Evolution Mining Limited (EVN) Earnings Call Transcript & Summary
October 15, 2024
Earnings Call Speaker Segments
Operator
operatorWe appreciate everyone being on the line, and we’re glad to have you join us for Evolution Mining Limited’s September 2024 quarterly results. Everyone is connected in listen-only mode for now. After a presentation, we’ll move into a question and answer session. Should you want to pose a question, please press the star key and then the number one on your telephone keypad. At this point, I’ll pass the conference to Mr. Lawrie Conway, Managing Director and Chief Executive Officer. Over to you.
Lawrie Conway
executiveThanks, Kylie, and good morning, everyone. On today's call I'm joined by Barrie van der Merwe, our Chief Financial Officer, Matt O'Neill, our Chief Operating Officer, Glen Masterman, our VP Discovery, and Peter O'Connor, our GM Investor Relations. We released our September quarterly report and an exploration update today. During the second half of FY twenty-four, we laid the foundations to enable safe and reliable delivery of our FY twenty-five plan and continued high-margin cash flow generation. That is precisely what the September quarter delivered. Starting the year positively was very satisfying, with a first quarter on plan and improved safety performance, where our TRIF reduced to 7.2, a 7.5% improvement. We remain well on track to deliver production guidance of 710 to 780 thousand ounces of gold and 70 to 80 thousand tons of copper at an all-in sustaining cost of AUD 1,475 to 1,575 per ounce. Page 1 charts in our report clearly demonstrate the solid start to the year, the material amount of cash we are generating, and the opportunity ahead of us for even higher cash flow levels. Production in our first quarter came in at around 26% of the midpoint of guidance, while cash flows were about 24%.
Lawrie Conway
executiveSince spot prices right now are significantly above where they stood when our guidance was published, there could be more than AUD 105 million in extra cash flow upside during this year. We turned out slightly less than 194,000 ounces of gold along with 19,000 tons of copper. Production across the group matched the plan. One standout during the quarter was additional gains at Red Lake, which climbed past 37,000 ounces. On top of that, the Cowal Underground Mine hit an annualized mining rate of 2 million tons. For continuing operations, our all-in sustaining cost came in at 1,569 per ounce, which beat what we had planned. Excuse me. That holds true even when you factor in that the copper price we realized sat roughly AUD 900 per ton under the assumption in our guidance. The team deserves credit for controlling operating costs and sustaining capital so we could deliver these low-cost ounces. Based on the price achieved in the September quarter, the all-in sustaining cost margin was an exceptional 57%, or more than AUD 2,100 per ounce. Should the spot price hold, that figure rises by a further AUD 290 per ounce. Group cash flow of AUD 108 million carried on the downward path for gearing, which fell 1.5% to 23.8%. We finished the quarter with a cash balance of AUD 484 million, which gives us liquidity above AUD 1 billion.
Lawrie Conway
executiveGiven the cash we're producing and how our debt repayment schedule looks, we feel very good about the position of our balance sheet. Group cash flow came in on the strength of robust operating and mine cash flow before major capital, at roughly AUD 430 million and AUD 380 million, respectively. As I said earlier and as the charts on page one show, the September quarter provides the foundation for us to generate over AUD 1.9 billion in operating mine cash flow, which would be roughly 24% above what we delivered in FY24. Given that this would come at a gold price just 18% above last year, it really shows the cash-generating strength of the portfolio and the sector-leading cost position we hold. A few highlights within cash flow include Cowal, with AUD 125 million in net mine cash flow, which puts it firmly on track to exceed the AUD 350 million top end of the guidance range we announced previously. Red Lake achieved record quarterly cash flow under Evolution's ownership, at AUD 27 million. As consistency begins to take hold at Red Lake, the focus there is now on building on the strong start to the year. Mount Rawdon generated AUD 21 million of net cash in the final quarter of its mining operations.
Lawrie Conway
executiveFinally, we put out our exploration update today as well, and the results are excellent at the Bert Ore Body at Ernest Henry, at what could be a new ore source at Cowal Underground, and with additional encouraging results at the Major Tom target at Northparkes, with healthy copper grades. All of this gives us confidence regarding additional production sources beyond the areas we currently mine. These programs are going to continue through the year, and I am sure Glen and the team will deliver more success in the quarters ahead. I will now pass things over to Matt for an update on the operations.
