Evolution Mining Limited (EVN) Earnings Call Transcript & Summary

July 23, 2020

Australian Securities Exchange AU Materials Metals and Mining earnings 56 min

Earnings Call Speaker Segments

Bryan O'Hara

executive
#1

Thanks, Kevin. Good morning, everyone, and welcome to the June 2020 Quarterly Conference Call for Evolution Mining. Joining us this morning are Jake Klein, our Executive Chairman; Lawrie Conway, CFO and Finance Director; Bob Fulker, COO; and Glen Masterman, VP, Discovery and Business Development. This has been an extremely volatile year, with so many distortions in financial market prices compared with economic reality, so it is reassuring to know that one asset class is behaving exactly as it should. Gold's historical negative correlation to real interest rates still holds true. With real rates declining and extraordinary government stimulus in place, the gold price has performed well. The U.S. dollar gold price now sits within a few percent of the all-time high set way back in 2011, while the Aussie dollar gold price keeps breaking records, averaging over $2,600 per ounce for the June quarter. We have a busy couple of months ahead, with our financials being released on the 13th of August, which we'll use as an opportunity to issue FY '21 guidance and an updated 3-year outlook. Then on the 1st of September, we hope you can join us for our virtual Investor Day, which will focus particularly on the longer-term outlook for our business, highlighting the growth potential at Cowal, Red Lake, Ernest Henry and Mungari. On today's call, we'll be speaking to the June 2020 quarterly results presentation released to the ASX this morning. Thank you, and I'll hand you over to Jake.

Jacob Klein

executive
#2

Thank you, Bryan, and good morning to all of you. We appreciate you spending part of your day with us on this call. I want to begin by taking a moment to reflect on the tragedy our industry in Australia went through last week, when a young man died in Western Australia; ours is a fairly small and close community, and this has rightly affected every one of us. We will learn from it together, and our thoughts go out to his family and his workmates during this extremely hard time. I hope that you, your loved ones and your colleagues are healthy and doing well as we all deal with these extraordinary circumstances. At Evolution, we are lucky to operate in Australia and Canada, 2 jurisdictions that are excellent places to do business and, fortunately, also countries where the COVID-19 pandemic is being handled well. So far, Evolution has managed the COVID-19 pandemic very successfully. We are getting through this with authenticity, holding firm to our health and safety values, and at the same time keeping our business strong. To date, COVID-19 has had no effect on our production, and none of our employees or contractors has been infected. Today I will speak to Slides 3 to 5 of the presentation we have released. As an opening remark, I would say that if I could bottle this set of results and pull them out every quarter from now on, I would gladly do so. They reflect so many of the fundamental qualities that underpin our core long-term strategy at Evolution. First and very importantly, our safety performance is getting better. Results in this area can never be good enough, but the signs are encouraging. During June, we had no recordable injury. Our culture of engaging with, reporting and learning from each incident is also improving significantly. Second, we have spoken for a long time about our approach of prioritizing margin over volume. Here you can plainly see the benefits of that strategy; in our view, generating more cash from fewer ounces is a very good thing. This quarter, we achieved record operating cash flow, record net mine cash flow and record free cash flow, and we grew our cash balance by $204.7 million, once again showing that Evolution is a high-margin, low-cost business. We are delighted with today's high gold price and hope it rises further, but we will not stake our business on it, as we keep working to position Evolution as one of the very few gold companies that can truly say it will thrive through the inevitable cycle. Third, a gold company is, by definition, depleting its assets with each ounce it produces. So you have to keep adding ounces through discovery and also create value through improvements. If you fail to do that, you are moving backwards. Today, we announced the Maiden Underground reserve at Cowal. That is an asset we acquired in 2015 with a resource base of 3.4 million ounces. After that point, we've turned out roughly 1.3 million ounces at low cost, brought in more than $750 million of net mine cash flow, and as of today the asset holds a resource base exceeding 9 million ounces. At Cowal, our reserve base is now just about 4.5 million ounces, and we'll keep expanding that reserve base as we drill additional inferred resources and convert them into the indicated category; we'll also stay conservative, capping our resources at AUD 2,000 per ounce and figuring our reserves at AUD 1,450 per ounce. That's the soundest way to safeguard our margins. The maiden reserve announcement lands well ahead of the end-of-this-calendar-year schedule we had anticipated, and it shows the momentum we're generating at this world-class mine. Bob and Glen will go into more detail on the highly exciting opportunities sitting before us at Cowal as we work our way toward a production profile exceeding 300,000 ounces per year of low-cost gold; we remain very impressed and encouraged by how readily Evolution's approach, style and culture are being taken up at Red Lake. The transformation and turnaround are moving faster than we had anticipated, and the scale of the opportunity is considerably larger than we expected. We believe that, as this carries on, we'll be able to show material value creation consistently across these assets. And you'll hear more on that from Glen in his summary, as well as at our Investor Day and when we release our results. The turnaround at Mungari is impressive, and the team there has done a great job of consistently delivering at or above their plans. Finally, and I think this matters a great deal, we keep showing that we're willing to refresh and revitalize our portfolio. Cracow is an asset that has served us well, yet its mine life is 18 months and it requires an owner ready to put risk capital into discovery. Compared with the opportunities before us at Cowal, Red Lake, Ernest Henry, Mungari and Crush Creek, all properties with discovery upside, Cracow would not have ranked above them from a discovery standpoint. This marks the third asset we've sold, and we still believe our strategy, that bigger isn't necessarily better and that margin beats volume every day, is the finest approach for creating long-term shareholder value. With that, I'll pass things over to Bob.

