Operator
operatorWe appreciate everyone being on the line, and we’re glad you could join us for Evolution Mining’s September 2021 quarter results call. <<operator_script>> At this point I’ll turn the conference over to Mr. Martin Cummings, General Manager, Investor Relations. Please go ahead.
Martin Cummings
executiveThanks, Harmony. Good morning, everyone, and welcome to the September 2021 Quarterly Conference Call for Evolution Mining. Harmony already noted that I serve as General Manager of Investor Relations. Joining us this morning are Jake Klein, our Executive Chairman; Lawrie Conway, our CFO and Finance Director; and Glen Masterman, our VP of Discovery and Business Development, who are with us from the group office in Sydney; Bob Fulker, our Chief Operating Officer; and I am dialing in from Brisbane along with Bob. Three months have now passed since I took over from Bryan O'Hara as GM, Investor Relations. I'll be honest — those 3 months went by in a blur, though that is because they were also transformative for the business as we keep improving the quality of our portfolio. Although 2021 has proven a difficult year for gold equities, the macro backdrop still supports the investment case for gold. Economies are attempting to reopen and restart after COVID lockdowns, while at the same time grappling with rising inflation, and decisions were made to scale back economic stimulus programs. Geopolitical tensions persist, particularly in Asia, and the possible fallout from a collapse of heavily geared Chinese property developers is still a worry. While we can hope such events push prices higher, our focus stays on delivering value to our shareholders regardless of what the gold price is.
Martin Cummings
executiveHaving said that, I'll pass things over to Jake now so he can walk us through the September 2021 quarterly report.
Jacob Klein
executiveThanks, Martin. Good morning, everyone, and thank you for joining us. We do appreciate it. For those of us in New South Wales, it feels good to be returning to a normal life, although it's clear that living with COVID means a new normal, wearing face masks, getting vaccinated, proving you're vaccinated wherever you go and a welcome return to conversations with real people rather than virtually on Teams or Zoom. At Evolution, we are encouraging everyone to get vaccinated and are looking forward to the opportunity to travel again soon. Recognizing the need to get on the ground, I want to thank Bob Fulker, our COO; and Glen Masterman, our VP, Discovery, for traveling to Red Lake this last quarter and enduring a 2-week quarantine on their return. Their visit to site was invaluable and a good reflection of their commitment to our company. Turning to the quarter's results. We delivered a first quarter that exceeded our production guidance at lower cost than the AUD 1,450 an ounce we guided when we released our full year results on the 19th of August. This is a pleasing outcome and a good way to start the year. You will hear more from Bob on the makeup of these results.
Jacob Klein
executiveHowever, I’d like to spend a moment highlighting a few strategic wins from the quarter we just closed. There are several, and I recognize our team has put in enormous effort to deliver on many operational and strategic fronts at once. At every one of our cornerstone assets, we hold projects that will substantially raise value over the longer term. Cowal secured approvals from the New South Wales government for our $380 million underground development, and work began accelerating as key contracts were awarded. Obtaining that approval represents a major accomplishment. Just as significant, the Stage H cutback at the open pit has now reached ore. And beginning this quarter, you will begin seeing the payoff from processing higher-grade material. That will build quarter by quarter across the rest of FY '22. At Red Lake, integration of the Battle North acquisition carried on. Our geologists are searching for an analog to the high-grade zone, and our development rates are meeting their targets. Plenty of work remains at the operation, yet the turnaround to bring Red Lake back to its standing as a premier Canadian gold mine is building momentum. We understand what needs doing. We understand how to get it done.
Jacob Klein
executiveAt this point it comes down to execution and delivery. Ernest Henry keeps adding to a superb track record, and the concept study for mining beneath the current reserves has now advanced to pre-feasibility study, with rising confidence that mine life will be extended. Buying the Kundana and EKJV operations from Northern Star changes the game for Mungari and has lifted it to become our fourth cornerstone asset. We only received the keys in late August, and already the effect on grade and ounces is visible. Our focus is now moving toward integrating and optimizing those operations so we can improve efficiencies and cut costs. Importantly, last week we signed a life of mine tolling agreement with our partners, Rand and Tribune, to treat 100% of the EKJV material at Mungari. That marks an important milestone, since previously the ore was split and treated at different mills, which created significant complexity. I encourage you to watch the emergence of the discovery at Cue, where we are earning 75% as the strike length has now grown to approximately 1.6 kilometers, and we are starting to intersect interesting widths and grades in the bedrock. Earlier this month, we again delivered on our strategic commitment to keep improving the quality of our portfolio by selling Mt Carlton for up to $90 million to Navarre Minerals.
