Ero Copper Corp. (ERO) Earnings Call Transcript & Summary

November 3, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 50 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone holding on. I'm the conference operator, and I'd like to welcome you to Ero Copper's Third Quarter 2026 Operating and Financial Results Conference Call. Please note that this call is being recorded. <<operator_script>> At this point, I'll hand the conference over to Farooq Hamed, VP, Investor Relations. You may proceed.

Farooq Hamed

executive
#2

Thank you, operator. Good morning, everyone, and welcome to the Ero Copper third quarter earnings call. We released our operating and financial results yesterday afternoon, and they're available on our website, together with our financial statements and MD&A for the 3 and 9 months ended September 30, 2026. You can download a corresponding earnings presentation directly from the webcast, and it's also available in the Presentations section of our website. On the call with me today are Makko DeFilippo, President and Chief Executive Officer; Wayne Drier, Executive Vice President and Chief Financial Officer; Jonathan Batista, Executive Vice President and Chief Operating Officer; and Courtney Lynn, Executive Vice President, External Affairs and Strategy. Before we begin, I'd like to remind everyone that today's discussion will include forward-looking statements, which involve risks and uncertainties that may cause actual results to differ materially. For a detailed discussion of these risks and their potential impact on our business, please refer to our most recent annual information form available on our website as well as on SEDAR and EDGAR. Unless otherwise noted, all figures discussed today are in U.S. dollars. With that, I'll now turn the call over to Makko DeFilippo.

Makko DeFilippo

executive
#3

Thank you, Farooq, and good morning to all of you. As we always do, we'll keep today's prepared comments brief so there's plenty of time for Q&A. Before I get into the quarter, I'd like to pause and take a step back. Even with the market's recent ups and downs and the ongoing uncertainty around how quickly AI infrastructure spending will move forward, the fundamental worth of quality copper output, robust free cash flow generation, and a real organic growth pipeline has rarely been this evident. That leads me to the 4 key takeaways I'm hoping you'll come away with from today's call. First, the way we operate is flowing straight through to cash generation and balance sheet strength. This year, out of every dollar available to us, $0.97 has gone toward reducing debt. Our dedication to our balance sheet has produced a net debt reduction of roughly $100 million in Q3 by itself. For Ero, that translates into more room to keep moving our organic growth projects ahead, Fumas included. Second, our cash operating margins are still solid. Savings from our One Ero initiative, together with a successful foreign exchange hedge strategy, are working in tandem just as intended to counter the inflationary pressures we're experiencing at Ero and across the mining sector.

Makko DeFilippo

executive
#4

Third, performance at our copper operations remains strong, and we're well positioned to hit this year's copper output target. Fourth, the gold concentrate initiative started at Xavantina in late 2025 has given us genuine operational and commercial flexibility during this year. Assays are now in hand for the in-process material that we anticipate selling across the coming 8 weeks. And on the strength of those results, we forecast 75,000 to 80,000 ounces of gold combined from Xavantina in this year — a record for the company however you measure it. Keeping those points in mind, I'll move now to the quarter. As you've observed, we posted record financial results for this quarter and for year-to-date, setting new high watermarks on every key financial metric. Our results demonstrate progress. Specifically, I'd highlight the sequential quarterly gains in plant throughput at our copper operations. Record annual throughput volumes are on track at both Caraiba and Tucuma this year. Operating momentum throughout our business, together with metal price tailwinds, drove record cash flow from operations of roughly $191 million and adjusted EBITDA above $200 million, each climbing almost 40% quarter-on-quarter and a striking 260% since our third quarter of last year.

Makko DeFilippo

executive
#5

For the year so far, we brought in more than $420 million of cash flow from operations along with $470 million in adjusted EBITDA — roughly 60% and 110% higher, respectively, than where we stood at this point last year. With operational performance improving like that, it should come as no surprise that this marked our seventh straight quarter of faster deleveraging. Looking back and setting our much better net debt leverage ratio of 0.5x in Q3 against the 2.6x peak we saw at the beginning of 2025, I can't help but feel proud of how our leadership team has stayed committed and focused on that goal. Now, on to our operations themselves. Our copper business turned out 18,300 tonnes of copper in the third quarter at a consolidated C1 cash cost of slightly above $2.50 per pound. Throughput volumes at Caraiba and Tucuma stayed solid in Q3, rising 8% and 14%, respectively, quarter-on-quarter. We still expect Q4 to be the year's strongest operating quarter, and we remain on track to hit full year copper production guidance. On the cost side, ever since the U.S. ran conflict began, we've flagged a possible $0.10 per pound effect on our reported cash costs, reflecting the inflationary pressures we're observing and the pass-through of a stronger BRL on our functional currency.