Robert Fulker

executive
#3

Thanks, Jake, and good morning to all of you. If you'd kindly turn to Slide 6. It's a pleasure to begin with a couple of very strong positives. Over the quarter, TRIF declined another 6%, reaching 6.8. Across the full year, that represents an 18% improvement, which means fewer injuries are occurring; we have been closely tracking and responding to COVID's effects, and to date our employees and operations have not been materially impacted. In the June quarter, we produced 218,000 ounces at an all-in sustaining cost of $1,088, along with $224 million in net mine cash flow — a terrific outcome from the site teams in delivering a solid fourth quarter. We keep producing gold safely. There's a fresh ore reserve at Cowal, plus a significant opportunity at Red Lake thanks to the outstanding resource work done by the geological team; and lastly, FY '20 output came to 746,000 ounces, with an all-in sustaining cost of $1,043. That figure includes 27,500 ounces from Red Lake at AUD 1,943 per ounce. Turning to Page 7: Cowal achieved a remarkable safety gain over the year, with TRIF moving from 8.7 to 1.8 across the 12 months. On top of that, total ore processed rose 7%, and plant utilization was up 2% for the year. Given that the plant is mostly fed from low-grade stockpiles, Cowal turned in a solid quarter: 60,600 ounces produced, all-in sustaining costs down to $941 per ounce, and net mine cash flow of $59.3 million — even while spending more than $55 million on underground diamond drilling and study work, the Stage H strip, and the IWL tails facility. All of that is investment in the future. As Jake noted earlier, Cowal today declared a maiden underground ore reserve of 804,000 ounces and lifted the GRE46 mineral resource to 2.9 million ounces. I want to acknowledge the whole project team for the tremendous effort they've put in so far, which made it possible for us to announce this excellent result. The team is currently in the last phase of the regulatory submission, and once we have approvals from both the regulator and our Board, we'll be ready to begin underground. Also, John Pennell joined us this week as General Manager — I want to welcome him to Evolution and thank Greg Walker for the excellent work he did keeping Cowal on track and delivering our ounces safely last year. Ernest Henry contributed significantly to the group again, with production of 28,000 ounces at an all-in sustaining cost of negative $617 an ounce and net mine cash flow of $68.3 million. Turning to Page 8, Red Lake's first quarter with Evolution beat my expectations. Ian Braden has guided the team, and they've truly embraced the task of overhauling their operation. Output reached 27,500 ounces at an all-in sustaining cost of AUD 1,943, generating mine cash flow of $9.9 million prior to restructuring costs. After the Campbell Mill refurbishment, the Red Lake mill was shut down and winterized to save costs. Availability at Campbell Mill has run at 98% since it went offline. Because the COVID situation remains so fluid, a local workforce is handling the bulk of the shutdown work. This has reinforced site ownership over shutdown quality and will be repeated in future wherever feasible. Underground development advance rates continue to improve month over month. In the coming six months, we aim to surpass 1,200 meters each month. That increase comes from concentrating on key development zones, achieving greater efficiency with the lead equipment, and enhancing cycle effectiveness across the board. Among other significant milestones this quarter: we decommissioned and removed 42 pieces of underground equipment, tore down unused and redundant surface buildings, began work on underground infrastructure modifications that will enable decommissioning of the Campbell shaft, kicked off the recent Balmer hoist automation projects, and continued updating the resource model—Glen will cover that—plus numerous smaller initiatives designed to reduce costs and drive efficiency gains. It's an exciting period at Red Lake. Amber and her team continue to feel driven and enthusiastic about realizing their goal of becoming the key asset within Evolution — one that generates genuine value. The target remains producing over 200,000 ounces annually at an AISC under USD 1,000, and I have every confidence this is well within reach. Mungari produced 37,000 ounces at an all-in sustaining cost of $1,089 per ounce, along with a new record for net mine cash flow of $39.8 million. Frog's Leg Underground achieved a 29% rise in tonnes at a higher grade. We're pleased to report that the Boomer development maintained mineralization as planned during the early part of the quarter, and a drill platform was set up to commence grade control drilling. Things are moving along well at Cutters Ridge, where we delivered first ore last month. The plant is still running steadily at a rate of 2 million tonnes per annum. At Mt Rawdon, we turned out a bit under 26,000 ounces, with all-in sustaining costs easing to $1,305 an ounce. We also booked record net mine cash flow of $32.3 million. As anticipated, we reached high-grade ore, which meant we didn't need to feed as much low-grade stockpile material. Mt Carlton came in at just under 15,000 ounces, with all-in sustaining costs down to $1,324 an ounce and mine operating cash flow of $11.7 million. Mill utilization stayed elevated at 97.9% for the quarter. That's a 5.3% gain for the full year. Cracow kept up its steady results, delivering slightly under 24,000 ounces with all-in sustaining costs down to $1,090 per ounce. We completed the sale of Cracow to Aeris Resources on July 1. I'd like to thank General Manager Jason Floyd personally, along with the whole site team, for what they've done and contributed to the Evolution group. Happily, Jason is remaining with Evolution. In summary, fiscal 2020 delivered many high points and some disappointing low ones as well, but I believe we continue to learn how to improve ourselves and our company through those difficult times. Safety results improved. Five of our six operations turned in strong performances. We dealt well with uncertainty in geology and geotechnics, as well as with COVID. On a personal level, a few things stood out for me: 61 Act Like an Owner nominations during the last quarter and 196 for the year. Value of $45.6 million came from our data-enabled improvements, the Debi program. The Cowal Underground project was accelerated, and remediation work at the Mt Rawdon reservoir has been completed. We are now in a new financial year, and our emphasis is on delivering reliably on our commitments. Every positive outcome from last year fills me with great pride, and I am encouraged by how eager our people are to challenge convention and think in different ways. Thank you for your time. I will now hand over to Glen.

