executiveHi, everyone, and thanks for joining Endeavour's webcast on the results for the third quarter of 2026. Just before we begin, a quick reminder about our standard disclaimer. Joining me on today's call are Ian Cockerill, our Chief Executive Officer, Guy Young, our Chief Financial Officer, and Djaria Traore, Executive Vice President of Operations and ESG, and they'll take you through the presentation. We're also joined by Sonia Scarselli, Executive Vice President of Exploration and Growth, and Rousseau Jooste, Chief Technical Officer, and both will be available during the Q and A. The call will run in our usual format. Ian will begin with the highlights from the first three quarters of the year, then Guy will take you through the financials, and after that Djaria will cover our operating results mine by mine, before handing back to Ian for his closing remarks; following that, we'll open the line for your questions. I'll now pass things over to Ian.
Ian Cockerill
executiveThanks, Jack, and welcome everyone joining today's call. Strong operational execution, together with better realized gold prices, has driven record financial results through this year, and that puts us in a really good position to unlock the group's substantial organic growth potential, lifting output by more than 27% to 1.5 million ounces by the end of the decade, while still delivering sector-leading shareholder returns. On the operations side, we remain on track for the lower half of this year's production guidance, with costs in line on a royalty-adjusted basis, since Lafigué's especially strong performance has helped offset weaker-than-expected output at Mana. We anticipate that the fourth quarter will be our best quarter, since Houndé, Ity, and Sabodala-Massawa are shifting to higher grades, and that remains true despite the recent halt of underground mining at Mana, which Djaria will discuss in greater detail afterward. This performance has produced record free cash flow generation compared with the same period a year earlier. That cash generation has enabled us to keep a net cash balance sheet position of $263 million while also supporting our key strategic priorities of delivering both sector-leading shareholder returns and sector-leading organic growth. Regarding shareholder returns, we delivered a record return for H1, and we remain on track to deliver another record for the full year. Regarding organic growth, we're quite happy that the final investment decision at Assafou has been approved, and project development has kicked off with the aim of first gold in H1 2029. At Sabodala-Massawa, the first phase of the underground expansion is coming along nicely, and phase two should get underway early next year, with commercial production still on schedule for early 2028. Lastly, our exploration efforts remain centered on realizing the potential of our major discoveries at Vindaloo Deeps, Houndé, and Kawsara at Sabodala-Massawa. We expect to share updates later this year on both of these multi-million-ounce resources, which offer meaningful life-of-mine upside at both mines. In closing, the business continues to produce substantial cash; a significant portion of it is being returned to shareholders, while we also put money into initiatives that will underpin the coming phase of expansion. I'd like to take you through each of those items in somewhat greater depth; beginning on slide seven with our forecast for the year. As we noted, we remain on course to meet guidance for both group production and all-in sustaining cost, and we anticipate improved production and costs during Q4. We're expecting output to land in the lower half of the range, and that's because Mana has been producing below what we anticipated. That comes after a weaker year at that site, made worse by the halt in underground mining that followed the ramp subsidence we told you about a few weeks ago. Turning to costs, we remain solidly on track: year-to-date AISC sits at $1,700 per ounce measured against a royalty-adjusted gold price basis, which lands right at the midpoint of the guidance range we originally gave. What this year demonstrates is how much our high-quality portfolio matters, since whenever a single asset falls short, any one of the others is certainly able to step in and make up the difference. Looking ahead to next year, that portfolio—especially Lafigué—will be used to drive throughput upward, and at Sabodala-Massawa we'll fine-tune both throughput and grades to counter as much of the Mana gap as possible. On slide eight, you can see we've produced 820,000 ounces to date this year, with a record margin running 40% higher than the same period last year. Higher gold prices clearly help us capture better margins, though our low-cost base also keeps us resilient should gold prices fall. Slide nine shows record adjusted EBITDA of $2.25 billion generated so far this year. That figure is 38% above the prior-year period, and adjusted EBITDA