyst
#23

Alright. Thank you, Doug. Thank you, Barrie. That is useful. I will step away.

Operator

operator
#24

Thanks. The next question is from Glyn Lawcock at Barrenjoey. Go ahead, please.

Paul Young

analyst
#25

Douglas, Barrie, good morning. Regarding that new facility, are you also aiming to have it upsized? I mean, I'd assume that comes as part and parcel of what you're trying to achieve, since it doesn't feel like, right now, given the cash burn and the coal price, that simply renewing at a similar size would be sufficient.

Barrie van der Merwe

executive
#26

Well, Glyn, if you take a look at that, where we begin when weighing these matters is the cash situation right now. As Douglas mentioned, as of yesterday, we're still at $200. You can see the upside of that CapEx — the expansion CapEx is beginning to fall away. Regarding our capacity to carry out some of these deals quickly, keeping the existing ABL structure in place is the better option, which lands you in that $150 million bracket. Under the notes we have, there are additional baskets available should we decide to increase that. When we examine it, the present cash position as it stands today, volumes are climbing as expansions come on, CapEx is declining, and the savings flow through for the remainder of the year. If you then add an ABL of 150 on top of that, plus some of the other initiatives we're considering that we discussed on the call, we reach a point where we're fairly resilient and able to navigate the cycle effectively. What matters to remember is that liquidity is most stretched around Q2 and into Q3 as we wrap up the expansion projects.

Barrie van der Merwe

executive
#27

Cash generation is providing solid relief, even with prices where they are right now.

Glyn Lawcock

analyst
#28

No, thank you, Barrie. So Barrie, perhaps a different way of answering that would be this: looking at the March quarter, conscious volumes are going to rise and costs are going to fall. Your overall dollar spend — while mining costs came in at $113, your total dollar spend per ton was $153, counting all royalties, freights, SG&A and so forth. On top of that you've got your CapEx. That implies you'd need a PLV price of $255 a ton simply to cover mining costs. Thinking about the second half of this year, then, where do you believe the business can get to on a PLV cash break even? I mean, today we're sitting at 190, U.S., for PLV. I think the market treats PLV as the benchmark. Where do you think the business can get to? It doesn't feel as though you can bring it down to a $190 break even, but where do you think you could get it to?

Douglas Thompson

executive
#29

Glynn, we’re not looking to step outside our lane and begin discussing guidance changes and similar topics. For the remainder of the year, our assumptions don’t include much improvement in pricing. Based on the work we’ve completed, we’re taking the position that pricing remains roughly where it sits now. Should any pricing increase occur, it will likely be marginal. What we’re focused on is taking cost out. As Barrie mentioned, 90% of the project is complete. Most of the CapEx is going to fall away. Our realizations are probably slightly better than the calculation you’re making, but I don’t want to begin talking about break-even prices at this point. I think at this stage we’ll stay with the guidance we’ve provided around our pricing. The difficulty we face is this capital-heavy period we’re currently in.

Paul Young

analyst
#30

All right, perhaps one last question if I may. You mentioned talks with the Queensland government. How would you characterize their progress? What are the chances of something like a royalty holiday until prices bounce back, or anything along those lines? Is there anything you can share to help us understand?

Douglas Thompson

executive
#31

Earlier this month we sat down with the Treasurer's Office, and we've also held talks with Stanwell. We'll keep those moving forward and respect where things stand with them in the discussions. I think we're all in agreement that the government isn't going to alter royalties, so let's set that aside. Might we get some relief around payment timing and similar matters? That's what we're currently discussing with them, to see whether we can obtain some short-term relief. The moment we have a result, we'll communicate it.

Glyn Lawcock

analyst
#32

Okay, best of luck to you. Thank you so much.

Douglas Thompson

executive
#33

Appreciate it, my friend.

Operator

operator
#34

Thank you. The following question is from Chen Jiang at Bank of America. You may proceed.

Chen Jiang

analyst
#35

Morning, Doug and Barrie. Thanks for taking my questions. I have a couple, please. First, a quick follow-up on the ABL and your senior secured bond. Could you remind us about the covenants, particularly any restrictions those covenants place that would limit your ability to raise additional funds, whether from the market or the equity market? That's my first question. Thank you.

