Evolution Mining Limited (EVN) Earnings Call Transcript & Summary
January 29, 2020
Earnings Call Speaker Segments
Bryan O'Hara
executiveThanks, Miles. Good morning, everyone, and welcome to the December 2019 quarterly conference call for Evolution Mining. Joining us this morning are Jake Klein, our Executive Chairman; Lawrie Conway, CFO and Finance Director; Bob Fulker, COO; and Glen Masterman, VP Discovery and Business Development. With the new year now underway, it remains an excellent moment to be a gold miner. During 2019, the US dollar gold price enjoyed its strongest year since 2010, gaining 19%, and that led generalist investors around the world to start dipping back into gold equities. This fresh interest showed up in the solid results of the U.S.-listed VanEck Gold Miners Index, which rose roughly 40% over the year. On top of that, the much-anticipated surge of M&A across the gold sector at last became reality, with seven transactions announced during just the last two months of last year, and in the process substantially reshaping the profiles of numerous companies involved, as is true of Evolution's acquisition of the high-grade, long-life Red Lake Gold Complex in Ontario, Canada. We look forward to connecting with investors over the coming month, with marketing in Sydney and Melbourne following today's results, investor meetings in Sydney after our financials on February 12th, a London roadshow in mid-February, and conferences in Sydney, Zurich, and Florida during the second half of February.
Bryan O'Hara
executiveAppreciate that, and now Jake will take it from here.
Jake Klein
executiveThanks, Bryan, and good morning, everyone — we appreciate you taking the time to join us on the call today. We know it's a busy day, and we're grateful for that. It's fitting to begin by acknowledging the devastation the bushfires have caused right across Australia, and to recognize the fantastic work the firefighters are doing, many of whom are volunteers — I'm proud that this also includes a number of Evolution employees. To support these efforts, earlier this month, we announced that we have provided AUD 3 million in funding to Rural Aid Australia, the New South Wales Rural Fire Service, and Queensland Rural Fire Service to support the bushfire, drought relief, and recovery efforts. Our thoughts are with all those impacted by these terrible events. Turning to Evolution Mining and our gold business, fundamentally and at its core, it is about discovering and producing ounces safely and efficiently, and converting gold in the ground into dollars in the bank. On this front, we have done well this quarter. The benefits of having a portfolio of assets is reflected in the fact that despite the headwinds we faced at Mount Carlton, we generated net mine cash flow of AUD 144 million and group free cash flow of AUD 84 million, which remains sector-leading.
Jake Klein
executiveWe closed out the quarter holding AUD 170 million in cash, with no debt on our books. Late in November, we announced that we're acquiring the Red Lake mine, and we remain on schedule to complete that deal near the end of March. This is a textbook turnaround situation — a mine that has suffered from a lack of capital investment for the past several years and today runs on a hand-to-mouth basis. While we expect the work and the changes needed to be substantial, and as we noted at the time of announcing the transaction, turning it around might take as long as three years, we have strong confidence that it will become a cornerstone asset in Evolution's future. Newmont has been wonderful to work with — highly engaged and very supportive of ensuring the ownership transition goes as smoothly as possible. Crucially, at Red Lake itself there are many highly skilled individuals who are driven and dedicated to bringing Red Lake back to being an efficient, well-capitalized, low-cost operation. Over recent weeks, we've had several people on site, and you can truly feel their excitement about what this operation can become. Red Lake holds a substantial gold inventory — more than 6 million ounces of high-grade gold in resources — and the exploration potential is considerable.
Jake Klein
executiveCowal just keeps getting better and better. The exploration results are blowing past even the most wildly optimistic expectations we held when we bought this incredible asset back in 2015. The board has given the green light to kick off a pre-feasibility study for an underground mine, and we anticipate that will lead to a maiden reserve being declared during this calendar year. Mungari has turned around impressively — it's now running consistently and also has encouraging exploration momentum that Glen will walk you through. The net mine cash flow Mungari generated across the first six months year to date exceeds what it generated across the 12 months in each of FY18 and FY19. Over the previous four years, Mount Carlton has generated a very impressive AUD 390 million in net mine cash flow, and as outlined in our release to the ASX on the 10th of January, it is facing headwinds from revisions to our interpretation of the ore body based on more recent drill results. The operation had a poor quarter and is now expected to produce between 70,000 and 75,000 ounces this year. The recovery from the Mount Rawdon wall slip is on plan. Cracow remains a reliable producer.