margin came in at a very healthy 61%. Although output was a bit lower, stronger gold prices—plus receiving their full benefit once our hedging program wrapped up at the close of last year—clearly helped drive record earnings. Those record earnings have translated into record cash flow. Slide 10 shows free cash flow generated of over $1 billion, equal to $1,246 in free cash flow per ounce of gold produced. That is approximately 50% higher than the comparable period a year earlier. We anticipate continued robust cash flow in Q4, supported by a stronger production profile and cash costs that are seasonally lower. Turning to slide 11, robust free cash flow is continuing to reinforce our balance sheet, and we remain in a solid net cash position of $263 million, with leverage comfortably under our long-term target. That strong cash generation, combined with a very healthy balance sheet, leaves us well placed to focus on our strategic priorities: sector-leading returns as well as sector-leading organic growth. On returns specifically, our record is strong, and since 2021 we have returned over $1.9 billion to shareholders. We have sustained annual double-digit growth, which reflects the priority we assign to shareholder returns, and we expect to extend that record in the future. We aren't providing forward guidance past the annual minimum commitment we've set, though our history points to returns roughly 86% higher than that floor. So far this year we've already delivered a record $312 million through dividends and buybacks, exceeding the minimum commitment for the full year. We remain on course to make our largest-ever shareholder return in 2026. And going forward, we don't anticipate Mana having any impact on that program. Turning to slide 14 and our organic growth pipeline, which leads the sector, we see a clear path to 27% production growth by 2030, driven by the top-tier Assafou project along with our Sabodala-Massawa underground expansion. In addition to those projects, exploration will underpin additional growth through key discoveries like Vindaloo Deeps and Kawsara — each providing meaningful life-of-mine upside at mines we already operate; and that’s not all we’re doing. To ensure our pipeline remains strong and that we can sustain organic growth over the long run, our new ventures exploration initiative is focused on identifying a varied set of premier development projects capable of supporting ongoing organic growth even past Assafou. Turning to Assafou on slide 15, we have approved the final investment decision and have begun project development. This marks a major milestone that takes a lot of risk out of the project's next stage and the path to first gold, which we expect in H1 2029—just seven years after discovery and 24 to 30 months after FID. Since our last update, we've finalized the in-principle terms of the mining convention with the Minister of Mines, based on the 2014 code, and we expect the rest of the government to fully sign off in the coming weeks. We've raised our CapEx envelope to $1.2 billion to further de-risk the project. Most of that rise—around 60%—reflects steeper compensation rates for land and crops after talks with local government and communities, and the resettlement plan should be wrapped up by year-end. Roughly 25% of the bump comes from added contingencies, mainly for the highway diversion, the grid connection, and the relocated transmission lines, as those two items remain in final negotiations with the government.
Ian Cockerill
executiveAnd lastly, roughly 15% of that higher figure comes from several modest de-risking adjustments: more advanced grade control drilling, an expanded EPCM and owners team support scope, extra spares, and better network connectivity at the site. To date we have committed approximately 5% of the initial capital, and activity at Assafou picks up in Q4 as we wrap up the mining tenders and begin earthworks for the plant, the dam, and relocation. On slide 16 you will see a straightforward reminder that Assafou ranks as a top-tier project and is plainly among the best approved gold projects anywhere in the world. What excites me most is that we are constructing a processing plant built to scale, and much of the exploration upside across our permits sits close to the Assafou plant. Over time we see room to push throughput past the initial design, with meaningful exploration upside beyond the 5 million ounces of resource defined for this project so far. At Sabodala-Massawa we are likewise advancing the underground expansion, which will feed high-grade ore to the CIL plant and raise output toward our goal of 350,000 ounces a year. First ore from the initial expansion phase remains on track for year-end, and the second phase has now received board approval. That phase should get underway in early 2027, with commercial production targeted for early 2028. Early works on phase two have begun, and key contracts, procurement, and underground