Develop Global Limited (DVP) Earnings Call Transcript & Summary

January 27, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 26 min

Earnings Call Speaker Segments

Operator

operator
#1

At this point I'd like to pass the conference to Mr. Bill Beament, Managing Director. Please go ahead.

Bill Beament

executive
#2

Morning, everyone, and thank you for being on the call today. Joining me is our Chief Financial Officer, Ben MacKinnon. It has been four and a half years since my last quarterly conference call, so I'm glad to be back engaging with the activity, and I may be a little rusty, so please bear with me. The strong results we're reporting today demonstrate that we remain well on track toward the key growth targets laid out in our five-year business plan. Part of the credit goes to the very successful production ramp-up now under way at Woodlawn, where we expect to hit a nameplate capacity of 850,000 tons per annum in the March quarter. It also reflects how quickly our Sulphur Springs project has progressed during the quarter, along with the mining services contract we secured recently with OceanaGold in New Zealand. We're two years into that five-year business plan, and we expect to hit our goal of producing 500,000 tons of copper equivalent a year on or ahead of schedule. The business plan also calls for two to three mining services contracts, and we already have two in hand. And lastly, with lithium prices recovering sharply, we are set to meet our goal on that front too, and I'll say more about that later.

Bill Beament

executive
#3

Let me now walk through a few of the quarter's key items that I can add color on, and then I'll turn things over to our CFO, Ben MacKinnon, for insight into the financials before we open it up to questions. I'll begin with several highlights we released today. Commissioning and ramp-up at the Woodlawn restart remain on schedule and the operation keeps delivering strongly, and we truly have that project positioned for steady-state output, consistent with what we identified and communicated to the market last year for the March quarter. The record 59,000 tons processed during December demonstrates this, giving us an excellent exit rate at Woodlawn toward hitting nameplate capacity of 850,000 tons per annum this quarter. It's pleasing to see quarterly concentrate revenue rise 98.5% to AUD 39.1 million on 9,500 tons of con sales, driven by gains of 36% in copper con and 43% in zinc con versus the September quarter, which really came from introducing and expanding high-grade production at our main Kate Lens. One point worth noting in the base metal sector is that treatment and refining costs charged by our off-takers, known as TCs and RCs, are falling substantially on an ongoing basis.

Bill Beament

executive
#4

They're providing substantial improvements to the Woodlawn financial outlook for this calendar year. Starting 1 January, Develop now switches back to spot market indices for treatment and refining, with copper and lead both trading well into negative territory, and zinc sitting at genuinely historic lows for treatment charges. And if we consider only the new treatment and refining costs alongside today's spot commodity prices, our net smelter return revenue increase — that's the revenue per ton we retain after off-taker costs and transport costs — has risen 40% to AUD 470 a ton now, compared with our published restart in August 2024, so that's a really big jump in revenue per ton. Another point is that we only recently began drilling at Woodlawn. We completed close to 10,000 meters, and that was really just grade control drilling. Our second drill won't start until later this quarter, and that's the rig we've brought in to extend our mine plan at Woodlawn from 10 to 15 years, but it hasn't begun yet. However, our grade control drilling actually intersected another lens known as the N Lens, and we have some excellent results just published that fall outside resources, and that will be a near-term mining area coming into the plan within the next 3 to 6 months.

Bill Beament

executive
#5

We’ve also got several intercepts in the I and D Lens that come from outside resources too. With grade control drilling, as we expected, as we keep drilling further into this ore body, we’re encountering more and more mineralization. Sulphur Springs has moved ahead quickly over the last quarter. We completed an updated DFS in the December quarter and it generated a pre-tax NPV of AUD 921 million. That represented a substantial 76% increase over the prior one completed in June 2023. What I’d like to highlight is that since we released that in October, spot prices for copper and silver have risen 20% and 150% above the assumptions we used in the DFS, while the zinc price is roughly the same — it’s probably about $100 higher right now. The point I also want to stress here is that when we begin discussing and examining commodity ratios and where they stand currently, it’s interesting because people talk about gold and silver ratios, and many are doing so at the moment, with silver approaching historical levels in that respect. But what we find interesting is that the zinc and copper ratio and the zinc and aluminum ratio are at historical lows.

