We appreciate you holding, and thanks for joining Coronado Global Resources' investor call for the third quarter. <<operator_script>> Our CEO and CFO will walk through the results, and after that we'll open things up for questions. <<operator_script>> At this point I'll turn the conference over to Chantelle Essa, Vice President, Investor Relations. Chantelle, please go ahead.

Chantelle Essa

executive
#2

Thanks, Rocco, and thanks to everyone for being on Coronado’s September 2025 call. Earlier today, we put out our quarterly report to the ASX and made our filing with the SEC. We expect our quarterly financials to reach the market on 11 November, together with our Form 10-Q. With me today are Douglas Thompson, our CEO, and Barrie Van Der Merwe, our Chief Financial Officer. In the report, you’ll find our notice about forward-looking statements and reconciliations for certain non-U.S. GAAP financial measures. A reminder as well that unless stated otherwise, Coronado quotes every number in U.S. dollars and metric tonnes. I’ll now pass the call to Douglas.

Douglas Thompson

executive
#3

Thanks, Chantelle, and thanks to all of you for taking the time to join us once more today. On the whole, we keep seeing encouraging movement on our plan, and the results for this quarter bear that out. Having closed June with a 6-year record for ROM production, we finished the September quarter with gains across every production and sales metric. Output was the strongest we have recorded since quarter 1, 2021. The money we are putting in is paying off. Measured against the prior quarter, production moved up by an annualized 3.2 million tonnes. We anticipate another meaningful lift in volumes in quarter 4, since our high-return Mammoth and Buchanan growth projects are each advancing toward steady state. At present, both sit between 60% and 70% of expected run rate. We anticipate that roughly 3 million tonnes per annum of annualized incremental tonnage will become evident in '26 and beyond, as these projects ramp up to full capacity. Our cost reductions are likewise continuing according to plan. Costs came down once more this quarter and remain under guidance levels. Even with that step change in performance, earnings are still under pressure amid the sustained low coal price environment. We announced a transaction with Stanwell — a strategic partnership meant to bring near-term liquidity into our business through a new structured ABL over the 2026 rebate, and to offer ongoing financial support whenever liquidity falls below $250 million, in effect resetting legacy agreements.

Douglas Thompson

executive
#4

Now looking at our metrics. In quarter 3, the key figures we hit were: group ROM production of 7.4 million tonnes, up 6%; saleable production of 4.5 million tonnes, up 21%; and sales volumes of 4 million tonnes, up 9%. At the group level, our total recordable injury rate came in at 1.16, which is well below industry averages in both Australia and the United States. Moving to group performance, as I mentioned, the quarter gave us solid production results, a 21% improvement in saleable production, and a full year record of 4.5 million tonnes. We also added roughly 600,000 tonnes of product inventory this quarter, which will help support higher production volumes in quarter 4. Total inventory at quarter end stood at approximately 1.7 million tonnes. Even with these material operational improvements, sales volumes came in marginally under our plan for the quarter. Several short-term equipment outages, along with port and vessel delays in both Australia and the United States during the final week of the quarter, created pressure on our planned railing and shipping. Now that the major expansion projects are complete, quarter 3 demonstrates the value and future potential these business improvements have created.

Douglas Thompson

executive
#5

Now on the Australian business unit. We saw improvement across every area. During the quarter, we raised ROM production, saleable production, and sales volumes. The third continuous miner started up in late June, as planned, and Mammoth currently runs 3 production panels. We expect Mammoth to hit planned run rates in quarter 4, with as much as an additional 2 million tonnes of incremental production each year from '26 onward. Cost reductions keep being achieved, with average mining cost per tonne sold in quarter 3 coming in under both forecast and budget and far below the bottom of our guidance levels. Shifting to the U.S. business unit. Operations concentrated first on commissioning and then on ramping up the Buchanan expansion project following first production from the new shaft, which likewise came in on plan in late quarter 2. The U.S. posted greater ROM production and saleable production, while sales volumes fell a little short of plan because of a delayed vessel in the final week of September. With the dual longwalls at Buchanan, we anticipate the U.S. business unit surpassing 7 million tonnes per annum going forward, thanks to the extra capacity the projects have now unlocked.

Douglas Thompson

executive
#6

It's really encouraging to witness the volume increase we achieved once those 2 big projects wrapped up, and we're eager to benefit from the additional tonnages they'll bring to the business going forward. On that note, I'll pass things over to Barrie, who'll walk us through our financial position for the quarter.

