Evolution Mining Limited (EVN) Earnings Call Transcript & Summary

April 21, 2022

Australian Securities Exchange AU Materials Metals and Mining earnings 57 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for holding, and welcome to the conference call on Evolution Mining's results for the March 2022 quarter. Everyone joining is in listen-only mode for now. After a presentation, we'll hold a question-and-answer session. <<operator_script>> At this point I'd like to pass the conference to Executive Chairman Jake Klein. Over to you.

Jake Klein

executive
#2

Thanks, Omni, and good morning everyone. We're glad you could join the call and appreciate your time. Bob Fulker, our Chief Operating Officer, is taking a well-earned break from today's call, so with me are our Finance Director and CFO, Lawrie Conway, and our VP Discovery and Business Development, Glen Masterman. On the macro front, U.S. inflation climbed to 8.5% this quarter, the highest it has been in 41 years, while unemployment in both the U.S. and Australia sits at historic lows. Russia's invasion of Ukraine is now in its third month, with the conflict showing no signs of easing, and COVID keeps causing havoc for people's health, workforce availability, and supply chains. Closer to home, in February and March, the Australian East Coast was hit by heavy rainfall and flooding that tragically killed 21 people and forced thousands to evacuate their homes. Against that backdrop, gold has been doing its traditional job as the best hedge against inflation and geopolitical uncertainty. Sadly, for the world, I expect these issues to persist. Turning to Evolution's quarterly reports and our performance, starting on slide three of the presentation. Today's report contains many highlights, but for me three stand out clearly.

Jake Klein

executive
#3

To start, our portfolio has been reshaped into one of the gold sector’s highest-quality, lowest-cost, cash-generative, growth-focused portfolios. 148,000 ounces of gold, produced at an all-in sustaining cost of A$990 an ounce, which was US$770 an ounce, represents a 27% decrease quarter-in-quarter, and that puts us very near to being the lowest-cost gold producer of scale anywhere in the world. Operating mine cash flow rose 33% to $269 million. Net mine cash flow climbed 135% to $124 million, though most of the $144 million in capital is being directed toward our most significant organic growth opportunities at Cowal and Red Lake. We paid our 18th consecutive dividend of $55 million, which brings total dividends paid to shareholders to $1 billion. Second, there is the effect of 100% ownership of Ernest Henry and the transformation at Red Lake. On the last quarterly report conference call three months ago, I stated that I was confident that by securing 100% of Ernest Henry, we had completed what is likely to prove one of the most transformative deals in Evolution’s short history. Today’s quarterly report proves this. The numbers speak for themselves. Copper production more than tripled to over 13,000 tonnes, producing an all-in sustaining cost of negative $2,000 an ounce, and the mine generated $185 million in operating cash flow.

Jake Klein

executive
#4

Gold sales came in above production, reaching 39,000 ounces, thanks to an extra 20,000 ounces of gold sold — this followed the cancellation of the prior economic interest. If you set aside the effect of those sales, operating cash flow during the quarter would have come to $137 million, and all-in sustaining costs would have been negative $4,200 per ounce. At Red Lake, the transformation picked up very meaningful momentum this quarter, with production rising 67% to 33,000 ounces. We anticipate pushing that above 40,000 ounces in the June quarter. That speaks to the considerable efforts of our people at Red Lake and the operations team under Bob's leadership. There remains plenty of work ahead of us, yet we are delivering tangible progress when it comes to creating value at this operation. Third, I felt proud of the resilience our teams showed. As I noted a few moments ago, COVID and rain events created difficulties across the country during the quarter, and we were affected as well. More than 25% of our workforce at Calow tested positive for COVID during the quarter — that came to 199 people. Fortunately, everyone is recovering. Naturally, this does not include the effect of those individuals who had to isolate after being deemed close contacts.

Jake Klein

executive
#5

Even so, we managed not just to post a solid quarter at Calow — the team also planned and carried out a Mills shutdown spanning seven days that was extremely demanding from a logistics standpoint, requiring roughly 300 contractors to gather across the sites. With highly rigorous protocols in place, nobody involved in that shutdown returned a positive test. During the quarter, record rainfall along the East Coast hit both Calow and Mount Rawdon. Cowal came through it, but at Mount Rawdon it caused some instability in the north wall of the open pit. While that is being handled, it has affected and continues to affect our capacity to reach higher grade oil from the open pit, and it also forced the crusher to be idled for nine days. As everyone is aware, Red Lake's weak performance during the first six months of the year gave us almost no runway against our original guidance, and factoring in these new developments, we have cut our FY 22 Production guidance by 20,000 ounces, or 3% from the low end, to approximately 650,000 ounces. We anticipate a strong fourth quarter, with production rising by roughly 22%.

Jake Klein

executive
#6

Our sector-leading all-in sustaining cost guidance remains unchanged at $1,135 to $1,195 an ounce, so we'll keep producing high-margin ounces. Moving to slide four, we've laid out the results from Ernest Henry. Since it's a copper-gold mine, comparing it with other gold mines is difficult. Cash flow is the best metric. And by that metric, I'm confident very few gold mines in Australia generated $175 million in net mine cash flow this quarter. We've decided to treat the copper as a by-product credit, which yields an exceptionally low cost of negative $2,000 an ounce. Another way to view this is on a gold-equivalents basis. Seen that way, production for the March quarter would have equated to 95,000 ounces of gold, or 380,000 ounces annualized, at a low all-in sustaining cost of A$1,150 an ounce. The charts on slide five illustrate the transformation taking place at Red Lake. I'm especially pleased that we built momentum during the quarter, with March the strongest month and, in many areas, setting all-time records at the operation. Having consistently delivered about 1200 meters of development over the last six months, the Red Lake transformation plan now targets consistently and safely mining 3000 ore times per day.