Bill Beament

executive
#6

Zinc hasn't seen the kind of rally that other commodities have enjoyed, but it's sitting at a certain level, and I'll give you an example. Under 10 years ago, the ratio of zinc to copper was roughly 0.5. Today it sits at 0.25. Either copper is going to come down or zinc is going to go up, and I don't think many people believe copper is coming down, and aluminum has moved from 1.6 to 1. So as Trafi pointed out to me in Geneva last week, that is not the norm. So they're very bullish on zinc and where it could go to. The other part on Sulphur Springs, if we were just to put spot commodity prices, exchange rate, and current treatment costs into the pre-tax NPV that we only put out in October, it would be up another 25% to AUD 1.15 billion, and Bill can talk about the funding of this later on because those sort of NPVs make funding a lot easier than a couple of years ago. The other thing we just put out today was some metallurgical geotechnical drilling that we did through the ore body at Sulphur Springs. It hit exceptionally high-grade copper, zinc, and silver mineralization, really reinforcing the scale and quality of this project.

Bill Beament

executive
#7

I want to highlight 204 meters grading 1.8% copper, 0.6 lead, 6.2 zinc, and 21 grams per ton silver — that's both the resource grade and the mine plan grade at Sulphur Springs — and once it's up and running, Sulphur Springs will likely turn out more than 1.2 to 1.3 million ounces of silver per year, plus a little gold. But once you break those increments down, there are some genuinely high-grade zones within it. That resource is going to grow from that hole by itself. It's worth noting that 49 meters of that intersection, at really good grades — 1.8 copper, 15% zinc, and an ounce and a bit of silver — falls outside the current resource. We also hit a full ore lens there, which has opened up an entirely new horizon in that ore body. As we knew when we began drilling this thing, it's going to grow, so we can't wait to get the drill rigs later in the year, once we have the positions in the new decline, to keep drilling this, because growing this from an 8- to 15-year mine plan was part of our strategy as well. The quality of this system is amazing.

Bill Beament

executive
#8

We're aiming for a final investment decision in the June quarter of 2026, which is the quarter coming up next. I know we are extremely, extremely busy pulling everything together, and it's shaping up really well. As for Pioneer Dome, it's remarkable how fast commodity markets can shift, and that was exactly the point of building our portfolio over the past three or four years — we've witnessed a substantial rise in the spodumene price. A couple of days ago, I believe it was yesterday, it reached $2,500. Overnight it settled, I think, at $2,420 per ton of SC6. What's also interesting is the return of the DSO, the direct ship ore market, which has genuinely opened up. That has produced an exceptional financial opportunity for this project. Keep in mind, we hold a fully permitted mine. We can dig a pit right now. That's quite different from many other projects. We have traditional owner agreements in place. All our mining approvals are through. We can start a pit today. So it's fully permitted. Delivering first DSO ore would take under six months. As a reminder, the capital cost for that entire project is roughly AUD 35 million to AUD 40 million to get it up and running. We'll go into a bit more detail on that during Q&A.

Bill Beament

executive
#9

We have already begun negotiations for full entry off-take, along with project financing and planning for pre-development work. That process is now underway. Term sheets are sitting in our inbox right now, and another one will arrive later this week. That market has transformed dramatically. Turning to mining services, we now hold our second contract — an AUD 200 million tunneling contract with OceanaGold at the Waihi North Project, which is probably among the best, highest-grade undeveloped gold projects anywhere in the world. We truly thank OceanaGold for trusting us to deliver that project on their behalf. It is a major cornerstone for us. It is remarkable how that has just unlocked New Zealand for further opportunities along the east coast of Australia. A substantial volume of tenders is being assessed right now for progression. You could not ask for a more favorable market for mining services providers than right now, with gold at $5,180 an ounce across the globe. At the moment you could mine the gravel in the car park and turn a profit. It is that bloody high. On the corporate side, as I said, really important. The December quarter marks our second-year anniversary of our five-year business plan, under which we are targeting 50,000 tons copper equivalent. Based on the results today, we believe we are well and truly tracking our turn of schedule — if not ahead of it.