Jake Klein
executiveErnest Henry remains a major source of cash, producing net mine cash flow of nearly AUD 63 million. It's great to see that the drilling program testing the extensions beneath RL 1200 has gotten started. Everyone at Evolution is enthusiastic about what lies ahead. We're happy to welcome Fiona Murfitt aboard as our new general manager, sustainability. Red Lake offers a huge exploration and turnaround opportunity. The launch of the underground mine design study at Cowal marks the beginning of a new chapter for our cornerstone asset. Drilling aimed at extending mine life at Ernest Henry is now in progress, and our diversified portfolio keeps delivering cash flow that leads the sector. On that note, I'll pass things over to Bob.
Bob Fulker
executiveThanks, Jake, and good morning to everyone. It's a pleasure to begin my quarterly remarks with something positive on the safety front. The behavior safety programs, still running at every site, are producing solid results, with TRIF falling from 9.3 to 8.4 during the quarter. On the production and cost side, in the December Quarter the group turned out 171,000 ounces at an all-in sustaining cost of AUD 1,069 an ounce. That gave us group mine operating cash flow of AUD 233 million and net mine cash flow of AUD 144 million. Turning to page six for the Cowal and Mungari results: Cowal produced 65,000 ounces at an all-in sustaining cost of AUD 898 an ounce, with mine operating cash flow of AUD 95.9 million, while net mine cash flow held up well at AUD 51.9 million. Cowal's highlights for the quarter included no recordable injuries, bringing their TRIF down to 4.5; completion of the Wirraga decline and extraction of the bulk sample for test work; and 22,000 meters of drilling across the GRE46 and Dalwhinnie zones, which keeps pointing to substantial potential to expand their 1.4 million underground resource. Given the stage three water restrictions currently in place in the region, the Cowal team has spent the past 12 months working on a strategy to remove their dependence on surface water.
Bob Fulker
executiveWe've achieved considerable advancement on this strategy through the following efforts. We began installing a second pipeline across Lake Cowal, which raises our pumping capacity by 30%. That lets us draw 100% of the water our mine needs from existing and future saline sources, the Bland Creek paleochannel, and freshwater from the Jemalong Weir. The project is progressing well, with pipe installation slated for completion this month and full use in the March quarter. Commissioning of the three additional bores at the Eastern Saline Borefield is anticipated in the March quarter, and testing at the second saline borefield is set to begin in the March quarter. Those are expected to be commissioned in the September quarter, contingent on testing of water resource quality and quantity. We have also identified a third saline borefield for assessment, aimed at further reducing water supply risk. Notably, under 20% of Cowal's total daily water needs currently depends on surface water, which carries risk from additional water restrictions. Given the program described above, we're confident the water supply is sufficient for Cowal's continuing requirements without material impact on operating costs or recoveries.
Bob Fulker
executiveMungari produced a bit under 33,000 ounces, with an all-in sustaining cost of AUD 1,344 per ounce and mine operating cash flow of AUD 30.4 million. Net mine cash flow at Mungari rose by AUD 8.6 million compared with the September quarter, with production at similar levels, and the operation kept improving its financial results quarter after quarter. The Frog's Leg underground mine delivered 116,000 tons of ore. Development of the Boomer access is still on schedule, having advanced 100 meters toward the mineralized zone. Plant throughput once again came in above plan, with an annualized rate approaching 2 million tons per annum. We've begun work using data to determine what the natural limits of the Mungari processing plant are, and additional studies have started to evaluate optimizing mining and sustaining processing rates beyond 2 million tons, including assessing a rate of up to 2.5 million tons. Excuse me. Construction of the Cutters Ridge road also got underway late in the quarter, which will open up further opportunities in the north. Turning to page seven for the Mount Carlton and Mount Rawdon results: Mount Carlton delivered a bit under 10,000 ounces at an all-in sustaining cost of AUD 2,182 per ounce. Because of the issues we've outlined, chiefly the main hydrothermal breccia zone, which constitutes the bulk of the mineralization in the V2 pit, it has tapered into a series of narrow, higher-grade feeder structures at shallower depths than anticipated.
