We appreciate everyone being on the line, and we're glad to have you join us for the Evolution Mining FY '24 Half Year Financial Results Conference Call. <<operator_script>> At this point I'd like to hand the conference over to Mr. Jake Klein, Executive Chair. Please proceed.

Jacob Klein

executive
#2

Thanks, Darcy, and good morning, everyone. We appreciate you joining us this morning, as always. I'm going to refer to the presentation that was released on the ASX this morning. On Page 3, we've laid out the order of the core. I'll begin with a few brief remarks. Lawrie Conway, our CEO and Managing Director, will then take you through a business update, where you'll hear that we remain on track to deliver FY '24 production and cost guidance. Barry will walk you through the financial results, which show that our cash generation is gaining momentum. And finally, Glen will give an update on mineral resources and reserves, which will showcase our very high-quality portfolio of assets. I do want to begin by acknowledging that the last month since we released our December quarterly report has been challenging. For those of you who have given us feedback, we hear you and we are listening. We know we need to safely deliver our guidance, and we also know that we need to build predictability into our business. I assure you that everyone at Evolution understands this imperative. To achieve this, we also recognize that we will need to be focused and not distracted.

Jacob Klein

executive
#3

We also believe our company is in a strong position. On Slide 4, the first column highlights something I think investors have been seeking — our cash generation is rising. For the half year, net mine cash flow climbed 136% to $203 million. Underlying EBITDA rose 28% to $573 million, and gearing came down to 29%. With copper and gold prices still elevated and lower capital intensity ahead, investors ought to feel confident that this stronger cash generation momentum will show up further in the second half, as we also gain from the capital investment made in the portfolio. Our EBITDA margin of 43% is high, and the portfolio's average mine life is now roughly 15 years, based solely on ore reserves. The quality of geological upside across our assets is shown by the fact that, excluding Northparkes, we essentially replaced every ounce mined during the last 12 months, and our drilling success produced a very substantial increase in copper ore reserves. You may remember that when we bought Northparkes in December, we stated our priority was to release a JORC confined resource and reserve, and that is what we have done today.

Jacob Klein

executive
#4

So this really validates that Northparkes holds an extremely sizable metal inventory. We've got more than 400 million tonnes of resource there, and that underpins our strong confidence in a really lengthy mine life at this operation going forward. Lawrie will tell you himself that integration has gone smoothly and the first couple of months on site are progressing well. Adding it to the portfolio also gives investors more copper exposure, and copper now accounts for roughly 30% of our revenue. When you look at how copper contributes to our mineral resources, it represents about 40% of the in-ground metal value today. Because we treat copper as a byproduct credit, this copper exposure delivers a structural, long-term cost advantage for us relative to our peers. Let me now move to Slide 5. A fairly solid analog for underlying value, I think, is examining how the company's mineral resources have grown on a per share basis. Beyond our people, the metal we own in the ground is the most valuable asset we hold — and the same goes for any other mining company. The chart demonstrates that as an Evolution shareholder, you've seen considerable growth in gold resources and copper resources alike on a per share basis since the company was formed in 2011.

Jacob Klein

executive
#5

Put differently, even after all those ounces we've mined and the nearly $1.2 billion handed back to shareholders through dividends, each Evolution share now has more copper and gold attributed to it than ever before across our 12-year history. The cost of discovery is another solid measure of accretive value. Looking at our long-term record in that area, we've grown mineral resources ounces purely by discovery — and here we're not counting ounces we bought, which came at under $50 per ounce of gold. When copper is counted as a gold equivalent, that figure drops to below $40 an ounce. To give you an update on how we'll safely and efficiently bring these ounces and tonnes out of the ground, I'll pass things to Lawrie now for a business update.

Lawrie Conway

executive
#6

Thanks, Jake, and good morning, everyone. I'll give you an update on the business and our outlook for the rest of FY '24. First, to Slide 6. Our group FY '24 guidance is unchanged, with production in the range of 789,000 ounces of gold and 62,500 tonnes of copper at an all-in sustaining cost of $1,340 per ounce, plus or minus 5% for all guidance metrics. All operations are on track to produce the midpoint of guidance or better, apart from Red Lake, which we updated in our December quarter report. January's performance was good and ahead of plan, which keeps us on track. Specifically, the key drivers for the March quarter are completing the planned major shutdowns at Cowal and Ernest Henry as well as ramping up the Cowal underground to reach commercial production by the end of the quarter. These activities will enable higher production levels in the June quarter. In addition, the continued ramp-up at the Cowal underground in the June quarter will enable higher throughput at higher grades. In the June quarter, we do have a planned major shutdown at Northparkes, which was included in our guidance for the asset. At Mungari, the June quarter will see a higher proportion of higher-grade underground material compared to the March quarter.

