Evolution Mining Limited (EVN) Earnings Call Transcript & Summary

April 20, 2023

Australian Securities Exchange AU Materials Metals and Mining earnings 65 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate you holding, and thanks for joining the Evolution Mining Limited call on the March 2023 quarter results. Everyone is connected in listen-only mode at this point. A presentation will come first, and after that we'll open it up for questions and answers. Should you want to pose a question, press the star key and then the number one on your phone's keypad. At this stage I'll pass the conference to Mr. Lawrie Conway, CEO and Managing Director. Over to you.

Lawrie Conway

executive
#2

Thank you, Darcy. Morning, everyone, and thanks for being with us as we lay out the results for the March quarter, which came out on the ASX this morning. On the call with me today are Bob Fulker, our COO; Barrie Van der Merwe, our CFO; Glen Masterman, our VP Discovery; Peter O'Connor, our GM Investor Relations; and Taryn Chua, our Group Manager, Investor Relations. Barrie came on board last month, and I'd like to welcome him to his first conference call. During our December quarter results call, I spoke about the macroeconomic shifts underway and the inflationary backdrop. Since that time, we have witnessed geopolitical tensions persist, a number of bank collapses occur, and inflation ease somewhat — though not to the extent that would give central banks and businesses enough reassurance just yet. That has benefited gold, which has again crossed the US $2,000 per ozt level and gone past AUD 3,000 per ozt for the first time. Taking everything into account, we do anticipate continued capital deployment into gold. On copper, the imbalance between supply and demand has persisted, and the price held at roughly US $9,000 a ton and AUD 13,000 a ton during the quarter.

Lawrie Conway

executive
#3

With elevated metal prices, this is a favorable setting for Evolution as one of the lowest-cost, high-margin producers. Considering the several challenging external events we faced, performance during the quarter was solid. First, and very pleasing on the safety front, we've now achieved three quarters in a row of improvement in our recordable injury frequency. Mining activities were suspended in early March because of the extreme rain event at Ernest Henry. The team has done an excellent job getting mining activities resumed in the past week, which came earlier than we had expected. We'll now finish the remaining recovery activities so we can safely ramp up to normal production rates by the end of this quarter. After a number of quarters in which we are investing heavily in two main growth projects, we saw the business start to transition back to a net cash generator. We delivered just under AUD 96 million in group cash flow and ended the quarter with a cash balance of AUD 164 million. Another enabler to improvement in our cash generation moving forward is that once we have delivered our last 35,000 hedged ozt this quarter, we move to being one of the few fully unhedged gold producers, fully exposed to a near record high gold price.

Lawrie Conway

executive
#4

The weather event at Ernest Henry, along with ongoing wet conditions near Mt Rawdon, were the primary factors behind our gold output staying flat quarter-on-quarter at 164,000 ozt, with an all-in sustaining cost of AUD 1,291 per ozt. By the close of this quarter, Ernest Henry will be back to normal production rates, and our sector-leading low-cost standing will be recovered. At Cowal, we hit a significant milestone as the first stope was mined from underground. Delivering this mine ahead of schedule and under budget — against an original budget of AUD 380 million amid a period of high inflation in market conditions for project development and construction — is a credit to the project and operations teams. The underground ramp-up will be the primary driver of production at Cowal, rising by roughly 16% to 320,000 low cost ozt. Red Lake showed improvement this quarter, with a 13% increase in production at an 8% lower all-in sustaining cost. We anticipate this improvement carrying into the June quarter, with production rising to at least 35,000 ozt at a lower all-in sustaining cost. As we move into FY 2024, Red Lake is expected to advance further to 40,000 to 45,000 ozt per quarter and to further better its all-in sustaining cost position.

Lawrie Conway

executive
#5

Here's an updated outlook for Red Lake: roughly 160,000 to 180,000 ozt next year, then rising to a minimum of 200,000 ozt per annum. At Red Lake, our top priority is steady mining at 1.1 million tons annually so our mills keep running at current capacity and we deliver better cash generation. The process optimisation study is advancing as planned and shows robust financial returns. We will only weigh any additional investment in expanding Red Lake's processing capacity once it proves sustained performance at current capacity and delivers sufficient cash flows and returns. We also released, excuse me, fresh drilling results at Ernest Henry, which clearly confirm it as a world-class asset with meaningful upside. Those results keep extending the mineralization, and Glen will walk you through them shortly. The crucial point, though, is that the drilling program keeps opening further chances to extend mine life past what is already being identified in the current pre-feasibility study. The updated study, which folds in the earlier drilling results and the growing footprint, is still on track for completion this quarter. Another growth catalyst — the Mungari plant expansion project, which will more than double annual processing capacity to 4.2 million tons per annum, bring a substantial cut in the all-in sustaining cost and open a path to lifting production to 180,000 to 220,000 ozt over the next 10 years — is progressing on schedule.

Lawrie Conway

executive
#6

We’re eager to lay out those specifics about the various growth opportunities during our Investor Day on June 5. At this point I’ll pass it to Bob, who will walk you through how operations performed in greater depth.

Bob Fulker

executive
#7

Thanks, Lawrie, and good morning to everyone. We’ve turned in a solid March quarter, with gold production matching Q2, even with the externalities we encountered. On a positive note, our safety results keep getting better: total recordable injury frequency fell 5% during the quarter to 8.9. Cowal delivered an exceptional quarter, starting underground ore production ahead of schedule and within budget. Because of that, both mined and processed grades rose in the quarter, and the operation produced circa 74,000 ozt of gold at an all-in sustaining cost of AUD 1,072 an ozt. Plant performance was outstanding, delivering another quarterly record for gold production under Evolution Mining. That came from great throughput and recovery, together with higher feed grades from both the open pit and the underground first production stopes. The underground project keeps moving forward, with the accommodation village and paste plant scheduled for completion this quarter. The Cowal team is managing costs and operational performance, and all the major projects remain on track for timely delivery. Cowal generated AUD 95 million of operating mine cash flow in the March quarter. Ernest Henry has safely restarted mining activities, with first stope ore hauled to the surface this week.