Glenton Masterman

executive
#4

Thanks, Bob, and morning to all of you. My remarks this morning will cover Slide 9, and I'll also be pointing you to Pages 12 to 20 of today's report. Discovery work at Evolution enjoyed a successful 2020 financial year, especially at the Cowal Underground. Output from the focused service and underground drilling programs keeps showing the high-quality opportunity sitting right in front of us. More than 400,000 ounces went into the updated mineral resource, just 4 months after we finished the previous estimate. Overall resources, which include the 804,000-ounce Maiden ore reserve, now stand at 2.9 million ounces. Drilling both below ground and at the surface will continue through this quarter. The aim is to turn more inferred resources into other categories, letting us add to the 1.5 million ounces already in the indicated category, while also continuing to expand the overall resource inventory—chiefly at the Dalwhinnie south area, where the mineralization remains open down-plunge. The infill results shown on Page 15 of this morning's report, among them 75.2 meters grading 5.1 grams per tonne in hole 139, back up our read on the geological continuity of mineralization within the underground resource; those results weren't available at the end of April when the resource model was updated, but they will be folded into our annual mineral resource and ore reserve statement covering the period ending December 31, 2020. Importantly, these fresh results support our hypothesis that the ore reserve will keep growing as feasibility work advances toward delivering first ore from underground. Over at Red Lake, we've now finished 2 full quarters of drilling and lifted the count of underground drills from 4 to 5. The program continues to chase various resource conversion possibilities at Cochenour and Lower Red Lake. In zones the schedule will mine during the coming 12 to 24 months, results demonstrate strong continuity of growth. Step-out drilling close by is checking whether mining can reach beyond existing designs in places where mineralization remains open along strike. Several longer step-outs at the northern end of the Cochenour ore body have verified that the Gold Eagle Corridor continues along strike. The top result was 4.7 meters at 18.8 grams per tonne, and follow-up drilling is planned near this first intersect to determine what the results signify. During the June quarter, revision work continued on the Red Lake mineral resource, and that included bringing more than 140 individual block models together into 19 models that are easier to manage. As we develop our understanding of the geology and of what controls grade distribution across the different ore bodies, our confidence grows that we have secured an excellent geological address in Canada. We look forward to sharing the results of this work once we finalize our analysis on the model later in the September 2020 quarter. At Mungari, access from the Frog's Leg decline to the Boomer vein was established in late May. As expected, the underground opening exposed a narrow section of the vein that was well mineralized, with abundant visible gold. During the September quarter, we kicked off grade control drilling ahead of schedule. Its aim is to underpin a mining study focused on optimizing development of the Boomer mineralization. You can find the drilling highlights on Page 16 of today's report, and they feature a notable intercept of 0.7 meters grading 133.8 grams per tonne gold, returned from an infill hole. At the Boomer North target, RC drilling is now underway; the program is designed to test a 1-kilometer extension of the Boomer structure where it persists north of the narrow fold. Initial results from this RC program should be reported in our September 2020 quarter end results. Moving on to Crush Creek, which sits 30 kilometers to the south of Mt Carlton, our operation there. During the June quarter, two diamond rigs began turning on the Delta and BV7 targets. We expect a reverse circulation rig to show up in the September quarter, and that will take the project to 3 drills in total. Initial infill holes, which were meant to check historic drilling results, confirmed low-sulphidation epithermal mineralization containing narrow intervals of bonanza grades. Since then, the program has shifted into step-out drilling, aimed at building inventory for a maiden mineral resource estimate that we think could extend mine life at Mt Carlton. We've gotten back assays from the initial 20 drill holes, and you can find the key intercepts summarized on Page 18 of the report we released this morning. Tight, high-grade intervals — like the ones hit in holes 12 and 16 — point up the chance to define narrow, small high-grade shoots over at the Delta target. Additional step-out drilling is planned for the September quarter, aimed at growing the mineralized footprint at both targets. I'll now turn things over to Lawrie.

