Dominion Energy, Inc. (D) Earnings Call Transcript & Summary

February 22, 2024

New York Stock Exchange US Utilities Multi-Utilities earnings 61 min

Earnings Call Speaker Segments

David McFarland

executive
#1

Hello, everyone, and thanks for being with us on this morning's call. The earnings materials, which include the prepared remarks we'll be making today, feature forward-looking statements and estimates that carry a range of risks and uncertainties. For a look at the factors that could lead to results differing from management's estimates and expectations, please see our SEC filings, among them our latest annual reports on Form 10-K and our quarterly reports on Form 10-Q. Later this morning, we'll go over certain measures of how our company has performed that aren't the same as those recognized by GAAP. The reconciliation of our non-GAAP measures to the most directly comparable GAAP financial measures, which we can calculate, appears in the earnings release kit. I'd ask you to check out our investor relations website, where you can look over webcast slides along with the earnings release kit. On hand for today's call are Bob Blue, our Chair, President and Chief Executive Officer, Steven Ridge, our Executive Vice President and Chief Financial Officer, and Diane Leopold, our Executive Vice President and Chief Operating Officer. Now I'll hand the call over to Bob.

Bob Blue

executive
#2

Thanks, David. Good morning to all of you. To start, as I always do, I'll turn to safety, which you can see on slide three. During 2023, the OSHA recordable incident rate for our employees came in at 0.45, which is a meaningful gain over what was already a solid track record. On top of that, we posted our lowest ever lost-time restricted-duty injury rate; those figures make us happy, yet we still want to do better. It's my firm view that when safety results are exemplary, we gain the ability to perform at our best across all three pillars of our mission, which appear on slide four. Reliability stayed excellent throughout 2023 — our electric customers in Virginia and South Carolina enjoyed power availability of 99.9% of the time, apart from major storms. The rates we charge residential customers remain far under both national and regional averages. Between 2005 and 2022, we cut Scope 1 carbon emissions tied to our electric operations by close to 50%, and yet annual energy generated during those years rose 9%. Looking ahead, you'll keep hearing about how we carry out our mission, since delivering an exceptional customer experience puts this company in position to produce the strongest outcomes for shareholders. This morning I'm delighted to pass along a number of significant updates concerning our business review as well as the Coastal Virginia Offshore Wind Project. First, let me restate what I said earlier about the review. My guiding priorities and commitments haven't changed, and neither has my confidence in the choice to launch the review or in how good the outcome will be. Foundational concerns that have weakened investor trust in this company across the past several years will be tackled by the review thoroughly and with precision. Rather than chase a string of partial fixes that would leave important elements and risks untouched, we intend to produce a complete outcome — one that yields a durable, high-quality strategic and financial profile, putting Dominion Energy in the best possible position to generate compelling long-term value for shareholders, customers, and employees; this morning, we unveiled a crucial piece of that outcome by executing an agreement that brings in a non-controlling equity partner for the Coastal Virginia Offshore Wind Project. This deal with Stonepeak, a worldwide leader in infrastructure investing, marks the last strategic move in the business review and produces a thrilling outcome for our customers and our shareholders. Before I take you through the details of the transaction, allow me to bring you up to date on how the project keeps developing successfully across every phase. The project remains on schedule and within budget, matching the timelines and estimates we gave before. We keep hitting major project milestones, as slide five shows. On the permitting front, BOEM gave final approval to our construction and operation plan last month, clearing the way for offshore construction to start in the second quarter, and the U.S. Army Corps of Engineers granted its permit, which has let us accelerate onshore construction. When it comes to materials and equipment, we're on track and progressing very well. A major reason we've succeeded is that right from the project's outset, we held firm on a requirement: our equipment had to come from established plants, with production capacity set aside specifically for our components. Our supplier EEW has delivered 24 monopiles to the Portsmouth Marine Terminal, and additional units are scheduled to arrive over the next few weeks. DEME will start putting these monopiles in place during the second quarter. As you may remember, we planned monopile installation to span two seasons, 2024 and 2025, which gives us a better ability to reduce the effect of possible delays or disruptions while keeping the final schedule intact. The first of three offshore substation topside structures has been finished and handed over to Bladt Semco for outfitting. We anticipate the initial delivery of transition pieces to Virginia in the second quarter. Manufacturing is done for all 161 mi of onshore underground cable, and roughly 200 mi of the 600 mi of offshore cable has been produced so far. Turbine manufacturing remains on schedule. It's important to note that although our schedule doesn't have turbine installation starting until 2025, DEME is right now assisting with an installation campaign for a project off Scotland's coast that employs the identical Siemens Gamesa wind turbine model CVOW will use. What's learned from that effort will help us when we install our own project later. Shifting to onshore work, construction has kicked off, covering civil work, horizontal directional drills, and the bores where export cables make landfall; on the regulatory side, back in November we submitted our 2023 rider filing, which represents $486 million in annual revenue. We're in the testimony phase at present and anticipate a final order by August. On slide six, the project's expected LCOE of $77 per megawatt-hour is unchanged. Once again we've included sensitivities illustrating how capital costs, capacity factor, and interest rates affect the average lifetime cost our customers pay. On this metric, we stay comfortably beneath the legislative prudency cap. Cumulatively, we've put about $3 billion into the project so far, and by the end of 2024 we expect to spend another $3 billion. Slightly over 92% of project costs are fixed at this point; that share will rise step by step as construction continues. At this point in completion, the $351 million of unused contingency remaining compares competitively, as a proportion of total budgeted costs, against other major infrastructure projects we've examined; it also stacks up well against the unfixed costs we're currently carrying. We've made it unmistakable to our team, our suppliers, and our partners that delivering this project on budget is what's expected. Related to that, this morning we put up a significant video update on our investor relations website. It includes representatives from the senior executive management teams of every one of our primary CVOW commercial partners, among them Siemens Gamesa Renewable Energy, EEW, Bladt Industries, Semco Maritime, DEME, and Prysmian, plus the CEO of Seatrium, which is building our Jones Act-compliant installation vessel. I really want our investors, along with government and regulatory partners, employees, and other stakeholders, to take a few minutes and view that brief video. In it, you will hear them speak for themselves — a unified voice expressing steadfast excitement about and dedication to getting the project into service on schedule and within budget. Having this kind of remarkable backing from our key suppliers is something we are lucky to have, and working side by side, we will bring this thrilling project to completion. Turning now to slide 8, there are a couple of closing items regarding Charybdis. At present the vessel stands at 82% finished, which is up from 77% when we last provided an update. Our anticipated delivery window remains unchanged at late 2024 or early 2025. Some notable points: staffing has grown past 1,200 workers and keeps being added to, versus roughly 1,000 back in October and 800 in August. We have achieved recent build milestones, among them putting in the last of the jackup legs. Commissioning of the jackup system is now in progress. Every major subcomponent has arrived on-site and is waiting to be installed; we anticipate the vessel being floated within the next few weeks. Project costs remain the same at $625 million, financing costs included. To wrap up, nothing has changed regarding when the vessel is expected to be available to back the present CVOW construction schedule, which includes being available to support any third-party charter agreements during 2025.

