Evolution Mining Limited (EVN) Earnings Call Transcript & Summary

January 20, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 51 min

Earnings Call Speaker Segments

Operator

operator
#1

Thanks for holding, and welcome to the December 2025 quarter results call for Evolution Mining Limited. Everyone is currently in listen-only mode. A presentation will be given, and after that we'll open it up for questions. Should you want to ask something, press the star key and then the number 1 on your phone's keypad. At this point I'll pass the conference to Mr. Lawrie Conway, Managing Director and Chief Executive Officer. Over to you.

Lawrie Conway

executive
#2

Thanks, Harmony, and good morning to everyone. I hope you had a nice break and I wish you a very healthy and successful 2026. On today's call I'm joined by Matt O’Neill, our Chief Operating Officer, Fran Summerhayes, our Chief Financial Officer, and Peter "Rocky" O'Connor, our GM Investor Relations. We released our December quarterly report today, and that will serve as the reference point for this call. Fran and I will be back in a few weeks' time when we release the financial results for the FY 2026 half-year. Before we get into the quarterly results, I want to take a moment to reflect on the tragic event that took place here at Bondi on 14 December. 15 people were murdered because of racism. No violence is acceptable, and even less so violence tied to racism. This heartless and cowardly act of terrorism occurred while many people and families were enjoying the Bondi environment, specifically the Jewish community celebrating Hanukkah. I know this has had an impact on our country, including on our team members at Evolution. The attack is something that should have been avoided. The federal government's lack of action on racism over the past 2.5 years is inexcusable. The refusal to call a royal commission until the overwhelming majority of Australians spoke of the need for it, and then to try and condense the timeframe for political reasons, is disappointing.

Lawrie Conway

executive
#3

There was a lack of leadership there. Conversely, we very much welcomed the swift, decisive measures and backing from the New South Wales state government. What worries me most is that we take nothing away from this and fail to make Australia a safer and more inclusive nation. We extend our sympathies to the family and friends of those killed. Everyone affected by the attack is in our thoughts and prayers, and we also thank all the first responders who volunteered their support during this incident. Coming back to Evolution. This marked another quarter — the eighth in a row — in which we safely delivered according to plan. We turned out 191,000 ounces of gold along with 18,000 tonnes of copper at a very low all-in sustaining cost of $1,275 per ounce for continuing operations. That was achieved safely, with our TRIF staying low at 5.8. Gold production rose by 10%, while our all-in sustaining cost improved by 26%. Importantly, cash generation has truly built momentum as we capture the benefits of the present metal price environment. Our underlying group cash flow rose 176% to $541 million, or roughly $2,800 per ounce once normalized for the FY 2025 annual tax payment made during the quarter.

Lawrie Conway

executive
#4

We saw reported cash flow rise 110%, reaching $412 million. That cash flow came in with gold priced roughly $800 beneath the current spot level. Group cash flow was driven by record mine cash flows, as operating cash flow climbed 57% to slightly more than $1 billion, and net mine cash flow doubled to $727 million, with the operations lifting their net cash flows somewhere between 55% and 140%. The cash flow charts on page 1 of the report make our capacity to generate cash very clear. We remain on track to deliver operating cash flow of nearly $4 billion. That figure is 40% above the level at which we issued guidance in August, and it is expected to be 25% above what we delivered during the first half. Our cash balance rose to $967 million after we repaid $110 million of debt along with $116 million in net dividends. No debt falls due before FY 2029. Gearing now stands at 6%, versus 11% at September and 30% a mere 2 years back. We are firmly on track to be net cash this year, which adds further flexibility to the balance sheet, including returns to shareholders. We continue to expect to meet our original group production guidance of 710,000 to 780,000 ounces of gold and 70,000 to 80,000 tonnes of copper.

Lawrie Conway

executive
#5

We expect group copper output to land at the bottom of the guidance range because of what happened weather-wise at Ernest Henry. During the last part of the quarter, 300 millimeters of rain fell at Ernest Henry within a 24-hour stretch, which led to water entering the underground mine and the operation being temporarily suspended. Everyone on site was safely accounted for, and there were no injuries. Recovery work is going well, and we expect only short-term effects on operations. The anticipated impact at Ernest Henry is roughly 7,000 to 8,000 ounces of gold and 4,000 to 5,000 tonnes of copper for FY 2026. Our group all-in sustaining cost guidance has been revised to $1,640 to $1,760 per ounce, which is a 6% improvement over our original guidance, reflecting continued cost control and the effects of higher byproduct credits, partly offset by the Ernest Henry weather event. This updated group guidance further cements Evolution?. Matt will walk through operational performance shortly. But I do want to highlight a couple of key points. Roughly 2.5 years ago, some analysts said Cowal's best days were behind it, and one even claimed the cash cow was finished. This quarter, it generated $361 million of operating cash flow at $4,500 per ounce and $284 million of net cash, which works out to more than $3 million per day even after investing in the OPC project.