Jacob Klein
executiveAnd then, we made our 17th dividend payment in a row and bolstered the balance sheet through a USD 550 million U.S. private placement bond issue that was timed and priced very well. It was a busy quarter, but if I stop and think about it, I believe it has put the company in a significantly and positively stronger strategic position. In a couple of weeks, on November 2, we will mark 10 years as Evolution. We take enormous pride in everything we have accomplished across the last 10 years. A great overview of that appears in our annual and sustainability report, which came out on Monday this week. It does a good job of capturing the incredible journey we have been on, and we are excited and confident that the best is yet to come. With that, I will pass it to Bob.
Robert Fulker
executiveThanks, Jake, and good morning to everyone. On a positive note, our TRIF came down a bit in the September quarter, landing at 9.1. That quarter was a stronger-than-typical result, with 171,000 ounces produced at an all-in sustaining cost of $1,430 an ounce. Both our production and our costs came in better than what we guided in August. Cowal delivered a solid quarter, producing 52,500 ounces along with mine operating cash flow of $48.5 million. The planned maintenance shutdown in August proceeded as scheduled, despite the complications that COVID created. That is chiefly why we expect the elevated AISC in Q1. Our approach of delivering while investing in Cowal's future carried on, with a further $37.7 million directed to major capital, mainly toward the IWL and the underground project. Work on the underground project keeps ramping up. The project team is now in place, and recruitment for long lead items has begun. The project remains on schedule and on budget. A couple of milestones were achieved during the quarter. Stage H is performing well, and ore availability will rise in the quarters ahead. Commissioning of IWL stage 2 got underway, and deposition began shortly after quarter end. Ernest Henry again contributed significantly to the group, producing 24,000 ounces at another record low all-in sustaining cost of negative $1,345 per ounce, while generating net mine cash flow for Evolution of $80 million.
Robert Fulker
executiveTurning now to Red Lake. My inaugural flight in 18 months wasn't exactly a pleasure, but returning to Red Lake for the first time in 18 months made the hassle worthwhile. Over my 2.5 weeks at the site, I could genuinely develop a solid sense of both the opportunities and the challenges that remain ahead of us. The enormous opportunity at Red Lake gives me confidence. That said, as we've said from the beginning, this turnaround is a long one, and patience is required. Still, nothing stands in the way. As I noted last quarter, the early emphasis has been on delivering steady development meters so that additional mining fronts can be opened up. After the July forest fires, when we lost over 7 days of underground access, development has improved steadily, with 1,183 meters delivered in the September quarter. Our stated target of 1,200 meters is nearly reached, and I'm confident this milestone will be hit this quarter. We now need to sustain this rate for future ore availability. Most of Q2 production is predeveloped, but the ounces delivered in the December quarter will require better efficiency in their stoping cycle — we need improved efficiency in our stoping cycles, sorry.
Robert Fulker
executiveWhen we examined the constraints around the stoping cycle, we confirmed the mucking and filling capacity we have installed is sufficient. What needs to get better is the drilling and blasting cycles, since drilled and blasted stocks are low right now, and slow stope turnover is making that worse. We've started drill and blast improvements aimed at lifting the stope production cycle and cutting potential dilution problems. Red Lake turned out 24,000 ounces in the quarter. That came from mine tonnes below plan along with lower grade, because a larger share of development ore went into the mill feed. That production result, together with a period of heavy capital investment, left mine cash flow negative. Operating cost expenditure, however, is tracking to plan, and the higher AISC reflects the reduced gold output. A few milestones marked the quarter: the CYD decline reached 136 meters into the Upper Campbell region. The McFinley decline broke through right on target, removing the access strip from the shaft that poses geotechnical challenges. And the cable mill is beating even optimistic throughput rates, and the site continues to see additional capacity there. For the Mungari operation, the Kundana and East Kundana acquisitions are a genuine game changer.