Bob Blue

executive
#3

Here's where we stand: we feel really good about the progress being made, and that's because our project partners are helping us push this key project over the finish line right when we said we would and without spending more than we planned. When we ran our offshore wind solicitation — a process that was both competitive and robust — a number of premier prospective partners, both strategic and financial, put in serious work across operations, regulatory matters, commercial questions, financing, and legal review to scrutinize the project from every angle. The outside input that came back to us was consistent across the board: the Coastal Virginia Offshore Wind Project sits in an ideal position to wrap up on schedule and on budget, and it has the support of suppliers and partners who are enthusiastic and committed. With that said, I'd like to walk everyone through the CVOW transaction, and I'll start on slide nine. We couldn't be happier about teaming up with Stonepeak, which ranks among the world's largest investors in energy infrastructure and oversees more than $61 billion in assets. Stonepeak has a track record of funding large, complex energy infrastructure projects, including offshore wind. The significant capital they're bringing to the table will benefit our project as well as our customers. As for the deal's structure, Stonepeak will invest into a newly established subsidiary of Dominion Energy Virginia. That entity will operate as a public utility in Virginia, and under the existing offshore wind rider in Virginia, it's able to recover costs it reasonably incurs to build and operate the project. Dominion Energy is going to keep complete operational authority over the building and running of CVOW, so we anticipate consolidating the partnership when it comes to accounting. Stonepeak is going to hold a non-controlling equity stake and will get standard minority interest privileges. When it comes to sharing costs, the deal includes strong cost sharing that notably enhances the company's credit standing and offers solid safeguards against any unexpected rises in project expenses. Required capital payments, which include an upfront reimbursement, are going to cover costs up to $11.3 billion on an equal 50/50 basis. That means splitting costs 50/50 up to 15%, or almost $1.5 billion more than what the project currently budgets, counting unused contingency, and up to 20%, or close to $2 billion more than the project's present pre-contingency budget. The deal also allows for further cost sharing, should there be any, between $11.3 billion and $13.7 billion. In that imagined scenario, Stonepeak would keep sharing in project expenses via a steadily widening range of dilution to Dominion's portion of project ownership. Slide 10 illustrates how Dominion and Stonepeak are going to divide project funding and ownership across different imagined cost situations. I say imagined because we absolutely anticipate completing this project on time and within budget. Moving to slide 11, when it closes, Stonepeak is going to give Dominion a cash payment to cover half of the capital used so far, minus $145 million. This reimbursement of almost $3 billion in project costs is going to go toward lowering debt at the parent level. After that, Stonepeak is going to provide their proportional share of capital requests while construction goes on, in line with the timeline in the appendix of today's materials. Once commercial operation begins, Stonepeak is going to pay Dominion Energy, and how much that payment is will be tied to the final construction cost, which you can see on the slide. Getting this deal across the finish line depends on sign-offs from the Virginia SCC and the North Carolina Utilities Commission, along with specific consents involving BOEM and additional regulatory bodies tied to transferring particular contracts and permits the partnership requires post-closing. We expect to secure every needed approval and consent by the close of 2024. Turning to slide 12, I believe this partnership genuinely advances the long-term interests of our customers as well as our shareholders. A number of important objectives get accomplished through this transaction. Number one, it brings in an attractive, well-capitalized, high-quality partner with a track record of investing in large and complex infrastructure projects, offshore wind included, and that will further de-risk a project that is already significantly de-risked and well-developed. Number two, it provides for robust cost sharing and delivers meaningful protection against any unforeseen increases in project costs. Number three, it enhances our quantitative and qualitative business risk profile through a highly credit-positive partnership. Our credit profile will improve because of this transaction, project concentration risk will be reduced, and our financing needs during construction will be lower. Additionally, our estimated 2024 consolidated FFO to debt is expected to improve by approximately 1% as a result of this transaction. One thing we made sure to do before putting pen to paper was go over this deal with the folks who assign our credit ratings. Given what they told us, our expectation is that they'll treat it as clearly positive on the credit side. That matters a great deal for the people we serve. When a utility is in solid financial shape and carries a robust balance sheet, it's in the best possible spot to bring in the funding required to provide a top-tier customer experience and to help the state reach its economic and environmental objectives. To put it differently, teaming up this way will lower the business and financial risk profile of our company, and that works in our customers' favor. I'd like to share several last updates regarding the business review, and with that I'll close out my prepared comments. Moving on to slide 13, we're making steady, deliberate progress toward securing the needed regulatory sign-offs and completing the divestiture of our gas utilities on schedule. Nothing about our initial projections for these deals has shifted. We anticipate ongoing collaboration with the relevant parties, and we foresee the regulatory processes wrapping up along with the transaction closures happening in staggered fashion throughout 2024. The anticipated after-tax proceeds come to approximately $9 billion, and our plan is to direct all of that toward paying down debt at the parent level, which, given where rates stand today, should translate into roughly $500 million less in pre-tax interest costs each year. Now, on to Virginia regulation. During our business review, we backed sensible changes to regulations that would let Dominion Energy, Virginia serve its customers, help meet the state's objectives, and vie for investor funding to support investments that benefit our customers. In November of last year, Dominion Energy, Virginia, the State Corporation Commission staff, the Office of the Attorney General, and other important parties came to a broad settlement in the ongoing biennial review. Nobody involved in the case objected to that settlement. Just last month, those same important parties restated their backing for the initial broad agreement. We expect a final order to arrive during the early part of March. On a connected note, during the previous month, the General Assembly chose Sam Towell and Kelsey Bagot by unanimous vote to sit as members of the State Corporation Commission, thereby occupying the two seats that remained unfilled; those two bring deep experience from government as well as the private sector, and we anticipate collaborating closely with these highly capable incoming members. Now, if you turn to slide 14, nothing has shifted regarding the business review commitments and priorities we set out originally. To begin, so there is no ambiguity, our present dividend has our full 100% backing, and that will not change. Growth in earnings, paired with a stretch of little to no dividend growth, will bring our payout ratio back to a range suited to peers eventually. To continue, during the prior year, the board altered the structure of my compensation for 2023, acting squarely on what investors told us, so that my economic incentives would line up more tightly with the financial stakes of our shareholders. Consequently, my 2023 long-term incentive compensation was entirely, 100%, tied to performance. During the past month, the board gave approval to my 2024 long-term compensation plan, and yet, as was true a year ago, it rests 100% on performance. A share of 65% depends entirely on relative total shareholder return across three years, and reaching a payout of 100% demands relative performance at the 65th percentile. Measured against what the industry typically does, that sets a demanding threshold, yet I regard it as fittingly matching my financial stakes to those of our shareholders.

