Evolution Mining Limited (EVN) Earnings Call Transcript & Summary

January 28, 2021

Australian Securities Exchange AU Materials Metals and Mining earnings 39 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line, and we're glad to have you with us for the Evolution Mining December 2020 quarter results. <<operator_script>> At this point, I'll turn the call over to Mr. Bryan O'Hara.

Bryan O'Hara

executive
#2

Thanks, Bernadette. Good morning, everyone, and welcome to the December 2020 Quarter Results for Evolution Mining. Joining me here in the group office in Sydney are Lawrie Conway, our CFO, and <<inaudible>> development. Bob Fulker, our COO, is also with us, dialing in from Brisbane. Gold has recently paused for a rest following an impressive stretch of 8 straight quarters of price gains in Australian dollar terms through to the September 2020 quarter. And while a correction has occurred from the record highs of close to AUD 2,900 per ounce set in the middle of last year, the present spot price of roughly $2,400 an ounce still gives our business a very healthy cash margin, given our focus on low-cost ounce production. We're looking forward to meeting with a number of investors in the weeks to come. On the calendar ahead, our half year financials and the annual mineral resources and ore reserve statement will be released on Wednesday, the 17th of February. That release will feature our first dual compliant ore reserve at Red Lake since we announced the 11 million-ounce mineral resource in August last year, and it will also give us a chance to provide a fuller update on how we're progressing toward bringing Red Lake back to the premier Canadian gold mine it once was.

Bryan O'Hara

executive
#3

Appreciate it, and now I’ll pass things along to Jake.

Jacob Klein

executive
#4

Thanks, Bryan. Morning, everyone. Appreciate you joining us and making time for today's call—we truly do appreciate it. First off, let me wish all of you a very Happy New Year. I hope you're doing well and staying healthy, and navigating the ongoing COVID pandemic successfully. Evolution has posted another excellent quarter, one that builds on the very good start to the financial year that we delivered last quarter. I'm pleased that we're firing on all cylinders and making meaningful progress right across the entire business. We've consistently said we want to be a safe, sustainable, high-margin, low-cost gold business. Our success in delivering on that is clearly demonstrated once again this quarter. The numbers in today's quarterly speak for themselves. Ounces produced rose 6% to 180,000 ounces, at sector-leading, low all-in sustaining costs of $1,166 per ounce on USD 852 per ounce. Operating cash flow came in at AUD 259 million, with net mine cash flow of $170 million—or a massive $946 for every ounce we produced in the December quarter. At Evolution, we believe that the ability to generate and bank cash from ounces produced is an absolutely critical ingredient for success in the gold sector.

Jacob Klein

executive
#5

Looking at the figures we published today, it's obvious that in this area we lead our sector. That stronger cash generation let us bring net debt down to just $87 million, with more than $90 million of additional reduction coming in this quarter alone. I think you'll agree this is a remarkable result given that a mere 9 months ago we financed the entire $550 million Red Lake acquisition with debt, and over that same period we also gave shareholders a fully franked final dividend of $154 million. We've held Red Lake for just 9 months, yet during that brief window the operation has beaten our expectations consistently on nearly every measure. Even after the sizable investment in its future growth, Red Lake managed to produce substantial net mine cash flow — an outcome we certainly did not expect to see happen so fast when we bought the assets. The momentum building at this operation is exciting. Beyond the cash flow we've put in the bank, which we've clearly shown, investors and shareholders should also — and do — concentrate on whether these cash flows can be sustained over the long term. On that point, I'm confident our mineral resource and reserve statement, due out alongside our half year results next month, will make plain both the quality of our portfolio and the progress we're achieving here.

Jacob Klein

executive
#6

Our approach remains one where margin matters more than volume, and we'll apply steady, conservative price assumptions when figuring resources and reserves — AUD 2,000 and AUD 1450 an ounce, respectively. That isn't driven by any bearish stance on gold; rather, we think this strategy and approach builds a stronger, more resilient business over the long term. Evolution sits in a very strong position to thrive across the cycle. In good times, such as the ones we're enjoying right now, we're posting sector-leading returns, paying dividends to reward shareholders, and putting capital into future growth. That's a great spot to be in. Add to that a fantastic group of people who care deeply about our values and about creating value. I'm now confident that Evolution is in very good shape. With that, I'll pass things to Bob, who will give more detail on operational performance and our growth projects.