Jake Klein

executive
#7

We hit that milestone in March, when 106,000 tonnes were mined — more than 20,000 tonnes above the mine's prior monthly record. And encouragingly, that mining rate has carried through into April. Continuous enhancements to our mining methods keep lowering stope dilution, which lifted mine grades by 17% in this quarter. Throughput at both the Red Lake and Campbell mills is running at record levels. The CYD decline, which will become a key new source of higher-grade material, has built real momentum and remains on track for first production ore in the September quarter — just six months from now. We're expecting production to rise above 40,000 ounces in the June quarter, and our focus is on holding that level consistently through the following few quarters. Although we're a few quarters behind where we originally planned, we remain confident in Red Lake's potential to become a 350,000-ounce-per-year, low-cost operation. Moving to slide six, the Cowal underground project is still on budget and on schedule for critical path activities. Key procurement milestones moved forward this quarter, and the award of the main mining and drilling contract is imminent. That will finalize the awarding of all material contracts.

Jake Klein

executive
#8

Initial ore output from this project is still tracking toward the quarter of June 2023, at which point the pace funds will be commissioned. On slide seven, you can see how substantially the acquisition of Kundana and East Kundana has shaped what lies ahead for Mungari. Integration work is moving along nicely, aimed at building what we call a single Mungari with standardized systems and processes, along with shared equipment and workforce costs, where previously there were three operations run separately. As one illustration of the operational synergies being realized, underground maintenance and training teams from three distinct units are now being merged, yielding considerable savings and efficiencies. Filling vacant positions is likewise going well, with open roles declining over the quarter even amid the tight labor markets of Western Australia. Moving to slide eight. Earlier this month, I had the good fortune to be onsite as Mount Rawdon welcomed a delegation from the Queensland government headed by the Minister of Resources, the honourable Scott Stewart. That visit featured an update on the two gigawatt pumped hydro power project and the major contribution it could make toward meeting Queensland's renewable energy targets. As a prospective pumped hydro facility, Mount Rawdon is blessed by history, topography and location.

Jake Klein

executive
#9

It has an enormous advantage in that roughly a billion dollars has already been invested in mining 200 million, which has been processed for gold production across the expected 25-year life of the operation. That billion dollars has left a large pit that can serve as the lower reservoir for the pumped hydro project. Beyond that, the surrounding region's topography gives Mount Rawdon an excellent natural site for the upper reservoir. On location, fortunately, Mount Rawdon sits just 25 kilometers from major power lines that link the southern and central Queensland grids. And additionally, the mine's closure timing aligns with Queensland's decarbonisation strategy, since the state is set to shut the 700 megawatt Callide B coal-fired power station in 2028. The study work is still ongoing and is expected to be finished in June 2023. With that, I'll pass it to Glen for an update on our exploration and discovery activity.

Glen Masterman

executive
#10

Thanks, Jake, and good morning. This morning I'll give an update on the exploration progress we've made across the discovery portfolio during the March quarter, which is laid out on slide nine. The key takeaways I'd like to point out are, first, the positive drilling results returned on the key joint venture, which have expanded the mineralization footprint at West Island and confirmed that very good grades are present at this emerging discovery. Second, at Mungari and Red Lake, the drilling results keep reinforcing our views on the underground upside potential, particularly at Kundana, where we are delineating new areas of high-grade mineralization very close to existing development. Turning now to the highlights in this morning's report. Starting with our Cue joint venture in WA, we completed our first full quarter of managing and operating drilling activities after taking over from our partner masquerade minerals at the beginning of January. We recently switched analytical laboratories, which has cut assay turnaround times from well over 12 weeks to a more manageable five weeks. Faster analytical turnaround times give us the confidence to accelerate diamond drilling, with a second core rig expected to arrive on the project during the June quarter. This will bring to three the total number of rigs on the JV ground in which we are earning 75% interest.

Glen Masterman

executive
#11

Page 11 of the report highlights encouraging results from the diamond program during the quarter. We were pleased to identify additional mineralized loads along the west Island trend, and recent aircore drilling has extended that trend by 500 meters, bringing it to 2.1 kilometers in length. The June quarter program will concentrate on drilling extensions of non-structures, so we can understand the possible scale of the mineral system and test other target styles that may matter for hosting high grade gold. At Mungari, the drilling results set out on page 14 extended the structure hosting the Christmas hanging wall load at Kundana. That mineralisation sits 35 metres from the main Christmas ore body, which we are currently mining. The results indicate that the important ore bearing structure stays open along <<inaudible>>. The next round of drilling will target the high grade quartz load within the structure, with the goal of potentially expanding the high grade mineral resource. One exciting implication of the recent Christmas results is the realization of untested potential and the hanging wall of the stress load, where this structural position is modeled to continue. At Red Lake, drilling retained high grade results on the extension of the ozone at lower Campbell, as summarized on pages 12 and 13 of this morning's report.