Bob Blue

executive
#4

More information about how my pay is increasingly tied to what shareholders care about will be included in the proxy statement coming out in March. Obviously, investors have gone through a tough stretch, and I need them to know I don't take that lightly. Next, cost control has remained a priority, and we've kept finding additional savings, especially when it comes to corporate overhead. Our company is, has been, and will stay among the nation's most efficient and dependable electric utilities. Last, our attention has been on assessing what investors have told us regarding perceived earnings quality and the risks in our plan. Steven will give an update during his prepared remarks on how we're handling unregulated investment tax credits as well as the assumptions behind our retirement benefit plans. If you look at slide 15, the announcement today regarding an offshore wind partner represents the last strategic piece of the business review. We're finalizing the financial plan right now, which is what lets us wrap up the review; an investor meeting is set for March 1st, and at that point we'll give a thorough strategic and financial update on the company and take part in a Q&A session. We'd like our investors and other stakeholders to join virtually whenever their schedules permit. Once that event is done, we intend to launch a broad investor engagement push to sit down with both current and potential investors. As we get ready to finish the review, my optimism about our company's future is greater than it has ever been; we know we have to deliver consistently on the financial targets we lay out when the review wraps up. As always, I bear responsibility for our pledge to consistently produce high-quality earnings growth that hits that plan, and my whole leadership team has taken that commitment on as well. With that, I'll hand the call to Steven.