Lawrie Conway

executive
#6

Just that cash flow level by itself beats what a lot of Australian multi-asset mid-tier companies generate, and this operation still has a minimum of 16 years of life remaining. At Mungari we achieved record net mine cash flow of $104 million — a 142% gain for the quarter, and that covers close to 50% of the capital for the plant expansion project. Over at Red Lake, the asset is now hitting the rhythm we wanted of 30,000 to 40,000 ounces each quarter alongside positive net cash flow. Output there came in at 33,000 ounces, and net mine cash flow doubled to $80 million. Over the last 18 months they've now generated more than $200 million in net cash flow. Turning to the projects, Mungari made a successful move into commercial production, and with the haul road fully sealed during the quarter, construction of the Castle Hill mining hub is now finished. Solid headway was made on the Cowal OPC project in this quarter, and it stays on plan and on budget. The studies covering our next two key growth projects — E22 at Northparkes and Bert at Ernest Henry — are now done and will be presented to our board for assessment in the March quarter. With that said, I'll pass things over to Matt, who will walk you through operational performance.

Matt O'Neill

executive
#7

Thanks, Lawrie. As we mentioned, we've now wrapped up yet another solid quarter of delivering safely according to plan, and we're still on course to hit our full-year guidance, which lets us keep benefiting from the environment of rising metal prices. I'm glad to report that our safety performance is holding up well, with teams across each operation continuing to place a heavy emphasis on this area. This quarter we did record a modest rise in our total recordable injury frequency rate, and that came from a higher count of injuries at our Cowal and Mungari operations during October. Our safety efforts stay centered on leading indicators, and our results there remain strong. Turning to production, as mentioned, we're on track to achieve full-year guidance. For me, the standout on the production side for the December quarter was the successful ramp-up at the Mungari operation, where we hit an annualized run rate through the mill of 4.1 million tonnes for the quarter. Over the course of the quarter, the team operated the new mill across a variety of operational parameters, and I'm pleased to say they are very happy with its performance. Just as in the September quarter, we experienced minor disruptions to mining activities in the open pit at Cowal because of wet weather.

Matt O'Neill

executive
#8

Once more, it was encouraging to see the team's efforts around resilience and reliability bear fruit, since we saw just small fluctuations at the plant stemming from those events. As mentioned, work on the OPC project keeps advancing nicely, and that project is running ahead of schedule while staying within budget. Both the Red Lake and Mount Rawdon operations kept delivering according to their plans, with very little variation across the December quarter. As Lawrie mentioned earlier on this call, Ernest Henry was hit by a major rain event late in the quarter, on 29 December. In the Cloncurry area, 420 millimetres — the typical yearly rainfall — came down within a mere 72-hour window, and 300 millimetres of that landed in only 24 hours. Throughout that event, every member of personnel was safely evacuated from the mine through the shaft, and the various dewatering systems, above ground in the pit and below ground, worked exactly as intended to lessen the rain's impact. We redirected water away from critical infrastructure locations and toward the mine's bottom, which kept the effect on mine infrastructure to a minimum. While we carry out dewatering and remediation at the mine, we have brought the planned February plant shutdown forward so it lines up with this work.

Matt O'Neill

executive
#9

Right now, the processing plant is being shut down, and the plan is to have that finished by the end of January. Based on what we currently estimate, full-year production at Ernest Henry will come in lower by 7,000 to 8,000 ounces of gold, along with 4,000 to 5,000 tonnes of copper. Over at Northparkes, we hit a major milestone in the December quarter: the E26 sub-level cave wrapped up after 10 years of operation, and the E48 sub-level cave ramped up successfully to take its place. So to sum up, we're still on track to hit the group's full-year guidance and to capitalize on the strong market conditions we're seeing at the moment. That concludes the formal portion of our update, and I'll turn things back to Harmony for questions.

Operator

operator
#10

Thank you. Should you want to pose a question, press the star key and then 1 on your phone, and wait until your name is called. To withdraw your request, press star 2; and if you are using a speakerphone, lift the handset before asking. Our first question is from Levi Spry of UBS. Please go ahead.

Levi Spry

analyst
#11

Morning, Lawrie and Matt, and thanks for making time — happy New Year. I suppose my first question is about getting to a net cash position at some point in this half. Could you say a bit about how the board might tackle that in February, what the competing interests look like when it comes to CapEx and exploration, and perhaps what you could bring forward — I'm thinking specifically about your projects — but also the OPC and how you plan to optimize it going forward, along with Northparkes, Bert?

Lawrie Conway

executive
#12

Thanks, Levi. Happy New Year — and I’ll ask Fran to add a few remarks. Since the day she came on board, our cash flow has only risen. Look, over the rest of this year we’ll get to a net cash position, and that really shows that if you deliver to plan, essentially in an unhedged environment, and do so safely, you do actually capture the benefits. Our policy is a percentage of cash flow targeting 50%. We review it on a full-year outlook basis, and at the close of each financial year, we review the policy. At year-end we’ll review the policy. I don’t expect much change, but we certainly have flexibility around the percentage we pay. Then, internally, I think our discipline around capital allocation and projects will stay key. We’ve seen that OPC is progressing well, and I was out there last week, and it’s actually much drier than it was 6 months ago and 3 months ago, which is good for the project and does create some flexibility around that project and what we do. On exploration, I think Glen is going at full tilt, but he’s looking at some opportunities there.