Bob Fulker

executive
#8

During the June quarter, the site will keep safely increasing activities until normal production levels are reached. The March quarter got off to a robust start, generating operating mine cash flows of AUD 112 million and an all-in sustaining cost of -AUD 3,781 per ozt, even with the weather event affecting operations. Work on the PFS mining extension study is ongoing. Every aspect continues to look positive. We anticipate giving an update at some point in the quarter once it is finished. Glenn will talk through the exciting drill results that keep coming from Ernest Henry. I want to acknowledge the site team's efforts over the last couple of weeks. Everyone has risen to the additional challenges and has been working safely together to get the operation running again. Thank you all. For the last five months, I have been experiencing Red Lake firsthand and I stay excited about the enormous potential there. With a dedicated team and the operational building blocks now being established, these will support further improvement from the Q3 result into Q4 and beyond. Among them are new ore passes enabling efficient material handling, the arrival of new equipment with higher productivity for better production drilling, and the ongoing shift to mechanical bolting that will bring operational and cost efficiencies.

Bob Fulker

executive
#9

On operational gains compared with the prior quarter, we saw development rise by 400 meters to just under 4 km during the quarter, along with roughly a 13% gain in total ore mined and in ounces produced. At Red Lake, our permanent leadership group is coming together, starting with the General Manager of Operations beginning in early March, and the search for the overall head of Red Lake operations is moving along well. To sum up, after spending considerable time at Red Lake during the last few months, I have confidence that we are laying the foundations needed to achieve additional operational gains over the rest of this year and on into FY 2024. Mungari showed dependable and steady execution, posting yet another robust quarter of gold output that exceeded the prior quarter and bringing about a 14% decrease in all-in sustaining costs, which shows the team is handling costs well even with an inflationary cost backdrop. Our future growth project keeps advancing, and we look forward to sharing more updates later in the June quarter. Mount Rawdon has kept enhancing its reach into high-grade pit ore, which produced greater ore tons mined and greater gold output, even with the heavy rainfall. We expect production and all-in sustaining costs to keep getting better in the June quarter.

Bob Fulker

executive
#10

I appreciate everyone joining, and now I'll hand things over to Glen, who will give us an update on exploration.

Glen Masterman

executive
#11

Thanks, Bob. Morning, everyone. I want to direct your focus to the exploration news we put out this morning, which outlines additional encouraging drill results at Ernest Henry. Building on the results we issued earlier in the year, we've kept drilling step-out holes into ground outside the existing resource limits, aiming to link the copper-gold mineralization between the base of Ernie Junior and the deeper lenses of the main ore body. We had confidence that the geology would support grade continuity through this zone. The three fresh results released this morning bear out our expectation of broad intervals of copper-gold mineralization in these areas that had not previously been drilled. Those new step-out results appear on the long section, Figure 1 in the announcement. As a frame of reference, we're viewing the ore body and mine infrastructure from the side, looking east to west. The domains of copper-gold mineralization appear as the light blue shapes, which we've modeled at a 0.7% copper contour. That's also the shell we use to constrain the reported mineral resource. There are three areas I'd like to point you toward that I hope will lead you to the conclusion that we have an excellent opportunity to keep extending the mine life, both within the PFS and past it.

Glen Masterman

executive
#12

The first area is shown in yellow and displays the mineralization footprint, which is what the current mine extension PFS covers. Since the original Glencore concept study, we have grown the mineral resource in this area substantially. The outstanding results from the ongoing drilling program are driving this. The PFS, due for release in June, is expected to drive a material increase in the ore reserve in this area. The green area represents upside beyond the PFS and is one of the main opportunities for future potential resource growth, incorporating new drilling results such as those announced this morning. A mineral resource update is scheduled for completion in the September quarter, which will inform the feasibility study. There is longer-term potential at depth below the 775mRL, which potentially adds future mine life upside. I'd like to finish off with a comment on Ernest Henry in terms of the growth that we're currently enjoying. From a geological perspective, this is creating lots of excitement across the Evolution geological fraternity. It's been a rare occurrence in my career that we receive a good number of our geologists putting up their hands to be part of the Ernest Henry story.

Glen Masterman

executive
#13

Those extended runs of high-grade copper and gold mineralization that keep showing up in our step-out results have gone well beyond what I expected to be achievable. It remains an exciting journey, and I'm eager for our site to return to full-speed drilling over the coming couple of months, so we can continue telling this story — one we certainly don't want to see end too soon. With that, I'll pass things over to Barrie.

Barrie van der Merwe

executive
#14

Thank you, Glen. It's a real pleasure to have come on board at Evolution as CFO in March, and to have the chance to speak with all of you in this forum for the first time today. I'll give a short overview of the financial results for the March quarter, which are set out on Pages 5 to 6 of the report released today. Operating mine cash flow came in at AUD 270 million, in line with the December quarter. Every operation delivered positive mine cash flow after sustaining capital for the quarter. Once major capital is taken into account, all operations generated cash apart from Red Lake, which is still in a capital investment phase as the Upper Campbell underground mine is developed. Gold sales reached 166,000 ozt, slightly above the December quarter, at an achieved price of AUD 2,639 per ozt. That figure reflects the effect of hedge book deliveries, which wrap up at the end of the financial year, with just 35,000 ozt left to be delivered. Ending the annual hedge book deliveries of 140,000 ozt per year equates to an estimated AUD 110 million to AUD 120 million in additional revenue at current spot prices when next year is compared with this year. The achieved copper price for the quarter of approximately AUD 15,000 a ton was AUD 2,000 above the level achieved in December.

Barrie van der Merwe

executive
#15

That comes from stronger pricing on quarterly delivery sales plus contractual adjustments tied to deliveries from earlier quarters. Now on the cost side. All-in sustaining cost came in at AUD 1,291 per ozt for the quarter, which still sits at sector-leading levels. Before the weather event at Ernest Henry, Evolution had been running under the midpoint of its all-in sustaining cost guidance of AUD 1,240 per ozt. As we noted in the updated guidance, lost copper by-product revenue is a key driver expected to push full-year all-in sustaining cost beyond the range we originally guided. As Bob said earlier, underlying operating costs are still well controlled. Total capital expenditure was AUD 194 million, matching the December quarter. Full-year sustaining capital is expected to land at or below the bottom of the AUD 190 million guidance range, with major capital at the low end of the AUD 530 million-AUD 600 million range. We closed with a cash balance of AUD 164 million after the final AUD 200 million payment to Glencore for Ernest Henry and a AUD 45 million debt repayment in the quarter, delivered via positive group cash flow of AUD 96 million.