Lawrie Conway

executive
#7

Turning now to Slide 7. Last month at Red Lake, we made the call to revise that mine's plan, aiming both for a better cash position this year and a stronger focus on reliability. For this operation, margin and productivity matter more than mere ounces. January's results, pleasingly, came in on plan, and that has carried through into February. Even so, keeping up the discipline is necessary if this is to hold for the rest of the year. Our organic growth projects are still on track and on budget, with the Mungari 4.2 project progressing nicely. The updated reserves for Mungari that we published today give us still greater confidence in that project. Studies at Ernest Henry and Cowal are proceeding as planned. On the whole, our capital spending stays inside the guidance range. Thanks to the solid progress achieved in the first half, we have moved into positive cash generation, exactly as we signalled at our Investor Day in June last year. Delivering the plan through the second half, which includes capturing the benefit of metal prices above plan, will let us boost cash flow substantially and keep cutting debt as the second half unfolds.

Lawrie Conway

executive
#8

Turning to Slide 8, let's discuss Northparkes. We closed that acquisition successfully in December, and during January we made the final working capital adjustment payment. The funds for that adjustment came largely from proceeds we received in January on a shipment made before the acquisition. Within our purchase price allocation, the contingent consideration carries a fair value of $28 million. Worth noting here is that this contingent consideration sat above our base case valuation. If we end up paying it across the next 3 years, Evolution stands to gain roughly $70 million in extra revenue. Integration efforts are advancing well. Engagement and support from our external stakeholders have been very good. Rob Cunningham came on board as General Manager a couple of weeks ago, and the site leadership team structure is now in place. Rob brings deep experience and knowledge of Northparkes. The first joint venture meeting has taken place, which included a visit by Sumitomo Metal operation. As I said on last month's call, the operation contributed net cash in December, after stream commitments, and that has carried on through January. Over the first 2 months, the operation has performed to plan. We met our commitment to report resources and reserves today, and Glen will walk through that shortly.

Lawrie Conway

executive
#9

Work on the E22 feasibility study is proceeding as planned, and the study team has seen really strong engagement around evaluating the alternative sub-level cave option. Completion of that study is expected in the June quarter. Before the financial year wraps up, we intend to hold a site visit so we can demonstrate the quality of this well-established, long-life asset, which carries meaningful upside potential. Thanks for spending time with us this morning. I'll pass things over now to Barry, who will walk you through our financial results.

Barrie van der Merwe

executive
#10

Thanks, Lawrie, and good morning to everybody. I'll begin on Slide 9. In this half we posted better financial results, with stronger profitability and more cash generated. Underlying profit after tax rose 54%, and we began to deleverage, helped by a 28% lift in underlying EBITDA, which was $127 million higher. Revenue grew 18% and ongoing cost discipline pushed the EBITDA margin up to 43% from 39%. Capital expenditure came down as planned, and major capital expenditure was $71 million below the same period a year earlier, while net mine cash flow rose $117 million, an increase of 136%. Gearing stands at 29.7%, down from 32.8% at year-end. The Board declared a fully franked dividend of $0.02 per share. Turning now to Slide 10. What pleases us most about these results is the momentum we're building in generating cash to cut debt and fund shareholder returns. As we told you at our Investor Day last year, our capital intensity is coming down. Major capital per ounce is $198, or 22%, lower than FY '23. And total capital expenditure is $76 million below half 1 of FY '23. The base plant for the Cowal underground has now been commissioned, and the mine is ramping up to commercial production.

Barrie van der Merwe

executive
#11

Our capital expenditure guidance hasn't changed. Relative to FY '23, the all-in margin per ounce rose 3.5x, moving from $173 per ounce up to $600, and that was driven by a strong gold price, lower capital expenditure and continued cost control. The graph at the bottom right of the slide illustrates the resulting picture of our group cash flow before debt, M&A and dividends, which went from a cash outflow of $95 million in quarter 4 of FY '23 to cash generation of $79 million in quarter 2 of FY '24. With production rising during half 2, driven by the Cowal ramp-up and increases in Red Lake production, that momentum will keep building. Finally, on Slide 11, the Board declared a fully franked dividend of $0.02 per share. That marks the 22nd consecutive dividend, which in total is now approaching $1.2 billion since inception. Payment will be made on the 5th of April to shareholders on the register on 28th of February. Our balance sheet is strong, and with $716 million in available liquidity and a fully repaid revolving credit facility, we have adequate flexibility to provide shareholder returns through dividends. As we announced at our Investor Day last year, our debt maturity profile is aligned with longer expected mine lives and their cash generation profile.

Barrie van der Merwe

executive
#12

Our investment-grade credit rating, which was reaffirmed in August, is evidence of this. We carry debt at a low cost of 4.99%, and 74% of that is long-term debt fixed at 4.5% per year. Across the coming 2.5 years, roughly 95% of our production remains unhedged; just 120,000 ounces are hedged, covering the capital for the Mungari 4.2 project at an average price of $3,185 an ounce. To conclude, we're delighted that cash generation began building momentum in the first half and will keep delivering high production through the second. Our balance sheet is strong and flexible, with the revolver fully repaid and $716 million of available liquidity. I'll now pass things to Glen for the MROR update. Thank you.