Barend Van Der Merwe

executive
#7

Thanks, Douglas, and good morning, everyone. We kept making gains in production and unit costs during the September quarter. Unit cost came in below the low end of guidance at $89.70 per tonne, and for the September month it was $80.10 per tonne, with 2.7 million tonnes of ROM mined. As I laid out in the half 1 results presentation, the link between strong ROM performance and unit costs is well established. Cash capital expenditure fell as expected, coming in at $59 million for the quarter. We were settling some of the final bills tied to expansions. That is $16 million below the June quarter, and we expect cash CapEx to land at the bottom end of guidance of $230 million for the full year. From that we can work out that the last quarter's spend will be roughly $20 million. Despite the rail availability and shipping delays Douglas mentioned that we faced at the end of September, we still built 560,000 tonnes of product inventory, which will be sold in the December quarter and will add to cash. Even so, our sales volumes rose 329,000 tonnes, which is 9% higher than the June quarter. Much of that was driven by strong thermal coal production at Curragh.

Barend Van Der Merwe

executive
#8

EBITDA, before the Stanwell rebate that is presently deferred, came in at positive $4 million. Those working capital outflows I described during the first half results presentation did indeed occur as we had anticipated. Other working capital levers that we pulled at the end of September offset both this working capital outflow and the cash we spent raising product inventory. Contrary to what was envisaged when we gave the half 1 results presentation, we did not draw on the ABL. Among the other cash outflows in the quarter was capital expenditure of $59 million. Interest paid came to $26 million, which was mainly the coupon on the high-yield notes payable in quarter 1 and quarter 3. We then had to cash back a further $29 million in guarantees, mainly tied to U.S. workers' compensation obligations. As I mentioned earlier, for next quarter we expect CapEx of $20 million plus/minus. That $29 million of cash backing will not recur, and interest will be lower — around $15 million for the quarter. Cash at quarter end stood at $172 million, and $16 million was available on the ABL facility with Oaktree, with that ABL still only $75 million drawn, as was the case at the end of the June quarter.

Barend Van Der Merwe

executive
#9

Earnings took a hit from a PLV index that stayed level through the first half of the year, from product inventory building up, and from weaker realized prices caused by the sales mix; during September we did secure a preemptive covenant waiver from Oaktree. And as of the end of September, that facility is still available, subject to the borrowing base. The transaction with Stanwell that was announced recently tackles Coronado's funding needs both near term and longer term in a metallurgical coal market that is depressed. Assuming due diligence is completed, long-form agreements are signed and approvals come through, financial close is anticipated around late November, with the proposed ABL facility adding roughly $165 million to available liquidity once the outstanding amount to Oaktree is settled. Waiving the remaining rebate under the amended coal supply agreement, the ACSA, plus the prepayment mechanism triggered when Coronado's liquidity falls below $250 million, could contribute as much as another $250 million in cash flow across FY '26 at current market prices, though it should be noted the figure does hinge on tonnages nominated by Stanwell. It's also important to understand that under this arrangement, cash flows come in monthly rather than upfront at the beginning of the year. As the expansion projects we recently commissioned ramp up and hit nameplate performance, that will contribute further to lower unit cost and better cash generation.

Barend Van Der Merwe

executive
#10

The deal we have with Stanwell gives us both near-term liquidity help and backing over a longer horizon, and we'll keep looking at the other choices open to us so the capital structure gets stronger and enough liquidity is on hand amid today's weak pricing conditions. Coronado will publish its quarterly financial statements for the September quarter to the market on 11 November, 2025. I'll now return things to Douglas for a market overview and the conclusion. Thank you.

Douglas Thompson

executive
#11

Thanks, Barrie. As Barrie said, coal prices stayed steady across the September quarter. If you look at the Australian benchmark, it came in at an average of $184 a tonne, which is the same as the June quarter. The U.S. East Coast benchmark, meanwhile, averaged $175 a tonne, a bit below the prior quarter's $178 a tonne. Looking toward the September quarter, we think prices will stay supportive thanks to a few important factors: First, in India, the restocking cycle after the monsoon should boost demand. That may get an extra lift from the Indian government's recent antidumping investigation into coke imports, which could help domestic coke producers. Second, the CFR China price is still holding a premium over seaborne benchmarks, and that mirrors a continuing domestic supply constraint, which should also raise import demand. And third, we're seeing ongoing rationalization of high-cost supply as producers react to margin pressures and elevated royalty burdens in Australia. Although macroeconomic uncertainties and cautious buyer sentiment could keep short-term pricing in check, the market stays very volatile to geopolitical developments, trade policy changes and weather-related disruptions. A lot of these could add upward potential to price volatility in the months ahead. Our view remains that the long-term outlook for seaborne coal is very positive.