Lawrie Conway

executive
#13

So clearly, E22 and Bert are things the board will be looking at during the quarter too. Like I said, we'll aim to keep rewarding shareholders in this environment, with discipline in how we allocate capital, whether that's projects or exploration — but it's a good problem for Fran to have, figuring out what to do. Fran, anything you'd like to add?

Fran Summerhayes

executive
#14

No, that summary was well done.

Levi Spry

analyst
#15

Yeah, okay, thanks. And then regarding Ernest Henry, maybe this one's for Matt — it was a pretty significant event, and it may have gotten a bit lost in an otherwise very good quarter, so where do things stand right now? You're expecting the plant to come back on at the end of the month, but what about the mine itself, the dewatering and all of that?

Lawrie Conway

executive
#16

Yeah. I’ll have Matt handle that. Look, Levi, I don’t think it affected the December quarter — as Matt said, it happened right at the end. It’s what we’re moving through as we enter this quarter. Matt touched on some of it during the call, but maybe, Matt, just a bit of color around the mine and the plant at the surface.

Matt O'Neill

executive
#17

Sure. Let me begin with the surface. We came through that water volume really well at the surface. The plant is in perfectly good shape. Rather than carrying out that shutdown in February, what we decided was to handle it ourselves and pull it forward into January, which gives us some time back that month. On the mine and infrastructure side, we have some minor flooding remediation work in certain areas that were more like pockets than anything else. As the water moved through the mine, a number of those pockets filled up, so that is the tail end of one of two conveyors and it won't take much to get it back. Then there is some work around a hydraulic pack that was sitting in a pit in the crusher. Nothing material on the infrastructure side. Right now we are dewatering into the existing dewatering system at a substantial rate. We are up around 35 megaliters a day. The present status is that this is moving ahead of plan, and as I said, we will turn the plant back on at the end of January and then work our way back through that, bringing the mine back on over that month as well.

Lawrie Conway

executive
#18

One thing worth noting, Levi, is that compared with what happened in March '23, the pumping stations and main power substations this time didn't take the kind of hit they did then. In fact, they came through essentially unscathed.

Matt O'Neill

executive
#19

Correct, that’s accurate. Those stayed running the whole time. There was a stretch when we held off sending personnel underground, since we weren’t willing to expose anyone to danger. A trip occurred, and that shut things down until we could get a person back in to repair it. Beyond that, every piece of infrastructure performed just as we had expected. The event’s magnitude was likely the problem. It’s nearly three times larger than anything we’ve encountered previously. About 100 mil within a single day was roughly the ceiling during the past two events, and we observed that during the buildup to this one, after which came the 300 millimeters. All the systems did what they were designed to do. An event of that magnitude hadn’t been observed in that area for a long while, and you could also see, among some of the nearby properties, that pastoralists experienced fairly serious effects unlike anything they’d had before. That was our difficulty. Handled effectively, infrastructure in good shape, and we’ll have operations restored shortly.

Levi Spry

analyst
#20

Okay, yes, thanks. Appreciate it, Lawrie. And thank you, Matt.

Lawrie Conway

executive
#21

Thanks, Levi.

Operator

operator
#22

Thanks. The following question is from Hugo Nicolaci at Goldman Sachs. You have the floor.

Hugo Nicolaci

analyst
#23

Morning, Lawrie, Matt, and Fran. Congratulations on what was a fairly strong quarter. I wanted to open with the first question, and it's a somewhat more strategic one. Clearly, this gold cycle has been quite strong — arguably unprecedented — given where prices sit today. Producer discipline has obviously been pretty important when it comes to capturing that operational leverage, and avoiding the pursuit of lower-grade ounces just to hit volume targets has produced a pretty good cash result. From where we stand now, gold prices are arguably more than double the level at which a lot of these mine plans were set. If this is the gold price going forward, is there room to begin rethinking how you approach these things in order to optimize value from here?

Lawrie Conway

executive
#24

Yeah. Look, I’ll let Matt say a few words about the plans and the mines, the open pits and the undergrounds. Basically, we consider the present price conditions, and as we’re mining in particular areas, if additional material turns economic, we take it. We’re right in the middle of our life of mine and mineral resource ore reserve review at the moment. We don’t simply allow the short-term metal price to push us into the wrong behaviors. Matt?

Matt O'Neill

executive
#25

Yes, we're leveraging that right now, but the discipline I'll continue to enforce across all the operations is that none of the lower grade should displace anything from the original plan or higher grade material. Where it begins to benefit us is that when we're able to boost capacity either through the plant or the materials handling systems, we can do so because most of the operations do have that capacity available. If we lowered cutoff grades, we'd see some reasonable increases at some of those operations. Probably one of the key ones that stands out in this environment, for both copper and gold, is Northparkes, and you'll see that's where a lot of the work is happening and where a lot of the focus on trying to take advantage of that is concentrated. We are doing it, but I don't want us to fall back and significantly erode the margin by chasing material that's only economically viable in this market. Got it.