drilling are starting to pick up pace. Past these two projects, exploration continues to advance at two large discoveries: Vindaloo Deeps at Houndé and Kawsara at Sabodala-Massawa. Each of these multi-million-ounce discoveries should deliver substantial life-of-mine extensions at both mines, and none of that is included in our 1.5 million-ounce target. Resources for both will be announced later this year, and as we move into next year we will put priority on reserve definition and mine plan updates, along with further resource definition as our focus extends beyond the initial resources. Before I hand over to Guy, I want to address our commitment to safety. Last month we tragically lost a colleague at our Ity mine, and our thoughts clearly remain with his family and his colleagues. Safety for all our employees and contractors is our number one priority, and throughout the year we have been rolling out a range of initiatives to strengthen safety practices, which Djaria will walk you through shortly. In the quarter we also formally introduced our phase two ESG strategy, which we refer to as ESG 2030. Guided by our purpose of producing gold that delivers meaningful value to people and society, our ESG 2030 strategy is built around five strategic pillars: championing our people, empowering host communities, boosting local economies, protecting the environment, and last but certainly not least, upholding ethics and compliance. Designed together with our stakeholders, this strategy supports delivery of the UN Sustainable Development Goals and the national development plans of Senegal, Côte d'Ivoire, and Burkina Faso. So to make our ESG 2030 strategy real, we put together a dedicated ESG caravan that traveled to our sites and host communities. By way of toolbox meetings, presentations, cultural events, and social media, we've gotten through to more than 4,500 employees and contractors and engaged with over 8,500 people in our host communities; and with that, I'll turn things over to Guy, who will walk you through the financials. Guy, the floor is yours.
Guy Young
executiveThanks, Ian, and hello everyone. I'll take you through the financial results for the third quarter. Turning to slide 21, Q3 production and sales came in as we expected, though a bit below Q2 because of the customary wet season effect and mine sequence. All-in sustaining costs fell by $50 per ounce versus the prior quarter, mainly on lower sustaining capital expenditure across the portfolio and smaller input cost increases than anticipated. EBITDA and adjusted EBITDA declined on lower sales and realized gold prices. Cash flow, though, was much stronger quarter-on-quarter, with free cash flow rising 76%, helped by lower quarterly cash taxes as we had guided. As Ian said earlier, we expect to land in the lower half of our full-year production guidance range despite the operational challenges at Mana, with costs inside the range. We produced 256,000 ounces of gold in Q3, down from Q2 as I noted, driven by lower grades processed at Ity, Houndé, and Lafigué owing to their mine sequence, fewer tons milled at Houndé because of the wet season, and the halt in mining activities at the Aviera Portal at Mana. Our AISC improved versus the prior quarter largely on lower sustaining capital. Even with the lower AISC, our all-in sustaining margin per ounce was a touch lower quarter-on-quarter because of the lower realized gold price. Most of these factors should reverse in Q4, with higher grades at Houndé, Ity, and Sabodala-Massawa expected to make Q4 the strongest production quarter of the year, notwithstanding the suspension of underground mining activities at Mana since late October. Q4 costs should also improve on the higher production and the reduced contribution from the higher-cost Mana mine. On slide 23, our adjusted EBITDA edged down to $639 million for the quarter on lower gold sales and gold prices, with the EBITDA margin also slipping slightly, reflecting the lower gold prices; on slide 24, our operating cash flow rose by 28% to $407 million for the quarter. The bridge shows a negative impact of $110 million from lower gold sales and prices, partly offset by a small decrease in operating expenses, including lower royalty payments tied to the lower gold price. Cash taxes fell by $291 million quarter-on-quarter, in line with the usual payment seasonality. Finally, net working capital swung from a $52 million inflow last quarter to a $54 million outflow in Q3, driven by a normalization of payables from the prior quarter, an increase in VAT receivables, and a buildup in spares and consumable inventories. Thanks to this stronger operating cash flow, you can see on slide 25 that free cash flow rose by 76% to $261 million for the quarter, bringing year-to-date free cash flow to a record $1.02 billion. As in previous years, we expect our strongest operating quarter in Q4, and as guided, we've now paid around 95% of our full-year cash taxes. So