Douglas Thompson

executive
#12

What our team achieved in Q3 tells a powerful story. Operational results have risen and are now at record levels. We are seeing strong execution throughout our investments, and that is underpinning the improvement. The market is still weak, and it has stayed that way for a long stretch, which creates difficulty for producers and affects the entire industry. On that note, I will turn things over to Rocco, and then we will take your questions.

Operator

operator
#13

<<operator_script>> Our initial question this session is from Glyn Lawcock of Barrenjoey.

Glyn Lawcock

analyst
#14

To start with, there were quite a few moving pieces this quarter. Could you perhaps simplify things a bit for us? In other words, absent those one-offs and the product build at the port, would you view the business as free cash flow positive for the quarter? And looking at the current settings you'd anticipate for Q4, would the business now sit in a stable free cash flow position?

Barend Van Der Merwe

executive
#15

Yes. So Glyn, that's a good one to expand on a bit. I'll walk through the quarter first, then discuss how things move going forward. If you look at how the bank balance moved during the quarter, it was down $90 million. Within that, we paid $60 million of CapEx, $30 million of interest, and we got $30 million of guarantees back in cash. So looking at quarter 4, we'll spend roughly $20 million on CapEx, $15 million on interest, and there won't be the cash backing. So if everything else holds steady, and that's before working capital, I'd say on an underlying basis, you're probably burning $40 million to $50 million in the fourth quarter. Then you need to layer on the expansions continuing to rise. So you need to form a view on what cash that will generate. And then you need to get into working capital. Now for quarter 3, that quarter was really working capital neutral. So whatever levers we pulled at the end of Q3 -- end of Q2, we pulled again at the end of Q3. So that's a wash. As we head into quarter 4, obviously, at some point, we need to reinvest in working capital, and it's mainly debtors and accounts payable, because inventory is handled separately.

Barend Van Der Merwe

executive
#16

So some investment in working capital will be required. My view is that the new ABL coming into the business will be the source of funding for that. And then there's the inventory you'll sell down — the product inventory on hand. What I mean is, when you consider that entire working capital piece, there's a net working capital outflow coming, and the ABL that comes in will fund it. On the underlying business, on a like-for-like basis, I'd say at current prices it should burn roughly $40 million to $50 million, though whatever the expansions deliver would offset that on top. And then the final point, which has been very topical in Queensland over the last couple of days: you need to go look at the BOM website and form a view on the weather at Curragh. That was a bit of a long one, but I hope the long one broke it down a little into buckets.

Glyn Lawcock

analyst
#17

Yeah. And clearly, on pricing, we’re $10 per tonne better off right now compared with Q3 at the moment?

Barend Van Der Merwe

executive
#18

That's right.

Douglas Thompson

executive
#19

That's precisely right.

Barend Van Der Merwe

executive
#20

That's right.

Glyn Lawcock

analyst
#21

And then maybe just regarding pricing, specifically the U.S. domestic price settlement for next year that's coming up — is there any update you can give on that?

Douglas Thompson

executive
#22

Right now, Glyn, there aren’t any negotiations taking place in the market. So unfortunately, no.

Operator

operator
#23

<<operator_script>> That wraps up that question—my apologies. It appears a follow-up has come in from Glyn of Barrenjoey.

Glyn Lawcock

analyst
#24

Apologies, Douglas. I figure there are a good number of rival requests coming in on a specific line, and it's likely just a matter of holding and fending everyone off. Given that inventory buildup of 0.5 million tonnes plus the problems at ports, do you believe you're able to make that up and also ship the higher output you're aiming to deliver in Q4? Or might there be the chance of bottlenecks and so on? I'm just considering your allocations.

