Evolution Mining Limited (EVN) Earnings Call Transcript & Summary
July 16, 2021
Earnings Call Speaker Segments
Operator
operatorThanks for holding, and welcome to the conference call on Evolution Mining's June quarter results. <<operator_script>> At this point I'll turn the conference over to the Executive Chairman, Mr. Jake Klein.
Jacob Klein
executiveMorning, everyone, and thanks for making the time to be with us on today's call. We always appreciate it. This morning, we'll be walking through the presentation we put out on the ASX today. Bob Fulker, our Chief Operating Officer, joins us from Brisbane. Lawrie Conway, our CFO and Finance Director, and Glen Masterman, VP, Discovery and Business Development, are with me from locked down Sydney. Wherever you're listening from, I hope you're well and healthy and getting through these very turbulent, uncertain and constantly changing times that we keep finding ourselves in. Beginning on Slide 4 of the presentation. One thing that isn't changing is Evolution's commitment to carrying out a growth strategy centered on sustainable high-margin ounces. In our view, this is the pathway to building a unique gold business that will prosper through the gold cycle. The foundation of this strategy is developing a focused portfolio of high-quality, high-margin, long-life assets. That's why we examine everything through the lens of how we can improve the quality of our portfolio and, at the same time, make sure we secure an appropriate risk-weighted return on the capital we are deploying on behalf of our shareholders.
Jacob Klein
executiveThat's also the reason our ore reserve estimate will stay at a conservative AUD 1,450 per ounce. Even though we came in a little below the high operational bar we set for ourselves this quarter, the strength of our portfolio let us deliver, across the last 12 months, an EBITDA margin of roughly 50% on every ounce of gold produced — a sector-leading result. We've frequently spoken before about how much potential we see in both Cowal and Red Lake. And now we are ready and committed to lifting both operations to the next level. We are committing to Board-approved capital programs and execution plans that will turn these assets into the bedrock of Evolution's future and give us a clear line of sight to producing more than 900,000 ounces of low-cost gold annually. That represents a 35% increase over current production rates. We bought Cowal in 2015 for $703 million. Back then, it was scheduled to close in 2024, which is only 3 years from now. During the time we have owned it, we have generated $1.6 billion in operational cash flow and $760 million of net mine cash flow. That comes after all investment in capital projects and discovery, and it exceeds the original purchase price.
Jacob Klein
executiveHaving generated 1.4 million low-cost ounces, we've nonetheless managed to expand the reserve base to 4.6 million ounces, with resources standing at 9.7 million ounces. Today we're committing to yet another step change in this asset's production profile — a $380 million underground mine that will let the operation deliver a sustainable 350,000 ounces of low-cost gold annually and stretch its mine life out to at least 17 years. In line with our emphasis on return on capital, this investment will produce an ungeared IRR of roughly 15% at an Australian dollar gold price of $2,200 an ounce. And at today's spot gold price, an IRR above 20%. Fifteen months ago, we acquired Red Lake. Back then, we committed to a Phase 1 transformation of the operation under which, within 3 years, we would be producing 200,000 ounces a year at an all-in sustaining cost below USD 1,000 an ounce. I'm pleased to report that we're on track to deliver on this. Today we're announcing our commitment to speeding up delivery of our aspirational targets and returning Red Lake to its status as a premier Canadian gold mine, producing more than 350,000 ounces of low-cost gold with a mine life exceeding 15 years.
Jacob Klein
executiveWhen we bought the Red Lake Mine 15 months back, it was on a path toward shutting down. We were aware of that at the time. It lacked sufficient capital, and the mining equipment was aging and unsuitable for the kind of modern, productive operation we aim to construct. That is also the reason we could purchase an 11 million ounce orebody for USD 375 million. At our Investor Day last September, we published updated Red Lake reserves and resources, and since then we have bought the Battle North properties and the Bateman plants. The capital investment we are announcing today boosts our confidence in the medium-term plan, as shown by a defined ramp-up profile to reach 350,000 ounces within 5 years. We are confident that our dedication to this enhanced capital program is appropriate, timely and necessary to transform Red Lake into world-class assets. Moving to Slide 5. We keep handling the difficulties of the COVID pandemic very effectively. And although it has brought added stress and inconvenience and has triggered some delays to equipment orders, thanks to how responsive and resilient our people are, it has had a low impact on our business. We are truly lucky to have so many passionate and committed people in our business.
Jacob Klein
executiveAt the start of this month, we shared our pledge to cut carbon emissions 30% by 2030 and reach 0 emissions by 2050. We genuinely feel this is the correct course of action. Our MSCI ESG rating having been lifted to AA makes us extremely proud. Among our global gold mining peers, that is the top rating. Moving on to Slide 7. Even with COVID, the 2021 financial year proved another strong one for Evolution. Our annual production landed inside the range we originally set. That said, because of a few one-off operational setbacks in this last quarter, we ended up roughly 3% below the revised production guidance we put out in April. It genuinely felt like a tale of 2 halves, with headwinds hitting us during the second half. And although the fourth quarter improved on the third quarter, we didn't close out the year with the strength we'd have wanted. I have strong confidence that we've fixed the issues within our control that caused this. Cost control was solid on our part. We outperformed our initial AISC guidance and stayed inside the revised cost guidance we issued in April. Our economic interest in Ernest Henry remains an outstanding asset for Evolution.
Jacob Klein
executiveOur exploration work is feeding into our strategy, and we're seeing encouraging new drilling results from the Cue joint venture in WA. Cash flow came in very strong: operational cash generated exceeded $900 million, while net mine cash flow reached $555 million. Measured per ounce, that is sector leading. With that, I'll pass things over to Bob for more detail on the quarter and on our growth projects.
Robert Fulker
executiveThanks, Jake, and good morning to everyone. On Slide 8, I want to begin with safety. Our 12-month moving average TRIF has edged up gradually to 9.7 for the March quarter, while the 3-month moving average has fallen to 7.7. That represents an 18% decline over 3 months, at the start of a downward trend across the group. Mt Carlton keeps up its streak of injury-free production, with 144 days recordable injury-free at year-end. June quarter production came in at 169,000 ounces at an all-in sustaining cost of $1,232 an ounce, which, as Jake noted, is better than our third quarter. Even so, it fell short of what we expected because of several issues that we have now addressed. Those issues include seismicity at Red Lake, an unplanned 12-day shutdown at Cowal, and the Mt Rawdon pit performing but still under our expectations. Cowal produced 53,000 ounces at an all-in sustaining cost of $1,106 per ounce, and mine operating cash flow was $63.9 million. Spending on major growth projects has stayed on plan, with $41.6 million of completed work for the quarter, mainly on the underground development, Stage H and IWL. The Cowal team's resilience was tested once again this quarter when the ball mill rotor suffered a major failure, taking the plant offline for 12 days.