because of that, we anticipate another round of robust free cash flow in Q4, which would extend the record performance we have posted so far this year. Let's turn to the balance sheet, where we kept a net cash position that remains very healthy and a leverage ratio that held steady versus the prior quarter. In Q3, operating cash flow came to $407 million, while investing activities used $146 million, and that figure includes mine and project capital. On the financing side, we paid out $227 million of minority dividends, which matches the timing of minority dividend declarations and cash upstreaming, plus $16 million covering financing fees and lease liabilities. Turning to gross debt, we also repaid $410 million against our revolving credit facility and $10 million against our Lafigué term loan over the quarter, which brought gross debt down to $586 million. All told, liquidity looks very healthy, with roughly $850 million in cash and about $700 million accessible via our undrawn RCF. That healthy leverage position provides the flexibility we need to meet our shareholder commitments, namely investing in growth while still maintaining our strong shareholder returns program. Last from me, on slide 27, earnings from mine operations reached $514 million for the quarter. Rather than walking through each line on that slide, I'll simply call out a few standout items, among them our current income tax expense, which declined by $180 million, a reflection of lower taxable profits and the timing of approvals for cash upstreaming. Deferred tax came in as a $37 million expense, compared with the recovery seen in Q2, mainly reflecting local board approval and payment of withholding tax during the prior period. And lastly, add back adjustments of $35 million covered other expenses, a non-cash tax adjustment tied to foreign exchange on deferred taxes, and losses on financial instruments connected to foreign exchange movements between the euro and the dollar, partly offset by fair value gains on our marketable securities; that takes us to adjusted net earnings attributable to shareholders of $241 million, or $1 per share. Thanks for listening. I'll now pass things to Djaria, who will take you through our operating performance. Djaria?
Djaria Traoré
executiveThank you, Guy, and good day to all of you. Safety is where I'll start. As Ian said earlier, we unfortunately lost our colleague, Mr. Biermann Leon Bado, a man who had spent more than 30 years at our Ity mine. He was found unresponsive in the processing plant and passed away on October 7. His family, his friends, and his colleagues remain in our thoughts and prayers. After a thorough investigation, we are putting several recommendations into practice, among them broader camera coverage across the process plant, and we are currently trialling wearable technology designed to enable earlier detection and prevention of incidents for employees working alone or in distress. We’ve also brought in an outside firm to independently examine our operational risk and safety culture. This month, Ian and I are going to run a safety workshop in Abidjan for contractor CEOs. The point is essentially to ensure all of our business partners are completely in step with our health and safety requirements, and to have them restate their own dedication to zero harm. Our total recordable injury frequency rate for the trailing 12 months stands at 0.67, which is still under the industry average—and yet the commitment we hold to zero harm for everyone at our operations and beyond is achieved. Turning to slide 10, the way we performed in January means we can still hit our full-year guidance, and it shows how much a quality portfolio matters. A solid portfolio reduces swings, since strong assets can make up for weaker ones. We expect production to come in within the lower half of the guidance range, with Lafigué delivering our strongest expected results while performing partly below plan. We anticipate Q4 will bring our best grades, and Sabodala should match the prior quarter. As for costs, individual and remain on track, royalty-adjusted basis. We look for costs to improve versus Q3, which reflects a larger contribution from the higher and a smaller one from the lower. On slide 31, I'll begin with a mine-by-mine overview. During the previous quarter—Q3—we had noted that waste stripping at Houndé would reach its highest level, and combined with wet-season effects, that pushed production lower for the quarter. All-in sustaining costs came down because we spent less on sustaining capital, since part of the waste stripping at the Vindaloo Main pit was moved out of sustaining capital and into non-sustaining capital. That shift stemmed from how we prioritized mining and from a modest delay in getting the waste stripping work underway. Is anyone able to hear me? Can you hear me now? Are you hearing me? Hello? Can you hear me? Hello?
Guy Young
executiveWe can hear her. We can hear you, Djaria.