Glen Masterman

executive
#12

These results affirm strong continuity on a local scale and point to a chance for substantial resource potential lying between those deep intercepts at the base of the lower Campbell mineral resource. Upcoming drilling is going to be designed with short step outs from nearby development so that we can extend the mineral resource into the 500 meter gap that has been identified on the ozone corridor. I'm looking forward to sharing the results from the June quarter drilling programs at our next opportunity in July. With that, I'll pass things over to Lawrie.

Lawrie Conway

executive
#13

Thank you, Glen. Good morning, everyone. This morning, I'm pleased to update on our financial performance for the March quarter as shown on slide 10 of the presentation and outlined on pages 9 and 10 of the report. We're in a very strong quarter of cash generation with operating cash flow up one third to $269 million and we delivered a $125 million of net mined cash flow. This was an increase of 135% from December. We invested $144 million in capital comprising $33 million in sustaining and 111 million on major projects. At Group Capital guidance remains unchanged at $150 to $175 million for sustaining capital, and $440 million to $505 million for major projects. Group cash flow for the quarter was just under $22 million. Jake mentioned are excellent all-in sustaining cost performance for the quarter, and the $990 per ounce equates to a margin of around 60%. We remain on track to deliver our group all-in sustaining costs within the guidance range of $1135 to $1195 per ounce. We did see some higher costs come through in the quarter and these were in line with what we outlined with our half year results. As I mentioned that the half year results though, the improvement in metal prices and revenue are more than offsetting these cost pressures.

Lawrie Conway

executive
#14

The realized gold price rose 3.6% during the quarter. Realized copper prices slipped modestly, falling 1.5%, yet our copper volumes grew by more than three times. Managing cost pressures across every part of the business stays our priority. Even following the higher debt tied to the Ernest Henry acquisition, the balance sheet kept getting stronger. Gearing now sits at roughly 23%, and we expect it to move below 20% over the next few months. That matches the first target level we established after any acquisition. We closed the quarter holding $538 million in cash, with liquidity of about $900 million. Moving to slide 11 and the quarter in summary, an all-in sustaining cost under $1,000 per ounce is clearly sector leading, and we will end the year inside our group cost guidance range. The margins we are producing can fund our growth plans while still returning funds to shareholders. Ernest Henry's immediate exceptional contribution shows clearly through added copper exposure, lower group all-in sustaining costs, and a material lift in cash flow. With the current mine life plus the anticipated extensions, this cornerstone asset will deliver significant benefits for many years ahead.

Lawrie Conway

executive
#15

What gives us confidence that the transformation is now moving along nicely is the Red Lake team's capacity to deliver gains across every part of the operation, and we expect momentum to build once more in the June quarter. Our other assets are doing well. And across the whole business, we have shown resilience in the face of the extreme rainfall events, and the effects of COVID, particularly the isolation requirements for positive cases and close contacts. We are well placed to finish the financial year strongly. Thank you for your time this morning. And Harmony, please open the line for questions.

Operator

operator
#16

Thank you. <<operator_script>> Our first question is from Matt Greene at Credit Suisse. Go ahead, please.

Matt Greene

analyst
#17

Morning, Jake and the team. First question is just about Red Lake — do you figure it’s moving the right way? What I want to ask about is the milling. Could you give some background on how you’re running the Campbell mill above 2000 tonnes per day? Do you have a feel yet for what the optimal milling capacity might be? And just to confirm the exception allowing operation beyond that level — I believe I remember you saying it was only for six to eight weeks. Is that right, or have you managed to extend it?

Jake Klein

executive
#18

Taking your final question first: it's a 12-week trial, and if it's intermittent, you can restart it. So we're confident that at these higher rates of 2000 tonnes, we can keep it running through the end of June and into early July, though we are pushing it to the boundaries. When we acquired the operation, I believe it was only running at roughly 1,700 or 1,800 tonnes a day. The milling throughput achieved in the first quarter represents historic highs, as do the other mining roads. So the productivity is beginning to come through that we need in order to convert this into a medium grade, higher tonnage operation.

Matt Greene

analyst
#19

Appreciate that, Jake. Development rates, meanwhile, continue to hold above 1200 minutes each month. And assuming you can sustain 3000 tonnes per day, how are you thinking about the Bateman mill relative to the Red Lake mill? Since it's a new mill, could there be opportunities for cost savings or scale there? Should you pursue that medium grade path, it involves a transition to Bateman. And what are your thoughts on operating all three mills?

Jake Klein

executive
#20

Yeah, so Matt, we're evaluating that at the moment. It's located 11 kilometers away from the Campbell and Red Lake Mills. We also have the chance to run a bulk trial at the McKinley deposit, which sits close to the Bateman mill. But we're figuring out the milling strategy — clearly, the upper Campbell area, which is set to come online during the first half of next year via the CYD decline, provides us with higher grade and potentially fully independent access to ore <<inaudible>> bodies. So to this point, our focus has been on keeping both mills full, since this is the first quarter in which the Red Lake mill and the Campbell mill have operated together for the entire quarter. So to this point, with the issues being on mining rates, we're getting that right; we now need to start achieving consistency and reliability. We believe we're getting there — you can see the trends. But clearly, we've had a difficult 12 months at Red Lake prior to this quarter.

Matt Greene

analyst
#21

Yeah, that’s great, Jake. And then just regarding Cowal, which shifted during the quarter with the rain and COVID, and you mentioned 25% of confirmed cases—if we were to take the close contacts that had to isolate, what sort of levels of entities and to the experience of time on site?