Robert Fulker
executiveThe team responded really well here and kept downtime to a minimum by routing around the ball mill in the circuit. After it was back up and running, we achieved average throughput of 1,117 tonnes per operating mill, which returned things to plan. Those 12 days of downtime meant Cowal lost the chance to overperform for the quarter and to offset some of the shortfalls at other sites. Ernest Henry again delivered a significant financial contribution to the group, producing 21,000 ounces at a record low all-in sustaining cost of negative $1,358 per ounce while generating net mine cash flow for Evolution of $77.2 million. Red Lake produced 30,000 ounces at an all-in sustaining cost of $2,233 per ounce, with net mine cash flow of negative $21.9 million. That was after capital expenditure of $30 million. Expect us to focus on delivering for the Phase 1 transformation. That included $9.8 million on mine development and $8.7 million on mobile and fixed plant acquisition and maintenance. Battle North and the CY Decline -- the CYD decline -- accounted for an additional $4.5 million and $3.8 million, respectively. Red Lake this quarter was affected by the seismicity in the R and the Hangingwall 7 zones, along with some ore pass issues at Cochenour.
Robert Fulker
executiveThe team has put a mitigation plan in place for these issues, and both development and production have begun to rise. After our first full year of ownership at Red Lake, it's pleasing to see continued improvement as we work to transform this operation back into an operational pillar for Evolution. One year into the 3-year transformational plan has seen significant change. For the quarter, several key achievements were: progress on the site development and improvement plan, which included jumbo training with bolting, an increased development rate at Cochenour, North American supply established for the ground support supplies, rig shaft automation completed, the Red Lake mill operating at greater than 1,000 tonnes per day during the quarter, Campbell mill upgrade and supporting sustained higher throughput and the CYD box cut construction with development to commence this month. The McFinley decline is progressing well with breakthrough expected in the coming quarter. Bateman mill commissioning and extension studies are all progressing well. Mungari delivered 23,000 ounces at an all-in sustaining cost of $1,927 an ounce and a net mine cash flow of negative $5 million, including $21 million in capital spend during the quarter. Underground development and open pit capital waste stripping contributed $12.3 million and $5.3 million being spent to complete stage cell 3 of the TSF.
Robert Fulker
executiveEach of these positions the business for what lies ahead. On the production side, stoping difficulties persist underground, which is affecting how much high-grade ore reaches the plant and led to output below plan for the quarter. The team has put together a stoping improvement plan, with work on it starting in June. Rates at the open pit keep getting better, up 38% versus the March quarter. Processing had a solid quarter as well, taking the site beyond its 2 million tonne per annum gold for FY '21. Mt Rawdon turned out 21,000 ounces at an all-in sustaining cost of $1,338 an ounce, with net mine cash flow of $18 million for the June quarter. Ore mined rose fourfold compared with the March quarter after access to a pit bottom was reestablished. Regrettably, that access was lost once more at the end of the quarter. Mt Carlton produced 22,000 ounces of payable gold during the quarter at an all-in sustaining cost of $1,301 an ounce and net mine cash flow of $19.6 million. Let me now direct your attention to a central item in today's release, the Cowal underground Board approval and the Red Lake growth plan. Turning to Slide 9, Cowal has been a cornerstone asset for Evolution ever since the acquisition in 2015.
Robert Fulker
executiveAnd moving to an operation with a mine life beyond 15 years, processing roughly 9 million tonnes annually, that further shows how excellent these ore bodies are. As the underground gets developed, output at Cowal went up by 70%, and all-in cost is going to drop by about 30% across the coming 3 years. On Slide 10, the study demonstrates a solid business case with the underground, which will lift production at Cowal to roughly 350,000 ounces per year. The Board gave approval for building an underground mine that uses a conventional long-haul open stoping methodology with paste backfill. The underground is going to deliver approximately 1.6 million to 1.9 million tonnes per year of high-grade fleet for the Cowal processing plant across a 7-year peak production period starting in FY '25. Development will ramp up to a sustainable rate of 1,100 meters per month in FY '23. Commercial production will begin after the commissioning of the pastefill plant in FY '23, since we have taken a conservative approach of not starting stoping until top drilling is available. Operations will start with mining being carried out by our contractor. The tender has been prepared for execution in the second half of FY '22. The current go-away decline contract has been extended so that mining continuity is allowed up to this date.
Robert Fulker
executiveMining costs of $65 to $85 per tonne have been benchmarked, and they're based on work done with a select group of mining contractors during the study phase. Those figures have also been stress tested in our sensitivity analysis on overall project economics. On Slide 3, the key milestones I'd like to point out: regulatory approval this quarter — I believe we are well on track for this; underground development contract award in half 2 of FY '22; and the pastefill plant and accommodation village. This project has progressed exceptionally quickly. We hand over the project to John Penhall and the Cowal site team completed in expectation of the regulatory approvals. As with all the long-life operations, we will seek opportunities to optimize and improve the project as we gain further information from the drilling campaign currently underway. And our procurement work have started for long lead time items such as the paste plant, village units and the primary mining contract. And the Project Director has started. This is an exciting time for all of us at Evolution as Cowal moves to a truly integrated mine with a combination of an open pit and underground operation. If we move to the next slide with Red Lake.
Robert Fulker
executiveLike I said, now that the Battle North acquisition is done, we have a route to a targeted more than 350,000 ounces starting in FY '26, along with an all-in sustaining cost reduction of more than 20%. Our resource of 11 million ounces, now combined with expanded plant capacity, gives us a mine life beyond 15 years. The Red Lake operation really is world class. Phase 1 of our 3-year transformation is on track, and through the Battle North acquisition we've gained the chance to speed up ore treatment. On Slides 13 and 14, these 2 slides visually show how close the operation sits. On Slide 13, you'll see the consolidation of the district, and on Slide 14, I've highlighted the McFinley ore body, a recent addition from the Battle North acquisition. Slide 15. Looking back, it's hard to believe we have only taken the keys for 15 months. We've accomplished a great deal in that time, but there's still plenty to do over the next 2 years to realize our original goal of 200,000 ounces at USD 1,000 AISC. We remain on track. To date, we have established the path to deliver the gains in production identified and to deliver value from the huge resource and reserve base at Red Lake.