Bob Fulker
executiveThe underground mineral resource model has been impacted as well, with comparable geological interpretations applied to it. Mount Carlton had been expected to deliver considerably more ounces during the June 2020 quarter, from both V2 and the underground. Guidance for Mount Carlton now sits at 70,000 to 75,000 ounces, with an all-in sustaining cost of AUD 1,150 to AUD 1,225 per ounce. On a brighter note, underground development advanced nicely over the quarter, and the East Lode was hit right on schedule in early January 2020. Development underground is ongoing, with stoping set to start in the June 2020 quarter. Drilling at Crush Creek is likewise anticipated to get underway in the June 2020 quarter. Mount Rawdon turned out slightly more than 20,000 ounces at an all-in sustaining cost of AUD 1,815 per ounce, alongside mine operating cash flow of AUD 13.9 million and net mine cash flow of AUD 9.1 million. Happily, the sharper focus on safety is bearing fruit, with TRIF dropping from 12.2 in the September quarter to 8.9 in the last quarter. The West Wall Stabilization project, described in the September quarter report to fix the pit area affected by the west wall slip, remains on track, and material movement is consistent with plan.
Bob Fulker
executiveWe anticipate costs coming down once we get back into high-grade ore at the pit floor during the June half. Now let's move to page eight for Cracow and Ernest Henry. Cracow keeps delivering steady results, with output of slightly more than 20,000 ounces, an all-in sustaining cost of AUD 1,284 per ounce, and mine operating cash flow of AUD 23 million. Upgrades at the processing plant have generated quarterly savings above AUD 120,000 along with a continuing lift in recovery. Ernest Henry once more contributed substantially to the group, delivering 23,000 ounces at a negative all-in sustaining cost of AUD 526 an ounce and producing net mine cash flow of AUD 62.7 million. Drilling has begun beneath the 1,200 RL, with 10 holes finished totaling 4,400 meters. Operationally, things are progressing well at Red Lake. The interim mine plan, which lets us revitalize the operation and begin the shift toward sustainable production, involves speeding up capital development to 1,000 meters per month, or at minimum 1,000 meters per month, while halting development in non-core zones. We are finalizing plans and placing orders for new mine equipment to boost capacity and production efficiencies. That equipment should be commissioned in the FY21 year.
Bob Fulker
executiveWe see an opportunity to shut down two shafts, which would cut our operating and maintenance expenses, and to finish the major maintenance work at the Campbell mill so it runs more reliably and gets more use. We'll give another update once the transition has closed. To sum up, we're still concentrated on lifting our safety results while hitting the guidance figures for both ounces and costs. Going forward, the pieces are now in place at Cowal, Ernest Henry, Mungari and Cracow for a strong year. Mount Rawdon has recovered, with material movement matching our plan to complete the West Ramp cutback and deliver the ounces for FY 2020. Red Lake is an excellent purchase with huge upside. The people there are driven and highly capable, and I look forward to collaborating with the site team over the coming quarters to build one more production pillar for Evolution. On that note, I'll pass things to Glen.
Glen Masterman
executiveThank you, Bob, and good morning to everyone. We made substantial headway at Cowal last quarter in both the surface extension work and the underground infill drilling campaigns. Our extensional drilling carried on enlarging the mineralized footprint located in the southern portion of the GRE46 Dalwhinnie complex. The results we reported this morning from hole 544B, which take in seven meters at a grade of 124.7 grams per ton, came from drilling in and around the 348 zone, as illustrated in figure one on page 13 of today's report. Identifying this new area of mineralization at the Dalwhinnie position has brought to light broad intervals of very impressive grades, and we believe these will produce a meaningful expansion of the mineral resource once the results are folded into a re-estimation of the underground block model. We extracted the underground bulk sample from the 985 level drive, and the ore was run through the Cowal plant as a low percentage blend over the December 2019 quarter. We carried out detailed monitoring of metallurgical performance on that underground ore blend, and there was no noticeable effect on recoveries when compared with a modest rise in mill head grade. Mapping of the underground exposures in the 1057 and 985 level drives has verified the pronounced south to southeast plunging character of the GRE46 mineralization, something previously identified and built into our geological model of the underground mineralization.