Glenton Masterman

executive
#13

Thanks, Barry, and morning, everybody. I’d like to direct everyone to Slide 12 in the presentation, which refers to the results set out in our December 2023 Annual Mineral Resources and Ore Reserves statement, released to the ASX this morning. Year-over-year, gold resources rose 8% and copper resources rose 134%. Similarly, relative to the December 2022 result, our reserves are up 15% for gold and 100% for copper. One key message I want to leave with you is that the MROR grew through a mix of acquisition, drilling and design changes. Another key message is that we hold a quality portfolio of assets in excellent geological locations that we will keep growing. Our MROR growth in 2023 came mainly from the Northparkes acquisition, which on an 80% attributable basis added 2.6 million resource ounces of gold and 2.3 million resource tonnes of copper, plus 660,000 reserve ounces of gold and 390,000 reserve tonnes of copper. As Jack said earlier, you’ll remember that in earlier December, when we announced the Northparkes acquisition, we cited resources and reserves as reported by CMOC in their public disclosure. At that time, we committed to doing the work that would allow us to report the Northparkes MROR under and in accordance with the JORC 2012 code.

Glenton Masterman

executive
#14

That work was finished across December and January, and from it we've concluded the outcome matches what our extensive due diligence found. The principal change we made was to reflect a full year of mine depletion in 2023. The Northparkes material information summary along with Table 1 can be located in the fairly lengthy appendix of our MROR statement. At Northparkes, the following step is to report the mineral resource so that it incorporates the ore reserve, keeping it consistent with how we'll report the MROR for our remaining assets. In practice, that means the mineral resource announced for Northparkes this morning excludes the metal that underpins the ore reserve. This reporting situation came to us from CMOC, and it mirrors exactly how Canadian companies report their resources and reserves. Over the coming 6 months, our goal is to rerun the Northparkes mineral resource so that it includes the ore reserve. You can arrive at a conservative estimate of Northparkes' full and positive effect on the group results by looking at Table 1 on Page 2 of this morning's MROR announcement and adding the Northparkes ore reserve's contained gold and copper to the metal totals of the reported group mineral resources.

Glenton Masterman

executive
#15

Turning to Slide 13. I want to draw your attention to the waterfall chart, which shows how the group MROR changed from one year to the next. As noted, the Northparkes acquisition was the primary growth driver for our mineral resource. That said, we also recorded a meaningful addition at Mungari, largely because of a higher gold price assumption, plus gains from our drilling programs at the Kundana underground. At Mungari, the outcome is a 10% rise in the mineral resource. We also saw noteworthy additions at Cowal, mainly from drilling success underground, and at Ernest Henry as well. As Jake noted, our long-term group discovery cost, updated to reflect the 2023 changes, comes in under $50 per ounce for gold additions to the mineral resource and at a very competitive $37 per ounce on a gold equivalent basis. At Red Lake, we are reporting a decrease in the mineral resource. The principal causes of this change are mining depletion, reclassification of the resource at Aviation, which has shifted some of the mineralization out of the inferred category following recent drilling results, and alignment of the resource cut-off grade for several ore bodies in the lower areas of Campbell, Red Lake and Cochenour with current mining costs.

Glenton Masterman

executive
#16

For our mineral resources, we report them using optimized pit shells or underground mining shapes, and we assume a long-term gold price of $2,500 per ounce of gold and $12,000 per tonne of copper. Ernest Henry is the one exception, where that estimate gets reported inside the interpreted 0.7% copper envelope. Aside from Northparkes, group ore reserves increased substantially, with a key contribution coming from Ernest Henry for both gold and copper. We're pleased that the Ernest Henry ore reserve doubled during the year relative to the ore body's size when we acquired 100% ownership 2.5 years ago. At Mungari, we realized a 30% addition to reserves, which reinforces our confidence that throughput will be maintained at the 4.2 million tonne milling rate deep into the mine life at Mungari. Our ore reserves assume long-term gold and copper prices of $1,800 per ounce and $9,000 per tonne, respectively. I'll conclude my section with some comments on the growth history of gold and copper resources and reserves since the company was formed. We have built our business through a series of creative and accretive M&A transactions that gave us the foundation of our business, and from that foundation we have been able to significantly grow our resources and reserves.

Glenton Masterman

executive
#17

Our drilling-driven expansion, together with improved modeling and design revisions, has exceeded the depletion of their MROR. One crucial factor behind what we've achieved is finding and securing properties and top-tier geological locations where our drilling campaigns can keep generating value. With that said, I'll return the floor to Jake for his closing remarks.

Jacob Klein

executive
#18

Thanks, Glen. Before we open the lines for questions, I'd like you to take a quick look at Slide 14, where we've laid out the key messages we want you to take away from this <<inaudible>>. As you can see, we're generating more cash. Our guidance remains unchanged. The quality of our portfolio continues to improve. Our balance sheet has begun to deleverage, and I can assure you that we, as a team, understand precisely what is expected of us for the rest of <<inaudible>>. With that, Mel, could you please open the lines for questions?