Barrie van der Merwe

executive
#16

Just to remind everyone, the fully franked dividend of AUD 0.02 per share — which adds up to an aggregate payment to shareholders of AUD 37 million and was declared earlier this quarter — is going to be paid on June 2nd. That marks Evolution's 20th consecutive dividend, bringing the total to AUD 1.09 billion since 2013. Our committed revolving credit facility of AUD 525 million is still available and fully accessible, which gives us total liquidity of AUD 689 million. I'd also like to remind you that over 60% of our debt is repayable between the 2029 and 2032 financial years, at a fixed interest rate of 3.6% per year.

Lawrie Conway

executive
#17

That's a key point when you look at our balance sheet and where we stand on liquidity. Gearing is around 31% on an unaudited basis, and after a stretch of significant capital investment, the balance sheet is in a strong and flexible position — and it's getting better as the business starts shifting toward generating net cash. At this point I'll turn things back to Darcy so we can take your questions. Thank you.

Operator

operator
#18

Thank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw that request, simply press star two. In case you're using a speakerphone, please lift the handset before asking. Our first question comes from Rahul Anand of Morgan Stanley. Please proceed.

Rahul Anand

analyst
#19

Hi, Lawrie, Barrie and team. Thanks for having me. My first question concerns Red Lake. I was looking at next year’s guidance and the 1.1 million ton mining rate needed to fill the mill. If we back solve a little for next year’s grades, it seems we arrive at roughly 5.2 to 5.3 gm a ton. I’d like some color on the optionality or upside in that grade for next year, largely because at about 7.5 gm a ton, what could potentially lift production higher at Red Lake next year? Are there some critical items you might be able to change? That’s the first one.

Lawrie Conway

executive
#20

Appreciate that, Rahul. I’ll let Bob take it from here and add his perspective. As we look ahead to next year, the biggest opportunity we see lies in the mining rates we’re able to hit at Upper Campbell — that’s where the higher-grade material you’re asking about is located. That is genuinely the area where we see the upside. Bob, would you like to add anything?

Bob Fulker

executive
#21

You're right about that. Across the three operations, the higher average grade sits at Campbell or Upper Campbell. The more tons we can pull from there, the more that average grade goes up. That's the lever we have.

Rahul Anand

analyst
#22

So is there a specific reason, then, that we're at 160 to 180, which, working backward, would imply a grade of about 5.2 grams per ton next year? And would it be fair to describe it as simply being rather conservative—in the sense that you're still carrying through those cultural changes and so on for next year?

Bob Fulker

executive
#23

Yeah. Rahul, we are still working our way into the core of the Upper Campbell zones. Getting in there, opening up those areas and everything else is taking us some time. The real point is restoring steadiness in how the mining areas are delivered and making sure we are averaged or weighted evenly across all three operations. Later in the year, we will be pulling more Campbell than we do early on; stoping has already begun in Upper Campbell, and it is slow going as we develop into it. Lawrie, would you like to add anything there?

Lawrie Conway

executive
#24

Yeah, the one thing I'd add on that, Rahul, is that when we consider the three separate areas we're mining and the mills they'll feed to keep those mills full, that's where the grade averaging-down comes from. We can't spend the whole year mining only Upper Campbell grades from Upper Campbell and still keep both mills full. As Bob said, it's a balancing act — how do we keep both mills full from those three mining areas, and each one has different grades.

Rahul Anand

analyst
#25

No, that's clear. All right, thanks for that. So, second and last question, about your costs. Yeah, definitely, really strong cost management there, and, you know, staying solidly under that guidance figure. Could you perhaps help us get a sense of a few of the main changes you made and how you managed to pull this off? Obviously, you know, during the prior year, we saw very elevated costs throughout the sector. We were still anticipating something of a tail on the inflation front, but you appear to be doing rather well where costs are concerned. How should we think about costs moving forward? Any particular key items to highlight where you've truly done well?

Lawrie Conway

executive
#26

Well, look, it's a fascinating situation because for several of our inputs, inflation hits right away, while for others there's a delay. You know, when we examine it, our power agreements for Cowal, Mungari, and Mount Rawdon keep us locked in through December. So that will carry through the second half of the year and then into FY 2024 and beyond. Labor, you know, was immediate. We witnessed that at roughly 5%-6% this year. Oil prices have declined. Shipping rates have declined. That's where we've picked up benefits. It's a combination, and really what every one of the sites has been doing throughout the year is figuring out how to control those costs. I think moving ahead, you know, we will encounter some inflationary effects that carry into FY 2024. We had built some allowance for that into our FY 2024 outlook. We're also seeing some of those costs soften compared with where they stood during the first half of the financial year. Somewhat difficult to really pinpoint anything in particular beyond the fact that what we've observed at each of our sites is a strong emphasis on it, handling it through a capital-intensive stretch, and ensuring we capitalized on the elevated metal prices we've managed to realize, which is what delivered that performance for us in the March quarter.

Rahul Anand

analyst
#27

Got it. Okay. Many thanks for that, team. I'll relay it.

Operator

operator
#28

Thanks. Our following question is from David Radclyffe at Global Mining Research. The line is yours.

David Radclyffe

analyst
#29

Oh, hello there. Good morning to you, Lawrie, and the rest of the team. I'll start with a question about capital spending. Clearly, you've cut the amount you planned to spend this financial year by a substantial margin. It seems to be particularly the case at Cowal and Red Lake. I was hoping you might give us a bit more detail on those two operations, and in particular, you know, where those savings in spending have actually come from. And then, how should we view that going forward — does that deferred spending simply move into next year? Is it spread out across a few years, or is part of that spending now being canceled?

