Nitin Dahiya
executiveThanks, operator, and good afternoon to all of you who are with us today. Welcome to Energy Vault's 3Q 2026 Financial Results Conference Call. The earnings release and investor presentation can be found in the Investor Relations section of our website. Before we get started, I'd like to remind everyone that this discussion includes forward-looking statements, which carry risks and uncertainties. Actual results could differ materially from what these statements express or imply. Please see our latest SEC filings, along with the safe harbor language in today's earnings release and the presentation, for a discussion of the factors that might cause actual results to differ; we assume no obligation to update these statements except as the law requires. With that covered, I will — sorry, actually, I also want — we also plan to discuss certain non-GAAP financial measures. Reconciliations to the most directly comparable GAAP measures appear in our earnings materials. I also want to remind everyone once more that an investor presentation has been posted to the website. We'll be referring to specific slides as we move through the deck, so downloading it may be helpful. With me today is Robert Piconi, our Chairman and Chief Executive Officer. Rob will start with the strategic and operational updates, and then I'll walk you through the quarter, our balance sheet, and the updated outlook. Rob, over to you.
Robert Piconi
executiveThanks very much, and I want to welcome all of you to our Q3 earnings call. We'll follow the same presentation format that Nitin just laid out, just as we've done previously. I'll begin with an executive summary touching on 3 key areas, then we'll walk through some specifics before handing things back to Nitin. Let me start with highlights on our execution this year and how it's fueling profitability and cash flow, then discuss how we've grown the portfolio along with our new build and transfer AI compute infrastructure solutions, and finally spend some time on balance sheet strength. Looking at our Q3 numbers, the quarter came in as expected—very similar to the two before it. Contract backlog rose by double digits quarter over quarter and by multiples compared with a year ago, revenue grew at a double-digit rate, gross margins were strong, and cash generation was robust. To put a finer point on it, this is the seventh quarter in a row that cash has increased, rising about 60% from the prior quarter and close to 3x versus the year-earlier period. A big part of that comes from our integrated business model, which is a truly distinctive strength and central to how we operate as a company. Our build and transfer strategy delivers near-term revenue and cash with accretive gross margins, even as we put capital into build, own, and operate infrastructure so that recurring revenue and earnings build as assets come online. Producing gross margins of this kind—for those who track the sector, in the EPC business at two to three times what the market delivers—does more than give us accretive cash as we build and hand off solutions. That strength, combined with our operational experience, lets us be highly capital efficient in the way we construct projects that we will own and operate down the road; once again we posted backlog growth of roughly 15% quarter over quarter, which gives us solid visibility into revenue through the remainder of 2026 and on into 2027, and we're excited to share with you for the first time at this point what that revenue range will look like, all while sustaining profitable growth over the long term. Regarding our latest revenue guidance, we lifted it into the $290 million to $310 million band — that's the upper portion of what we had previously projected. The change mirrors when we now expect contracted deliveries and milestones to land. With 7 weeks left in the quarter as we speak, we're quite confident about tightening toward the high end of that band. We expect this to be the largest quarter the company has ever had, coming in at approximately $250 million. Given how much visibility that robust backlog expansion gives us, we are also providing 2027 guidance: revenue should more than double from a year earlier, landing between $600 million and $700 million, with EBITDA between $40 million and $50 million — marking our first full year of positive EBITDA, which is yet another milestone. That represents the following step as we transform our expanding backlog and execution strengths into profitable growth. Obviously, at this moment we are concentrated on the current quarter and the significant ramp ahead of us, holding those healthy margins and turning these deliveries into cash. We're pushing our own portfolio forward too, with several projects at various points in financial close and financing. Take Stoney Creek in Australia — it just got formal grid interconnection approval and is moving toward a final investment decision. That one's huge for us, the biggest project we have in Australia, at 1 gigawatt hour. We also closed the Goshe acquisition we announced last quarter, which brought in 2.3 gigawatts of U.S. battery storage development projects, including 350 megawatts that are ready to build — and that came on the heels of our Japanese portfolio acquisition earlier this year. As we know, in energy, scale matters enormously for profitability and cash, and for credibility with some of the biggest customers globally. We're building that scale right now, aggressively, both organically and inorganically. I'll also note that our AI infrastructure solutions have advanced tremendously since the 1.25-gigawatt announcement of the hybrid generation and storage solutions that we're leading with our software. Our opportunity is to solve this problem and its power constraint through these integrated generation, storage, and software solutions, which play a very important role in load balancing and give our customers a single pane of glass visibility. Customer interest and momentum remain robust, and growth is still strong. One thing that matters a lot, particularly with the macroeconomic environment where it is, is that these solutions sit behind the meter—they never connect to the grid. As a result, many of the problems that would otherwise hit current grid demand and current power availability when deploying such solutions simply don't arise for us. That capability is something we are putting to work. Our approach also aims to curb certain emissions from generation—including gas-fired generation—by