Evolution Mining Limited (EVN) Earnings Call Transcript & Summary
July 20, 2023
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone joining us and want to welcome you to the June 2023 Quarter Results Call for Evolution Mining Limited. <<operator_script>> At this point I'll turn the conference over to Mr. Lawrie Conway, who serves as Chief Executive Officer and Managing Director. Please go ahead.
Lawrie Conway
executiveThanks, Darcy, and good morning, everyone. Appreciate you being with us this morning as we lay out the results for the June quarter, which were released on the ASX this morning. On the call with me today are Bob Fulker, our COO; Barrie Van Der Merwe, our CFO; Glen Masterman, our VP of Discovery; and Peter O'Connor, our GM, Investor Relations. As we set out at our Investor Day last month, there's a very clear plan in place for the next few years, under which we'll be delivering low-cost production with reduced capital intensity, which will enable us to deleverage the balance sheet and deliver improved returns for our shareholders. From FY '24 to FY '26, 4 of our assets will move to higher production rates and increased cash generation. FY '23 was about positioning these assets into this phase. We have a fantastic pipeline of projects that will increase mine life and margin, and they all have further upside potential, which we are currently evaluating. This is evidenced by the excellent drilling results that Ernest Henry released today, which further enhances the expansion project and continues to give us confidence that there is much more value to be unlocked at this asset.
Lawrie Conway
executiveGlen will walk you through those results in a moment. The June quarter was all about getting the business ready for FY '24. And I can confirm we're entering FY '24 in a position to deliver on those plans. That objective was met, though a couple of areas could have turned out better. On safety, our total recordable injury frequency fell by another 3% to 8.64, and that's now 19% below where it stood at the beginning of the year. Given a year with so much activity, change and adverse weather hitting our business, it's very pleasing that the team kept its focus on doing tasks safely. Turning to production, the positives include Ernest Henry getting back to normal operations after recovering from the weather event. Mungari turned in another strong, consistent quarter. Cowal kept producing low cost ounces and higher cash flows. Red Lake improved by 12% to 31,500 ounces, and we saw higher production at Mt Rawdon. For the year overall, we produced 651,000 ounces at an all-in sustaining cost of $1,450 an ounce, broadly in line with guidance of approximately 660,000 ounces at $1,390 an ounce. The main drivers of the production variances were unplanned outages at Red Lake, which cut production by 3,500 ounces, a slower ramp-up at Ernest Henry of around 3,000 ounces and 1,000 copper tonnes, and roughly 2,000 ounces less at Mt Rawdon because of the timing of pit access.
Lawrie Conway
executiveThat reduced output carried through to our all-in sustaining cost to the tune of roughly $25 per ounce, and the weaker copper output affected AISC by around $20 per ounce. A lower realized copper price of $10,600 per tonne in the quarter was mostly tied to QP adjustments stemming from the March quarter, and that contributed about $25 per ounce to the all-in sustaining cost. We produced slightly under $200 million in operating mine cash flow during the quarter, and the drop versus the prior quarter came from the production hit at Ernest Henry. That event led to roughly $160 million less cash flow in the last quarter. Mine operating cash flow for the full year came to $944 million, and mine cash flow before major capital was $747 million. We ended the year with a cash balance of $46 million. That came in above our expectations, since we understood during May and June that operating cash flow at Ernest Henry would be reduced because of limited revenue, as noted earlier, while those assets still carried nearly all of their operating costs plus recovery costs. Now that Ernest Henry is operating normally again, that stronger cash flow will pick right back up starting in July.
Lawrie Conway
executiveBob will walk everyone through the quarter's operational results in detail shortly, along with how each of these assets is positioned entering FY '24 to deliver its plan. That said, a few important points deserve mention right now, and they back up our guidance of 770,000 ounces at $1,370 per ounce, as well as how the business is shifting toward stronger net cash generation and deleveraging starting in FY '24. Cowal hit 2 significant milestones during FY '23: ramping up higher-grade ore in Stage H and starting production at the new underground mine. Cowal turned in record annual production since we've owned it, despite the weather effects felt in the first half of the year. Cowal is now becoming a major cash contributor to the business as capital investment declines. One more notable accomplishment at Cowal: it has generated positive cash for the last 3 quarters and finished the year net cash positive, even following the significant capital investment. Ernest Henry was back to normal operations by the close of FY '23, and the effort over the last 3 months to reach that point reflects great credit on the team. What this means is that Ernest Henry is now once again the high-margin, strong cash generating asset it had been for many years.
Lawrie Conway
executiveI visited Red Lake about two weeks back, and versus my last trip there was meaningful movement on the improvement plan. Things are heading the right way, and the shifts currently underway will help Red Lake grow steadier and begin producing returns. Red Lake posted a better quarter, and although our aim was to hit 35,000 ounces in that period, the silver lining in output coming in a bit under target is that unplanned operational outages caused it, rather than the cultural or behavioral factors behind earlier shortfalls. Going into FY '24, a higher production rate at Red Lake will be paired with a better cost position, and many cultural and hygiene issues have now been settled. Effective 1 July, all staff are on salary contracts with steady rosters plus a bonus system tied to the wider organization's approach, built on performance and positive cash hurdles. The structural issues have been dealt with too. John Penhall, who was our General Manager at Cowal, has been named VP Red Lake. John raised his hand for the job a couple of months back, and we view John as the right leader for Red Lake from here.