Lawrie Conway

executive
#5

Thanks, Glen, and good morning, everyone. I'll spend a little time today covering how we performed financially in the June quarter and in FY '20. You'll find a summary of the financials on Pages 10 and 11 of the report, and on Page 10 of the presentation. As Jake said, if we could repeat this June quarter each quarter, we'd be very happy, and our bank balance would be growing substantially. It gave us an excellent finish to the full year, as the charts on the slide show. Group AISC came in at $1,043 per ounce, or USD 700 per ounce. That's globally competitive and sits toward the bottom end of the cost curve. Our Australian operations produced 719,000 ounces at $1,008 per ounce for the year. Once you exclude the effect of the higher gold price and the lower copper prices on royalties and by-product credits, respectively, we'd have landed at the top end of guidance, around $990 an ounce. Pleasingly, Red Lake delivered over 27,000 ounces in its first quarter, below its guidance range of $2,100 to $2,300 per ounce. Our sites generated in excess of $750 million before any restructuring costs. That came after roughly $370 million of sustaining and major capital investment, most of it directed at growth or future production. The result was healthy margins across the business, with an all-in cost margin of $765 per ounce, while Red Lake's first quarter delivered a margin of $253 per ounce. Our EBITDA margin rose to 53% from 51% at the March quarter. That produced record cash flow for both the quarter and the full year, at $188 million and $542 million, respectively. At the close of the financial year, the cash balance was up by $205 million to $374 million; we're cutting our gearing quickly, with net bank debt down to $196 million. And early in July, we received a $60 million initial consideration for the sale of Cracow, which brings our net debt position down further. We'll release our full year financial results on August 13, along with guidance for FY '21 and an updated 3-year outlook. With that, Kevin, please open the lines for questions.

David Radclyffe

analyst
#6

I wanted to ask about the GRE46 reserves, specifically regarding that 2.5 gram grade. Obviously, given the number of holes and the interval results you reported today, quite a few zones show high-grade material. So how should we view, I suppose, the overall upside on that grade? Or, said differently, what might the grade profile look like once you start mining? Could you potentially mine some of those high-grade areas early on?

Jacob Klein

executive
#7

Thanks, David. I'll pass it to Glen, and then he'll pass it to Bob.

Glenton Masterman

executive
#8

David, regarding that average grade question — yes, it's an average, and as you're aware, some zones within the resource model show grades considerably higher than that figure. The drilling results back this up, including what we released this morning. What we're trying to accomplish as underground drilling continues — drilling aimed at converting more inferred resource into the indicated category — is to put priority on the zones where we believe the best opportunities exist to bring material into the mine schedule sooner. That consideration is essentially what shapes how we rank and plan the drilling program for the coming months. As for the major opportunities we'll be scheduling, and this should become clear through the feasibility studies, we will further optimize the resource. I'll pass things to Bob, who can address that.

Robert Fulker

executive
#9

Thanks, David, and thanks, Glen. The short response to what you asked is that I’d anticipate the grade coming in somewhat below that once we release the mining plan. Our team is focused on optimizing the real schedule. As usual, we’ll in fact pick out those higher-grade zones to mine first. This is a worldwide reserve grade. And my expectation is that once mining begins, it will come in above that lower bound.

Jacob Klein

executive
#10

Thanks, Bob. David, I’ll make just one additional point to wrap that up, and I hope it answers your question. When we first began considering the underground at Cowal, we were thinking of an operation at 750,000 to 1 million tonnes per annum. The size of the discovery, which is now almost 3 million ounces and remains open at depth and along strike and continues to grow, has led us to conclude that a larger-scale operation would in fact be preferable. So we are now targeting 1.5 million to 2 million tonnes per annum, which has made it possible to lower the cut-off grade, and that has affected the grade. But as Bob said, optimizing that grade within the mining schedule still offers upside relative to that average reserve grade.

David Radclyffe

analyst
#11

All right. So perhaps I could just ask a quick follow-up about Red Lake. I mean, the cost reductions appear to be progressing nicely. We're still in the early stages. But maybe I can press you on this — since things are moving along and your remarks sounded pretty favorable there, on when you believe you could in fact hit that USD 1,000 an ounce cost target?

Jacob Klein

executive
#12

You're welcome to press us, but I'll do my best to avoid answering that question. And I'll point you back to the — when we put out the guidance. As a general remark, I'd say Red Lake keeps exceeding our expectations in every part of the operation, geologically speaking, from a mining standpoint, but above all in how people are embracing the changes at the site. Since 2019, the workforce has been cut by 20%. At first, there was some uncertainty over whether production rates and development rates could go beyond 1,000 meters a month. Those are now being achieved consistently. And Bob is confident the team has what it takes to raise that to the 1,200 meters a month. We've set out in the quarterly a range of items that have been taken out of costs, and it has caught us off guard on every front; but above all, it has caught us off guard geologically, because we're applying a different lens to an operation that previously aimed at a grade above 15 grams a tonne; and in our terminology, 7 to 8 grams a tonne counts as high-grade material. So when you look at it through a different lens, you get a very different answer.