Jake Klein

executive
#22

From what I recall, the peak single-day absentee figure came to roughly 80 people — somewhere between 75 and 80 — and at this point it has fallen to around 35. So the trend is downward, yet 80 out of roughly 400 people represents a substantial number away from the site. That 400 is the entire workforce. So once you account for that shift plus those taking breaks, the number would come in below 400.

Matt Greene

analyst
#23

Right, understood. So, with these latest adjustments the government has made regarding close contacts, do you anticipate things will start to loosen up?

Jake Klein

executive
#24

John Penhall, Cowal's general manager, is here in the room — yes, he's nodding. But none of us claim expertise in pandemics, so we're hopeful. Yes, Cowal bore the worst of it, and the team handled that extremely well. I mean, bringing 300 people onto site for a shutdown was a pretty remarkable feat, and they did it without any infections.

Matt Greene

analyst
#25

Yeah, thanks for that. All right, so if I can just fit in one final question about Mount Rawdon, maybe something with a longer horizon. Plenty of gold miners are aiming to reach net zero on emissions. How are you thinking about this pumped hydro project — might that be something you take part in down the road and perhaps look to, I suppose, produce credits to offset carbon elsewhere in the portfolio? And just on the scale, how did you get to 2 gigawatts for 10 hours?

Jake Klein

executive
#26

So I think the reservoir capacity at the pit has really set the scale. It's a project in the multibillion dollar range, and we aren't power operators, nor do we plan to become one. But yes, there's the opportunity I described — could we hold some ownership stake in the projects? It would be small, and to me a disproportionate share of carbon credits would be a structuring outcome that would be fantastic for Evolution. It's something we haven't been able to test yet. The first priority is making sure this project is feasible and economic. The prefeasibility study indicates that it is, and the meetings with the Queensland Government suggest it fits and aligns exceptionally well with their requirements. The more I read about pumped hydro and deep battery storage, the more compelling Mount Rawdon becomes. But fundamentally, Matt, Evolution's priority is twofold: one is to do the right thing by the community and the remediation of the mine. The second is to maximize the project's value, and pumped hydro has the potential to be a very significant and valuable project for Evolution shareholders.

Matt Greene

analyst
#27

Much appreciated. Thanks for spending some time with us, Jade.

Operator

operator
#28

Thanks. Our following question is from Mitch Ryan at Jefferies. You have the floor.

Mitch Ryan

analyst
#29

Morning, Jake and everyone. Here's my first question. On page 10 of your quarterly working capital build, there's roughly $67 million for the quarter — probably this one's for Lawrie. Compared with earlier quarters, that looks elevated. My guess is the Ernest Henry Acquisition has some connection to it, but I'd just like to ask whether you could give us some detail on that amount of movement.

Lawrie Conway

executive
#30

Yes, Mitch, that’s precisely what I’m referring to. What occurred in the March quarter is that we finalized the joint venture, so we receive the gold sales, and that created a favorable working capital movement. However, we then shifted to 100% of the concentrate, which operates on either a three- or four-month quotation or period. So in this very first quarter of owning 100%, our working capital will rise, and it rose by more than $40 million on the receivable side. And that was the primary effect on our working capital movement during the quarter.

Mitch Ryan

analyst
#31

Thanks. Onto my second question. Given what happened during the quarter, it's understandable that you've eased the FY 22 guidance. I'm just wondering whether any of the factors behind that revision are likely to carry over into FY 23 and potentially pose a risk to the guidance that's currently out there for FY 23?

Lawrie Conway

executive
#32

Mitch, my view is that Red Lake is where the genuine exposure sits. We had put out guidance of 200,000 ounces for next year. That's something we're examining closely. As the final budgets and loans come together, we'll probably have to lower that before long. Still, 40,000 ounces is the following milestone, and after that 50,000 ounces, building up from there.

Mitch Ryan

analyst
#33

On that same point, could you give us some clarity about Red Lake and that 40,000 ounces? My way of thinking about it is that once you've hit that in the fourth quarter, that becomes the new base — is that the right way to look at it? Or is it a case of running hard in the fourth quarter and then it may come down in 1Q FY 23?

Jake Klein

executive
#34

No — what we observed, when we had that discussion about trimming guidance within the range, is that we've deliberately tried not to load up the fourth quarter and then drop off a cliff in the first quarter of next year. So we're strongly motivated by the fact that we've acknowledged our missteps at Red Lake. We have to build confidence, and we have to regain credibility. And we're going to work at establishing a base and then stepping up from those bases.

Mitch Ryan

analyst
#35

Appreciate it. That's all I have.

Operator

operator
#36

Thanks. We move to David Radclyffe of Global Mining Research for the following question. The line is yours.

David Radclyffe

analyst
#37

Morning, Jake, and everyone. I have a quick follow-up, I suppose, regarding Red Lake. A few things there. First off, there’s that chart you have that shows better haulage coming from Cochenour, which seems to be after the team <<inaudible>> for the quarter indicates Cochenour was a major bottleneck. And looking ahead, should we be expecting roughly comparable volumes from Cochenour?