Glen Masterman
executiveThe results we've seen confirm that choosing to finish the level drives to the east of the exploration decline was the right call — it lets us set up the best possible drilling positions for the infill program at GRE46 Dalwhinnie. We can now shift drilling orientations from southeast to northwest, which will let us gather data to model grade distribution more accurately for both current and future mineral resource estimates. Over at Mungari, we started an access drive from the Frog's Leg decline, and it has now advanced 100 meters toward the Boomer laminated high-grade vein. We anticipate drilling Boomer from footwall drill cuttings during the June 2020 quarter. With the results from the closed space grade control program, we'll be able to build a detailed block model estimate covering a small section of the Boomer vein. The aim here is to work out the best way to model the nuggety, high-grade character of the gold mineralization. We'll also assess how production from that same area reconciles against the gold predicted by the grade control model. The results we received this morning keep confirming our interpretation that Boomer mineralization represents a small-sized resource opportunity. Finding mineralization in this area has altered our previous understanding of the structural architecture across the Mungari camp.
Glen Masterman
executiveOur current interpretation is that the Boomer structure continues the Strzelecki Shear Zone and hosts a Raleigh complex at the East Kundana joint venture, which lies farther north. Because our geological understanding has shifted, the Strzelecki structure now sits in a different place as it extends southward onto our Mungari tenements. Consequently, along this structure there is a 1-kilometer-long stretch of untested strike that has not been drilled and is prospective for high-grade laminated veins. Over the coming couple of quarters, we anticipate drilling to close that data gap. After spending a week on site at Red Lake, I came back last week and was very pleased with everything I saw and experienced. First, there is a talented group of enthusiastic, high-quality technical explorers who are eager to get moving. Besides using the opportunity to deepen my understanding of the geology and potential of the Red Lake complex, we devoted time to putting together a plan for restarting drilling activities once the transaction closes. The immediate priorities are completing infill drilling to build greater confidence in resource extension targets across lower Red Lake and at Cochenour. This drilling program will underpin the proposed operating strategy in these areas of the mine.
Glen Masterman
executiveOur discovery drilling is going to be aimed at finding additional continuous ore bodies that could add substantially to resources. Up to five rigs should get our drilling campaign underway through the end of June, and after that we'll ramp up to eight rigs in FY 2021. All in all, the December 2019 quarter gave us stronger results from discovery programs right across the group. At Cowal, we anticipate the underground resource will be upgraded and grow beyond the 1.4 million ounce inferred resource reported for December 2018. We'll share specifics on our model updates in February, at the time we publish the annual mineral resource and ore reserve statement. Finding the small, high-grade Boomer vein at Mungari led us to reinterpret where the Strzelecki Shear Zone sits, and there are untested gaps along strike to the north. Last, we're eager to finish building our position at the Red Lake Gold Complex so we can pursue an aggressive drilling strategy in the hunt for new high-grade resources within one of the most prolific Archean greenstone gold belts anywhere on the planet. On that note, I'll pass things to Lawrie.
Lawrie Conway
executiveThanks, Glen, and good morning, everyone. Today I'll give a quick rundown of the financial performance for the December quarter; a more detailed analysis of our half-year financial performance will come when we release our results next month. You'll find a summary of the financials on pages 10 and 11 of the report. The operational performance for the quarter wasn't as good as we would've wanted to deliver, but the quality of the assets and the benefits of a diversified portfolio approach were again demonstrated through sustained high levels of cash generation. Some assets delivered lower operating cash, while other assets continued their investment in major projects, or others ran into some operational difficulties. A standout was Cowal, where in excess of AUD 50 million of net mine cash flow was delivered from essentially processing stockpile material and after investing over AUD 40 million in major projects. Ernest Henry delivered another exceptional quarter at over AUD 60 million. Mungari delivered a third consecutive quarter of increasing cash flow at around AUD 25 million. These assets offset the lower performance at Mount Carlton and Mount Rawdon. Overall, we delivered just under AUD 145 million in net mine cash flow, which was the equivalent of AUD 830 per ounce sold, and this allowed for us to invest over AUD 70 million of major capital investment for future production.
Lawrie Conway
executiveCapital spending rose by AUD 24 million during the quarter. Before any M&A activity or debt servicing, net cash generated came to AUD 83.6 million, and net cash for the quarter grew by slightly less than AUD 80 million. That works out to roughly AUD 480 per ounce banked in the quarter. This cash flow was achieved at a realized gold price of AUD 2,090 per ounce, which sits AUD 225 per ounce under the spot price. Given the business's sustained cash generation, we paid off the term loan's outstanding balance of AUD 275 million, which puts us in a debt-free position. Now to our cost position and the outlook for the year. Our AISC for the first half was AUD 1,041 per ounce. That result is a little behind plan, though we remain on track to hit guidance of AUD 940-AUD 990 per ounce. The key drivers for getting to that cost guidance are the production mix, sustaining capital, and the operating cost profile. We expect second-half production to be comparable to the first half, but the mix will differ and so will the grades. Cowal will come in about 20,000 ounces lower in the second half, as it keeps processing stockpiles while waste ripping at Stage H continues.