Matt O'Neill
executiveThanks, Lawrie, and good morning everyone. Since this is my first complete quarter in this position, I figured I would open today by addressing the question people ask me most often: what are my early impressions now that I have been in the job for a while? Having now spent time across all the operations — not only in management forums but also in more informal settings like shift changeovers, safety interactions, and even breakfast or dinner conversations in the camps and local communities — one thing that has stood out clearly to me is the quality of both the people and the assets. What I have observed is a readiness among people to work as part of a team... but also, and this matters a great deal to me, a strong wish to belong to a team that succeeds, which has made the beginning of the year genuinely pleasing. On asset quality, my impression comes from what I have seen in the building blocks: the ore bodies, the infrastructure, and the life of mine plans, which at a number of our operations run fifteen years and beyond, and include optionality either to extend or to grow. Bringing the discussion back to how the first quarter performed, we have seen an improvement in our lagging safety indicators, as reflected in the reduction in the recordable injury frequency rate.
Matt O'Neill
executiveOne thing that's likely been a major factor behind the better safety results is the attention we've placed on leading indicators — things like critical control verifications and material risk actions — and that emphasis will carry forward. During the September quarter, we turned out slightly less than 194,000 ounces as a group, which matched plan. And as mentioned, Cowal stood out, generating cash flow of AUD 125 million in the quarter. From my perspective, among the highlights, Red Lake came in a very close second to Cowal — as Lawrie pointed out, it achieved its best quarterly cash flow since Evolution took ownership. Cowal's output was consistent with plan and, as noted, served as the group's primary cash flow contributor, and it's positioned to keep producing strong returns through the rest of the year. Ernest Henry's production likewise matched plan. What stood out for me at Ernest Henry was the drilling results Glen will discuss later. Northparkes delivered a solid quarter, finishing a major shutdown in the shaft, and its production met plan. Cash flow at Northparkes for the quarter was affected, however, by the timing of concentrate shipments, with that cash flow set to be realized in the December quarter.
Matt O'Neill
executiveAt Mungari, we're a little behind where we planned to be. That came from wet weather during July, which had an effect on ore movement between the Paradigm mine and the mill. I'm happy to say that since then, we've brought the Rayjax Mine online and also built up some buffer at the mill, which should keep that from happening again. The expansion project is tracking well — it's running a little ahead of schedule and on target for cost — and the team on site is very much looking forward to what the new mill will unlock. As I mentioned earlier, Red Lake did well, with record cash flow thanks to a strong focus on cost control, and the operation produced in line with plan. Worth noting for the quarter here is that we drew down on the surface stocks, which was in line with our plan, and those surface stocks will be replenished over the course of the next quarter. Mount Rawdon finished mining this quarter and will keep processing stockpiles through into the final quarter of this financial year, where it will then move into care and maintenance. So overall, the outlook for the operations for the rest of the year is positive, and we're on target to hit our full-year plan.
Matt O'Neill
executiveAt this point I'll pass things over to Glen, who will walk us through the exploration results for the quarter.
Glen Masterman
executiveThank you, Matt, and good morning to everyone. I want to draw your attention to the release about our exploration announcement, which brings out several highly encouraging and meaningful exploration results from the September quarter, and which pairs nicely with how our operations have begun the year. As Lawrie mentioned earlier, we got additional exciting drilling results from Ernest Henry, Northparkes, and Cowal, and each of them confirms the geological endowment at those operations as well as the potential for future incremental production from a range of alternative ore sources. First, at Bert — which, as a reminder to everyone, is a separate footwall ore body at Ernest Henry — we returned an impressive intercept in hole 1426, with copper and gold grades well above average reserve metal grades. This result follows our Bert exploration announcement last quarter of the best gold end intercept ever drilled at Ernest Henry in hole 1402. Both holes are highlighted in Figure 1 on page 2, which clearly show the continuity of strong metal grades between them. The Bert drilling program will carry on through the December quarter to further delineate the extent of mineralization. We will run an update of the Bert resource at the end of March next year, which will include these latest holes and all others completed between now and then.
Glen Masterman
executiveWe anticipate these fresh results will expand the resource, and it keeps taking shape as a possible future target for incremental production. At Northparkes, the September quarter's drilling concentrated on growing near-surface copper mineralized zones at the Major Tom and E51 targets. The two sit within one kilometer of one another and constitute potential open pit resources located just three kilometers from the processing plant. Major Tom results bear out the robust copper grades in holes we reported earlier and shared during our site investor visit in June. If you were there, you'll remember the fun experience our geologist, Jonathan Hoy, provided at the core shed as he walked through porphyry copper geology one oh one while we examined spectacular intervals of abundant blebby bornite mineralization, the driver of grade at Major Tom. I'm pleased to say we are encountering additional mineralization of the same kind in holes drilled above and below the hole displayed that day. The continuing drill program is designed to extend this copper mineralized zone along strike to the south, where the best chance to keep growing it exists. Close by at E51, we are nearing having enough information to begin geologic modeling, modeling being the next evaluation stage, with the goal of progressing toward maiden resource estimates at either or both targets next year.