Nick Herbert

analyst
#13

Let's begin with a couple of questions on Cowal, please. Could you walk me through the assumptions behind that FY '21 guidance, especially for the first half, when you're working through that low-grade stockpile?

Jacob Klein

executive
#14

Yes, well, this lines up very closely with how the plan and schedule have been laid out before, Nick. We completed the Stage G cutback during the September quarter, and that represented the strongest production run rate we achieved at Cowal in this financial year. As we head toward the H cutback ore, which we'll reach in the second half of the year, we're processing low-grade stockpiles. So that's our profile for what the stockpile material looks like over the next 12 months, along with some of the H cutback material, and that's what produces that outcome. Still, I think it aligns very closely with the messaging we've given previously.

Lawrie Conway

executive
#15

And Nick, to address what you asked about, regarding the profile: I mean, during the first half of the year, it's entirely low-grade material. So there will be a further decline in production in the September quarter from the 60, and that will carry through into the December quarter as well; and then in Q3 and Q4, you'll certainly see it step back up. When we provide the full guidance next month, we'll be able to lay out the profile across the year.

Jacob Klein

executive
#16

I know I risk going over the same ground, but if you take a longer-term view of Cowal and what it offers, when we bought it we never expected this — the mine had originally been slated to shut in 2024. Without the underground, we have pushed that out to 2032. Now we are examining how the underground would be developed. And on a sustainable long-term basis, that additional 300,000 ounces is very much achievable; and I would add that the underground we are discussing is only what we regard as Phase 1 of it.

Nick Herbert

analyst
#17

Yes. That's really useful; and if we stay on the underground topic, would you mind expanding on that a little more, specifically the timing for when that possible 1.5 million to 2 million tonnes might actually begin producing, and also the assumptions behind the permitting timeline needed to get there?

Jacob Klein

executive
#18

The permitting side is honestly the hardest piece to forecast. What I can tell you is that this project sits in the central west of New South Wales; it's going to generate long-term jobs. It's going to bring a lot of investment; it's going to deliver plenty of benefit to the surrounding communities, who are strongly supportive. And it involves an existing mine with an excellent record on environmental and community engagement. So from a government standpoint it meets every criterion for projects that are essentially shovel-ready and ready for investment. So our plan is to file the submission with the regulators early in the December quarter. How long that process takes, we can't say for certain. But we'll be in a position to mine on the very day they grant us that approval; and 12 months after that, we expect to have our first ore coming from the underground.

Robert Fulker

executive
#19

And just to add to that, Nick. Twelve months is plenty of time, given the mining style, to get water or salts out. It will ramp up after that, but we're fairly confident we can get some kind of ore feeding going within those 12 months.

Nick Herbert

analyst
#20

All right, great. And then last thing, just regarding Red Lake, I know you haven't provided guidance for next year, but could you give a kind of high-level sense of how you're viewing potential production from there next year, I suppose also considering what your planned development rates were that I believe, Bob, you had mentioned. So any indication on that would be useful.

Jacob Klein

executive
#21

Thanks, Nick. I'll begin and then pass it to Bob, but let me just say that we remain in that phase of investment and transformation. This is a mine that was essentially being harvested and had been due and scheduled to shut within the next 12 months. So our priority and focus is on drilling and development. And as a result, the ramp-up in production won't represent a huge step change from the current year, but it is an investment in the future and it will deliver us that plus 200,000 ounces at under USD 1,000 an ounce.

Robert Fulker

executive
#22

To build on that point, Nick, the rate at which we develop the underground is what really matters. The more development work we complete early on, the more areas we can open up. That said, we then have to make sure the drilling, including grade control drilling, actually ties in behind it and gives us information on the actual stoping areas. So with geology and engineering collaborating, the coming 12 months are really about building that development stock, or development inventory, while making sure we move into the areas that drive the most value. At 1,200 meters-plus per month, we should be able to start pulling ahead. It's therefore encouraging to see that we're now doing more than 1,000 meters a month. And the team on-site is pretty bullish about what they can achieve and where they can go. So I'm quite pleased that that's where we would be.

Jacob Klein

executive
#23

But my view is that over the coming 12 months, production won't be the priority. What will be the priority is investment, along with getting that operation positioned for a highly successful long-term future.

Robert Fulker

executive
#24

Yes. And there is plenty ahead of us to get done over the coming 12 months.

Levi Spry

analyst
#25

Nick put forward a couple of fairly strong questions there. I might be able to tackle both of them in a little more depth; so Red Lake's rate of development, from 1,000 meters to 1,200. So at 1,000, you're producing 100,000 ounces per year, but you're moving up to 200,000 ounces. Could you expand on that a bit, Bob? Like is it a — are they linear? Do you have to reach 2,000 meters in order to hit 200,000 ounces?