Djaria Traoré
executiveAlright, apologies for that. I'm not sure exactly where the line cut out, but let me go back to the beginning on Houndé; starting on slide 31, I'll give a mine-by-mine overview that includes Houndé. As we mentioned last quarter, Q3 was the peak period for waste stripping at Houndé, and that, together with the wet season's impact, led to reduced output in the quarter. All-in sustaining costs also declined owing to lower sustaining capital expenditure, as a portion of the waste stripping at the Vindaloo Main pit was moved from sustaining to non-sustaining capital. That reclassification came about because ore mining was prioritized and the start of waste stripping was slightly delayed. Looking ahead, we expect Houndé to deliver a stronger fourth quarter, mainly because ore grades should be higher once waste stripping wraps up at the Vindaloo Main 3 pits. As a result, Houndé's output and all-in sustaining costs are both tracking in line with our full-year guidance. Turning to Ity, quarterly production fell since we processed lower-grade material from Le Plaque and the Ity pit, which was anticipated. Despite that, all-in sustaining costs came down, reflecting reduced sustaining capital after waste stripping finished at Le Plaque and stockpile inventory grew. For Q4, we anticipate grades will climb as we mine additional higher-grade ore, primarily from the Bakatouo, Walter, and Le Plaque pits. Because of that, Ity remains on course to hit the production and cost targets it set for the full year. Even though costs right now are running under the bottom of the range, the added sustaining capital for stripping work and the Q4 plant upgrade ought to push all-in sustaining costs up into the guidance band by the time the year closes. Beyond that, we’ve reduced non-sustaining capital expenditures by $20 million for the entire year, bringing it to $25 million, since our focus is on advancing the detailed engineering for the resin plant upgrades prior to fully putting them in place next year; looking at slide 33, at Mana, quarterly production and costs matched the previous quarter, with higher grades offsetting the impact of the mining pause at the Aviera Portal. After the quarter ended, on October 28, we stopped all underground mining operations due to access ramp subsidence on the ramp that leads to the Wona open pit. As a result, we anticipate output will be well under the bottom of our production guidance range, while costs will exceed the upper limit. Our capex guidance for this year stays the same. On slides 34 and 35, I'd like to draw your attention to what has taken place, and also bring you up to date on our geotechnical findings so far, plus the outlook. The access ramp that leads into the Wona pits and ultimately gives access to both the Dangouna and Aviera portals partly collapsed, so the ramp could no longer be used, and surface access to the Dangouna and Aviera portals was restricted as well. Another ramp provides a way to reach the third portal at Wona, and that route has not been affected. Once the ramp had settled down, we stopped all underground mining operations as a precaution and launched a comprehensive geotechnical assessment. In the initial fortnight following the incident, that assessment focused on visual checks and drone-supported scanning across the higher levels of the Wona underground workings, and so far no irregularities or indications of ground failure have been detected in that area. The assessment remains underway, and it has pinpointed a substantial graphitic shear zone with a north-south trend that passes through the affected region. That geological feature, combined with the historical employment of the sub-level open stoping extraction approach, especially in the shallower section of the underground workings, could have contributed to the subsidence event. Moving to slide 35 and what comes next: our geotechnical review continues, and at the same time we're broadening the routine geotech monitoring program using several techniques—radar, LiDAR, and InSAR data—so that operations stay safe and we can move forward into the Aviera Portal. Regarding underground work, re-entry at Wona is planned for Q4. As a precaution, our initial focus will be on stabilizing the shallow portion of the deposit before any ore mining begins again, which we expect in Q2 2027, subject to receiving all required regulatory approvals. In the meantime, the geotech review will continue progressing through Aviera, with the aim of obtaining a sign-off to re-enter. Assuming permission to go back in is granted, remediation work—now slated to continue through the second quarter of next year—should get underway, with the aim of restoring access and keeping people clear of the zone right next to the collapsed portion of the ramp. Turning to open pit operations, we are pushing to speed up the Bana Camp open pit, and the mining permit has now come through. In parallel, grade control will begin at the Maoula open pit before ore mining starts, which we anticipate in Q2 2027, contingent on favorable drilling