Steven Ridge

executive
#5

Appreciate that, Bob. Morning, everybody. Our Q4 2023 operating earnings worked out to $0.29 per share. Across all of 2023, operating earnings reached $1.99 per share. Full-year GAAP net income totaled $2.29 per share. Schedule 2 in the earnings release kit walks through each adjustment that bridges operating results to reported ones. On slide 16, there's a reconciliation we put together comparing actual operating earnings with the guidance shared during our last earnings call. Three primary drivers account for the gap versus that guidance. First off, during Q4, weather across the territories our utility serves came in $0.02 worse than usual. Next, we took on $0.03 of hurt tied to specific outages at Millstone. And finally, following our business review — and after earnings guidance had already been issued in November — we chose to alter our accounting methodology for recognizing investment tax credits in earnings. That change created a negative variance to guidance of $0.02 for the quarter and $0.07 for the year. I'll go into more detail on this accounting methodology change shortly. Schedule 4 of the earnings release kit contains a summary of all drivers for earnings versus the prior year period. During our previous quarterly update, we described 2023 as a year of transition for the business, since the outcomes of steps initiated through the business review to advance our long-range goals were still pending. With that context, I'd like to go over our usual notes regarding the 2023 figures. Operating earnings per share for 2023 totaled $1.99. Consistent with what we did three months ago, we believe it's important to highlight several of those same adjustments that investors could consider when trying to get a clearer picture of how 2023 actually performed. First off, weather across 2023 was unusually mild by historical standards, and that created a $0.18 drag on full-year earnings, $0.02 of which occurred during the fourth quarter. Remember that the second quarter was the mildest one compared to the 15-year average over the past half-century. Looking ahead, we don't expect weather to stray from historical norms in that manner. Next, we continue to anticipate about $0.50 in yearly interest savings from paying down debt at the parent level, thanks to the divestitures of Cove Point and the gas utilities. Keep in mind, because of how discontinued operations appear in our 2023 results, all of the earnings from these assets are excluded, yet the advantage from using the sale proceeds isn't reflected. Third, our 2023 results contain roughly $0.11 of unexpected and unlikely-to-recur damage from prolonged planned or unplanned outages at Millstone, which includes $0.03 in the fourth quarter. We have continued to carry out the actions we laid out during earlier earnings calls so the plant's performance lines up with its solid track record of operations. Also keep in mind that 2023 counted as a typical year for a double-fueling outage, and that created an extra hit of roughly $0.10 during 2023, which will not recur over the coming two years because double-planned outages happen only once in a three-year cycle. Number four: we expect roughly $0.15 of benefit from including market-based revenues tied to certain customers in the annual fuel factor, along with lower interest costs resulting from securitizing $1.3 billion in deferred fuel balances, which we had funded in 2023 using short-term debt. That fuel securitization deal closed last week. Customer demand turned out to be incredibly robust, which allowed us to achieve a great result for the people we serve. Now, shifting in the opposite direction, we expect an additional negative impact of about $0.18 stemming from the $350 million annual revenue decrease related to Virginia Rider at DEV, given that this rate cut did not influence our first-half 2023 figures. Taken together, those revisions would yield an illustrative 2023 operating earnings per share of around $2.85. During the prior quarter, we mentioned that a portion of the shift we underwent in 2023 would extend into 2024, and that is the reason we continue to view 2025 as the pivotal year for the company's financial performance following the review. At the investor meeting, we'll provide a full strategic and financial outlook that runs through 2029. That will include guidance on operating earnings per share, EPS growth, credit, dividend, CapEx, and financing, plus other pertinent financial details. In our view, this presentation will give investors reference material and insights that help them gain a better grasp of Dominion Energy's refreshed profile, as well as the main value drivers across each of our business segments. Just a reminder: what I said on the earlier call about the factors driving 2025 earnings still holds, and you can find that repeated on slide 17. Now I'll turn to the point Bob raised in his prepared remarks regarding how we've assessed investor feedback on perceived earnings quality and plan risks. To give you some context, over the past few months we've been talking directly and at length with our shareholders, and they've given us useful input. A lot of that input confirmed the commitments and priorities from our business review. One thing we kept hearing was unhappiness about how good our earnings have been in the past and about the risk levels in our plan assumptions. We've treated that input as important. We've made clear promises that we won't go after unregulated solar investments just to create upfront operating earnings from tax credits, or to show gains from particular asset sales and operating earnings; those promises haven't changed. Now we're doing two more things. The first: in December, we officially chose to alter our accounting method for how we record investment tax credits in earnings. I'd like to explain where this accounting change comes from and why we're making it. In the past, Dominion Energy applied a method known as flow-through accounting. Under that approach, when a project went into service, all of the income tied to non-regulated investment tax credits was booked right away — the full 100%. Because we used flow-through previously, we saw a lot of volatility in operating earnings, and that volatility came from credits produced by unregulated solar investments. Then the Inflation Reduction Act came along, and as a result, the dairy and swine renewable natural gas projects we had already committed to are now able to receive investment tax credits. Had we chosen not to change how we account for these items, the credits from that RNG would have caused the same kind of fluctuations in operating earnings that the unregulated solar credits caused before. So we moved from the flow-through approach to the deferral approach. With deferral, income from investment tax credits gets recorded across the asset’s anticipated lifespan — for renewable natural gas projects, that’s 30 years. Making this switch to deferral lowers volatility in earnings tied to ITCs. On top of that, GAAP regards deferral as the favored approach, and it’s what most peer utility companies use. This accounting change also brings how we handle non-regulated ITCs in line with how we handle regulated ITCs, adding further consistency. So what does moving to this more preferable accounting method mean for results in the past, the present, and going forward? In the earnings materials we put out today, you'll see that Dominion Energy is going to restate its financials so that the deferral approach is used for ITC income that we had previously reported under flow-through. You'll find a breakdown of the impacted line items in the Form 10-K we plan to submit tomorrow. I've already discussed what this meant for 2023 results. When we gave guidance in November, we were working off the flow-through method. Once we moved to deferral, and once RNG project completion dates shifted, actual results came in different from what we had guided.