Douglas Thompson

executive
#25

Yeah, we do have capacity available. Right now the team is examining what we can bring forward ahead of year-end, specifically around shipping and rail access in particular. As you're aware, in the U.S. there's no storage capacity at the ports. So whatever goes into a train set has to be unloaded straight onto a vessel. There's almost no buffer time. That's the rail-side constraint. - The other one sits in — Australia is bringing rail lines on. Now, one piece of what we did in Q3 was catching up on certain thermal contract deliveries through to Stanwell. That's also part of what drove thermal volumes higher during the quarter. In quarter 4, the power station will clearly burn more, and they're asking whether we can supply them with some extra. That frees up domestic lines that won't need to run to port. So the team is working through those catch-up possibilities. What I'm trying to indicate is that several of them are available to us and we're actively working through them right now.

Operator

operator
#26

Today's following question is from Daniel Roden of Jefferies.

Daniel Roden

analyst
#27

I just wanted to ask — you said you're at 65% of capacity at Mammoth, and I was hoping you could give us a little more detail on how that's going. And I suppose, as of today, you have your 3 continuous miners on site, and they've been there for a couple of months now. So how do you see it — what are the stage gates, and what are the outstanding elements, I guess, in terms of that ramp-up profile to get from 65% up to that 100% capacity of the 2 million tonne per annum? And probably just <<inaudible>> and noting that in previous, I guess, commentary around that it was a 1.5 million to 2 million tonne per annum kind of project, and you seem to have settled around that 2 (sic) 2 million tonne. Is there any risk that we kind of fall back into that range? Or are you still pretty confident at that 2 million tonne per annum?

Douglas Thompson

executive
#28

That's a really good question. Let me walk through the technical milestones first. As we've been building the mine out since December, you begin with a single continuous miner fleet, obviously. Then you have to develop the mine itself, put the infrastructure in place around it, and create the space for a production panel — and that includes conveyor belt systems, so that once you're in the production panel and your shuttle cars are running back, they can load onto your spine conveyor, which carries the material out to the surface. That's the reason we've been staging them one after another as that infrastructure has been built, and it's why it's worth calling out. We now have 3 production panels, and we've completed all of that infrastructure. The other piece was getting the permanent ventilation system designed and constructed, because underground you need to build the crossovers as the mine expands, so that fresh air flows in and exhaust air flows out through the system — and that requires infrastructure built underground. So that work has been underway for the first 6 months. And it is now all established and in place for the mine, with the 3 panels operational. As to how the ramp-up is going at 60%: when you design a mine of this nature, you do all your geological research and estimates, and most of that is playing out the way we modeled and expected.

Douglas Thompson

executive
#29

But you don't truly know how the teams are tracking until you actually cut the first coal. And one lesson from the ramp-up concerns the bolter configuration we purchased — the equipment that installs the support infrastructure while you're developing the underground mine — and we've had to make some modifications to it. Those modifications are happening right now. It's proven successful. So we're achieving the bolt rate we need, that will carry on through quarter 4, and we'll put it behind us. So we've altered some of the ways the method of work gets done to handle the geology and the bolting rate ramp-up profile. Then the last part of your question, the 2 million tonnes, it will be situational. The system we've built, and technically it performs at full run rate such that it can do that 2 million tonnes per annum to hit the upper end of what we've got planning, and that's what we'll plan from '26 and beyond. But we may flex it as we move into different areas within the mine. And I don't want to get over my skis here. But as we consider Mammoth 2 into the future, there might be an opportunity to build out a fourth panel, and during late '26, maybe early '27, we'll bring another production unit online at Mammoth that will give us some more upside capacity out of the mine, which will benefit us for when Mammoth 2 gets built out into the future.

Douglas Thompson

executive
#30

Hopefully that provides a bit of clarity regarding what we intend to do.

Daniel Roden

analyst
#31

Okay, that makes sense. I've run my own checks, I suppose, and I feel fairly confident about it, but perhaps this is a good chance to walk through things — there's been some coverage regarding the Buchanan matters, and maybe a bit of clarity on how that situation is developing and what effects you're observing? And do you anticipate that some of those effects will carry on into Q4?

