operatorHello, and thanks for being with us today. Welcome to the webcast for Endeavour Mining's first quarter 2026 results. Right now, everyone is in a listen-only mode. Once management finishes its presentation, we'll open things up for a question-and-answer session. If you'd like to ask something, please join us on the phone line. Just be aware that because of time limits, questions from covering analysts will get priority. This conference call is being recorded today, and a transcript will be posted on Endeavour's website tomorrow. I'll now turn the call over to Endeavour's Vice President of Investor Relations, Jack Garman. Over to you, sir.
Jack Garman
executiveGood day, everyone, and thank you for joining the webcast on Endeavour's Q1 2026 results. Ahead of beginning, kindly take note of the standard disclaimer we always provide. Joining me on today's call are Ian Cockerill, Chief Executive Officer; Guy Young, Chief Financial Officer; Djaria Traoré, Executive Vice President of Operations and ESG; and Sonia Scarselli, Executive Vice President of Growth and Exploration. The format for today follows what we normally do. First, Ian will cover the quarter's highlights, then Guy will take us through the financials, and after that Djaria will guide you through operating results mine by mine, before Ian returns for closing remarks. Following that, we'll open the line for your questions. I'll hand things over now to Ian.
Ian Cockerill
executiveThanks, Jack, and welcome to everyone who's joining the call today. So, Q1 2026 was a record quarter for Endeavour, with strong operational performance and an elevated gold price underpinning our very strong financial results. Production of 282,000 ounces was in line with our plan, and we expect to see progressive improvements as we move through the year as stripping activity opens up progressively higher-grade ore through to Q4 later on this year. While all-in sustaining costs on a royalty-adjusted basis also came in towards the lower end of our guidance in the quarter. This performance translated into record free cash flow of $613 million, and that's equivalent to $2,176 per ounce produced. That's a 29% increase over the prior quarter. Through the year, we'll continue to focus on our margins and maximizing free cash flow from every ounce that we produce. This free cash generation transformed our balance sheet. We moved from net debt of $158 million in the previous quarter to now a net cash position of $405 million at the end of this quarter, a $563 million swing in just three months. Given the strong balance sheet position and our outlook, we're going to look to increase our shareholder returns through supplemental dividends within our H1 2026 dividend announcement and through continued opportunistic share buybacks.
Ian Cockerill
executiveWith gold trading where it is now, we'd anticipate supplemental returns of no less than twice the $1 billion minimum commitment we've made, spread across the coming three years. Turning to organic growth, as we said last week, the Assafou DFS validates a high-quality, long-life asset with project economics that are very strong. Early works have started, and we're aiming for a final investment decision prior to the close of this year. On the exploration side, we're speeding up resource definition at our Windelou Deeps target, and a maiden resource is expected in the first half of this year. At the same time, our new ventures exploration program keeps widening our exploration footprint into the most prospective tier-1 gold provinces, most recently through the strategic investment into Guyana. I'll now walk you through each of these areas in somewhat more detail. On slide 7, you'll see production came in at 282,000 ounces, lower than Q4 because of planned reduced grades mined and processed, though consistent with the mine sequence. All-in sustaining costs rose in the quarter, mainly reflecting royalty costs pushed up by the higher gold price, along with some smaller effects from stripping activity and elevated power costs at Mana. Even with those higher costs, our all-in sustaining margin of $2,976 an ounce came in $751 per ounce above Q4, as margins keep consistently expanding in step with higher gold prices.
Ian Cockerill
executiveLooking at slide 8 for the full-year guidance, you'll see that group production and all-in sustaining costs are still on course to hit guidance. Q1 production came in at 282,000 ounces, which is roughly 26% of the bottom end of our guidance range, and we anticipate stronger output during the second half, with the peak arriving in Q4, in line with our planned mining sequence. Turning to costs, although first quarter all-in sustaining costs of $1,834 an ounce are a touch above the guidance range, that mirrors elevated royalty costs stemming directly from the higher gold price. Adjusted back to our budgeted gold price level, underlying all-in sustaining costs of $1,642 an ounce landed in the lower half of the guidance range, and that's based, say, on our $3,000 gold price. On the capital side, we anticipate both sustaining and non-sustaining capital being weighted toward the first three quarters of the year, in step with our stripping program. Meanwhile, growth capital of $50 million to $100 million is now anticipated to back early works at Assafou, largely during the second half of the year. All told, we have confidence in our full-year outlook and expect improvements as the year progresses. Free cash flow hit a record $613 million in Q1, a 29% increase over Q4, and equal to $2,176 per ounce of gold produced.
Ian Cockerill
executiveOur attention stays on getting the most free cash flow possible out of each ounce we produce. With operations getting better as the year goes on, we expect to counter at least part of the hit from higher taxes during Q2 and Q3. Thanks to that robust free cash flow, we were able to bring down balance sheet leverage quickly in Q1 — cutting net debt by $563 million and reaching a net cash position of $405 million by quarter-end. That gives us the financial room to deliver Assafou, our world-class organic growth project, while also paying out sector-leading returns to shareholders. Our leverage target across the cycle sits below 0.5 times net debt to adjusted EBITDA. That is still the plan, though we don't intend to sit on a very large net cash position either. We will stay with our capital allocation model and aim to raise shareholder returns while putting Assafou's development first, along with our exploration program. Turning to slide 11, our shareholder returns program is pretty straightforward. From 2026 through 2028, we are committed to returning no less than $1 billion to shareholders, and we will hold to that commitment even if gold falls to $3,000 an ounce. At current gold prices, we could give back more than twice that minimum commitment to shareholders.