Barrie van der Merwe

executive
#36

Alright, thank you for that. I take it your question relates to the notes — specifically, what governance applies and what restrictions exist, correct?

Chen Jiang

analyst
#37

Absolutely. That's right. Correct.

Barrie van der Merwe

executive
#38

Yes. Regarding the notes, no Maintenance Covenant applies. Nothing resembling leverage or debt service coverage exists in the notes. That puts us in a very good position. The notes permit the ABL we hold, which is a $150 million ABL. They also permit certain other debt buckets beyond that. There is, in a sense, a debt service coverage trigger that must be satisfied before additional debt can be added. Even if that is unavailable, those buckets remain. The notes provide considerable flexibility for raising funding to a sufficient level so we can manage our present situation.

Chen Jiang

analyst
#39

Okay, so just to build on what you said — you noted that there's some kind of constraint on bringing in additional capital through the debt market. Have I got that right? Based on your notes. Based on your notes.

Barrie van der Merwe

executive
#40

Yes, a debt service coverage trigger does exist. Even in the event that we fail to satisfy it, we retain access to a general debt capacity bucket of $50 million that we can draw on, plus an equipment financing bucket of $50 million available to us.

Chen Jiang

analyst
#41

Alright, that's noted.

Barrie van der Merwe

executive
#42

Regardless of where the debt service cover lands, those two buckets are available in any scenario, at a minimum.

Chen Jiang

analyst
#43

Yes, of course. Could you give more detail on what those debt services involve, please?

Barrie van der Merwe

executive
#44

Right. So all of that will be included in the SEC filings we file. It's somewhat of a forward-looking pro forma-style calculation. As usual, it's sort of a pro forma two times. As I mentioned, at present, that two times won't work on a pro forma basis given where we stand. The 50 plus 50 remains available, and that's sufficient for us to navigate that along with the ABL. It affords us considerable flexibility. We're also in a position where we don't foresee anything that would require us to go ask noteholders for consent or relaxation.

Chen Jiang

analyst
#45

All right. So I suppose that comes to 2x, 2x on an EBITDA basis, and after that you're counting on the ABL for liquidity across the coming 6 months.

Barrie van der Merwe

executive
#46

To start with, we're leaning on the cash we currently have on hand, which will then — and we keep repeating this, but it matters — it's important that we sort of manage the timing of how the capital gets deployed. By the end of April, there's $200 million sitting in the bank. We've used 55% of the capital allocated for the year. Production is going to rise. The first lever is the cash in the bank plus the cash the business generates. Then there's the ABL, which we're examining restructuring with our existing lenders, and after that we're looking at the other options available to us. That's how we'll navigate through this. As I mentioned, the notes permit access to certain additional buckets as well. We're chasing every other alternative to strengthen the liquidity position and bring it to where we want it to be.

Chen Jiang

analyst
#47

Absolutely, and thanks, Barrie. I have one more question about your CapEx. Going through your quarterly, if I’m reading it right, I wasn’t able to spot any CapEx released for this quarter. Since your projects are moving along well, could you share any insights on CapEx for the March quarter, and also how I should think about your CapEx guidance? Are you on track to hit that guidance? Thank you.

Barrie van der Merwe

executive
#48

No, that's fine. I did bring it up in the notes. I realize it wasn't included in the release itself. What I mean is, the remarks I gave when I spoke earlier related to the cash spend on capital. As of the quarter's end, we've used 45% of the low end of guidance. That comes to just over $100 million in cash CapEx. At the end of April, it was 55%. That's roughly $125 million of cash CapEx. On guidance, we remain on track to hit it. I'm simply pointing out that the cash CapEx I've been using those percentages on and the accounting CapEx we use for guidance tend to differ somewhat because of accruals and so on. We're on track to meet the CapEx guidance, with the bulk of the expansion CapEx now behind us.

Chen Jiang

analyst
#49

All right, understood. Since you've already used up 45% of the cash CapEx against the guidance for the whole year, I'd imagine your CapEx is heavily weighted toward the first half.