Jacob Klein

executive
#19

Thanks. <<operator_script>> Our initial question is from Kate McCutcheon at Citi.

Kate McCutcheon

analyst
#20

Regarding Northparkes, you said the joint venture meeting went positively and that you are evaluating the SLC alternatives for the E22 study, which is expected next quarter. Does the JV back the sub-level cave rather than the block cave? My read is that the approach favors maximizing cash flow over maximizing NPV. Would that be a fair interpretation? And what can you share about E22 going forward?

Jacob Klein

executive
#21

Appreciate that, Kate. Lawrie is the one who should take that question.

Lawrie Conway

executive
#22

Yes, and thank you, Kate. On your first question, Sumitomo has been quite supportive about examining both alternatives—that's actually something they raised themselves during the meeting. Beyond that, they're keen for us to get the most out of <<inaudible>> cash flows. They haven't committed to either one; what matters to them is that the correct choice gets made. I'd say a positive development over these first couple of months is that the site team has been openly involved in reviewing both options. In the earlier period, under the previous owners, they were fixed on a single path and believed no other answer existed, whereas right now the level of engagement has been really constructive.

Jacob Klein

executive
#23

I’ll just build on that point. I think Kate, as with the mineral inventory of that size at Northparkes — and yesterday the Board received an update from Glen on some of his initial views regarding the geology — and yes, there is certainly much more still to be found in the field. And I think that with an inventory of that size and scale, you have a genuine opportunity to optimize it. And as Lawrie mentioned, Sumitomo came to the meeting and was actually constructively engaged and supportive of examining it from both a cash flow and an NPV standpoint, which may have differed from the previous owners.

Kate McCutcheon

analyst
#24

Then, June — we’ll receive an update, or the June quarter.

Lawrie Conway

executive
#25

Absolutely.

Kate McCutcheon

analyst
#26

Then I suppose this is partly a strategy question about the resource reserve update — right now you're using $1,800 for gold and <<inaudible>> for copper, whereas peers are different. You've been slower to raise those figures, and they remain below some of the U.S. peers we look at that also have long mine lives. How do you think about ensuring you get the most out of the reserves, versus a conviction in pricing, I guess, or being able to flex the mine plan to take advantage of commodity prices?

Jacob Klein

executive
#27

That's a solid question, in my view. Our approach to ore reserves has been quite conservative. Honestly, it encouraged me to notice that Barrick — the standard-bearer when it comes to low reserve price assumptions — sits even below where we do. Their figure is $1,200 <<inaudible>>. For a long time, whenever I looked at Mark Bristow and Barrick, I felt that assuming a conservative reserve price is a smart lens through which to judge your portfolio's long-term worth. In the near term, though, we certainly examine how to optimize our mining strategies so that the higher gold price is factored in. Naturally, we're delighted that gold is trading higher. Still, in my view a conservative assumption on the gold price is the right one. I also believe it mirrors the quality of our portfolio. What it means is that when you compare reserve ounces across a set of different companies, not all of them carry equal quality. In my view, the companies using the lowest price assumption are the ones showing higher quality.

Operator

operator
#28

Our following question is from Manav Shah at Morgan Stanley.

Rahul Anand

analyst
#29

Rahul Anand here, calling in from Morgan Stanley. I've got two questions, and the first one is a quick one about Northparkes — specifically the revision to the reserves figure. Is my read correct that this represents a reduction of roughly 30%? I want to be clear that my focus here is purely on reserves, not resources. And Glen mentioned this was anticipated, since earlier changes to ore resource and reserve weren't in line with the JORC code. So going forward, after this cut, how should we be thinking about modeling this? And specifically, which areas of your development plans around E22 have been affected, in your view?

Jacob Klein

executive
#30

Glen is the one who should take that question.

Glenton Masterman

executive
#31

Yes, Raul. So I think what may be going on here is that when we made the acquisition announcement, the resources and reserves were quoted on a 100% basis. What we've done through the work to bring it into line with the JORC code is to report those resources and reserves at our attributable ownership interest, which sits at 80%. That accounts for the difference, plus and adjusted for depletion in 2023. So I think that's perhaps where you might be kind of seeing that 30%. So it's actually not a 30% reduction. The only adjustment, as I said, was for the depletion.

Jacob Klein

executive
#32

And I think the only other thing I’d point out to you, Rahul, is that for Northparkes, we haven’t yet incorporated the reserves into the resource. So, as Glen said, that’s work that will be carried out during this calendar year and will be added to the resources, so it’s consistent with how other companies report JORC resources.