Ian Cockerill
executiveWith gold prices staying strong through this year, we expect to pay out a meaningful supplemental dividend once we report our Q2 results and declare the H1 2026 dividend. We have already finished $54 million in share buybacks during this year, and we will keep acting opportunistically while those buybacks form a major part of our supplemental returns. Turning to slide 12 and our sector-leading organic growth. Last week we released the results of our definitive feasibility study, which boost our confidence in the Assafou project and in what it can do for our portfolio — generating production growth, reducing costs, and creating long-term value. We found Assafou in 2022 for $13 million, and according to the DFS, with gold at $4,000 per ounce, the project now carries an after-tax value above $5 billion, with an internal rate of return of 55%. That is genuine value creation, and it shows the promise of this highly prospective region and our capacity to move projects swiftly from discovery into production. The Assafou project will look fairly comparable to the other mines we have constructed, though it is larger. The DFS sets out a 5 million ton per annum gravity and CIL processing plant designed to enable a smoother production ramp-up and to provide extra redundancy, giving us optionality to expand the plant later as we develop and further grow the exploration resource right around the mine.
Ian Cockerill
executiveWe've already got early works moving. Long-lead item procurement is underway. Detailed engineering and design work is advancing, and the main tenders have gone out. We've also begun land compensation talks under the resettlement action plan, and that plan has to be completed before resettlement can begin, since resettlement sits on the critical path. Our target is a final investment decision before this year ends, followed by a build phase of 24 to 30 months. After construction gets going, the critical path to production runs through resettlement, mining pre-stripping, and ore commissioning. Mining can't begin without resettlement, and putting together the resettlement action plan is a central element of our early works program. Assafou could become one of our biggest, lowest-cost assets, with the longest mine life, able to turn out 320,000 ounces of gold annually at an all-in sustaining cost of $1,026 per ounce across the first eight years of a planned 16-year mine life. The DFS also shows greater confidence in the mine plan, supported by close to 100,000 meters of extra close-spaced drilling. That drilling has grown reserves and resources and brought in maiden proven reserves and measured resources, giving us far more certainty about what we'll mine and when, which derisks the ramp-up and the early production profile.
Ian Cockerill
executiveWhat's more, we see considerable exploration potential right around the mine, which will underpin ongoing reserve and resource growth and strengthen the mine plan as time goes on, with the chance to keep production at elevated levels across this period for far longer. Turning to exploration at Assafou on slide 14, the bulk of our drilling has concentrated on the Assafou deposit itself, and we have only just begun stepping out past Assafou. On this property we have already outlined 20 highly prospective targets, which we are prioritising through a guided $10 million spend this year. Our focus will be on advancing the Pala Trend 3 deposit after the 2025 maiden resource, on defining a maiden resource at Pala Trend 2, and on exploration drilling at Pala Trend southwest and Koumangan. At Assafou, we have found a new mineralized greenstone belt that is highly fertile, and through our own land package plus our strategic partnership with Koulou Gold, we expect to unlock substantially more value across this belt. Assafou is now central to our organic growth outlook, and together with increased production at Sabodala-Massawa, we are targeting 27% growth in production to 1.5 million ounces by 2030, with a solid position in the first cost quartile.
Ian Cockerill
executiveReferring to slide 16, after we rolled out the new exploration strategy late last year, our exploration guidance has been raised to $100 million for this year. Across the portfolio, near-mine resources will be our priority for addition, growing resources at the Assafou deposit and nearby targets, while we push new ventures forward to refill the long-term organic project pipeline. On slide 17, as you can see, we're pleased to have signed a strategic investment of $20 million with Altair for a 9.9% stake. Through our greenfield and new ventures program, the Guiana Shield is one of the four tier-1 gold provinces we are targeting. Since the Guiana Shield continues the West African Birimian, our grasp of the geology, as well as the structural context, is solid. Altair now holds one of the largest consolidated land packages in Guyana, covering highly prospective ground to the south of the recent significant discoveries at Oko West and Oko Gani along the same shear zone. The prospectivity excites us, and the proceeds from our investment will be deployed to speed up these exploration programs. Before handing over to Guy, I just wanted to touch briefly on ESG. As a long-term partner in West Africa, we will always strive to deliver sustainable value to all of our stakeholders.
Ian Cockerill
executiveJust in 2025, the amount we contributed to host economies was $2.8 billion, and across the past six years, our contribution has totaled $12.9 billion. That steady delivery of value — together with ongoing gains in governance, stakeholder engagement, and ESG management systems — is gaining wider recognition. Now a member of the Extractive Industries Transparency Initiative, we satisfied every transparency expectation in 2025, performing strongly against our peer group. Beyond that, our ISS rating has been upgraded, which puts us in the top 10% of our sector, consistent with the other strong ESG ratings we continue to hold. With that introduction, I'll pass things to Guy, who can walk you through the Q1 financials. Guy, over to you.