Robert Fulker

executive
#7

Thanks, Jake, and good morning, everyone. I'll begin with the health and safety of our people. We achieved some significant progress there. Among the highlights, Mt. Rawdon has now gone more than 12 months with no recordable injury — the longest such stretch in its history. The team has taken up the idea that we are only as good as today's performance, and I remain focused on pushing this record further. Our COVID response is still active, and we can report no material impact on any of our operations or businesses. This quarter has brought changes in our operational team, with 3 new general managers. I'm very pleased that 2 of those were internal appointments, which speaks to the depth of talent we've developed at Evolution. During the December quarter, we produced 180,000 ounces at an all-in sustaining cost of $1,166 per ounce, along with more than $170 million in net mine cash flow, which brought the half year to over 350,000 ounces at an all-in sustaining cost of $1,182 per ounce and $354 million in net mine cash flow. I believe everyone would agree this is a strong result and a tribute to our dedicated, engaged site teams. If you turn to Page 6. Cowal produced almost 55,000 ounces at an all-in sustaining cost of $958 an ounce, generating net mine cash flow of $39.2 million, with capital investment of $38.3 million directed toward the underground study works, Stage H stripping and the IWL tails facility.

Robert Fulker

executive
#8

For the underground study, the work has involved optimizing the mine plan and pushing forward the planned Galway decline. We've awarded the contract for that decline, and work gets underway in the March quarter. That gives us an extra drill platform to further evaluate the deposit before the study wraps up in the June quarter. The Cowal orebodies keep exciting us with their quality, and progress toward an operation producing more than 350,000 ounces of low-cost output is very much in sight. Importantly, the regulatory approval process is moving along. The highlight of the quarter was the public engagement sessions, which drew overwhelmingly positive submissions. I'm confident we'll secure the approvals we need for our early works program, and our plans to deliver first production within 12 months of approvals remain on track. Ernest Henry once again contributed significantly to the group, producing 24,500 ounces at an all-in sustaining cost of negative $710 an ounce, while generating net mine cash flow of $73.7 million. At Red Lake, production rose 27% quarter-on-quarter to just under 34,000 ounces, with an all-in sustaining cost of $1,937 per ounce and net mine cash flow of $10.3 million. Red Lake keeps getting better. Underground development averaged 985 meters per month during the quarter, 10% higher than the prior quarter, with steady month-on-month gains toward our long-term goal of 1,200 meters per month.

Robert Fulker

executive
#9

January has carried that improvement forward, with a 40-meter per day average over the last 18 days. On the underground side, we hit an Evolution record in December: 71,000 tonnes of ore mined, with the surface stockpile sitting under 22,000 tonnes. That sets us up to start the Red Lake mill on plan in the June quarter, which lets Red Lake finish the financial year very strong. During the quarter, the Board gave approval to begin the Campbell Young Dickinson Box cut in portal, so the surface decline can get underway. That decline lets us decouple mine production from the installed shaft hoisting capacity and from underground mining equipment size constraints. It's a key step in our vision for Red Lake. Box cut construction starts in the March quarter, with decline development expected to begin in the June quarter. Our vision for Red Lake has moved forward with the establishment of the value realization project. This study is meant to determine the optimal pathway for Red Lake to materially increase production margins to between 300,000 to 500,000 ounces per year. We expect the study to conclude in the June quarter, with a positive outcome progressing to prefeasibility study. In mid-December, we welcomed Kirsty Liddicoat, General Manager, Red Lake.