Lawrie Conway
executiveSo Bob can go back to being COO full time. We've reset the management superintendent levels, and we're now rightsizing the organization, with a workforce reduction of at least 10% to be carried out by the end of the September quarter, which will deliver roughly $12 million in annualized savings. Mungari has performed consistently for the past 2 years, along with the work done in recent months on the cost profile. Mungari should generate materially higher operating cash flow to fund the investment in the plant expansion. That shift in cash generation at Mungari is what let us justify the investment in the plant expansion. I'll now hand things to Bob, who'll walk you through the operations performance in more detail.
Robert Fulker
executiveThanks, Lawrie, and good morning, everyone. As Lawrie mentioned, group-wide in FY '23 our TRIF fell by 19%. Every operation has improved as the safety improvement plans take hold. In Quarter 4 we came out of FY '23 ready and prepared for FY '24. Happily, Cowal and Mungari beat plan for both the quarter and the year. Ernest Henry got back to normal operations by the end of June, recovering from the March weather event. That has positioned them to deliver guidance in FY '24. Red Lake lifted gold production by 12% in the June quarter, which builds on the operational improvements made in the March quarter and shows our efforts are beginning to bear fruit. Mt Rawdon finished the year with higher-grade faces open and being mined and new water in the pit. Cowal turned in another strong production quarter with 73,000 ounces at an all-in sustaining cost of $1,138 an ounce. Happily, ore mined was a quarterly record for Evolution. Quarter-on-quarter, ore mined rose by 3% to reach 4.5 million tonnes at 0.97 grams per tonne. That includes 54,000 tonnes at 3 grams -- 3.09 grams per tonne from underground. Combining these underground and open pit ore tonnages gave a mill feed of 2.1 million tonnes at 1.29 grams per tonne.
Robert Fulker
executiveWe expect ore output to be below the level of the past two quarters, because of the planned mill shutdown in Q1. After that, though, quarterly ounce production should rise as the year goes on, driven by a growing share of underground feed. As that underground feed increases, we will also see process grade climb steadily through FY '24 as the underground proportion grows. For the full year, the average combined processing grade is expected to be 1.3 to 1.4 grams per tonne. The underground ramp-up is proceeding as planned, with full commissioning of the paste plant in a village taking place this quarter and commercial production anticipated by the end of the December quarter. Cowal's operating mine cash flow for the full year rose $369 million, and with the significant investment in the new underground mine now complete, major capital spending will decline over the coming year. That means Cowal has begun shifting back toward being a material cash generator for the business. Ernest Henry has fully recovered from the extreme weather we faced in March, which required a major recovery initiative, limited ore tonnes mined and processing of low-grade stockpiles. The effect of that event on ounces, cost and cash flow is reflected in this quarter's results.
Robert Fulker
executiveBy the end of June, everything at Ernest Henry — the tape, draw, and shaft operations, plus production drilling and development — had reached full production rates, restoring it to the consistent, reliable performer it has been known to be. Output in Quarter 4 came in a bit softer than anticipated, owing to some start-up problems tied to the mine infrastructure and to blending low-grade stockpiles with cave material. All of those issues have since been resolved, and we have now been running at steady state for more than 4 weeks. The operation has turned its attention to developing the 1,200 level, which will serve as the primary production source through the second half of FY '24. Feasibility study work on the cave extension is advancing according to plan, and our mineral resource update will be completed during the September quarter. All-in sustaining costs took a significant hit from the low ounce and copper output, along with a realized copper price that came in below expectations. I expect coming quarters to return to historic levels. Full year mine operating cash flow at Ernest Henry came to $398 million, and while that is solid and speaks to the asset's quality, I am frustrated that we lost the fourth quarter, which would have given us another superb year at Ernest Henry.
Robert Fulker
executiveAs Lawrie said, John Penhall has been named a VP of Red Lake. I want to thank John for taking on this role, and I'm eager to watch him and the team keep building on the improvements at Red Lake. Over the past 2 quarters, Red Lake has posted a 12% rise in ounces. The June quarter also brought a 12% gain in grade, along with more than 4,000 meters of steady development. Development in H2 came in 12% above H1. Those results stem from the steady emphasis on better mining practices that we discussed earlier. On the cultural side, we have moved every employee onto one aligned incentive program, featuring base salary compensation plus an incentive bonus tied to operational performance. We've also put consistent rosters in place. The purpose of these steps is to support employee satisfaction, productivity, and alignment with our company goals. In June we began resizing the workforce, aiming to match our people to the smaller equipment fleet and the operating tasks so we can lift operational efficiencies. Those reductions will carry into FY '24 as we complete moving people around the site. By the end of Q1, we are aiming for an overall reduction of roughly 10%, and that is expected to produce yearly cost savings of roughly $12 million with no compromise to safety, while also boosting our productivity.