Guy Young
executiveThank you, Ian, and greetings, everybody. As Ian mentioned, the first quarter delivered very strong financial results, powered by a higher gold price and steady operational execution. Our realized gold price rose by $937 per ounce, reaching $4,810 per ounce, which underpinned our record financial performance. Although output declined modestly versus the prior quarter and costs rose in part because of that, adjusted EBITDA climbed 29% and adjusted net earnings were 64% higher. Turning to cash flow, operating cash flows rose 21% and free cash flow gained 29%. Slide 21 shows adjusted EBITDA hitting a record $880 million, a 29% increase quarter-over-quarter, while our adjusted EBITDA margin also improved substantially, rising by roughly 12% to 65%. That higher EBITDA mirrors the mix of stronger gold prices and reduced operating expenses stemming from lower production, and the better margin shows how we translate higher gold prices into earnings. On slide 22, operating cash flow rose 21% to $737 million versus Q4 2025, reflecting stronger gold prices and lower operating expenses, even with higher cash taxes and a larger working capital outflow tied to trade and payables, inventory, and receivables.
Guy Young
executiveTurning to slide 23 for a closer look at how operating cash flow improved, the higher realized gold price contributed $169 million to operating cash flow. Ounces of gold sold fell by 24,000 to 278,000 ounces in Q1, and that had a $99 million effect on operating cash flow. Operating and other expenses came in $156 million below Q4, for several reasons. First, nominal mining and processing costs were lower, reflecting reduced production; second, the hedging program wrapped up last year, and we booked a loss on it in Q4; and higher royalties partly offset these. Income taxes paid rose by $23 million to $46 million, which mirrors the expected timing of corporate income tax payments along with provisional withholding tax payments at Sabodala-Massawa. On that subject, note that for the full year we have raised cash tax guidance from $600 million to $700 million, to a revised range of $660 million to $770 million, which reflects greater withholding tax payments tied to more cash repatriation amid higher gold prices. Cash income tax guidance stays the same for the year. Lastly, working capital was a $91 million outflow, which is $75 million more than last quarter's.
Guy Young
executiveThe main reasons for that rise included a decrease in payables—something we anticipate in Q1—plus greater VAT and stockpiles. If we look at VAT first, although VAT balances went up in Q1, April has brought some encouraging signs: direct VAT reimbursements have resumed in Burkina Faso, processing times have come down in Senegal, and reimbursement levels are higher in Côte d'Ivoire, and if that continues it will give a positive boost to our Q2 working capital. The stockpile growth reflects some deferral of stripping at Houndé and the related stockpile drawdown, as well as larger mining volumes at Ity. We expect both of those trends to normalize over the remainder of the year. Though it's less significant, we've accumulated supplies of certain critical consumables, such as fuel and explosives, to help cushion any possible effects from the closure of the Strait of Hormuz. If you turn to slide 24, free cash flow hit a record $613 million in Q1, 29% higher than Q4, even with lower production and higher AISC, taxes, and working capital outflow. Free cash flow has risen every quarter since Q2 2025, as we're gaining from stronger gold prices and managing to turn most of the extra margin into free cash. At today's gold prices the outlook is still very strong, especially in H2 of this year.
Guy Young
executiveJust to remind everyone, though, we're expecting free cash flow to come in lower for Q2 because of seasonal tax payments. That's just normal regional tax seasonality — higher corporate income and withholding tax payments make up roughly 65% of our full-year payments, and those get paid in the quarter. On slide 25, you can see how our cash flows substantially strengthened our net debt position. We began the quarter at $158 million of net debt and finished with $405 million of net cash. As laid out on the prior two slides, operating activities produced $737 million of cash flow during the quarter. Investing outflows came to $125 million, which included $75 million of sustaining capital, $45 million of non-sustaining capital, and $6 million of growth capital. Financing activities included a net $75 million drawdown on the revolving credit facility, along with $27 million of share buybacks, $8 million of lease payments, and $4 million of financing fees. All of that leaves us at a net cash position of $405 million at quarter end. As Ian said earlier, we don't plan to build up a large net cash position and will keep following our capital allocation model of increased shareholder returns after prioritizing Assafou development and exploration requirements.
Guy Young
executiveNow, turning to net earnings: profit from mining activities rose to $776 million, driven by the stronger gold price and partially offset by royalties and sustaining capital. Other costs went down, since the higher Côte d'Ivoire royalties from the previous quarter are now included in our cost of sales. Deferred tax came in as a $97 million expense, versus a $53 million recovery in the prior quarter. That shift reflects accruing additional withholding taxes ahead of anticipated greater cash upstreaming stemming from the elevated gold prices, as I mentioned earlier. Adjusted net earnings for the quarter reached $442 million, or $1.53 per share, a 65% increase over Q4. Thank you — I'll now pass it to Djaria, who will take you through the operating performance.