Robert Fulker

executive
#26

We don't know yet. I'm sorry. So it isn't linear. If we hit that additional 1,200 meters per month, we'll be building development inventory at a good rate, and that lets us bring more ore out sooner than the original two- to three-year timeline we mentioned. Keep in mind, though, that it's actually been drawn down over the past 12 to 18 months, so we have to rebuild that stockpile first. Long term, 1,000-plus is probably the level we need to sustain it, and getting more earlier is simply better for us. I do want to repeat that it is constrained. We need to get the geology in front of us. We have to grasp how that interpretation works, and we truly need to get the drilling done along with the development in concept so the operation gets mined as optimally as possible.

Levi Spry

analyst
#27

Yes. Fine. And regarding Cowal specifically, then, for next year's guidance. So is that based on — what throughput rate does it assume, I mean, at — operating on stockpiles? Is it operating at 9.2?

Jacob Klein

executive
#28

No, it runs at 8.7 million tonnes per annum.

Dan Morgan

analyst
#29

I'd like to get a bit more clarity on that Cowal Underground reserve you published, along with the grade. I'm just wondering whether you're factoring in a lot of dilution there. I ask because the grade compared with the resource grade looks like the same figure.

Robert Fulker

executive
#30

Dan, I was trying to recall; that's in the actual — the tables covering dilution, I believe it's 5% footwall and hanging wall, Glen?

Glenton Masterman

executive
#31

Yeah, that's correct.

Robert Fulker

executive
#32

So they took that, and on top of it they made allowances for blocks beyond the range to count as 0, so some of those have been factored in too. I can't recall the exact overall dilution percentage, sorry. If needed, I can get that back to you.

Glenton Masterman

executive
#33

Right. And I think the other thing you're seeing is that the blocks being brought in — for them to be counted toward the reserve — must show at least 75% indicated resource within a stope shape, and that's a conservative approach; there are plenty of blocks sitting at 50% that haven't been counted. So obviously we're aiming to convert more of that inferred material into indicated so those stopes can be counted in the overall resource. But I think one point worth making on the resource model — which has been updated to deliver the 2.9 million ounces — is that it's been estimated as a solid global estimate of the overall resource. What the infill drilling gives us is a better understanding of the local distribution of grade, and that will then influence how our stoping sequence is prioritized through the feasibility study; so that's part of the next phase of work through this feasibility study, really improving that output that can feed into the design of the mine plan and the scheduling.

Jacob Klein

executive
#34

And I would also say that what we've achieved on the discovery side has genuinely prompted us to consider speeding things up; and as you've pointed out before, we had been expecting a reserve of 1 million ounces. Our target is 1 million ounces by year-end, and then we'd release that and begin submitting regulatory approvals; however, in light of the conditions we're facing, in light of the success and the confidence we have in the discovery opportunity at Cowal, we felt it would be preferable to release it early and secure the regulatory approvals early, which we hope will let us pull forward, fairly substantially, first ore from the underground.

Robert Fulker

executive
#35

My apologies. Dan, a 0.2 meter skin has been applied to the footwall and hanging wall. However, an additional 5% dilution is applied to the total reserves. So it is in fact a 0.2 plus up 5% dilution; and then there is — anything in development also carries a dilution, which sits outside of a strike drive; so they have been a bit on the conservative side in some of it.

Dan Morgan

analyst
#36

Yeah. I suppose on a broad level, just thinking conceptually — I mean, each quarter you release drilling results, and frequently you come across — you're finding gold beyond your existing resource, and now you have a reserve. So the thing keeps expanding. I'm just curious whether you could discuss how you'd anticipate it expanding. Will it keep expanding in tonnage, in grade, or in both? Could you speak to that?

Glenton Masterman

executive
#37

Yes. That's a very good question. I think there are two ways to respond to that, Dan. I think first, as infill drilling continues, meaning more definition added to the resource model, we believe the opportunity lies in sort of sharpening up the domains. The resource domains are pretty high. So what we'd anticipate there is a grade improvement, though likely a reduction in tonnes, yet for the same overall ounces; and that's a trend we're beginning to observe as we tighten the drill spacing within the inferred resource to bring it into indicated; regarding new growth, it will be a mix of both. And what we're prioritizing in our step-out drilling, which is underway from surface, is — for instance, the Dalwhinnie south area, which continues along-strike from Dalwhinnie, which is — in terms of grade bins when you look — when you assess the model, Dalwhinnie really delivers the higher grade, or blocks into the model. So we are prioritizing Dalwhinnie or extensions of Dalwhinnie to sort of hopefully boost the grade. And some of the early results are quite encouraging. So that's definitely a priority; but I do expect that in the step-out drilling we'll see a wider space in growth in tonnes and grade. And it's — or growth in tonnes at roughly about the same grade. Hopefully, they're higher. But as we infill, the desire is that tightening the geometries will improve it.