Makko DeFilippo

executive
#6

We've now factored that into our full-year consolidated C1 cash cost guidance. On the cash margin side, through this year's first 9 months, our foreign exchange hedge book has delivered realized gains of $30 million. That protection exists precisely to shield the business against the kind of conditions we faced during the first 9 months of this year. Wayne will go into more detail on how management sees this margin protection relative to our adjusted C1 cash costs. At Xavantina, mine performance came in just shy of 8,000 ounces and was objectively below what we expected in Q3, yet total gold produced and recovered rose 23% quarter-on-quarter to a record of roughly 25,000 ounces. Boosting output from historic concentrates was a key operational priority for us this year, given the slow start to mining in the first half. And with all-in sustaining costs at sub $750 per ounce, it's perhaps no surprise that we prioritized selling this material. The investments we made in the first half to improve our drying capacity for historic concentrates are clearly paying off as we move into the second half of the year.

Makko DeFilippo

executive
#7

So because of that, we're anticipating Xavantina to deliver total gold somewhere in the range of 75,000 to 80,000 ounces during this year. Moving now into the growth pipeline. Over at the Feras project, we wrapped up the 45,000-meter Phase 3 drill program during August, and in doing so we finished the whole exploration portion of the earn-in agreement with Valley Base Metals over 2 years ahead of the planned timeline. The drilling results have shown, consistently, high-grade continuity inside the deposit as well as in extensions at depth and along strike. We anticipate releasing the complete results from the Phase II program before year-end. At the same time, we're advancing all technical work streams in support of the project's pre-feasibility study, and we anticipate publishing that study in 2027. The work we've completed, and continue to carry out, to reinforce our operating performance and enhance operating margins for our One Ero program is now translating into robust free cash flow generation and record financial results. With that said, I'll hand the call over to Gelson.

Gelson Batista

executive
#8

Thanks, Makko, and good morning, everyone. As Makko laid out, we delivered strong metal production in Q3 and expect better performance at all 3 operations in Q4. I'll give a bit more detail on the operational drivers underneath and what we anticipate for the rest of the year. At Caraiba, copper output came to 9,387 tonnes in the quarter, with C1 cash costs of $2.89 per pound produced. Production rose 12% versus the prior quarter, helped by greater plant throughput, higher grades and better recoveries. Costs during the quarter took a hit from accelerated waste stripping at the Surubim open pit and from elevated maintenance costs on the road fleet. Both of those cost centers were strongly affected by the high diesel price environment in Q3. Going forward, we anticipate stronger output at Caraiba in Q4, supported by higher mined and processed grades from deeper high-grade benches at Surubim, along with contributions from the Pilar underground mine, which puts us in good shape to hit full year production guidance. C1 cash costs should come down in Q4 as production volumes rise. At Tucuma, copper production was 8,958 tonnes at C1 cash costs of $2.12 per pound produced. Production and costs were comparable to the previous quarter, since a planned reduction in process grades was offset by a 14% rise in plant throughput.

Gelson Batista

executive
#9

In Q3, recoveries took a hit because of operational changes we needed to make following a mill liner replacement and a maintenance shutdown. That effect was temporary, and Makko discussed it on our Q2 conference call. As we look toward Q4, we anticipate production gains from higher throughput rates as well as improved metallurgical recoveries. We expect C1 cash costs to come down sequentially, which supports the full year production and cost guidance we have maintained for Tucuma. The 3 new filters we are installing arrived at site late in Q3, and we are still on track to complete their installation and commissioning before year-end. At Xavantina, mine gold production came to 7,844 ounces, with Q1 cash costs of $1,892 per ounce produced in Q3. Mine and process grades rose as expected. That said, as Makko pointed out, operational delays in reaching key high-grade stopes meant grades processed were lower during the quarter. Going forward, we expect both mined and processed tonnage and grades to improve in the fourth quarter. That view is backed by all-time record development levels reached over the past few months. Gold recovered from the historic concentrate stockpiles rose 47% versus the prior quarter, reaching 17,414 ounces at C1 cash costs of $621 per ounce, as the operations gained from the mobile field depress and industrial drier commissioned at the end of Q2.