leaning more on battery storage, and we're examining new options for tackling water usage in this area as well. We remain committed to keeping a robust balance sheet that backs our expansion. Although I've saved it for last, this point is plainly essential and truly foundational to the way we execute and sustain strong capital discipline. To start, we closed the quarter holding $236 million in total cash. That represents roughly 60% growth quarter over quarter and 3x year over year. As I noted before, this is now the seventh quarter in a row that our cash position has increased. Given the current environment and the volatility in the market, that is clearly a quite robust indicator as we build up our balance sheet. During the quarter, we additionally cut corporate-level recourse debt by $12 million. Our emphasis on disciplined execution, operating cash, and the financing pools, we believe, will let us move toward profitability with very limited needs for equity funding. We will stay selective regarding the projects we push forward, the way they get financed, and the returns those projects generate for shareholders. I will now walk through a few of the supporting pages, wrap up there, and call out just a handful of items before I hand things back to Nitin. If we look at Page 4, it shows a number of the milestones behind some of the progress I just mentioned — everything from certain portfolio expansions and financing for generation equipment, which is essential today as we bring power solutions to market, to other projects we've advanced around the world, including the announcement about the Italian project and its designation in Sardinia as a project of preeminent national importance. In addition, as I said, the Stoney Creek approvals obtained just recently will now accelerate our move into construction in Australia, which remains a very important region of the world. Every one of these pushes ahead the development and delivery work that underpins our long-term business evolution.
Robert Piconi
executiveIf you go to Page 5, overall I’d say the quarter Nitin will walk through came in as we expected — again, quite similar to the first two quarters ahead of it — and it really positions us for strong execution across the remaining 7 weeks of this quarter and for delivering one of our biggest quarters to date. Nitin will get into those details shortly; on Page 6, you can see we keep a healthy blend of build and transfer plus build, own, and operate backlog, and it shows how that backlog has evolved over time. I think the key underneath that is the move into large bookings tied to the next 12 to 15 months as well; that clearly gives the business a lot of accretive cash, thanks to the strong gross margins we just talked about. And if you look at this quarter and then toward the end of the year, we still expect to keep building that contract backlog. Roughly 35% to 40% of that $2.3 billion backlog should convert, as I said, over the next 12 to 15 months. And we estimate that backlog could get close to almost $3 billion as we look toward exiting the year and the next time we’ll be together at our Q4 earnings. Clearly, strong progress here. I think it’s a great signal for investors looking at that growth and even seeing backlog growth outpace what is, although very large, revenue growth. That gives a good indication of strong, sustainable future cash flows for the company. On Page 7, a few items here: our build and transfer backlog is at about $825 million, with most of that, as I said, converting over the next 12 to 15 months; that gives us tremendous visibility. As a company, I’d say we’re in the best position we’ve ever been at this point in the year, and looking at next year with the coverage the backlog will provide on the revenue range I mentioned at the top; we’d also say a good chunk of the backlog is growing related to some near-term solutions around prime power and the behind-the-meter solutions I mentioned a little earlier, and that we continue to explore other opportunities to grow those solutions. These solutions are modular, averaging about 250 megawatts. They include gas and batteries together, but very importantly, our software platform plays a critical role managing both assets to optimize them and to load balance them into demand needs that are volatile. On Page 8, just to highlight a bit on our build, own, and operate backlog here, it’s approximately $1.5 billion now. Looking at the wider concession portfolio, we project an annual run-rate EBITDA potential above $200 million as we aim to finish 2028 with projects moving into commercial operations; and I should point out that this comes on top of the build and transfer in our prime power solutions EBITDA that we produce through our standard course business too. Clearly, having that build-own-and-operate revenue and that backlog lasting 10 to 15 years or more gives us substantial confidence about the future and a great deal of visibility. That cash flow visibility will assist us in optimizing our capital structure and in how we seek to invest, grow, and scale the company, both organically and inorganically. Moving to Page 9, we anticipate a considerable operating portfolio across the coming year and a half. Calistoga and Cross Trails, naturally, keep advancing. That said, we have numerous other projects in the U.S. that now fall within the project financing timelines. We have additional projects in Australia that I referenced, Stoney Creek, which has now cleared many of the regulatory approvals and is progressing into the financing phase. Snyder AI is aiming for the first half of '27, Stoney Creek for the second half of 2028, and both are coming online with financing underway; also, through the acquisitions I mentioned, we have further projects that will be starting and/or in the process of completing project financing on, and we are simply very excited to bring these projects to market across the next 12, 24, and 36 months, as we keep serving the growing and very near-term demand in the AI compute infrastructure sector. Moving to Page 10, we have another 1 gigawatt of controlled megawatts that sit within our purview right now to develop and carry through the development cycle and through the various project financing phases. This is energy storage as a service solutions, our powered land, and our powered shell solutions. We will move these projects forward according to off-take quality, financing availability, and balance sheet efficiency. What's brought to the portfolio gives us choices