Steven Ridge

executive
#6

Several projects that we had initially thought would wrap up during 2023 are now slated to reach substantial completion in 2024. Income from investment tax credits tied to those projects will instead be recognized gradually across their estimated 30-year useful lives. Looking ahead through 2029, we anticipate that ITC income, which includes credits generated by renewable natural gas, will make up, on average, roughly $0.03-$0.04 of annual operating earnings per share; to be clear, nothing about the underlying economics of RNG investments has changed, since the underlying cash flows have not changed. Although this shift in accounting methodology affects when an investment tax credit shows up in book income, the cash value of those tax credits remains identical under either approach. Now let me offer a few remarks about our retirement benefit plans, which appear on slide 19. We are assessing a rebalancing of plan assets, moving from return-seeking toward lower-risk classes. This should lower future funding risk as well as overall variability in plan assets. That assessment will happen during 2024, and the final reallocation of assets will occur in early 2025. Let me tackle what I suspect may be some questions about this decision. First, some background. Compared with a lot of other businesses, Dominion Energy kept providing conventional defined benefit pensions to newly hired workers for a longer period. As a result, a few thousand of its staff members are still building up final average pay retirement benefits through those legacy pension arrangements. That situation creates a liability duration that is fairly extended — we figure it lands around the 75th percentile when measured against a broad group of corporate plan sponsors. The expected return on assets assumption, or EROA, that Dominion Energy uses today is based on an asset mix shaped by how far out our liabilities stretch. So, why act at this point? With our retirement plans funded at a strong level — 117% in aggregate as of year-end — we think the time has come to look at ways of de-risking the assets in those plans. That would mean shifting the mix toward asset classes carrying less risk, which should bring down volatility and raise the portfolio's implied hedge ratio. So what does this mean for our financial plan? Many variables feed into how EROA gets determined, among them interest rates and equity returns, so we aren't in a position right now to say with precision what assumptions we'll adopt down the road. That said, just to illustrate, we estimate that a rebalancing might lower our EROA by 100 basis points, which would bring our assumption to approximately the same level as our peers. If EROA were lowered by that amount, it would cut into operating earnings annually by somewhere between $0.08 and $0.10 for each share. In addition, assuming a scenario where EROA drops by 100 basis points, we anticipate that operating earnings per share tied to retirement plans would average roughly $0.20 per share over the period from 2025 through 2029. Now, turning to slide 20, let me wrap up what we've covered. This past year, our safety results ranked as the second finest in the history of the company; we keep making the investments required so that we can deliver dependable, reasonably priced, and progressively cleaner power that serves our customers daily. Our offshore wind project is still moving forward on the timeline and budget we established. To meet the goals laid out in the business review, we've made meaningful progress, and one example is bringing in a partner for non-controlling equity financing related to CVOW. We're proceeding quickly while also being careful as we work toward finishing that review. We understand how much it matters to produce a strong outcome and then carry out everything flawlessly from that point on. We're eager to wrap up the review and share our strategic and financial update during the investor meeting on March 1st; with that said, we're now open to your questions.

Shar Pourreza

executive
#7

Can you hear me, Bob?

Bob Blue

executive
#8

Yes.

Shar Pourreza

executive
#9

Great. Great. Clearly, congratulations on the divestiture and on bringing the review to where it stands now. Regarding the process as such, could you perhaps go into somewhat greater detail about the bidding interest and explain what led you to choose this sharing structure in the agreement? And just to verify, this really is a genuine 50/50 pro rata split across the $11.3 billion, correct? So that 1% variance shown on slide 10 — it's simply linked to possible changes in the withholding amount. Is that right?

Bob Blue

executive
#10

You've got that precisely right, Shar. So through $11.3 billion it's 50/50, and then the adjustment we laid out comes into play; regarding the process, we drew a considerable amount of interest from counterparties on both the financial and strategic sides. On the prior call we touched on this a bit, noting that we had reached late stages with a number of appealing parties. And they conducted extensive diligence on this project. They brought in their own offshore wind experts, along with teams focused on regulation, finance, and similar areas, obviously. And what I found genuinely encouraging was hearing, unanimously, from the parties who took part, just how well this project is progressing; so not a single party that entered diligence had any concern about the project whatsoever. And that was truly helpful. So then, when we considered how we would go about selecting a partner, if you look back at certain points we raised before on the prior call, we highlighted how important pro rata cost sharing is. That's what we've secured here, and we feel very good about it. We stated that we required a transaction making sense for our customers as well as our shareholders, and one consistent with the objectives we laid out through the business review. We believe this deal with Stonepeak satisfies that exceptionally well. Cost sharing that includes protection against any hypothetical or unforeseen project cost increases, while having a well-capitalized partner to assist us on that front, was essential. Strengthening our credit profile means this will be extraordinarily beneficial for our customers and for our capital providers. This is a very good deal. We're very pleased with it. We're pleased with how the process unfolded.

Shar Pourreza

executive
#11

Understood. And then, apologies, Bob — is there a possibility for you to farm down a stake once more in any future offshore wind ventures, for instance, CVOW2?

Bob Blue

executive
#12

The law that allowed this kind of partnership setup, in my view, was written with this project in mind. So at the moment our attention is squarely on schedule, on cost, and on offshore wind, and we have an excellent partner alongside us to get that done.

Shar Pourreza

executive
#13

Understood. Then, as a final point, without looking too far past next week, it's clear you've aimed throughout this entire process to keep outside equity to a minimum. So how does what's being announced today shape the way you see this, particularly when we consider an ATM against a block? Also, are there any other efficient sources left that we ought to know about, especially regarding the vessel, given that RNG might no longer be an option? Thank you.