Hugo Nicolaci

analyst
#26

Appreciate that. On the second point, picking up where Levi left off regarding the OPC at Cowal — clearly you're ahead of schedule and the team is already on site. How are you thinking about pulling the next stage forward, or could the rainfall we've had perhaps restrict your ability to move on that right away?

Lawrie Conway

executive
#27

Yeah. So, Hugo, I think completing the Northern Bund last quarter lets us get going on E46 and quite a bit of other surface infrastructure up at the northern end, and that's the reason it went first on the schedule. Lake water levels are dropping, and dropping nicely. Unfortunately, while I was at Cowal, the folks there mentioned they'd have welcomed some of the rain that Ernest Henry received, since conditions are pretty dry out there and at Northparkes. As we see it, the expectation is that the lake will be dry around the middle of this year. You may remember that when we approved the project, the southern portion of the lake relocation was planned for FY 2028 and slated to be dry — that gives us a chance to think about pulling it forward, because nobody wants to wait a couple of years only to discover the lake is wet or full once more. That's something the team is working through at the moment. Then, on the rest of the surface infrastructure and the work Joe and his team are reviewing, I think they'll fold that into the plan.

Lawrie Conway

executive
#28

This gives us a chance to examine the IWL — should we develop that ahead of time so that two and three open pits are ready within the next couple of years, we could move on it sooner. For sure, one item we'll be reviewing is simply whatever else might be accomplished at present given the conditions they're facing.

Hugo Nicolaci

analyst
#29

Thanks, Lawrie. Perhaps just one final item, if I may, and this one's for Fran. Could you remind us of the way the quotational pricing periods for copper operate? Looking at the realized pricing on a few of the byproducts, it appears quite favorable compared with average prices during the quarter. Please remind us whether there's any timing effect or other impact we ought to be taking into account.

Lawrie Conway

executive
#30

Yeah. Hugo, from your vantage point it isn’t straightforward to model, I’d imagine, since at Ernest Henry the quotational period is nominated on a monthly basis. Over at Northparkes, the quotational period gets nominated each quarter, and you have two offtake partners—Sumitomo, our joint venture partner, and IXM, our main offtake partner. Those nominations have to come from them. Looking at the end of September, roughly eight shipments remained open to pricing, approximately 21,000 tonnes of copper, divided about three at Ernest Henry and five at Northparkes. At the close of September, those were priced near $15,000 a tonne. They subsequently rolled into December pricing, which was roughly $18,500 a tonne. That is what raised the copper price we achieved for the quarter by approximately $3,000 a tonne. As of the end of December, we have roughly four shipments outstanding, about 10,000 tonnes, which will be finalized during this quarter. After that, it hinges on what each offtake partner nominates over the next 3 months for pricing purposes. That is the reason it is somewhat challenging. As things stand today, the average has been about 19,200 month to date.

Lawrie Conway

executive
#31

If those shipments are finalized this month, that's the rate some of them will be repriced to. Like I mentioned, it isn't easy for you, but it truly hinges on what they nominate.

Hugo Nicolaci

analyst
#32

Great. That is still useful context. I will share it with the team. Thanks, everyone.

Lawrie Conway

executive
#33

Appreciate it.

Operator

operator
#34

Thanks. Our following question is from David Radclyffe at Global Mining Research. Go right ahead.

David Radclyffe

analyst
#35

Morning, Lawrie, and hello to the team. This is somewhat of a follow-up to what Hugo asked, since clearly, when you examine the quarter, Mungari stood out as the sole operation posting a fresh record, and that, of course, mirrors the added capacity. There's a certain amount of late mill capacity throughout the group, so I'm simply trying to get a sense of whether any near-term opportunities are on your radar for driving throughput and capitalizing on this environment. If there aren't, then what's holding it back? Is it that you aren't willing to move on the capital budget as it currently stands? I'm just attempting to grasp how you might in fact run those mills a bit harder.

Lawrie Conway

executive
#36

Thanks, Dave. I’ll have Matt walk through each one briefly. To begin with, I’d say capital isn’t the limiting factor here; what matters is making certain that, when we do put capital to work, we earn the returns. As I see it, with today’s announcement about the land near Ernest Henry that we’ve acquired, together with the earlier project we announced some time back, we end up with an unbroken footprint encircling the plant, all of it within hauling distance. One program is already under way, and this will be the following one. That creates an opportunity for us, since the mine is the constraint, and Bert is obviously part of that. We’ll examine every such opportunity available to us. Matt, the key ones?

Matt O'Neill

executive
#37

I'd say Ernest Henry is the primary one for us. Today we actually have extra milling capacity beyond what we push through the mining system. We're open to using that—whether it comes from our own material via exploration or from a toll agreement with folks in the region. That's something we're actively chasing. Beyond that, looking at Northparkes and Cowal as the next two, both are mill constrained. At Cowal we spent some money on the mill in the last financial year to set it up for the next 20 years, and we also spent a bit there on improving recovery. At Cowal we're working on opportunities to raise throughput through the mill, but that's something I certainly don't want to rush through there. Those two are essentially mill constrained, with improvements and incremental improvements possible, and we can feed them from our own sources. Mungari is a similar story. Mungari obviously has now ramped up. Our strategy there is to run the Castle Hill complex, which is running very well, as our baseload feed, and then supplement that with our underground feed, which is where the grade comes from and gives us the ounces.