Robert Fulker
executiveBoosting our underground development pace is essential if we're going to hit this higher production level. So far, we've managed to exceed 1,000 meters per month, but what we need to show now is that we can do it consistently and reliably. Among the other things we've kicked off: finishing the box cut for the CYD decline into the Upper Campbell area, which will give us a separate mining front. We've reorganized the workforce, and that includes a number of secondments from our Australian operations over to Red Lake. Greater deployment of new equipment and technology, more use of surface remote and autonomous equipment, and better stoping and paste cycle times. On Page 11 — I know it's a busy slide and I apologize for that — there's a lot happening at Red Lake. Alongside the original transformation, we're now pursuing additional improvements to the Red Lake economics through more processing capacity. To build on what I said at the start, the key milestones over the next 3 years revolve around delivering the 3-year transformation plan; lifting installed plant capacity to 1.5 million tonnes per annum, which comes through adding the Bateman mill and expanding capacity at the Campbell mill; and raising development and production rates so we deliver the 1.5 million tonnes needed to fill the 3 mills.
Robert Fulker
executiveLooking at ore, the decline at CYD is going to get underway before long, and we expect the first stoping ore in the first half of FY '23. Over the next 3 years, output will build to 650,000 tonnes per year. In time, my aim is to put in place the ability to mine roughly 1 million tonnes from a decline, as more ore processing capacity comes online. This is an exciting period for the Red Lake operation as the vision takes shape. There's plenty of hard work ahead, but I have confidence in the operation's future. Thanks for your time, and I'll now pass things to Lawrie.
Lawrie Conway
executiveThanks, Bob, and good morning to everyone. Jake and Bob have already covered the quarter and how we closed out the year. I won't revisit the financial results, but I do want to say that we ended FY '21 in a very strong position, with $326 million of group cash flow and $160 million of cash in the bank. I'll give you a fuller update next month when we release our FY '21 financials. This morning, I'm going to lay out what the next 3 years look like at Evolution. First, to Slide 19, which sets out our production and cost outlook. Our production is planned to rise by approximately 35% to over 900,000 ounces by FY '24. That will be driven by growth at Cowal and Red Lake, which we've outlined this morning. FY '22 will be up slightly from FY '21 as we transition to higher production at Cowal and Red Lake from FY '23 onwards. Once these projects are executed, we will have a sustainable annual base of over 900,000 ounces. Compared with the outlook provided in September 2020, the main changes outside of Cowal and Red Lake have been at Mungari and Mt Rawdon. At Mungari, the Boomer results were positive but not enough to make it worthy of investment, since it would have further eroded the margin at that asset.
Lawrie Conway
executiveSo because of that, we've decided to take it out of the plan. At the same time, at Mt Rawdon, we've made the call to flatten the wall angles so we can minimize the geotechnical stability problems. That brings their yearly output down over the coming few years, but it does lengthen their mine life. On all-in sustaining costs, we still expect to hold our position as a low-cost producer. The biggest place we're seeing higher input costs is labor, which makes up about 53% of our cost base and is expected to rise by 3% to 4% each year. The higher all-in sustaining cost in FY '24 is tied to more mine development needed at Red Lake so we can match the expanded processing capacity that Bob described. That said, we expect that once Cowal and Red Lake hit their higher production rates, all-in sustaining cost will come in better than the FY '24 level. Moving to Slide 20 and our planned capital investment for the next 3 years. Sustaining capital should stay fairly flat across those years, with each asset generally needing somewhere between $10 million to $20 million annually. So we're planning to invest between $120 million to $160 million per annum.
Lawrie Conway
executiveOne major factor here is how old the installed infrastructure is. Now that we've extended the mine lives at Cowal and Red Lake, it makes sense to replace or upgrade equipment and infrastructure so we can ensure better ongoing availability and bring maintenance costs down. At Cowal, it's primarily the mobile planning, whereas at Red Lake it covers the whole site, given the absence of capital invested over the years before we owned it. Our major capital outlook ties directly to the growth and extension opportunities we've laid out at Cowal and Red Lake. With a well-defined path now in place at these assets for the next 10 to 15 years, investing now is appropriate, cementing them as cornerstone assets in the portfolio. That means we'll invest somewhere between $450 million and $560 million annually over the next 2 years. This slide shows the breakdown of these key projects and investments. At Cowal, the primary investment will be the underground project along with continuation of the integrated waste landfall. Relative to the outlook we gave in September, the changes to CapEx levels at Cowal have been either the timing of spend or the scale of the underground mine.
Lawrie Conway
executiveAt Red Lake, the scale of the mineral resource plus the Battle North acquisition have let us sequence mine development and plant expansions so that we can deliver a 350,000-ounce annual production profile by FY '26. The capital investment lines up with the milestones Bob laid out, where we'll put money into opening the 3 mining fronts in parallel across the next 3 years, though each will proceed at a different pace. Simultaneously, we'll spend on growing processing capacity to over 2 million tonnes per annum during the next 18- to 24-month period, beginning in the middle of FY '22. However, the shift in our major capital profile versus the September 2020 outlook is essentially tied to Red Lake and the new mine plan, which by the time the asset hits the sustainable run rate of 350,000 ounces per annum now delivers over a 170% production increase and as much as a 50% cost reduction. Finally, on Slide 21, we show our capital management details and how we intend to fund growth along with returns for shareholders. The balance sheet is in great shape, with gearing finishing the year at approximately 15%, on a cash balance of $160 million and net bank debt of $460 million.