Steven Ridge

executive
#14

Appreciate that, Shar. Steve, I'll pick this one up. So, as we've stated, offshore wind represents the last piece of our strategic puzzle, and one week from now, we're eager to present our full strategic and financial plan. Regarding any financing specifics, we won't be offering comments at this point. Let me restate what we've been saying from the moment this review started: our aim is to hit and surpass the thresholds tied to our downgrade, while also working to keep outside equity requirements as small as possible. In our view, the deals announced so far have strongly reinforced what we're trying to achieve. That said, a complete plan will come next week, and my sense is we'll refrain from doling out bits and pieces before then.

Shar Pourreza

executive
#15

Fantastic, guys. Congrats, and we'll chat next week. Thanks.

Steven Ridge

executive
#16

Thanks, Shar.

Nick Campanella

analyst
#17

Hi there, good morning to everyone. I appreciate you taking my questions, and I'm grateful for the announcement made today. So yes, congratulations. Well, I suppose you had this perspective shown in the slide regarding 2025 considerations during the call for the third quarter, and the factors are mostly unchanged. However, you've also brought in this disclosure about pension and ITC; so I suppose as you consider the $0.08-$0.10 of detriment coming from pension and then the $0.03-$0.04 from ITC, is that additional to that outlook for 2025?

Steven Ridge

executive
#18

Okay, Nick — Steve here. Let me make one thing clear: guidance for 2025 has never been provided by us, and avoiding that has been a deliberate effort on our part. During the previous call, we brought up that list to drive home the point that anyone outside the company trying to form a perspective on 2025 needs to think carefully about a range of factors, and about many of those we've shared nothing at all. That list was walked through simply to point out what a few of those factors might be; what people have baked into their own models or estimates regarding ITC or EROA is not something we can see, so putting ourselves in a spot where we tell them how today's updated information on those subjects should factor into their thinking is really hard. And providing anything along those lines is something we're going to refrain from. What I can tell you is that we're looking forward, once again, to sharing what we believe will be a highly compelling result next week. Helping people grasp, once again, which of those drivers deserve their consideration is something we've aimed to do thoroughly.

Nick Campanella

analyst
#19

All right, thanks a lot for that. It's really good, I have to say, to get that input from the agencies. Things appear to have gone well, and you're pointing out that this deal lifts FFO to Debt by 100 basis points. So speaking purely in terms of the numbers, compared with the level the agencies are looking for you to reach once this review wraps up, where does that leave you on an overall basis?

Steven Ridge

executive
#20

Right, Nick, once more, we won't be revealing what our pro forma credit metrics will look like; that's coming next week. For sure, in both qualitative and quantitative terms, the agencies have spoken openly in public about backing the moves we've made during this review; so again, we're not attempting to be evasive, but rather to stay consistent with the way we've handled this review over the past 15 months; we won't share our pro forma credit view in that sense. That will come next week.

Nick Campanella

analyst
#21

Understood. Understood. Looking forward to next week, and congrats again. Thank you.

Steven Ridge

executive
#22

Thanks, Nick.

Jeremy Tonet

analyst
#23

Hi, good morning.

Bob Blue

executive
#24

Morning, Jeremy.

Jeremy Tonet

analyst
#25

Hi. I wanted to pick up somewhat on that final part of the questioning and I get that certain matters can't be addressed today and will be addressed next week. But a few of the agency communications we saw indicated that current FFO to debt under this kind of arrangement would appear very strong, yet across the construction cycle, it would weaken and create pressure there. I was just curious whether there's anything you can share regarding your thinking on how that compares, whether the agencies have had a preview of this transaction, or any other general thoughts, I suppose, over that time frame, around the pressures that the cash drag from this project creates?

Steven Ridge

executive
#26

Yeah. Thanks, Jeremy. What I'd say regarding that subject is that, on the whole, we concur with essentially the way the agencies characterized it, which was some pre-funding of some very heavy capital plans that exist within our plan, which we've discussed on prior calls; we haven't provided specific numbers. Tomorrow, when the K comes out, you'll see our capital investment. This year it's $10 billion, which compares against an average of $6 billion for our company. And so there was essentially some pre-funding via massive sales, and I believe that's what they were signaling. Broadly, concerning our relationship with the agencies, we don't speak for them. I will say that we've been very deliberate throughout the process in making sure they understood in some detail, some confidential detail, how we were thinking about the review and in gathering their perspectives as it related to how they think about our company. That has extended, some I can share. It's extended to some formal engagements with rating agencies that have allowed us to make sure we have a good sense of where they are relative to how we're thinking about our plan and our business risk profile. Regarding this transaction specifically, as I mentioned and as we typically will do, we walked them through in some fairly detailed manner the terms of the offshore wind partnership transaction before we signed and made sure that we were comfortable indicating in our script today that we think they'll view it as unambiguously credit positive.

Jeremy Tonet

analyst
#27

Understood, that's quite useful, thanks. I wanted to shift direction somewhat. I may have overlooked this, but regarding the wording on the dividend and its outlook — is there fresh guidance we ought to note, or do we simply hold off until next week?

Bob Blue

executive
#28

No fresh guidance exists. Things remain exactly as they've stood from the beginning: our commitment to the present dividend is total, at 100%.

Steven Ridge

executive
#29

And Jeremy, I'm going to take a risk here and say that next week you also won't be hearing anything different regarding the dividend. We've been hammering that point throughout this entire stretch. So I don't want anyone to come away thinking we're stating this now and will shift our position in a week. We clearly know about what's happening in the sector when it comes to payout ratios; that's something we're tuned into, but nothing is changing. And you shouldn't anticipate anything different next week from what we've already said in public about our dividend and where we expect it to head over time.