Robert Fulker
executiveThe Q4 shortfall came from 2 additional pass blockages, which led to a 12-day — sorry, 12-hour — loss of production at Cochenour. These operational problems, which can be fixed easily, differ from the <<inaudible>> issues we discussed earlier. Those initiatives, together with our continued dedication to sustainable and ongoing improvement at Red Lake, had put Red Lake in position to deliver into FY '24. Mungari keeps justifying the confidence we place in it by delivering consistently and reliably. Full year production came to 136,000 ounces. As we announced before, we have approved moving the Mungari growth project into execution. This will lift processing capacity to 4.2 million tonnes per year. Production for the quarter matched what we expected, owing to a smaller share of underground feed than in prior quarters, along with an East Kundana milling campaign. Cutters Ridge was finished in the quarter, and the mining fleet is now focused on prestripping work at Paradigm. Ore extraction from Paradigm is now anticipated to begin in the September quarter. All-in sustaining cost rose to $2,083 per ounce, mainly because of the production — the planned reduction in production. Mungari's total costs were 4.5% lower in H2 than in H1, reflecting the benefit of the site optimization we have continued to observe.
Robert Fulker
executiveWhen you look at the whole year, Mungari generated mine operating cash flow of $108 million, which shows a strong financial result. At Mt Rawdon in Q4, we saw meaningful gains in gold output, with both material movement and ounces produced reaching their highest levels for the year. Over this period, we've had less rain, which has given us better pit availability and access to the high-grade zones within the pit. The pit — those technical issues are going to need active management as we move forward. For safety reasons, that might mean a minor change to the mining sequence. Net mine cash flow for the quarter rose to $11 million. As we look ahead to FY '24, Mt Rawdon is well placed to meet its production and cost guidance as the high-grade ore on the pit floor gets mined and processed. Thank you for your time — I'll now hand things over to Glen for an exploration update.
Glenton Masterman
executiveThanks, Bob, and good morning, everyone. I want to direct your attention to the exploration announcement we put out this morning, which describes additional <<inaudible>> and high-grade drilling results at Ernest Henry. Given how strongly the surface drilling program focused on infill and the fact that the underground program had been suspended since March, I wasn't expecting to be describing much in the way of new results from the June quarter. That said, the results we got back came in well above what I had expected and keep highlighting the quality of this world-class mineral system. Three things have come out of the latest results. First, we've confirmed that the lower lenses extend below the feasibility study footprint, not in the direction of Ernie Junior. Second, we've pushed the high-grade gold domain identified within the modeled copper grade shell further south and down plunge. And finally, the lower lenses are wider than our previous modeling had indicated, with the <<inaudible>> now sitting further west in the model. What these results mean is that the mineral resource will keep expanding beyond the mine extension footprint, especially in the area shown in green on the long section in Figure 1 of this morning's exploration announcement.
Glenton Masterman
executiveIn addition, what the drilling results are showing us is that metal grades inside the mine extension footprint, and beneath it as well, are staying stable — and on the gold side they may even be rising — which lines up with the grades we estimated in the model. As Bob said, our next update to the Ernest Henry Mineral Resource will be finished in the September quarter, and it will take in the strong results from the last 6 months of drilling. I'm also happy to report that we have recently awarded new contracts for underground and surface drilling at Ernest Henry. Both of those service providers are now mobilizing to site so they can kick off the eagerly awaited definition and extension drilling programs at Bert and in the Ernie Junior connector zone. I'm looking forward to reporting what I expect will be another set of exciting drilling results in the September and December quarters. Moving on now to Mungari, where I was on site last week with our geologists running the underground and open pit drilling programs. The focus of our drilling is to solidify the production schedule past the first 5 years of production for the growth project at the 4 million tonne per year milling rate. It was really pleasing to see the 2 underground rigs set up nearly side by side, aggressively drilling extensions of mineralization past the leading edges of the Genesis and Christmas veins at Kundana.
Glenton Masterman
executiveWe're doing work that's increasing the potential resources at those 2 known structures, and it's also giving us fresh insight into what new structures might hold — and I'm confident we'll find them as we keep deepening our geological understanding of the Millennium system. It was also nice to get out to the Paradigm pit and see the exposure at the top of the <<inaudible>> in the geology, which suggests we're not far from breaking through into the top of the ore body. I went over to our RC rig to check on how the definition drilling beneath the current pit design is progressing. This program is still in its early days; its goal is to turn resources into reserves, which will support expanding the pit design and let us keep this production center going longer than the current plan forecasts. Once the rig wraps up at Paradigm, it will move on to pursue a similar objective at Castle Hill. Finally, this morning's announcement included the results of our modeling at the Cue Joint venture, which led to the declaration of a 143,000 ounces Inferred Mineral Resource at West Island. That resource was optimized into a single pit grading 2.6 grams per tonne, and it sits 6 kilometers north of Musgrave Minerals' resource footprint at Lena and Break of Day.