Barrie van der Merwe

executive
#50

Yes, absolutely. It’s heavily weighted toward the first quarter, in fact. When you look at cash CapEx — suppose cash CapEx for the entire year is trending toward that lower end of guidance. As I mentioned, the accounting figure will be somewhat higher. If you note that by the end of April we had spent $125 million in cash CapEx, then only roughly $100 million remains for the rest of the year across the coming eight months. We spent 55% in four months.

Chen Jiang

analyst
#51

Right. Okay. All right. Perhaps one final question about your cost, if that's fine. When I look at the cost, I understand the March quarter always carries a higher cost, but it's running 15% above the midpoint of your guidance. With your growth CapEx coming, that will bring your cost down, sure. What other levers from current operations, particularly when looking at even Cara, where the cost is much higher? What other levers can you use to improve your cost position and improve the margin?

Barrie van der Merwe

executive
#52

Yes. Looking ahead, you're correct that the volumes coming off Mammoth and Buchanan will significantly change the denominator. As we mentioned today, we're pursuing that aggressively and applying that cost lever with real force. Within the $100 million we announced today, the US operations are a major contributor, because as you can imagine, we've cut Cara's costs substantially over the past year or so. We essentially prioritized the U.S. initially while work at Cara continues, and we address that in the release. On the U.S. side, regarding reducing the cost base, there's the phased development at Buchanan. At Logan, we're idling that surface operation, which is in fact a cash accretive option we're carrying out there. Those are the sorts of things we're doing while we keep optimizing Cara. As Douglas mentioned, another truck and excavator fleet will also be coming out of Cara during the remainder of this year. It's about continuing to push that forward and driving productivity up and costs down. I don't know, Douglas, would you like to add to that?

Douglas Thompson

executive
#53

No. I would add as well that, as we said before, the expenses tied to the underground project and the additional tons are considerably lower than what we currently spend to produce. As those volumes arrive in the second half of the year and the ramp-up proceeds, they assist in lowering the total cost of operations, especially in establishing the cost profile for 2026.

Chen Jiang

analyst
#54

Okay, thanks. Appreciate it, Barrie and Doug. Many thanks — I'll be sure to share that with the team. Thank you.

Operator

operator
#55

Thanks. The next question is from Daniel Roden at Jefferies. Go ahead, please.

Daniel Roden

analyst
#56

Hello, and good morning to Doug and Barrie. Thank you for taking my questions. I suppose what I'm really hoping for is a clearer picture of how the CapEx is being reprofiled and rephased across 2025. Where exactly would that rephasing fall? The most obvious candidate that comes to mind would, of course, be Mammoth, where you've reaffirmed the ramp-up profile, I believe. How do you view that rephasing, and what would it look like?

Douglas Thompson

executive
#57

It's a mix of a few of the development capital items we talked about — Buchanan, now that we're rephasing it, since we've built a fairly solid buffer at that development. That moves some costs beyond this year. That's the first piece. On the sustained capital side, during the First Half we have a lot going on. You've just seen our results. We had roughly 15 days in the First Quarter when infrastructure was taken down for repairs. Come July, we'll handle some common infrastructure that had originally been slated for earlier. We've moved past this stretch of heavy investment, so that work will take about six days of operations. When I say common infrastructure, I mean the 250-ton bin and our rejects bin, where we'll be doing some setup work for the future. They'll shift that out somewhat. As for certain prep plant upgrades at Cara, we've moved CapEx past this key investment window. Same thing at Logan and at Buchanan — we've rephased part of that capital. The effect isn't only to shift it beyond the year but also to move it later within the year, which eases some of the pressure we're facing right now.

Douglas Thompson

executive
#58

Mostly it relates to development and to keeping business capital, and that is being phased at the moment.

Daniel Roden

analyst
#59

Yeah. OK. OK, got it. In my view, the Coronado report's discussion was somewhat thin regarding how things are advancing at Mammoth. So I was just curious — what's the count of continuous miners currently at the site, and how have operations been going up to this point, I suppose? A little extra detail there would help. All right.