Jake Klein

executive
#38

David, I’m not sure if you’ve ever gone through Red Lake’s history, but that high-speed tram was not high speed at all. And it took an enormous sum of money. At first, it used purpose-built electric low keys, so those have been replaced. We’ve replaced them. There has been some remarkable and effective change management in that area. The team has performed extremely well there. And at this point they’re operating it with a lot of consistency. So Cochenour was never truly in a position to supply dependable base load, and now it is beginning to be able to do so. Its grade is lower. So as we open better and higher-grade sections in Aviation MMTP, you’ve seen with mine, a few stops there. And once the upper Campbell area comes into line from the CYD decline, obviously, if the mills are full, we’re going to try to replace as much material as possible with higher-grade material.

David Radclyffe

analyst
#39

Thanks. As a follow-up, considering what you said earlier regarding the 2023 outlook — it seems ore mining rates are rising, though you mentioned dilution control this quarter. So is the key issue really just getting that up toward reserve grade next, since it's still clearly running below that? I mean, you do have new high-grade areas coming in, like aviator, and I believe you said you've begun stoping <<inaudible>> there. But is that still the main drag into 23, and is that how we should think about it, or is there additional potential — the aspiration, I guess, for ore throughput levels was perhaps higher as well?

Jake Klein

executive
#40

Yes, I believe some of the wear and tear from those 12 months is part of it. The real issue, though, is achieving a consistent grade by reaching those higher-grade zones, and delivering reliability, predictability, and confidence. At this point the mills are operating at maximum throughput. Right now there's a 15,000 tonne stockpile sitting on surface. Keep in mind that three or six months ago, at Red Lake, skeptics questioned whether this would be an operation that could survive. Our confidence never wavered. But this quarter, you're beginning to see development rates holding steady, mining rates holding steady, processing rates holding steady — it comes down to building confidence and earning credibility.

David Radclyffe

analyst
#41

Okay, thanks Jake — I'll make sure that gets shared.

Operator

operator
#42

Thanks. We’ll take the next question from Al Harvey at JPMorgan. Go ahead, please.

Alistair Harvey

analyst
#43

Hello Jake, Glen, and Lawrie. Appreciate the call. Perhaps just one question about Mungari. I'd like an update confirming the Mungari mill expansion remains on schedule for FY 22. You did sort of walk through some of those synergies you're seeing across the role in EKJV projects. Could you outline any others and how we should think about cost savings at the ongoing asset?

Jake Klein

executive
#44

Yeah, so what we're doing is bringing together what were basically 3 distinct operations into a single one. We believe there are synergies and opportunities in that area. As you're aware, the labor market is tight. I noted that our vacancy rates did in fact decline this quarter, though we started the quarter with a high number of vacancies. But yes, there's ample opportunity. Glenn went to Mungari 2 weeks ago and returned very enthusiastic about the geology. And the study remains on track to be finished at the end of this year, this calendar year.

Alistair Harvey

analyst
#45

Thanks, Jake. And perhaps just to add onto what was said about Mount Rawdon, do you have any expectations regarding how long stabilizing that pit wall could take? And maybe just continuing from that? How should we think about rehab costs when it comes to the pumped hydro project? Does that push it further down the track? Or would we still need to account for some costs there for the rehab?

Jake Klein

executive
#46

My view is that this quarter's issue concerns getting at the ore, and we have adopted some cautious premises in which we have confidence, which helps explain the reduction in guidance. Indeed, our expectation is that this represents production that has been pushed back rather than production that has been lost. Even so, the geotechnical work must be carried out. As for the rehab, the result is somewhat binary: either rehabilitation will be required, or we will proceed with the pumped hydro scheme. What I would urge people to do, therefore, is begin considering the option value of a pumped hydro scheme that is viable at that operation.

Alistair Harvey

analyst
#47

Thanks, Jake. I’ll slip in one final question here about the Ernest Henry cost — clearly, once you remove that lag effect 42 and the negative $4200 an ounce, that’s pretty impressive. Should we expect those actual numbers to carry into the quarters that follow now? Or do we anticipate any further accounting lag impacts ahead?

Jake Klein

executive
#48

Al, I’ll hand that question over to Lawrie, though thanks for being first to ask about Ernest Henry on this call. During the initial quarter of our ownership, this asset returned 17% of the purchase price to us. Laurie, your turn.

Lawrie Conway

executive
#49

Right, Al — nothing else ought to affect the cost structures coming out of the oil joint venture. So from here on, AISC will be normalized based on the gold and copper that gets produced and sold. And plainly, it will hinge on the copper price we realized during the quarter. On by-product credits, Jake has essentially fixed it in his head that it will be negative 4200 each quarter. We simply need to walk him back to the accounting fundamentals, or the mechanics behind how you work it out.

Alistair Harvey

analyst
#50

Excellent. Thank you, Laurie, Jake, and Glen — I'll be sure to share that.

Lawrie Conway

executive
#51

Much appreciated.

Operator

operator
#52

Thanks. We’ll take the next question from Daniel Morgan at Barrenjoey. Go ahead, please.

Dan Morgan

analyst
#53

Hello, Jake and everyone. My first question concerns Cowal. Considering how rainfall and COVID affected the quarter, and it sounds like those effects are continuing this quarter, could you lay out your current expectations for grades from the open pit over the coming 12 months? Thank you.

Jake Klein

executive
#54

Well, I believe we see it as consistent, though John Penhall is right here—and I'll put him on the spot—our general managers are standing in for Bob while he's on leave. So John, you're the best one to answer that.