Lawrie Conway
executiveBack in July, we fully paid off the revolver and drew down the new $440 million facility that was set up when we acquired Battle North. Liquidity is in good shape at $850 million. And when you pair that with robust cash generation, we have enough room to fund the growth plans we have ahead. That said, as has always been our practice, we want the balance sheet positioned so it can absorb any negative impacts, fund any business development opportunities, and still be able to return funds to our shareholders. So we are well along in restructuring our debt profile, with the goal of aligning maturities to the group average mine life. This will double the average tenor and cut near-term debt repayment commitments. We expect to wrap this up by the end of the current quarter. On dividends, our policy stays the same — it's based on a percentage of cash flow. Pending finalization of the FY '21 financials, we expect our final dividend to fall in the range of $0.04 to $0.06 per share. Any dividend remains subject to Board approval and declaration. I look forward to giving you a further update next month with our full year's results. Thank you for your time this morning, and I'll now hand back to Jake to close out the presentation.
Jacob Klein
executiveAppreciate that, Lawrie. Now if you go to Slide 22, you'll see why we believe this business is set up well to do well right through the cycle. Our assets sit in Tier 1 jurisdictions — Australia and Canada — and I think that's going to matter more and more to investors as time goes on. We're staying on strategy: still prioritizing margin over volume, still wanting to keep improving and upgrading the quality of what we hold, and still recognizing that each dollar of capital we put into our asset portfolio has to earn a risk-weighted return that's appropriate. Thanks for your time today. With that, let's open the lines for questions.
Operator
operator<<operator_script>> Our initial question is from David Radclyffe of Global Mining Research.
David Radclyffe
analystClearly there's quite a bit to absorb here. Perhaps I could start by following up on what Lawrie said regarding the dividend. Since it's probably reasonable to say the capital profile you've released exceeds what the market anticipated, and the dividend is tied to free cash flow, did you consider obviously keeping that policy in place but simply attaching a caveat of a minimum set dividend?
Jacob Klein
executiveDavid, I’ll have Lawrie take that one. Still, you’re correct — we’ve put out quite a bit of information, and that fits how we try to be as fully transparent and open as we can. So we’ll leave it to you, other investors, and analysts to work through it. We hope we’ve explained it well, but I’ll turn it over to Lawrie.
Lawrie Conway
executiveYeah, David, that was something we took into account. What I mean is, the flexibility our dividend policy gives us comes from looking at how the business is expected to perform and the cash it generates. We also take into consideration what our franking credit balance will be. And right now, our view is that after we restructure the balance sheet, we'll have considerably more flexibility. But committing to a minimum is not something we're prepared to do at this point.
Jacob Klein
executiveTo build on that point, David, when it comes to our budgets and forecasts — the internal ones sit down at $2,200 an ounce. So clearly, with spot price at $24.50 right now, cash flow looks considerably stronger.
David Radclyffe
analystYes, absolutely. Just a couple then on Cowal. Look, regarding the underground update you released today, could we just clarify what you're assuming for the operation's overall milling rate? Is it still 9 million tonnes — meaning 20% from underground based on the figures you gave, and obviously providing some headroom given your much higher permitted rate?
Jacob Klein
executiveYes, that's right.
David Radclyffe
analystAll right. Could you then give us some detail on the grade profile, since you mentioned front-loading higher-grade material? Broadly, our figures imply that to hit that 350,000-ounce target, you need to be producing above 3 grams. So for how long initially might we see grades above 3 grams?
Jacob Klein
executiveGlen is on the call. And since he hasn’t had an opportunity to talk up some of the drilling and the success he’s achieving at Cue, I believe this question should go to him.
Glenton Masterman
executiveThanks, Jake. And yes, David — essentially, what we've been doing lately is really stepping up the definition drilling that takes place underground, so that we can build our grade control stockpiles before production begins. During that preproduction phase, that's what will keep us quite occupied. We have roughly 90 kilometers of drilling ahead of us in order to deliver adequate grade control stocks for the production plan across the first couple of years. As things stand right now, we're clearly still working from a model — it's a global model. Once we begin infilling it, we'll start to gain understanding and be in a position to optimize the grade within that model. In the earlier years, production will concentrate on and around the Dalwhinnie areas as well as the Galway areas, and within the model those are distinct elements that should actually deliver a higher grade than the average grade. So the infill drilling is concentrated in that area, which lets us keep optimizing the further detailed designs that we need to carry out.
Robert Fulker
executiveOne more thing to add there, Dave. We discussed those 3 grams. By the time the underground is ramping up, we should actually be into the main portion of Stage H of the grade. This year we're at 0.92. By the end of FY '24 and moving into '25 and '26, you ought to see that roughly 15%, 20% higher. So that lines up at the same moment as when we'll be — right now we're planning about 2.45 to 2.65 grams per tonne coming from the underground.
David Radclyffe
analystOkay. And then when it comes to that really long tail from underground, just thinking out loud here, what's the reason for not keeping up the 2 million tonnes per annum rate? Why scale it down instead during the later phases of the operation?
Jacob Klein
executiveWhat I'm giving you reflects what we know right now about the stoping plans and the mineral inventory as it stands. That will evolve as time goes on. And clearly, it's our aim to expand both this resource and this reserve base.
Robert Fulker
executiveDavid, let me also add to that point. In those later years of the underground mine's life, the workings sit somewhat deeper. So we still have to get the drilling set up before we can keep turning resources into reserves.
David Radclyffe
analystYeah, absolutely. Perhaps I can slip in one more quickly. On Mungari, could you give us additional detail regarding volumes across the guidance period? And when will we actually receive further clarity on the future, since you're now discussing a significant investment a couple of years away in terms of mine plan and reserve conversion? And I suppose removing Boomer from the plan at this point means we're nearing the end of the underground?
Jacob Klein
executiveYes. So at Frog's Leg we're working on gradual enhancements to the profile, and we are seeing a few step-by-step gains there. But we've consistently stated that Mungari's future hinges on an additional 0.5 gram. During the most recent quarter, results came in at 0.5 gram below what we'd typically want. So what we've done — and this has been happening concurrently — is examine a future at Mungari in which we can treat low-grade material. That is the reason we're conducting this pre-feasibility study on mill upgrades. And in all probability, that represents the future of the operation. Naturally, we would be delighted to find some higher-grade material, but we are planning and preparing the operation for a low-growth future.