Douglas Thompson

executive
#32

Yes. Well, thanks for asking. What I'd say is that we don't get pulled into speculation. We don't make comments about things like that. There's a plan in place. We simply stay focused on what we're doing, and we do our best to keep the market updated in the way we appropriately have. Speculation is inevitable. We've had to step forward and set the record straight on what is factually incorrect. Not long ago, someone also claimed that we approached Oaktree seeking additional funding and were turned down. Well, that is factually incorrect too. So sadly, the journalistic effort behind these articles is limited, and I'll take a jab at this. If you write about an underground mine and then place a photo of an open cut mine next to it, you really have no idea what you're talking about. But leaving that aside, what happened at Buchanan was that we experienced a fall of ground at an intersection in our North mine, well away from the working areas, so it had nothing to do with the coal seam. It did, however, affect our conveyor system from that longwall coming out. We worked with <<inaudible>> mines to establish a plan to secure it. We brought it back into production.

Douglas Thompson

executive
#33

That didn't have a material effect since our second longwall was still running at the time. So we felt we had to come out and set the record straight once that inaccurate article appeared. As for the more recent speculation surrounding the Stanwell deal, I chalk that up to — look, we've issued a limited release covering what the details of the deal are. We did that because we're still working respectfully through things with Stanwell on this deal. And I'll say we have a very detailed term sheet agreed with them. But we're working through due diligence. And once the long forms are finished, we'll announce it to the market. Now Q10 will obviously provide a lot more color on it. But speculation will remain speculation, and I won't discuss it much beyond that, because that's the credence it deserves.

Daniel Roden

analyst
#34

That's quite clear. Perhaps just one more from me, and I can rejoin the queue if further questions come up. Regarding your sales mix this quarter, and the outlook too, I believe—you mentioned that the market isn't compensating for premium quality met coal. On that point, is there anything you can do going forward to alter and, I suppose, optimize your product mix for sales to the market outside your contractual commitments, to help boost earnings on a quarterly basis into '26? How much flexibility would you have around doing things like that?

Douglas Thompson

executive
#35

Daniel, we do have some flexibility here, and you've touched on all the key doors that need to be stepped through. One is that we're contracted, and people genuinely want our product. None of our clients have failed to take product that they want or that is under contract. So then the question becomes what you can build within your flex of what's not contracted. Part of what we did in the quarter in the product mix, and you would have seen it in the results, is we did do more thermal, and that was a catch-up with Stanwell. Power demand in Australia is now heading towards its peak at the end of the year as it heats up and everybody fires up air conditioners. There are a couple of other power stations within the state that are having difficulty getting to their performance rates. So our clients asked us if we can provide more and we could. And as you say, on some of those premium products, the pricing isn't just there. It's a very narrow trade there that sets the rest of the market and secondary products -- so we've been looking at, well, where can we get a yield advantage as we produce the product and pricing.

Douglas Thompson

executive
#36

So that's the reason you've been seeing a bit more thermal heading into the export market during this quarter too, where our sales and marketing teams have managed to secure some good pricing through that, and we also have a yield advantage. So we're pursuing every avenue available to us, but we are fairly well contracted. So the options open to us are limited in the near term in terms of what we can do on that front, but we've done what we could.

Daniel Roden

analyst
#37

Yes. Got it. And perhaps I can squeeze in just one more before passing it along. In this release, as well as earlier, you noted that the company is looking into possible routes involving sales of minority assets or other deals within the business. Do you have any fresh information or remarks that could shed some light on any of that? Or I'd guess it's fairly limited, but yes, I appreciate the comment.

Douglas Thompson

executive
#38

Daniel, we have been considering every avenue that can deliver shareholder value while we work through this challenging stretch, and we have been wrapping up those big projects that build long-term worth in the assets — which included, as we mentioned, a number of approaches coming in because people recognize the quality of what we hold. Those assets are now substantially de-risked, since the capital projects are essentially complete and beginning to produce, and they carry full permits <<inaudible>> with long lives, and their products plainly satisfy long-term market demand. Yet none of that has reached the stage of a firm offer, or of people making overtures to us. As for the minority sale process, that remains a process that is a <<inaudible>> — I won't say anything about it at this point, but interest in it is strong.

Daniel Roden

analyst
#39

Yeah, with the geopolitical situation as it stands, your U.S. assets would be of interest. But I appreciate that color and commentary.

Operator

operator
#40

Our following question is from Chen Jiang at Bank of America.