Lawrie Conway

executive
#30

Thanks, David. So regarding major capital this year, we're tracking toward the mid-to-low portion of the major capital range. One factor behind that has been the Cowal underground project — the project team had been planning to complete everything required by June this year. As the year went on, the reviews Bob and the team carried out focused on determining what had to be in place when we began production and what had to be in place at — there's likely been somewhere between AUD 35 million and AUD 45 million of capital that wasn't actually needed as we commissioned, and that will shift into the early part of next year. That's the primary change in major capital for this year. Turning to sustaining capital, I think it's really been the sites, once again, examining their cost control and where they can save on capital. We're tracking toward the lower end of our sustaining capital. We don't foresee a material shift into next year. Based on current indications from our plans, we're right in the middle of those. The planning cycle now indicates we remain in the range of AUD 190 million to AUD 240 million for FY 2024.

Lawrie Conway

executive
#31

It's really a matter of the sites doing an excellent job with capital management this year. They've pinpointed certain projects that don't need to go ahead. They've also pinpointed certain projects that ought to be deferred, and the biggest one is the Cowal underground surface, which is being pushed into FY 2024.

David Radclyffe

analyst
#32

Thanks. Following up on that, regarding Cowal — clearly the plant was shut there, yet you're still extracting considerably more than you're putting through the mill, and it appears you've accumulated fairly sizable stockpiles over this year. Since you've been working to keep cash flows in check across the group, and the underground is now clearly ramping up, would you consider easing volumes from the open pit, or does the mine plan call for mining much harder than what's needed in the short to mid-term? Or might I ask, are you actually beginning to think about capitalizing on the fact that you hold a substantially higher permitted processing rate?

Lawrie Conway

executive
#33

Sure. Great question, David. If you ask someone from finance, their answer would always be, "Why do we outmine the mill?" Ask a mining engineer instead, and they'd tell you, "We need the highest grade going through the mill first." At Cowal, the rehandle isn't an incremental cost. Under the plan, we'll keep going — we will outmine the mill by roughly six million tons per annum this year. The same will happen again next year. Our focus there is feeding the highest grade through at the earliest possible time. When we look at it — and it's easy to say in hindsight — but consider Cowal with the stockpiles we have there: through that six to eight month stretch of extreme wet weather, we can process, and process at higher grades than would have been possible without that strategy in place. It does deliver some benefits during those periods.

David Radclyffe

analyst
#34

Okay, great, I'll make sure to share that.

Operator

operator
#35

Thanks. Our following question is from Jon Bishop of Jarden. You have the floor.

Jon Bishop

analyst
#36

Hello, everyone, and many thanks for answering my questions. I'd like to dig a bit deeper into something you said regarding Mungari and the decreases in all-in sustaining costs that are anticipated from the feasibility plans for expansion at that site. Obviously, intuitively, larger processing infrastructure will deliver economies of scale, but I'm curious about what other areas are driving significant cost savings. Because from what I understand about Mungari, filling that big plant's capacity will require you to add more mining operations. Have I got that right, or is there something I'm overlooking?

Lawrie Conway

executive
#37

Jon, the initial advantage we realize is really the economies of scale at the plant. We're seeing that decrease in processing cost per ton drop substantially, and that then carries through into the all-in sustaining cost. Another point, and we've observed it this year, is that Mungari has now stabilized and has brought the Kundana and East Kundana operations in so they form a single operation. Some efficiencies are going to come through, and the project will gain from those. What it will amount to is mining several ore sources, but the plant expansion lets them be sequenced. We do see some gain in mining costs as we begin stripping at one site while mining at another, and then wrap up at the third. You get certain advantages from consistent ore and from moving high-grade material through, which then delivers a benefit to your all-in sustaining costs. The study is close to being finished, and on the 5th of June we'll lay out the complete economics of how all of this fits together. The case being assembled for Mungari is very compelling.

Jon Bishop

analyst
#38

Alright, that's useful, thanks. To pick up on the capital allocation point, you've made it pretty clear in this quarterly release that Red Lake has to stand on its own two feet. You have the Ernest Henry life of mine extension coming, which you'll present later this quarter, and Mungari as well, once that work is done. How should we think about the medium term where your growth is concerned? I mean, you've given us a sense of Red Lake for next year — arithmetically, at the reserve grade, if you get to 1.1 million tons per annum, that would support 240,000+ ozt per annum. What timeline should we be looking at for that growth, and what does it look like? Should we be thinking AUD 750 million to AUD 800 million over the next two to three years? What do you think is a fair outlook from the market's perspective?

Lawrie Conway

executive
#39

I mean, I think when you look at it, Jon, our process for allocating capital is going to ensure we sequence those projects in the right order, instead of attempting everything simultaneously. There was a different situation where we wound up building two new underground mines, doing the integrated waste landform, and a couple of other projects. Our thinking is that you'd see Mungari come up first for a decision to move into execution. Ernest Henry has time, depending on when we get down to the 1,200 level and carry out some development there. Red Lake, really, as I said earlier on this call, has to earn the right to that capital by sustaining mining rates at the 1.1, which keeps the plants full. The upside is that if we can achieve further efficiencies at Upper Campbell and get a greater proportion of material coming through at the higher grade, then you get that without actually having to invest the capital. You invest when you can see you can sustain it at the 1.1. I think what we've gotta be conscious of at Red Lake is that if we do the processing optimization, which takes it to 1.8, that mining rate has to rise by 60% almost instantaneously, and that's the other thing we have to take into consideration when that one gets sequenced.

Lawrie Conway

executive
#40

Looking ahead a few years, the production profile we plan to lay out at Investor Day will hinge on the order in which those projects are sequenced, and they are currently in the final stages of study.

Jon Bishop

analyst
#41

All right, that’s genuinely useful. May I squeeze in just one more? Is there anything new you can share about when stamp duty will apply? Has any guidance come through from the Treasuries, especially Queensland’s?

Lawrie Conway

executive
#42

Jon, as I believe I mentioned to you at one point, right now we're operating in a one-way communication mode. That is, we'll hold back until they reach out to us.

Jon Bishop

analyst
#43

All right, thanks so much.

Operator

operator
#44

Thanks. The following question is from Matt Green at Credit Suisse. Go right ahead.