Robert Fulker

executive
#10

Kirsty has recently worked at both Suncor and BHP. At this point, I'd like to express my appreciation to Amber Adams, who served as interim General Manager following the transaction — her leadership and commitment across the last 9 months have been essential to the success of the improvements that are already being embedded in Red Lake's plans. Mungari turned out more than 30,000 ounces, with an all-in sustaining cost of $1,402 per ounce, and generated net mine cash flow of $22.7 million. Milled tonnes for the half year came to 999,000 tonnes, which shows that the effort to lift plant throughput to 2 million tonnes per annum is sustainable. Study work is continuing to move forward on the processing strategy for the cardinal region. The preliminary leach test work is expected to wrap up, and engineering packages are expected to be awarded, in the March quarter. December brought the departure of Andrew Millar, who had been General Manager at Mungari for the last 3 years. I want to thank Andrew for his tireless efforts — we will miss him. Greg Walker is the new General Manager at Mungari. Previously, Greg served as Integrated Planning Manager and as interim General Manager at Cowal, and he brings a wealth of experience to the team. At Mt Rawdon, output exceeded 24,000 ounces at an all-in sustaining cost of $1,170 per ounce, with net mine cash flow of $24.2 million realized.

Robert Fulker

executive
#11

Intense rain created a temporary geotechnical problem on the Eastern ramp, which reduced output ex pit in mid-December. The remediation work is finished, and general production has come from low-grade stockpiles. That approach will carry on through Q3. Mt Rawdon is also experiencing a leadership transition, as the outgoing General Manager, Jamie Rawdon, is moving to Red Lake to help Kirsty and her team with their transition. I want to express my gratitude to Jamie for what he accomplished at Mt. Rawdon, especially for guiding the team to its best-ever safety result, which is continuing under the new leadership of the incoming General Manager, Thomas Westbridge. Thomas previously served as operation manager at Mt. Rawdon and offers both continuity and a fresh perspective to the operation. Mt Carlton produced more than 12,000 ounces at an all-in sustaining cost of $2,214 million an ounce, with mine operating cash flow of $1.3 million. Continued plant optimization efforts produced the second straight quarter of record mill throughput of 246,000 tonnes. Furthermore, preparatory work has begun in the open pit to start a decline in the second half aimed at accessing high grades overall. To sum up, our operations keep performing well, they are all delivering either at or above our expectations, and I am confident we are well positioned to deliver a successful FY '21.

Robert Fulker

executive
#12

Across every measure, we are observing better safety results, and we expect those gains to carry forward as the year moves along. I appreciate everyone's time, and now I will pass things along to Glen.

Glenton Masterman

executive
#13

Thanks, Bob, and good morning. We spent the bulk of November and December modeling results from key drill programs right across the portfolio, and those results are now being folded into our Annual Mineral Resource and Ore Reserve statement for the 2020 calendar year. The MROR update's results will come out in the March 2021 quarter. I want to recognize the huge efforts of the discovery and resource definition drilling teams, who managed safely through a COVID-interrupted 2020 to finish their planned programs feeding into our MROR. At Red Lake, work moved forward on the ore reserve, which is optimizing the 11-million-ounce resource that was released in August last year. The focus areas take in the Upper Campbell and Red Lake areas of the mine, where the new model showed the most material resource increases. Drilling carried on with 6 underground rigs — 4 on resource definition, converting additional resources to reserves, and 2 rigs on step out drilling. Highlights from the program at Cochenour and lower Red Lake appear on Page 12 of this morning's report. Discovery drilling at Red Lake targets extensions of high-grade mineralization along strike at Cochenour. We are also exploring for repeats of the geological architecture that hosted mineralization in the high-grade zone along the relatively undertested Northwest corridor situated between Red Lake and Cochenour.

Glenton Masterman

executive
#14

At Cowal, surface drilling results kept supporting growth of the resource at Dalmeny South. The latest intercepts show that mineralization is still open down plunge. Our plan is to finish upcoming step-out drilling from underground, since there we can set up better drilling positions. We got all results from the underground infill program during the quarter, and those results are now being modeled so they can inform an update to the GRE46 mineral resource. In the new model, we expect a substantial upgrade in classification from inferred to indicated resources. That model also incorporates results from a close-spaced grade control simulation, which was meant to test model reconciliations for a block of rock in the mine plan that represents 3 months of production at PFS production rates. The results demonstrated a positive reconciliation against the resource model for that particular parcel of mineral inventory, and they suggest there are chances for additional grade optimization as we keep infilling the resource. Underground drilling will start again in the June quarter, and our focus will stay on reserve conversion. In Northeast Queensland, we finished acquiring a 100% interest in the Crush Creek project in December last year. Drilling kept advancing the delta and BV7 prospects, which have the potential to extend mineralization along strike at those targets.