regarding where we deploy capital; and we believe we are going to be hitting over $200 million, as I said earlier, of run-rate EBITDA as we exit 2028 based on the current business opportunities we are executing while maintaining, naturally, adequate liquidity and limiting the need for equity. Again, that is in addition to what we will be accreting from our build and transfer business and serving some of the AI compute demand. Moving to Page 11, Page 11 here really emphasizes the different types of projects and different drivers and the considerations for each. Also, just to point out that along the way we're developing the strongest possible execution and financing experience here, going after behind-the-meter storage opportunities with data center customers who have immediate power demand and are having to wait for longer-term grid solutions, while we keep working on projects under development, such as the ones in New Mexico we've mentioned and other projects in the powered land and powered shell area. On Page 12, as we've said previously, we expect 2026 revenue in the range of $290 million to $310 million. For gross margins in 2026, we're now narrowing to 20% to 22% following the raise we put together last quarter. That revenue range sits in the top half of our prior guidance, as I noted at the start, and the guidance is underpinned by all the deliveries we're currently in the process of executing. With 7 weeks left in the quarter, we clearly have tremendous visibility now and very high confidence in reaching the top end of that range. On the cash side, we expect to finish the year somewhere between $170 million and $200 million, depending on opportunities and other projects we may close, contracts we may close, or deposits that come in. And importantly, I think, we expect a further reduction in our corporate-level recourse debt compared with the third quarter. Moving to Page 13, as I mentioned, for the first time we're introducing 2027 guidance based on our contract visibility and that tremendous backlog growth; at this point we're projecting a range of $600 million to $700 million and positive EBITDA of $40 million to $50 million.
Robert Piconi
executiveOur primary emphasis is on turning that backlog into revenue, keeping that conversion going, and growing the backlog further as we scale—executing with the discipline you've come to expect from us and deploying capital in a disciplined way. Page 14, I believe, sums up many of the areas we've focused on during the past three years, and also looks forward to 2027. Frankly, if you could pause at any point and review the prior three years, that's a pretty solid trend to step back and study. I'd call it tremendous growth across the board, whether you look at our revenue. It's really encouraging to see backlog expanding at a multiple of that revenue growth. I think that's a positive sign when we think about the long-term build, own, and operate approach. However, as the way we've broken out the backlog shows, a substantial portion will convert over the coming 9, 12, and 15 months, and that provides the confidence—and gave us the confidence—to issue the projection we provided for 2027. You're also continuing to see robust gross margins. Clearly, those gross margins are a reflection of a great deal of the supply chain management that's been accomplished, of how we execute, and of how we deliver to customers on time and within or under the budgets we establish. I'm going to jump and skip over Page 15, which you can read about some of the momentum on the commercial pipeline and how that's gone, and jump now to Page 16 on our final strategic execution and focus, just to wrap up before turning it over to Nitin. Priorities, I think, as you've heard both in how we've executed this year as we look at Q4, we're going to execute on that revenue ramp, with strong visibility from where we sit today to do that. That's number 1. Number 2 is to turn this time of power demand into bankable contracts. This applies to our build and transfer offerings, and it's also true for the contracts combining hybrid integrated energy generation with energy storage. Beyond that, it covers our build, own, and operate projects within the powered land and powered shell segments. Next, we'll push forward the project milestones along with the related financings — something we've already accomplished this year across 3 other earlier projects, with numerous such efforts currently progressing in the U.S. and Australia, and project financing talks just getting started in Japan. And fourth — this is really essential, in my view, particularly in a market where we expect volatility to persist. I think the macroeconomic and geopolitical backdrop is going to stay unpredictable. Our approach to the balance sheet and to how we raise financing continues to be highly disciplined. As the largest shareholder, I feel I can say plainly that my number one priority is cutting back on or eliminating any kind of dilutive transaction. I know that identical worry is foremost in the minds of all of you who are listening as investors. At the moment, we've got a very solid group of capital pools backing our expansion, and equally important, a gross margin business inside our EPC operations that is highly strong and accretive — one that will be converting over the next 12, 15 months and beyond as we continue building that order book. From the solutions angle, basically, as I said earlier, my confidence in how we're positioned as a company has never been higher — the generation, the storage, our software platform and the differentiation it makes possible, along with owning and operating assets over time. Essentially, I'll leave you with this thought: when all is said and done, having worked across numerous industries throughout my career and at numerous companies. Number 1, I think I've never been more excited about what the future holds for us here; but number 2, we have one of the best teams in the industry to accomplish not only what we've been doing, but to keep scaling and growing this company. We don't constrain our thinking in that sense. Our people are highly focused on delivery and execution for our customers. We're very focused on protecting our cash, on building our balance sheet flexibility, and focused on scale. Hopefully, you've gotten a sense of that during the first 3 quarters of this year, and we'll keep seeing that now as we deliver our largest quarter to date as a company in our history. With that, Nitin, I'll hand it back over to you.