Glenton Masterman
executiveWe still see appealing upside in the high-grade loads that our deeper drilling has defined at West Island, which sit beneath the bottom of the oxide pit design. Along the 7-kilometer mineralized trend that links back to the Lena and Break of Day deposits, there are many further exploration targets. We keep evaluating the choices available to us for unlocking and crystallizing the value of our stake in this joint venture. With that, I'll pass things over to Barrie.
Barrie van der Merwe
executiveThanks, Glen, and good morning, everyone. In the fourth quarter, every operation produced cash at the operating level. Even with the big hit to revenue from the weather event at Ernest Henry, that site broke even on mine cash flow before major capital during the quarter. The weather event, which came to roughly $160 million, was a factor behind the weaker net cash flow we saw this quarter. Over the quarter, we paid down $40 million of debt and $37 million in dividends. Net cash flow for the quarter came in above what we had anticipated when the production outage began. Across the full year, every operation except Red Lake delivered net mine cash flow, and at Red Lake major capital expenditure of $189 million will position it to keep moving toward a stable, reliable production rate of 200,000 ounces, as we set out at the Investor Day. With production rising 18% to 770,000 ounces in FY '24, a lower planned capital investment and our leading cost position, we expect improved and strong cash generation in FY '24. Gold production in FY '24 is planned to be weighted to the second half as the Cowal underground mine and Red Lake's Upper Campbell mine ramp up.
Barrie van der Merwe
executiveDuring the opening half of FY '24, planned maintenance shutdowns are also scheduled for the first quarter. Output of 50,000 tonnes of copper is going to be delivered evenly across the year. We expect all-in sustaining cost per ounce for FY '24, at $1,370 per ounce, to come down from present levels as production ramps up through the year. Capital investment is falling in FY '24, with major project capital guided to be roughly $100 million lower than FY '23. As we explained at the Investor Day, our focus with major projects is managing the overall schedule and budget of projects so the business case is delivered. Sustaining capital should be consistent quarter-on-quarter. That said, discipline on capital allocation will remain in place to ensure we invest the right amounts at the right time. The balance sheet position is strong, with gearing remaining below our upward target of 35%. As we move into FY '24, increased cash generation will see us shift to a deleveraging phase. Following the debt restructuring undertaken in June 2023, Evolution has no debt settlement commitments in FY '24 and benefits from the current high price environment, with only 20,000 gold ounces, or 2.5% of production, hedged at $3,084 per ounce for delivery in the second half of FY '24.
Barrie van der Merwe
executiveIncreased output at today’s pricing, combined with reduced capex, is going to drive robust cash flow for the year and put us on a path to begin paying down debt. At this point we’ll open it up for your questions, and I’ll turn things back over to Darcy. Thank you.
Operator
operator<<operator_script>> Our initial question is from Andrew Bowler of Macquarie.
Andrew Bowler
analystYeah, I have a few questions regarding the workforce cut at Red Lake — the 10% target. Could you go into a little more detail about where those reductions are happening? Are they at the operational level, the tech services level, or management? Any additional detail would be helpful, please.
Lawrie Conway
executiveYes. Actually, Andrew, I’ll let Bob take that one and walk through it, but basically, this applies throughout every part of the business, including the operational areas.
Robert Fulker
executiveYou've got it right, Andrew. So it's rising across every area. We're continuing to restructure and shift pieces here and there, but that 10% is going to come from throughout the entire business.
Andrew Bowler
analystOn the exploration side, that's probably one for Glen. Regarding the upgraded resource at Ernest Henry that we expect this quarter — has the data cutoff for it already gone by, or are you still awaiting some assay results that will be folded in?
Glenton Masterman
executiveNo. Andrew, the data cutoff is already closed. So that modeling and estimation work is underway right now. I don't have the exact date of the data cutoff, but it would have been at least about 6 weeks ago. So the information that came through in this morning's announcement will be bundled up and incorporated in the next update that we do as part of our regular annual run in December.
Andrew Bowler
analystAnd one final quick item from me. On the Musgrave JV — obviously the maiden resource there is interesting. Have you done any kind of check <<inaudible>> on what that JV might look like assuming they successfully close the deal, or does that remain a tool for after completion?
Glenton Masterman
executiveWell, yes — it's a fascinating scenario to work through for Musgrave, and I suppose it isn't a shock given an operating plant sits close by. Look, I think we've — as I mentioned, we're still working out what choices are available to us. That project still holds upside. And we're deciding whether it's something we'll push forward with and try to bring to completion, or whether other opportunities might be more logical when it comes to how we unlock value from that joint venture interest.
Operator
operatorOur following question is from Kate McCutcheon at Citi.
Kate McCutcheon
analystRegarding Red Lake, could you walk us through how the mining recovery and dilution are trending there, along with the ore pass problems you encountered this quarter — are you confident those are transient? Maybe a bit more detail on that.
Lawrie Conway
executiveAppreciate it, Kate — Bob is fully set to field those questions.