Bill Beament

executive
#10

Our plan is also aimed at two or three mining services. Right now we have two, and it wouldn't shock me if three arrive shortly — maybe even four. In the December quarter, group external revenue hit a record of almost AUD 95 million. There are plenty of conversations underway. Our business is expanding, with numerous corporate opportunities in our sector. And finally, we've strengthened the team. We're scaling this up extremely fast. There are many new projects and many opportunities, and it's excellent to have Duncan Bradford, a highly credentialed mining executive, join the board as a non-exec director. Nathan Stoitis — anyone in the extractive hard rock metallurgy industry knows Nathan's background as our GM of processing and metallurgy — and Fraser Perry has come on board as our General Manager of Business Development. He's an extremely busy guy. With that, I'll hand things to the moderator to open up for questions, please.

Operator

operator
#11

Thank you. Should you want to pose a question, kindly hit star one on your phone and hold until your name is called. To withdraw your request, just press star two. Also, when using a speakerphone, please lift the handset before asking your question. Our first question is from Joseph House at Bell Potter Securities. Go ahead, please.

Joseph House

analyst
#12

Morning, and thanks for taking my questions, Bill and Ben. Congratulations on a strong quarterly update. First question, just on head grades — can you give any commentary on how they progressed during the quarter and how they compare with the September quarter for Woodlawn?

Bill Beament

executive
#13

Sure, Joseph, that's a really solid question. Yeah. So here's how we see it: we'll provide 0.1, and we'll offer far more detail when the March quarter comes, since by then we're truly reaching a stable, normal state. But as you can observe, revenue rose 98.5% from the prior quarter. Concentrate sales, as you'll note, increased 36% and 43%. So anticipate that those grades will rise fairly significantly. Otherwise, we couldn't achieve those gains in revenue and in concentrate output measured in tons and metal. And lead declined somewhat, the con. I believe it fell 29%, though that was more than compensated by the improvements. And it comes down to the timing of which lenses we process. So what matters most here is that the September quarter contributes considerably more, with the Kate Lens entering production, and that's projected to add a further 50% of the stope production quantum during the March quarter as we continue ramping up the primary production lens.

Joseph House

analyst
#14

That is quite clear, thanks. And regarding where silver prices stand right now—spot at almost $110 per ounce—does that change your thinking at all on the processing approach, perhaps putting more priority on silver recovery rather than the lower-value metals, or would that be too complicated?

Bill Beament

executive
#15

That's a really interesting question, Joseph. And it's worth pointing out that once Woodlawn is running at steady state and producing at Sulphur Springs, we'll average 2 million ounces of silver annually. So for us it's a genuinely significant revenue byproduct. Are we doing anything differently? No, but obviously we're trying to maximize recoveries and get the silver into the respective cons, because with silver you want it in your copper and your lead con, since when you go to zinc, as you know, your deductibilities, I think everyone's is about the same. They get roughly a 3-ounce deductibility in zinc. So are we trying to get it into the first two cons? Absolutely, before it reaches the third. And we're getting the vast chunk of our recovery into that, and probably achieving better con grades than we expected for silver. Probably the thing to note is when you're getting negative, and I mean substantially negative, treatment costs and refining costs for copper and lead, just think processing-wise, the more tons you get paid from the smelter for the time. Expect that we're maximizing recoveries into concentrate regardless of whether we're balancing that con grade and extra tons, but we're getting paid for the extra tons by the smelter.

Bill Beament

executive
#16

So the miner comes out ahead on both sides, and the smelter probably ends up worse off on both. Still, we're handling that very effectively.

Joseph House

analyst
#17

From that standpoint, we’re in a very good position. At this point, are the TC/RCs fixed, or do you essentially accept a spot price for those TC/RCs? Can you put a number on the possible earnings tailwind across calendar year 2026?