Nitin Dahiya
executiveThanks, Rob. I'll briefly go through the third quarter results and our financial position now, then hand things back to Rob. If you turn to Page 18, backlog stood at $2.3 billion as of November 10th, which is up roughly 147% year-over-year. That backlog, strong and still growing, is a major factor behind the financial outlook Rob laid out. Revenue for the quarter came in at $13.1 million, a decline of 61% year-over-year, though this was due to the timing of shipments and project milestones that we had anticipated. As we noted last quarter, most of our back-half revenue will land in the fourth quarter. Adjusted gross margin—a figure we consider a more meaningful comparison because it adds back non-cash D&A—climbed 50 percentage points from a year earlier, reaching 81%. Tariffs gave us a $4.3 million benefit during the quarter, and setting aside that tariff effect, adjusted gross profit remained a solid 48%, about 17 percentage points higher than the prior year. Total cash at quarter's end stood at $236 million, $55 million of which was restricted, up $88 million from the previous quarter and $174 million versus a year ago. Turning to Page 19, I'll share a few additional income statement details. Third-quarter revenue, as I mentioned, came in at $13.1 million, matching expectations. Revenue for the first nine months rose 4% year-over-year, totaling $52 million. For Q3, gross profit under GAAP was $9.3 million, which works out to a 71% gross margin. On an adjusted basis, gross profit was $10.6 million, giving an adjusted gross margin of 81%. The $4.3 million tariff refund we mentioned is included in both of those figures. Excluding that refund, GAAP gross margin would have come in at 37.9%, and adjusted gross margin at 48%. So the refund had a meaningful impact on the percentages we reported for the quarter, and because revenue was such a small number, our guidance for full-year GAAP gross margin remains in the 20% to 22% range. Adjusted operating expenses for the quarter were $25.2 million, which is $9 million higher than the prior year. Discipline on operating costs matters a great deal as revenue grows, since it's a key part of hitting the adjusted EBITDA target we've set for 2027. Still, OpEx was up this quarter, largely because of project development costs and legal costs related to expanding the owned and operated platforms, plus larger bonus accruals. We think those added expenses will pay off through contract activity during the coming 12 months. So we're watching controllable OpEx closely while still putting money into the business where it makes sense. We anticipate operating expense growth will decelerate next year, since much of this year's increase came ahead of the revenue ramp. For the quarter, adjusted EBITDA came in at a loss of $14.7 million, versus a loss of $6 million in the prior-year period. That, again, mirrors reduced revenue alongside elevated OpEx, partially offset by improved gross profit. On a GAAP basis, net loss totaled $28.2 million, equal to $0.17 per share. Adjusted net loss stood at $0.14 per share. Moving now to Slide 20, I want to briefly walk through our capital stack. This is a slide we've added this time, given that our capital structure is relatively complex, and it pulls together non-recourse debt at the project level, preferred capital, and recourse debt at the corporate level. Simply looking at total debt in isolation can sometimes give a misleading view of what our balance sheet actually owes. We've laid it out in the presentation so it's easier to follow. Recourse debt at the corporate level dropped $12 million from the prior quarter, finishing at $221 million. Non-recourse debt rose, largely driven by the engine financing behind our acquisition of reciprocating engines and the DevCo financing related to the Goshe assets. Whenever we can, we're putting financing in place at the asset level to back growth in our own portfolio, and we anticipate that will grow as we take on more projects. With that, I'll hand it back to Rob for some closing comments before we open the floor for questions. Rob, over to you.
Robert Piconi
executiveAll right, thanks, Nitin. To close things out, as I mentioned, I feel really good about this quarter and how it positions us going into Q4 with the ramp we're delivering. The backlog growth we're seeing on the commercial side, along with the teams and the opportunities in critical markets, remains quite positive in my view. We've also strengthened the balance sheet, as you can see from the cash growth, and we keep adding financing partners to make sure we have the capital needed to keep building this business. When I think about visibility, having 2027 in front of us for the first time and now projecting revenue growth at over 2x what we're finishing this year, there's obviously a lot of confidence there that strong gross margins will continue, given how we manage both the supply chain and the commercial activity. On top of that, our first full year of positive EBITDA, which is another important milestone, and I know one that investors and all of us as a company are very focused on. With that, what I'll say is that as we look ahead now, we do expect, as I mentioned earlier, that markets are going to remain volatile, both on the macro side, as I mentioned, and on the geopolitical side, a lot of things we are prepared for, and we have the balance sheet to deal with that volatility while continuing to grow and, most importantly, execute for our customers. Customers we're building relationships with and have built over time are all seeking us out as we look at solutions that can be deployed with a lot of credibility and a lot of predictability given our past performance, but in addition, having the balance sheet continue to strengthen as we look at larger and more accretive opportunities as a business; with that, operator, we'll go ahead and conclude here and turn it over to you for Q&A. Thank you.