Lawrie Conway
executiveThose lower grades are going to be partly offset by increased tonnage and recovery. At Mungari, output should be a bit higher thanks to anticipated better grades, a stockpile increase because mined tons will exceed processed tons, and reduced costs. Mining costs will also feel an effect as development gets underway at the Cutters Ridge mine, with those costs being capitalized as major project investment. Grades at Mungari are projected to come in roughly 5% higher. Higher production and lower costs are anticipated at Mount Carlton and Mount Rawdon, particularly during the June quarter, as Mount Carlton reaches the underground ore and Mount Rawdon replaces stockpile material with better-grade ore from the pit. Cracow and Ernest Henry should post a second-half result comparable to their first half. Sustaining capital is set to be AUD 10 million less in the year's second half, which ought to bring our AISC down by AUD 25 to AUD 30 per ounce during that period. Major capital across the March and June quarters will look much like the December quarter. Every commitment stays in place to complete the Red Lake transaction, made up of an AUD 600 million five-year term loan facility plus a new CAD 125 million three-year performance bond facility.
Lawrie Conway
executiveWe’re also going to renew the existing facilities: a CAD 360 million three-year revolver and a CAD 175 million three-year performance bond facility. A couple of items will be included in our half-year financial results — our exploration costs of AUD 17 million–AUD 22 million will be expensed, and most of that expense relates to Tennant Creek. As we repay our debt facility during the quarter, roughly AUD 5 million–AUD 7 million of non-cash facility costs will be expensed. I’m looking forward to updating you next month on the half-year financial results. With that, I’ll now ask Miles to open the line for questions.
Operator
operatorThank you. Ladies and gentlemen, we're now going to start the question-and-answer portion. Should you want to pose a question, simply press star one on your phone and then wait until your name is called. To withdraw your request, please press the pound or hash key. That's star one on your telephone. Our first question today is from Levi Spry of JPMorgan. Levi, please go ahead with your question.
Levi Spry
analystMorning, everyone. I have a few quick questions about the schedules for a couple of the studies and the reserve and resource updates you have underway, especially at Mungari and Mount Carlton. Could you give us a sense of when that work is expected to wrap up?
Jake Klein
executiveRegarding Mount Carlton, Levi, those updates will come in February, at the time we publish our mineral resource and reserve statement.
Levi Spry
analystAlright.
Jake Klein
executiveThe same applies to Mungari.
Levi Spry
analystRegarding Mungari, could you speak to the studies on feeding the plant and raising its capacity that Bob described, plus the drilling you're really only just beginning at Boomer and Dalwhinnie, as I understand it?
Jake Klein
executiveDalwhinnie sits at Cowal, while Boomer's is located at Mungari. Yes, that will come in the next 12 months, as part of the next MRR update. We're carrying out the study to examine whether we can increase it. We've already got this plant running at a sustained rate of 2 million tons per annum, and we're now looking to see whether it makes sense to move it to two and a half million tons per annum. Also, the drilling that Glen's doing is certainly giving us enthusiasm and encouragement about that district's potential.
Levi Spry
analystAll right, thank you — and thanks again.
Jake Klein
executiveAppreciate that, Levi.
Operator
operatorDavid Radclyffe from Global Mining Research has the next question in the queue. David, go ahead and ask.
David Radclyffe
analystThanks. Morning, Jake and everyone. I have a few follow-ups specifically about Mungari. Regarding what was said about moving over to Cutters Ridge, does that tell us anything about the choice concerning the White Foil underground?
Bob Fulker
executiveDavid, this is Bob here. At the bottom of the pit at White Foil, we're carrying out the drilling, and we're still working our way through those studies. The transfer — or the move — over to Cutters Ridge is in fact a planned move, timed right as the White Foil pit reaches its natural limit at the bottom. Glen, would you like to add anything to that, or?