Robert Fulker

executive
#38

Dan, much of what we have been concentrating on recently is really about which area would genuinely be the first one we would want to mine, and how we can actually raise our confidence from a geological standpoint as well as a grade standpoint; and clearly that is — the southern end of the ore body sits closer to where we are in terms of decline and access. So there are a couple of different elements in there that we would hope to attempt to accomplish over the next little while.

Dan Morgan

analyst
#39

Yes. And just one last question, which follows up on that. I mean, you clearly have permits to carry out the exploration decline and activities. I'm wondering, under those permits, what are you able to do that would allow a quicker start on the project once you get, I guess, mining permits.

Robert Fulker

executive
#40

Yes. Dan, we have a permit to do the exploration decline and drilling from underground. The decline itself has actually stopped or finished now. We're continuing the drilling; we would need additional exploration permits to do more exploration drives and to extend that out. It's an option, but it's one of those things that we're considering. We don't have a mining permit for underground; so we're a little bit restricted there.

Dan Morgan

analyst
#41

So to move the permits forward, is the approach to go for the mining, given that you've used up your exploration permits in order to develop? Is that...

Jacob Klein

executive
#42

No, one of the options we're considering, I think, is to put in another section of decline development, which will cross the ore body and also place us in the right spot from a development standpoint. It will serve a dual purpose, both as an area from which we could explore further and later as part of the production decline. So that's what we're looking at. Obviously, the exploration decline we did put in was comparatively easy to permit, and we'd expect the same for any additional permit for decline development.

Robert Fulker

executive
#43

As you can appreciate, Dan, we have a strong desire to understand the ore body, and our knowledge of it is substantial. So whatever information we’re able to obtain that helps the geologists and engineers, that will boost our confidence.

Reg Spencer

analyst
#44

Turning to Cowal, there's a fairly wide gap in the possible underground production rates, ranging from 1.5 million tonnes right up to 2 million. Could you perhaps shed some light on what the limiting factors might be for that underground ore production rate, just to help guide our thinking ahead of the pre-feasibility study?

Robert Fulker

executive
#45

Yes, Reg, this is Bob here. That's a good question. Part of the answer will come over the next 3 to 6 months. A lot hinges on geography and space, on the number of mining fronts we can establish, and on how many stoping fronts we can actually get going. Given the mining style being planned, which is a fully filled type of mining method, you need extra mining fronts to really push the rate up a lot; so that's the thing actually constraining the rate. From the size of the ore body, 1.5 million to 2 million is realistic. If you look at the actual area it covers, the strike extent, and the depth extent, it's fairly easy to have at least 2 or 3 mining fronts operating at once.

Reg Spencer

analyst
#46

All right, great. And just one final thing, regarding the stockpile feed going into Cowal during the first half of this financial year — I may have missed this earlier, but the overall average stockpile grade, and correct me if I'm mistaken, sits at roughly 0.6 grams. And since we don't really have precise guidance on the ramp-up once you're back into the in situ wall in terms of the feed into the plan ex pit, should we assume — I presume you'd be preferentially treating some of those higher-grade stockpiles during the first half of next year. I'm just trying to get a sense of what kind of feed rate we ought to be thinking about.

Lawrie Conway

executive
#47

Yes. I mean, Reg, that's right. I mean, during the first half of the year, we'll be mining at an average grade of probably around 6 to 0.65, but that will rise. So that's across the first 2 quarters. But we'll be out mining the mill such that the average grade going through would probably land in the 0.8 to 0.85 range, and then in the second half of the year, get back up over 1 in terms of grade and process as we move into the better grades in Stage H and the oxide material.

Lachlan Moffet Gray

analyst
#48

I wanted to pose a wider question regarding how the coronavirus pandemic has affected the gold price industry more broadly. What I would like to hear is your view on what could take place should a global economic recovery occur, and conversely, what could take place should the disease keep spreading.

Jacob Klein

executive
#49

Thank you, Lachlan. In my view, we are in a highly favorable environment for the gold price, considering the scale of fiscal spending needed to deal with this COVID pandemic. From a health and safety standpoint and a community standpoint, hopefully we will see a recovery from it. Yet the volume of money being spent and demanded by governments around the world indicates that we are in a very positive environment for the gold price for at least the medium term.

Matthew Frydman

analyst
#50

This is probably a pretty straightforward question about the Stage H cutback. Could you remind us how much waste needs to be moved before that pushback can be unlocked, consistent with what you're currently thinking on timing in the second half of next year? In the June quarter, you were running nicely at roughly 3 million tonnes of capitalized waste for the quarter. Is that the same rate you'll need to sustain through the first half of FY '21 to match that timing?

Lawrie Conway

executive
#51

Yeah. Matt, what we'll see is that we'll be mining on the order of 4 million to 5 million tonnes of total waste per quarter across the year. Depending on where we sit in the pit, that determines how much gets capitalized, and it's likely to stay around similar levels to what we had in the June quarter. But toward the end of FY '20, that certainly drops off as we get close to double the ore per waste tonne coming out of the pit.

Matthew Frydman

analyst
#52

Yes. Lawrie, you already answered my question about how much is being capitalized. So when we step up from 4 million to 5 million tonnes on a quarter-on-quarter basis, does that call for — is it because of shorter haul distances or more fleet? Or in what way is that being accomplished?