Robert Fulker
executiveI think the improvement in grade is a solid sign that dilution is beginning to be brought under control in the stoping blocks. Since we implemented the <<inaudible>>, we've seen far fewer drilling problems. Post-drilling, the <<inaudible>> is now coming in extremely close to design. And if they do have to drill a hole away from the original design, they're able to recalibrate as they go to make sure the toe lands in the right spot underground, so that's in place and it's working. Blasting is actually working quite well and -- not quite very well. And we've had a lot fewer problems over the last, I'd say, 4 to 6 weeks. Than we were having, in the last half of last quarter and the start of this quarter. So we're seeing plenty of improvements and far fewer blasting problems, which is helping recovery, improving ore flow and improving how consistently the plan is delivered. So that's improving all of those sorts of things. The ore pass problems we had at the Cochenour and Balmer mines, if you recall last quarter, we had some issues at Balmer.
Robert Fulker
executiveWe're currently finishing up the final development work on the Balmer rectification, and that should be installed during the next quarter, which will resolve that problem for good. The issues at Cochenour were small ones involving the blockages, which simply came about from some sloughing happening in the actual pass along with a few problems we had at the top. We had Grizzly bars in place. We didn't have a Grizzly mat, and those bars ended up bent, which let our oversized box get in there, and all of that is already being repaired. So I expect fewer of those kinds of things going forward. As for the ore passes, we're going to run into problems from time to time down the road, but we just have to ensure we have contingencies ready to handle them, and we're building those out there.
Kate McCutcheon
analystGot it. Now regarding Cowal Underground — I'd have thought those numbers would come up from one quarter to the next. Should we read anything into that, or is it simply the ramp-up?
Robert Fulker
executiveSorry, which metric was that?
Kate McCutcheon
analystRegarding Cowal, we have the underground figures for tonnes mined as well as the grade.
Robert Fulker
executiveYeah, we're going to keep ramping up throughout this year. That grade I provided was an average covering both open pit and underground at Cowal over 12 months. However, Q1 is going to come in lower, and Q4 will clearly be higher. Tonnage is going to rise. We completed 54 blasts last quarter. This quarter it should be roughly 100. And as we close out the year, we'll be at approximately 400,000 tonnes for that quarter. So that's the step-up we achieve across the year to hit our annual tonnes and ounces. And the underground value, of course, is higher.
Kate McCutcheon
analystRight, so that — I believe you were sort of pointing toward a 2.3 to 2.5 grade level there?
Robert Fulker
executiveRight, that figure represents the yearly average as well as the first quarter, though it's essentially the lowest grade, given the limited tonnage we're receiving.
Kate McCutcheon
analystOkay, cool. And for my last question, maybe this is just for Barrie — regarding those one-off costs at Ernest Henry, is there anything we should be aware of as they flow through the P&L?
Barrie van der Merwe
executiveRegarding those one-time expenses on the stat P&L, Kate, they'll simply flow through in the usual way. Then, as we noted in the release, for purposes of AIC per ounces, they were normalized. Obviously, some of those costs will be recovered through insurance into next year as we move along and finalize that.
Robert Fulker
executiveYes. So to put it briefly, Kate, the loss cash flow clearly doesn’t show up in revenue, and every cost — whether operating or recovery-related — will hit the P&L. So all the costs reported in the quarterly will go to the P&L.
Kate McCutcheon
analystAll right, so that covers everything. Yes. Great. That helps. And regarding the insurance figures, you still don’t have any visibility into their timing or size?
Barrie van der Merwe
executiveI mean, that takes some working through, and we'll see it unfold over the next year. Lawrie?
Lawrie Conway
executiveRight, Kate — at this point we don't, and that comes down to how the insurance is structured. There's a 42-day deductible we have to get through first. So the question becomes: apart from those 42 days, what did the outage actually cost us, and what portion of that is insurable? Finalizing that will likely take a few months, in our view. Now that operations are restored, we've assembled all the relevant information and handed it to the underwriters so they can carry out an assessment.
Operator
operatorDaniel Morgan with Barrenjoey has the next question.
Dan Morgan
analystPerhaps we could begin with that final item—regarding how far the insurance plan reaches—and ask whether, as an approximate guideline, what falls within scope is the operating cost you would have taken on across those 42 days. Is that the kind of rough rule of thumb we can apply?
Lawrie Conway
executiveNo, Dan — it's a bit more involved than that. You have those standing charges, and you need to determine which portion actually falls within the deductible; after that, they carry out an assessment, reviewing the prior 12 months to establish what a typical run rate would look like, and then they also make a judgment about the metal prices that should be applied to the revenue you'd have lost and so on. So on our side, we view the insurance recoverable amount as neither material nor major relative to the lost revenue, which is exactly why we won't be making a provision for it in the accounts.
Dan Morgan
analystAbsolutely, that works. All right.
Lawrie Conway
executiveKeep in mind — as you'll recall, we actually resumed operations before reaching the full deductible days. So the question then becomes how much time you've spent running at reduced rates after that deductible period, and that's the reason the figure you end up with as a recoverable comes out lower.
Dan Morgan
analystYes. All right. And remaining on Ernest Henry for a moment. It sounds as though every one of the main work streams is back to full strength by the close of the quarter, so we've begun this year on a strong footing. That said, is there anything else at the site that might linger, which would imply the first quarter of this year carries some operational effect we should factor in, or is it a clean year ahead at Ernest Henry?