Glenton Masterman

executive
#15

Page 15 of this morning's report contains results from recent holes at the gamma target, which sits 500 meters east of delta. Those attractive wins and grades at gamma underscore the growth potential ahead as we keep testing further vein targets. On the whole, we're extremely pleased with what we've seen at Crush Creek — the results are matching our initial expectations and confirm the project will play an important role in extending mine life at Mt Carlton. We recently began PFS study work that will look at integrating Crush Creek into the life of mine plan at Mt Carlton. And finally, over in Western Australia, Musgrave Minerals, our joint venture partner, yesterday released the full results of the 49,000-meter aircore drilling program completed at the key project late in 2020. Several multi kilometer long gold anomalies have been prioritized for follow-up diamond drilling, which is expected to commence next week. I look forward to providing an update from Q at the end of next quarter. With that, I'll hand over to Lawrie.

Lawrie Conway

executive
#16

Thanks, Glen, and good morning, all. Today I'll walk through how we performed financially in the December quarter, before we get into a deeper breakdown when our half year results come out next month. You'll find the summary laid out on Pages 9 and 10 of the report. During the December quarter we kept up our momentum on cash generation, with group cash flow of just under $100 million before debt, dividends and any business development activities. The main factor behind the lower group cash flow was the gold price we achieved in the quarter, which was $118 per ounce lower. Even so, that group cash flow works out to more than $562 per ounce sold being banked, and it shows how we stay focused on producing high-margin ounces. Even with the gold price falling, we still delivered a net cash margin of more than 23%. Once again, every operation was net cash flow positive for the quarter, generating more than $170 million of mine cash flow after we invested around $174 million in sustaining and major projects. Capital investment across the group remains on track with full year guidance. Sustaining capital is trending towards the lower end of the $113 million to $138 million guidance range, while major capital is still within the $260 million to $290 million range, depending on how the timing of our major growth projects plays out.

Lawrie Conway

executive
#17

Like we said on the September quarterly call, output in the back half of this year is going to top what we delivered in the first half. For the full year, we'll land inside a range of 670,000 to 730,000 ounces. Looking at how the next 2 quarters break down, the March quarter comes in below the December quarter, and then we climb considerably in the June quarter. What's shaping the March quarter is the mine sequencing at Mt Rawdon across those next 2 quarters, which Bob touched on, along with planned shutdowns during this quarter, much like what takes place in the September quarter. Growth in the June quarter will come primarily from more tonnes processed at Red Lake, thanks to the planned use of the Red Lake mill during that period. This production mix will create a bit of quarter-on-quarter variability in the group AISC and AIC. Even so, overall we're still on track to hit group AISC guidance of $1,240 to $1,300 per ounce. Right now, we're leaning toward the bottom end of that guidance. Today's elevated copper price is helping both unit costs and cash flow. If that holds for the rest of the year, the yearly benefit would come to $35 per ounce on AISC and $30 million on cash flow.

Lawrie Conway

executive
#18

That gives us a chance to land at or beneath the floor of our AISC guidance. Our balance sheet got even stronger during the quarter, with cash rising to $438 million and net bank debt falling to $87 million. As things stand right now, the business is still on course to be net cash by the close of the financial year, even after accounting for the interim dividend coming up that we expect to pay in the March quarter. I'm looking forward to bringing you our half year financial results next month. Thanks for joining us this morning. And Bernadette, would you please open the line for questions.

Operator

operator
#19

<<operator_script>> Our initial question is from Nick Herbert at Crédit Suisse.

Nick Herbert

analyst
#20

Jake and the team, I have a handful of questions for you, please, and they concern Red Lake, so let me begin there. It's good to see that it is running ahead of plan. I'd just like to know whether you can provide additional specific goals regarding mining and production rates, and the schedule for ramping those up past this year's guidance. Maybe you could lay out a path toward the productivity objectives you referred to, and tell us whether that schedule has moved earlier, since you appear to be surpassing expectations on most of the metrics there.