results; processing is expected to stay on hold through Q2 2027 so that stockpiles can build up and thereby underpin steady operations. Discussing 2027 guidance right now would be somewhat early, since our budgeting work is still underway, though full details will come alongside our regular end-of-January update. Briefly, we anticipate that full year 2027 output will be affected by the absence of processing, particularly during Q1, along with the underground mining ramp-up starting in Q2. At the group level, though, our attention is on opportunities throughout the group to lift production, especially at Lafigué and Sabodala-Massawa, where we see some potential via greater throughput and higher grade ore. Turning to slide 36, covering Sabodala-Massawa. Output rose a bit because mill availability got better after a maintenance program starting in Q3, and because we added higher grades from the Massawa North Zone stockpile, which we put through the BIOX plant as part of the test work program. As we said before, that test work program led to lower recovery, though it came in better than expected, since we blended ore from Massawa North Zone with our main feed from Massawa Central Zone and concentrated on optimizing the recovery rate. From this test work, we expect to begin processing fresh ore from Massawa North Zone late in 2027. In Q3, all-in sustaining costs went down, driven by lower sustaining capital and higher gold sales. Turning to Sabodala, we anticipate a better fourth quarter at both of the processing plants. Ore of higher grade coming from Niakafiri West, Goumbati, and Samina Pit is expected to underpin greater output via the CIL plant, and simultaneously we continue fine-tuning the BIOX plant so it achieves greater throughput along with improved recovery. At Sabodala-Massawa, we remain firmly on course to hit the full-year guidance for production as well as all-in sustaining costs. Lafigué appears on slide 37. The nine months at Lafigué have been very strong, largely because processing throughput beat expectations, operating 11.5% above design nameplate for the year to date 2026; during Q3, production declined somewhat since we drew down additional lower grade stockpile over the wet season. Wet-season mining expenses pushed all-in sustaining costs up a bit. At Lafigué, output in Q4 should dip somewhat, since we're beginning pre-stripping ahead of the next pushback at the main and west pit — that translates into reduced grade and throughput. With Lafigué having performed strongly to date, the operation remains on course to land close to the upper bound of production guidance while costs come in toward the bottom of the range. Turning to slide 38. At Lafigué, we've kicked off a 16 MW solar power plant project, which should help bring costs down, reduce CO2 emissions by almost 27%, and diversify where our power comes from. Under our Deferred Purchase Sale Agreement alongside TotalEnergies, we put up only a modest amount of capital upfront while securing a cheap per-unit price for solar electricity across the entire reserve life of mine. Construction gets underway in early 2027, and we anticipate wrapping it up in early 2028 — which again backs our goal of cutting CO2 emissions intensity 30% by 2030. Thanks to all of you. I'll now turn things back to Ian for his closing remarks.
Ian Cockerill
executiveThank you so much, Djaria. Before we begin the Q and A, I’d like to spend just a few minutes explaining why we see Endeavour as a still very compelling investment. We’ve built a strong record of delivery across exploration, project development, and operations, and that has helped create the high-quality, resilient business we have today. We haven’t stopped there; we’re future-proofing the business through our organic growth projects, including Assafou and the Sabodala-Massawa underground expansion, which are driving sector-leading organic growth through the end of this decade. On top of that, our new ventures exploration strategy gives us a solid foundation for new projects into the 2030s. Because of our high-margin production, strong free cash flow generation, and healthy balance sheet strength, we’re able to pay a sector-leading shareholder return while continuing to grow. So in short, Endeavour offers a rare combination: strong cash flow, an unrivaled organic growth pipeline, sector-leading shareholder returns, and very few companies in our sector can deliver all three of those at the same time at such an attractive valuation. With that, I’ll hand you back to the operator, and let’s open the line for any questions you may have. Thank you.
Daniel Major
analystHello there. Am I coming through clearly?
Ian Cockerill
executiveYes, Daniel. Good afternoon.
Daniel Major
analystGreat, thank you very much. I really appreciate the questions. On the first one, you clearly gave a CapEx update for Assafou. I assume more detail will come with the full-year results, but could you offer some sort of broad guidance on how that $1.2 billion of spending will be spread between now and ramp-up, well, commissioning in 2029?