Lawrie Conway
executiveI’ll pass it over to Bob, who’s been back in his role for a couple of weeks now and is fully up to speed on it. But basically, by the end of June, as we said, every one of the areas that lets us return into the production areas is clear and clean. The area has been brought down to the 1,200 level, which allows us to get in there for development. Of course, below 1,200 there’s still a bit of cleanup left to do, though it isn’t significant. And obviously, there’s a bit of modern equipment needed to clean everything up, Bob, that we need to get back into full operation.
Robert Fulker
executiveDan, thank you. Drilling is now running at full capacity on every level above 1,200. At the 1,200 where we're mining, we're actually doing production drilling. So we're reaching that level for production as well, in hopes, though we do still have some mud lift at that level. The 1,175 is clear, and we've got excess there to begin development. The 1,150 has been stubbed, but it still holds mud, and we haven't started down there yet since we're focusing on the 1,200 and 1,175. And the decline actually goes down to 1,125, but we haven't — still — we're still using it as a sump and motor while we clean up the upper portions of it. The first area where we began developing was back up at the top of the mine, where we've been doing some ventilation work, and that's fully complete. So all the teams are down at that 1,200 and 1,175 now.
Dan Morgan
analystAbsolutely. The team did a tremendous job. If I could just shift us to Red Lake, Bob. What's the pace of the CYD decline looking like? And any news on when you'd anticipate it connecting with the lower demand levels?
Robert Fulker
executiveYes. I’ll simply restate what you just mentioned. The team at Ernest Henry did an extremely good job. They truly carried out marking and raised no complaints regarding any of the work they were doing, and that work was quite messy, so everyone really appreciates it. With CYD, if we were to run it flat out, it would be during this year — in this financial year. That’s because we now have a jumbo in 11 Level. It is developing up toward an incline. At the moment, though, the priority in 11 Level is actually to get the drive across to an old stope so that we can use it as backfill. And we have already mined a stope on 11 Level. So the only reason we won’t get it through within the 12 months is that we’ll be making sure we actually get the ore out as we link the top and the bottom together. So it may take a little bit longer than that. To tell you the truth, if I get more ore out of CYD, you will be happy. So that will be the determining factor. But if we actually — if we hit at the top and bottom month a day, it would be through this financial year.
Dan Morgan
analystAnd one final question. Did the Upper Campbell contribute anything during the quarter or in July? I'm just curious about what conditions are like in those areas.
Robert Fulker
executiveYes. We had — sorry, 2 stopes up in the Upper Campbell. During the quarter, we had 1 stope at 11 Level, and we expect the next one to come through at 3/4 level around mid-August, when we should begin firing. So we ought to see that one in the coming quarter too. There won't be another stope at 11 Level for some time, while we get that drive out to the waste fill stope. And then the plan is to try to reach more as well.
Operator
operatorMitch Ryan with Jefferies has the next question.
Mitch Ryan
analystIn the quarter, Cowal <<inaudible>> became publicly available for the expansion project, and that includes CapEx of roughly $300 million. I'm just wondering what the timing might be for the key components of that CapEx spending, and how much of it sits inside the FY '24 guidance of $85 million to $90 million for cap this year.
Lawrie Conway
executiveYeah. Thanks, Mitch. I mean, as far as this year goes, there’s very little capital involved for the open pit continuation. Like we said on the Investor Day, we’ll only be spending about $5 million on it this year. The public period has closed, and then obviously we need to see how that public period turns out to figure out what the next steps are. On the regulatory side, we still expect that to run through FY '24 and into FY '25 before we actually get to those decision points on the project.
Mitch Ryan
analystAlright. And there's really no urgency around any of that capital associated <<inaudible>> as required?
Lawrie Conway
executiveYeah. So, as we mentioned during Investor Day, there are alternatives available to us regarding the OPC, clearly, given the stockpile material, though we first need to complete the approvals and permitting process prior to deciding on the project. But yes, right now, there's no urgency with that project to begin today.
Operator
operatorJon Bishop of Jarden Australia has the next question.
Jon Bishop
analystYou touched on a few things in your opening remarks about the productivity efforts, I suppose, that you've been concentrating on at the site. I mean, some of your peers, through this quarterly reporting cycle and definitely over the last 12 to 18 months, have mentioned inflation that's been fairly stubborn. And I think a lot of that comes not just from consumables and, to some degree, fuel, but certainly from the productivity problems. What is your team doing differently that leaves you somewhat comfortable about your all-in sustaining cost guidance?
Lawrie Conway
executiveWell, Jon, you know, as we discussed during Investor Day, when we examine where our expenses sit, almost 50% comes from labor. We continue to anticipate that will shift, based on what we said at Investor Day, by 5% to 6% through FY '24. The encouraging part is that as we closed out June, our site with the greatest turnover, Mungari in the WA market, has watched that figure fall significantly across the year. So that's been a positive in terms of holding onto that workforce, and the gains Scott and the team achieved by consolidating 3 operations into 1 and cutting back workshops and warehouses and similar items. That translates into needing fewer personnel at that site. Then, turning to the other elements, power — we have agreements locked in for as much as 8 years, 2 years, 4 years. So we basically have visibility on what those expenses will be. The diesel price, driven by oil, has basically stayed within a fairly tight band of movement over the past 3 to 4 months.