Ben MacKinnon

executive
#18

Joe, so during calendar year 2026 we shifted to an index based on spot. Under our off-take agreement with Trafigura, fixed TC/RCs applied in calendar year 2025. This year, then, an index tied to spot is what we moved to. Significant savings can be achieved there. As for the quantum, we aren't stating those at this point, and perhaps further down the track we'll do so along with some guidance.

Joseph House

analyst
#19

Sure, that's fine. One final item, then. With conditions looking good for the mining services segment, do you have the capacity to possibly land a third contract of comparable value and length to the one with OceanaGold Corp, or would you be considering something that might be somewhat smaller?

Bill Beament

executive
#20

That's a fair question. So, we absolutely do have capacity. Staffing has never been a problem for us, though I'd say across the whole industry it's incredibly tight — the tightest I've witnessed at any point in my career. And as you know, with gold sitting at $7,400, essentially every open pit worldwide now has an underground operation attached to it. That said, the large contracts aren't always the most lucrative ones, Joseph. Frequently the smaller boutique jobs deliver significantly better margins, with far less pressure and far fewer headaches. So you don't need to chase a big contract in order to earn a good margin. Having said that, we've got the capacity in place, and most crucially, we've got the equipment, since equipment simply isn't available out there. If you failed to place orders a couple of years back, best of luck — you'll be heading to the used market, picking up a loader or truck that's five years old, and you'll certainly feel that in the price. So we have the equipment. We have the people. We have the management. We have our DNA. We've just appointed Duncan Bradford to the board as a non-executive to head up Byrnecut offshore. Shannon Bunn previously worked offshore and ran all the Byrnecut operations after Duncan.

Bill Beament

executive
#21

He has held the CO role with us for 3.5 years now, and as everyone is aware, my own background is in mining contracting too. That gives us quite extensive know-how and connections on the personnel and management side of mining services. Still, we already hold 2 contracts. We have no ambition to become large in this area. There is plenty of activity out there, and right now you must stay highly disciplined in that segment, since wages are climbing throughout the industry in particular categories, and the gold players are able to afford those rates. If you want good talent, you will have to pay for it. So we will even adjust contract structures to account for that. We will probably even begin including jumbo prices as a fixed line item, so that we can negotiate as people keep pushing rates higher, because they are pushing them higher already. So you have to be extremely shrewd regarding what you do, what you pursue, and where you go. But we have remained very disciplined about what we are evaluating. We simply want to partner on solid projects with solid people, and ensure we can earn our margin while the mine owner receives what they deserve too.

Bill Beament

executive
#22

After that, everybody comes out on top.

Ben MacKinnon

executive
#23

Joe, there's another thing to keep an eye on here — we just need to make sure we're balancing the requirements of our own contracts too. Mining services is a great piece of what we do, but the real value creation for us comes from owning assets, meaning our mines. So we simply have to ensure we've got sufficient people to run our assets as well, and that's something we need to keep in mind, especially with Pioneer Dome potentially coming on board. Yeah.

Joseph House

analyst
#24

Got it. Excellent. That's where I'll stop. Appreciate it once more, gentlemen. Nice work. Thanks.

Operator

operator
#25

Thank you. As a reminder, to ask a question, press star one and hold until your name is called. We’ll take a brief pause so additional questions can register. Thank you. Our next question is from Hayden Bairstow at Argonaut. Please proceed.

Hayden Bairstow

analyst
#26

Morning, everyone. Bill, I wanted to ask about what you disclosed at Woodlawn. Clearly, this quarter we have concentrate tons. In the prior quarter, it was metal tons, along with some rough grades. I'd just like to understand why that disclosure differs from one quarter to the next. That would simply make it easier to track what's happening as you ramp things up.

