Develop Global Limited (DVP) Earnings Call Transcript & Summary

October 28, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 18 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we’re glad to have you join the conference call for Develop’s quarterly report for September 2026. <<operator_script>> At this point I’ll turn the call over to Bill Beament, our Managing Director. Please proceed.

William Beament

executive
#2

Thanks, and good morning, everyone, and thank you for joining us. With us on the call today are Dave Lonsdale, our Interim CFO, and Luke Gibson, who has just been appointed as our Head of Investor Relations. Well, I'm very pleased with what we've delivered this quarter. I think when you look across the business, it's been an outstanding quarter for Develop. And importantly, we are delivering on what we said we would do. We've achieved record mining and processing tonnes at Woodlawn. We've mined our first ore at Pioneer Dome, and we're making tremendous progress at Yitirrti, where development is running ahead of schedule. And at the same time, our Mining Services business continues to perform strongly. We generated nearly $30 million in operating free cash flow as a company, and we invested nearly $60 million in growing our production base for the future. So there's an enormous amount happening across our business, and we're getting some really great progress and achieving fantastic results. So starting with Woodlawn, the performance has been fantastic. We mined over 202,000 tonnes of ore. We processed more than 201,000 tonnes for the quarter. Both are site records and historical records. The plant throughput was up 17%, and we achieved that despite a major scheduled shutdown.

William Beament

executive
#3

The team put in a fantastic effort there, and it demonstrates how much progress we've made in a fairly brief period. Another thing that was really encouraging was our recoveries. Zinc recoveries climbed from 75% to 83%, and performance across the remaining metals has been solid and steady. Copper equivalent production came in below the prior quarter, though there's a strong rationale behind that. We deliberately chose to mine ore of a lower grade that hadn't featured in the original mine plan or the life of mine plan. Access to it was straightforward, the cost was low, and crucially, it holds meaningful precious metals, with gold and silver prices at decent levels. Honestly, it was just too valuable to leave in the ground. So we seized the chance to mine it. What matters most at Woodlawn, though, is what now lies ahead of us. We've built out over 1.54 million tonnes of ore at 2.8% copper equivalent grading that's ready to be produced. As everyone knows, we've continually driven down our capital development to create greater mining flexibility. That represents a sizeable inventory of developed ore, and it leaves us well positioned going forward.

William Beament

executive
#4

We've also opened up numerous extra mining zones, and our crews now have much greater latitude in the way they work. We're finally achieving the split between development and production that we've been striving for. That matters since it lets us mine with better efficiency and consistency. We're back on the planned grade profile now, with October feed grade through the mill at 2.9% copper equivalent. So we're highly confident about the outlook for Woodlawn, and our FY '27 guidance is still unchanged. Then there's the exploration upside, which I find especially exciting. The results coming from our Project DM15 are exceptional. We hit 12.2 meters at 15.7% copper equivalent in the J Lens, which we'll reach in development at the close of this financial year. We've extended the N Lens, a new discovery we began — that we found a short while ago. We pushed that some 190 meters past the current resource boundary. And overnight, we received a further 90-meter extension to this, which now puts N Lens mineralization under a kilometer from surface. And anybody who understands geology, with multiple lenses, that's an enormous, enormous result. These are exceptional results, and they strengthen our belief that Woodlawn is a very large, high-grade quality mineral system.

William Beament

executive
#5

We now have a rig dedicated to exploration that is working on growth, and our focus is on proving out what a 15-year mine plan can deliver — our aim is to get there within the next 18 months. So expect considerably more from Woodlawn. Turning to Pioneer Dome. What the team has pulled off in so short a time is really impressive. We started up an open-pit mine. We extracted our first lithium ore. Two weeks ago I was in Esperance, inspecting the first product at port, and we remain on schedule for our inaugural DSO shipment during this quarter. And Dave, I believe we have secured that for the 9th of November. That is a tremendous outcome. The mining operation is up and running, the logistics chain is established, and the project is advancing very well. And crucially, we have set up the offtake arrangements with a floor price to shield our downside. That gives us confidence in the returns we are earning on the capital deployed. Our goal is to have our capital outlay recouped by the close of this calendar year. So that is an excellent result and one more illustration of our capacity to spot an opportunity, act swiftly and deliver. At Yitirrti, we are just as pleased with how things are progressing.