Lawrie Conway
executiveAnd once more, we understand that this represents 5%, 6% of what we spend overall. So it's kind of — we're drawing on every bit of that data, which is bringing you to 60% to 70% of our total cost base and has allowed us to figure out how the $1,370 cost is assembled.
Jon Bishop
analystAlright, that's genuinely useful. Now, to push a bit further on the Red Lake yearly savings you mentioned — has that already been baked into your guidance, or is it more of a fresh dollar figure that we ought to view as steadily working its way into our outlook for Red Lake in particular?
Lawrie Conway
executiveNo, Jon, we had already factored that into the plans and guidance we laid out at Investor Day.
Jon Bishop
analystGreat. Okay. Just one last question, if you don’t mind. I just want to follow up on what Mitch said about Cowal there. If I’ve got this right, and forgive me if I’m mistaken, the open pit, as you’re currently operating it, kind of begins to wind down in fiscal ’26. Is that correct?
Lawrie Conway
executiveAbsolutely.
Jon Bishop
analystRegarding the timeline for accessing the new pits, provided you complete the consultation process, that's fine. Is there some kind of expectation, or should we take a conservative view when looking at production profiles easing somewhat across fiscal '26 and '27 as a result of feeding through certain stockpiles? Are you fairly confident that you'll be able to supply the mill with steady feed and grades that are relatively consistent?
Lawrie Conway
executiveFrom the OPC standpoint, we recognize there's more than 40 million tonnes of stockpile material on the ground at Cowal right now. With Stage H in FY '24, we'll lay out the mill. So by the close of FY '24, that figure will rise. Clearly, those stockpiles definitely contain low-grade and low low-grade material. And what we observe is that, looking ahead to '26 and '27, you'd be discussing 40,000 ounces in '26 and 30,000 ounces in '27 as the impact in each of those years, if we don't begin OPC during FY '26 or FY '27. So those impacts are known to us. We'll see what happens with permitting, and we'll also see where Cowal sits within the business in terms of when we need to and should be putting investment into that project.
Operator
operatorThe following question is from Hugo Nicolaci at Goldman Sachs.
Hugo Nicolaci
analystTo circle back to Red Lake, perhaps on a more qualitative note. Now that you're implementing those adjustments regarding head count and they're beginning to show results, have you received any input from the workforce about how that process is proceeding, how it's being received, and the wider attitudes there? And as a follow-up, where would you say you see the next areas for optimizing that asset?
Lawrie Conway
executiveThanks, Hugo. I'll pass things over to Bob in a moment regarding the workforce and the upcoming areas. But when we take a look at it, the feedback coming from the site—we've handled that via a consolidative process, through which we have a workforce whose service ranges up to 40 years. So there are a number of people who are definitely near retirement. And so in Canada, an early retirement scheme exists. We've made that available to people as the first part. Then, as the equipment arrived and fewer people were needed, we've been doing that. And then obviously, the support areas. So those communications have been ongoing, and the feedback has been positive around that restructuring, and that will be completed by the end of the September quarter. And then in the other areas, really, what we're trying to do is make sure that as we now bring in the equipment, as we're changing the mining areas, the consumables obviously have to be better utilized. So it's those sorts of areas that John and the team will be focused on. Bob, do you want to just touch on it?
Robert Fulker
executiveYes. I suppose looking at it from the workforce angle, Hugo, during the past 7 to 8 months, myself, Jason, back when he was with us, and Thomas over the recent stretch, we have kept an ongoing dialogue with the employees regarding our situation and what is happening. In my view, that has made getting through this considerably easier, assuming they have stayed informed. Clearly, this is a stressful period for folks experiencing a change. I have not received negative or bad remarks. I have heard remarks from the town and from residents there that what we are going through had been anticipated by this point and that they figured something was coming. And I have gotten the same or comparable remarks from many in the workforce. But keep in mind that change is hard for people, and we must remain aware that this is likely a stressful stretch while we work through this restructuring period. The sole thing I would add regarding the productivity gains Lawrie mentioned is that, as the mine advances and begins delivering more steadily across the year, I expect that -- rather than expecting, we are already concentrating on the mill and the mills and ensuring we are prepared and that our productivity with them keeps getting better.
Robert Fulker
executiveNaturally, stress hasn't really been a factor for me for some time now. So we've run them at the nameplate and even beyond it for brief stretches, though not for extended ones. As a result, both the maintenance crew and the production teams are already concentrating on that next area of opportunity.
Hugo Nicolaci
analystOkay, that's clear. Maybe just one more, then, on capital more broadly across the group — you noted in the release that you'd paid the 20th consecutive dividend during the period. And if I look at the full-year cash flow movements, it implies you're ending the year with that $46 million of cash on hand. So how important is it to keep that dividend payout going forward, and how do you weigh the rebound in cash flow into FY '24 against the $700 million per annum average CapEx over the next few years?