Ian Cockerill
executiveWell, as we've said before, for this year the likelihood is that we'd spend roughly up to $100 million. That $100 million was really concentrated on long lead items. Now, since we began with the crop compensation scheme and we've already started making payments to people, that's where the $100 million will be directed. Then across 2027 and 2028, I'd call it a reasonable balance, perhaps weighted a little toward 2028 for the additional $1.1 billion. So let's assume up to $500 million in 2027, and roughly $600 million in 2028. That then gets us ready for production to begin in early 2029.
Daniel Major
analystAll right, that's fine. Thank you. Apologies, I just want to be clear: you'd still anticipate the group spending close to $100 million on growth CapEx during this year, which means you're implying a fairly substantial step-up in Q4 coming from Assafou — just to confirm that point.
Ian Cockerill
executiveWell, what you'll see is a large rise, mainly, as I mentioned, since we began.
Daniel Major
analystRight.
Ian Cockerill
executiveWe're paying the crop compensation, and of course some invoices for the long lead items are arriving now; that work is well underway, but the $100 million is obviously part of the $1.2 billion. Just to be clear, it certainly isn't on top of the $1.2 billion.
Daniel Major
analystGot it, thanks. Turning to my second question, about Mana — clearly an incident has happened, a problem that does arise in this industry, but for some time now people have been debating whether this asset's quality is on par with the rest of the portfolio. I'd say it's been one more drag on guidance, offset by other assets. Regarding Mana, is it still core to the portfolio, given the potential you see in that asset?
Ian Cockerill
executiveDaniel, I've made this point previously: all the way up to this specific incident, it has generated strong cash and contributed very healthily to the group. This is an unfortunate hiccup. Like Djaria mentioned, we feel very fortunate that nobody was hurt in this event. The first inspections at the site — and I was out there alongside Djaria and the crew — those inspections give us reason to think there's a way around the problem that would let us resume underground work at the mine. This won't be a quick fix. It's going to take a while. Given what we know right now, and clearly recognizing how significant that graphitic shear zone — which runs sympathetic and sits in the shallow portions — really is, I believe that out of an abundance of caution, we ought to be very careful about re-entering. We’ll handle this responsibly and with careful planning, and we’ll ensure this issue does not recur. As for the deeper operations, based on everything we’re observing, we aren’t seeing any additional deterioration. The key thing to note is that this isn’t comparable to, for example, South Africa, where seismic activity causes substantial ground movement. No seismic activity was linked to this event; rather, material simply unraveled and peeled away from the graphitic shear into the open voids—that’s what occurred. Absolutely. Through Wona, the access we have — our examination of the shallow zones mined there indicates those voids have not degraded in any significant way beyond what the initial excavation already showed. In my view, that gives us a reasonable route back in, and from there we can proceed gradually and carefully, in a proper manner, toward the remainder of the mine. We may very well need some extra access routes; those would be included in the broader remediation plan, which is under review right now. Regrettably, we cannot provide final specifics at this point, since there are clearly numerous variables to consider. Once that's taken care of, I think we'll be well placed to offer more detailed explanations and responses at the close of January next year, when we report the year-end results.
Daniel Major
analystAll right, thanks. If I could squeeze in just one more. I think the market very much appreciates the boost to capital returns. Earlier in the year you mentioned $600 million of capital returns assuming a gold price of $4,500. My guess is we will probably land a bit under that, but would it be reasonable to say that somewhere in the range of $500 million to $600 million in capital returns for the full year stays the target, based on the $600 million at $4,500 that you previously provided?
Ian Cockerill
executiveWell, we never provide forward guidance on a matter like that. Your calculator is as good as ours. That said, as we noted in the narrative, and Guy brought it up, we remain in a solid position to deliver very, very good returns. I would rather not put an exact figure out there, but we are still well placed to keep leading the sector when it comes to returns to shareholders.
Daniel Major
analystOkay, that's where I'll stop. Thank you so much for your questions.