Bill Beament

executive
#27

Yeah, look, that's a fair question. Like I mentioned, clearly the March quarter is the steady-state one. So we'll provide the complete set of tables, and we'll likely follow the same approach Sandfire uses, honestly. I'd say that's probably the standout template, in my view. So starting with the March quarter, that'll be in there. Yeah, the one item we probably did overlook is the concentrate grades. They match exactly the September quarter ranges we provided for copper, zinc, and lead. So on that front, nothing has changed. Honestly, that was probably just a minor oversight, Hayden.

Hayden Bairstow

analyst
#28

Okay, so about the revenue figure — my question is for Benny. I’m assuming that provisional pricing adjustments are affecting part of this, since prices rose quite sharply during the December quarter.

Ben MacKinnon

executive
#29

Yes, there was a certain amount of price uplift, Hayden, though the main driver was volume from the standpoint of concentrate revenue. I believe we noted during our previous call — or perhaps in certain conversations we had with you — that we received a big shipment of copper concentrate early in October. That shipment simply landed outside the September quarter and instead went into the December quarter. Volume was the predominant factor, but there is definitely some pricing improvement as well. Our realised price, especially for copper, is climbing markedly. We expect that to keep rising as we capitalise on the most recent price increase observed over the past couple of weeks. Yeah. I think our provisional figure for copper stood at AUD 1,607,100, I believe, at its current level. It is approaching AUD 9.5 to 20. So yeah, you're right. A bit of provisional pricing was involved there.

Hayden Bairstow

analyst
#30

Yeah, and just turning to Pioneer Dome — obviously, there are two clear plants that could be brought in. I mean, do you know where things stand with those talks, or are they only just beginning when it comes to trying to secure access to the one that's operating or the one that isn't?

Ben MacKinnon

executive
#31

Right now we're pursuing all three of those options. We moved on that really fast, Hayden. The first point is that we'll be discussing mine gate and treating through other areas. So that work has already begun. We're now dusting things off and examining the possibility of constructing our own plant, since we always stated in the original scoping study that above $1,500 spod was really the tipping point. Today we're at $2,425. So we're looking into that. But the DSO market is open. In the past week, two very large off-takers have offered us money in term sheets. So that's extremely, extremely interesting. That market is open, and it's very aggressive, very aggressive right now. So that hasn't come as a surprise, but it has happened pretty fast. And once you start to grasp what those DSO rates are per ton, Jesus Christ, it's just about as good as gold mining.

Hayden Bairstow

analyst
#32

And do you have a preliminary arrangement in place with the Esperance Port for that already, assuming it was offshore?

Ben MacKinnon

executive
#33

My apologies, Hayden — I didn’t catch that.

Hayden Bairstow

analyst
#34

So if you decide to take that path, is there already a preliminary agreement in place with the Esperance Port?

Ben MacKinnon

executive
#35

At this time, we don’t have an agreement in place with them, though talks have begun regarding securing access to the Esperance Port. And clearly, since MinRes has had some slots open up there, some access to the Esperance Port will be available. Okay. In fact, there’s quite a lot of access.

Bill Beament

executive
#36

Yeah. We already have a quote from one very large logistics provider, and then there's a second logistics provider that was supposed to send it to me yesterday, but it'll arrive today. So that's a, yeah, complete handoff from mine to ship.

Hayden Bairstow

analyst
#37

Okay, thank you everyone.

Operator

operator
#38

Thank you. That brings us to the end of the question-and-answer session. I will now return the floor to Mr. Beament for his closing comments.

Bill Beament

executive
#39

Thank you. And I appreciate all of you who have come on for Develop's first quarterly call in four and a half years. It feels good to be back in this space and speaking with analysts. So my hope is that the other analysts who are listening can take this information and begin coverage. So a very strong quarter for Develop — likely the busiest one in the company's history. A very exciting year lies ahead. Please take the time to read the quarterly. We have three incredible projects plus a mining service division that keeps getting stronger. I believe we are positioning ourselves to become the leading base metal mining company on the ASX that investors need to hold. So with that, I'll end the call, and thanks once more for being with us.

Operator

operator
#40

That brings today's conference to a close. We appreciate everyone for joining in. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Develop Global Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Develop Global Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Develop Global Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.