Robert Fulker
executiveYes. To add to that, when we brought Boomer in and a few smaller satellite pits came out, the plan said that over the following 2 to 3 years — '22 through to '24 — you have underground feed available that supplements it by the end of FY '24 without any other underground successes. You move to that lower-grade asset. And the studies so far have shown — we've been running leach studies, we've been doing plant expansions, additional plants. It says that around FY '24, you would upgrade it to roughly 4 million to 4.2 million tonnes to handle that lower grade that you'd expect from an open pit only starting in FY '25. And that study will be done in the next few months.
Operator
operatorSophie Spartalis from Bank of America has the next question.
Sophie Spartalis
analystIn the same way, I’d like to take a look at Red Lake and the reserve grade that’s implied there. So if you simply take the 350,000 ounces at the 1.5 million tonne rate, that implies a grade of roughly 7.4 to 7.5 grams per tonne — how do we square that with the grade profile you showed on Slide 14, where many of the grades sit considerably below that level? Could you walk us through how you intend to reconcile that grade gap over the coming few years?
Jacob Klein
executiveThanks, Sophie. Could you point us toward the basis on which you're working out the tonnages and the grade? The reason I ask is that the reserve grade in use is 6.9 grams per tonne, and the five-year profile reaches more than 350,000 ounces. So the...
Sophie Spartalis
analystYes. So assuming you’re working with 1.5 million tonnes...
Jacob Klein
executiveCorrect, 1.5 million by FY '23. So that's — and the FY '25 goal we're discussing is an additional 350,000 ounces.
Sophie Spartalis
analystCorrect. So even in 2025, should you proceed with that 1.5 million tonnes...
Jacob Klein
executiveCorrect — in '25, that figure exceeded 2 million tonnes.
Sophie Spartalis
analystOh, all right. So when we're talking about that 350,000-ounce figure, you're drilling...
Jacob Klein
executiveMore than 2 million tonnes each year. That figure stands above 2 million tonnes annually.
Lawrie Conway
executiveWe're looking at 2 million up to 2.1 million starting in FY '26, and that's the point where we reach 350,000.
Sophie Spartalis
analystAll right, so regarding that 1.5 million — when do you expect to reach that level?
Lawrie Conway
executiveIn FY '24, that figure will reach 1.5 million. And until the plant expansion is complete, you'll be running at somewhere between 250,000 and 270,000 ounces during that period.
Sophie Spartalis
analystAll right, and that assumes a reserve grade of 6.9, correct?
Lawrie Conway
executiveAbsolutely.
Sophie Spartalis
analystAlright. No, that’s great. Then, regarding the cost guidance, Lawrie, you mentioned labor costs rising roughly 3% to 4% annually. Is that increase coming from a specific part of the group?
Lawrie Conway
executiveNo. I think when you examine it, take the West Coast — our turnover rates rose across this year. So there are definitely far greater cost pressures around labor availability for Mungari. Then on the East Coast, Cowal is likely under more pressure from construction than from mining in that area. So we don't view that as such a large issue. Then looking at Mt Rawdon and Mt Carlton, Queensland certainly hasn't experienced pressures as big as those in the West. And then for Red Lake in Canada, we've been conducting reviews. As we acquired Battle North, our positions there are competitive, but we also recognize that as they emerge from the pandemic and the country opens up somewhat more, we'd expect to see probably still movement of 3% to 4% there. But we aren't seeing high turnovers there at this point.
Jacob Klein
executiveSophie, I'd just like to build on what Lawrie said — our retention rate sits at roughly 90%, and I believe that would lead the sector. It's something we're putting a lot of effort into, ensuring people truly find their time at Evolution to be a career highlight.
Sophie Spartalis
analystYes, that's great. And then just one last question, if I may. Regarding Ernest Henry, you mentioned the drilling program that's underway there. When might we hear the result of the mine life extension, and will there be any changes to the mine plan? Also, do you anticipate any significant shift in how they approach the asset below the 1,200 RL?
Jacob Klein
executiveThe plan remains on schedule. As we mentioned earlier this year, the concept study reached finalization by the close of the June quarter. It will be reviewed with our joint venture partners during this quarter so we can agree on moving to a pre-feasibility stage. Any reserve revision will arrive at the close of this calendar year, when Glencore provides its update, the MROR. That is what we would then feed into 2022. So right now, everything is tracking according to plan. No additional drilling is underway at present. That comes later in the second half — likely more toward the December quarter. Then regarding changes to the mine plan, down to the 1,200, we still have the best part of 3 and a bit years remaining. So we see no need at this point to alter that mine plan or its sequencing.
Operator
operatorThe following question is from Daniel Morgan of Barrenjoey.
Dan Morgan
analystGoing back to Cowal for a moment. Thanks for all the extensive detail you gave us on the underground. I'm just curious about how that's meant to fit together with the open pit. I mean, we talked earlier about milling capacity of roughly 9 million tonnes. You've kind of been operating at around 8.5 million per annum. I'm just wondering whether you keep running at 8.5 million going forward as you approach the end of the open pit. You'll have ore and stockpiles to feed in alongside the underground ore that will still be coming. I'm just kind of wondering how the end of the mine life looks as the underground and the open pit come together.
Jacob Klein
executiveAbsolutely. Daniel, congratulations on taking on the new position. And since we figured you'd been away for a while, we gave you plenty of material — so there was some reading to catch up on. I won't — Bob is over in Queensland, ready for a question. I'll pass this one along to him. Bob?
Robert Fulker
executiveThanks, Jake. I hope everyone can hear me clearly. The line has been a little scratchy at times. Daniel, that question has two parts, right? The first one concerns the milling rate. The second one is about how you integrate the underground with the open pit. Is that correct?
Dan Morgan
analystYeah. What I’m really trying to get at is that the underground seems to have a longer life than the open pit, if you’re milling really hard at 9 million tonnes. So at the back end of the mine life, you’ve only got underground ore. I’m just wondering how that fits into your thinking, or whether you run the mill less hard, so that you’ve got some ore toward the back end to mix with the underground. That’s what I’m trying to understand.
Robert Fulker
executiveI strongly believe that getting the gold out sooner is preferable — both for cash flow and for value. So running at a suitable rate early on makes sense to me. That 9 million tonnes is the rate gold has consistently run at, roughly around that figure. It does hinge on the feed, though. Which means it hinges on how much oxide versus fresh rock there is, and on hardness. That's the reason it fluctuates somewhat. Still, hitting 9 million tonnes is what we're aiming for. Near the later stages of the mine's life...