Djaria Traoré
executiveThanks, Guy, and good morning, everyone. Before we get into operating results, I'd like to start with safety, which continues to be our number one priority. We were deeply saddened by the fatal injury suffered by one of our contractor colleagues at Mana on 6th of March, as we've reported previously. After that incident, we launched a comprehensive investigation and identified several areas for improvement, particularly in contractor onboarding, supervision, and ongoing training. Those actions are now being rolled out across all our operations. Notwithstanding this incident, our total recordable injury frequency rate of 0.72 on a trailing 12-month basis improved over the quarter and remains among the lowest in the sector, and we keep working to eliminate fatal risks. Before moving to the mine-by-mine review, I'd like to address our first quarter performance against guidance on slide 29. As Ian said, we remain on track to deliver full-year guidance, with performance weighted toward H2, since production and costs are expected to improve at Houndé, Mana, and Ity during the second half of the year, consistent with the mine plans. In quarter one, group production came in lower than the previous quarter of 2025 because of lower grades at Sabodala-Massawa, Mana, and Ity, again in line with the mining sequence.
Djaria Traoré
executiveAll-in sustaining costs came in higher for the quarter, driven by gold sales, increased royalty expenses, and more stripping activity. On the whole, we're happy with where we stand so far. Turning to Houndé on slide 30, output rose because we mined and processed better grades from the Kari West and Vindaloo Main pits. Our all-in sustaining costs went up, though this was mostly driven by higher royalty costs tied to higher realized gold prices, along with greater sustaining capital from additional waste stripping at Kari West and improvements to heavy mining equipment. We'll keep stripping at the Vindaloo Main pit pushback, which will help us reach better grades and lift production across the year, and we expect to see the cost benefits only later in the year, once most of that stripping is finished. Moving to slide 31, at Ity, production fell because we mined lower grades from the Bakatouo and Walter pits, and we also processed fewer tons owing to scheduled mill maintenance in quarter one. All-in sustaining costs at Ity improved thanks to lower sustaining capital and the boost from by-product silver sales, even with higher gold prices and lower gold sales. As with Houndé, Ity's results should be weighted toward H2, since blended grades are anticipated to rise as the year goes on.
Djaria Traoré
executiveIf you turn to slide 32, it shows Mana's output declined versus the prior quarter, which came from lower grades plus the winding down of mining at the Siou underground deposit, where reserves are almost exhausted. In the same way, all-in sustaining costs rose because of reduced production and sales levels, along with higher royalty costs tied to gold prices and our ongoing reliance on costlier self-generated electricity. Regarding costs, we anticipate grid power availability will get better in quarter two, since Burkina Faso's grid is bringing on new capacity. We're also working to make our grid connection at Mana more resilient by automating the underground ventilation system and installing a new transformer and capacitor bank, which should lift productivity and bring operating costs down. During H2, mining feed from the Wona underground deposit should be supplemented by ore from the Bana Camp open pit, which supports somewhat higher grades, throughput, and production. Turning to Sabodala-Massawa on slide 33, production fell because mined and processed grades were lower than in quarter four 2025, though this matches the mine sequence. All-in sustaining costs went up as a result of weaker gold sales, greater royalty cost linked to the higher gold price, and increased sustaining capital.
Djaria Traoré
executiveLooking ahead through 2026, we anticipate consistent results at the CIL plant, since better grades will be partly offset by somewhat reduced throughput, and on the BIOX side we foresee ongoing gains in both throughput and recovery as the optimization work that is underway carries on. When quarter one ended, we released the technical report for Sabodala-Massawa. It's also worth keeping in mind that this outlook is conservative and reserve-only, and we plan to optimize and smooth it out through further exploration and sequencing. The study set out substantial production growth reaching the high-300,000 ounces by 2029, with average output of 335,000 ounces per annum across the next five years. That considerable rise in production is expected to come from the ramp-up of underground mining at the Kerekounda and Golouma deposits. As mining ramps up, it is projected to deliver higher grade to the CIL plant, along with high grade through the BIOX plant from the Massawa North Zone deposit. We expect to smooth this production profile through sequencing of Massawa North Zone and conversion of additional reserves, which would let us achieve and maintain output in the mid-300,000 ounces range for longer. Finally, turning to Lafigué on slide 35, production increased as we mined higher grades from the Main pit.
Djaria Traoré
executiveWe also gained from better recovery, and that has risen since we finished the processing plant optimization project. Our all-in sustaining costs are up as well, driven by a substantial rise in sustaining capital tied to the planned waste stripping for this year, plus greater royalty expenses stemming from higher realized gold prices and elevated royalty rates. With stripping ongoing, we anticipate grades will decline over the coming quarter and then recover once more as we advance to the next pushback in the second half of 2026. On the whole, as you can observe, quarter one delivered results that were steady and predictable. Consequently, we are strongly placed for the remainder of the year. I appreciate your time, and now I will pass things to Ian.
Ian Cockerill
executiveThanks, Djaria. As you have heard, we have gotten off to a robust operational beginning, and financially we have turned in yet another record quarter. The main priorities going forward are pretty straightforward. First, meet our guidance on both production and costs. Second, get the most free cash flow possible out of each ounce we produce so the balance sheet stays optimized, which lets us provide organic growth that leads the sector along with shareholder returns that lead the sector, while we continue being a trusted partner to the countries that host us. We very much look forward to bringing you up to date on how we are doing over the course of the year. So with that, I will say thanks, and I will now pass things back to the operator, who can open it up for Q&A. Many thanks, Anne.