Glen Masterman
executiveNo, I think, as you mentioned, Bob, we're carrying out additional infill drilling to close just a handful of gaps in the underground resource block model for White Foil. Plus a good amount of drilling over at the Boomer target to keep delineating the Boomer vein as another alternate underground target.
David Radclyffe
analystAll right, thank you. So, a quick follow-up on Boomer. In your view, are you far enough along at this point to carry on installing underground infrastructure while drilling is still going, or do you tend to hold off until results come in? My assumption is that you're still viewing this as an underground. I'm just trying to get a sense of how soon it might potentially be able to feed the mill.
Jake Klein
executiveWell, David, the drilling results we've seen so far have given us enough confidence to go ahead and extend a level drive toward Boomer, and there are a couple of reasons for that. The first reason is really to get ourselves into a closer position off the footwall, so we can drill a fairly detailed grade control program from there. Then, while that drilling is underway, the ramp will keep advancing up the vein itself to open it up. The plan, as you can well imagine with these high-grade laminated veins, is that they're extremely nuggety in nature, and modeling them can be quite a challenge at times. What we intend to do is drill a tight-spaced grade control pattern and then compare it against what we recover when we open up a section of the Boomer vein, so we can understand how it will reconcile. That's the intention right now, and we believe we have, as I mentioned, enough encouragement to get out there and carry out this body of work at this time.
David Radclyffe
analystAll right, thank you. Then the final piece would just concern the fresh reading of the situation there, plus the fact that you're looking at a kilometer zone with respect to how much strike potential Boomer holds for the Strzelecki. Is that strictly a place where no drilling has ever taken place historically, or has some historical drilling occurred that might offer you insight along with some targets you could follow up on right away?
Jake Klein
executiveIn this region, there's been a bit of shallow drilling. Previously, people interpreted the Strzelecki's location as running somewhat nearer to the White Foil pit's edge, tracking alongside it fairly closely—not exactly within the pit, though quite near to it. As we've worked on developing the Boomer vein itself, we've come to understand that the Strzelecki Shear Zone has shifted direction. Some shallow drilling crosses it in that area. Our view is that drilling isn't effective, and we need to test at greater depth where we interpret the structure lies, so we can genuinely determine whether additional strike length might be opened up. For us, I'd say that's likely the most exciting aspect of this Boomer development across roughly the last 12 months.
David Radclyffe
analystExcellent. Appreciate it, everyone.
Jake Klein
executiveMuch appreciated.
Operator
operatorMichael Slifirski from Credit Suisse has the next question in the queue. Michael, go ahead and ask your question.
Michael Slifirski
analystYeah, I have a couple of quick questions. First, regarding Red Lake, I'd like to understand what you consider the biggest obstacles, since you've allowed yourselves quite a lengthy window to sort things out. What are the main difficulties? Is it mainly labor relations and workforce reductions? Is it environmental matters, or is it just the absence of investment and development plus the other capital that needs to be addressed?
Jake Klein
executiveThanks, Michael. Before I get to your question, I want to make sure you're doing all right — this is the first conference call where you haven't been the first one to jump in. Is everything okay with you?
Michael Slifirski
analystWell, today I've got four quarterly calls to juggle. Thanks for lining them up like that and keeping us on our toes.
Jake Klein
executiveHappy to. It only refers to subperformance. Regarding Red Lake, the main difficulty, I believe, has been a lack of investment — this is a large mine, and for quite a while no exploration money has gone into it. For some time, development spending has also been absent. It is effectively being reset, with exploration underway and an interim plan starting to take shape that will concentrate on drilling larger zones, giving us better production sources rather than the current scattered approach. We're beginning to build a sustainable operation. The resource exists. What it truly needs is recapitalization. On-site, there is a very clear acknowledgment that changes must happen and that how we've operated across the last few years cannot continue. The workforce is engaged. The geology is exciting, and the opportunity is present. I'm not sure — Glen or Bob, would either of you like to add something?