Lawrie Conway

executive
#53

No. So I mean I think if we look at — let me just quickly verify that the total waste material moved for the quarter at Cowal came to roughly 3 million, and we will see that step-up. We do have shorter haul distances for material. Some of it is heading out to the IWL, but fleet utilization will also be rising during the year. So we carried out some major rebuilds in June on certain pieces of gear so it could handle the step-up in material that we need to move in the first half of this year.

Matthew Frydman

analyst
#54

Yes. Absolutely. Then, to wrap up on that capitalization point: would it be accurate to state that the capital portion of the waste stripping gets completed by FY '22? Is there still a bit of capitalized stripping continuing into FY '22?

Lawrie Conway

executive
#55

No. It wraps up in FY '21; this will be — the final capitalized material for Stage H comes in FY '21.

Kate McCutcheon

analyst
#56

So just regarding that increase from the stockpile, going from 0.65 to around 0.8, did the ore sort account for that? And could you explain how things are progressing with it and what sort of volumes you're able to treat?

Robert Fulker

executive
#57

What I believe Lawrie meant, Kate, is that we're actually mining more than we can feed through the mill. So the lower grade material will go onto the stockpile, and we'll take the higher portion of that lower grade. The low-grade stockpiles themselves are in fact being depleted. And that's really the grade that — Lawrie, is that...

Lawrie Conway

executive
#58

Right, so it's a blend there, Kate. During the first half of the year, you'll find that a portion of the material coming from the mine runs above the average, and that will be processed; however, we also have low-grade material that right now sits above the grade being produced from the pit. And the third element, as Bob mentioned, involves some sorting the team is doing to lift the grade too, so we get that shift from roughly 0.65 up to somewhere between 0.8 and 0.85 across the first half of the year.

Robert Fulker

executive
#59

And then as we move through the latter part of the year, we'll have some ore that comes through, and that ore is a bit higher grade as well. So...

Lawrie Conway

executive
#60

And during the first half of the year, some oxide material is passing through, and that material is likewise above 1 gram per tonne. So roughly 4 factors are what set the grade that moves through the plant.

Kate McCutcheon

analyst
#61

Right, okay, understood. And then, Lawrie, perhaps a few questions for you. So purely for FY '21, is there a cash benefit we can expect — or could you just make clear how the stockpiles would be handled and what we should assume about cash cost at Cowal next year?

Lawrie Conway

executive
#62

Like Jake, I'll try to hold back from providing the full guidance today given all the various questions coming through. What matters at Cowal is that the low-grade stockpile definitely carries value within it. But the inventory movement across the year drawn from those stockpiles is going to be minimal. As a result, we will see their AISC rise slightly between this year and next, purely because of that grade and reduced production.

Kate McCutcheon

analyst
#63

All right, understood. That's useful. And then last thing, regarding Red Lake, should we be looking for a standalone JORC resource? Or will that come out as part of your usual year-end schedule?

Jacob Klein

executive
#64

No, a JORC resource is in preparation. And once more, not to steal any thunder from our August release and Investor Day, that is the point when you ought to expect the JORC resource to appear.

Kate McCutcheon

analyst
#65

All right, understood. See you in August.

Jacob Klein

executive
#66

Thank you, Kate.

Lachlan Moffet Gray

analyst
#67

I'd simply like to get your general view on how the gold industry ought to be approaching the windfall we're currently seeing. Gold and the iron mining sectors, I think, are probably the only ones that will be paying dividends at their usual level, more or less. Should the higher level of income be viewed as something that ought to be distributed?

Jacob Klein

executive
#68

Well, that's a fair question, Lachlan; and our focus and our strategy, as I mentioned in my earlier remarks, centers on margin over volume; we take the view that this industry is highly cyclical. Right now we're in a strong part of the cycle. And as I said before, I think there are plenty of reasons to believe the cycle still has a long way to run. But when the gold price is this strong, we need to be delivering superb returns, and you can see that in Evolution's results today. We're producing substantial cash flow while putting money into our world-class assets that will grow us and sustain us going forward. We've also paid out 13 consecutive dividends and have a target of distributing up to 50% of free cash flow; and so in this environment, investors are getting a good yield if they're investors in Evolution.

Jacob Klein

executive
#69

Thank you. We really appreciate everyone making the time to be on the call today. As you can see, Evolution is in great shape, and that's not only down to the quality of our asset portfolio but mainly because of the quality of the people we're fortunate to have in our business. At every level in the organization, they're values-focused, they're working hard, and importantly they're collaborating as a great team to deliver these outstanding results. I don't think there's been a better example of that than in the June quarter, given the performance our people have delivered through uniquely challenging circumstances. Please stay healthy and safe, and we look forward to speaking with you again on the 13th of August when we release our full year results and 3-year outlook. Thanks very much for joining.

Operator

operator
#70

Everyone, that’s all the time we have for today’s call. We appreciate you joining us. You’re welcome to disconnect now. Have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.