Matt O'Neill

executive
#38

What we can do is push higher-grade product through the mill so that any of the lower-grade material at Castle Hill gets pushed back or deferred. Naturally, we model the economics of that based on the approach we take. Exploration is one of our main spending areas, and it's somewhere we see potential upside if we're able to secure more underground feed. We'd like that feed to come from material we own, since that's where our strongest margin is generated. With that said, there are situations in which we will, can, and already have toll-treated higher-grade product belonging to others, provided the numbers work for us once that material is deferred. Those are the areas in question. Beyond that, Red Lake has mill capacity. The chance to boost our own material isn't large there, and that material remains the constraint on the mining operations, while third-party material in that area is fairly limited. John and the team are examining those items as they arise. I believe that covers most of the operations.

David Radclyffe

analyst
#39

Okay, thank you. Perhaps I could just return to Mungari for a moment, since I believe during that site visit you were still in the process of ramping it up and hadn't really put it to the test, and from what the commentary suggests, you may have pushed things a bit here with third parties. You're clearly confident about reaching capacity. Did the engineers leave any margin of conservatism in there, so to speak? Do you think Mungari could be run somewhat above nameplate? No,

Lawrie Conway

executive
#40

We're looking into that. Right now, it ramped up just the way we intended. There were stretches when we ran above nameplate, though that had more to do with material being a bit softer. As with most mills, the rate we get depends on what we're feeding through. That's what I'd like us to achieve. Right now, we're definitely not making that promise, but it's what we're working toward. Dave, I think if you look at the quarter, it came in at an annualized 4.1 million tonne rate for the quarter, and that counted that October month of commissioning and commercial production.

David Radclyffe

analyst
#41

That's great. Thanks — I'll share that with the team.

Lawrie Conway

executive
#42

Thanks, Dave.

Operator

operator
#43

Thanks. The next question is from Daniel Morgan at Barrenjoey. Go ahead, please.

Dan Morgan

analyst
#44

Hey, Lawrie and the team. I want to revisit the Cowal Southern Bund decision for a moment. Could you perhaps say a bit more about what's behind the choice to move faster on the Southern Bund? Is it that it's simpler, cheaper, or more productive — so it comes down to costs? Or is it on the revenue side, meaning you'd potentially get to more ore, more material, improved grades, and a better grade sequence? What exactly feeds into the decision to execute sooner if you go ahead?

Lawrie Conway

executive
#45

Yeah. Morning, Dan. So the main factor really comes down to where the lake level is. Since it's dropped like that, and as you remember, our plan was always to carry it out dry — that approach costs less. That's the key call here, because the question isn't whether we can manage the capital. So long as we remain inside the 430 million, we're okay. Then the second aspect concerns the flexibility it gives the site. With all that infrastructure placed around the southern area, it becomes possible to examine E41 and decide the timing. That arrives in FY 2027 and afterward. I think that's the reason the secondary element is the flexibility it hands to Matt and the Cowal team — for a stretch, we'll be processing low-grade stockpile material. You're working through the stage I cutback. Being able to open up E46 and E41 simply takes a lot more risk out of that operation.

Dan Morgan

analyst
#46

Okay, thanks. One more question from me. On page 2 there's a footnote about Northparkes, where some kind of positive adjustment has come through tied to stream deliveries. The figure shown is 18 mil, and it was an outflow. That looks somewhat lower than I had expected. Could you just clarify what's happening there?

Lawrie Conway

executive
#47

Yes. In that period, we reconciled the stream's finalized pricing and payments with Triple Flag. The final pricing, along with everything that came back to us across a number of periods, produced a credit in our favor. That explains the $18 million — I believe last quarter it was roughly 32. There was a benefit tied to the final pricing. That is absolutely a one-off.

Dan Morgan

analyst
#48

Would you call that a one-time item, or is there something along the lines of an annual true-up, or anything we could see again 12 months from now that might go either against us or in our favor? No,

Lawrie Conway

executive
#49

Dan, this is more of a one-off, since we're working through the full mechanics of it with Triple Flag. Obviously, we were getting up to speed on it during the first year. Since then, we've completed all the reconciliations with them, so it's more of a one-off.

Dan Morgan

analyst
#50

All right, that's completely clear.

Lawrie Conway

executive
#51

That's a really solid one-time item.

Dan Morgan

analyst
#52

Thanks, that’s a helpful one-off. Yeah, very clear. I’ll move on to Red Lake. It appears you’ve achieved a breakthrough at Cochenour, and if I’m reading that right, does it mean you’ll stop using ore passes and instead truck ore down to the high-speed tram? Could there be advantages when it comes to grade and reconciliation? Thank you.