Gelson Batista

executive
#10

As we look ahead to quarter 4, we anticipate that an additional rise in throughput volumes, combined with a better grade profile, will feed straight through into reduced C1 cash costs. Given the volumes shipped and those in process so far through October, as Makko mentioned, we expect historic concentrate volumes to stay robust. At this point I'll hand the call over to Wayne, who will take us through our financial results.

Wayne Drier

executive
#11

Thanks, Gelson, and good morning, everyone. During the third quarter, our financial results showed copper sales volumes rising 10% and gold sales volumes rising 47%, both compared with the prior quarter, and metal prices were strong as well. Together, those factors pushed quarterly revenue to $348 million, which was 22% higher than in the second quarter. As Makko mentioned, we posted record quarterly cash flow from operations, which climbed to $191 million, and adjusted EBITDA rose to a record $201 million, with both measures up 39% quarter over quarter. That strong financial performance let us speed up debt reduction, and we made repayments of $70 million against our revolving credit facility in the quarter, which brought total repayments in 2026 to $105 million. Consequently, net debt fell by $99 million in Q3, to roughly $353 million, and adjusted EBITDA for the trailing 12 months rose to $657 million. Taken together, those factors brought our net debt leverage ratio down to about 0.5x. Our liquidity also strengthened over the period, rising $82 million to $264 million, which included $114 million in cash and cash equivalents and $150 million available under our revolver. On foreign exchange, a stronger real continued to weigh on our reported operating costs and capital expenditures in the quarter. Even so, on a cash basis, our hedge program performed as intended, producing $10 million of realized gains in the quarter and lifting total foreign exchange gains through the first 3 quarters to $30 million.

Wayne Drier

executive
#12

Even though those gains lessen the cash effect of a stronger real, they aren’t part of the C1 cash costs we report. To give a clearer picture of how we view cash margins at Ero, if the $30 million of realized gains booked year-to-date were applied across the operations on a pro rata basis, that would mean a $0.15 per pound decrease in consolidated copper C1 cash costs and a $50 per ounce decrease in Xavantina C1 cash costs across the full year. You can see this on Slide 17 of the webcast presentation. With that, I’ll hand the call back to Makko for some closing remarks.

Makko DeFilippo

executive
#13

Thank you, Wayne. Before we take questions from the line, I'd like to return everyone to the 4 points I began with. First, we're converting operational results into cash. This year, out of every dollar we had available, $0.97 went toward paying down debt, and that includes roughly $100 million of net debt reduction in Q3 by itself. Second, copper is doing well for us, and we're still on schedule to hit our full year production guidance. Third, thanks to the gold concentrate program at Xavantina, we're on track to produce approximately 75,000 to 80,000 ounces of gold this year, which would be a record for the company. Fourth, our One Ero program and our BRL hedge strategy are working together, exactly as intended, to keep cash operating margins strong even with the inflationary pressures the whole sector is facing. Finally, casting our eyes a little further out to the Fernox milestones, we're still on track to deliver the pre-feasibility study in 2027. Thanks for being with us this morning. Operator, we're ready for questions.

Operator

operator
#14

<<operator_script>> Our first question is from Fahad Tariq at Jefferies.

Fahad Tariq

analyst
#15

Now that the leverage ratio and net debt to EBITDA sit at 0.5x, could you say a bit about the shareholder return program — when we ought to expect some kind of announcement, and how the management team is viewing shareholder returns?

Makko DeFilippo

executive
#16

Yes. Appreciate the question. Look, I believe I addressed this quite thoroughly at our Capital Markets Day back in September in Sao Paulo; that journey is well underway. Our leverage ratio now sits below the level we were targeting. We remain on course to pay back the revolver. And certainly, given where prices stand at present, the expectation is that repayment happens during Q4. We're having a very active conversation with our Board about how that shareholder return framework will take shape. And I think you'll simply have to wait and see when we're ready to present that to the market.

Fahad Tariq

analyst
#17

All right. Turning to the Brazilian real — it has weakened quite a bit in the couple of weeks since the election. So how should we think about what that means for the fourth quarter, both as it relates to the hedges and the floor price in the second half, and also the impact on operating costs? Does it roughly net out?