Rahul Anand

analyst
#33

And then just to take a quick look at a second item, maybe somewhat on the working capital front. You saw some working capital release in the half just past. With Northparkes now included, I was hoping to get a sense of where that working capital movement is heading. As far as working capital requirements go, what's the situation with Northparkes at present? So the release in this half was $22 million, is that right?

Jacob Klein

executive
#34

Appreciate that, Rahul. Barry, over to you.

Barrie van der Merwe

executive
#35

Rahul, appreciate that. So, regarding working capital on the stat balance sheet, there are a few points worth keeping in mind. First, you have to make an adjustment for Northparkes and for what went into the $70 million net trade working capital position we assumed there. Then you should also factor in that non-trade accruals exist — accruals for stamp duties and transaction cost, for instance, also sit on the balance sheet. The best reference point, if you'd like to examine the cash trade working capital flows for the half, is to go back to the December quarterly report, where we disclosed an outflow of $57 million, and that really broke into 3 parts. As Ernest Henry emerged from the weather event, it was building up some working capital — so that was one component. The Cowal long-term stockpile accounted for roughly $10 million to $20 million of it, and trade creditors that declined during the half were $10 million to $20 million, which together made up that $57 million. Looking forward, given increased activity into the second half, you'd expect that to push the creditors up somewhat, but the Mungari project is ramping up as well.

Barrie van der Merwe

executive
#36

So there's a slight rise in creditors from that, partly offset by the Cowal stockpile build, which is a steady element of our working capital. So as I look forward on working capital, I don't anticipate Northparkes will skew it or affect it in any material way, since we have it with a full working capital position. And then I think it's pretty flat going forward. I don't expect any material moves there.

Lawrie Conway

executive
#37

I'll add just a few remarks here. As Barry mentioned, during this June-to-December half you're seeing the ramp-up as Ernest Henry comes back to full production. In the June half of last year it was lower since there was no output during that stretch. Now they've settled back into a normal cadence, on a monthly basis. So going forward with Ernest Henry, you won't really see much of a swing anymore. Northparkes, as Barry noted, ramps up purely through an acquisition. Its concentrate shipments aren't monthly the way Ernest Henry's are, simply because of production volume. So they'll shift within a quarter, but across the full year you'd see that smooth out, and consequently the <<inaudible>> movements in creditors and debtors. Thus, in the second half of this year, I'd expect it to return to a steady run rate.

Operator

operator
#38

Levi Spry from UBS has the next question.

Levi Spry

analyst
#39

If I could return to what Kate asked about assumptions on price. Say I formerly considered roughly $1,450 as a reserve price, and now that figure stands at $1,800, though the reality is likely somewhat more involved than that. Going forward, how ought we to view Red Lake and Mungari regarding the assumptions, and at a high level, how do you weigh those two against the remainder of your portfolio at present?

Jacob Klein

executive
#40

I think before I pass things over to Glen, Levi, I'll just add a few remarks. As you rightly pointed out, we used to sit at $1,450. Our price increases, I'd say, have been significantly less than the sector's. So we remain at the very bottom end. And as Lawrie mentioned, the emphasis and pivot at Red Lake is now on cost margin instead of headline production figures. We reset that in January as we <<inaudible>>, so you'll see us being far more focused on that as we deliver. And pleasingly, for the first 6 weeks of this year, it is delivering to plan. And in the same way, at Mungari, as we said when we answered Kate's question, wherever there's a chance to take ounces that are profitable and add to our cash generation, we'll take them from the pits and mining areas where development is in place so we can recover them. Glen, would you like to...

Glenton Masterman

executive
#41

Yes. Look, I'll build on what was said there, Levi, and speak specifically to Mungari. For our underground operations, we base things on the long-term gold price assumptions used for the reserve there, which currently stands at $1,800 an ounce. I think one factor we do factor in at Mungari involves the open pit — so when we have an open pit mining schedule spanning a 12- to 18-month period, we'll examine a variety of gold prices and run sensitivity analysis to determine which mining option works best for us, and that's against the $1,800 per ounce. So that is definitely something taken into account in the short term. Over at Red Lake, we're still working with current prices — well, the price assumptions we've used in the update released today; there are models at Red Lake that run on the older assumptions, and those will be gradually updated over time.

Operator

operator
#42

Matthew Frydman from MST Financial has the next question.

Matthew Frydman

analyst
#43

I have a few questions. First, I'd like to explore the declining capital intensity a bit, since you've obviously pointed out that this is really one of the main factors behind your cash flow improvement. And that clearly stems from some of your major capital projects wrapping up. So I'm just trying to understand how that plays out next year and over the medium term. So maybe, first, a couple of questions on that. Could you remind us, or give us a brief summary, of which studies are anticipated over the next, let's say, 6 to 12 months for key projects? Off the top of my head, I mean, there's the Ernest Henry life extension, the Cowal open pit continuation study, and you just mentioned the Northparkes study when answering Kate's question. Is there anything I'm missing there? Anything from Red Lake? And if you could just give us the approximate timing on that?

Jacob Klein

executive
#44

Lawrie, the floor is yours.