Jeremy Tonet

analyst
#30

Understood. That's quite useful. I'll stop here. Thank you.

Steven Ridge

executive
#31

Thank you, Jeremy.

Steven Ridge

executive
#32

Operator, we seem to be having a technical problem. I'm aware that a few other people were waiting ahead of that. Naturally, we're sorry.

Steven Ridge

executive
#33

Okay, sounds good. Thank you.

Jeremy Tonet

analyst
#34

Morning to you. I thought I'd try once more in case there was an opening. I realize everything announced today just came out, so it's all quite recent, but perhaps you could share additional detail about how stakeholders are reacting so far, or what regulators have said, and what your expectations are for how this deal will proceed.

Bob Blue

executive
#35

Sure, Jeremy. Following the release of the announcement, we spoke with the regulatory staff earlier today. That said, let me address more broadly what we anticipate in terms of the reception, beginning with the process itself. We have to secure approvals from Virginia's State Corporation Commission and the North Carolina Utilities Commission. Some administrative approvals from BOEM are also required, though the main ones sit with the states. As I said before, and I think you're aware, a bill that passed unanimously in Virginia last year made possible the partnership structure we've assembled. That means the SCC has to sign off under the Utility Affiliates and Transfers Act. The test there: service must stay adequate at rates that are reasonable, and the arrangements need to serve the public interest in other respects. On top of that, we need Affiliates Act approval in North Carolina. Virginia's Affiliates Act approval comes with a 90-day statutory clock. As for the remaining regulatory green lights, no specific timelines are attached, though assuming we secure approval before the year is out strikes us as reasonable. That's how the process works. Still, if you pull back and look at the bigger picture, policymakers in both Virginia and North Carolina get how much a strong balance sheet matters. Take Virginia's general obligation bonds: Moody's has rated them AAA going back to 1938, S&P since 1962, and Fitch since 1991. And when you bring up that AAA bond rating with Virginia policymakers, I can tell you the word they typically reach for is coveted. They understand that when a state's finances are solid, it can deliver the highest quality of service to the people it serves. Our situation is no different. A sound financial position on our end means we can give customers the very best experience. It also means we'll have the resources to put money into initiatives that align with what the state is trying to achieve. Those are powerful arguments for the regulators weighing this deal, and I have every confidence they will recognize the upside and give it the green light.

Jeremy Tonet

analyst
#36

Understood. That is quite useful. Thank you. Perhaps you could expand a bit further, I suppose, regarding the transmission opportunity emerging in PJM, given that PJM just raised its 10-year local load growth CAGR, along with Dominion's capacity to take advantage of those requirements.

Bob Blue

executive
#37

Diane, I'll address that briefly. And Jeremy, your skill at working through the technical matters here really impresses us.

Diane Leopold

executive
#38

Absolutely, and good morning to you, Jeremy. You're completely correct about that. The most recent PJM projection came in a bit above what we saw a year ago, putting us at roughly 5.5% annually within the DOM zone. A portion of that involves the neighboring co-ops located inside our zone, and we keep seeing plenty of chances to put money into transmission. During the most recent PJM open window, we were granted roughly $2.5 billion in extra projects. A large share of that backs expansion tied to data centers, and we anticipate more projects down the road to match that rising demand.

Jeremy Tonet

analyst
#39

Understood. That helps. I'll stop here. Thanks a lot.

Bob Blue

executive
#40

Appreciate it, Jeremy.

Steve Fleishman

analyst
#41

Hello there. Steve Fleishman speaking. Am I the one talking now?

Bob Blue

executive
#42

Hi, Steve. You're coming through loud and clear.

Steve Fleishman

analyst
#43

Steve Fleishman here. Alright.

Bob Blue

executive
#44

I appreciate your patience.

Steve Fleishman

analyst
#45

Yeah. Happy to. That was fascinating. I suppose I take it you're not really in a position to say anything about how FFO to Debt shakes out across the board, but is it fair to figure, going by those downgrade thresholds we've witnessed previously, that the rating agencies will probably keep them unchanged coming out of this review?

Bob Blue

executive
#46

Yes.

Steve Fleishman

analyst
#47

All right, that's useful. And just one more thing off to the side — from what I can see, this year's legislative session was pretty quiet. I simply want to confirm that nothing happened during that session that we ought to know about.

Bob Blue

executive
#48

Steve, you've described it correctly. The big matters the General Assembly was taking up had little connection to energy. They did, of course, elect the SCC judges. Energy-related legislative proposals did come up, but at this stage none of them remain active in the General Assembly.

Steve Fleishman

analyst
#49

Alright, I'll stop with that. Thanks.

Ross Fowler

analyst
#50

Good morning.

Bob Blue

executive
#51

Good morning, Ross.

Ross Fowler

analyst
#52

No technical problems, thankfully. Yeah, good morning. I have a few things to ask. Commercial load growth rose by nearly 9% during 2023. I believe you folks mentioned data centers somewhat, but as I recall, there were significant limitations on adding data centers in Northern Virginia due to transmission. How are you viewing that expansion as we head into 2024? Does some constraint hold it back in 2024, or ought I to anticipate a similar magnitude over the next year?