Robert Fulker
executiveEven though the integration only happened during August, the boost in grade that came from directing the Kundana fleet's ore into the Mungari mill proved decisive in achieving the quarter's 35,000 ounces. That works out to a 39% rise in feed grade versus the prior quarter, reaching 2.12 grams per tonne. With more development done, Kundana ore processed first, and all our people now aligned with the Evolution way of working, it has been an enormous quarter. Having closed the transaction and transferred the workforce over, we are now focused on optimizing the combined operations to bring costs down. Capital spending during the quarter went mainly toward the TSF stage 4 expansion and ongoing open pit development. Mine production at Mt Rawdon came to 20,000 ounces, with an all-in sustaining cost of $1,420 an ounce and net mine cash flow of $9.3 million. Ore mining on the western wall has restarted, positioning the operation for steady output or to feed coming quarters. Mt Carlton produced 15,700 ounces of payable gold in the quarter, at an all-in sustaining cost of $1,773 an ounce and net mine cash flow of $10.3 million. I'd like to take this chance to thank Anton Kruger and the Mt Carlton team for their tireless work cutting injuries at Mt Carlton and for delivering on their promises over the last couple of years.
Robert Fulker
executiveMy view is that they've left things in excellent condition for Navarre to keep running successfully going forward. To sum up, during the quarter we achieved ounces and AISC that were on track and in line with guidance, and we're positioned to meet the production and cost guidance for the year. I appreciate your time, and now I'll pass things to Glen.
Glenton Masterman
executiveThank you, Bob, and good morning to everyone. Last week we announced fresh drilling results from the Cue joint venture, and those results have promisingly widened the mineralization footprint at this new and emerging discovery on Lake Austin in Western Australia. These recent results have strengthened our confidence in this high-quality project, and they also confirm the original site selection by our discovery team, which is what led to the formation of our partnership with Musgrave Minerals in 2019. You can find the best intersections highlighted on Pages 14 and 15 of this morning's report. Importantly, we have examples on cross-sections across the trend showing multiple wide intervals of gold in neighboring drill holes, and we are seeing the same thing repeated on adjacent sections. This gold in regular mineralization, an extensive mineralization footprint, 1.6 kilometers south from our previously reported diamond drilling results on West Island. The significant mineralization identified at West Island, and now in the new aircore results, is hosted by a favorable dolerite unit, which is geologically continuous along strike. These new results have delineated mineralization in the deeply weathered and oxidized part of the regular profile, which overlies fresh bedrock underneath. The current diamond drilling program is aiming to delineate the fresh rock source of mineralization in the bedrock.
Glenton Masterman
executiveAssay results are in for 2 of the 7 new diamond holes at West Island. Hole 24 delivered the strongest numbers: 8 meters at 3 grams, with a section of just under a meter at 20 grams inside it. It's narrow, yes, but high grade is showing up there, and that's a key element we'd like to encounter more often. The 75% earn-in on the Cue JV is now well within reach, and together with our partner Musgrave we're putting together plans to speed up the diamond drilling program across the coming several months. Over at Red Lake, our drilling has been launched from a spot in the hanging wall of the Red Lake ore bodies, serving two aims at once: testing a geological analog of the high-grade zone and looking at possible extensions down-plunge of the R Zone, one of the Campbell ore bodies. The initial hole ran more than 1,000 meters and hit mineralization in the footwall of the Kovala fault, thought to be a possible extension 500 meters down-plunge of the R Zone's current mining front. That 100 intersect footwall ereported on Page 11 of the report opens new real estate in a previously untested but favorable geological position.
Glenton Masterman
executiveWe can't yet say how this will play out over time. That said, the follow-up hole is now being drilled, and it will help us learn whether this new opportunity has potential scale, and it will also test another location for high grade that could be tied to the Kovala fault. At Cowal, we currently have 2 diamond rigs drilling underground in the Galway ore body, working from the Galway decline. More than 10,000 meters were drilled in the quarter. The new results, which will be folded into our year-end MROR analysis, keep sharpening our geological understanding of the underground ore body, which lets us further optimize the mine plan for the first years of underground production. At Mungari, we're glad to be able to report consolidated drilling results across Kundana and East Kundana after acquiring these assets in August. Underground drilling at Kundana focused on verifying small resource extensions and classification upgrades in future mining areas next to existing development. At Kundana, we continued to step out — sorry. At Kundana East, we continued the main K2 structure, which hosts the high-grade laminated vein style mineralization at Rubicon-Hornet and Pegasus. The results show mineralization extends beneath the deepest development levels at Pegasus and Rubicon, and they also confirm some modest extensional opportunities at Pode and Hera.
