Endeavour Silver Corp. (EDR) Earnings Call Transcript & Summary

August 8, 2023

Toronto Stock Exchange CA Materials Metals and Mining earnings 33 min

Earnings Call Speaker Segments

Operator

operator
#1

Many thanks for staying connected. This is the conference operator speaking. We welcome you to the Endeavour Silver Corp Second Quarter 2023 Financial Results Conference Call. Please note that everyone attending is in listen-only mode, and this conference is being recorded. Following the presentation, attendees will have a chance to pose questions. To enter the question queue, simply press Star, followed by one on your telephone keypad. If you require assistance at any point during this conference call, you can signal an operator by pressing Star and zero. At this time, I'd like to hand the conference over to Galina Meleger, Vice President of Investor Relations. Please proceed.

Galina Meleger

executive
#2

Thanks, operator, and good morning to all of you. Ahead of beginning, I'd like you to review the precautionary wording in our MD&A concerning forward-looking statements, along with the risk factors tied to those statements. Both our MD&A and our financial statements can be found on our website at edrsilver.com. Joining us for today's call are Dan Dickson, Endeavour's CEO, Christine West, our Chief Financial Officer, and Don Gray, Endeavour's COO. After Dan's formal remarks, we'll open the line for questions. Dan, over to you.

Dan Dickson

executive
#3

Thanks, Galina, and hello everyone. Let me begin by recognizing the huge strides we made at Terronera during Q2, which moves our strategy forward in pursuing high-margin production growth. In the quarter, we secured formal board approval, committed to project loan financing, put a seasoned team in place, and construction is now well underway. Terronera is a one-of-a-kind opportunity that will reposition the company to generate significant free cash flow, bringing us one step closer to our mission of becoming a premier senior silver producer. That said, even with continued positive production performance, the headline for this quarter remains pressure on costs. As a company with operations in Mexico, we are facing the challenge of rising costs, and we remain vigilant in mitigating the impacts. Like all our peers, macroeconomic factors such as industry-wide inflation and a strengthening Mexican peso have continued to put pressure on consumables and labor costs across our operations. Unfortunately, we expect these trends to continue for the near term. On production, consolidated Q2 silver equivalent production was up 8% year-over-year to 2.3 million silver equivalent ounces, bringing us to 4.7 million silver equivalent ounces for the first half of the year. This performance puts us well and in line to achieve this year's production guidance of 8.6 million-9.5 million silver equivalent ounces.

Dan Dickson

executive
#4

When you look at the same period a year earlier, silver output rose 10% and gold output rose 6%. At Guanacevi, results were broadly in line overall — we milled more tons, but that was offset by lower grades. During the quarter, changes we made to mine sequencing led to grades coming in below what we had planned in recent quarters. That said, we anticipate getting back to higher grades in both the third and fourth quarters. Silver and gold grades each fell by 20% in Q2 relative to Q1. Our other operating mine, Bolanitos, continues to perform steadily. In Q2, higher gold production was offset by lower silver production. At Bolanitos, the team appears to be continuing a strong effort to meet or beat their targets, including mined and processed tons. Turning to our financials, we reported top-line revenue of $50 million, with cost of sales of $37.5 million, giving operating earnings of $12.5 million. After exploration, G&A and other expenses, we reported a net loss of $1.1 million, or negative $0.01 per share. Excluding non-cash mark-to-market adjustments on marketable securities, adjusted earnings came to $2.1 million, or $0.01 per share this quarter. At the site level, Guanacevi delivered mine free cash flow of $5 million, and Bolanitos was pretty much breakeven.