Lawrie Conway

executive
#45

Yes, Matt, I believe you've covered nearly all of them. So, taking a look, the Mungari plant expansion is currently in execution. Regarding the study—the Ernest Henry study—the feasibility work continues through to the March quarter of 2025. We have the Cowal open pit continuation, for which the study is close to being finished. Ultimately, though, regulatory approvals will dictate the timing on that one. We submitted materials to the government over the past couple of weeks. So it's now with them, and we're in <<inaudible>> what consent conditions and other requirements might apply before we can even reach a decision on it. Then, obviously, we have the feasibility study at Northparkes on the E22, which is coming through into the June quarter. As we mentioned in June at the Investor Day, and those projects are laid out in that pack, we'll schedule them as and when they're required. When we consider Ernest Henry, every day that Glen continues drilling and discovering additional metal makes things harder for the study team. But the bulk of that capital falls in '27-'28. And looking at the Cowal continuation, we have that flexibility regarding stockpiles.

Lawrie Conway

executive
#46

Obviously, there's water on the lake, and we've got the bund built there. And there's also the mining fleet and the mining crew. So over the next 6 months, we'll evaluate that depending on how the regulatory approvals proceed. But that's the current status of each of those studies. And we're right in the middle of life of mine planning. So as we finish this financial year, we'll provide the outlook and guidance on these capital projects. But I think, as Barry highlighted, net mine cash flow being up 136% is driven by 2 things. First, capital intensity is decreasing, and the higher metal prices are flowing through to the bank.

Matthew Frydman

analyst
#47

I should note there isn't anything particularly specific regarding studies that are due at Red Lake. Still, at least in FY '24, it represents a substantial portion of the mine development and growth capital. You spoke about how you reset near-term expectations at that asset on the production side. But how should we think about the pace of capital spending there? I mean, at Red Lake you've been spending $50 million or $60 million each quarter, at least over the last 2.5 years. Does the emphasis on margin going forward imply reduced mine development capital? Should we anticipate that growth capital will drop off materially once Upper Campbell is finished? I'm just trying to walk through how that shapes up?

Lawrie Conway

executive
#48

Yes. Look, I think that's a solid question, Matt. When we examine it, what John and the team are dealing with right now, we have 2 processing plants. We have 3 mining areas. Certainly, a lot of development work is needed to keep the plants running. What John is doing now is figuring out how he keeps those plants full with the right productivities from the 3 mining areas that we have available, while at the same time generating cash. We did that workforce restructure in the first quarter of this financial year and then worked out what we need going forward with that real shift in mindset rather than trying to develop and move the mining rates up to levels that basically need too much capital and given it hasn't returned cash at the moment. That's the change in focus for them. I do think though, again, and if you look in the financial statements and the turnaround at Red Lake, while it's not getting to where we need to be, the cash flow before the major capital has moved dramatically compared to the December half of last year. So, we are seeing some, but we're not seeing the outcomes in terms of the ounces delivering the cash.

Jacob Klein

executive
#49

And Matt, from a strategic standpoint, I would simply note that our portfolio has shifted substantially across the past ten years. When the company was founded, I believe our portfolio's average mine life stood at roughly 5 years measured on a reserve-life basis. Today it sits at 15 years. That figure covers reserves only. So we hold 30 million ounces in resources. And counting the copper resources as a gold equivalent brings in a further $20 million <<inaudible>>, with Northparkes obviously standing as the longest-life asset we have added. So capital allocation is a major focus for us — we want to make sure we direct funds only to projects where it is needed, that clear the hurdles, and that suit the portfolio overall. As you have observed throughout the last decade, the portfolio is also subject to change. What I am stressing strongly is that there will not be additions made to the portfolio, yet the portfolio remains continually under review.

Matthew Frydman

analyst
#50

Jake, since we're on the topic of the portfolio and capital allocation, maybe a quick question. In the presentation you obviously highlighted how much copper now contributes to revenue and to in-situ value across the group. I'd like to ask how that shapes your decision making on possible portfolio changes, possible acquisitions, possible divestments, and just internal capital allocation calls. I mean, do you want to hold copper exposure at roughly 30%? Is that the right level? And I guess, are you mindful of steering clear of being overexposed to copper? So that potentially drives decisions about asset additions, as you just mentioned.

Jacob Klein

executive
#51

Matt, there isn't a specific figure we're locked into. I think it really ties back to the portfolio quality strategy and what we've seen, particularly with Ernest Henry and Northparkes. We picked up the remaining interest in Ernest Henry during 2021, and Northparkes came to us more recently. Those are very substantial assets, with very long mine lives, very low costs, and very strong cash generation. So I'm not steering our BD team toward copper-gold assets exclusively. But we have been examining opportunities where we believe the portfolio's quality can be improved, along with mine life and production cost. Northparkes came along late last year, as it happens. We've been reviewing it since February. And actually, it was an asset that drew our interest back in 2021 — or rather 2020, when the Triple Flag Stream was acquired. So it's been on our radar, and it sits right in our backyard. But once more, returning to the messages investors have given us, no material additions to the portfolio will occur until we've shown that reliability and predictability, until investors feel confident about that reliability and predictability, and until we've earned the right to grow.