Glen Masterman
executiveTurning to Cowal, we can now share our initial result at a fresh exploration target located between the open pit and the southern end of the underground mine. Testing this target had initially been planned for later in the year. That said, a geologist made the call to deepen a hole being drilled by one of our underground grade control rigs from a platform at Dalwhinnie South, and it intersected the target at a fairly reasonable angle, delivering this very strong result. We feel confident that we've found a repeat of the crucial geological contact relationship that controls where high-grade mineralization sits underground. In an area never before explored, that contact zone remains open both along strike and down dip. If our interpretation holds, this could become a new underground mining front at Cowal in the future. Separately, during the quarter we began drilling at our Cloncurry North earn-in JV, which sits 10 kilometers northwest of Ernest Henry. There we're testing copper gold targets in rocks similar to those that host the Ernest Henry ore bodies. While a new discovery has yet to come from a hole, we're encouraged by the visual indicators in the early holes, which point to us possibly being at the edge of a copper-gold mineral system.
Glen Masterman
executiveI'm eager to share an update next quarter regarding how drilling is advancing at Ernest Henry, Northparkes, and Cowal. I have confidence that we'll keep expanding and unlocking resource potential across these promising near-mine exploration opportunities. With that said, I'll pass things over to Barrie.
Barrie van der Merwe
executiveThanks, Glen, and good morning to all of you. For me, this quarter was a very pleasing one, since the business keeps producing strong cash flow that supports our de-leveraging plan. Net mine cash flow came to AUD 172 million in the quarter, and group cash flow was AUD 108 million, which brought gearing down another 1.5% to 23.9%. Our cash balance rose by AUD 81 million to AUD 484 million, bringing net debt down to AUD 1.35 billion. During the quarter we paid AUD 21 million in stamp duty related to the Kundana acquisition. Available liquidity for the group now stands at AUD 1 billion. Cost performance in the quarter was very pleasing as well, with an AISC per ounce of AUD 1,569, which came in better than planned. That figure covers the continuing operations, given that Mount Rawdon is now processing stockpiles. We are well on track to hit our full year cost guidance of AUD 1,475-AUD 1,575. Our disciplined approach to capital expenditure carries on, as we only spend capital on projects at the point when it is required. We stay focused on delivering multi-year projects, such as the Mungari 4.2 mill expansion, in line with its overall business case. The Mungari 4.2 project remains on budget and is slightly ahead of schedule. We are on track to meet our capital guidance for all three.
Barrie van der Merwe
executiveBeyond that upside — which stems from the present gold spot price running roughly AUD 250 an ounce above what was realized during the first quarter, as Lawrie described before — the December quarter stands to gain additionally from cash receipts tied to three Northparkes concentrate shipments that reach the delivery port on schedule. Another cash boost comes from the 1,500 tons of copper produced during the September quarter yet left unsold. Only AUD 75 million of debt matures in FY25, with AUD 15 million of that payable in the December quarter, and our 23rd consecutive dividend went out on October the... Given this strong opening to the financial year and the ongoing momentum in cash generation, we remain on course to bring gearing down to approximately 20% by the close of FY25, even as we keep investing in the business and lifting shareholder returns via dividends. Kylie, could you please open the line for questions now? Thank you.
Operator
operatorThanks. Should you want to pose a question, hit star one on your phone and hold until your name is called. To withdraw that request, hit star two instead. And if you happen to be using a speakerphone, kindly lift the handset before asking. Our first question is from Kate McCutcheon at Citi.
Kate McCutcheon
analystGood morning, and congratulations on the quarter as well as the exploration results. Regarding your remarks about Bert in the quarterly, the notes mention that this could push capacity toward 8.5 million tons per annum. My understanding was that you had earlier described it as roughly an incremental 1 million tons. So what you said today suggests somewhat greater confidence that it may end up larger. Would that be a fair reading?
Glen Masterman
executiveKate, I’ll pass it over to Glen. My sense is Glen is indicating that this gets us to that point, however—
Barrie van der Merwe
executiveSo, we're heading toward, you know, fully defining a resource that's going to be studied. On the question of, you know, the, you know, the quantum, you know, the production rate, I think it's a bit early to, sort of, say too much about that until we complete the study and grasp how, you know, that will, sort of, be integrated into, you know, where, where we're mining at Ernest Henry. But it, it's certainly taking shape at this point, Kate, as an opportunity for incremental production.
Kate McCutcheon
analystAlright, that's clear. It was only that you included a remark there about seeing a feed rate nearer to 8.5, but I'll watch for the revised results. And then Evolution came up in the media today, re-acquisition. May I just confirm that you're still focused on the portfolio today and bringing that gearing down toward your 20%, which I think you've spoken of as the next stop ahead of the 15%? As in, there are no plans to make any changes to the portfolio for now.