Matt O'Neill

executive
#53

Yeah. Dan, Matt here, mate. Look, ore passes will still be in use, but what this does is lower the risk on those. Given the problems we hit earlier on, we've built some duplication and contingency into that system. Ore passes will still be used through there. The biggest gain for us in that spot will also be ventilation, and the mobility of some of our equipment too. What it gives us is more a matter of operational flexibility and reliability. At this stage it doesn't necessarily affect grade and other bits and pieces. It does open up some other areas and lets us do things a little quicker, but the benefit really comes around operational flexibility.

Dan Morgan

analyst
#54

Thank you. The final question concerns costs, really. Clearly, the provisional pricing items came through, but indications of cost discipline are apparent too. On Mungari in particular, quite a bit is happening with assorted third-party ore purchases. Commercial production was declared partway through October, so that AISC figure is not necessarily a fully clean guide going forward. I'm just curious what the current view is on roughly what Mungari's costs will be on a clean basis. Thank you.

Lawrie Conway

executive
#55

Yes, Dan. I believe when Matt discussed the plant testing and all of that, the team used the chance presented by that ore purchase to run that kind of material through the plant sooner. Those costs and ounces are not included. If you look at what we reported for Mungari this quarter, the AISC and the costs really relate only to our own ore. That provides a solid indication of roughly $2,000 an ounce — consider that through most of October there were commissioning costs. Going forward, you should expect to be in the early low $2,000s once it reaches the 50,000-ounce quarterly run rate. For Mungari, I think the quarterly cost was $1,980. As I mentioned, there is some commissioning in there, but it applies only to our ounces and our costs.

Dan Morgan

analyst
#56

All right, many thanks for sharing your views, Lawrie, and to the rest of your team.

Lawrie Conway

executive
#57

Appreciate that, Dan.

Operator

operator
#58

Thanks. The following question is from Matthew Frydman at MST Financial. Go right ahead.

Matthew Frydman

analyst
#59

Sure. Thank you. Good morning, Lawrie and everyone, and Happy New Year. I think my question follows on from part of what was discussed earlier. I’m quite keen to hear how the two studies now under board review turn out, and I’m certain you’ll share that when the time comes. I don’t want to come across too much like Oliver Twist, but I’m wondering what else might be looked at when it comes to any kind of formal growth studies among those options Matt described in concept—are there important growth projects that you’re advancing into that pipeline as time goes on? My second question is this: looking at your reserve at Marsden, clearly a large low-grade reserve in your figures. I believe it was last cut at a gold price of $1,350 an ounce, and right now we’re only about $5,000 an ounce above that. So at what stage does that turn into a workable growth project, or does that reserve need to be reconsidered at all, I suppose? Thanks.

Lawrie Conway

executive
#60

Matt, Happy New Year. I really hope our non-exec chair at this point is tuned in, since he'd be delighted to hear about Marsden. Let me begin with that one. For us, on Marsden, whatever we pursue there has to beat what we already have at Northparkes and Cowal. That's genuinely the benchmark it must measure up against right now. It just kind of sits in the background. The engineering team definitely doesn't give it priority, though it does get reviewed. It's encouraging that you brought up Bert and E22 and then immediately moved on to ask, "Okay, what's next?" For us, Bert matters a great deal to Ernest Henry given the capacity available in the plant. That's something the board will weigh. The studies are complete, and we'll present them this quarter. On E22, I believe E22 is truly what can unlock what we hold at Northparkes when it comes to lifting both mining and processing capacity. We have such a large resource there, and we need to examine how we can grow that over time, because doing so won't lower the NPV of the asset.

Lawrie Conway

executive
#61

So I think when we bring that to the board this quarter, it's a matter of, all right, what does E22 deliver for us when we considered a block cave and the sublevel hybrids — the best result, as we've said before, is the block cave. Now the question is where that fits into unlocking the remainder of the operation as we expand capacity. And I think when you consider the other items and what comes next, at Cowal we have the OPC running. We have E46, E41, E42 in operation. The underground is at capacity. What Matt has raised is, all right, given all those ore sources and the work completed on the plant, are there ways to lift the processing and production rates at Cowal? Then I think when you look at Mungari — Matt mentioned it earlier as well — we have the baseload at Castle Hill. The underground, which is receiving most of the exploration dollars, is what gives us the chance to get more than 20% of our material through that plant, and to run the plant above nameplate.

Matthew Frydman

analyst
#62

All right, thank you, Lawrie. So perhaps the next question is about how we should view capital allocation for the company moving forward. As you just explained, you're fairly far along with your capital expenditure across most of the portfolio. There are still a couple of formalized growth projects in the pipeline, as I understand it — Bert and E22. Overall, it's clear the business is generating substantial cash. How should we think about any potential revision or reconsideration of the capital allocation policy, given the absence of any other large-scale growth investments like Marsden, which we just discussed, and how does that look in the current gold and copper price environment in terms of how appealing that capital is for spending externally to the business? Thanks.