Bob Fulker
executiveBefore I turn things over to Glen, Michael — from where I sit, everything Jake mentioned, plus a bit more on a couple of those points. On development, we have to have developed stocks in front of us. But before we can truly have those developed stocks in front of us, Glen actually needs to properly delineate them and get that grade control drilling done so the mining plan is fully developed. For me, it comes down to achieving consistency between geology, mine planning, and metallurgy, and having all of it working together in cohorts so we can bring a consolidated plan together. That means focusing mining on areas where we know we can achieve solid improvements in effective and efficient material movement. It means focusing the guys on clean mining of the ore body. All of that is going to take a little bit of time to get there. Really getting that drilled stock, that developed stock, and then that stoping stock ready to be mined is why it can take a little bit of time — because it's been underinvested, and we need to get back to a position where we can deliver consistency.
Jake Klein
executiveAppreciate it, Bob.
Glen Masterman
executiveThanks. Michael, the drilling program is tightly aimed at backing the mining priorities we have at Red Lake. Lower Red Lake and Cochenour have been pinpointed by us as places where getting ahead of grade control drilling is a real goal. For some time, that area has been underinvested at Red Lake. On top of that, there's even some basic resource definition drilling along strike from known mining areas where the ore bodies haven't been closed off. These are the focus areas, just at the outset, where we want to begin building our knowledge base in those parts of the mine. At the same time, what we'd like to accomplish is really to pin down larger, more continuous, and, I guess, mining-friendly geometries on these shear zones. A number of targets exist in Lower Red Lake and extensions along strike and even up and down deep at Cochenour, where we'll be stepping out and kicking off some extensional drilling alongside all of our grade control and res def.
Michael Slifirski
analystGreat, that's really useful. Thanks. My second question is for Bob, about Cowal and the switch to saline water. You've said before, I believe, that reagent use is low and maintenance is low thanks to the high-quality water the plant has always run on. Earlier in your remarks, I know you mentioned that you don't expect OpEx to change significantly, but given that you previously described the plant as being in great condition with low consumable costs because of good-quality water, how do you view the medium term for the plant with lower-quality water?
Bob Fulker
executiveThanks, Michael. For context, the TDS levels we're discussing fall between eight and 10,000. From a total dissolved salts standpoint, that's not comparable to what you'd be mining in West Australia or Central Australia. I don't anticipate any meaningful rise in reagent use or costs. Once you get somewhere above 20 to 30,000, you begin to observe deteriorations, but at roughly eight to 10,000 — the salinity level we're referring to — we really don't expect much of a difference from where we stand today.
Michael Slifirski
analystThat's great, thank you so much.
Jake Klein
executiveAppreciate it, Michael.
Operator
operatorIf you'd like to pose a question, simply press star one on your phone and hold until we announce your name. Today's next question is from Daniel Morgan of UBS. Daniel, please go ahead with your question.
Dan Morgan
analystHi, Jake and team. Just a quick follow-up regarding the water situation at Cowal. You've just finished a pushback, and this year you'll be shifting toward the use of stockpiles. I was just wondering: what share of the throughput from those stockpiles is going to be oxide ore in nature?
Jake Klein
executiveDan, I don't have that figure available right at this moment.
Bob Fulker
executiveCould we follow up with you on that? Clearly, every one of our projections rests on the stockpiles and on what we know about them.
Dan Morgan
analystRight.
Bob Fulker
executiveWe’ll have to follow up with you on that.
Dan Morgan
analystYeah, maybe to step back to a higher level, it really boils down to how much water gets used. Cowal has a water study, I believe it's a couple of years old or so, showing that the oxide ore consumes more when it's processed through the plant. I was just wondering whether you could speak to that, and to how you expect water consumption to look over the next 12 months compared with what you've seen.
Bob Fulker
executiveAt a high level, over the past three to six months we've been putting more oxides into the feed, drawn from the stockpiles. Our current model, along with the simulation for the water model, actually accounts for the extra water that an oxide feed requires. It also accounts for the fact that running oxides through the mill gives you lower returns from the TSF, owing to how fine the oxide is when it passes through the processing plant. All of the modeling does factor those things in, and it's probably return water where you take a bigger hit than with actual consumption water. When you combine those two, they are being accounted for. I don't have a percentage, sorry.
Dan Morgan
analystI appreciate that.
Bob Fulker
executiveAppreciate it, Dan.
Operator
operatorThat brings us to the end of the Q&A portion. I'll now return the call to the Evolution Mining team for any final comments.
Jake Klein
executiveThank you. Thank you all. I know this is a busy time, and you likely have plenty of calls and reports to write. I appreciate you taking the time. Thanks for that. We look forward to another call on February 12, when our half-year accounts will be released. Thanks for joining.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.