Justin Clare
analystI'd like to begin by focusing on the outlook for 2027. You gave guidance of $600 million to $700 million. I'm just wondering whether you could help us understand how revenue splits between build and transfer projects and Asset Vault, and then I'm also curious, within build and transfer, how much of the expected revenue ties to that 1.2-gigawatt integrated power agreement you signed earlier?
Robert Piconi
executiveGreat, Justin, thanks. On your first question, when we look at next year and the business mix we'll have, a lot of that mix — and you asked specifically about BOO and BAT. So in 2027, we'll still have the 2 projects running that we have this year, Calistoga and Cross Trails. And then we'll be moving into Q4, potentially bringing one more U.S. project online. But mainly, many of the projects we're building here will come online in 2028. That's why we have such strong visibility into 2027 at this point, because a lot of that revenue will be build and transfer revenue we've already contracted. It's already booked, so we have plenty of confidence in that number. The supply chain discussions have taken place and we've lined things up. So that's on the project mix, and regarding that one contract we announced, you asked about its size and how significant it will be next year. It will be an important piece of the revenue. It won't be, you know, something that would exceed half of our revenue, but it will be an important piece of our revenue; and what's very interesting about it is we're also expecting next year to be the first year when we should have quarters that are a little smoother in shape. And at those revenue levels, obviously managing that, managing cash, and as we look at delivery, I think we'll be quite welcomed. But in any event, I think that's how we're looking at next year.
Justin Clare
analystUnderstood. All right. That is quite useful information. Then, looking at one of these slides, or you mentioned possibly expanding the backlog to $3 billion by year-end. So that could be a fairly significant increase. And I'm just curious how much visibility you actually have. Does that come from clear sight lines on build and transfer projects, or does it come from expanding the asset-light portfolio? And then I'm also wondering whether that $3 billion would be net of the substantial revenue you expect to recognize in Q4.
Robert Piconi
executiveYes, regarding your first question, it's a fairly balanced mix when it comes to fueling that backlog growth and that bookings growth. I mean, the opportunities there, I think, as we said, include various project financings in Australia and the U.S. on projects. So we're going to see considerable strength there that will fuel that backlog. And keep in mind, those will be 10 to 15-year type of backlog streams. But we also see plenty of demand and opportunity continuing in our energy storage solutions on the build and transfer side. And much of that is driven by near-term demand in and around solutions that can essentially operate off-grid, microgrids, behind-the-meter solutions to support some of the near-term power needs. So it's really a mix of both, with a lot of strength across both segments.
Justin Clare
analystUnderstood. All right. Then only one more thing. I'm wondering, given that you signed that big 1.25-gigawatt strategic agreement, how has the pipeline for additional integrated power solution opportunities been developing since that moment?
Robert Piconi
executiveIt's expanding and it's busy. Justin, I'd describe it as a really fascinating segment, since it offers significant advantages when it comes to speed, as it doesn't depend on grid power, which clearly is heavily in demand, and particularly given the emphasis on which, I believe, has been available in the market for 6 to 8 months. Yet I think even considering the recent government shifts that have just taken place, I think the necessity of not depending on grid power in relation to that demand while keeping pricing where it stands, examining the solutions that sit behind the meter, that are off-grid, that bring other advantages to the communities, we are witnessing considerable interest in that area. And what's especially notable is the part our software plays in it. Our software doesn't just manage our battery, it also manages how generation tech coexists, whether fossil or renewable, alongside our batteries. By doing so, we can optimize the way that power gets delivered to try to boost the sustainable elements, meaning cutting emissions from, say, some of the gas generation side; but it also provides that visibility for handling some of the load when we're powering AI compute infrastructure across training and the inference models, there's plenty of differing volatility that must be handled, and we're obligated to deliver five nines quality of uptime in that situation. So our software is filling a very significant role managing any kind of hardware, and the customers especially truly value that.
Justin Clare
analystAll right, that's great, thank you. I'll relay that along.
Derek Soderberg
analystI just wanted to get a sense of your views on growth in '27. You folks keep delivering on projects, both the live ones and building up the backlog. What do you figure the market is overlooking here? Again, it just looks to me like you keep delivering. Maybe give me your big-picture take on what the market could be overlooking about you folks in this story.