Dan Dickson

executive
#5

On the operating cost side, we have been feeling pressure from a number of inputs. Direct costs per ton rose 15% in the quarter. When we put guidance together, we assumed 5% inflation. But so far this year, prices for key inputs — steel for ground support, and consumables like zinc and cyanide — have kept climbing far beyond that assumption. On top of that, lab-labor costs are weighing heavily because of the stronger Mexican peso, which has reached a 7-year high. Our original 2023 guidance assumed a Mexican peso to US dollar exchange rate of 20 to 1. Right now we are looking at 17 to 1. That is a 14% move year-to-date, and it pushes our local costs up in US dollar terms. All of this shows up as higher overall costs. Quarterly cash costs and all-in sustaining costs both sit above the upper bounds of our guidance — $13.52 per ounce for cash costs and $22.15 per ounce for silver, or all-in sustaining costs per ounce. Consequently, management anticipates costs will come in above the cost metrics we previously provided in our 2023 guidance. Inflation is an industry-wide problem that is expected to last through the year. We are taking a close look at our purchasing practices to find where and how we can soften the impact.

Dan Dickson

executive
#6

Keeping a lid on costs remains a major priority as we strive to make our operations more efficient. Management expects cost figures for the rest of the year to match the actual costs from H1 2023. As of June thirtieth, our cash on hand stood at $43 million, with working capital of $78 million. To preserve flexibility in executing projects, we launched a $60 million ATM filing during Q2. We anticipate finalizing the definitive loan documentation for the $120 million senior secured debt facility shortly, with closing and drawdown slated for Q3. Following the quarter, we bolstered our liquidity further by divesting a 1% interest in Capstone's Cozamin royalty to Gold Royalty Corp. That transaction will deliver a $7.5 million cash infusion in Q3. We initially acquired that royalty via a concession transfer agreement in 2017 for under $500,000. Here's a brief update on construction at Terronera. By the close of Q2, we had hit 30% completion. We've invested $70 million through the end of Q2 on direct development. Total project commitments amount to $144 million, and we're progressing in line with the optimized plan, both in terms of schedule and budget. Throughout the quarter, we maintained steady progress on engineering, surface construction at the plant site, mine development, and setting up internal processes to execute the project as effectively as possible.

Dan Dickson

executive
#7

If you'd like to look at pictures showing how construction is coming along, I'd suggest heading to our website and checking the Terronera page. Here's a brief summary. The number of people on-site has grown to more than 450 employees and contractors. Engineering for the mill and surface facilities in detail is now over 70% finished. The engineering work was completed so we could issue requests for proposals on the mill construction contract, covering structural, steel, mechanical, piping, electrical, and instrumentation. Work on the access road is essentially done. Our early emphasis on upgrading roads has made the construction ramp-up much easier, particularly ahead of the rainy season. The camp, which will house 550 personnel, is essentially finished. Almost every dormitory unit is in place. A handful of live, final living units are still outstanding. Mine development is moving forward on two fronts, and as of June 30th more than 600 meters have been completed. At the same time, preparation is underway on a new portal that will provide access to the lower portion of the ore body. Bulk earthworks for the planter are close to wrapping up, with close to 300,000 cubic meters of material moved. Excavation work is finished for the coarse ore reclaim tunnel and the grinding areas, and rebar installation has now started. Turning to procurement, deliveries are progressing according to schedule, with shipments reaching the company's laydown warehouse. Key equipment delivered in Q2 includes jaw and pebble crushers, vibrating screens, flotation cells, and the concentrate bagging system.

Dan Dickson

executive
#8

Finally, regarding community engagement, we keep working alongside nearby schools to back educational initiatives and cultural festivities. Moving forward, our primary emphasis is on moving mine development ahead, pushing forward the concrete work for the mill platform, and awarding the contract for mill construction, which will launch the following big construction phase. That, I believe, concludes today's prepared remarks. Don, Christine, and I are glad to take whatever questions you have. Operator, would you kindly open the line for Q&A?

Operator

operator
#9

Thank you. We’ll now start the question-and-answer portion. To get into the question queue, press Star and then 1 on your phone’s keypad. A tone will sound to confirm your request. If you’re on a speakerphone, please lift your handset before you press any keys. To take your question back out, press Star and then 2. Our first question is from Heiko Ihle at H.C. Wainwright. Please go ahead.