Operator

operator
#52

The following question is from Daniel Morgan at Barrenjoey.

Dan Morgan

analyst
#53

To start with, regarding what you mentioned in the presentation about January delivering some very strong operational performance across the group — I just want to dig into a couple of assets. At Cowal underground, are we still on schedule to declare commercial production in the March quarter? And is it now tracking well, the underground with the base plant and the mining sequence — so are all of these in a relatively healthy rhythm?

Jacob Klein

executive
#54

Lawrie, over to you?

Lawrie Conway

executive
#55

Yes, Dan. Basically, by the time we reached the end of December, the base plant was close to commissioning, and that took place during January. Tonnage has gone up, and we expect that to keep rising through February and March. Given how things have performed so far this quarter, we remain on schedule to shift to commercial production beginning in the fourth quarter.

Dan Morgan

analyst
#56

Turning to Red Lake and the aviation mining front — obviously there was seismicity there in September of last year, and that temporarily put a section of high-grade ore off limits. Last month you mentioned you anticipated access would be restored, and there was a regulatory decision on it too. So do you have access now? Has that happened yet, or is it still something you're expecting <<inaudible>>?

Lawrie Conway

executive
#57

So we've regained access into Hanging Wall 7. That took place in January.

Dan Morgan

analyst
#58

Maybe just digging a little deeper into that Red Lake remark — I think the presentation mentions changing the mine plan so it focuses on cash generation. Could you expand on that a bit more? What exactly are you doing here?

Lawrie Conway

executive
#59

Yes. So what John and the team have accomplished is essentially pinpointing the zones where production drilling is required and where development needs completing so we can deliver steadily across the second half of the year and lift productivities, since we weren't seeing that during the first half. As a result, we're not likely to mine as much as our plan had assumed. And from what we've observed in January and February, that renewed emphasis on productivity in drilling and development meters is beginning to deliver improvements. Beyond that, in the processing areas, we've seen better recoveries, which was another area John and the team wanted to concentrate on.

Jacob Klein

executive
#60

Dan, I got the chance to meet up with John when he came through Sydney a couple of weeks back, and in fact I'll be heading to Red Lake in a week's time, and I'm looking forward to seeing it. But something very pleasing from the Board's point of view on this is that Red Lake is genuinely beginning to concentrate on costs, and Lawrie has steered them in that direction under this new strategy. A real emphasis on cost — we saw a 10% reduction in the workforce in June. John is examining other areas where costs can be optimized and the mine made more efficient. So I believe this change in approach will deliver a better outcome for us from a portfolio perspective.

Operator

operator
#61

Al Harvey from JPMorgan has the next question.

Al Harvey

analyst
#62

Perhaps just a brief question. Naturally, the group guidance stays as it is. I was just hoping you could walk us through how the rest of the portfolio is expected to cover those 40,000 ounces removed from Red Lake. I mean, the December quarter, and I suppose, what the main risks are to closing that gap?

Jacob Klein

executive
#63

Lawrie? Yeah, Al — look, like I mentioned during the call and again last month, every one of the assets is either hitting the midpoint of guidance or doing better than that. Red Lake is the asset we've downgraded. We've stated we'll land within the range of 789,000 plus/minus 5%. I think you can figure out for yourself that it won't be the plus 5%. So, we are inside that range. What you'll see is Cowal, Ernest Henry, Mungari, Rawdon and Northparkes all delivering at the midpoint of guidance or better. That clearly won't make up for the entire 40,000 ounces, and it depends on how Red Lake performs against their new target range. But as we stand at the end of January and as we stand midway through February, we remain on track for that range of 789,000 plus/minus 5%. And I think — and just to add to that, and it was in the presentation, what we see is that Cowal and Ernest Henry have their shuts this quarter. They reach commercial production on the underground. So yes, Cowal has a lift up. They can push more tonnes through in the fourth quarter and in the third quarter, you'll see Ernest Henry, which will be consistent quarter-on-quarter.

Jacob Klein

executive
#64

And at Mungari, as I mentioned, you'll see more underground material coming through in Q4 compared with the current quarter. At Paradigm, we've now ramped up to full mining rates. Over at Mt Rawdon, the pit mining is just being finalized — that will wrap up during the September quarter — and Northparkes is performing according to plan, as a cave.

Al Harvey

analyst
#65

Turning to Northparkes, I realize you touched on something like a 3-year cash harvest when the acquisition happened. I just want to clarify whether that figure covers CapEx for E22 no matter if it ends up being a block cave or a sub-level case?