Glenton Masterman
executiveDrilling that steps out into the footwall zone of the K2 structure has delivered several encouraging intercepts of stacked lodes mineralization at Startrek. We're presently hitting this mineralization through wide-spaced drilling across roughly 1 kilometer of strike. Additional drilling and modeling are set to carry on during the December quarter so we can deepen our understanding of this possible future mining opportunity. On that note, I'll pass things over to Lawrie.
Lawrie Conway
executiveThanks, Glen, and good morning, everyone. I'm glad to have this chance to walk you through how we did financially this quarter, which is laid out on Pages 8 and 9 of the report. From an operational standpoint, it was another solid quarter, with operating cash flow of just under $194 million and net mine cash flow of $67.5 million. That came after we put roughly $35 million into sustaining capital and $90 million into major projects. Both our production and our all-in sustaining costs are still tracking toward the group guidance we set for the year. When we released that guidance in August, we noted that FY '22 would be the first year in a couple of years in which we make a significant investment in our future growth projects. That investment has begun to ramp up, and the good news is that every project remains on track and to budget. Our capital guidance for the year is unchanged, at $123 million to $148 million for sustaining projects and $430 million to $495 million for major projects. One positive this quarter is that cash generated from operations came in higher than planned, thanks to production and costs staying on track and to higher metal prices achieved. That gave us group cash flow of $30 million, and we paid $92 million for our FY '21 final dividend.
Lawrie Conway
executiveIf we factor in the debt repayments along with the completion of the Kundana acquisition, the quarter closed with a cash balance of $422 million and net bank debt of roughly $468 million. That put our gearing at 13.4%, which sits comfortably inside our tolerances. During August, we successfully priced a USD 550 million private placement, which has strengthened the balance sheet further and boosted its flexibility. It extends the debt maturity profile beyond 7 years, with the next major repayment of $240 million not due until FY '26. Also, in the December quarter, we expect to receive $26.8 million as part of the proceeds from the Mt Carlton divestment. The company's financial position is very strong and keeps supporting the execution of our growth strategy. Thank you for your time this morning, and Harmony, please open the lines for questions.
Operator
operator<<operator_script>> The initial question will be from David Radclyffe of Global Mining Research.
David Radclyffe
analystMy question concerns Red Lake, and clearly the lower-grade approach has depended on increased tonnage. Campbell is on the way, of course. But what is it that actually generates greater tonnes from the historical zones? Bob listed a few things, I believe. Perhaps you could say more about them. And then how does that shape your thinking regarding McFinley? Does it lead you to consider possibly advancing that sooner so as to provide a new mining front and, in that way, keep the mills running at capacity?
Jacob Klein
executiveThanks, Dave. Expanding into new mining areas is absolutely the top priority. That said, Bob has been on the ground there, so I’ll pass that question over to him.
Robert Fulker
executiveThanks, Jake, and thanks, David. Yeah, so the plan is really to get additional mining fronts opened up so we can remove the constraint on the cycle. Campbell — we'll bring in a new mining front, or Upper Campbell, sorry. But right now what we're focused on is getting an extra mining front at Cochenour and in lower Red Lake, since we currently have access to those. And we're opening up areas such as aviation. There's a zone known as NMPP. There's a zone known as Upper Hanging Wall 7. So we're trying to get those opened up in order to, as I mentioned, take the constraint off the cycle. The problem with the Campbell decline, or the CYD decline, is that we've consistently stated that within 12 months we'll be getting ore, and we've still got a fair distance to go before that one opens. Regarding McFinley, we still have a great deal of geological knowledge to gain there. We now have access to it through the decline — a decline broke through. Happily, from a survey standpoint it was spot on. So that was a nice target to hit. But the next step is really to give the geologist a solid amount of time to understand, first, the geology; and second, the ore mineralization.
Robert Fulker
executiveGlen, was there anything you actually wanted to add regarding the mix in the ore body?
Glenton Masterman
executiveBob, I'd say your summary captures it fairly well. After we open it up, we'll be in a position to begin applying or building out what we know geologically. We also have to drill additional holes from angles that are more optimal. That, essentially, is the plan from here on.