Lawrie Conway

executive
#63

Yeah. Look, Matt, this is a good position to be in. Two years ago, people were asking us, "How can we afford these projects?" Today the question is, "How do we keep that discipline?" I think we've laid out our capital spend, sort of, for the projects already in the pipeline at that $750 to $950 million. What now, with the progress we're seeing at Cowal and the outcomes of the studies and where metal prices are, is what can we invest in incrementally, either bringing projects forward, accelerating them, or new projects to bring forward production growth, as long as, if you look at the portfolio at the moment, the asset's average annual rate of return is sitting around that 16%. If we can generate those sorts of returns, then we would increase our capital allocation. If we were to increase that allocation by $100, $200 million a year and we can generate those returns given the cash that we're generating today and where the balance sheet sits, I think that would be the best use of a part of the extra cash flow we're getting. We obviously are still remaining committed to increasing returns to shareholders through dividends, and they'll share in the increased cash flows automatically by our current policy.

Lawrie Conway

executive
#64

If there are also ways to get through the back half of the year.

Matthew Frydman

analyst
#65

Understood. Thanks, Lawrie. That is clearly a reasonable way to look at it. Of course, the balance sheet has shifted quite rapidly — a good spot to be in. Thank you.

Lawrie Conway

executive
#66

Thanks, Matt.

Operator

operator
#67

Thanks. We’ll take our next question from Adam Baker at Macquarie. Please go ahead.

Adam Baker

analyst
#68

Good morning, Lawrie and the team. I want to circle back to Mungari — I noticed the 127,000 tonnes yielding 9,000 ounces of gold from third-party ore purchases in the region. I'm just curious whether you could elaborate a bit more on that. Should we think of this as a normalized rate going forward? I know you're evaluating additional opportunities, and just to give us some color, are there companies approaching you about processing material in that region? From what I understand, this currently represents roughly 10% to 15% of your plant throughput capacity. Thanks.

Lawrie Conway

executive
#69

Well, Adam, I'd say first off that, yes, there are folks out there who'd want a brand-new mill with the capacity for them to run some ore through it. As Matt laid out during the call, we took that opportunity to buy ore so we could really put the plant to the test during commissioning, instead of sitting around waiting until our own ore arrives — both the main ore coming from Castle Hill and the underground material too, especially since we have a big campaign in this second half on the underground. I'd almost call that a one-off, but if capacity is available, we'll take it, because we believe our mine plan gives us 4.2 million tonnes of our own ore to run through the plant. Should there be spare capacity, we'd consider it, but at the moment that purchase really only related to the commissioning phase of the plant. If we do it, it has to displace something. This particular one didn't — yes, it turned a profit, it didn't make us a lot of money, but it let us learn plenty about the plant.

Adam Baker

analyst
#70

Yeah, thanks. So the lower cost guidance makes plenty of sense given the stronger byproducts — I'm just trying to get my head around that 6% improvement at the midpoint. Roughly how much of it would come from the stronger byproducts, and how much from better-than-expected cost control at Mungari and so on? Oh,

Lawrie Conway

executive
#71

Well, Adam, it's really a mix of the two. As for the split, that hinges on how the second half plays out. We're delivering $2,000 to $3,000 a tonne more at the halfway point of the year than what we had roughly guided to. At 19, the current price is roughly $4,500 a tonne above, and the byproduct credits matter quite a bit there. If you look at what we're spending on gross operating and net operating costs versus our budget, it's pretty much in line, a touch lower in certain areas. Then, turning to sustaining capital, we're actually tracking nicely against guidance — a little bit, I'd say, a little opportunity for some sites to go to Matt and request somewhat more money, given the cash they're generating. Still, I do believe the discipline around all of the capital has been very good right across the business.

Adam Baker

analyst
#72

I appreciate that.

Operator

operator
#73

Appreciate it. The following question is from Jefferies analyst Mitch Ryan. You have the floor. Good

Mitch Ryan

analyst
#74

Good morning, Lawrie, and to the team. I just wanted to probe a bit at one of the responses you gave to Matt Friedman's question about speeding up Northparkes. You mentioned that you're clearly reviewing E22 and pushing that faster, while also growing capacity. I'd like to get a clearer picture: does the Triple Flag agreement meaningfully change your thinking, and is there anything you can act on there when it comes to expanding Northparkes?

Lawrie Conway

executive
#75

Yeah, Mitch, absolutely. If you look at Northparkes, there's a stream sitting on top of it where we receive only 40% of the gold while bearing 100% of the costs. That affects what we're able to accomplish when it comes to unlocking Northparkes. What I've been pleased about is that we've been engaging actively with them ever since we took ownership of the asset. They recognize they have a part to play, and we keep working through what part they'll have at the site going forward as we unlock the value. I think it comes down to this: when we look at it, it's permitted to 8.6, and it can get to 7.5. We have 600 million tonnes in resource. If you keep operating at those rates, this mine runs for 75 years, so boosting processing capacity and mining capacity is the right move at some point. We have to make sure it will deliver a good return, both on a pre- and post-stream basis.

Mitch Ryan

analyst
#76

Alright, thanks. My next question is about Ernest Henry — I see you've clearly managed to bring some of that work forward, but was there any work that couldn't be moved into the shutdown that got pulled ahead? And if that's the case, will it be pushed back or finished later in the half?