Chen Jiang

analyst
#41

My question concerns the financial support transaction you announced on Tuesday. To clarify, the earlier liability, or the agreement signed with Stanwell in June, stays unchanged in terms of pricing and repayment, correct? The new one you will sign with Stanwell, though, is simply an extension of the legacy contract from 2037 to 2043. How should I think about the thermal coal price, since the legacy contract's thermal coal price, from memory, was around $30, whereas the new contract signed with them in June was, I believe, at market price? That's my first question. The second question concerns the prepayment from Stanwell, because I assume the waiver — sorry, the rebate for '26 will be waived. So there is no further Stanwell rebate, I assume, going forward. That contract expires at the end of FY '26 regardless. So how should I think about the Stanwell prepayment, particularly from a P&L and accounting perspective?

Barend Van Der Merwe

executive
#42

Jim, so regarding the first part of your question, just to confirm that the rebate waiver — that's a complete waiver, and the rebate concludes, as you mentioned. So at the close of this year, the rebate comes to an end. For the following quarter, we still have the deferral of the rebate that we agreed to earlier this year. So that's where things stand on the rebate. As for the coal sales agreement known as the ACSA, the amended coal sales agreement that expires at the end of '26, early 2027 — that position remains unchanged, but the rebate disappears now. I think the dollar per tonne that you've associated with that is pretty accurate. So you can keep looking at that. Now let me address that immediate prepayment part first. So what the agreement with Stanwell provides is that they will give us a prepayment up to a maximum of the discount they would have received. So the way to think about it for next year is if our liquidity is below $250 million, the maximum prepayment we can obtain is the coal market price, less port and rail, obviously, next year, less the $30 that you quoted times the tonnes they nominate.

Barend Van Der Merwe

executive
#43

So — and actually, if you go and look at my script, I gave you an estimate there of what I think it will be. So it can probably be up to $150 million. While we say up to $150 million, we'll give more detail on this in the 10-Q and beyond that. But as the liquidity kind of goes down from $250 million, that prepayment increases. The closer you get to $250 million, the less the prepayment is. So that's the concept. So that's the first part, how the rebate works, how the coal sales agreement work. Then on the extension of the NCSA, the new coal supply agreement from 2037 to 2043 — the easiest way to look at that is earlier this week, we put out some material we used to cleanse our noteholders from a transaction we were discussing with them. On Page 17 of that release, there's a slide that's got quite a bit of detail about how the existing — the pre-existing Stanwell arrangement works, and there's some data there that will give you what you need. The principle is that NCSA can be extended, the term stays the same as what it is today.

Barend Van Der Merwe

executive
#44

Nothing about the contract's price has been altered. The sole modification involves Stanwell's ability to nominate a broader tonnage band: rather than 1.8 million to 2.2 million, they may now nominate 1.2 million to 2.2 million tonnes. That change isn't limited to the 2037 portion, though — it kicks in from 2027, so it covers all 15 years of the agreement's term. One final point, just so everyone's clear: the deal we completed earlier this year with Stanwell — the $150 million, which was a rebate deferral covering nine months plus a prepayment, with 800,000 tonnes tied to that transaction — remains exactly as it was. No changes there whatsoever.

Chen Jiang

analyst
#45

Moving to another follow-up: I mean, a few years down the road — say, once the industry turns around and your profitability improves in a few years — how does your dividend policy change over the long term? Since Tuesday's release mentions that dividend payment carries certain requirements, I'm guessing you have to pay Stanwell. Is that right? Whenever — if you wish to declare a dividend to shareholders, then you probably need some kind of consent from Stanwell, or some payment to Stanwell. I'm just wondering what sort of payment to Stanwell is required if you want to declare a dividend?

Douglas Thompson

executive
#46

If you look at the announcement from earlier this week, the final paragraph gives some of those details. No consent from anyone is required for us to declare dividends. That decision sits with the Board, and when declaring a dividend the Board will weigh business circumstances, et cetera, the market outlook, all of those factors. Importantly, I think the Board will also weigh the company's capital structure. As things stand right now, the company carries quite a bit of gearing. That's something we consider seriously before declaring dividends. You can imagine — and it's only fair — that Stanwell would want some level of deleveraging to happen when we declare a dividend. So the arrangement with them doesn't say you can't declare a dividend, and I can't say that. We can still make distributions as we get profitable. But this prepayment bucket we've agreed with Stanwell, which gets us through the tough times, has to be repaid as we declare dividends. It's similar to the arrangement we've got with our noteholders, where if we declare dividends, we need to make a prepayment offer to them as well — whether they accept it or not is up to them, but they had a similar requirement.