Douglas Thompson

executive
#60

Things have gone really well. I've said repeatedly that delivering this project within the schedule and the budget we fixed last December is virtually unprecedented in Queensland. The team deserves top marks for how they pushed to the finish and got the project operational. Across this year we're bringing three continuous miners into service. The first entered production in December. Throughout the First Quarter it has been progressing and developing the mine. During the First Quarter, we constructed and portaled all four portals. All of them are now connected. That gives us the capacity to put several key elements in place to prepare the next quarter through ventilation. Permanent ventilation fans are now installed, and the mine has been ventilated according to design. We also constructed the underground conveyor system and, after that, the surface stacker for the ROM. That work is now finished too. This made it possible, as the mine was developed, for the second continuous miner to begin production. That happened in early April, as planned. The third will start production in July, as planned. Everything is proceeding according to plan.

Douglas Thompson

executive
#61

Delivery of the equipment is proceeding according to plan. Overall, things are going quite well. We're happy with how it's shaping up. Naturally, we're still at an early stage in these projects as the mine goes through ramp-up, but we've succeeded in assembling a solid crew — highly experienced individuals at Mammoth — which has clearly added to the expertise we brought from the U.S. We've also begun to raise our sights and examine the possibilities that will emerge in 2026 once primary development is behind us, once the drives are done and the mine is built out; at that point, given the coal thicknesses and the mining method, we'll move into secondary mining, where you return and remove the floor. That should deliver a healthy boost in low-cost incremental volumes in 2026 coming from Mammoth. There are plenty of encouraging indicators emerging from this project for Cara's long-term future. We're enthusiastic. I'm extremely enthusiastic. My priority is steering us through the coming six months, though I'd like the team to begin evaluating Mammoth II, since it represents a very low-cost chance to add further tons, likely starting in 2027 and 2028.

Daniel Roden

analyst
#62

Yeah. Okay. No, thanks. This might be a bit of a low-effort question, but you brought up the Stanwell negotiations that are happening right now, just looking at what options exist there. I think it would be fairly rational to, I guess, rephase the rebate if that were on the table. When do you think you'll be able to update the market on that? Do you have any expectation there?

Douglas Thompson

executive
#63

A counterparty exists in this situation, and that party happens to be a significant client of ours. They will remain our client for many years to come. We intend to treat them with considerable respect, along with the conversations currently underway. Both sides recognize the worth this holds for us and for them. Setting a timeline is something I would prefer not to do, yet we are engaging with them in earnest.

Daniel Roden

analyst
#64

Not a problem at all. Thank you, Doug — appreciate it. I'll make sure to relay that. Thanks.

Operator

operator
#65

Thanks. Our following question is from Colin Tan at MLP. Colin, you're live now — go ahead and ask.

Colin Tan

analyst
#66

Morning, everyone. Apologies — I had myself on mute. Appreciate you making the time for this. I have a few questions again about where your liquidity stands, if I may. It looks like the ABL facility carries a condition requiring you to keep a minimum cash balance of no less than $100 million against those facilities. Does that condition remain in effect? And if we look at the $200 million in cash you currently hold, would it be fair to say that $100 million of it is effectively reserved for the ABL facility? Is that the correct way to view it? Thank you.

Barrie van der Merwe

executive
#67

Yeah, thanks, Colin. That $100 million requirement isn't attached to the facility itself — it's the waiver we're currently running under that carries the $100 million minimum. We're in discussions with the lenders about restructuring it, and we're also reviewing other alternatives; obviously, our preference would be for that requirement not to exist. As we noted in the release, it sits within the waiver, which remains in effect through 31 May.

Colin Tan

analyst
#68

All right, understood. Appreciate the clarification. Given where things stand right now, do you perceive any danger that the ABL lenders, as part of the continuing talks you're having about securing removal of the waiver and so on, might actually want to cut back their exposure to the company in the near term?

Barrie van der Merwe

executive
#69

So, as we've said, talks are underway regarding restructuring that facility. From a management standpoint, our goal in doing so is to benefit the business. I think the fortunate part for us is that we have these other alternatives we're actively pursuing. We anticipate being in a position to make some decisions about which type of facility and structure suits us best. It's fair to say the financial markets have shifted a great deal over the past month — since, that is, the Frame's Liberation Day speech. Each counterparty must take whatever steps it needs to manage its risk. I can't speak for them regarding their strategies and what they might choose to do. We have options, and we're going after them.