Heiko Ihle

analyst
#10

Thanks, Galina, Dan, and the team. Am I coming through clearly on your end?

Dan Dickson

executive
#11

Heiko, we can hear you clearly.

Heiko Ihle

analyst
#12

Great. Hey, regarding Terronera, I reread your July press release earlier today and set it next to your note from today. Dan, you clearly gave additional detail earlier on this call too, but I still have to ask: is anything causing you some difficulty, whether on availability or on pricing? The camp looks like it's largely finished, and mine development is still moving along at a solid rate. Is there anything we ought to be aware of? My guess is the answer is no, but I just want to confirm.

Dan Dickson

executive
#13

No, that's a reasonable thing to ask. As I said, we're encountering substantial cost pressure throughout our operations. From a procurement perspective, I believe Don and his team have performed very well — they got out ahead and secured many of our critical components. I've noted on earlier calls and in previous press releases that our whole mobile fleet is already at the site. Many of the plant's essential components were purchased well in advance and are expected to arrive here. We received some during Q2, more will come in the back half of the year, and the remainder will follow. A great many of those components, or key purchases, have arrived consistent with our expectations, consistent with our optimized plan and the feasibility study. We handled that quite well. There are always items that concern us — that's our role as management — and ensuring we achieve our mine development headings and the rates, and delivering on that through the next year, year and a half, will keep us on time and on budget for Terronera.

Dan Dickson

executive
#14

We do come out ahead on certain items, and ideally there will be others we don't win, and with any luck some cost-side wins as well. Right now, and it's still early, as I mentioned, Terronera stands just 30% complete, and we believe we're matching the budgets very closely.

Heiko Ihle

analyst
#15

That served as a really good segue into what I wanted to ask next. Clearly, the Mexican peso has climbed fairly significantly. You brought it up before on this call, and it's in your release too. At the moment we're sitting at 17.12. For the rest of the year, what figure are you assuming in your model? I'm not sure whether you also have a longer-term number for modeling the peso — if so, please share it.

Dan Dickson

executive
#16

For the rest of this year, our cost guidance is basically going to be similar to what we saw in H1. In H1, we averaged a bit over $17, maybe closer to $18. I'd probably feel comfortable saying $18 to 1. Over the long term, we'll review that at year-end. Right now we're in the middle of our 2024 budgets and just getting that process started. From various conversations with different banks, we do anticipate the peso will keep depreciating as it has over the last 20 years. Of course, we don't have a crystal ball. When that reverses so we stop seeing peso appreciation — hopefully within the next six months, though again, no crystal ball on that. When we issue guidance for 2024, we usually specify the FX rate we're using at that point.

Heiko Ihle

analyst
#17

Understood. All right, Gareth, I'll follow up with you later. Thanks for your time.

Dan Dickson

executive
#18

Thank you, Heiko. I appreciate the questions. It's nice to hear from you.

Operator

operator
#19

Craig Hutchison from TD Securities has the next question. The line is yours.

Craig Hutchison

analyst
#20

Hey everyone, appreciate you giving me the chance to ask something.

Dan Dickson

executive
#21

Hi Craig, how’s it going?

Craig Hutchison

analyst
#22

Appreciate it, doing well. Turning to Terronera — about the Mexican peso, could you help us understand the extent to which it’s exposed to the domestic currency, the peso, and the extent to which it’s exposed to the US dollar?

Dan Dickson

executive
#23

Sure, so labor costs clearly carry a lot of peso exposure relative to the U.S. dollar. Many of the things we've bought have been denominated in U.S. dollars. Out of the $230 million, we've committed $144 million. Of the $90 million that's still to be exposed, we expect somewhere between $30 million and $50 million to be tied to the Mexican peso. Not significant at this point in time.

Craig Hutchison

analyst
#24

All right, that's helpful. Now regarding your operations, how would you roughly split the exposure between Guanacevi and Bolanitos?