Glen Masterman
executiveI believe you actually responded to that yourself, Kate. I mean, that's accurate. I mean, what we're concentrating on is executing the plan safely during this year, keeping our attention on the—
Lawrie Conway
executive... the growth studies and the execution projects in our pipeline, plus the strong results that Glen and his team keep delivering, which give us additional optionality.
Operator
operatorAll right, I appreciate the clarification. Daniel Morgan from Barrenjoey has the next question.
Dan Morgan
analystHi, Lawrie and Tim. Could I dig into Mungari just a bit more? You said today that the project is running slightly ahead of schedule — which I understand points to March 26th as the completion date. You also mentioned it's on budget, and you disclosed that AUD 60 million of the AUD 250 million mill budget has been spent. I realize spending can be uneven, but how should we look at this? For instance, is there a chance the project finishes ahead of schedule? Or is it too soon to say? Could it be that certain work streams are ahead while the ones on the critical path aren't? Perhaps you could elaborate a little. Thank you.
Lawrie Conway
executiveYes, thanks, and good morning, Dan. So I think, if we take a look at it, and for anyone who managed to join the site visit at Diggers, a good deal of the surface infrastructure plus the preparations to hook things up to the new plant — those are the areas moving along nicely, and they're running ahead of schedule. And I mean, we're talking about weeks ahead of schedule here, not months. But a lot of that work that has to be completed so everything's ready when the mill shows up, along with a number of other items to be installed during the second half of the project — we're halfway through now. So that spending rate goes toward getting all of it installed, and then once the big items arrive toward the back end of the project, that's the point when that capital will flow through. So that's how we see it. I mean, I think if we take a look at it, the project team has the capital and the works programmed out across that 30-month period. It will shift between the months, but there's nothing we would sort of point to in terms of how to plan that out over the next couple of quarters. The only thing we should focus on is that right through to the end of the project, at the end of the 30 months, we're tracking to the AUD 250 million budget.
Dan Morgan
analystAlright, thanks. And this is probably a broader, simpler question about the whole business. As I look toward the December quarter, I would have expected an increase in output for both gold and copper, since you have no major shutdowns, there's still some decent growth at Cowal, and cash flow should be somewhat stronger if these spot commodity prices stay where they are. Is that a reasonable read, or is there anything you'd want to point out regarding the quarter ahead?
Lawrie Conway
executiveYeah, look, I mean, that's accurate. At $3,970 today, as I mentioned, we're nearly $290 an ounce above what we achieved in the first quarter, so that will help the cash flows. From a production perspective, quarter on quarter, those shuts are finished, so you'll see an uplift. I think the offset you'll see is that Mount Rawdon is now moving to stockpiling lower grade than what we achieved in the first quarter as we mine the last stage of the pit. So production there will drop off somewhat, and that's probably the only main variance we'd see in Q2 versus Q1 across the assets. I think the other one would be Red Lake, which will be slightly lower since they'll have some shuts in December that weren't in the September quarter. But overall, you'll see an uplift in production in the December quarter.
Dan Morgan
analystAlright, thanks a lot, Lawrie, and thanks to the whole team.
Operator
operatorHugo Nicolaci from Goldman Sachs is up next with a question.
Hugo Nicolaci
analystHello there. Good morning to Lawrie, Barrie, Matt, Glen, and Peter. Appreciate the update today. My first question concerns Northparkes, following that site visit in June. Could you share how the sub-level work is coming along? Also, perhaps you could speak to the substantial quarter-on-quarter increase in material from the open pit, and how you view that higher material movement alongside the stockpile drawdowns you mentioned earlier for the year.
Lawrie Conway
executiveSure. Appreciate it, Hugo. Matt, that one's yours.
Matt O'Neill
executiveYeah. Thanks, mate. As for the work we laid out for the remainder of the year at Northparkes, we're basically on schedule. So, if you look at the pre-phase work for E48, some development work there is where we need it to be. Drilling is coming along quite nicely. In that area, we're more or less in line with expectations. As for the open pits and the movements coming through, we feel pretty comfortable with where that stands. At Northparkes, we have some fairly substantial stockpiles sitting between the mine and the mill, so the only movement we'd see there is whatever material we put through the mill. So we're doing a bit of work in that area with the team on site. But at this stage, all the works at Northparkes are going well. Probably the main one that I think will help us be more reliable there, or keep being reliable, is around works in the shaft. So all those structural works at the bottom of the shaft are done, which was no small feat from the team, and that should see us going well into the future with that asset.
Hugo Nicolaci
analystThanks. Now for my second question, about the TCRCs at the copper-producing assets. I appreciate that you have your own agreements in place there, so the full pass-through isn't necessarily visible to you, but could you give us any extra detail on how big the cost reduction you expect at Ernest Henry and Northparkes is, both in the quarter just ended and for the remainder of FY twenty-five?