Jacob Klein
executiveDavid, the sole point I’d tack on is that right now, the bulk sample will come from McFinley’s, though that only appears in our plans after 2030. As Bob pointed out, we have plenty of mining fronts that we aim to open up ahead of that time.
David Radclyffe
analystOkay. Perhaps I can probe a bit further on this. Bob, I believe you brought up the stope cycle. Could you elaborate on what's going on there, since that seems to be a new development? Is it the systems? The ground? The equipment? Or some mix of those? And how fast do you figure you can fix it?
Robert Fulker
executiveThanks, David. I was kind of hoping Jake might actually chime in there for a moment.
Jacob Klein
executiveNext month I’m scheduled to head to Red Lake, and I’m waiting for that trip. After that, I’ll be in a position to respond.
Robert Fulker
executiveIt's a mix of several factors, though the biggest ones involve the systems themselves and how long their cycles take. A lot of that comes down to those specifics, David. Having more mining fronts available lets us operate in several areas simultaneously, which keeps us from getting in our own way. Drilling has caused problems. Powder factors have caused problems too. Placing the paste curtain, or the initial wall, correctly reduces how much rework comes from paste making and ground support rehabilitation. All of that is now coming up to speed within the cycle. One straightforward illustration: we placed an order for a couple of V-30 slot raises, which lets us raise the spend on bringing in the slots and the stope initial blasting. Those should show up this month. So I'd say it's partly all of those items and the above. It's also partly the green conditions and the learning curve on our side. We altered the hole size — our hole diameter — which allows us to boost our drilling rates. That has actually delivered some benefit over the last 3 weeks. I hope that gives you a sense of it.
Operator
operatorThe following question is from Daniel Morgan at Barrenjoey.
Dan Morgan
analystIf I could, I’d like to say a bit more about Mungari and those toll treatment arrangements. Could you walk us through the way they operate? Does that count as revenue, and how is it recognized? Is it material or not? And then, how much do you intend to mill from each of the different components that now make up Mungari — EKJV, Kundana, Frog's Leg, White Foil, and so on?
Jacob Klein
executiveI'll have Lawrie walk us through the tolling arrangements, and then perhaps pass things to Bob regarding the mix.
Lawrie Conway
executiveYes. Thanks, Jake. Thanks, Daniel. So, with the toll treating arrangement, we'll campaign the mill through each quarter. Generally, that's about 1 month per quarter. We'll kick off the first one later this month and it will run for roughly 3 to 4 weeks. And the arrangements will involve cost reimbursement for that toll treating. That gets recorded as an offset to the cost we incur, whether in processing, admin, sustaining capital around tails and similar items. So that's how it will be reported on the cost side. And then on production, we'll only report our attributable production and our attributable tonnes through the plant, along with our attributable grades and recovery, respectively. And Bob, I'll hand it over to you for the various ore sources we'll have this year.
Robert Fulker
executiveThanks, Lawrie. So the feed will come around a little bit at about — if I were to say a milling rate of 2 million tonnes, and it's probably going to be slightly under that for a few other reasons. But there's roughly 1 million to 1.1 million combined from the underground. The balance will come from the open pits, and that will be lower grade. The underground feed is globally around about 30% to 35% from Kundana and East Kundana, and the remainder coming from Frog's. Does that help?
Dan Morgan
analystThat does. It indicates Frog's may still have some life remaining. Could you speak to that? I figured we might be wrapping that up shortly.
Robert Fulker
executiveGlen, just quickly on Frog's — based on what we know right now, there's still roughly 12 to 18 months to go, correct?
Glenton Masterman
executiveYes. So what's left on that runs through the close of next calendar year and slightly into Q1 of calendar year '23. That leaves just over 12 months remaining for Frog's Leg.
Dan Morgan
analystAll right, and perhaps turning just to Cowal. Could you maybe go into a little more detail about precisely where we stand with the Stage H reductions? So what I'd like to know is the material. When will Stage H be complete? What amount of money has yet to be spent? When ought we to see the benefits showing up through grade? And when does that project wrap up?
Jacob Klein
executiveI’ll have Lawrie take that one. Dan, before I turn it over to him, I’d just note that everything we discussed regarding Mungari was reflected in the guidance update we provided after the acquisition.