Jacob Klein

executive
#21

Thanks, Nick, and good morning. I'll share a few remarks, then turn things over to Bob. As I mentioned during my introduction, Red Lake is an asset that is surpassing our expectations on nearly every front. The first element was that resource upgrade. Clearly, the reserve figure. When we acquired it, the reserve base we indicated ran from 1.2 million to 1.4 million ounces. Today we've stated that we anticipate a material upgrade to that. We've clearly made the decision to begin and start a decline. That plainly signals how we view those Upper Campbell areas and our ability to access them. But those are fairly high-level remarks, and they don't really address the many very significant changes and improvements that have taken place at the site. These are productivity changes, and Bob can speak to them briefly. I'm hesitant to bring forward or alter our outlook, which said it would take us 3 years to deliver the 200,000 ounces at less than USD 1,000 an ounce. I think we should stay with that. But obviously, we'll be trying our best to accelerate it and deliver as soon as we can, and things are going better than we anticipated.

Jacob Klein

executive
#22

Bob, I’ll hand things over to you for a few remarks.

Robert Fulker

executive
#23

Thanks, Jake, and thanks, Nick. I'll begin with development. Now, I never claimed that 40 meters per day truly equals 1,200 meters per month, since with these improvement projects you inevitably get stretches that go really well, followed by stretches where you have to address additional recurring individual issues. What's encouraging on the development side, though, is that we're genuinely beginning to see a solid gain in consistency regarding the rhythm the team is settling into. So the fact that we've hit that 40 meters for close to 3 weeks at this point has really given me confidence that the 1,200 — which was our target and has been our own figure for a fair while — will mean we actually start building a stockpile, or a store, of mining blocks and accessible development stocks ahead of us. The following stage after that, clearly, is getting production raised to align with development. And that, obviously, is a process too. The team has been focused on production drilling effectiveness along with the blasting and the loading of explosives, and then progressing to production of 70,000 or 71,000 tonnes in a month.

Robert Fulker

executive
#24

That's the strongest result we've achieved so far. As you can see, development stocks are getting better as we advance at 1,200 meters per month. That ruling can get better too. So all of these elements are converging. On the positive side of the hoisting system: right now, hoisting isn't our bottleneck. The constraint has been the internal trucking and the mine's internal systems, and that's what we're focused on. So there are quite a few different items the team has been addressing, at Cochenour, at Red Lake, and at Campbell. Did that answer your question?

Nick Herbert

analyst
#25

Thanks, that's useful, Bob. Staying with Red Lake, I realize the study is still pending. On the mill expansion, though, could you share how your thinking has evolved and what size you might be leaning toward? Also, a quick remark on where the extra drilling will be aimed to reach that decision — are you looking to bring in new resource, or is it purely infill from this point? I'm just trying to gauge the magnitude of the opportunity you're weighing, perhaps relative to what your reserve could look like this quarter, while bearing in mind that in the end the opportunity may be considerably larger than whatever that reserve shows.

Jacob Klein

executive
#26

Nick, I’ll offer a few remarks once more, and then perhaps turn things over to Bob and Glen for additional detail. As we’ve mentioned, when we took it over — and as Bob has pointed out — the mine, or the operation, has been constrained by mining, and we’re making solid headway in changing that. Ultimately, we want to move toward making it an operation constrained by the mill. As you know, there were 2 mills. There are 2 mills that were there, and we’ve decommissioned the Red Lake mill, or placed it on care and maintenance, and said, “We’ll only use it once we build up the stockpile.” I think quite pleasingly, at the end of December, there was some stockpile in front of the Red Lake mill for the first time in a long time, and that gives us confidence that in the fourth quarter — and we’re not going to start the wet sale at Red Lake with a stockpile there ready to be processed. So we’re starting to move the needle. So obviously, depending on those development rates, the mining stocks and the underground drilling, and that’s all part of the Phase 1 transformation plan. It’s early days to talk about just what we — what scale this operation should be.