Lawrie Conway
executiveRight, Hugo. So the TCRCs in the offtake agreements we have run on a calendar year basis. So when we move forward, that's the point where we'll set prices for calendar year 2025, and that will affect our FY 2025 costs during the second half of the year. In our guidance, we had built in some shift from 2024 into 2025. So what we'd see is that once we get the benchmark prices for 2025, we'll update the market if there's any material shift, but we have allowed for those TCRCs for both operations to come down in the-
Matthew Frydman
analystThanks, Lawrie. I'll turn it over to the next speaker.
Operator
operatorOur following question is from Matthew Frydman of MST Financial.
Matthew Frydman
analystSure, thanks. Good morning, Lawrie and team. I have a couple of questions; perhaps the first one concerns Red Lake, and Matt is probably in the best position to answer it. Could you elaborate on the improvements made at that asset and, I suppose, the kind of consistency we can anticipate going forward? Obviously, during the September quarter, you milled more than you mined, as you mentioned, but you expect those stockpiles to be rebuilt in the December quarter. I am just trying to grasp, I suppose, what is behind that expectation. Is it due to better mining rates and the availability of blasted stocks, or is it more about the shift changes in December that Lawrie referred to? So, yes, I suppose I am asking about mining consistency, and then second, the consistency of the grade profile. Should we expect that to keep rising over the course of the year? Thanks.
Lawrie Conway
executiveI'll make a few remarks first, then hand things over to Matt, who can say that the consistency seen at Red Lake has been there since his start. Still, I'd attribute it to what Jon and the team accomplished during the second half of FY twenty-four: they got much better sequencing in place for shutdowns and planned maintenance, lined up the mining and processing schedules with those events, and built the stockpile ahead of time so there's actual contingency in the system. Another point is that we've been adhering more closely to the mine plan, which makes it far easier for the whole workforce to understand where things are headed, day in and day out, and month after month. So as we look ahead, that's the kind of thing we want to see there. And I think another effect as we began this year is that it showed the workforce that with proper planning of this kind and some contingency available, they have the ability to perform their jobs much better.
Lawrie Conway
executiveMatt, you have the floor.
Matt O'Neill
executiveLawrie, I’m sticking with the first response you gave.
Lawrie Conway
executiveRight.
Matt O'Neill
executiveAs for that, I believe Lawrie already addressed the points I was going to raise. The crucial thing there is operational discipline. We're beginning to see it truly take effect and become more consistent, and then contingency is the second piece. So at this point there's more than a single method to move the ore around inside the mine, and beyond that you're seeing some contingency designed into the plant. You'll still encounter sequencing issues, just as any typical underground operation does — once you adhere to the plan, you won't pull stopes out of sequence. So some variation will exist, though it will be minor and in line with the plans. So yes, from the operational discipline standpoint we're really quite comfortable, since that is what has driven it.
Matthew Frydman
analystYes. All right. Appreciate it. And perhaps only—
Lawrie Conway
executiveI was about to pass it back to... You also raised a question about the grade, and I believe the steadiness of our mine compliance is proving beneficial for the grade.
Matt O'Neill
executiveYes, that's correct.
Matthew Frydman
analystYeah, my apologies.
Matt O'Neill
executiveApologies—well, I can't tell which Matt you mean.
Lawrie Conway
executiveYeah, exactly — you've got it right.
Matt O'Neill
executiveThis will follow the plan, and that plan does fluctuate. It isn't a trend that climbs higher and higher in exponential fashion, but across the year it will keep going in accordance with the plan.
Matthew Frydman
analystAll right, that's clear. Thank you — and sorry about mixing up the names earlier, but I appreciate you going back to those particular points I mentioned. Now, turning to the exploration success, and I suppose trying to get a sense of where things go from here — Glen has, of course, already commented on some of this. Would it be reasonable to say that the near-term aim is to fold that drilling, presumably, into the upcoming resource and reserve update? But I'm also trying to grasp the longer-term picture: how do these different successes feed through into the mine plans across the three assets? So, perhaps thinking about it specifically — we've discussed Bert a little. Clearly, at Ernest Henry there's the extension feasibility study, which is due in early 2025. And then at Northparkes, you've flagged Major Tom, but again, there are pre-feasibility and feasibility studies under way there, including, I suppose, how you're thinking about underground materials handling and that kind of thing. So the real question is this: does the exploration success you've highlighted mean those case studies at the assets get reframed so as to take it into account? Or do Bert and Major Tom represent, I suppose, additional pieces of work sitting on top of those core studies that are expected to be delivered in early 2025?