Lawrie Conway

executive
#66

Yes. Looking at that, the study should be complete during the June quarter. And then, as we mentioned, we are evaluating the 2 alternatives: the block cave and the sub-level cave. In our assessment, the sub-level cave comes out ahead, from a cash standpoint and even on an NPV basis, since it gives us the option to transition to a block cave later in the mine's life. So once that work wraps up, we'll be in a position to lay it out. But on a sub-level cave basis, what we anticipate is that the next 3 years would each be cash positive, after which there's some capital investment, and then — that's the situation as it stands today, though we simply have to wait for the feas study to conclude.

Operator

operator
#67

The following question is from Jon Bishop at Jarden Group Australia.

Jon Bishop

analyst
#68

I'd like to dig a bit deeper into your trade payables, or net payables, position. I understand these are just snapshots at a point in time. Still, could you provide more context on what has driven the increase over roughly the last 3 years? If I look at your historicals for each reporting period, net payables have moved from around $60 million roughly 3 years ago to about $300 million as of your December 31 figures. Is that purely a result of growth in asset scale, or are there underlying factors or movements there that we should know about?

Jacob Klein

executive
#69

I’ll have Barry take that — Lawrie will handle the question — but creditors continue to get paid on schedule. There’s no need to worry about that.

Lawrie Conway

executive
#70

A few points on that, Jon. Yes, those amounts have sat within the assets, though I think looking across the past 3 years is the right lens, since that is the period when our capital spend was rising. As a result, at reporting dates you would observe bigger payable balances. Then, as Barry said earlier, once we reach the December half, we have taken on the Northparkes liabilities tied to stamp duties and similar items that flow in there. In addition, with the Ernest Henry acquisition, 100% of it at the start of 2022, we move to holding 100% of that concentrate, whereas previously we held only 30%. That too was reflected in the receivables, yet the TC/RCs connected to it also come with the requirement to book them as a payable.

Jon Bishop

analyst
#71

And I just want to ask about the conversations you've been having with Sumitomo since you took over. You've clearly inherited some open pit mining operations, and they look gold heavy. With your stream, keeping those probably isn't in your interest. How is that dynamic playing out in your talks with Sumitomo about mine plans?

Lawrie Conway

executive
#72

I’ll pass it over to Glen, who chaired the joint venture meeting. From Sumitomo’s point of view, though, I think the key thing is making sure we extract the best value from the asset. And obviously that isn’t tied to the stream. That decision wasn’t theirs to make. Still, our thinking on optimizing the asset is quite well aligned with theirs. Glen?

Glenton Masterman

executive
#73

Correct. And one method Sumitomo has communicated to us for achieving that is to <<inaudible>>. What they favor is keeping that steady, even output across the medium term — over the coming five years — and truly fine-tuning and getting the most out of how we operate in the underground, bearing in mind, naturally, in the open <<inaudible>>. Those pits are short-term in nature. So they remain, in a sense, focused and in agreement with us regarding how we intend to view Northparkes going forward.

Lawrie Conway

executive
#74

On that point, Jon, I believe one pit is mostly gold while the other contains both gold and copper. So they are indeed separate pits.

Jacob Klein

executive
#75

And just one last remark on that. I'd say the initial interactions we've had with Sumitomo and Triple Flag have been quite good and very constructive. They seem glad to have us on board as the new owner, and we're eager to work with both of them to maximize what this asset can deliver going forward.

Lawrie Conway

executive
#76

To give you a few illustrations of that, Jon. On the Evolution side, we've brought the technical team in, and also on the <<inaudible>> side. As you're aware, they have a very lengthy track record there. And it would be reasonable to say that when it comes to the asset, especially regarding its history, their understanding is probably deeper than ours. So we've had the technical teams get together, sharing concepts and ideas, and really trying to take on board what Sumitomo has learned over the years about how we can keep making improvements at the asset.

Operator

operator
#77

Hugo Nicolaci from Goldman Sachs has the next question.

Hugo Nicolaci

analyst
#78

Only a single question about costs. In the pack, you mentioned that for FY '25 you anticipate a smaller rise in labor costs. Could you remind us when contracted labor pricing resets generally occur across the portfolio?

Lawrie Conway

executive
#79

Hugo, when it comes to our employee labor reviews, those happen once a year and they kick in starting in June. So that covers most of the workforce, and then the contractors are basically dependent on <<inaudible>>. As for our fixed plant shutdowns, as each of the shuts comes through, some of those are obviously on contracts over 2 to 3 years with indexation built into them. And then for the other contracts that get awarded as new contracts, it depends on the market rates at the time that we award the contracts. But what we saw through last calendar year, it averaged pretty well in line with what we have movements for our workforce as well.

Operator

operator
#80

Thank you. That brings us to the end of the question-and-answer session. I'll turn things back over to Mr. Klein, who has some closing remarks.

Jacob Klein

executive
#81

Appreciate it, Mel. And thank you all for being here <<inaudible>>. One last note — Happy Valentine's Day. Enjoy the day. Cheers.

Operator

operator
#82

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.