Jacob Klein
executiveI should probably mention as well that a pre-feasibility study is currently underway covering extra open pits along with initial extensions to the E42 pit.
Robert Fulker
executiveThat's exactly the point I was heading toward, Dan—that's the answer. Essentially, how do we really bring in additional ore, and how do we simultaneously bring in other material while carrying out this underground work? Underground operations do continue beyond a pit's lifespan. If you examine certain other operations, there are some recent instances in Australia. And what that means is you have to modify how the processing plant is configured. Yet the initial step is really to bring in some of these further studies, which are now beginning to get underway, covering other open pits within that E42 extension.
Dan Morgan
analystRegarding those constraints and moving toward that goal—and I realize you haven't done this analysis yet—what would be the main factors behind introducing additional open pit material? Would it require more drilling on your part? Or does it depend on a permitting decision? Or is there a reserve price assumption of some kind that you might consider changing?
Robert Fulker
executiveI'd say every one of those points applies. Look, we're at a really early stage in the study work, but the goal is to bring a few of them in late in E42, which would let us access extra ore at a higher grade — or a better grade — compared with the stockpiles. That's the objective. Glen, would you like to speak about the resource to reserve?
Glenton Masterman
executiveYes, absolutely, Bob. So regarding the satellite pits, both north and south of E42, we have drilling programs running this year — in FY '22, rather — and those will shape what we anticipate feeding into the feasibility study. That study will really look at how those pits fit into the broader life of mine plan and how they might integrate with a potential expansion of E42. We're aware that the ore body continues past Stage H, as well as how it ties in with the underground.
Dan Morgan
analystAll right. And regarding Red Lake, I was just wondering whether you could speak to what you'll require, from a permitting standpoint, and the timeline for those items in order to carry out the plan you've laid out today.
Jacob Klein
executiveLawrie, over to you.
Lawrie Conway
executiveYeah, Daniel — from the permitting side, for the milling, we'll need full approvals on those beyond the 50% capacity uplift. So that work is continuing. We'll require some permits to move material from the leases to the plants. We've secured one of those for the Bateman mill. We're working on the rest. On the mining side, nothing unusual is needed for access into those mines. So yes, permitting, as we see it, won't be the main issue. That said, it's also about making sure the First Nations and stakeholders are brought along on that journey to understand going from where we are today to where we'll be by 2026. That's a material change in that regard.
Jacob Klein
executiveYes, that's right. And a real advantage of acquiring the Bateman mill is that every approval sits at the provincial level, so no federal sign-off is needed from us.
Dan Morgan
analystAlright. My final question is somewhat more conceptual in nature. I mean, I notice that you've moved more aggressively and sooner on this net 0 carbon pledge that you announced not long ago — more aggressively and sooner than peers, I'd say, sorry. I'm just curious whether you could discuss how you approach this regarding what these commitments cost. How might you put a number on that? I realize that — we're all moving that way, but I'm just curious how you quantify what these cost the business and potentially what peers will need to consider as well.
Jacob Klein
executiveSure. So, Daniel, we put a great deal of research and effort in before making this commitment. Scope 2 emissions account for 70% of our total, while scope 1 makes up the remaining 30%. If we purchased carbon offsets covering all of our emissions, the cost would come to roughly $9 million. That's a position we have no desire to be in — buying carbon offsets. But if you want to put a number on what this commitment costs without altering how we operate, that figure is it. In our view, Cowal — responsible for 50% of our emissions — is where our attention belongs most. And the route to dropping below 35%, or reaching that 35% cut — the 30% reduction by 2030 — runs through grid power, which is renewable. So we have to get in the cube early, and we've begun doing so to move that forward. So that gives us a renewable power source from the group.
Operator
operatorMatthew Frydman of Goldman Sachs has the next question.
Matthew Frydman
analystGood to hear everyone's doing well. Thanks once more for the thorough outlook details this morning. First, regarding Cowal, I have a few questions about the underground project's economics. I suppose the first thing is that, given you've completed the economics and the investment case using a gold price of $2,200 an ounce, that yields a 15% pretax IRR. Obviously, that sits well above the level at which you cut reserves and even the level at which you cut resources. And I suppose also bearing in mind that 30% of the mine plan falls within the inferred resources category or even exploration target. So I'm just wondering how sensitive that material in particular is to that $2,200 an ounce gold price assumption versus the $2,000 an ounce resources cutoff or even the $1,450 an ounce reserves cutoff. Is the gold price assumption the key question there? Or is it purely a matter of drilling density, as Glen mentioned earlier? And then second, extending that question, does using that high gold price mean you're applying a different threshold to these projects because in your view it's low risk? I suppose that ties to your earlier comments on risk-adjusted returns.
Jacob Klein
executiveYes. Thank you, Matt. I believe I'll split that question into two parts. First, Glen will talk about the resources and reserves conversion, so to speak, and then I'll pass things over to Lawrie. But we aren't applying a return profile to this project that differs from other projects. In our view, a return of plus 15% would be very attractive. Glen?
Glenton Masterman
executiveThanks, Jake. And yes, Matt — so, look, what we're doing, or really what we have in the underground portion of the mine here, and that resource component you mentioned of up to 30% — or inferred resource component of up to 30% — that comes in during the later years of the mine's life, and at this point in time it simply hasn't been drilled enough at depth. So what we're doing is — really, the goal during the preproduction period is to drill so we have 2 years of grade-controlled stock ahead of production, and that will really be the annual plan in terms of derisking the indicated resource down to measured, which we can then use for grade control, as I said, in optimizing a stope design. So at any given point in time, that's essentially going to be our objective. So reaching that deeper inferred material will happen later on in the life-of-mine plan. And as I mentioned a bit earlier, the focus right now is really just on the first couple of years, to get that resource model derisked for the optimized stope designs.
Lawrie Conway
executiveYes. And regarding the economics, Matt, I would echo Jake's comments. Our studies are built on the resource and reserves. Then for financial modeling, we apply whatever plan assumptions we happen to be using, and for our current life of mine plan the metal price assumption is 2,200. That's why the study concludes at that pricing. When we examine sensitivity to it, you would likely be getting back down to — I'd say somewhere in the AUD 700 to AUD 800 range before reaching NPV neutral or breakeven. And then at 2,000, you certainly still have a reasonable NPV on this project. We do run those sensitivities. And then, as Jake mentioned, the IRR at current spot is 21%. And as a result, NPV would be higher on the order of — I would have said 450 million, 500 million NPV at spot pricing. So all of those sensitivities have been run. This isn't something that will be sensitive to the price.