Robert Piconi
executiveSure. Yeah, I'll give it a first go, and then I'll bring in Nitin, who has just come aboard. He's only been here a quarter at this point, so he arrives from the outside, from BlackRock. So I'm certain he'll offer some views on this shortly as well. But one thing that stands out, Derek, in this market is that it's a show-me market. And I think as we've delivered, I think over the last 6 to 8 quarters with cash rising each quarter, the balance sheet getting stronger, basically doing what we say. I think the operational gross margins we're putting up, particularly on the EPC side, they're 2x to 3x what the market is achieving if you look at some of the players in the storage integration space, they were struggling. So I think while all of that is positive and I think received well, and I think it's backed by some of the customer contract wins, I'll point to our biggest contract win ever at between $500 million and $600 million that we had announced. But ultimately, I think from an investor standpoint, especially as we head into a year where we've got 75% of the year we're delivering in one quarter, I think investors want to see that happen. I'll remind investors that we did the same last year. So we are very good at execution and at focus and at minimizing the noise, let's say, in concentrating on delivery. So I think we've shown that, but obviously on the eve here of delivering our biggest quarter and about 75% to 80% of our year in 1 quarter, I think that's just swaying a bit what otherwise investors might be just lining up. Look at what we've just guided and reiterated here, not only for this year — I mean, we're 7 weeks away — but also guiding at a 2x-plus revenue next year, strong visibility, as we mentioned on that, I mean, that's going to be mostly build and transfer, the stuff that we've already booked, right? So it's, I'd say, from my perspective, it is a market, given the volatility and things at a macro level that we keep seeing, I'd say week to week. I think it's just that people do want to see that execution. And given what investors are hearing today, my hope is they recognize it—not just based on where we ended the quarter from a balance sheet standpoint, meaning growing that cash balance, what we've put on the board, but also regarding bookings growth, continuing to build on that, and now, with just under 2 months left in the quarter, guiding to the upper half of the range. I think hopefully that builds confidence and we keep bringing investors into the story. But I'll hand it over to Nitin. Nitin, you may have a perspective here as well.
Nitin Dahiya
executiveThank you, Rob. I believe you've addressed that pretty thoroughly. From a shareholder standpoint, we're under-owned, correct? So that ties directly to where our market cap sits. And as Rob said, part of it comes down to seasonality or the lumpiness in our business; but as a company, we're at an inflection point, both on scale and on profitability. I'd like to believe that will draw considerably more interest; we're also working to give more clarity so we're easier to follow. You know, we have two businesses, and again, the level of disclosure we provide on them hopefully makes them easier to follow and also gives people comfort about the visibility we have and the confidence we have in the numbers. But in the end, I think we want to execute as well as we can, and there are certain controllables on our side. And I think we can perform well on those. And, you know, markets can be somewhat irrational, but they're not something we can control.
Robert Piconi
executiveDerek, let me tack on one more point, since I believe it matters. I have conversations with many of our investors — not just the top 5 to 7 groups that account for more than half of our total shareholder base, but also quite a few of the groups that have come into the story over the last year, from time to time. What stands out, and I hope we have made this fairly clear during this call, is that given the growth we have delivered, given how large the projects are that we are discussing and that are underway, investors are asking themselves: how will you pull this off without some huge dilutive equity offering, right? And as we keep posting the numbers, building cash and acquiring portfolios, I think that after the Goshe acquisition, I spoke with investors and, you know, people lacked visibility. It is disclosed now, it is in the queue, but we closed that acquisition in cash and in Q3. So that $236 million comes after we acquired that company; so I think investors, with the growth we have and the increase in the backlog, may be somewhat worried. And I think they voiced this — is there some large — and as I think we have been very clear here, we have not only the project financings that we keep doing, we have growing cash there, as you can see on the balance sheet; we had already announced a $300 million pref fund. We have only drawn about $35 million to $40 million of that; so, if you think about that pref fund, it allows a multiple of 3 to 4 when it comes to obtaining the debt and the ITC in terms of CapEx. So think of that as enabling $1 billion to $1.2 billion of CapEx. So I think that is really the last item I would mention that potentially maybe has people waiting on the sidelines, but I cannot be any clearer than what I have just said; and again, I am the largest shareholder in the company, so I think I should have a little leeway here to offer my view on this a bit. I think we continue to be, I think, extremely undervalued as a company, despite the transparency that we are providing and despite how we are executing.
Derek Soderberg
analystUnderstood. I really appreciate all that detail. For my follow-up, I've honestly been jumping between calls this evening, so I apologize if someone already raised this; I'm just hoping to understand better how you arrive at the adjusted EBITDA figures for next year. There's clearly a lot of growth. I'm curious whether you could discuss OpEx, specifically how it will grow alongside revenue. And perhaps you could also touch on gross margin and how that helps get you to the EBITDA guidance for '27. Thank you.