Lawrie Conway
executiveThanks, Jake. Yes, Daniel. So basically, by the end of September, the bulk of the material waste movement tied to the Cowal Stage H cutback is complete, and the order waste ratio has reached a level we'd consider commercial production. There was a small amount in September. So essentially we've wrapped up capitalizing on Stage H as major waste development. And from here on, as Jake said, quarter by quarter, we'll see grades rise compared with what we achieved during the last couple of quarters. We shifted from stockpiles to primary feed from the pit.
Dan Morgan
analystAnd regarding that grade, could you give a bit more detail on what the path looks like across the coming couple of years? My understanding is that you were set to go beyond a 1 gram tonne as well.
Glenton Masterman
executiveYes. So for the remainder of this year, the grade will rise to roughly 1 gram per tonne during the December and March quarters. Then, as the year wraps up, it will climb to 1.1. And through FY '23 and beyond, you'll be sitting in that range of 1.1 to 1.2 grams per tonne.
Dan Morgan
analystAnd then for the last question, just on Ernest Henry — when should the market expect an update on the study beneath the 1,200 RL?
Jacob Klein
executiveMy understanding is that Glencore completed their MRR late this year, so my guess is it lands in the first quarter of next year. That said, as we noted in the report, the concept study comes across as quite positive — they've moved it along to the pre-feas study, and the mine life extensions appear promising.
Operator
operatorMatthew Frydman with Goldman Sachs has the next question.
Matthew Frydman
analystPerhaps Lawrie could take that one first. If we look at how much major CapEx grew in the quarter, you spent roughly $90 million. Annualizing that rate—multiplying by 4—puts us at $360 million. Your guidance is $440 million to $510 million. So I'm just curious what accounts for that gap. Is it simply timing tied to key projects? And specifically, spending on the Cowal underground looked fairly light in the quarter, even though your advance rate came in above budget. I'm wondering whether that might be the main factor behind the difference, and how that Cowal underground spending could ramp up over the year.
Lawrie Conway
executiveThanks, Matt. Now, at Cowal, regulatory approval didn't come through until the end of September. So it's the mining portion that ramps up across this year. We expect capital in the second half to run roughly 40% to 50% above the first half, and that's going to be the mining. It also reflects the accommodation, the pace plant and other infrastructure projects coming together. So that's kind of why you can't simply multiply it by 4. And in a similar vein, looking at Red Lake, it'll be only, I'd say, $5 million to $10 million per quarter above what we delivered in the first quarter. Same situation as they ramp up with the CYD decline while we do some work on commissioning the Bateman mill and wrap up the bulk sample work at McFinley, and the final major project in the second half of the year will be around the tails and ammonia plant.
Matthew Frydman
analystThanks, Lawrie — that's useful. I think while I have you here: back in July, if I recall correctly, you said that as you began the year you were seeing labor costs up roughly 3% or 4% compared with a year earlier. Does that still hold? Are there any other places where costs are rising — whether operating or capital — that differ from what you noted, or anything else you'd flag?
Lawrie Conway
executiveNo, Matt. On the labor side, we wrapped up the annual review for the whole organization, and it happened in September. So that's now being finalized, and across the organization we came in at an average of roughly 3%, 3.5%. As for the contract rates we've bid on some of these mining contracts being awarded, we're seeing waste levels with increases similar to what we'd anticipated for our business. So nothing there worries us. We've recently done a couple of contracts for consumables. Happily, those have either been flat. A couple came in 3% to 4% below the expiring contracts, and then a couple are probably about 3% to 5% higher. What I think we're up against, though, heading into the remainder of this year, is labor, as we've consistently mentioned. WA is the hottest market, and people availability will be our focus area there. Then in logistics, we've encountered some problems with delivery times owing to COVID and moving items around from other countries that have had to contend with the pandemic somewhat worse than we have. So certain delivery times have been pushed out on the order of 4 to 6 weeks, but nothing that sits on a critical path of material issues for us.
Lawrie Conway
executiveAnd then, finally, in certain segments like tires and those consumable items, as demand picks up slightly, what matters most is ensuring new agreements are secured—we’ve spent the past 3 to 4 months working to see that our contracts are renewed and to obtain the allocations we require for the coming couple of years.
Jacob Klein
executiveAnd there's probably one thing, Matt — Glen is definitely tired of me reaching out to him about it, whether by phone before or on Teams these days as we start returning to the office in person — and that's the assay results from this promising-looking core he keeps telling me about, and then I keep pressing him on whether the assays have come in yet. Assays are definitely our bottleneck.