Makko DeFilippo

executive
#18

Yes, I’ll address that question too. Clearly, our hedge book for 2026 is already in place, so for Q4 we’re fairly well covered—though obviously it doesn’t cover all of OpEx and CapEx. So some of those tailwinds we’ve seen since the election will certainly help. But looking ahead to 2027, we manage our book actively and proactively. We’ve taken advantage of some of this weakening to put hedges in place for 2027. So we’re beginning to build our book for 2027 as well.

Wayne Drier

executive
#19

Yes. Perhaps to address that point, when we consider Q4, it's worth highlighting that our hedging approach safeguards the floor—in this instance, for Q4, at BRL 5.54. That represents our level of protection. We take part in BRL exposure right up to our ceiling of BRL 6.42, which was shown on Slide 8 of the webcast presentation. So if you consider where we stood during the first 9 months of the year compared with today, should the Bureau keep weakening, we would take part in that until reaching our cap of BRL 6.42.

Operator

operator
#20

Orest Wowkodaw from Scotiabank has the next question.

Orest Wowkodaw

analyst
#21

It's really encouraging to see the cash flow generation. I had a couple of questions about Xavantina. First, the grade was quite low in Q3. I'm wondering whether you've now seen a turn in Q4, with a grade that's, say, closer to reserve grade.

Makko DeFilippo

executive
#22

Yes. Look, I’ll start us off, and then Gelson can add his thoughts on this. We’re expecting Q4 to come in as the strongest quarter of the year. I think a few of those key high-grade stopes that Gelson mentioned during the conference call — the ones we had planned to bring in late in Q3 — got pushed back somewhat. So they’re arriving now, in Q4. I mean, Orest, I think it’s worth remembering that when we talk about reserve grade, that figure is an average across the life of mine. Obviously, in any given month or quarter, we’re mining stopes that sit well above that range — in some cases, as we saw over the last couple of years — and then some that sit lower. So when we think about reserves, it’s clearly a blended grade. But what I can tell you is that, based on our results here, we do see grades rising as expected. Our infill drill program and the channel sampling we have for Q4 support that well. So we’re feeling pretty good about the stopes we’re in right now and those we’re going to mine in Q4. I don’t know, Gelson, whether you’ve got anything to add there.

Gelson Batista

executive
#23

No. Appreciate the call, Orest. I believe Makko covered it properly — the stopes we brought in during this quarter and getting things back on track. So nothing more from me.

Makko DeFilippo

executive
#24

Yes. Orest, I think — Gelson brought this up as well. Orest, the main thing we need to focus on — as we come out of the first half, clearly we're not where we'd hoped to be when it comes to development mine performance. I think the — a solid leading indicator for us, as Gelson said there, is that we hit record development over the last 3 months, all-time historic record development levels. So we're definitely not out of the woods yet. I think declaring victory is too early, but given that we achieved the development that we — being ahead on development, being in some high-grade stopes and seeing that flow through, I think, is a strong indicator for where we believe Q4 is heading.

Orest Wowkodaw

analyst
#25

To follow up on that, the guidance, as I understand it, points to 15,000 ounces of gold coming from concentrate sales in Q4. What's behind the expectation that this will come in below Q3? Is it that you anticipate some sort of uptick during the rainy season toward the end of the year? Or is my wondering whether this is a conservative estimate on point? Or does something cap the volume here in Q4?

Makko DeFilippo

executive
#26

Yes. Look, clearly we put substantial money into the on-site dry infrastructure, and we saw the results of that come through in Q3. That happened to line up with the seasonal dry stretch, which of course helps that dryer run well. I'd say the reality for us is that our approach in concentrates has stayed consistent. We can only give forward-looking information based on what we have available at hand. And what we have today in dry inventory, or drying inventory, is that 9,000 ounces. Of course, we expect to add more to that, but the 15,000 is what we have assayed and available today. And I would say that also includes over 6,000 ounces that were invoiced in October, right? So I think that's an important point to keep in mind as we think about Q4.

Orest Wowkodaw

analyst
#27

All right, and one last thing — if I could pivot briefly here. Could you bring us up to date on the shaft sinking work at Caraiba, covering what you now expect for completion and the CapEx still left to spend on it?