Matt Greene

analyst
#45

Hello, and good morning, everyone. I'd like to build on what was said regarding the outlook for fiscal 2024 at Red Lake. In the past, your target was roughly that one million tons, and Upper Campbell was expected to supply approximately 40% of the feed. Could you give us additional detail on what sort of shift there might be when it comes to volumes or how much the various mining areas would contribute?

Lawrie Conway

executive
#46

Appreciate that, Matt. Bob, I'll hand it off to you.

Bob Fulker

executive
#47

Yeah. Thanks, Matt. For the midterm, the goal remains reaching roughly 40% from Upper Campbell. Next year it won't quite get there—we'll come in a little short of that. By the latter part of the year, the run rate will be near that kind of level. That's due to the development and opening of the new areas; it's simply taking time to reach all the old areas. Over the long term, yep, it's still about the same.

Matt Greene

analyst
#48

Alright, thanks Bob. So, regarding the reconciliation for those Upper Campbell stopes, how is that shaping up against the reserve grade of several half grams per ton?

Bob Fulker

executive
#49

Yes. On the actual stopes — and once a mining engineer has had a go at describing them, I'll check whether Glen wants to add anything from a knowledgeable geological perspective. Those stopes really are coming out and reconciling well against the models. We're seeing some swings and roundabouts in certain zones around the old ore bodies. Broadly speaking, it's coming out the way you'd expect.

Glen Masterman

executive
#50

I think you've described it really well, Bob. With these narrow load systems, we do expect some ups and downs. A few stopes will outperform the model, while others will fall short. Overall, the reconciliations are landing where we feel comfortable.

Matt Greene

analyst
#51

That's great, thanks. So I guess just one final thing on the mill optimization — have you finished the geomet and the studies in-house, or are those still underway?

Glen Masterman

executive
#52

Some of the data has already come in. Honestly, I doubt we'll have the full picture at a level I'd be satisfied with for some time yet. At this point there's sufficient data for us to begin working out what is happening across the various ore bodies. That is from a metallurgy standpoint. The connection between that and our ability to mine the different areas in the correct proportion is where we'll begin to see some of the benefits.

Matt Greene

analyst
#53

Understood. All right. I suppose, at a conceptual level — and I realize you're still working through some of this — what's your thinking on how the mill capacity and the infrastructure already in place would be used? Are we still considering that 1.8, perhaps as a route toward two, or has the scope shifted significantly compared with what you presented to the market before?

Lawrie Conway

executive
#54

No, Matt, the scope is unchanged. It still aims at the scenarios that have been run, which say 1.8 is about the right rate for Red Lake. Those multiple scenarios are examining, you know, one plant, three plants, or some combination in between. That is the same as it was when the optimization study began.

Matt Greene

analyst
#55

All right. Regarding that single facility, would it simply be an expansion of one of the plants you already have, or could it end up being a brand-new plant?

Lawrie Conway

executive
#56

That is exactly what I said. There are several possibilities. It could be, you know, an upgrade of Campbell, or it could be a standalone option, or perhaps a combination of the three, or something in between. That is why the study, once it wraps up at the end of this year, will give us a sense of direction regarding which approach is the right one.

Matt Greene

analyst
#57

All right, that's excellent. It sounds as though we might get a bit more detail on that near the end of this year.

Lawrie Conway

executive
#58

Actually, let me return to that earlier point, though. Red Lake has to earn the right to receive the upgrade and the capital investment for it.

Matt Greene

analyst
#59

Understood. That's all, then. Appreciate it, everyone.

Operator

operator
#60

Thanks. We’ll take the next question from Alex Barkley at RBC. Go ahead, please.

Alex Barkley

analyst
#61

Okay, thank you. Morning, everyone. I have a somewhat more detailed question regarding the revision to the FY 2024 guidance at Red Lake. A lot of the problems, it seems, were cultural in nature. You have discussed that, but also operating procedures, the ore waste pass matter, and it sounds like when these problems arose, you addressed them quite swiftly. I am simply attempting to determine precisely what negative carry-through into FY 2024 you anticipate, because it appears that all aspects there are moving in a favorable direction.

Lawrie Conway

executive
#62

Sure, Alex — if we take a look at it, the December quarter's performance came in below what we'd anticipated. The work Bob has laid out has shown improvement through the March quarter, and when you consider what we'll be producing in the June quarter, the run rate there is lower than what we'd actually planned at the beginning of this year. As Bob mentioned earlier as well, the Upper Campbell percentages of material coming through in FY 2024 are somewhat lower than expected, since we've been able to access the stopes from those old workings. Those are the main items that will affect FY 2024. I think it's fair to say — and I'll pass it to Bob — but the things we'd identified that needed correcting over the last five months have been put in place, and they will deliver across the next 12 months.

Bob Fulker

executive
#63

Right, exactly. Alex, I think a good illustration is that at Cochenour we already have one pass in place, but what we still need is to get this one at Red Lake. It’s planned and signed off and it’s in the schedule, though it probably won’t actually be installed until around the end of Q1 or Q2 next year. That one is the Balmer pass. As for the drill rigs, there is currently one drill rig running underground. A second drill rig is being sent down the hole at Cochenour in 28 pieces. It should be operational by the end of this quarter. We’re gradually putting these pieces in place, and once they are fully operational, we’ll see the benefits come through.

Alex Barkley

analyst
#64

Alright, that's useful. Just one more thing about Red Lake. You mentioned consistently hitting 1.1 million tons mined per annum before considering the mill expansion. My thinking was that with Upper Campbell, the mining capacity you referenced might handle that on its own. It seems like it would mostly be a question of waiting for Upper Campbell to ramp up rather than needing consistency across the entire site. Given a year or two, I'd have expected you to reach 1.1 easily and then perhaps even need to throttle back the tons coming out of the mine, as you put it, until milling increases. So why exactly did you make that comment? It looks like hitting 1.1 is just a matter of time.

Lawrie Conway

executive
#65

Sure, I think you have to view that within the broader picture of Red Lake and of Evolution as a whole. It's reasonable to say we can reach 1.1 and perhaps exceed it, gradually raising our milling capacity. Going from 1.1 to 1.8 requires capital investment on the processing side, and you also need to invest on the mining side in mine development. For an asset that currently hasn't delivered adequate cash returns, then to go and compete for capital across the wider group — we have several other projects that probably look more compelling at present — and you need that confidence that you can raise, as I said, the mining rate by 60% to fill mills that can already consume all the feed coming through.