Operator
operatorThank you. If you'd like to pose a question at this point, please hit star one and one on your phone, then hold until your name is called. Should you wish to pull your question, simply hit star one and one once more. Expect a brief delay as we put together the Q&A roster. As a reminder, that's star one and one to ask a question. Our first question now comes from Alain Gabriel at Morgan Stanley. Go ahead with your question, Alain, your line is open.
Alain Gabriel
analystGood afternoon, and thanks for taking my questions. My first one is for you, Ian. With gold prices where they are today, the cash balance is growing very quickly, and you can easily finance Assafou, meet all your capital returns commitments, and still be left with a significant cash pile. Although that's a good problem to have, it also brings some scrutiny on capital allocation. How are you thinking about M&A at this point in the cycle, and do you think you have the capacity to take on a sizable project like Assafou and pursue M&A at the same time? That's my first question.
Ian Cockerill
executiveThanks, Alain. Honestly, this is a nice problem to have — we've got the cash plus an organic growth pipeline that's already well defined. No matter what cash balance we're holding, our real emphasis is on expanding this business organically. There are plenty of chances for us to do exactly that, and that's where our main attention sits. Beyond that, our other emphasis is clearly on the exploration front, and the Altair investment, I think, offers another obvious sign that this is the area where we're comfortable committing funds. We're patient-capital investors. What we're after is the right openings to step into so we can generate genuinely outsized value returns for shareholders. Doing that each quarter would be lovely, but we take a longer-term view on it. On the M&A side, we're always scanning, and should the right opening appear, clearly we'd examine it. So far we've reviewed a number of openings, yet none has ultimately proven positive. M&A isn't something we shy away from, but our main attention, clearly, is on organic growth.
Alain Gabriel
analystThanks. That's quite clear. The second question is probably for Guy, about how energy costs affect the business. If you could tell us a bit more about diesel exposure across the group, how do you expect the conflict to hit your cost base? Are you noticing any supply stress showing up in the supply chain? Because it looks like you handled this really well in Q1. How are you thinking about these dynamics going forward? Thank you.
Guy Young
executiveHi, Alain. Let's spend a moment on how we see the distinction between supply security and pricing risk. On the first point, supply security, speaking broadly across all our sites, we don't depend especially heavily on fuel or other related consumables that pass through the Strait of Hormuz. We have refineries we rely on that are largely regional, particularly in Côte d'Ivoire and Senegal, and the crude feeding those refineries mostly originates from Nigeria. We also receive some refined products from North and Western Europe. Given all of that, and after talking with our suppliers and testing their business continuity planning, we don't see supply security as the main issue. It's more a matter of pricing, as you pointed out. Looking across the portfolio, and keeping in mind that fuel represents anywhere from 10% to 15% of operating costs, it's significant but not that material, when we run the numbers factoring in local pricing, we arrive at an AISC impact of roughly $10 per ounce for every $10 on the price of a barrel of oil.
Guy Young
executiveThat's the pattern to this point, and it's also what we expect across the rest of the year. Looking just at price variance right now, Q2 costs should rise by about $25, driven solely by fuel prices. One more point I'd like to mention briefly — Djaria brought it up during her presentation — is that how much fuel we consume does partly hinge on grid availability. In places where grid availability falls, we'll use larger volumes of self-generated power, and that by itself pushes costs up. Depending on grid availability, approximately $10 per ounce for each $10 per barrel.
Alain Gabriel
analystThanks — that makes a lot of sense. Appreciate it.
Operator
operatorThank you. Our next question comes from Ovais Habib at Scotiabank. Ovais, please go ahead — your line is open.
Ovais Habib
analystThanks, operator. Hi, Ian and the Endeavour team. Congratulations on beating Q1 expectations and on what really is a strong beginning to the year. Ian, I have a couple of questions for you. The first one was already addressed concerning supplies and the cost effect on the Middle East side, so that was helpful. Many thanks for that. Moving on to Assafou, Ian, you put out a robust DFS on Assafou. The permits are in hand. What is holding you back from giving the go-ahead to begin construction on that project?
Ian Cockerill
executiveThanks, Ovais. Now, regarding Assafou, we've already secured the environmental permit and the exploitation permit, and at the moment we're negotiating with the government over the mining convention. Clearly, getting that finalized matters. That process includes setting up a local entity, which is a standard administrative step. I should say the government of Côte d'Ivoire has been extremely supportive of this project. They understand how important it is both for the country and for us. To be fair, they're genuinely doing their utmost to ensure that every required permit, approval, and so on is being expedited in a timely manner. As for what remains outstanding, one of the main items, as we noted in the presentation, was completing the resettlement. Two villages are located on top of the ore body. We're negotiating with those communities and seeking their assent and approval so we can move forward. That has to happen before mining activities can actually begin, since both villages would potentially fall inside the usual blast perimeter for the starter pit. Another matter to be addressed is a national road that crosses the pit's footprint and needs to be diverted.