Matthew Frydman
analystAll right. Yes, that feedback appears fairly consistent. Last thing from me on Mungari. Jake, you said the focus now is on removing costs from the Kundana acquisition. I'm just curious whether you could give us a sense of which cost drivers there you potentially view as an opportunity going forward at Kundana. Is it the material flows in the milling? Is it the mining cost? I'm just wondering where your focus will be. And second, can you remind us of the timing of the mill expansion study? And have you considered or run the numbers on whether there's an opportunity for third-party tolling in the region? Is that an attractive option until you can execute on that mill expansion, given the discussion we just had around Mungari processing plant feed and the mix and the capacity there?
Jacob Klein
executiveThanks, Matt. The way I see it, the biggest opportunity comes from the fact that these operations have been run as 3 separate operations. The EKJV operation was separate -- run separately from the Kundana operations, and obviously, our operation was run separately to those 2. So the opportunity now provided by getting this toll milling treatment in place is to try and integrate them and really optimize them from a labor planning, equipment, maintenance perspective right across the operations. And on first pass, look, we think there's real opportunity to make it a lot more efficient than it's previously been operated. Now we're still getting to know it. We're still learning, but there is tremendous opportunity to improve efficiencies at the operation. With regard to the mill expansion, we are completing that study. It will be completed this quarter. But we're probably just going to take sort of a deep breath and look at it and see how best to optimize the Mungari region in our next planning cycle to see whether going for more tonnes is the right strategy versus kind of optimizing for profitability and margin and at a lower throughput. So watch this space. We'll have all the data available, but it will also depend on how we go in terms of integrating and optimizing the operation.
Matthew Frydman
analystAll right. You likely already addressed what I was asking when you talked about prioritizing margin in deciding if bringing in any third-party toll treating makes sense. Still, do you have any thoughts or remarks on that front — specifically, could you leverage spare capacity at an outside treater?
Jacob Klein
executiveAbsolutely. That said, we aren't a materials processor — we're a mining company, and that will always come first for us. So if such an opportunity came along, we'd certainly consider it, though it probably wouldn't be a major driver.
Operator
operatorAl Harvey of JPMorgan has the next question.
Al Harvey
analystI was hoping you could give a quick recap of the Mt Carlton divestment and explain why you decided to take an equity stake in Navarre. I suppose I'm trying to understand the thinking behind that. There's some interest on my side in the Victorian exploration ground. Any thoughts on the reason that option was chosen would be helpful.
Jacob Klein
executiveYes. Thanks, Al. So, on the Mt Carlton divestments — the reasoning behind that is pretty straightforward. It represents 1.6% of our reserves, it has a very short mine life remaining, and it isn't material to our growth expansion plans. We've kept exposure via the contingent payment, and we chose to hold a little additional exposure through the equity component, both to back their equity raise and because we want some exposure to their delivery and discovery track record, which Ian Holland has. So it isn't a material amount for us, but it does give us some exposure to Ian's discovery track record.
Al Harvey
analystAnd perhaps it's more about the portfolio in general. We're down to 5 assets at this point. I believe in the last strategy presentation you mentioned the target was 6 to 8. So is forming JVs on early-stage projects a path forward for you to raise that count, working with Cue and similar outfits? Or are you still running rollover operating assets?
Jacob Klein
executiveYeah, we keep evaluating things. I mean, our hope is that Cue becomes the sixth operating asset, though it's still some distance from that point. Glen's discovery strategy was established a while back, and Cue is the product of several years of execution against that strategy. So they have some other items in the pipeline, and we're building momentum in that area. From where we sit, 6 to 8 assets is the ideal count. But if we ended up with 5 operating assets generating more gold and more money, that would also be a good result for us.
Operator
operator<<operator_script>> Our following question is from Kaan Peker of Royal Bank of Canada.
Kaan Peker
analystI've got two questions. The first is about Mungari. It looks like a really strong quarter. I realize it's still fairly early, and this touches somewhat on what Matt raised earlier. But when it comes to cost performance and the actual processing of the EKJV, how are costs tracking against those expectations from before the Kundana acquisition? And I'm also curious whether it opens up, or leads to a reevaluation of, the existing resource base at White Foil, Frog's Leg and Castle Hill. I'll come back with my second one.