Colin Tan

analyst
#70

Thanks, that helps. My final question: earlier you said prepay financing ranks among the few options you're looking at right now. Under the ABL financing documents you already have, would prepay financing be permitted? Do any restrictions apply in that area?

Barrie van der Merwe

executive
#71

Nope, none at all. Under that ABL facility, every one of those prepay structures fails to work.

Colin Tan

analyst
#72

Under the debt notes, they're permitted as well. Okay, I understand.

Barrie van der Merwe

executive
#73

Correct.

Colin Tan

analyst
#74

That covers everything I had to share. Appreciate you all taking the time.

Operator

operator
#75

Thanks. We'll take the following question from Nathan Martin at Benchmark Company. Go right ahead.

Nathan Martin

analyst
#76

Thanks, operator. Douglas, I just have a quick clarification. You said that idling the surface operations at Logan is included in the $100 million of savings you're aiming for. My understanding is that there are roughly four underground mines at that complex as well. Is that right? And if it is, what level of production should we expect from those mines if you do idle the surface operations for the rest of the year, as you mentioned?

Douglas Thompson

executive
#77

Yes. To get right to it, that's precisely correct. At the Logan complex we have 5 mines plus surface operations, and then there are the 4 undergrounds. Those 4 underground mines will keep running without interruption. Performance so far this stage, year to date, has been solid, and we don't foresee any halt to the underground mines ahead.

Nathan Martin

analyst
#78

Alright, thanks for that. Maybe I could ask something further about transportation. You mentioned that operations have been affected by some of the severe rain and weather conditions we've experienced here in the U.S. At this point, would you say most of those effects are behind you? Or are shipments still being caught up on? Some detail on that would be helpful.

Douglas Thompson

executive
#79

My sense is that Queensland's industry is working through the shipment backlog. If you looked at the ports yesterday, there were 19 vessels at anchor, I believe. Coal was sitting ahead of three of those boats, and 16, I think, were still awaiting their turn. The sector is recovering, and this period is fairly seasonal — whether it's after the rains, mines readjusting their plans, or the final push toward the end of the line, especially for some of our peers whose reporting is on a June calendar rather than the December calendar we use. My expectation is that this gets made up and moved through the system, probably before June is out. Naturally, we're caught up in some of that ourselves, since we co-ship and the like. The disruptions in the U.S. bounced back quite fast. This ties to the melt at the.

Operator

operator
#80

The conference operator here — we've briefly dropped the audio coming from the presenter's line. Kindly stay on the line, and the call will pick back up in a moment.

Douglas Thompson

executive
#81

Okay, thank you, Mel. I’m honestly not certain what took place there—perhaps Mel wasn’t happy with my response and ended the call. I had been discussing how weather affected things in the U.S. What I was referring to involved extremely heavy rainfall that hit while the melt was underway in places such as West Virginia. Some rail infrastructure was affected, though it bounced back quite fast. By now we’ve seen a very large rebound in the ROM stock we hold on-site and in the product stock we were working to move to port. In the U.S., the majority of that has now moved through, especially at our Logan operations. Buchanan got through it mostly without damage, and the results will show that. Right at the close of the month, in Australia, a ship loader experienced certain mechanical problems. Whether that was directly tied to the weather or to something else, I can’t say for sure, but the effect was that roughly a 60,000 or 70,000 shipment slipped out of the month and was instead reported in the quarter, and that came from Cara.

Nathan Martin

analyst
#82

All right, Douglas, thanks for making the time — and good luck.

Douglas Thompson

executive
#83

Appreciate it, my friend.

Operator

operator
#84

Thanks. We’ll take our next question from Chan Mew Wei at Arkin Capital. Go ahead, please.

Chan Mew Wei

analyst
#85

Hello there, and thanks for spending some time with us. For my first question, I'd like to get a feel for where the CapEx run rate will land once those growth projects wrap up — I believe that's mostly in the first half of this year — and what it looks like from there. Then for the second question, I'm wondering how much cash burn the Stanwell contract involves compared with what things would look like absent that contract.