Alex Barkley

analyst
#66

Yeah. All right, my apologies.

Lawrie Conway

executive
#67

That covers that part.

Alex Barkley

analyst
#68

More was simply about hitting that 1.1. Yeah, that ought not to have been the case. You're right. That increase does require the additional amount.

Lawrie Conway

executive
#69

Yes, I’m with you on that — 1.1 is achievable. And if more of the mix comes from Upper Campbell, that actually means higher ounces, at a cost, with a better margin. That’s a path we’re aiming at for Red Lake. As you’ll see this year, we won’t even hit a million tons through the plant. That’s the next step we have to reach: push more higher-grade ore through, and then make the case for the expansion and beyond one point.

Alex Barkley

analyst
#70

All right, that's useful. Many thanks.

Operator

operator
#71

Thanks. The following question is from Matthew Frydman of MST Financial. You have the floor.

Matthew Frydman

analyst
#72

Sure. Thank you. Good morning, Lawrie and the team. I want to apologize upfront. I'll pick up where the previous few questions about Red Lake left off. I suppose, yes, putting it plainly, do you still consider 1.8 million tons per annum of mining a target that can be reached, in light of everything you've come to learn about the site and your deeper understanding of Upper Campbell now that mining is underway there? Or has that view shifted, given, as I said, your grasp of the mining conditions or the geometry of the ore body, the geotech, and the advance rates you've managed to achieve, has your fundamental thinking changed?

Lawrie Conway

executive
#73

Matt, good to have you back on these calls. That one I'll pass along to Bob.

Matthew Frydman

analyst
#74

Thanks, Lawrie.

Lawrie Conway

executive
#75

Yes, briefly put. That remains the case. Over to you, Bob.

Bob Fulker

executive
#76

Thanks, Lawrie. Good day, Matt. How are you doing? The short answer is that I still think it can be done, but first there's stability, and then demonstrating consistency at the 1.1, and after that it's simply a matter of achieving multiples within that 400,000 to 500,000 ton range. You know, if we can get the Upper Campbell working — or when we do — we can connect the Middle and the Lower Campbell, and reaching that point involves a great deal of development. We can actually bring Upper and Lower Red Lake into the link as well. This has to be viewed as several mining fronts and mining areas in order to reach that higher tonnage regime. That brings with it the complexity of a large operation, and it comes down to the systems we need to have in place, which ties back to what Alex was saying — we are putting those things in place, but getting them to be stable is going to take time.

Matthew Frydman

analyst
#77

Thanks a lot, Bob. Would it be reasonable to think that, if you imagine a proportional rise across all mining rates — from, say, 1.1 up to 1.8 — then proportionally you'd see a comparable bump in the equipment and people underground, and likewise a comparable rise in the monthly development rates you'd need? In other words, would each of those scale up in proportion, or are there some scale benefits that come from having several mining fronts?

Bob Fulker

executive
#78

You will get some benefits from scale, but the ore body's style and the geology have to be factored in. As Glen was saying, this is always going to be a small, lensing ore body, and extracting it is going to require a lot of development. The size will bring some scale.

Matthew Frydman

analyst
#79

Understood — many thanks, Bob. One more question about Ernest Henry: regarding the remediation effort and, I suppose, the possible design modifications you've put in place following the weather impacts, has that shifted your view at all, or informed the mine extension study when it comes to future-proofing that asset as you go deeper and potentially reducing the effect of weather events down the road?

Bob Fulker

executive
#80

Thanks, Matt — that's a really good question. From where I sit, the way the team got back in and had operations running again in such a short span of time has been a tremendous effort by the people on site. But looking ahead from here, as we go deeper, we've always had the view that at some point we need to add more mitigation strategies beneath the current emergency stopes — that's part of the work we're doing right now. Naturally, this incident has pushed it further to the front of our minds than it might otherwise have been. It's long been a line of thinking that we ought to do something further down.

Matthew Frydman

analyst
#81

All right, thank you, Bob. Should we anticipate any significant expenses tied to that, or would it simply fall under carrying out the expansion study should you decide to move ahead with it?

Lawrie Conway

executive
#82

My view is that this would simply fall under the actual expansion, or whatever steps we take, Matt. It won’t be significant, in my opinion.

Matthew Frydman

analyst
#83

Understood, and thank you so much for that. Thank you, Lawrie.

Lawrie Conway

executive
#84

Much appreciated, Matt.

Operator

operator
#85

Thanks. We'll take our next question from Mitch Ryan at Jefferies. Go right ahead.

Mitch Ryan

analyst
#86

Good morning, Lawrie and the team. To start with, I'll keep my question focused on Ernest Henry. Obviously, you've got Barminco now mobilized at the site. Could you give us some detail on the main milestones for the decline development beneath the 1,200RL, and also on the related cost and any additional detail? Is that being capitalized or expensed?

Lawrie Conway

executive
#87

I'll pass things over to Bob so he can discuss how Barminco has been performing, though I believe they had only limited time on site before the suspension came. As for the decline's cost, those amounts will be capitalized to the project — the Barminco extension project.

Mitch Ryan

analyst
#88

Since the weather was a factor, that question focused more on upcoming milestones than on past events.

Lawrie Conway

executive
#89

No, that’s not something I’ll cover. Mitch, Bob will address those points for you.

Bob Fulker

executive
#90

Mitch, the work Barminco’s doing — as Lawrie mentioned — has been somewhat paused given what happened. The plan is really to have them help speed up the decline down into the area beneath the 1,200 and the 1,125. Right now, they’re actually assisting with some other development up in the mine’s upper sections until we get back down to the bottom. From a milestone standpoint, I’d expect us to come out with that when we discuss the actual outcomes of the pre-feasibility study. That’s what they’re working toward at the moment. Barminco will help and has helped us before the rain with some of the decline work, which is the extent for our other sub levels, and also beginning to think about how we involve them in the potential for any additional infrastructure for the extension.