Douglas Thompson

executive
#47

So Stanwell is in the same position. Should we end up owing them contingent amounts within that concession bucket down the road, then any dividend we declare has to give them a matching sum—or possibly a larger one, depending on how much sits in that contingent repayment bucket. Basically, the more assistance they give us, the more we have to pay them back ahead of dividends. So if we owe them a lot, they have to receive more money than shareholders. Again, the specifics on where the threshold lies and what the amount is will come in due course.

Operator

operator
#48

And moving on, the next question is from Rob Stein of Macquarie.

Rob Stein

analyst
#49

Apologies if this was already covered, but I wanted to verify once more. Regarding waste levels, stripping and similar items, how did activity levels look during the quarter compared with the quarter before? I'm just looking at the average mining cost per tonne sold. I'm merely attempting to compare that so I can get a sense of the quarter-on-quarter change and what is occurring on the waste side, in order to understand the movements in unit mining costs.

Douglas Thompson

executive
#50

Yes. So, Rob, on balance, the volumes being moved are improving. We haven't reduced waste movement to — and I believe what you're really getting at is whether we've high graded the mines over that period. And no, we haven't. The benefit we're drawing on is our four dragline fleets that we've discussed, which formed part of the $100-odd million we removed from Curragh over the course of last year; we pivoted away from truck and shovel once our mine was set up to be a more productive dragline mine. That has carried on. I think we mentioned it last quarter that one of our draglines is now performing at world benchmark levels, and the other three are getting there as we build the capacity around them. So the draglines are now getting to a position where they move a lion's share of it. And I say draglines, dragline systems, so that includes dozer push and cast blast, which is the cheapest form of moving waste, and then truck and excavate. So we rationalized truck and excavate at the mine, and we've kept that installed capacity through our own fleets and contractor fleets at the same level through quarter 2 into quarter 3.

Douglas Thompson

executive
#51

That tonnage remains in line with the plans for our mine and the release of coal.

Rob Stein

analyst
#52

All right. So even with Mammoth on the way and 65% of capacity — which we hope will rise in the quarters that follow — that extra volume, first, I’d imagine, helps spread out your costs. And second, it likely swaps out some of the expensive marginal tonnes for cheaper underground tonnes. Is that roughly how we should view how your unit costs will move going forward?

Douglas Thompson

executive
#53

You're right about that. When we took a step back a couple of years ago and examined the business, then set this plan in motion—the one I keep mentioning—the strategic push was, first, that Buchanan had to be debottlenecked. We had two longwalls with excellent capacity, yet only one shaft for bringing material to the surface. So we pinpointed the engineering solution: repurposing an old vent shaft, executed as cost effectively as possible, and the team has now completed that work—removing the bottleneck and allowing us to capture the incremental tonne out of the U.S. In Australia, we were ideally seeking an incremental tonne that could dilute higher costs as stripping ratios climb, while also reducing risk, since our two open cuts there sit in fairly close proximity. Weather systems passing over the mine tended to hit cash flow at both operations. And we could see genuine potential for underground mines. So we set about designing it, and that is what we've succeeded in getting approved and built. It therefore delivers not just what you called cheaper tonnes, but across the asset's life as stripping ratios rise, as they naturally will, it builds capacity within our business to bring underground mining skill from the U.S.

Douglas Thompson

executive
#54

Turning to Australia, where we're expanding, and that skillset will let us work the resource over a longer horizon — developing Mammoth 1, 2 and 3, plus possibly, and I do mean only a twinkle in my eye at this stage, one more underground operation in the south further down the track. What that does is make sure the stripping ratio won't overwhelm the economics. So yes, it's dilutive there. The second thing is that it removes risk and delivers a better-quality margin, because during wet weather spells, when you're ultimately operating Mammoth 1 and 2, the underground gives you enough capacity that you don't need to tie up large working capital in the wrong production just to get through the impact of a weather system — you can produce as you go. Over time that helps lift the mine's margin and the quality of that margin. So those really are the main reasons behind developing this underground mine, just as you described. Eventually it opens up other possibilities — you can revisit how the underground is run relative to the open cuts, adjust your production profiles and so forth, and that will mostly be driven by the market.