Barrie van der Merwe

executive
#86

I'll take the first one. I believe we touched on the in-year FY2025 CapEx somewhat, but let me go through it again just to make sure we're well aligned on that. By the end of the quarter, 45% of the bottom end of guidance had been spent. That works out to roughly $100 million spent. By the end of April, that figure reached 55% of the low end. That's cash CapEx, correct? That comes to about $125 million. As for cash for the remainder of the year, from April onward, roughly $100 million still needs to be spent. Now, the accounting number will fall within the guidance range of $230-$270 million. Looking beyond that, the business — including the expanded operations at Mammoth and Buchanan — would require a staying business CapEx level of approximately $150 million annually on a go-forward basis. Some development would be needed from time to time for box cuts and a bit of underground development, which I'd put at around $20 million-$30 million per year. There's some flexibility on the timing of those. This year is a procedure in terms of capital, and then we'll begin to see the benefits of those volumes and the cash flows coming through.

Barrie van der Merwe

executive
#87

Regarding Stanwell, Douglas — may I take that one?

Chan Mew Wei

analyst
#88

Sure, go ahead. Would it be all right for me to wrap that up?

Douglas Thompson

executive
#89

Right, okay. So looking at cash burn, the step change with Stanwell in 2027 comes from a couple of factors. First, there's a rebate we pay — for each tonne of coal sold for export, a portion goes to Stanwell. That payment falls away and ends entirely at that point. Right now, as Barrie mentioned, under current pricing it sits at roughly $7 million. Because it's index-linked, it tracks the market. With us in a down cycle at present, it's still around $7 million each month. If you're working out the burn on that basis, it's in that ballpark. We also supply 3 million — this is a volume-based contract — but roughly 3 million tons of product to them annually. That goes at a steeply discounted rate, though it's not a figure we disclose to the market given the confidentiality of our contract with them. It is steeply discounted. Come 2027, when a third of that comes off, we take it back and can sell it into the export market. Even if we continued selling it as a thermal product and captured the yield gain from it, it would fetch a much better price. A lot of what we've put to the market lately to give a sense of the size of that uplift assumes we sell it as a thermal product.

Douglas Thompson

executive
#90

Once that contract comes to an end, the business will see a material change.

Barrie van der Merwe

executive
#91

Just to add, we do disclose that Stanwell rebate separately in the Quarterly. You can pick up the line item there, and then if you go back and want to see how it behaves at different price levels, it is all in the public domain. That will give you a good idea of how it moves in response to prices.

Chan Mew Wei

analyst
#92

Understood. To make sure I have this right, on the first piece, the rebate, you're putting it at roughly $7 million each month—so approximately $84 million on an annual basis that could potentially be saved going forward—and then there's also the ASP discount that hasn't been disclosed, is that correct? I'm fairly new to the story, I guess. Could you give a really, really brief explanation of why that standalone contract existed in the first place, since it looks quite punitive? Did you receive a chunk of capital up front because of it, or what was the reasoning behind that?

Douglas Thompson

executive
#93

No. The agreement currently in question existed while the prior owners held the asset. Upon acquiring the asset, we took on both that agreement and its obligation. It originates from the time when that standalone entity initially held the coal resource and granted the earlier owners — or in fact the owners before them — access to develop the mine. This is an agreement that has persisted across the various ownerships we have inherited, and we are seeing it through until the conclusion of its current form.

Chan Mew Wei

analyst
#94

Understood. Thanks. I’ll rejoin the queue.

Douglas Thompson

executive
#95

That's not a problem at all. Once we're offline, we'd be glad to walk you through more of those specifics and bring you fully up to date.

Operator

operator
#96

Thanks. That brings the Q&A portion of today's call to an end. I'll turn things back over to Douglas now for any closing comments.

Douglas Thompson

executive
#97

Thanks, Mel. And thanks to all of you for being with us today. Should you have additional questions, please contact Chantelle and the team, and we will get those answered. To those attending the Investor Day at Cara on 5 June, we look forward to walking you through and showing what we have accomplished out at the mine and the investments we have made. If anyone else is expressing interest in joining, it is filling up, but please reach out to Chantelle. We would love to show you what we are doing. Thank you.

Operator

operator
#98

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.