Bob Blue

executive
#53

Well, when you mention northern Virginia, that referred to a single portion of Loudoun County, Virginia, where data centers are heavily concentrated. And yes, we encountered certain transmission limitations. We've taken on a number of near-term efforts that are either finished or nearly finished. Beyond that, we ultimately have 2 projects for 500 kV transmission lines, with 1 already in progress. The remaining one sits within the regulatory review. Honestly, the first of those 2 500 lines is going to ease the limitation in Loudoun. And we've managed to begin connects on data centers. There was a short stretch when we halted things to verify precisely what we were doing, yet we've resumed. Still, I believe the bigger issue is that we will definitely manage to serve the data center expansion we anticipate arriving. That's going to demand transmission investment. Diane just referenced that from the latest PJM open window; we've seen considerable data center expansion across our company and our service territory for a number of years. Our ties with the data centers are quite strong, and we anticipate that expansion will persist, and we anticipate being able to serve it.

Ross Fowler

analyst
#54

That's excellent, Bob. Thanks for the update; and then one additional item, if I could. I understand you're unable to address many topics today before the analyst day next week; but ideally, here's one you can talk about. Fixed costs, I believe, are now slightly above 92% on this, and unfixed costs sit at roughly $700 million, just under $750 million. What's your thinking on your capabilities and timeline to lock in more of those unfixed costs on this project?

Bob Blue

executive
#55

Yeah. It'll arrive gradually as we get nearer to the project's end. The way things worked previously, we'd secure a contract, and you might receive a fairly large portion at once. Going forward, it's some onshore transmission. It's fuel for vessels that will handle the offshore construction. And that's simply going to decline over time.

Diane Leopold

executive
#56

The remaining item would be assorted expenses tied to managing projects, essentially the internal work our team puts in over time; those make up the biggest pieces.

Ross Fowler

analyst
#57

All right. That's great. Thanks. I'll stop here.

Durgesh Chopra

analyst
#58

Yes. Good morning. I managed to join. There are two brief questions. Apologies. I simply want total clarity. Given the offshore divestiture that has been announced, is this the final asset sale we ought to anticipate, or are there further portfolio optimizations we should anticipate before the Investor Day takes place next week?

Bob Blue

executive
#59

Right. That wraps things up. On our prior call, we indicated that bringing in an equity partner for offshore wind represented the final strategic move, and now we've completed it.

Durgesh Chopra

analyst
#60

Understood. Then a quick clarification, perhaps directed at Steve. Regarding the change in ITC accounting as well as the change in pension accounting, Steve, could you please remind us what is included in that 2023 representative figure you have there, the EPS figure there? What has already been factored into that number?

Steven Ridge

executive
#61

Right. So for 2023, if you look at footnote 22 in tomorrow's 10-K, you can work the numbers out yourself. All of it is disclosed by us. What you'll find is that during 2023, roughly $0.40 of earnings came from income tied to pensions. So moving ahead, we've already said a bit regarding EROA. There's one more factor I want to touch on quickly that takes us from that $0.40 toward the $0.20 average. Like most companies that sponsor pension plans, we compute a key figure — our expected return, and interest cost plus service cost feeds into the net income or expense for the pension; in practice, we smooth actual asset returns across a 4-year window and then apply our expected return on asset against that smoothed asset value. That isn't merely allowed — it's the norm. I believe some smooth across 5 years. Ours is a 4-year smoothing. Once more, that's fairly typical. Given how 2022 performed, at least within our portfolio, when we took a really big hit to value across — frankly — both the equity side and the fixed income side of what we hold, which, again, I doubt is out of the ordinary for others, what you're going to observe across 2023, 2024, 2025, and 2026 is that smoothing play out so that by 2026, that loss is completely recognized. Now, it isn't as straightforward as claiming 2022 was down, so I'll absorb a piece of it annually. We do this every year; so in effect you've got a stacked Excel spreadsheet in which annually you're layering in a bit more from the prior year, while certain years fall off that schedule. So what you get is a net view of your asset value under this smoothing structure. I hope I haven't just lost you; but because of 2022's damage working its way through, that becomes one driver. If your question is whether, sitting at $0.40 today and hearing it should be nearer to $0.20, with a sensitivity provided around 100 basis points, how do you reach the next figure? That accounts for a large share of what remains. On ITC, during 2023, because of the changeover to the deferral method, I believe we land at roughly $0.03 in our 2023 results. And once more, that stems from recasting historical results. We go back and ask, "Hey, had we not treated this as flow-through, had we treated it as deferral, a portion of that value sits across that 30-year period." So as I said, $0.03-$0.04 of expected operating EPS from the ITC credit going forward. That's roughly where we'd land in 2023 too.

Durgesh Chopra

analyst
#62

Okay, and Steve, let me make sure I've got this right — sorry, this is getting pretty deep in the details. So when I look at forward EPS, on a net basis, compared with 2023, which was $2.85, we ought to come in $0.20 below that net-net, correct? ITC roughly flat, and then pension accounting for a $0.20 decline.

Steven Ridge

executive
#63

Right. That figure isn’t exactly that exact. What we’re providing is $0.20 as the mean across 2025 through 2029, and within that there’s a bit of variability. But broadly speaking, compared with 2023, $0.40 would mean shifting something nearer to $0.20 during the 2025 through 2029 span.

Durgesh Chopra

analyst
#64

Thank you, Steve.

Operator

operator
#65

Thanks. That brings today’s morning call to a close. You can now hang up, and I hope the rest of your day goes well. Thanks again.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Dominion Energy, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Dominion Energy, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Dominion Energy, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.