Ian Cockerill
executiveWe're on the verge of finalizing the optimal diversion for that road. There's been a bit of back-and-forth on it, yet we're nearly there in terms of wrapping it up. Those, I believe, are the two main matters still open. Naturally, I think it always matters when you're in negotiations, the government is aware we're eager to move forward, and they want this project to move forward too, but keeping our options open is important. Just to give a sense of how confident we are that the project is proceeding, we've already committed roughly $80 million in pre-expenditure, mainly directed at long-lead items, so this is one more way we can help derisk the project by ensuring long-lead items are manufactured, transported, and delivered well on schedule, and that they don't hold up any part of the build program. We're running a number of things in parallel. I remain reasonably comfortable that before this year ends, we will formally announce the project. I think it's clear from what we're already doing that we do believe it isn't a matter of if this project goes ahead, it's simply a matter of when, as simple as that.
Ovais Habib
analystUnderstood, thanks Ian. Perhaps shifting over to exploration now — and this may be one for Sonia if she's on the line. Clearly, you have a sizable 2026 exploration program. What I'd like to hear is which target or area Sonia finds most exciting, and when we should begin getting exploration results back?
Ian Cockerill
executiveSo, Sonia's here with us. I'll hand things over, though I can say she's enthusiastic about every one of those areas.
Sonia Scarselli
executiveAbsolutely, Ian — and thank you, Ovais, for raising that. It really comes down to how much time you'd like me to spend walking through this exciting pipeline. If I had to highlight just a couple of areas, then certainly the results we've seen at Vindaloo Deeps in Houndé are excellent, and we intend to publish the maiden resource figures during the first half of the year — there'll be more detail to follow on that — along with a solid grasp of the upside and what the potential looks like. Moving on to the other areas, we've got encouraging results at Sabodala-Massawa. A complete portfolio review has now been finished, and it turned up more than 20 fresh opportunities within the pipeline, the first of which should deliver a maiden resource very clearly defined by year-end at Kawsara. That's genuinely exciting. At the same time, we've also pinpointed additional underground potential across the area, at both Sabodala and Sofia, and further updates should arrive near the end of the year once we have concrete results. Shifting our focus to Côte d'Ivoire, there's a great deal there to examine — the question is more about which target we put first. Ity keeps delivering positive surprises. We saw really strong results late last year in both greenfield and brownfield opportunities, and infill drilling is now underway on the brownfield ground near the CIL plant.
Sonia Scarselli
executiveSo Assafou — much of what we accomplished there over the last couple of years was really aimed at building confidence in the Assafou resource. That confidence is now in hand. The DFS is advancing, and there's quite a sizable potential in underexplored brownfield opportunities that we're pushing forward in parallel to get a clearer read on. Those are at an earlier stage when it comes to exploration work. We'll be in a position to share a somewhat fuller picture both toward the close of this year and into next year. Taken as a whole, it's a highly exciting pipeline across the areas we already hold.
Ovais Habib
analystGreat, Sonia — appreciate it.
Sonia Scarselli
executiveAnd so, if you're handing that over to us — right.
Ovais Habib
analystApologies — please continue.
Sonia Scarselli
executiveActually, I was simply going to say — everyone, kindly stay connected, as the call will pick back up in a moment. Again, please hold the line; the conference is going to resume shortly. Everyone, kindly stay connected, as the call will pick back up in a moment. Everyone, kindly stay connected, as the call will pick back up in a moment. Everyone, kindly stay connected, as the call will pick back up in a moment. Everyone, kindly stay connected, as the call will pick back up in a moment. Everyone, kindly stay connected, as the call will pick back up in a moment.
Operator
operatorThanks — the speakers are back with us now. Go ahead, please.
Ian Cockerill
executiveApologies — would the previous speaker mind posing that question again? I believe Ovais’s question has just been finished, and we’re now proceeding to the following one.
Operator
operatorIs there anything else you'd like to ask, Ovais?
Ovais Habib
analystNo, I'm all set. Thanks a lot for taking my questions.
Ian Cockerill
executiveSorry to interrupt you like that, Ovais—we ran into an electronic glitch on our end.
Operator
operatorThanks. Our next question comes from Richard Hatch at Berenberg. Richard, the line's yours — go ahead.
Richard Hatch
analystThanks, and yes, I appreciate the time, and congratulations on a really strong quarter. You’re doing what you said you’d do, and you’re producing that free cash flow, which is great to see. So, just two questions. First, given the volatility we’re seeing in Mali, could you speak a bit about whether that is causing any kind of instability across the wider region? Are you seeing anything along those lines affecting your operations? Then second, just on Vindaloo Deeps, you touched on it briefly there, but I wonder whether you could expand a little more on what you hope to show the market on that when you update on the resource, and how we should think about that over the short, medium, and longer term? Thanks.
Ian Cockerill
executiveRichard, thank you. As everyone is aware, Mali is not among the jurisdictions where we hold operating assets. We do have one old legacy asset, the Kalana mine, and it is currently being sold. That sale process is still ongoing. Our understanding, certainly, is that the kind of activity involving civil unrest does not seem to have moved down toward Kalana. By Mali's standards, that area is a considerably more benign region. Mali has no immediate effect on our operations. As for the possibility of this spreading from Mali to other places, at present, no. The clear candidate for some spread was Burkina Faso. Conditions there seem relatively calm. We are not observing any worsening of the local situation. The security forces in that country are, more or less, on top of things. We are cooperating closely with them, and once more, we are not facing any issues at present, nor do we expect any in the near term. Regarding Vindaloo Deeps, as Sonia mentioned, within a short period we will issue an update covering the resource size and the timing for when it would begin entering the plan.