Matthew Frydman
analystYes, absolutely. So I suppose if we take that and apply it at a group level — if a 15% pretax IRR is enough at a gold price of $2,200 an ounce, and if that's enough for the Board to approve an investment, then to me that would suggest there are probably plenty of other projects across the portfolio that screen quite well with those inputs. So in that gold price scenario, could you perhaps talk through whether those other options are indeed out there and whether that's something you would be considering?
Lawrie Conway
executiveFirst off, Matt, given the projects we laid out today, I'd be somewhat concerned if Bob had additional options tucked away capable of delivering returns of that kind. Realistically, looking across the portfolio, Cowal — with the underground and open pit studies — will deliver the strongest return. If we consider Red Lake opening up the mining fronts and raising the processing plants to 2.2 million to 2.1 million tonnes per annum, Ernest Henry going below the 1,200, and then optimizing Mungari as it moves to a lower grade while you upgrade the plant, those are likely the standout ones. And as you'd see from our outlook today, they need some capital over the next few years. So some of the others will probably find it hard to match that. But that doesn't mean there aren't smaller incremental projects at each of the assets that they'll be looking to bring through over the next couple of years.
Jacob Klein
executiveMatt, I think it's worth me chiming in with my own view on what you said about returns, since our BD team has been quite busy across the past 12 months—and really over the last 10 years, though especially during the last 12 months. You'll find very few projects available for purchase, and a handful in Australia have changed hands in recent months where you could assume an AUD 2,200 gold price and still achieve a return above 15% on reserves and resources. So when it comes to buying versus building, the projects we're developing—taking these assets to a genuinely different level, with 350,000-plus ounces and long lives—compare favorably against nearly everything we've examined through a buy lens during the last 12 months.
Matthew Frydman
analystYeah, absolutely — that's a helpful perspective. I suppose my thinking was leaning more toward how it fits with your reserve price of $1,450 an ounce. From my standpoint, and as you folks have discussed before, that $1,450 is a quite cautious figure, essentially making sure you produce a positive margin across the cycle. But the way it comes across to me, you seem to be suggesting that something above that level is required for the Cowal underground to generate a positive return.
Jacob Klein
executiveNo. What we're saying is that we'll mine right up to our reserve cutoff, but the assumption behind that is a long-term gold price of $2,200.
Matthew Frydman
analystSure, understood. All right. So perhaps we can return to the details on Cowal, Lawrie — I believe you touched on this somewhat earlier regarding what is behind part of the CapEx variance compared with the guidance you gave last year. I'm curious whether you could identify specifically, I suppose, which sections of the mine are being developed sooner or are being accelerated relative to what was previously expected? And I suppose this may be one for Glen, but might that support — I guess, on top of that smaller tail that we observe at the back end of the underground mine life, does accelerating this development also advance the possibility of additional output in that tail?
Lawrie Conway
executiveYes. Matt, it’s a mix of factors. When we examine the integrated waste landform, some capital is shifting out of FY ’21 and into FY ’22. That happened because we were actually able to eliminate the requirement for an additional lift at the storage facility. As a result, we could — we weren’t — we didn’t need to proceed at the same pace on the IWL. So a portion of that capital arrives in this year. And clearly, some then shifts into the other year — into ’23. In addition, with the IWL, now that we’ve moved well into the deeper portion of construction, we’ve managed to pinpoint areas where some of that capital can be shifted out to ’25 and ’26. So that’s roughly what we mean regarding timing on that project. Overall scope isn’t changing — there’s likely about a 5% shift in the total overall capital cost of it. Then, when we look at the underground in our 3-year outlook from September 2020 and our life of mine plan from last year, it assumes a different approvals timeline. Consequently, capital that was in FY ’24 is moving into FY ’23 and similarly, ’23 into ’22. And that’s really the reason we say there’s a change there.
Lawrie Conway
executiveAnd the final item regarding underground: at present we are considering that mining rate of 1.7 million tonnes, versus the plan we had initially in the pre-feasibility; you can see a portion of that development capital moving forward, after commissioning, into the earlier years. That is the reason we note you get somewhat more development, owing to the mine's size and also to the timing, based on approvals and on what the feas study ultimately allowed us to mine at. Glen, is there anything on the underground in terms of optionality that will emerge from the drilling?
Glenton Masterman
executiveAbsolutely — it really is. And I think — this happens quite often with underground mining projects: as we drill in the years ahead, new opportunities will come up that, depending on how they meet or pass through the quality filters, could shift the sequencing somewhat. But future drilling is what will inform that.
Jacob Klein
executiveAnd roughly $15 million in capital is allocated toward a pre-feasibility study on those open pits, which will complement — rather than — and bring down that tail.
Lawrie Conway
executiveYeah, that’s a fair point, since in last year’s long we actually had that out 2 years later. But now that approval has come through on this and the underground plan, it says we need to begin and move into the feas study now.
Matthew Frydman
analystUnderstood — thanks for walking us through all that in detail, folks. I’ve got one final quick question for myself here. Clearly, I’ve already used up a bit of time. But just briefly regarding Red Lake during the quarter, I noticed you mentioned certain seismic problems encountered underground. And you discussed operational and planning controls implemented to deal with that. I was just wondering whether you could elaborate on what exactly those controls involve. And I’m also curious — is this a problem that exists only at the deeper levels of the mine? Do you view it — do you consider it a positive that a substantial portion of the future mine plan centers on Upper Campbell and other sections of the mine? Or do those seismic issues genuinely need to be factored in, dealt with, and managed across the entire mine, I suppose, especially since you intend to fairly substantially increase the volume of material being moved underground?
Jacob Klein
executiveBob, calling in from Queensland.