Mitch Ryan

analyst
#91

Thanks. Since we haven’t had sufficient Red Lake questions, here’s another one for today. Clearly, with the study due at the end of the year and your remarks that it must stand on its own two feet, suppose we reach a stage where it isn’t standing on its own two feet—do you think we could then get to a point where you’d have to examine the carrying value of the Battle North, the Bateman Mill, in relation to that?

Lawrie Conway

executive
#92

No, Mitch — what I mean is that right now, once the study wraps up and depending on which direction we take it, in terms of how that expansion would get done, we then assess what the assets are worth. That happens each six-month reporting period. Right now, nothing is anticipated on that front. It also hinges on when we actually schedule the expansion.

Mitch Ryan

analyst
#93

Apologies, and for my last question I’ll stay on Red Lake. You’ve begun to show some operational gains. We have seen a handful of mornings like that, but what exactly is behind those operational gains during the last quarter? Are you putting more people or machines into it, or are you achieving better productivity from the machines and people already there?

Lawrie Conway

executive
#94

I'll pass it along to Bob, who is practically a resident of Red Lake at this point. My sense is that several factors are at play — some related to reorganizing the site and keeping up the work on culture and behaviors, and some related to what has also been installed. Bob.

Bob Fulker

executive
#95

Correct, that's spot on. What I'd add is that we've been pinpointing what I'd call internal constraints, and our focus is on ensuring we implement lasting fixes rather than merely applying temporary patches. That ore pass is a solid example. The drill rigs are another. We've kept pushing along with the old-style drill rigs, and we finally had to accept the hard truth and say, "Look, we have to move to the new style in order to achieve the productivity gain and the cost reduction." It comes down to ensuring we concentrate on the right priorities. The people on site want to perform well, they genuinely want to develop and produce. We simply have to establish the systems around them that let them do so.

Mitch Ryan

analyst
#96

I appreciate that.

Operator

operator
#97

Thanks. We move to our following question, which is from Trent Allen at CLSA. The line is yours.

Trent Allen

analyst
#98

Thanks, guys. I think we've probably had enough questions on Red Lake. I'll step back and ask the M&A question. It's very topical at the moment, of course, you know, Newcrest, Newmont. We said farewell to Bob's old friend, OZ Minerals, this week. I don't know if it's accurate, but I read in the papers that the owners of Northparkes might be entertaining offers for that asset. Of course, Evolution grew by M&A and portfolio upgrades, and it hasn't been on the cards for a while, but it feels like with Red Lake finding a level, Ernest Henry back in operation, something you might think about. I won't ask you if you will consider it because I know you will in the future, but maybe you can remind us of what your criteria are for M&A. How many assets you like to operate, what kinds of operations you look at, and also what state the balance sheet needs to be in before you consider it. Thank you.

Lawrie Conway

executive
#99

Yes. Trent, I believe it’s reasonable to say that with consolidation in the industry occurring at a heightened pace right now, our view is that this does create an opportunity for assets to come to market. Kirron and the team keep evaluating what opportunities might emerge. From where we sit, we’ve stated that we think running as many as eight assets is a good size for us as an organization. We currently have five, and one of those will move out over the next couple of years in terms of Mount Rawdon, either as pumped hydro or as mining comes to an end. So we have capacity from that standpoint. On asset quality, we want assets with long life. We’re seeking a mine life of more than 10 years, high margin, similar to what we already have. So long as it improves the quality of the portfolio, those are assets we would certainly take a look at. I think the Ernest Henry transaction back in 2016 demonstrates that we’re willing to consider joint ventures as well as owning assets 100%. Our focus on Tier 1 jurisdictions has not changed.

Trent Allen

analyst
#100

All right, thank you for that. This is a bit of a cheeky one to ask, as always, but are there any plans on your side to raise capital in the near term? Thanks.

Lawrie Conway

executive
#101

<<inaudible>>

Trent Allen

analyst
#102

That is exactly the response I expected from you. I appreciate it.

Operator

operator
#103

Thanks. The next question is from Tom Prendiville at Canaccord Genuity. Go ahead, please.

Tom Prendiville

analyst
#104

Good morning, Lawrie, and everyone on the team. Appreciate the presentation. I might pick up where Trent left off with his corporate-related question and probe a bit further into what you said about hedging. It's clear that your hedges are unwinding fairly rapidly, and by the close of this financial year you'll have no hedges at all. Naturally, that leaves you with complete exposure to a gold price that's close to an all-time high. From what I understand, Evolution really only puts hedges in place when it does M&A. So I suppose what I'm asking is whether we can take it that, with the hedge book running down, you won't immediately re-enter hedging? Or otherwise, what's the plan for the near term?

Lawrie Conway

executive
#105

That's essentially a stealth M&A question. I'd put it this way: hedging has served us as a capital management tool. And it's not as though hedging has only ever been deployed in acquisition mode. Take Red Lake — when we bought it, we understood substantial development work would be needed to bring it back to a better operating state, so we put some hedges in place there, on cutbacks. Big cutbacks at open pits are another instance where we've used hedging. Our thinking is that, at this point, given where the balance sheet stands, and as Barrie laid out going forward, we intend to stay unhedged. Whenever we pursue M&A, we always examine the overall mix — the balance sheet, debt, equity and hedging each have a part to play.

Tom Prendiville

analyst
#106

All right, excellent, thank you — I'll make sure that gets shared.

Operator

operator
#107

Thanks. We’ll take the next question from Paul Kaner at Ord Minnett. Go right ahead.

Paul Kaner

analyst
#108

Morning, gentlemen. Thanks for taking my question. Nothing about Red Lake—just one on the balance sheet. I appreciate that roughly 60% of your balance sheet, or your debt, sorry, is longer dated, and that you have this optionality with the revolver. Are there any earnings or gearing ratios on the other facilities that might affect your confidence? For instance, if you were to go above that 35% gearing mark, would anything need to be renegotiated?