Dan Dickson

executive
#25

Right, so depending on the operation, somewhere in the 30%–35% range — Bolanitos sits at about 32%, while Guanacevi runs a bit higher, roughly 34% or 35% — of our costs come from labor. And clearly, labor is fully exposed.

Craig Hutchison

analyst
#26

Alright.

Dan Dickson

executive
#27

The other 65% that's left — roughly half of that is linked to the Mexican peso. All told, when you add it up, somewhere between 55% and 65% of the costs we carry are connected to the Mexican peso.

Craig Hutchison

analyst
#28

All right, regarding the financing, I’ll focus on inflation and the FX pressures you’ve observed. Could that $120 million, which has been agreed to so far, potentially be increased? Has it been finalized, and is that the figure we should expect?

Dan Dickson

executive
#29

Right, no, it's done. From our perspective as the management team, we feel that's roughly the ceiling we're willing to accept on the debt side. We set up the $60 million ATM facility, which we haven't drawn on, as a safeguard. In the end, should we wind up over the $230 million mark, our preference would be for that to come through equity, simply because we don't want to become too heavily levered with debt.

Craig Hutchison

analyst
#30

Alright, that’s clear. Sure. Appreciate it, everyone.

Dan Dickson

executive
#31

Appreciate those questions, Craig.

Operator

operator
#32

Our following question is from Lucas Pipes at B. Riley Securities. You have the floor.

Lucas Pipes

analyst
#33

Thanks a lot, operator. Good afternoon, everyone. I'd like to begin on the cost side as well and, more broadly, perhaps ask what kinds of steps you're taking right now in order to shield against cost inflation. Are there particular things you're examining at the operational level? Any extra detail you could offer would be appreciated. Thank you.

Dan Dickson

executive
#34

Yes. Thank you, Lucas. It is, it is hard to separate inflation and, ultimately, the Mexican peso getting stronger when you talk about labor. From an efficiency perspective and making sure we operate as well as we possibly can, I think we have done that well at Bolanitos. At Guanacevi, we are able to do better on that. We are examining how to improve our ventilation, our pumping, cut our electricity usage from pumping and be more efficient from that angle. We are also aiming to be more efficient with our underground advances, making sure we use the correct quantity of explosives, the correct quantity of steel, instead of potentially using more than we should have been. I think it is really an efficiency perspective from our operations team, that we can find small wins here and there, and whether it concerns, it concerns the inputs going in, so the number of units we are using as opposed to those costs of those units. Because there is only so much you can do from a, like, for instance, the strengthening of the peso, our labor costs, we need those laborers. The question is, do we need as much labor as what we have? That is where we can make those adjustments.

Dan Dickson

executive
#35

Naturally, we’ve had a fair amount of good luck, such as at Guanacevi, thanks to the discoveries in 2019 in the high-grade area. I believe a portion of that grade will improve in the latter half of the year. That’s going to bring down our costs per ounce. It comes down to small details—staying watchful about those small details and ensuring we run things as well as possible.

Lucas Pipes

analyst
#36

Thanks for that. One more question about Guanacevi. With the better grades coming from the El Curso ore body, how sustainable is that? You mentioned the back half of the year, but as we look ahead to 2024, should those benefits keep showing up, get better, or more or less level off at the second half level? Thank you.

Dan Dickson

executive
#37

Yeah, I believe it would level out. We've got a solid lifespan still ahead with El Curso. I mean, clearly, we have Milache and Santa Cruz Sur, plus other zones we can mine. Santa Cruz, or El Curso, is essentially the core source of our output, and that's going to keep going for the foreseeable future, particularly through 2024 and 2025.

Lucas Pipes

analyst
#38

Thanks, I appreciate that. One quick final question from me. Regarding Pitarrilla — I mean Pitarrilla — what does the outlook look like there, and what major milestones should the market be watching for? Thank you.