Robert Fulker
executiveI think that breaks down into two pieces. First, there's the opening up of the upper level and the front areas of the mine, front areas that you can mine from. Because of that, you're going to get seismicity in the lower part of the mine — that's part of the ground, part of the nature of it. So having more additional mining fronts will actually allow us to move to different mining areas and to slow down the mining in the areas that are more susceptible. And what the seismicity does is it comes with time. So if you can have time between activities, you'll actually stop the interruption. So getting additional mining fronts, getting additional areas to be developed, that's a big bonus for seismicity. We don't see anything in the upper levels. We don't see any indication at the moment. So it's only in the Lower Red Lake area that we're seeing it. The other things we're trialing is we're trialing destressing blasting around development. So blasting ahead of it. We're trialing different profiles to try and reduce the stress or improve the stress distribution. And we're trying to go to a better arch profile like we used in West Australia. So we're implementing all those things as we're speaking as well as different ground bolts — or grounding support bolts, et cetera, et cetera.
Jacob Klein
executiveAnd Matt, before you head off, I can’t resist mentioning that we did — while carrying out the box cuts, a portion of that material went through the plant since it was running 2 grams a tonne. And as you can see, we did include one hole that insect the 2.75 meters at 21 grams, which is very close to the decline. So Red Lake keeps proving to be a geological magic pudding.
Robert Fulker
executiveTurning to what we call Treasure trove.
Matthew Frydman
analystOf course we wouldn’t reject a grade of 2 grams per tonne — definitely not. Thanks for laying out those details, everyone.
Operator
operatorOur following question is from Alex Barkley at Morgan Stanley.
Alex Barkley
analystThere's a question about Red Lake and what the operating capacities look like there. You mention figures like 1 million, 1.5 million, moving up to 2 million, and even beyond 2 million. On top of that, you're also developing the McFinley mine. My rough understanding was that the existing operations at the Upper Campbell decline run at about 1 million tonnes apiece, which might mean your mining is running ahead of that. Could you walk through how you're weighing mining capacity against milling capacity over the coming few years?
Jacob Klein
executiveSure, I'll handle that, and then Bob and Lawrie can chime in if they'd like. Essentially, right now we're mining only in the low Red Lake and Cochenour areas, and that's the single mining horizon we currently have. At present we're producing roughly 850,000 tonnes from there. We're constructing the Upper Campbell mine, which we're aiming to bring on in the next couple of years, FY '24, so we can ramp that up to 750,000 tonnes. That gives 1.5 million tonnes combined from the existing areas and the Upper Campbell areas. In his speaking notes, Bob mentioned he's hoping we can eventually exceed 1 million tonnes out of the Upper Campbell area. And then the McFinley ore body will contribute as well — 375,000 or 325,000 ounces, I believe — tonnes, that is, that we're looking to recover from there in due course. So altogether that comes to more than 2 million tonnes within the next 5 years. But it's mining — really, we're developing, and we have 3 separate mines feeding 3 separate plants. Bob, would you like to add to that?
Robert Fulker
executiveThe one point I would make is that a great deal of effort is going into the McFinley ore bodies. Glen and his team are working hard to get a handle on them, just as we did with the Red Lake ore bodies right after we arrived there. And the plan — it's really a straightforward one. It amounts to running the highest grade material through first and producing at a rate that genuinely fills those processing plants.
Alex Barkley
analystYeah, and just following up on that — you kind of mentioned how CapEx shifted at Cowal. Over at Red Lake, was there anything that caught you off guard when moving from last year's figures to these? I mean, you've tacked on a few additional items, Upper Campbell, McFinley. But did any increases come up? Or does all of that just feed into incremental production growth?
Jacob Klein
executiveAlex, yeah, that’s a solid question. I’ll pass it to Lawrie in just a moment. But I’ll just mention that with the September update, we were examining that Phase 1 transformation — 200,000 ounces at under USD 1,000 per ounce. So the CapEx we’re discussing now gets us to that 350,000-plus ounces.
Lawrie Conway
executiveOkay, yes. Alex, honestly, aside from the upside surprise regarding what Red Lake is truly capable of, there aren't any genuine surprises. So, in examining last year's long-term guidance—which fed into our 3-year outlook and this year's plan—what matters is the mine development sequence. It's the plant expansions and, clearly, the Battle North acquisition along with that plant and mine deposit, since those are the sole changes relative to last year's plan. Sure, they add a few hundred million dollars of capital over the next 2 years. But by FY '24, '25 and '26, you do get that payback—as we mentioned, a 170% increase in production plus a 50% reduction in the AISC and AIC. So nothing there caught us off guard; on sustaining capital, I'd say it isn't really a surprise. It's the fact that you now have a 15-, 20-year mine life there. You have some very old equipment. You have equipment that isn't actually suited to what we intend to do at the mine. So we've made that decision to speed up equipment and infrastructure replacement over the next 2 years.
Lawrie Conway
executiveAnd because of that, Red Lake is going to receive most of the sustaining capital, and that wasn't part of our plan the last time around.
Operator
operatorAl Harvey of JPMorgan has the next question.
Al Harvey
analystI just want to ask something quick about Red Lake. I believe you mentioned before an aspiration of 300,000 to 500,000 ounces per annum. I'd just like to know whether that top end of the range remains a possibility, or are you fairly content with the 350,000-ounce target at this point?
Jacob Klein
executiveAppreciate that, Al. It's a solid question. Our long-range plan puts us above 400,000 ounces. Still, given the timeframe and how conservative we are when it comes to guidance and outlooks, the only figure we're ready to state today is above 350,000 ounces. That said, we definitely hold aspirations of exceeding 400,000 ounces, and our long-range plan indicates that this is achievable.
Al Harvey
analystMaybe just one more about recovery at Red Lake. So with the 3 mills you’ll eventually have, should we still expect recoveries to be near current levels, around 91%? And could potential refractory material have any effect, and would that alter your milling strategy?
Jacob Klein
executiveThe recovery rate we're looking for falls in the range of 91% to 92%.
Operator
operatorThat brings us to the end of the question-and-answer portion. I'll turn things back over to Mr. Klein now for some closing comments.
Jacob Klein
executiveThanks, Harmony. Before you head off, I really do appreciate you joining us. I suspect we've managed to go on longer than the Premier of New South Wales did in their morning briefing today on COVID discourse, which is a good thing. It shows there's interest. I'd also like to thank our team for reaching all of these milestones — getting to these milestones has demanded an enormous amount of effort from a very large number of people throughout our organization, and Evolution is genuinely in strong shape, with some terrific opportunities ahead of us and world-class assets in our portfolio. We look forward to bringing you an update on the financial results call. Thanks.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.