Rob Stein

analyst
#55

That’s really useful context. So stepping back — and I know there’s been a lot of noise, I suppose, surrounding how the company is financed, which mostly comes from Curragh — but if I look at it purely from an engineering or operational perspective, how satisfied are you with where things stand on, first, your growth plans; second, your productivity agenda; and third, metrics like safety and operational health? Has any of that changed during this recent volatile stretch, in the sense that prices haven’t really moved in your favor, but at the same time, the company’s finance structure hasn’t been stable?

Douglas Thompson

executive
#56

Since this is public, my team will give me grief, to put it politely, if I'm not honest. In that respect I'm never satisfied, because I can always spot more in an engineering solution that would boost productivity. And honestly, that's the best way for you to take out cost. You can only save so much before you genuinely have to push productivity in the business to remove cost and find an engineered solution or technical advancements. So we will always keep driving. I'm really pleased with what the team has delivered on our longwall <<inaudible>> dragline systems — we're now running those draglines at a much better level of performance. There's more we can get out of them. As you build the strike length out in the north, we're designing a figure of eight type engineered solution that we can run on at least two of our draglines, which will push cost down further. The team has restructured the dumping strategy. As a result, our haulage profiles are much shorter than they historically used to be. So we've removed a lot of cost from the business by dropping haul strings on trucking lengths. And we're really simplifying the mining systems at Curragh, where it was very complicated and convoluted, with far too many hands on the pillars of the two mines, because we had contractors that were highly integrated into it.

Douglas Thompson

executive
#57

We worked hard on the One Curragh plan, regained control of the mine plans across all the mines, and have now split it into three mines, each with suitable leadership teams and the technical expertise needed to operate them — and I include the underground mine in that. So they're much more focused, easier to run, and we're really pushing the mines toward a unit cost focus. I'm happy with the direction we're heading, but I know there's more in the system and in the plan that we can extract over time. And Mammoth plays a big part in unlocking those options we have. Canada has always been a very dependable, strong performer. You only have to look at how we move a longwall versus what the industry achieves. With what we've done there — the flexibility of the old shaft and the new shaft, and the capacity between the two longwalls — it will help us run the mine far more efficiently. And in both systems, Australia and the United States, we've essentially taken the engineering — since your question is tied to engineering — and removed the bottleneck from underground or from the operating systems, placing it at both prep plants.

Douglas Thompson

executive
#58

Also, a processing-plant bottleneck tends to be the simplest one to fix from a technical standpoint, since it sits above ground and you can push through improvements there, and at this point the system is confirming that both of those are indeed the constraint. So my view is that once we get past those, additional upside can be unlocked from the system. That leaves me pretty enthusiastic about it. The final item I want to turn to is what you asked about, namely whether during this period of pressure we have moved away from our plan when it comes to safety and how we are carrying things out. The fundamental plan and the discipline around it have been adhered to very tightly, because all of us invested heavily following COVID. At the time coal prices were very high, we asked our Board to let us carry out this plan and make up for old stripping ratio shortfalls so the draglines would be properly set up. So on that we have not compromised. Have we made sensible short-term adjustments in stripping ratio and truck and shovel in response to coal pricing? Yes, we have, but we have not harmed the underlying plan, and that was quite deliberate. And on the safety side, I really have to give credit to the team that has driven safety.

Douglas Thompson

executive
#59

Safety culture within the U.S. business has always been extremely robust. And over at Curragh, we've spent the past four years genuinely streamlining safety and building a strong safety culture. If you look at the charts we've published, the lag indicators are doing very well — far below the industry average — but what excites me is the lead indicators, and how the team is applying itself to learn from incidents, put new systems in place, and implement engineering controls. The one that stands out most strongly is the dragline systems: we now design a system that's an industry first, with proximity detection for people and equipment approaching draglines. Our team developed that through partnership, has gifted it to the industry, and I think has offered the industry a change. Regulators and others have reviewed it, and we've received due recognition from the industry, along with industry awards for it. So the mine has really climbed a maturity curve around safety as well. So I can say confidently there's no compromise — but you can never take your eye off the ball when it comes to safety. You have to stay on it constantly.

Operator

operator
#60

The Q&A portion of today's call is now finished. I'll turn things back to Douglas so he can offer some closing comments.

Douglas Thompson

executive
#61

Thanks, Rocco. I appreciate everyone taking the time to be with us today. Should anything else come to mind, feel free to reach out. Chantelle and the team will get back to you, just as she always does, very promptly. Thank you.

Operator

operator
#62

Thanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.