Robert Piconi
executiveNitin, would you like to take that one?
Nitin Dahiya
executiveRight. So like I said, OpEx came in a bit higher this year, though we think that pace will ease. On EBITDA guidance, if you look at it through gross margin, we've told you our backlog ought to carry adjusted gross margins in the 20-plus percent range. I believe that still holds, since a lot of that revenue lands next year. Subtract OpEx moving up modestly, and I think you land in that range. And again, one key point on those numbers: we don't want to starve the business and simply cut back on OpEx, but where we see solid opportunities to put money into the business, we would. Still, we're clearly focused on profitability and generating returns for shareholders. So that's one item. The other thing I'd add — and I realize this isn't a specific question — is that over time, as our build, own, and operate assets come online, our EBITDA margins will naturally expand. So next year's EBITDA turning positive — this will be the first full year of positive EBITDA. And again, operating leverage is in there. Meaningfully, this is only a range. But as time goes on, we actually expect that margin to grow meaningfully.
Derek Soderberg
analystThanks, guys. That's really helpful. Appreciate it, guys.
Noel Parks
analystSo one thing I'd be interested in hearing about is the EMS software side of the platform. Lately I've been hearing more talk about what role EMS plays, especially on projects that use TCGT alternatives, reciprocating engines being one example, and what I keep hearing sounds to me like more awareness of what storage brings, particularly in these kinds of data center projects and possibly island power, power supply projects. So any thoughts you have on that would be great.
Robert Piconi
executiveYes, thank you, Noel. I touched on this a bit and spoke about how significant a part software is playing. So what you're picking up in the market, I believe, is exactly right. And that software capability, for several reasons, is what truly helped make it possible for us to win the size of contract we did, the 1.25-gigawatt. A few points about the software side: it doesn't just give you a single pane of glass and operate, kind of connecting into the operating systems, for instance, from what we announced regarding Caterpillar engines. So connecting into that operating system and connecting that into our battery management system too. So operationally we connect in order to manage, but the genuine value isn't only in managing that, it's also in being able to distribute it in an optimized manner, in balancing load, and in optimizing the charging and discharge where batteries are concerned, in optimizing the timing of when the reciprocating engines, the RICE as in your example, would come online; by doing that through software, we can also keep emissions to a minimum when you consider the integrated combination and mix of battery energy storage along with the generation engines. So I think that's also something very important for the communities where we're going to operate. Ultimately, then, at the end of the day, we are taking on and making sure that we will deliver five nines of quality and uptime for our customers. And doing that in a setting where you have AI loads and training and inference that are highly volatile, right, in particular? So the way you manage and balance that and feed that back into both the generation and the storage is fundamental. And this is something especially over the last 6 months that has become more and more prominent as a decision factor. It definitely was — the software was absolutely a decision factor, I believe, in how we were chosen to support one of the largest deployments of 250-megawatt modular prime power solutions across multiple sites. What really gets me excited — and if our software team were here, they'd say the same — is what we'll learn about how these models behave, and depending on the geography and the demographics of where they're deployed, you know, those deployments are also going to involve different modular sizes. So it's genuinely interesting, both how these projects will be deployed and what we're going to learn, and they'll be among the first ones operating in this mode, meaning behind the meter, off the grid, so we're very excited to share as we bring these first systems up. Deliveries already began this quarter, so that's a contract where we're just starting to get those deliveries in this quarter that we announced last quarter. So that's something we're excited about.
Siddharth Rajeev
analystI have two questions, if that's alright. Could you share what the ideal timeline looks like for Stoney Creek, both the start of construction and when it would really be operational?
Robert Piconi
executiveSure, yes. We're planning Stoney Creek, which we've just announced, and just to reiterate what we said a moment ago about some milestones over the last 3 months. We already received development approval, which is a critical milestone, but perhaps even more critical is what's called the 534, the grid interconnection approval. We actually just received that 2 weeks ago. So that really just paved the way now for us to get right into construction. We had already announced in June that we acquired the land on that project rather than a lease structure. So it gives us very good flexibility; all of that means basically we're in project financing mode as we speak. In fact, Cory Magnuson, our president of AssetVault, is in Sydney right now and on some of those things. So to answer your question, that is a project that will be coming online in 2028; and I think as we've already started some of the works around the site there and now we're going to be doing some of the detailed planning for that, we'll probably be able to give you a tighter frame within 2028 next quarter; but for sure, it's a project that will be coming online in 2028.
Siddharth Rajeev
analystAll right, and the next one concerns capital raising needs, Q4 and 2027. Do you have any rough figure or any guidance regarding how much is required, how much you intend to raise, or the net capital raise?