Makko DeFilippo

executive
#28

Yes, absolutely. I'll step in at this point, and if I leave anything out, Gelson can take over. So at present, roughly 1,250 meters have been finished. That leaves around 300 meters remaining, if you track the progress the way we described it at our Capital Markets Day. We continue to expect to finish that shaft during Q1, just as we laid out in September at our Capital Markets Day. For us, that's a key metric. As I mentioned, regarding the schedule and the completion of the shaft, let me take you back to a few of the remarks from Q2 — I'd like to remind everybody that the most recent shaft constructed at Pilar dates to 1986, roughly 40 years ago. So we are definitely not aiming at one particular month next year. These investments will serve the operation, we hope, for decades ahead. Turning to CapEx, yes, well, it's a $370 million investment as of the end of Q3, so roughly $300 million, meaning $70 million still to come. We anticipate spending a substantial portion of that here in Q4, with the remainder over the course of next year.

Operator

operator
#29

Our next question is from Guilherme Rosito at Bank of America.

Guilherme Rosito

analyst
#30

Alright, I’ve got 2 questions on my end. First, could you maybe start with an update on Tucuma — how are the filters progressing? And what should we expect — perhaps you can give us some detail on 2027 compared with what you’re likely to produce in 2026, or how 4Q is shaping up? Then my second question is also about Xavantina. I know you guys touched on it a bit, but if we look at the prior 3-year production outlook, it implied 50,000 to 60,000 ounces at Xavantina. And given the performance we’ve had year-to-date, especially on grades, it seems a bit more challenging than what you’d have seen early in the year, right? So my question is whether — how are you guys thinking about the 3-year production outlook? Is there any chance you think it could be revised lower? Just to hear your thoughts on that.

Gelson Batista

executive
#31

Appreciate the question. This is Gelson speaking. At Tucuma, the filters are all on site now — they got there in the last quarter, toward the end of it. Completion remains on schedule for year-end. And as we said earlier, we expect to reach roughly 2026 at 4 million tonnes per annum, just as previously planned. So the filters are progressing as planned, and the team on the ground is working to ensure we finish them on time.

Makko DeFilippo

executive
#32

Yes. And perhaps just to touch on that point, Gelson may want to speak to this. If you look at the performance quarry as we bring on additional filtration capacity, huge progress has been achieved there, getting to roughly 800,000 tonnes a quarter. So we're well on our way. And as Gelson said, we expect to exit the year at that 4 million tonne a year rate, which is where we expect to be for '27. Certainly on the question about Xavantina, I might point you in a somewhat different direction there. I think if you look at our — even our adjusted guidance, obviously, which came down versus our expectations in the early part of the year, that really reflects a delay in vanishing point development. If you look at Q4 in isolation, I think that's a better representation of what that asset is capable of doing with obviously the transition that happened this year. So looking at Q4 and multiplying by 4, I think it's probably a better representation than looking at the full year '26, especially the first 9 months and getting to that range. So I would say that when we think about Xavantina, I think Q4 is more representative of what we think we can do both in terms of throughput volumes, mine performance, throughput volumes and also process growth.

Operator

operator
#33

Matheus Moreira of Bradesco BBI has the next question.

Matheus Moreira

analyst
#34

I've got two questions. First, regarding Caraiba, you said we should expect output to improve during the final quarter, with better grades as the driver. I'd like to know how those grades should carry through into 2027? And can you help us grasp what a sensible production mix across Pilar, Vermelhos and Surubim would look like for next year? My second question is about Furnas. You finished the Phase 3 drilling program in the quarter, which is about 2 years ahead of the initial timetable. Does that open the door to pulling an eventual FID forward? And which key milestones remain to be worked through? Then perhaps one more on Furnas, on the PFS that you expect to wrap up in 2027. Could you give us a sense of whether that's more likely early or late in the year? That's my 2 questions.

Makko DeFilippo

executive
#35

Yes, exactly. There's quite a bit to cover there. So if I overlooked anything, my apologies—just ask again. But to begin with the first question about Caraiba. Right, look, I think we've been consistent that the biggest driver of better grades this year out of Caraiba as a mix is those deeper levels, those deeper benches at Surubim. We've been mining Surubim for the past 2 years. Really—and when you consider the investment over the past 2 years, the strength of that investment is really underpinned by those deeper benches, right? They run about 1% copper versus where we stood a few years back. It's a very high-grade open pit operation, at least the deeper levels of Surubim. We do expect to see some of that carry into Q4, with a bit of a lag in Q3. We expect some of that material to push into Q1 of next year. But we gave more clarity at our Capital Markets Day about the relative mix and how we see Surubim shifting into N8 next year and across the next 2 years. So I'd direct you to the Capital Markets Day for that breakdown on the grade—on the mix of relative sources, but we do see this transition in '27 from Surubim into N8.