Lawrie Conway

executive
#109

No. When it comes to those two term loan facilities, there are several covenants involved, and tangible net worth is one of them — we're inside our tolerances, and we're genuinely covered on interest and similar items, debt servicing. None of these present problems for us. As a matter of fact, across every one of them we feel quite comfortable with the direction we're going, because as Barrie laid out, what we basically see is that the final payment to Glencore has now been made. We hold AUD 164 million in cash, which covers debt repayment for this quarter, and stamp duty should rise. After that we're set for the dividend in June. We're now entering that cash generation phase in order to begin deleveraging, which further strengthens the balance sheet position. There's nothing — from what we examine — that either limits us when drawing the revolver or requires any renegotiation on those two facilities.

Paul Kaner

analyst
#110

Great. No, that works well. Thanks so much. I have nothing further.

Operator

operator
#111

Thanks. We’ll take the next question from Al Harvey at JPMorgan. You have the floor.

Al Harvey

analyst
#112

Hello everyone, good to speak with you. Could we get a brief status check regarding the Mount Rawdon pumped hydro study — specifically its timeline — and also your view on whether that release will end up being a significant event for the share price once it lands?

Lawrie Conway

executive
#113

Al, Jake is going to appreciate that you raised this. We needed to hold it until this section of the call. The study is progressing nicely. There are two main milestones. Later this year, we essentially complete the technical feasibility study, confirming through all the work that the project is genuinely technically viable. That effort is moving along well and gives us considerable confidence that this will hold true. The second piece, coming in the first half of the next calendar year, is when the commercial study portion reaches completion, since you clearly must settle the facility's size. You then have to determine which offtake parties would be prepared to commit, and those parties likewise need clarity on what the terms of those offtakes would be. That falls within that window. Around the middle of next calendar year, we expect to reach a conclusion. At that point we would know what we would be doing with that project. As Jake has mentioned repeatedly, it spans from zero to AUD 1 billion, and we hold 50%.

Lawrie Conway

executive
#114

We genuinely won't have clarity on exactly what that figure will turn out to be until both of those study components are complete.

Al Harvey

analyst
#115

Yeah, understood. Maybe just one last thing for Glen. I suppose we all saw Musgrave Minerals put out their study earlier this week on Cue. That's outside the joint venture you have with them, of course. I guess I'm just after a quick update on West Island. I take it you've hit the farm-in threshold, and where do you see the potential for that project going?

Glen Masterman

executive
#116

Oh, Al, I was actually hoping you would ask about Ernest Henry Drilling, but I can discuss Cue instead. That's fine. Look, we announced last quarter that we had finished that earning, so that brings us to a 75% interest on the joint venture ground, which lies north of the 100% owned tenements that Musgrave described in their update earlier in the week. I think, in terms of where we stand, look, we are in the final phase of completing resource modeling on two main targets there. West Island is one of them that you mentioned. The other is A Zone, which is a little bit to the south. Yeah, once we have that information, that will sort of guide where we go next on the JV.

Dan Morgan

analyst
#117

Appreciate it, everyone.

Operator

operator
#118

Thanks. The next question is from Daniel Morgan at Barrenjoey. Go ahead, please.

Dan Morgan

analyst
#119

Hello. A brief question about accounting, of all things. We saw a significant increase in D&A allocated to Mungari. What's driving that? I realize it can be uneven, but is there any shift there, or anything we should know about?

Lawrie Conway

executive
#120

Dan, look, the key item there would be — probably during this quarter — a true-up as we wrapped up all the acquisition accounting, the fair value uplift, which then is beginning to be amortized in connection with Kundana and East Kundana. We can certainly provide you the breakdown on that, along with where it stands going forward.

Dan Morgan

analyst
#121

Sure. Sorry to circle back to Red Lake again. I realize plenty of questions have come up already, but on the CYD decline, my understanding is that it's meant to connect with the deeper portions of the mine, and that represents a significant catalyst for the operation. When is that expected to happen?

Lawrie Conway

executive
#122

I'll pass things over to Bob, since right now there's a positive story coming out of Red Lake.

Bob Fulker

executive
#123

The real drop from the surface is now roughly five level, and it's continuing to fall. We've opened up 11 level. About a week and a half back, we completed the final stripping into the shaft, and everything went smoothly. At this point we have a five and a half to five and a half drive running from the Reid Shaft all the way around to the Campbell area and to the location — not quite reaching the actual decline up and down location, but reaching the location on the level where we can begin developing upwards too. That leaves only the level between roughly five to five and a half level and 11 level. That's approximately six months of development at full tilt.

Dan Morgan

analyst
#124

Yeah, right. Just so I’m clear: starting at the end of this year, will you be able to drive equipment down and reach every part of the mine? Is that — am I understanding that correctly?

Bob Fulker

executive
#125

The milestone for getting everything down, CYD comes a bit later, since we have to move from the 11 level down to the 14 level. Once we're down at the 14 level, we have a four before drive. From there, we can essentially drive everything down and across into Red Lake, into Lower Campbell, et cetera, et cetera. At that point, we won't be able to drive it up into Cochenour until the decline at Cochenour is broken through to the 52 level. Getting that Cochenour one through takes around about nine to 12 months.

Dan Morgan

analyst
#126

Great. Appreciate the responses. Cheers.

Operator

operator
#127

Thank you. That brings us to the end of the time available for questions today. I'll now turn things back over to Mr. Conway for some closing remarks.

Lawrie Conway

executive
#128

Thanks, Darcy, and thanks to all of you for spending time with us today. We truly appreciate the effort you've made to be on this call. As I noted in the release, this was, you know, a pivotal quarter for us here at Evolution. It lets us keep moving toward generating net cash and to grow production in FY 2024, and that will be further boosted as we become fully unhedged at the close of this quarter, so we can take advantage of the higher metal prices. We've got a number of engagements lined up over the next couple of months: the Macquarie Conference in early May, the Bank of America conference in mid-May, ahead of our Investor Day on the 5th of June, which includes site visits to Cowal and Ernest Henry on the days following the Investor Day. If anyone needs any information on that, please feel free to reach out to Rocky and Taryn. Finally, I do want to express our appreciation to Taryn Chua in Investor Relations, who finishes up with us at the end of this month. She has done an incredible job, both in Investor Relations and in business development. We thank her for her efforts and wish her all the best for the future.

Lawrie Conway

executive
#129

I appreciate that, and…

Operator

operator
#130

Thanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.