Dan Dickson

executive
#39

Yeah, no, that's a pretty reasonable question, and I appreciate you raising it. So for us, Pitarrilla — as I think most people listening probably are aware — we bought it back in 2023 for $70 million, and we've been putting a lot of effort in there. At the end of 2023 and into early 2024, we did quite a bit of re-logging of the historical data. This year we had a $3.3 million budget, and the bulk of that is meant to advance the ramp toward what we believe — or what our predecessors believed — was a manto zone. It was roughly 300 meters away to reach it. We've run into some delays. We've had to work around issues on the old historical ramp. It looks like we're going to need to drive a parallel ramp, which means instead of 300 meters, we ourselves will have to go 500 to 600 meters, and that will push back our drilling program and end up being either late Q4 or, more likely, into 2024. We won't have as much news on Pitarrilla this year — which had been expected around the end of the year from a drilling standpoint, with economic analysis to follow next year. That'll slip into next year simply because of this ramp. But we still have big expectations for Pitarrilla.

Dan Dickson

executive
#40

Sure, we've outlined a resource exceeding 600 million ounces, but what we're really doing is testing whether this can work as an underground mine, along the lines of what Silver Standard examined back in 2009. Naturally, I'd always like things to move more quickly than they sometimes do, and my hope is that we can still complete that economic analysis during 2024.

Lucas Pipes

analyst
#41

Much obliged for all the nuance and specifics, both from you and the team. Wishing you the best of luck.

Dan Dickson

executive
#42

Thank you, Lucas. I appreciate you asking those. I trust everything is going well.

Lucas Pipes

analyst
#43

Appreciate it.

Operator

operator
#44

Our following question is from Justin Stevens at PI Financial. Go right ahead.

Justin Stevens

analyst
#45

Hi, everyone. Nearly all of my questions have already been answered. I’ve got a final one. Clearly, the GCV grades declined in Q2. You expect an increase in Q3 and afterward. Was the sequencing effect there mainly tied to development? If that’s the case, do you believe you’ll be able to remain ahead and maintain sufficient stopes in the high-grade areas to keep that grade fairly flat going forward?

Dan Dickson

executive
#46

So there were two things that drove that sequencing. We actually lost one of our high-grade stopes, and we spent a lot of Q2 cleaning that up and getting it fixed so we can get back in there in Q3. Development has fallen a bit behind — not dramatically behind — but we do have a recovery plan in place to make sure development stays ahead, so we don't get these changes in our plans, in our mine plan sequencing. That's sort of the bugaboo for every underground operation: making sure you have enough mine development and that you don't get ahead of yourself and pull out too much ore, because eventually that always catches up with you. We do expect Q3 and Q4 to stabilize, and again, grades to come in slightly below Q1. I thought Q1 had pretty high grades and we significantly beat plan, but it'll land somewhere between Q2 and Q1.

Justin Stevens

analyst
#47

On that point, regarding the high-grade stope — was that simply an isolated ground condition problem, or something else?

Dan Dickson

executive
#48

Yeah, our view is that it was an isolated case. We're constantly watching that, but things have gone really well for us on the ground in El Curso.

Justin Stevens

analyst
#49

Sure.

Dan Dickson

executive
#50

We anticipate being in a solid position.

Justin Stevens

analyst
#51

Okay, so maybe just a thought on timing as well. I understand you've been wanting to twin a few holes over at Bruner and basically re-optimize that resource. Is that something we should figure on happening simply by the time the year wraps up?

Dan Dickson

executive
#52

No, I believe that lands in 2024. We haven’t really focused on Bruner this year. We did secure every one of our drilling permits — again, there are no plans.

Justin Stevens

analyst
#53

Sure.

Dan Dickson

executive
#54

Our goal is to ensure that this stays intact.

Justin Stevens

analyst
#55

The main focus is clearly Terronera, along with all the rest of it.

Dan Dickson

executive
#56

Yes, exactly.

Justin Stevens

analyst
#57

Correct.

Dan Dickson

executive
#58

That is precisely right.