John Penhall

executive
#55

Thanks, Jake. And good morning, Daniel. We expect that rate to rise gradually across the next 12 months, and when we look back at the prior 12 months, with volumes having picked up, the strip ratio sits well below one. So volume is going to be a factor here, but we will see more volume, and we will see higher grade, and that will carry through the mill. We are already seeing the grade climb from roughly point 9, 12 months ago, to around just under 1% — or one gram per tonne, I should say — going through the — now.

Dan Morgan

analyst
#56

Thanks. And perhaps one for Lawrie on the accounting side. The DNA at Ernest Henry came in at roughly $4,000 an ounce. I'm just wondering whether there could be some finalization adjustments on the accounting front or anything like that? What's the best guidance on where that ought to land? Thank you.

Jake Klein

executive
#57

Yeah, Dan, there definitely would be some of that when the prepaid metal gets finalized, which was consistently averaging $1,350 to $1,400 an ounce. And then now you're amortizing an additional billion dollars of asset acquisition. So that was the impact this quarter as we completed the life of mine plans in the June quarter, and we'll update on what the DNA profile for this asset is going to be going forward. And I don't have it in front of me, but we had it at the half year as to what it would be on an annual basis, but I'll get Martin to follow up with you on that one.

Dan Morgan

analyst
#58

Alright, thanks. And Red Lake — going back over a few of the earlier questions, specifically about the mills where you ran this trial. Could you expand on what you've discovered regarding the mill that you weren't aware of before? And what has possibly caught you off guard from operating at full tilt?

Jake Klein

executive
#59

Yeah, they can be driven harder than before. And their throughput capability is greater than what they had previously. So we're sort of stretching the limits at this point. But Bob is always eager to push things further. And I think we began at 1700, 1800 tonnes, and now at Campbell they're above 2100 tonnes. The mills have never truly been run at their maximum capacity.

Lawrie Conway

executive
#60

Yes, and one more thing I'd mention there, Daniel — if you remember, at the point when we first acquired the asset, the Campbell mill was among the items we'd flagged during that day as needing some care, focus, and investment when we took ownership, since it wasn't a mill built to run for those longer stretches, and we got that work done. What's encouraging from this trial is that the work completed has let us operate beyond even what the team believed possible on an unlimited or unconstrained basis. So because of that, they're growing somewhat more confident regarding the capital that might be needed to keep this going at these levels.

Dan Morgan

analyst
#61

Then perhaps you could just give an update on the permitting process for that, since this is a temporary dispensation allowing these mills to run flat out — which, I assume, obviously gets throttled back in the September quarter. What's the process for repaying them at a higher number once you know what that number is?

Jake Klein

executive
#62

That's infrain, and in our view it isn't a big obstacle. It's really more a matter of process than anything else.

Lawrie Conway

executive
#63

And if you remember, when we discussed the mill expansions during the second half of last calendar year, running at these rates involves a local permitting approval, whereas going above 50% I believe triggers a federal one. So the improvements we're making fall under local approvals, which means it's not as complicated.

Dan Morgan

analyst
#64

I appreciate that.

Operator

operator
#65

Thanks. The following question is from Kate McCutcheon at Citi. Go ahead. Hi, Kate, you're live now. Thanks. Our next question is from Alex Barkley at RBC. Please go ahead.

Alex Barkley

analyst
#66

Yeah, hi, Jake and team. I've got another question about Red Lake. Mining rates have been going quite well—especially in March, when they were well above even the 850 kilo tonnes you'd guided from existing mines in FY 22, 23. I'm just wondering why, on an annualized basis, gold and all-in sustaining costs would still come in below your FY 22 guidance, even though it probably suggested the second half was going to be better. So I'm just wondering what you had expected for the third quarter in that original guidance versus what was actually achieved. And was it basically just a case of grade not being where they wanted—where you wanted them to be? Thanks.

Jake Klein

executive
#67

The key problem, I'd say, is really those first six months of performance, when we produced 38,000 ounces, which — as I mentioned — left us on our group guidance with essentially no runway, and it was a disappointing performance. So that's been well documented. Building from that base, the third quarter was pretty much in line. It's consistently delivering now, and we're gaining more confidence, but yes, we're a bit gun shy about making bold predictions. We need to build confidence for the site team, and we need to build confidence that these things are consistent, and that 3000 odd times a day becomes a habit. And then we can start looking at optimizing and getting greater. We're very comfortable with the models. The reconciliations aren't giving us concern about the models. We do have some work to do to further improve mining dilution. But these are all within the range of what you'd describe as normal improvements.

Alex Barkley

analyst
#68

All right, so when you describe the third quarter as pretty much in line, don't grade for roughly what you'd planned at the start of the year.

Jake Klein

executive
#69

Right, so the material at Cochenour is low grade, that's true. And we're seeing some dilution from all the parts there at Cochenour, which is an ongoing issue as we mine those areas. All of that is factored into the guidance and everything we have now. But Cochenour is a bit low grade, and that's because of the success we've had with the tramming and the haulage of that material, being a base load, and the aviation NIM and CP zones are only coming online now. So that's where you're going to see a bit of a grade increase in the fourth quarter.

Alex Barkley

analyst
#70

All right, absolutely. And I apologize if I overlooked what you said earlier during this call, but my understanding is that you mentioned Red Lake is running a few quarters behind the initial timeline — does that relate to the guidance you have of sub U.S. $1,000 per ounce by the close of FY 23?