Lawrie Conway
executiveYeah, I mean, the way we see it on the capital management side, we consider whether we can fund growth into the business, service debt, and give returns to shareholders. So when we get to the August full year results, we'll have those discussions with the Board and make recommendations on dividend. But in short, we view dividends as just as important a part of our business and capital management plan as any other part of what we do with the revenue we generate.
Operator
operatorMeredith Schwarz with Bank of America has the next question.
Meredith Schwarz
analystI have just a couple of questions, if you don't mind. Regarding the layoffs at Red Lake, could you provide some guidance on what those costs are likely to be? My assumption is that they'll flow through the P&L during the first half of '24. Then my second question concerns Ernest Henry and is more about production. Recoveries have been trending lower across the last 12 months. How do you see getting them back up to the low 80s going forward?
Lawrie Conway
executiveThanks, Meredith. I’ll pass the Ernest Henry item to Bob in a moment. On the Red Lake redundancies: depending on where those people are from and which schemes they’ve been made redundant under, the total cost of the program could be as much as $10 million to $12 million. But again, as I mentioned, once we finish this program at the end of September, we’ll need to assess where each person came from and which schemes they’re leaving the business on.
Robert Fulker
executiveAnd regarding recovery, Meredith — once the cave is performing at the end of June, we expect grades to come back to the full grade — sorry, full cave grade — and that should let recoveries climb back up to that low 80s level we've seen historically. So the low recovery has resulted from blending the low-grade material with the cave material plus the mill restart. So it ought to get back to the low 80s.
Operator
operatorThe following question is from David Radclyffe of Global Mining Research.
David Radclyffe
analystClearly, many questions have come up. So I might pose one about Pumped Hydro. The Queensland Government, obviously, made some fairly significant commitments not long ago. So I'm just curious about an update following your remarks at the Investor Day, really regarding the view that, given how large these commitments are, do you still see room for state support for Rawdon, or is the government now likely finished? And so, does that mean you would depend more on nongovernment investment?
Lawrie Conway
executiveDave, Jake is going to reach out to you directly with a personal email to thank you for posing that question. Look, I think the truth of the matter is that over the past 3 to 4 weeks, the amount of engagement Jake and the project team have managed to achieve with government has been substantial. So the brief response is yes, the government still has interest in this project. And I think that governmental interest keeps growing as they examine where the project stands, the way it feeds into the grid, and the timing of when Mt Rawdon could become available to come on stream as a renewable energy project. So from where we sit, we remain confident about government involvement in the project. And as we proceed through to the completion of the technical and commercial feasibility of the project, engagement levels, in my view, will keep building just as they have over the last few months.
Operator
operatorAl Harvey from JPMorgan has the next question for you.
Al Harvey
analystJust a single question on Mungari and the expansion there. I suppose it seems like you need that grade to sustain the 200,000 ounces per annum output over the first 5 years. And I believe Glen touched on this during the opening remarks. But there was some discussion at the Investor Day regarding those higher-grade shoots from <<inaudible>>. I'm just curious how those prospects are progressing, and whether they might feature in the next R&R? And after that, you also mentioned progressing — relocating the drill rigs to establish some additional reserves at Castle Hill. So what's the focus there? Is it really about more ounces? Or are we trying to prove up a longer mine life?
Glenton Masterman
executiveI'll kind of break that question into two pieces. So first, at Kundana and within the Millennium complex there. The short answer is yes, we're going to be upgrading our MROR based on the drilling results we're delivering right now. What I think we're seeing is the opportunity expanding along the structures at Christmas, the newly discussed new structures that are at early days. And I think there's a favorable understanding that we need to advance those to kind of work out how they kind of fit in over the longer term to sort of potential resources. But — it's genuinely exciting stuff, though this is emerging. And so yes, I'm expecting an upgrade at Kundana. And I think over the longer term that's going to be one of the sources of high grade that we can kind of blend into the baseline that we'll be producing from the regional production centers. Kind of switching to the second part of the question, which is kind of what are we hoping to, I guess, deliver through the drilling programs at Castle Hill and also at Paradigm. I think when we look at how we've optimized those resources and the design pits, the metal price assumptions we're using, we still carry a lot of inferred material or blocks into those pit designs as well as mineralization potential.
Glenton Masterman
executiveSo the purpose behind these drilling programs is really to improve the classification of those old blocks. And ultimately, that's going to put more ounces into those ore reserve design pits. So that's the first goal. And then by delivering or converting resources into reserves, we'll also be able to extend that. So we're working toward both of those goals — we're trying to hit both of them through these drilling programs.
Operator
operatorThanks. At this point we don’t have any more questions. I’ll turn things back over to Mr. Conway for his closing remarks.
Lawrie Conway
executiveThanks, Darcy, and thank you all for spending time with us today—we genuinely appreciate it. We’re looking forward to welcoming some of you to the Mungari site visit in two weeks’ time, and after that we’ll bring you an update on the full-year financials. Thank you.
Operator
operatorThanks. That brings today’s conference to a close. We appreciate everyone taking part. You’re welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.