Jacob Klein

executive
#27

And we're reviewing every possibility on that front. We do believe our reserve base clearly can support production above 200,000 ounces. The longer-term goal is still 300,000 to 500,000 ounces, and that will be incorporated into the study we're currently working on which, as Bob mentioned, will move into the PFS phase after the second half of this year. Bob, Glen, would either of you like to add anything?

Robert Fulker

executive
#28

Glen, would you like to say something about the resource before I move on to the rest?

Glenton Masterman

executive
#29

Absolutely, Bob. So Nick, regarding your earlier question about whether additional drilling is needed and what must be done to turn more resource into reserve — in the area we're especially focused on, the Upper Campbell, drilling is already quite dense. Within the core of that Upper Campbell resource, we're at nearly a 6-meter drill spacing. So there isn't much more grade control work that could really improve definition there. A couple of things do need doing, though. First, we need to begin validating some of the geological geometries, since those will affect final state designs as we move forward. So some work remains there. But given that density of drilling, as you'd expect, there aren't many alternative solutions beyond the ones we've already delivered. On the reserve side, before I hand back to Bob, we've taken a rather conservative approach, especially with our modifying factors. Because it's a portion of the ore body that hasn't been mined before, you're moving into some of these newer areas.

Glenton Masterman

executive
#30

So we're not—we're choosing the cautious route before we truly grasp how it will perform against the model. So items such as geotech considerations, where we'll be mining beside open voids and so on, we have to be—we've adopted a careful stance there. Plus how we've—our perspectives on mining recoveries and dilution as we move into those old mining areas. So it's, as I said, reasonably conservative. I anticipate that once we get in there and begin to understand it, that will begin to shift, and we'll then be able to probably adjust the modifying factors so we can convert more of that resource into reserve. Over to you, Bob.

Robert Fulker

executive
#31

Thanks, Glen. Scale, focus, plant size—those are genuinely what the study is centered on, so that we can actually arrive at those figures. Still, the main objective above all else is to take that resource Glen just mentioned. And listen, I won't predict the reserve we're releasing next month. But the aim is to try to grasp what the reserve is, what potential conversions exist, and to deliver value while bringing our costs down across every area. So that's truly the heart of how we'll achieve the scale. That scale is going to emerge from the study. And at this point it's a bit early to really discuss it.

Jacob Klein

executive
#32

But like everything we've done, ever since we announced the Red Lake acquisition, we want to stay appropriately conservative and put ourselves in a position where we aren't overpromising and under delivering—in fact, doing the opposite.

Operator

operator
#33

<<operator_script>> Al Harvey from JPMorgan has our next question.

Alistair Harvey

analyst
#34

Jake and the team, just to follow up regarding Red Lake. So you have the resource reserve that's due out this quarter. My assumption is that you're anticipating a substantial upgrade to the non <<inaudible>> reserve obtained through the acquisition. I assume that's largely because of the bigger resource base. But do you expect any contribution from adjustments to estimation methods or economic assumptions? I know Glen mentioned a couple earlier about being somewhat more conservative. Yet are there other drivers, perhaps a slightly higher gold price or factors of that kind?

Jacob Klein

executive
#35

Al, no — we're holding at AUD 1,450 per ounce. That's the conservative gold price assumption we're using. As Glen mentioned, there are several modifying factors we've gone back and re-examined. We believe our estimate is appropriately conservative, but we'll walk through all of it when the reserves come out next month.

Alistair Harvey

analyst
#36

Sure, happy to address that. Turning to Mungari now — the work on Boomer seems to be advancing quite nicely. Could you remind me of when full ramp-up is expected, along with the anticipated ounce contribution and the mine life, particularly in light of the indication and the exploration results, which are not quite as extensive along strike at Boomer?

Jacob Klein

executive
#37

Bob, would you like to handle that one?

Robert Fulker

executive
#38

Thanks, Al. At Mungari, the underground operation has a life of roughly a couple of years. Boomer is in fact included in that. We anticipate Boomer entering production at some point within the next 6 months or thereabouts. The explanation for this, Al, is that we are currently driving the second-strike driver. So the first one has been completed, and we have carried out additional drilling. At present we are driving the second level, and that is actually going to provide more detail on precisely what constitutes a long strike glen — did you want to discuss any further drilling that has taken place?