Jake Klein

executive
#71

So regarding Red Lake, guidance for this year stood at 165,000 ounces, and that is what drove our miss — the underlying reason for it. We had overestimated how much we could transform that operation. We've rebased it, and we believe we're on track; nothing we've observed at the operation makes us doubt it can be achieved. Still, on delivery we are clearly 12 months behind where we expected to be.

Alex Barkley

analyst
#72

Okay, sounds good. Many thanks, everyone.

Operator

operator
#73

Thanks. The next person to ask something is Andrew Bowler with Macquarie. You have the floor.

Andrew Bowler

analyst
#74

Hey Jake, good day. I just kind of spotted a one-liner in the quarterly regarding development at Bateman — is that mostly about setting up drill positions? And are you thinking about sort of moving ahead toward getting some additional output as well?

Jake Klein

executive
#75

The purpose here is to set up drill locations. And there is indeed an opportunity for us to take 100,000 tonnes as what's referred to as a bulk sample at that site. However, that falls outside the figures we're discussing today.

Andrew Bowler

analyst
#76

That's quite alright. As for that interim goal of 3000 tonnes, those are down, and clearly, going past that figure is, well, it's sort of anticipated to come, you know, either through ongoing refinements in how mining is done or from the next major move, which would be opening up those fresh zones as part of that substantial capital push happening right now.

Jake Klein

executive
#77

We're starting to develop those new areas, and it's really a matter of bringing several of them online. We've mentioned before that the asset was significantly underdeveloped and undercapitalized at the point we acquired it. We were aware of that going in — we purchased it for US$375 million a couple of years back. We knew that was the situation. What we didn't know was how much was behind the capitalize, but reaching 1200 meters a month was an important milestone for them. We've since moved that to 3000 tonnes, roughly four tonnes a day. That level is now being achieved, and it comes down to building those bases, de-bottlenecking the entire process — and the mine is certainly the process, since we still have a mill on site that isn't being used right now, which is the Bateman mill.

Andrew Bowler

analyst
#78

Thanks for that. I’m just coming back to Australia — I mean, you’re talking about beginning the underground network about a year from now. Should we expect a reasonable volume of development ore from now on, for roughly another year or so? And if that’s the case, could you give us a rough guide on it, or should it be fairly minor until that first opening milestone?

Jake Klein

executive
#79

John, would you like to handle that question?

John Penhall

executive
#80

Lucky, yes. No worries. Good morning, Andrew. Look, I think in the context of, of the underground as it develops, we're going to see that normal profile as we start to develop into the ore body over the coming next 12 months. We're pretty busy, busy drilling at the moment underground to get confidence in in those first set of stoping. But I think as we follow the critical path, you're going to see come through in our quarterly results, I guess an increasing amount of ounces coming out of the underground, but mostly through development, until we hit that first stipend. And like all mines, Andrew it's going to have a bit of a ramp up period that posts the mill coming on board. But you will start seeing increasing levels of development ore. Again, it will be at a modest rate, because of course, with development, it'll come through with that lower cut off.

Andrew Bowler

analyst
#81

That's fine — I have nothing further. Appreciate it.

Operator

operator
#82

Thanks. We'll take the next question from Matthew Collings at Morgans. Go right ahead.

Matthew Collings

analyst
#83

Morning, Jake. This is a pretty straightforward question about Mungari. Maybe it comes down to how the JV is accounted for, but there seems to be a mismatch between the tonnes processed and the grade for the gold that was produced — is that gap simply attributable to Evolution's answers versus a hole through the mill? Am I looking at this the right way?

Jake Klein

executive
#84

Yeah, that's right. So we report 100% of the stats through the mill, and then we use our attributable production figure — meaning 100% of the assets plus 51 of the EKJV.

Matthew Collings

analyst
#85

That's quite all right. I appreciate it greatly.

Operator

operator
#86

Thanks. Our following question is from Kate McCutcheon at Citi. Go ahead, please.

Kate McCutcheon

analyst
#87

Hello there, Jake and Lawrie — is my voice coming through at this point?

Jake Klein

executive
#88

Yes, we can.

Kate McCutcheon

analyst
#89

To follow up on what Dan asked about Calow, I believe during the September quarter results you indicated that grades at Stage H would rise by roughly 1 gram per ton in December and March. And I would be operating at 0.8. What is behind the fact that you still expect an increase to that 1.1, 1.2 in FY 23?

Jake Klein

executive
#90

Regarding that, Kate, the mining grade is always going to be the lower figure, since we've been drawing down that stockpile from Stage H. So the lower grade continues. That's the average grade, mind you. Meanwhile, the highest grade is moving through the middle. So when we spoke about the lifting grade, we're observing that in the grade process. We're transitioning from stockpile material over to pure Stage H material. We saw that reach just under a gram during this quarter. And it will rise, as John mentioned earlier, across the coming quarters as we extract higher volumes of ore from the pit.

Kate McCutcheon

analyst
#91

Yeah, that's clear and makes sense. Then for Lawrie, how much longer will cash tax stay at that reduced rate? And second, when do you expect the stamp duty on the Ernest Henry deal to be paid?