William Beament

executive
#6

During the quarter, we finished 991 meters of underground development, which is a record, and we're ahead of schedule. That's a remarkable outcome, especially considering we only have one jumbo running. At the surface, construction of the processing plant is underway. GR Engineering has moved onto the site and is making strong progress on earthworks, infrastructure, and long lead items, and they're pouring the mill foundations right now. All of it is moving toward first concentrate in the June quarter of 2028, which isn't far off. This will be another major producer for Develop. What we're doing today is setting the groundwork for a meaningful increase in production and cash flow over the years ahead. Our Mining Services business also keeps delivering. We brought in $46.4 million of external revenue for the quarter. Development rates at Waihi are climbing. In fact, we set a record there just 2 days ago. BP33 is coming along well, and both contracts have a lot more to give as they ramp up to steady-state run rates by the end of this financial year. The caliber of our team and our capacity to carry out underground mining projects continues to be a genuine competitive edge for Develop.

William Beament

executive
#7

We'll keep being picky about where we put that capability to work. We're after top-quality projects, solid counterparties, and opportunities that last over the long term. Financially speaking, we're sitting in a very strong spot. Operating free cash flow for the quarter came to $30 million. Growth investment totaled $59 million. We repaid more than $12 million of debt, and we ended the quarter holding almost $96 million in cash. On top of that, we have roughly $504 million in undrawn facilities. That gives us the financial room to keep delivering on our growth strategy. And importantly, we're accomplishing all of this while keeping an excellent safety record right across the business — our lost time injury frequency rate still stands at 0. That really is a credit to our people and our teams in the field. So when you add it all up, I'd say it's been a pivotal quarter for Develop. Woodlawn is delivering record mining and processing volumes, with a substantial inventory of developed ore and some outstanding exploration results. Pioneer Dome is moving into production, with first sales this quarter. Yitirrti is being built, with underground development running ahead of schedule. And our Mining Services business keeps growing and delivering.

William Beament

executive
#8

We're assembling a set of premium, long-life mines that produce the metals the world requires. And we're accomplishing that through our people, our own capabilities, and a really sharp emphasis on execution. The chance sitting in front of us is massive. We've invested an enormous amount of effort into bringing these assets to their current state, and that investment is now beginning to show up as genuine operating results. It truly is coming out of the ground across all 3 assets. And as these projects keep ramping up, we're positioning ourselves for strong and swift growth in free cash flow. So I'm incredibly happy with the quarter. I'm very proud of what our teams have accomplished, and I'm genuinely enthusiastic about what lies ahead. With that said, I'll open it up for questions.

Operator

operator
#9

<<operator_script>> Our initial question this session is from Joseph House of Bell Potter Securities.

Joseph House

analyst
#10

To start, I’d like to understand more clearly why you chose to mine out-of-plan ore of lower grade. My assumption would have been that, with copper prices where they are, it would be logical to prioritize or maximize copper output during the quarter. Or was there a technical constraint such that, if you hadn’t extracted what you did in that quarter, it might have become technically challenging at a later point in the mine plan?

William Beament

executive
#11

Yes. Look, that's a fair question, Joe. So as you're probably well aware, we tend to look at things through 3 separate lenses. There are lenses dominated by zinc. There are lenses dominated by copper, and there are also lenses with a high precious metals content and less base metal. So it all hinges on where you sit in the sequence and what you're extracting. But in some of these lenses we're encountering far more precious metals than the original model accounted for. And even this month, mate, gold and silver make up 42% of my revenue. So we're not about to leave that material behind. If it's present, if it's cheap, if it's incremental, we'll take it — particularly with gold at $6,000 and silver around $88. So really, where we are in the sequence determines our — I suppose, our blend of metals.

Joseph House

analyst
#12

All right, got it. So your guidance points to roughly 45% of FY '27 copper equivalent contained production landing in the first half. Based on what you delivered in the first quarter, it seems like — yes, as you noted, better grades should show up during the second quarter. Should we likewise anticipate stronger mining and processing rates in that same quarter?

William Beament

executive
#13

Yeah. So the guidance we issued a couple of weeks back, Joe, was 45% of — actually it was 45% of tonnes in the first half and 55% in the second half. And so we're actually 6% above our guidance in ore tonnes mined. So yeah, look, we're very confident, as I said, our grade's running at 2.9% copper equivalent this month. So, as I said earlier on the call, we maintain our guidance for FY '27.

Joseph House

analyst
#14

Okay. And yeah, like you mentioned, the mining and processing rates in Q1 were impressive, and that happened even with a planned shutdown. Could you speak to what was done at the plant during that shutdown? I'm just trying to get a sense of whether any operational debottlenecking or operational improvements are being implemented there that might potentially boost processing rates going forward.

William Beament

executive
#15

Mate, we had what I believe was a five-day shutdown. So if that hadn't happened, we'd probably have produced another — what would that figure be? Another 12,500 tonnes of process, since our stockpiles went up quarter on quarter. But that five-day shutdown was actually a major crusher shutdown. So that's where our problem was. And if I remember correctly, I think it had something to do with the chute feeding into the tertiary crusher, but all of that has been resolved with more of an optimization effort, and the crusher is running extremely well now.