Lawrie Conway
executiveThanks, Matt. I'll begin with the second question, on where this fits regarding resources and reserves. What the exploration results and the programs Glen and the team are running show us is that these are areas giving us additional production opportunities. Because at Ernest Henry and Northparkes, we already have as much as 1.5 to 2 million tons of latent capacity sitting in our processing plants and concentrators. So how do we capture that, given our materials handling systems, and then when we look at Cowal, the underground with grades more than double those of the open pit, being able to displace that open pit material, especially as we move into Stage I and go back to processing some stockpiles — that's what we see as the real benefit. So that's what those programs are aimed at: showing that you can raise the production rate without having to put capital into processing plant capacity, while those other studies carry on. Those other studies are the ones that would feed directly into the materials handling system and the existing base load in production.
Lawrie Conway
executiveHaving these programs in place is genuinely valuable, since they offer additional upside without interfering with the other extensions' plans.
Glen Masterman
executiveAnd to add to what Lawrie said there, Matt, I think the way we're viewing this is that all of those — well, the three opportunities I laid out this morning — they're additional, or they will augment and complement the studies already underway at the operations you brought up. And that has really been the approach, especially at Northparkes, and to some degree at Ernest Henry and Cowal, which is: how do we unlock value that isn't simply about building resource at the end of mine life and creating a rather complicated production target? So are there chances to pull particular targets forward and make use of that latent capacity sitting in the plants? Beginning with Northparkes, the open pit targets — we've concentrated quite heavily on those over the course of the year. Largely because, logically, they won't compete with the underground materials handling system, and we'll be able to deliver that incremental production growth going forward. Now, we're still at a fairly early stage. We're delineating really the extent of mineralization. We're still carrying out the pre-resource drilling at the moment. We'll shift into the modeling and estimation phase in the new year, once we're comfortable that we have enough drilling to give us some meaningful results there to understand.
Glen Masterman
executiveIn a similar vein, at Bert we will be conducting a resource update, as I noted, which is set to be completed by the June quarter of next year. That will put Bert in a position where we can begin considering, or examining more closely, precisely how that possible supplementary output would fit within the overall plan. At Cowal, as Lawrie said, there's a future opportunity to potentially replace some lower-grade material coming from either stockpiles or the E42 stage. It is genuinely early days — just one hole into it — yet we have encountered a repeat of the same geology that governs grade in the neighbouring underground mine. So it's a new area with plenty of room to expand, though considerable work lies ahead of us to comprehend it and, in the end, develop it.
Matthew Frydman
analystAppreciate that, Glen and Lawrie — very helpful detail. So maybe just to pull it together at a very high level: it sounds as though the blue sky upside across all 3 of these exploration targets, if that's what we're calling them, is really more about possible incremental production down the road in time, rather than simply added resource and reserve plus life extension. At a high level, is that roughly how you're looking at all 3 of these opportunities?
Lawrie Conway
executiveMatt, I'd say your summary captures it nicely. That is precisely the aim behind our efforts.
Matthew Frydman
analystAlright, Lawrie, thanks — appreciate it.
Operator
operatorDavid Radclyffe from Global Mining Research has the next question.
David Radclyffe
analystMorning, Lawrie and everyone. I've got a few quick follow-ups about Northparkes. On what you said regarding open pit mining — clearly a very large quarter — does that mean the E31 North pits have now been completed, or was more material extracted? And does that mean open pit mining at Northparkes is now done for the time being, or have you given E28 some more thought?
Lawrie Conway
executiveMorning, Dave. No, I mean, the quick response is that since we had the shaft works maintenance underway, we were drawing from underground, so those were among the main sources over that stretch. The open pits will keep going until this financial year ends, and then as for E28, you know, work carries on there regarding where it fits within the life of mine plan, and we're also starting up our life of mine planning at this moment.
David Radclyffe
analystAlright, cool. And then, like you mentioned, there's plenty of stock sitting in front of the mill at this point. So, is there any additional maintenance kind of lined up for the year, or do you feel good that you could really sort of keep the mill full through the rest of the year and perhaps even put the upside potential to the test toward that roughly 7.5 million ton rate?
Glen Masterman
executiveMatt here, mate. Yeah, at this point, there's still a bit of work left for us on the 180 area when it comes to crushing, so we haven't fully opened up the feed from the open pits to flood the mill. That said, we do have a chance to look into how hard we can run that area, so we'll be examining that, but right now, we're still in line with plan. We're not planning on sort of swamping it at this stage.
David Radclyffe
analystGreat, thank you. And if I might fit in one final question about exploration. On Major Tom E51, clearly there are some additional positive results, and it appears Major Tom has been drawn toward the south. So have you eliminated the possibility that they might connect? Then regarding the resource side, it would obviously be great to have that maiden figure, but the drill spacing still looks fairly wide, so infill work is needed. So would it be fair to say you will still be well into FY26 before you come close to considering whether these could form a new… if they hold together, a new source of ore?