Makko DeFilippo

executive
#36

Once more, there's somewhat of a difference in grade profile there, mainly since the lower benches we're currently mining at Caraiba are quite high grade from an open-pit standpoint. For us, just to address a couple of the questions you raised there. One is tiers ahead of schedule, and I think those are very important milestones. The one we can directly control is the effort devoted to drilling. Given the quality of projects, we believe that Furnas getting well ahead on drilling is among the best places to direct growth capital. And so we've clearly done that, correct? Two years ahead of schedule, as you noted. Regarding pulling forward FID, we still have a couple of levels of engineering left, including the PFS here next year and then obviously, a feasibility study. What I'd say is, let's get through the pre-feasibility study and the work we're doing now, and then have a discussion sometime next year about that. The reality, though, is that, as I've said many times, we still must go through the permitting process. We're clearly familiar with what that entails, having done that for Tucuma quite recently.

Makko DeFilippo

executive
#37

So that's another important parallel work stream running alongside all the drilling and all the engineering work. So there are a couple of key permitting milestones that we're pushing forward this year. Those are going well, as we've also discussed at our Capital Markets Day. And regarding the timing of the pre-feasibility study, I'd say look, yes, we're processing as fast as we can. The — if you follow the milestone agreement, we have until September to finalize that. Obviously, we're — we continue to work as fast as possible to get that done. But I would say September at the latest given the time line as outlined in the area of improvement.

Operator

operator
#38

Our following question is from Ricardo Monegaglia at Banco Safra.

Ricardo Monegaglia Neto

analyst
#39

I've got two things. First, a quick follow-up on Tucuma. Throughput went up, which is great. But recoveries came in a little below what we had estimated. So could you shed some light on what caused that? And how confident are you, maybe, about getting to that high 80s or low 90s level?

Makko DeFilippo

executive
#40

Absolutely. To start, we covered this during the Q2 conference call. Right at the close of Q2, we completed a mill reline along with a significant maintenance window, and both went well. That said, we did observe a recovery impact stemming from it. Operational changes were required — mostly related to liberation — and those weighed on Q3 recoveries early in that quarter. As the quarter progressed, recovery did improve. Naturally, that underpins our view of where we'll land for the rest of the year, with recoveries climbing into the high range, as Gelson noted. I'd add that recovery depends on grade. Tucuma has a grade-recovery curve, as every copper flotation operation does. So we're expecting robust recoveries in Q4. Over time, grade clearly plays a role. We have several initiatives underway to support better recovery going forward. Still, I'd characterize the Q3 read-through as a one-off hit from that maintenance period, plus certain operational tweaks we made to enhance the circuit — again, alongside larger throughput volumes during that stretch.

Ricardo Monegaglia Neto

analyst
#41

That's very clear. My second question concerns corporate G&A. The G&A within operations came in pretty much where we had anticipated, though corporate G&A ran somewhat higher and was expanding at roughly 30% year-over-year. So I just wanted to get a sense of what we might treat as one-off, and perhaps what run rate you'd suggest we model for the quarters ahead and possibly for 2027?

Wayne Drier

executive
#42

Absolutely, that’s a fair question. The shift between Q2 and Q3 — roughly $4 million — is in fact wholly tied to an SAP implementation project that’s currently in progress. At the moment, we’re essentially rolling out SAP S/4HANA, a cloud-based ERP system, across the enterprise. Unfortunately, under the rules — the IFRS rules for cloud-based systems — we aren’t permitted to capitalize those costs the way we would with legacy ERP systems. As a result, those expenses run through the implementation. So I think you should expect to see that amount over the next 2 quarters, 2 to 3 quarters. We anticipate the implementation will be finished by Q2. But the run rate — certainly, if you look at Q1 and Q2 — that’s our normal run rate. What’s different here is purely the SAP implementation.

Operator

operator
#43

Stefan Ioannou from ATB Cormark has the next question.

Stefan Ioannou

analyst
#44

I might have missed this earlier, but perhaps when we visited the site about a month ago at Xavantina, I was wondering whether the outlook for the concentrate that will still be coming out of the ground, say, through the middle of next year, remains the same? Or is there any further detail on the outlook over the upcoming quarters regarding what gold in concentrate production might look like?