Ian Cockerill
executiveA couple of small items still need to be wrapped up, but the moment it's ready to publish, we'll take it to the market. What I'd say is that I don't expect the market to be disappointed. I believe they'll be quite pleased with what's coming out of Vindaloo Deeps.
Richard Hatch
analystGot it, that's very clear. Thanks — I'm looking forward to it. Cheers.
Operator
operatorOur following question comes from Amos Fletcher at Barclays. Amos, the line is yours — go ahead with your question.
Amos Fletcher
analystGood afternoon, everyone. I have two questions. The first one is just about working capital. Obviously, there's a lot happening in the working capital line this quarter specifically, but I guess it was quite a surprise how large the build was. I was just wondering, Guy, if you could give us some guidance on how you expect it to play out over the next few quarters? Thanks.
Guy Young
executiveAbsolutely, Amos, and thank you. Yes, the working capital outflow was fairly substantial. I went over it during the presentation, but perhaps I can go through it once more, focusing on stockpiles, which account for about two-thirds of that outflow. The rise in stockpiles is clearly tied to mining tonnage. What separated our initial forecast from what we actually saw in Q1 was partly a deferral of some waste stripping, especially at Houndé, driven by both the production profile and fleet availability. We anticipate that this will pick back up during Q2, and slightly at the beginning of Q3. As stripping activity ramps up, we should naturally see some drawdown of stockpiles. Additional stockpile drawdown is expected at Sabodala-Massawa as we move into the second half. Lafigué also saw continued growth in stripping activity. With most of our sites planning some stockpile drawdown, the kinds of builds you observed in the first quarter ought not to recur over the rest of the year. Then, without delving into specifics since that wasn't part of the question, I believe there are encouraging trends and indicators on both the VAT and the consumables side as well. Hopefully the level of working capital build will not repeat through Q2, 3, and 4.
Amos Fletcher
analystIs there still room for additional builds, though at reduced levels across the coming two quarters, would you say?
Guy Young
executiveYeah, depending on the site, builds are possible. For instance, at Mana we'd really like to have additional stock on hand so we can be sure plant utilization is there. At Lafigué, Houndé, and Sabodala, we'd expect to see some drawdown of stockpiles. After that,
Amos Fletcher
analystOn the second question, I was hoping you could give a somewhat wider update regarding the process of revising Senegal's mining code. Has anything new come up on that front during the past few months that you can share?
Ian Cockerill
executiveAmos, there's nothing new we can share on that front right now.
Amos Fletcher
analystPerfect. Those are all the questions I had. Thank you.
Operator
operatorThanks. Our next question comes from Carey MacRury at Canaccord Genuity. Carey, please go ahead — your line is open.
Carey MacRury
analystMorning, and congratulations on the strong start. One more question, this time for Guy. You now hold more than $1 billion in cash, yet there is still some amount drawn on the credit facility. I'm curious — my assumption is that you'll repay that later this year, and do you have any plans to pay down the Côte d'Ivoire debt ahead of schedule, or will you simply leave it as is per the schedule?
Guy Young
executiveCarey, on your first question about the RCF drawdown, as you're probably aware, you'll recall that we operate on a cycle where the bulk of offshore funding and capacity arrives through OpCo dividends. Those dividends will incur withholding tax in Q2, which in effect lets us begin repatriation in Q3. How quickly that repatriation happens hinges on cash levels at the mine sites. Once the money reaches offshore, we use it to reduce the RCF. Based on current forecasts, we ought to have the RCF paid down during Q3 as soon as our OpCo dividends come up.
Carey MacRury
analystWhat about that Côte d'Ivoire debt?
Guy Young
executiveThanks. I honestly was having a hard time recalling the latter half of what you asked, so I appreciate it. On the Côte d'Ivoire debt — no, Carey, my sense is we'll leave that as it is. As you can probably picture, holding local debt gives us cash and liquidity as well as tax benefits. No, paying it down ahead of schedule isn't something we'd consider. That cash would go toward other purposes. My expectation is that the Côte d'Ivoire facility stays in place and amortizes in the way already disclosed.
Carey MacRury
analystExcellent. I appreciate it.
Operator
operatorThanks. Our next question comes from Anita Soni at CIBC. Anita, go ahead—your line is open.
Anita Soni
analystMorning, and thanks for taking my question. I know most of them have already been asked and answered, but I just wanted to check: have you had any conversations recently with the S&P/TSX about being included in the index? From what I understand about the tech process, the S&P has reached out to stakeholders to look at including companies in the TSX that aren't incorporated in Canada, and I know you were removed a couple of years ago. So I'm just wondering whether you've had any discussions with them lately?
Ian Cockerill
executiveAnita, Jack has told me that, obviously, there's discussion about including on the TSX index those companies that aren't domiciled in Canada. Obviously, that would give us a tailwind. We haven't had any detailed conversation; our understanding is that these are early conversations — early days — but from our perspective there's nothing tangible when it comes to contact, no.
Anita Soni
analystAppreciate it. That covers everything I wanted to ask.
Operator
operatorThanks. Our next question comes from Mohamed Sidibé at NBCM. Mohamed, go ahead — your line is open.