Lawrie Conway

executive
#77

Probably not, in short. Nothing of consequence. A handful of small underground jobs we weren't able to finish purely because of access — those will get done, but they won't cause a processing plant shutdown or any meaningful underground shutdown this quarter. No — I'd say 95% of the tasks we've managed to pull forward or push back, whichever applies.

Mitch Ryan

analyst
#78

Alright. I appreciate you all providing those responses. Thank you.

Operator

operator
#79

Thanks. The following question is from David Coates at Bell Potter Securities. Go ahead. Oh,

David Coates

analyst
#80

Morning, Lawrie. Morning, everyone. Appreciate you making time today, and well done on a strong quarter. My question is somewhat high-level. There's been plenty of discussion and a number of questions today regarding where you can add value. Is it reducing cutoff grades? Is it growing plants? Could it be acquisitions by region? I'm just curious — and we're in what is a fairly unprecedented gold price environment, not only the price itself but the pace at which it has climbed. Out of all the growth or value-adding options that you're presumably weighing and that have been talked about, which ones are rising to the top as the best bang for your buck in the kind of environment we have right now across the portfolio?

Lawrie Conway

executive
#81

Look, I’ll have Matt discuss the opportunities he sees at each of the assets. As far as we’re concerned, if we’re able to extract additional ounces or tonnes — copper tonnes — from any of our operations, that essentially lifts our margin, and that’s really the area we’re going to concentrate on. I think what we must always keep in mind is that, in the present pricing environment, if you do greenlight a project — Cowal OPC being one example and Mungari being another — it takes 2, 3 years before those come into production. You need genuine confidence regarding where the metal price will sit at that point compared with those nearer-term items involving modest gains in processing capacity or recoveries or similar things. Those are the ones you can definitely bring online immediately, but with the others, you’ll be looking at 2 to 3 years’ confidence that, when you do bring them online, they’ll be operating in a favourable environment. Mungari is one example. In ’23, the gold price stood at roughly 40% of its level today, and they’re coming online at the right moment. I’ve been involved with projects that went in the opposite direction.

Lawrie Conway

executive
#82

Matt, would you like to walk us through a few of the items on your radar?

Matt O'Neill

executive
#83

Yeah. Beyond the ones already mentioned, like E22 and Bert, if I quickly go through the operations, the area that excites me the most — if I pick Cowal, and I'm stealing Glen's thunder here — is the exploration and resource potential that exists there. Putting money into drilling and putting money into mining does two things. There's a chance to extend, which isn't as exciting as growing, but there's also a pretty solid opportunity there, depending on where we see long-term metal prices settle, that you'd grow Cowal again. That's very exciting in terms of the results we're getting back from that, and Glen will give an update the next time we talk through it. Then the other one there is also Mungari. Along similar lines, the margin and the value come from underground, so the mill capacity is good, but if we can invest in our drilling and raise that percentage of underground, that's where we get our growth in ounces without a material one. Those are our best bang for buck. Then, like I said, Ernest Henry, the exploration, you do have that capacity there, but it's the cave and whatever else that's reasonably restricted there.

Matt O'Neill

executive
#84

There are also other ore sources in the area that we'd expect to see growth from at that site too. Those are likely the main ones. Excellent.

David Coates

analyst
#85

Much appreciated, everyone. Cheers. I've got nothing further to add. Thanks.

Lawrie Conway

executive
#86

Appreciate that, Dave.

Operator

operator
#87

Thank you. As a reminder, if you'd like to pose a question, hit star 1. Our next question is from Zane Guo at Morgan. You have the floor.

Zane Guo

analyst
#88

Good morning, everyone. Congratulations on a solid quarter. I've just got one question today about capital management. When you look at the second half, how are you weighing a dividend against a buyback?

Lawrie Conway

executive
#89

Zane, this has come up before. Share repurchases form one element of the capital management strategy we review. In our case, they have to be appropriately sized — if you use 10% of the company's value as a yardstick, that represents a substantial commitment stretched over time. I'll return to my earlier point: whenever we have projects available for investment that deliver a higher return for our shareholders, those come first. Beyond that, there's the flexibility in our dividend policy — in this environment of rising prices, shareholders are going to get a larger share of cash flow than was true historically. That, I believe, is what truly delivers the greatest value to our shareholders. My expectation is that the board won't be considering buybacks during this half year.

Zane Guo

analyst
#90

Got it — that’s useful, and I appreciate it.

Operator

operator
#91

Thank you. At this point, we have no more questions. I'll now return the call to Mr. Conway for his closing remarks.

Lawrie Conway

executive
#92

Thanks, Harmony, and I appreciate all of you spending part of your day with us on this call. We've completed yet another quarter that was safe and successful. Our cash flow keeps growing. Every project we're currently executing is proceeding according to plan and staying within budget. We're genuinely eager to bring you an update in a few weeks, when Fran will be able to share how we intend to use that cash as we publish our half-year results. Thank you.

Operator

operator
#93

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Evolution Mining Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Evolution Mining Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Evolution Mining Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.