Makko DeFilippo

executive
#45

Beyond Q4, we don't have any guidance. That's a fair question. The reality, I think, is what I laid out: we feel good about the 8 weeks we've got. Everything that assays and sits either in inventory or in the drying process right now. Going past that point, it's clearly hard to give any details, since we lack samples there, as we've talked about a few times in this forum. That said, I do believe there's still volume left. We're clearly putting priority on extracting and selling that material, especially with gold prices where they are. And again, as I said, an all-in sustaining cost below $750 is likely no shock as to why we're taking that approach. But I'd say stay tuned. We'll sort of square up some of the -- what's left on the balance there. Still, I think when you look at the next -- that material carrying on for the next couple of quarters into 2027 is a timeline that isn't unreasonable. Of course, I can't address the grades contained in it, because we simply don't know. But it seems reasonable to expect we'll have more material left to sell from over the coming couple of quarters.

Stefan Ioannou

analyst
#46

Okay. And put simply, I suppose it really just comes down to the fact that it's clearly underwater, so it's difficult to truly guess or estimate how many tonnes you still actually have, correct?

Makko DeFilippo

executive
#47

Yes. To obtain a sample that truly represents the material, we need to pump all of it out and dry it. And if we're going to go to that trouble, we might as well sell it. So yes, the reality is that we simply can't sample that material until it reaches the drying process, as we saw in Q4.

Operator

operator
#48

Our following question is from Rodrigo Bardo at BTG.

Rodrigo Bardo

analyst
#49

I have two questions. First, can you bring us up to speed on where things stand with the revised technical reports for the 3 mines currently in operation? Since the previous one, Ero has achieved significant progress on the operational side and with brownfield initiatives. Metal prices have also changed since that time. So what do you anticipate these studies will show? Is there a scheduled timeline, and when do you intend to publish them? An outlook from you, along with your expectations, would be very useful.

Makko DeFilippo

executive
#50

Thanks for that. Once again, I believe we addressed this topic, especially regarding Tucuma, during the previous quarter. We do anticipate releasing an updated technical report for Tucuma at some point this year. It's currently in the final phases. So please keep watching for it. That will come before the end of the year. We'll proceed with our usual reporting approach for Caraiba and Xavantina. Therefore, on today's call, we won't provide any guidance regarding what we're observing there. Clearly, with metal prices at their current levels, this has presented a solid chance for us to reexamine those plans and make some optimizations. That said, I would note that our emphasis remains on margin. So yes, keep watching. We'll have that conversation later in the year.

Rodrigo Bardo

analyst
#51

All right, that's great. For my second question, Makko, I'll also include this. How do you view the Ero equity story through 2029, looking ahead? We've observed numerous brownfield initiatives, Ero is producing cash, and deleveraging is happening rapidly. So, taking a wider view regarding operations, projects, and shareholder returns, what's your outlook for the company through 2029?

Makko DeFilippo

executive
#52

Yeah, that's a fair question — appreciate it. As I've mentioned on numerous occasions, the case for putting money into top-tier copper assets, particularly those throwing off a substantial amount of cash in the current climate, is one that, in my view, merits close attention. Clearly, taking our assets and the strength of our balance sheet and applying them to what we regard as a genuinely remarkable growth project for this company — and positioning the business to deliver on it — is something we devote considerable thought to, along with pushing forward several of the exploration programs within our portfolio. What I believe sets Ero apart in this climate from, well — I don't want to say the remainder of the sector, since that's too broad a characterization, but definitely from certain peers, is that we're nearing the end of what has been a multiyear, highly intensive, capital-intensive stretch. We're looking at the rest of — there are a few years before we launch into our next growth asset. That, in our view, positions the business really well to put money not just into the future growth sitting in front of us, but also into a couple of organic growth drivers around our operations, which we covered in detail at our Capital Markets Day.

Makko DeFilippo

executive
#53

Still, it's a thrilling moment, clearly, to witness the work we've invested in operations around value drivers such as the concentrate sales program. And clearly, the One Ero initiative we've been pushing, plus our currency risk mitigation strategy — I believe all of that is putting us in a good position for the company to carry out its organic growth pipeline, and for us to create extra value through certain exploration programs and brownfield development projects we discussed at our Capital Markets Day. And yes, to have a solid balance sheet on top of that. So our near-term priorities, I think as Wayne mentioned — when I say short term, I mean the coming quarter — clearly, we want to repay the remainder of our revolver. That stands as the team's top priority. And it's something we pledged to all of our shareholders back in 2025. And I think collectively we're very glad to see that sitting on the near-term horizon.