Mohamed Sidibé
analystMorning, everyone. Morning, Ian, and to the whole team. You've covered everything I had. I just wanted to maybe ask about the CapEx schedule for Assafou, specifically how it ties to the $50 million to $100 million of pre-expenditures you guided to for the year. Thanks.
Ian Cockerill
executiveMohamed, to put it plainly, what we've done is pinpoint the items with long lead times — essentially securing our place in line for mill shells, certain large HPGR equipment, and similar things. We've indicated the spending level, which is roughly $80 million, give or take. I think it's fair to say that money would be distributed across the year. It won't arrive as a single lump sum. Right now we're talking with a range of suppliers and obtaining their final quotes, and once that's finished, there will naturally be some element of timing around that spending. You should expect it to be spread out across the remainder of the year.
Mohamed Sidibé
analystThanks — and congratulations on a really strong quarter.
Ian Cockerill
executiveI appreciate it.
Operator
operatorMuch appreciated. Our next caller is Felicity Robson from Bank of America. Felicity, go ahead — your line is open.
Felicity Robson
analystMuch appreciated for the opportunity to ask. You gave us an update regarding the production profile at Sabodala. Could you share some detail on where additional potential exists to add to that, perhaps through resource conversion or exploration over the near term? Thanks.
Djaria Traoré
executiveThank you, Felicity. As we said, we're really pleased to have released the NI 43-101, in which we set out that production at Sabodala-Massawa will rise. Right now it's based purely on the mineral reserves. We've already seen a bump when you look at the production profile, 2026 versus 2025. What we're also seeing is that starting in 2029, there will be a substantial increase all the way to three in the mid-360 at least for the next five years. That said, to answer your question, there's definitely more upside at Sabodala-Massawa from converting reserves and resources and from further exploration. This year we actually have a budget of almost $15 million to grow those resources at Sabodala-Massawa. Maybe Sonia has more to add.
Sonia Scarselli
executiveAdding to what Djaria said a moment ago, you can see output rising in the late '20s, mostly because of underground development feeding into the pipeline. That is delivering very high-grade ore from Golouma and Kerekounda, which is quite exciting. Beyond the exploration upside Djaria covered, we have found several opportunities in both the exploitation permit and the exploration permit that will begin contributing to the profile over the next couple of years, beginning with Makana, a brownfield, non-refractory oxide deposit close to the CIL plant, then moving on to Kawsara, and we are also examining further underground potential. We have certainly identified ways to sustain that pipeline and that profile past the close of the 2020s.
Felicity Robson
analystExcellent. Thanks so much.
Operator
operatorThank you. Our last question for today comes from Frederic Bolton at BMO Capital Markets. Frederic, your line is open, so please go ahead with your question.
Frederic Bolton
analystGood afternoon, and thanks for taking my question. I'd like to build on what Ovais and Mouhamed asked about Assafou. There's $396 million of non-sustaining capital, and my understanding is that this sits on top of the growth CapEx in your financial model. Could you give me some detail on what falls under that non-sustaining CapEx? And then, in your growth CapEx, there's an unclear million set aside for owners' costs, which looks pretty high next to other projects of a similar size. Can you dig into what's likely behind that $215 million? Thank you. Hi,
Guy Young
executiveFrederic, the audio was cutting out a bit, but I believe I’ve captured roughly what you were asking about. The main component of the non-sustaining figure is essentially stripping. I’d like to remind everyone that Assafou sits relatively deep, and we face a very substantial pre-mining and stripping requirement there before we can reach the ore body. That is the fundamental driver behind the non-sustaining CapEx. On that point, Frederic, there are elements within the owners’ costs that, compared with our earlier projects, would be seen as somewhat higher. What we’ve tried to do, I think, is make sure we have incorporated and encapsulated every specific cost tied to Assafou. Wherever we have people working on Assafou, bringing teams in — one example being a more fundamental cost management team that is being brought in — as well as lessons learned from prior projects where we felt we needed the ability to ramp up somewhat earlier in terms of operational readiness. Those are the key factors driving the owner team costs.
Frederic Bolton
analystThanks. Is the management of the resettlement covered by that as well, along with the preparations for the highway diversion?
Guy Young
executiveThe expenses tied to relocating both the road and the power lines sit within the infrastructure line. You're completely correct that a fairly substantial effort is being devoted to the resettlement Ian mentioned earlier, and yes, that would fall under the owners' costs.
Frederic Bolton
analystExcellent. I have nothing further. A fantastic quarter to wrap up on. Thanks.
Operator
operatorAppreciate it. That brings the Q&A portion to a close.
Ian Cockerill
executiveMuch appreciated, operator, and thanks to all of you.
Operator
operatorGo ahead, sir.
Ian Cockerill
executiveThanks, operator, and thanks to all of you for spending time with us. I hope it has come through how happy we are with Q1, and how it positioned us for ongoing success across the remainder of the year. We're looking forward to getting together with you once more at mid-year, when we'll present our Q2 and H1 results. Thanks to everyone for tuning in today. We really appreciate it. Thank you, and goodbye.
Operator
operatorWe appreciate everyone joining the call today. That brings the program to an end. You’re welcome to hang up your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Endeavour Mining plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Endeavour Mining plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Mining plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.