Joseph House

analyst
#16

Yes. And perhaps we could turn our attention to Pioneer Dome for a moment. I'd really like to hear your take on the DSO markets. Compared with, say, 6 months ago, is there now more interest in DSO shipments, or less?

William Beament

executive
#17

Okay, so I just returned from LME Week, and it gave a really, really interesting perspective on commodities overall, I suppose. But I still haven't come across anybody who can say why lithium prices dropped 50% over 7 weeks. So that's — inventories are being depleted extremely, extremely fast, to the point where the major traders we sell to essentially think there may be — whenever China has depleted all those stockpiles throughout history, once that critical threshold is reached, it rebounds very, very swiftly. And the expectation is that's likely the June quarter of next year. So that's probably how the world's major trader sees it. Beyond that, though, a floor price protects us. We're able to recover our capital on that. And we'll simply continue watching that situation. So yes, look, clearly it has fallen a long way, but the good thing is we structured our offtake with a floor price for a set period, so we can recover our capital and reassess once that price recovers later in this calendar year.

Operator

operator
#18

<<operator_script>> Our following question is from Hayden Bairstow at Argonaut.

Hayden Bairstow

analyst
#19

I have a couple of questions. Regarding Pioneer Dome — since your approach at Woodlawn was to pursue that material when precious metal prices are stronger, would it be reasonable to expect you'd consider the same tack if you become confident lithium will improve by the middle of next year, given that you have ample financing between now and then, and simply postpone some of these DSO sales while waiting for better prices? Though I do understand there's a floor price in place.

William Beament

executive
#20

Yes. Look, Hayden, we have protection on the first 150,000 tonnes. That provides us with a solid runway to recover our capital. Yes, obviously we'll reassess after that. And just last week Trafi even made us an offer: if prices don't bounce back, they'd like us to continue mining, and they're willing to fund us to keep going. So that likely gives you some reassurance about a recovery in — as I mentioned, quarter 2, 2027. So we'll simply reassess that. It's a capital item. We built it, and I didn't mention this on the call, but I believe we informed the market it would cost us $30 million to construct that operation. It has cost us $18 million, and we're up and running. So that's a major win for the team. And obviously, it was a year pit and then it was going to go 7 or 8 years as an underground. And 7 weeks ago, the belief it would generate $150 million free cash flow a year, 7 weeks ago. So we've built it very capital light. And look, I have the FID document sitting in my inbox ready for the Board, but there's no point handing it to them at this lithium price.

William Beament

executive
#21

However, the capital expenditure needed to bring the underground into operation — the bottom of the J curve — comes to just $41 million. So it really is — we have positioned it extremely well. What the team accomplished regarding securing camps, haul roads, permits, and third-party agreements for haul roads into Port of Esperance — we have Shed 4 locked up. So best of luck to anyone attempting to move product through there. So, all of that effort represents an enormous body of work and a success for the team in getting that operation up and running. But we will simply continue evaluating it, mate, as things progress, though we are protected for the time being.

Hayden Bairstow

analyst
#22

Yeah. The one certainty with lithium is that it’ll be volatile, no matter what happens. Just on Mining Services, what run rate should we be thinking about for external volumes? I assume there was some final Bellevue payment in that quarter. So could I assume Core ramps up through the year as you get that underground moving? And what does the lumpiness look like at Waihi?

William Beament

executive
#23

Yes. Our guidance for this financial year is revenue of $100 million to $110 million — sorry, $100 million to $110 million. So obviously we've done pretty well in Q1, but obviously Bellevue has now ramped off. So I'll just stick with that guidance. But to give you a sense of our exit run rate at the close of this financial year, I think next year we're looking at something like $175 million to $180 million in revenue for that division from those 2 contracts.

Operator

operator
#24

<<operator_script>> Right now, there are no more questions coming in. I'll give the conference back to Bill so he can offer any closing remarks.

William Beament

executive
#25

Yes. Thank you, moderator. And once again, I appreciate everyone being on the call. I also want to extend a really big thank-you to every member of my staff, all of our service providers, suppliers, and contractors across the business. What has been accomplished over the last 3 months really shouldn't be understated. We have just completed construction of one mine, and another 2 are currently being built. Not many people out there build 3 mines in 3 years. We are building a business that will last for decades, and I genuinely appreciate the effort people are putting in out in the field and here in the Perth office. With that, thanks for joining today's call.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Develop Global Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Develop Global Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Develop Global Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.