Glenton Masterman

executive
#39

Yeah, absolutely, Bob. I suppose the drilling results along strike haven't been quite as strong as we'd hoped for. Those targets remain in place. There's additional work ahead. But I think the truth is that room for meaningful growth is shrinking as we basically keep filling in the gap. So, as I mentioned, there's more work to be done, and we'll evaluate that while we go through our FY '22 budgets and figure out which program we want to design and implement for next year.

Operator

operator
#40

<<operator_script>> Our following question is from Matthew Frydman at Goldman.

Matthew Frydman

analyst
#41

Jake and everyone, happy new year. I have just a couple of questions. First, regarding Red Lake, and in particular bringing the Red Lake mill back online. I'm just wondering whether the plan is to restart that mill and keep it operating through FY '22. Or does the plan call for a somewhat fixed campaign, in terms of the stockpiles that have accumulated during the June quarter? I'm just wondering whether this will be a permanent restart. And then, I suppose, second, whether you could place that within the context of how you see combined milling capacity at Red Lake right now, I guess given the improvement work completed to date and where that infrastructure stands at present.

Jacob Klein

executive
#42

Thanks, Matt — and happy New Year; the new name is a nice touch. Bob, why don't you take that one?

Robert Fulker

executive
#43

Thanks, Jake, and thanks, Matt. To pick up on restarting at the mill — the plan is for us to build the stockpile. And as we ramp production, we'll keep that going for as long as we can. At this point, it's just a bit more than the quarter. But the thinking is that the gaps between the actual shutdowns will get shorter as our production profile rises over the next 18 months to 2 years, so we can reach full capacity at both mills within that window. Total mill capacity at Red Lake sits between 1.1 million and 1.3 million tonnes. That's what we're aiming to fit on it, with combined capacities somewhere around that level. But we will be stopping the rebate. Again, the reason we run it at the moment — running it during that quarter — is that we winterize it and shut it down so it doesn't cost us that much money over winter.

Matthew Frydman

analyst
#44

Okay, that's really useful, Bob. The second thing I wanted to ask...

Jacob Klein

executive
#45

Matt — sorry, Matt. What I was about to say is that when we put out the financials and the MROR, one thing we will definitely do is walk everyone through what has changed at Red Lake, along with the outlook, the decline development, and where the opportunities sit. The shift over the last 9 months has been fundamental and transformative. When you see what the team on site has accomplished, it is very impressive.

Matthew Frydman

analyst
#46

Thanks. Jake, I’ll look forward to that detail. My second question concerns Cowal. Grade performance during the quarter was strong and, in any case, came in above what we had expected. I’m just wondering whether that result was as planned or as budgeted. Or has it instead been driven by the Stage H cutback perhaps running somewhat ahead of schedule? Are you reaching that ore earlier than anticipated? And has that played a part in the strong quarter?

Jacob Klein

executive
#47

Bob, here's one more question headed your way.

Robert Fulker

executive
#48

Appreciate that, Matt. I'd say it's a mix of factors. Partly it's Stage H, partly it's some favorable reconciliation coming from the initial ore zones at Stage H, and partly it's also favorable reconciliation from the stockpile grades we've been feeding in. So all 3 of those together explain it. Right now, it's definitely tracking where we want it to be for the full year. So we aren't anticipating significant uplifts across the whole year.

Operator

operator
#49

<<operator_script>> At this point we have no more questions. I'll turn things back over to Mr. Klein for his closing remarks.

Jacob Klein

executive
#50

Thanks, Bernadette. And thanks to all of you for being here. It's a packed day. There's one question I'd hoped someone would ask but nobody did, so I'll just offer a quick remark on it: Ernest Henry produced $74 million in cash flow this quarter and $150 million across the first 6 months. Because we don't run that asset, it doesn't attract much discussion. Still, it's a fantastic thing to own and throws off enormous cash. It has to rank among the most cash-generative assets held by any gold company anywhere. So I appreciate your focus and your presence on this call. We look forward to bringing you up to date on the financials and the MROR. And I'd say the main message from all of us at Evolution is that this company is in great shape. Talk soon.

Operator

operator
#51

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.