Kristian Koschany
analystHello, everyone. Nice work on the strong quarter. I appreciate you taking my call. Would you be able to take us through what the regulators need before open-pit mining can begin at Bana Camp and Maoula, if anything is needed at all, particularly given that the permit for Bana Camp has now come through? And on the same note, for underground mining to restart at Wona, Dangouna, and Aviera, have talks with the authorities begun yet?
Ian Cockerill
executiveThanks, Kristian. Both are excellent questions. As you're aware, following some delay, the official permit allowing us into Bana Camp has now been received. Some prep work had already been completed, so once that approval arrived, we were able to get moving again quite quickly. Ground movement will be limited: a bit of stripping, levelling off of areas, and building drill pads. We'll also carry out some advanced grade control drilling purely to firm up the ore body models. With that as a basis, our intention is to begin some stripping, hopefully early next year. We aim to be in a position to start stockpiling ore from Bulyanhulu and from the other permit by certainly moving into Q2 of next year, once all stripping is finished. These areas don't have particularly extensive cover, so the stripping ratios are fairly modest. That means we should reach ore reasonably fast; we'll stockpile it, and it will serve as supplemental feed alongside the underground ore we would begin receiving, which also probably starts sometime in the first half of 2027. As for approvals to restart underground, talks have already taken place with the Minister of Mines, who is tracking the whole process very closely and has certainly insisted that his team and his advisors be strongly involved, first with the program, second with approval of that plan, and finally with giving the overall approval for operations to commence. Frankly, that is what you would expect any responsible regulatory authority in any country to do. So good, open, transparent conversations are underway with the authorities, and we are making solid progress on that front.
Kristian Koschany
analystAppreciate it. Moving to my second question, I was hoping you could shed some light on the grade profiles at Houndé and Lafigué. Over at Houndé, now that Vindaloo Main phase three is complete, does that large Q4 increase represent a peak, or is it more likely to become the new normal for 2027? And at Lafigué, given that the next main and waste pit pushback kicks off in Q4, what sort of duration and depth should we anticipate for the grade and recovery dip as stockpile feed increases? Thank you.
Ian Cockerill
executiveYes. I'll have Djaria walk you through the specifics on that.
Djaria Traoré
executiveThank you, Ian. Kristian, I think, once more, apologies, since, well, I'm not certain the connection is somewhat shaky. You were discussing the Vindaloo Main 3 at Houndé regarding stripping, correct?
Kristian Koschany
analystYeah, I just want to verify something about that grade increase in Q4 — is it going to represent a peak, so that it drops back down again in 2027, or should we view the grade step-up at Houndé as the new baseline from here on?
Djaria Traoré
executiveOkay, thank you. As we communicated earlier, I think Vindaloo Main 3 was the primary source of production in 2026. Now that we've completed the peak of the stripping, we're seeing the higher grade that we expected. Obviously, we don't believe it will go back down, at each, because everything is based on the mine sequencing. We'll guarantee that from 2027 onward, stripping is consistently carried out before we access the better grade. What we're observing now, I believe, was anticipated, and we communicated well in advance that a larger stripping effort would take place. What you're seeing at present, once more, stems entirely from mine sequencing. The question isn't whether this becomes the baseline. I think that, again, hinges on what we're aiming to accomplish. Our stance has consistently been to push output as high as possible during Q1 and Q2. Q3 always brings a decline, after which we recover in Q4; we also take care to keep our sequencing aligned with that pattern.
Kristian Koschany
analystGreat, thank you.
Ian Cockerill
executiveThank you very much indeed, Operator, and thanks to all of you for joining us today. As always, if any thoughts, ideas, or questions come up for you after you have had a chance to digest the results, please do reach out to Jack and his team, and we will get back to you as promptly as we can. Thank you all, and we look forward to seeing everyone again at the end of January for our full year results. Thanks so much, everyone, and good afternoon.
Operator
operatorThat brings us to the end of today's conference call. Thanks for joining us, and at this point everyone can disconnect. Have a nice day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Endeavour Mining plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Endeavour Mining plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Mining plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.