Operator

operator
#54

Anita Soni from CIBC World Markets has the next question.

Anita Soni

analyst
#55

Sorry if someone already raised this — I just wanted to return to Xavantina. You said that using Q4 as a run rate would give a better sense of what it could do in 2027. Did you share the parameters for what you expect in Q4? I may have missed that <<inaudible>> tonnes grade — sorry, please go ahead.

Makko DeFilippo

executive
#56

Yes. If you look simply at the midpoint of the guidance we gave, it clearly still suggests a fairly substantial improvement in operational performance. The real question, I think, is how you get yourself into that range of 50,000 ounces plus. Looking at the whole of 2026 and multiplying it out, then taking the first 9 months and treating that as representative of what this asset is capable of — I don't think that's a fair approach. What I'd point to instead is what we expect to deliver in Q4. From an operational standpoint, we discussed this at our Capital Markets Day. And if you consider where we think we'll land, we're triangulating toward a range of 20,000 to 25,000 tonnes per month out of the mine and plant. In Q3, I think we saw levels quite close to that, with the normalized figure sitting at roughly 19,000 a month. So the mine did come back, as Gelson mentioned — a major factor there was grade, since we pushed back access to certain of the truly critical high-grade stopes that we anticipate at the end of the quarter, and those are clearly moving into Q4 now. So we did not give specific parameters.

Makko DeFilippo

executive
#57

That was really more of an implied math extrapolation, drawing on the Caraiba guidance plus where we're headed across the first 9 months.

Anita Soni

analyst
#58

Sure — and then regarding Caraiba, I just wanted to ask about the tonnage. So it looks like you've kind of ramped up to that level — I think at the Capital Markets Day you said roughly 4.5 million to 4.7 million tonnes per annum of sustained throughput, and this quarter you're pretty close to that, if my math is right. So at this stage, do you expect that rate can be sustained into 2027? Or is there something I might be missing, like some additional tie-ins or other work that needs to happen in 2027 to keep that rate up?

Makko DeFilippo

executive
#59

Yeah, we believe that can hold up. Of course, now and then we do have scheduled shutdowns, and those will affect it quarter by quarter, but there are no big tie-ins. The debottlenecking effort the team carried out, which Jonathan led, I think it paid off this year with sequential gains in throughput. And in our view, that rate is a fair reflection of what we're capable of, aside from the usual maintenance downtime during the year—but it's a pretty strong result from that operation compared with where we stood a few years back.

Operator

operator
#60

Orest Wowkodaw has another question for us.

Orest Wowkodaw

analyst
#61

I have one clarification, Makko. You said a technical report update for Tucuma is coming before year-end. Will that cover only updated reserves and resources? Or should we expect—or could we also see—a life-of-mine production plan included in it as well?

Makko DeFilippo

executive
#62

Yes. Thanks, Orest. We do anticipate revised resource and reserve estimates from the operation before the end of the year. There will be specifics regarding the phases of that operation. It may be more than I'm ready to discuss at that kind of far <<inaudible>> lens, and it isn't a huge surprise. But we'll share some information about the phases, particularly concerning how the reserves are built. That work is underway right now, and we're well positioned to release it ahead of yearend.

Operator

operator
#63

That wraps up the question-and-answer portion. Makko DeFilippo, I'd like to hand the conference back to you for any closing remarks. Please go ahead.

Makko DeFilippo

executive
#64

Yes. Thank you, operator, and thanks to all of you for being with us. I realize this is an extremely busy period. So, as ever, we’re grateful for the energetic Q&A session. For me, it ranks among the high points of the quarter, and I value the engaged back-and-forth. As usual, our team remains available for any follow-up conversations and questions. So please do get in touch with Courtney, Farooq, Drier, and the rest of our team. And to those we’ll be seeing in Toronto, Boston, and Montreal over the next few days, we look forward to meeting you in person. Many thanks, and we’ll speak soon.

Operator

operator
#65

That wraps up today’s conference call. You’re welcome to disconnect your lines. Thanks for joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ero Copper Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ero Copper Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ero Copper Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.