Robert Piconi
executiveOf course, Nitin, would you like to address that?
Nitin Dahiya
executiveRight, so we've provided cash guidance for the end of the year of $170 million to $200 million. That figure doesn't factor in any incremental raise at the parent. And actually, at the parent level, the corporate-level recourse debt, we expect to pay some of that down. Now, obviously there are a number of moving pieces involved in reaching that number, in terms of managing working capital for different projects and so on. But again, we're trying to be very judicious about how we use our cash and our balance sheet; and then also, when we look at projects, I think capital efficiency matters a great deal there. So our guidance doesn't assume that we'll issue any — raise any additional capital at the parent. At the project level, of course, it's a different matter, but that is non-recourse to the parent and doesn't accrete to the cash.
Robert Piconi
executiveRight, and Sid, on every one of the U.S. projects especially, we plan to leverage the full ITC along with the tax equity piece. That clearly represents an excellent financing route, plus the usual project-level debt. So really it's current course and speed on that, and as I said, we also have the pref fund, which lets us invest, and we still have a fair amount of that available to us.
Tyler Bisset
analystTyler Bisset here, filling in for Brian Lee. So first off, how much of the '27 revenue guidance is currently covered by backlog? If I subtract the 4Q expected revenue from that $800 million of build and transfer backlog, it seems like roughly 85% is covered at the midpoint. Is that about right directionally? Then, looking at how your backlog breaks down, some of the under-construction and contracted megawatt hours in the build and transfer business appear to have declined versus last quarter, though you also moved a meaningful amount of revenue to under-construction from contracted; could you discuss what's driving that? And did part of the business move from contracted into advanced negotiations?
Robert Piconi
executiveYes, Nitin, would you like to handle those? I'm glad to take them.
Nitin Dahiya
executiveSo what’s your preferred way to proceed? I’ll take the first one, please. Yes, and thanks for asking. What I’d say is that, when it comes to our revenue, as Rob said, most of it will come from the build and transfer side, though not the entire amount. That means there’s also a portion of revenue coming from the other side. And of course, we’ve provided that to you as part of our guidance. So plainly, I think you’re able to work out the figures, and we’re reasonably confident in that range.
Robert Piconi
executiveYes, and Tyler, on the point you raised, I think you're basically correct. This year isn't finished yet—we're at that stage in the quarter—and I often tell people we haven't let the sales team go. There's plenty of commercial activity. As you noted, a very, very large share of what we've just guided is covered, and those folks are out working to keep building on that; at our Q4 earnings, which is when we usually provide guidance on the coming year in March, we'll do that. Given the visibility and confidence we have, we're obviously providing some of this initial guidance; but it's fair to say we already have a good deal of next year covered. And then on the comment you made about the change, or somehow a reduction, in build, own, and operate—we have many things underway right now in that area on projects, and we've mentioned a few times some project financings and such. That's why, as you know, once those things close and get booked, you'll see our backlog rise in $200 million to $300 million increments for each one. So there's no real reduction whatsoever in our build-own-operate, except that we're also growing the backlog in build and transfer tied to some of these hybrid generation build and transfer contracts. So, as I said, if I went back a year and asked, gosh, what would I ideally want to see as we're building projects whose revenue we obviously can't recognize until they're fully built out and come online, and then it's 10 to 15-year revenue streams—I'd have said, wow, it would be great to have build and transfer projects that accrete cash to us while we're getting these larger projects built out. And that's exactly what has happened, and in a much larger way, I'd say, even than we were thinking a year ago as things have evolved here; so it's really all good.
Robert Piconi
executiveThanks, operator. Once more, I simply wanted to express appreciation to everyone for being on the call and tuning in here. As I've said a handful of times, I hope it comes through in the way I've framed things, I'm really enthusiastic about where we stand right now, about what we'll deliver this quarter, and about what we're looking toward next year. And again, I'll close by saying much of that confidence stems from the confidence of the team we have here at Energy Vault. Their dedication to the customer, to delivery, and I think given all the volatility we've had to navigate, especially across the last 12, 18 months, I think that focus on continuing to deliver and strengthen that balance sheet, 7th quarter in a row of cash increases, and we're going to keep that focus going. You've seen some of the extra hires we've brought on, some senior additions, I think, within the company centered on the financial side, both project finance and a lot of the wider financial areas as we consider the scale of the business. And I think it hasn't escaped you either that we're pursuing that not just organically, but inorganically as well. So in any case, I want to thank everybody once more, along with our employees and the teams, and hand it back to you, operator. Thank you very much.
Operator
operatorThank you. That brings us to the end of today's teleconference. You can disconnect your lines now. We appreciate your participation. This live transcript is generated automatically, with no human intervention or review.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Energy Vault Holdings, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Energy Vault Holdings, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Energy Vault Holdings, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.