Glen Masterman
executiveDave, yeah, that's probably a reasonable assumption. What I'd note, though, is the reason we'd move on to targets — and as you rightly point out, the drilling spacing is pretty wide — but with porphyry systems, grade variability can be far lower than what we've seen in gold systems. So the wide spacing, like we have today, will let us get to a classified and inferred resource, so we're fairly confident on that. And then obviously, depending on the scale and where we see the opportunity fitting into the life of mine plan, we can speed up the drill program to bring that forward, and earlier than FY 2026, to sort of, you know, advance the mining studies in parallel with that. The other thing — going back to your earlier question about whether the two join up — that's actually the million dollar geology question. What we're doing right now is delineating. We think they're discrete resources because these pencil porphyries tend to be, as you know, discrete, if you like. But what we do understand is, if you look at figure two in the exploration announcement this morning, you'll see where both targets sit relative to a pink unit we've outlined there, or delineated, which is, you know, one of the monzonite intrusions.
Glen Masterman
executiveSo what we're observing is that these pencil porphyries are showing up near the margins of this intrusion — along its shoulders — and that contact zone against the host volcanics has seen comparatively little exploration around the periphery, especially heading south and then, you know, continuing farther back toward the east and northeast, so there's quite a bit of opportunity there for us. We'll get to that down the road, but the initial step is to get a handle on sort of what we have with these two targets.
David Radclyffe
analystAll right, excellent. Many thanks. I'll relay that.
Operator
operatorJon Sharp of CLSA has the next question.
Jonathan Sharp
analystYes. Morning, Lawrie and everyone. Picking up from where Matt Friedman left off regarding Red Lake — that's Matt O’Neill, sorry. I'm sure by now you've taken a proper close look at how things run there, but perhaps beyond operational discipline, which, as you know, clearly matters a great deal, what would you say are the main priorities you've identified, say across the coming 12, 24, 36 months? What's easy to fix quickly? Which longer-term goals do you have in mind there?
Matt O'Neill
executiveYeah. So for me, the main thing I'm focused on over the next twelve to twenty-four months is drilling — making sure we keep delivering the same consistency we've had by getting ahead of ourselves on grade control drilling. So that's probably the central priority for holding onto the consistency we've seen. And after that, it's about what the life of mine process tells us to do. So we're doing some work through this life of mine process of... I think the operational discipline and the fundamentals of running a mine are now in place and beginning to show some benefit. We're now talking about what strategic decisions you make with those ore bodies to get the next step in performance out of that business. For me, that focus is on cash and making money and margin. So what that looks like, we'll work through during this life of mine process — that's probably where I'm at. So without saying this is the direction, we would go through that process, and we'd be in a better position towards the end of this year to give you a proper answer on what that next step is.
Jonathan Sharp
analystAlright, thank you. And just with the gold price having been so strong lately, if that trend keeps going through FY twenty-five, should we be expecting some upward pressure on the all-in sustaining cost guidance? What are your expectations on that?
Glen Masterman
executiveJon, the sole connection I’d make there is that, you know, should the gold price keep holding at its current level and then rise further, the effect of royalties on our all-in sustaining cost is what we’d observe. That’s really the only item we’d see in that regard. I think, you know, as far as how we stand relative to our other input costs in the market, the rationale behind the higher gold price is lower interest rates and inflation settling down more and heading downward, which would mean input costs won’t shift the way they have over the past two to three years.
Jonathan Sharp
analystAll right, all right, thank you. I'll relay that message.
Operator
operatorTom Prendiville from Canaccord Genuity has the next question for you.
Tom Prendiville
analystMorning, Lawrie and team. Thanks for taking my question. I just want a bit more detail on the balance sheet and gearing. So maybe this one's for you, Barrie. Clearly, the portfolio is benefiting from strong gold and copper prices. You're seeing strong, quick de-gearing, and you're spitting out some decent free cashflow. Gearing's now below 24%. You de-geared by 1.5% in the quarter, which is a great result. I know you sort of touched on this in your presentation, but maybe you can just talk in a bit more detail around the optimal, gearing level for AVN over the short to medium term. And the reason I ask is I'm just thinking about it in the context of capital management optionality or capital management upside over the near term. Thanks, guys.
Barrie van der Merwe
executiveAll right, thanks Tom, appreciate the question. So, as Lawrie laid out during his presentation, we’re seeing really strong momentum on cash generation, and we expect that to carry on through the year. You know, we’ve seen gearing come down 1.5% in the quarter alone, and we’ve been pretty open about the fact that we’re driving toward that 20% level by the end of this year, and then 15% over the medium term, right? So we’re fairly comfortable once we reach that 15% level. Along the way, what matters to us is continuing to invest in the business and in the strong CapEx opportunities and project opportunities that we have. And with that, as we mentioned at the full year financial results in August, as gearing declines, we’d be looking to boost share returns via dividends. And if you look back at that, we had a chart in the full year financial results that clearly shows that historically, as gearing has come down, you see dividends rising, you know? Putting all of that together, that’s the intention behind the capital management strategy going forward. It’s about generating the cash, continuing to invest in the business, and as the debt comes down, increasing the share of returns through dividends.