Jacob Klein
executiveYes. I’ll let Lawrie take that one. I’ll just say that once we had acquired the EKJV and Kundana tenements, September was clearly a stronger month than July and August. Over to you, Lawrie.
Lawrie Conway
executiveThanks, Jake. On the grade, I’ll handle the cost side. Yeah. So, what we’ve observed across the first 6 to 7 weeks is that costs are tracking as planned, but as Jake said, we do see opportunities for efficiencies between Kundana and East Kundana. And over the next couple of quarters of toll treatment, at the same time, the on-site team has started examining how they can truly optimize that cost base and essentially treat it as one component of the overall Mungari operation. So some work remains, and we’d expect that to emerge through the FY ’23 long planning process. But right now, they are tracking to plan, and going forward, what we see are opportunities to improve on that. On the resources side, Glen, perhaps I’ll pass that to you regarding what we’ll see as Kaan was asking about opportunities to add more resources there at Mungari.
Glenton Masterman
executiveLook, I think regarding the — moving in, I mean, I believe there were a few mentions of White Foil in the pits. I think, really, there is clearly mineralization located beyond our resource shales. But whether that gets included or excluded is really — is always going to hinge on what assumptions we make about metal prices. And right now, those stand at $3,000 per resource, or AUD 2,000 per resource, and $1,450 for reserves. So I'd expect that to remain fairly stable going forward. I think the genuine opportunities for us at Kundana and East Kundana really involve looking at sort of depth extensions of the ore bodies we know. There are sort of smaller opportunities in the footwall and the hangwall. We're picking up extensions of loads, such as Pode and Hera. I mentioned Startrek earlier, which is a footwall or an example of footwall mineralization on the K2 structure. It's early days there, but we've picked it up in white space drilling. So we believe there are incremental resource growth or resource growth opportunities. And as we keep learning about those assets, we'll be sort of prioritizing where we think the greater scale and opportunity for grade will be.
Jacob Klein
executiveI'd like to build on that point, Glen. Without question, our tenement areas hold plenty of low-grade material—Castle Hill is one example, and Carbine, which we acquired, is another now. The task facing Glen and his team is to locate extensions or further discoveries of higher-grade zones, since that would be a real boost for us, given that grade comes first.
Kaan Peker
analystSure. And I think you also brought up Carbine. I'm just curious about the long-term planning process, I suppose, that was mentioned earlier in FY '23. How do they — how do you look at those assets, especially since they're located beyond that 50 kilometer range, including Carnage?
Jacob Klein
executiveRight, so as you'll recall, at one point we were sort of building out Castle Hill as a standalone thing. These days, though, with Carbine sitting there, that's really where the center of gravity lies for the entire region. That said, we're in the middle of a capital-intensive stretch right now. We've been putting a lot of money in over the last couple of years. As a result, the bar is set very high at present for any further capital projects to get off the ground. So I'd say it stays in the portfolio, and it's a matter of waiting, seeing, and optimizing as we move forward. But there's no priority to go out and build a new plant at Carbine purely to get more production.
Kaan Peker
analystRight, got it. And one last thing, actually, before I hand things over. On Red Lake — any update you can give us on approvals at the Bateman mill, or anything along those lines?
Jacob Klein
executiveMy view is that the mill can effectively run at 450,000 tonnes per year on a permanent basis. Its rated capacity is 650,000 tonnes. And I believe Bob's opinion is that, without much in the way of extra mechanical upgrades, it could handle 900,000 tonnes. It's a mill that is very well set up — not overcapitalized. At Red Lake, for us, permits and approvals aren't a constraint at this point in time.
Kaan Peker
analystWasn't that constraint related to transportation?
Jacob Klein
executiveRight now, we're just pulling a bulk sample from either the Bateman or the McFinley deposit. So that doesn't strike me as a constraint, or at least I haven't come across it being a problem that might hold things up at this point.
Operator
operatorThat brings us to the end of the Q&A session. I will now return the call to Mr. Klein, who will offer some closing comments.
Jacob Klein
executiveThanks, everyone. It’s been a really busy quarter, and I appreciate you making time—I know today is busy too. Our AGM falls on 25th of November. At that point we’ll be marking 10 years as Evolution. It’ll be virtual rather than in person, so please do join us. Thanks very much.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.