Justin Stevens

analyst
#59

Perfect. Fine, thank you, and.

Dan Dickson

executive
#60

That’s great.

Justin Stevens

analyst
#61

I'm eager to see that uptick return in Q3.

Dan Dickson

executive
#62

Thanks, Justin, for those questions — I appreciate them.

Operator

operator
#63

Our following question is from Cosmos Chiu at CIBC. You have the floor.

Cosmos Chiu

analyst
#64

Hello there. Thank you, Dan, and to the team. My first question concerns Bolanitos, perhaps. In the MD&A, I believe you noted that Q2 saw stronger gold grades and greater throughput, which were offset by reduced silver output and weaker silver grades. So my question is this: will that elevated gold grade and diminished silver grade persist, and will it return to prior levels at some point down the road?

Dan Dickson

executive
#65

Yeah, thanks for those questions, Cosmos. I mean, we do actually see quite a bit of variation between Bolanitos, between gold and silver. Overall, I think our silver equivalent grades came in line with expectations and with budget, and Bolanitos was doing what we expected. For Q3 and Q4, it would probably match up pretty well with the gold grades and silver ratio from H1, and then from there on, similar at that point.

Cosmos Chiu

analyst
#66

Thanks. So, Dan, when I look at your guidance, as you said, production guidance hasn’t changed and cost guidance hasn’t changed. As we discussed on this call, there are plenty of questions about inflation, foreign exchange, and FX rates, and I guess in the MD&A you note that some of these inflationary pressures are expected to persist in the near term, and that actual cost metrics are expected to be above the cost metrics the company previously provided in its 2023 guidance. What does that mean? Are we potentially looking at costs for the full year coming in higher, or is that just looking out into Q3? I wasn’t too sure what the wording around that meant...

Dan Dickson

executive
#67

Yeah, that's right.

Cosmos Chiu

analyst
#68

I guess you could say—

Dan Dickson

executive
#69

Let me clarify that for you, Cosmos. As you mentioned, on the production side, we've produced 4.7 million silver equivalent ounces. Our top end of the range is 9.5 million silver equivalent. From a production perspective, we're tracking quite well toward that upper bound. Sadly, on the cost side, all-in sustaining costs came in at $22.15, and cash costs were close to $12, or $12.21, during the first half of the year. We anticipate our costs will land above the upper bound of our guidance. So we are not.

Cosmos Chiu

analyst
#70

Understood.

Dan Dickson

executive
#71

To restate that figure, for the second half of the year our cost metrics should look much like H1, and that, once again, places us beyond the top end of the range in our initial guidance.

Cosmos Chiu

analyst
#72

Got it. I suppose,

Dan Dickson

executive
#73

All right.

Cosmos Chiu

analyst
#74

Anyway, Dan—sorry, go ahead.

Dan Dickson

executive
#75

No, no, that's fine. I'm glad it came across. I simply wanted to make sure that point was clear.

Cosmos Chiu

analyst
#76

Alright. I suppose, as we’ve discussed, the Mexican peso is one of the key elements. I just took another look at it. My understanding is that at present you have no hedge at all when it comes to the Mexican peso. Dan, like you said, you don’t own a crystal ball, and neither do I. Is there any consideration being given, you know, to perhaps hedging that exposure over a longer horizon, particularly given, you know, some of the costs tied to Terronera?

Dan Dickson

executive
#77

It's a really solid question, and there are almost two sides to it. Operationally speaking, we won't be putting any FX hedges in place for Guanacevi or Bolanitos. Much of what we continue to read suggests the peso should remain fairly strong throughout 2023, but then turn around and return to its historical pattern of weakening versus the US dollar. That thinking is part of why we're doing nothing on the operating side. When it comes to Terronera, the situation differs, correct? Since we have a large occurrence there, and given the debt we're taking on with SocGen and ING, which is $120 million, there is an FX hedging element related to Terronera. It isn't significant. Craig asked earlier about what's left from an FX perspective. We've given those banks that detail, and we will need to put some FX hedging in place as a covenant under the loan facility. Also, for everyone else listening on the call, that loan facility carries a gold hedge requirement covering the first 2 to 3 years, totaling between 50,000 and 60,000 ounces of gold over that 3-year period, which averages out to 20,000 ounces of gold each year.