Lawrie Conway

executive
#92

The tax came in lower this quarter, and the reason is that, based on our tax returns, the FY 21 tax had to be finalized and paid in December — when we submit the return, a larger amount lands in the December quarter, which leaves the March quarter lower. Then we'll likely see somewhat higher tax cash in the June quarter. But again, we'll manage that depending on where we see the FY 22 year finishing and what franking credit balance we want to end up with. And on the second one, Ernest Henry will either be in June or possibly the September quarter. We're finalizing the valuation that has to go in with the stamp duty lodgement. We're hoping it goes into the September quarter, but it could be in June.

Kate McCutcheon

analyst
#93

Yes, thanks. And last, I realize Bob isn't around to field this one, but what excites you most regarding Ernest Henry, and have you spotted any opportunities or levers in the near term during these first couple of months?

Jake Klein

executive
#94

The thing that gets us most enthusiastic is the cash being produced, and I'll keep returning to this point because I wish somebody would take a look at it. Within the first quarter, we've already recovered 17% of the purchase price. We're pleased with the mine life extensions at debt. According to the prefeasibility study, an extended mine life is expected down there. So the geology, the operation, and the cash generation all have us excited.

Kate McCutcheon

analyst
#95

Yeah, that's reasonable. Appreciate it.

Operator

operator
#96

Thanks. The following question is from Stuart McKinnon of the West Australian. Go right ahead.

Stuart McKinnon

analyst
#97

Hello, Jake and everyone, just a couple of questions from me. First, regarding Mungari. Do you expect that COVID rates there haven't really peaked yet, would you say? I can see there haven't been major effects so far. However, you do note a modest rise in cases during April. Are you anticipating that this rise will carry on and that you might see absenteeism at similar levels to what you had <<inaudible>>, or are you not anticipating the same effect at Mungari?

Jake Klein

executive
#98

It stands to reason that this will probably rise as travel rises, and as exposure rises. What we would hope is that lessons have been taken from what happened at Cowal and at Red Lake, and that Mungari's protocols are robust and were developed based on what those other sites learned. And we'll be able to contain it in a manner that causes less disruption.

Stuart McKinnon

analyst
#99

Alright, thank you, Jake. I’ve got one more question, this one about the gold price. You said the macroeconomic backdrop is providing support for gold, and it’s certainly still at levels that are fairly high from a historical standpoint. But does it surprise you at all that the price hasn’t really pushed above 2000 U.S. announced? I mean, it’s difficult to picture a more favorable backdrop for gold. And although it is elevated, it isn’t really setting any records or anything along those lines. Does that surprise you? Or what are your views on where the gold price goes from here?

Jake Klein

executive
#100

In my view, it's headed upward. The Federal Reserve, I believe, faces a very, very difficult task in attempting to lower inflation from 8.5% last quarter without sending the country into recession. That has only rarely been accomplished successfully. So I anticipate that inflation will persist. And that is always beneficial for the gold price.

Stuart McKinnon

analyst
#101

All right, thank you, Jake.

Operator

operator
#102

Thanks. Our following question is from Michael Bennett of AFR. Go right ahead.

Michael Bennett

unknown
#103

Hey, Jake. Just a quick follow-up on COVID, given how tight the broader labor market is. So how many cases have you had at Mungari in the — Icrow <<inaudible>>, and are you getting a little frustrated that WI is still taking a very different approach, given what we saw this week with restrictions easing in New South Wales and Victoria?

Jake Klein

executive
#104

Yeah, so at Mungari we've had 10 cases so far — a lot fewer than, say, at Calow, or what Calow went through. I did notice — I believe it was in your paper — the push from mining companies for labor access, for overseas labor immigration to be eased, and we'd be very supportive of that. In a tight labor market like the one we have right now, getting access to skills without triggering rampant inflation and simply being unable to fill roles is critical to the future of the mining industry and, frankly, to the country's economy.

Michael Bennett

unknown
#105

And just one more thing on the <<inaudible>>—I mean, over the past few days, in BHP's quarterly results, we've seen what they and others have said about COVID's effects. I mean, if you step back, how significant is this for production and guidance across the industry going forward? And are there any solutions? Because it doesn't look like COVID is going away?

Jake Klein

executive
#106

Well, I think solutions exist, because the virus comes in waves, those waves do recede, and then sites and operations become better at managing it. Omicron appears to cause less damage, illness, or death than earlier strains did. So I think we have to learn to live with it. That is what our sites are doing and what our people are doing. But it creates a massive distraction for our operations teams. And I see John nodding his head on this point when it comes to handling high absenteeism, a lot of worry among the workforce, and legitimate concern about health. And that distraction is definitely not what you would call normal business.

Michael Bennett

unknown
#107

Okay, thank you, Jake.

Operator

operator
#108

Thank you. At this point, we have no additional questions. I will now return the call to Mr. Klein for his closing comments.

Jake Klein

executive
#109

Thanks, Omni. Thanks, everybody. This has been an interesting call and an interesting quarter. I want to wrap up by leaving you with one last thought: we sold our gold at $2,464 an ounce, which leaves us with an average margin of roughly $1,474 an ounce — or, as Lawrie put it, 60%. That comes from 150,000 ounces of production. Just to give you an equivalence basis, if we could hold the same production mix that quarter and we raised AIC to $1,740 an ounce, or $750 an ounce, which I think will be closer to the industry standard in Australia, that is the equivalent of us producing 300,000 ounces of gold at that AIC. Our view is that producing less gold at a higher margin and making lots of money is much better. Thanks for your time.

Operator

operator
#110

Thanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.