Tom Prendiville
analystGreat, yeah, that makes sense now. Thanks, Barrie. I'll relay that.
Barrie van der Merwe
executiveAppreciate that, Tom.
Operator
operatorThe following question is from Kate McCutcheon at Citi.
Kate McCutcheon
analystOh, hello once more. Just a brief follow-up question. Regarding the Cowal OPC approvals, is it still reasonable to anticipate those within this CY? And could you remind me what assumptions you had in the outlooks for Cowal that were laid out in the site visit deck concerning the timing of approval?
Lawrie Conway
executiveRight, Kate — regarding the OPC approvals, our expectation for this quarter, the December quarter, was to receive the consent conditions, then respond to them, and after that await the regulator's formal approval. That remains on schedule. Engagement has been genuinely strong, with the various departments giving us positive responses as we provide that input. So that work is ongoing. In terms of what we built into this year, we assumed Stage I would not commence. Our allowance was for the regulator's approvals of the OPC, then taking that final feasibility study to the board, and possibly toward the latter part of the year, some costs tied to the consent conditions around permitting and similar items. That's roughly what we've provided for. Basically, it's into FY26 when we'd begin progressing to the Stage I cutback, along with the other works connected to continuing the open pit mining.
Kate McCutcheon
analystAll right, understood. So everything's on schedule right now?
Lawrie Conway
executiveAbsolutely, and we’re glad about that.
Operator
operatorAs a reminder, if you'd like to pose a question, just hit star one on your phone and hold until your name is called out. Our next question is from Al Harvey at J.P. Morgan.
Alistair Harvey
analystMorning, everyone. Perhaps I could start by pulling back a bit and looking at Red Lake in terms of the longer-term opportunity in Canada. I believe you all picked up on the fact that some exploration work took place at Lake St. Joseph and the October greenfields project. So I was hoping to get a feel for how close those sit to Red Lake, what activity is underway at each, and what sort of target scale you see, plus how you view the longer-term opportunities across North America.
Lawrie Conway
executiveYes, that question is directed at Glen, Al. And our perspective on that is really about the opportunities Glen and his team are finding that could provide us with new production fronts in Canada. But would you like to explain where things stand with both of them, Glen?
Barrie van der Merwe
executiveYes, definitely. Thanks. Oh, right — as Lawrie said, we're really considering that roughly 7, 7-plus, 10-plus year horizon in terms of what enters the portfolio from a production standpoint. So, wrapping up at Lake St. Joe and October — both are relatively early-stage projects. We've largely finished a few of the field programs, which mostly involve geochemical sampling. So we're taking older methods and applying them in areas that haven't really been tested before, and we're actually defining some pretty exciting targets at Lake St. Joe. I haven't looked at the October data yet, though the field season has been completed. A bit of work is still underway, but we'll review that data once it arrives. Basically, what we have is — we'll reach a decision point on both projects. If a compelling opportunity exists, the next step would be to move toward drilling. If a compelling opportunity exists, I'll talk with Lawrie and Barrie about whether it will justify — warrant — some investment to drill it. While I have the mic, though, we've been doing quite a bit of similar regional work at Red Lake, and we're beginning to see some really exciting developments there on that front.
Barrie van der Merwe
executiveI mean, regarding the geek team, we're making progress. So it's... We're putting in the effort, not only on greenfields but also around our mine sites, and clearly, with the mine site work, once we produce those targets, we'll be at the front of the queue for, you know, whatever investment we can bring in for them.
Alistair Harvey
analystThanks, Glen. That's great.
Operator
operatorThat brings us to the end of the Q&A session. At this point, I'll return the call to Mr. Conway, who will offer some closing comments.
Lawrie Conway
executiveThanks, Kylie, and thanks to all of you. For FY twenty-five, the September quarter was a really strong beginning, and it built on the things we said we'd set out to accomplish as FY twenty-four came to a close. That keeps us on track to deliver guidance, which in the end means materially higher cash flow, and at today's prices that hands us even more upside and opportunity provided we can deliver — and do deliver — against that plan. Beyond that, we're seeing some genuinely good exploration successes, which opens up new opportunities for mining fronts and leaves us well positioned heading into the second quarter, with the balance sheet also in good shape. So thanks for your time today, and we look forward to updating you again soon.
Operator
operatorThat brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.