Dan Dickson

executive
#78

Once everything is fully finalized—hopefully during this quarter, Cosmos—we’ll walk through those specifics.

Cosmos Chiu

analyst
#79

Mm-hmm. Great. Then one final question. As you said, the rainy season is approaching in Mexico. You've been through a lot of rainy seasons, and so—

Dan Dickson

executive
#80

Absolutely.

Cosmos Chiu

analyst
#81

I’d like to, you know, sort of discuss how you’ve gotten ready for this on the operations side and also at Terronera. From what I’m reading, there are, you know, major milestones coming up at Terronera, but it’s a lot of delivery, some concrete work. I don’t see much in the way of major earthworks. But again, how have you kind of, you know, thought about the risk around the rainy season that’s coming upon us in Mexico?

Dan Dickson

executive
#82

Sure, as you mentioned, our operations have been through 17 years, 16 years of rainy seasons at those sites. I'd say they're quite well adapted to dealing with it, and you don't really see major shifts in our production profiles as a result of the rainy season. Over the years we've had problems at various times, like clay getting into the crushers and affecting things, but only at what I'd call a minor level. From the Terronera perspective, I think we've done a really solid job getting ready for it. That's why we've invested so much effort in the roads, the drainage surrounding the roads, and the drainage requirements. I'll probably hand this question over to Don, who is in Mexico and is on the call. He has a strong grasp of this and can likely answer better than I can. Don, would you like to give Cosmos some detail on the work we've done regarding the rainy season at Terronera?

Don Gray

executive
#83

Absolutely. We've taken a number of steps, much like what we did on earlier projects. Some are pretty straightforward — for instance, we place lean concrete at the base of the excavation, giving the contractor a surface to work from when the weather turns rainy. We also have pumps and similar equipment ready for excavations where rainfall might build up, that sort of thing. Another measure we've used elsewhere is setting up tents and overhead structures — really simple stuff. As long as the contractor is ready, and ours is — the concrete contractor is on site right now — we can work through it. We've been getting ready for this, or are in the process of doing so, and we expect to be able to handle the challenge.

Cosmos Chiu

analyst
#84

Great. Thanks, Don. If you glance outside at this moment, would you say rain is falling?

Don Gray

executive
#85

Looking outside at the moment, there's largely, largely clear blue overhead with a touch of, a touch of cloud cover. Once afternoon arrives, clouds roll in, and afternoon showers follow, though that's fairly standard for this point in the wet season around here, so.

Cosmos Chiu

analyst
#86

Thanks, Don. Apologies for catching you off guard there.

Don Gray

executive
#87

Okay.

Cosmos Chiu

analyst
#88

Once more, Dan, I appreciate you taking the time to address every one of my questions.

Dan Dickson

executive
#89

No, those are excellent questions, Cosmos — and we’re always glad to take them, so.

Operator

operator
#90

That wraps up the Q&A portion. Dan Dickson, I'll hand the conference back to you for any closing comments.

Dan Dickson

executive
#91

Alright, thanks to the operator, and thanks to everyone who's joining us for the Q2 financial results call. From the questions, I can tell that I think everyone gets how much Terronera matters and how much it matters for Endeavour to execute on Terronera over the coming 18 months. Of course, management is always eager and glad to take analysts' calls, and hopefully we're expecting solid results in Q3 on the production side, and we're keeping our focus on cost and trying to push that down as much as we can. Thanks, everyone, and have a good day.

Operator

operator
#92

That brings us to the end of today's conference call. Your lines can now be disconnected. Thanks for joining us, and we hope the rest of your day is a pleasant one.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Endeavour Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Endeavour Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.