Ferrovial N.V. (FER) Earnings Call Transcript & Summary
July 29, 2026
Earnings Call Speaker Segments
Silvia Ruiz
executiveGood afternoon, everyone. Silvia Ruiz here, and I want to thank you for joining us and welcome you to Ferrovial's conference call, where we'll be discussing the company's financial results for the first half of 2026. With me today are our CEO, Ignacio Madridejos, and our CFO, Ernesto López Mozo. As a quick reminder, the results report and the presentation were both posted on our website last night, after the US market had closed. Once today's presentation wraps up, we'll hold a Q&A session. Just like on earlier calls, you'll be able to ask questions live. To do that, you'll need to join through the conference call channel and press *5 on your phone keypad. Alternatively, you can submit questions via the forum within the webcast, and I'll read them aloud at the end of the Q&A session. Before we begin, please take a moment to review the safe harbor statement in the presentation, and keep in mind that the presentation includes forward-looking statements and expectations that carry certain risks and uncertainties, so actual figures may differ. On this call, we'll be discussing non-IFRS financial measures, which are defined and reconciled to the most comparable IFRS measures in our results report and on our website.
Silvia Ruiz
executiveSo with all of that covered, I'll now turn things over to Ignacio. Ignacio, the floor is yours.
Ignacio Madridejos
executiveThanks, Silvia, and good morning, everyone — appreciate you being here as we walk through Ferrovial's results for the first half of 2026. All in all, it was a solid semester, powered by our North American Highways, where revenue growth was outstanding, and by our Construction business, which grew revenue while staying on track for its profitability target. On the Airports side, New Terminal One at JFK has filed a completion remedial plan that sets March 2027 as the date for Phase A DBO. Turning to cash, we ended the first six months of the year with a net cash position of €1.3 billion, leaving out infrastructure projects. Cash came mainly from construction operating cash flow of €329 million, €378 million in dividends collected from projects, and €96 million from divestments, chiefly Silvertown Tunnel in the UK and transmission lines in Chile. On the outflow side, the main items were the equity injection into NTO, which came to €63 million, along with €398 million of cash dividends and treasury share purchases. As for recent developments, we put in bids for two new managed lanes projects — I-24 in Tennessee and I-285 in Georgia — and we'll know the results in the third quarter of the year. Also, our bid for the D35 highway in the Czech Republic, an availability project, was flagged as the most cost-effective, and the technical evaluation of that bid is ongoing right now.
Ignacio Madridejos
executiveLet's turn to our core infrastructure holdings, beginning with 407 ETR. Revenue at 407 ETR rose 18.7% during the first half of the year versus the comparable period a year earlier. Toll revenue climbed 20.2%, mainly because of higher toll rates that took effect on January 1st, 2026. Traffic was up 1.8% in the first half, supported by targeted commercial promotions. Consequently, EBITDA rose 24.4% compared with the first half of 2025, and that figure includes a Schedule 22 provision of CAD 5.5 million, which is significantly below the CAD 45.2 million recorded in 2025. During the second quarter of 2026, traffic came in 2.7% below 2025 levels, a reflection of softer economic activity, reduced rehabilitation construction on alternative highways, and adverse weather conditions, while commercial promotions carried on with a more targeted approach that boosts customer value while supporting EBITDA. On dividends, CAD 500 million was paid out in the first half, and a further CAD 550 million was approved for distribution in the third quarter of the year. Turning to Dallas-Fort Worth Managed Lanes, traffic in the area remains strong, though traffic on our managed lanes was affected by construction works and less favorable weather.
Ignacio Madridejos
executiveWhen it comes to operating results, all three projects delivered strong growth compared with last year, in both revenue and EBITDA, even with the higher revenue share. Taking the assets one by one: at NTE, traffic took a hit from the capacity improvement construction works, falling 0.6% in the second quarter and 2% in the first half of the year. Adjusted EBITDA rose 14.7% in the first half, and it was affected by $6.5 million of revenue share. LBJ lifted transactions by 2.9% in the first half of the year, and traffic climbed 6.9% in the second quarter, which reflects better utilization of the managed lanes as construction work on the I-635 East feeder corridor nears completion. Adjusted EBITDA was up 15.2% in the first half. At NTE 35W, traffic was hurt by heavier congestion at managed lanes entry-exit points, which caused bottlenecks, and also by the completion of capacity restrictions stemming from construction work on nearby Road 121. Transactions fell 0.2% in the second quarter and were up 0.4% in the first half of the year. Adjusted EBITDA, which increased 18.6% in the first half, was affected by $15.8 million of revenue share. Every one of our Dallas-Fort Worth Managed Lanes posted double-digit growth in revenue per transaction, comfortably ahead of inflation.
Ignacio Madridejos
executiveSeveral factors contributed to this: a favorable traffic mix, with greater heavy-vehicle volumes, largely due to technology enhancements in camera recognition that began being implemented in 2025, which improved vehicle classification, along with a higher number of mandatory mode events at NTE and NTE 35W. During the first half of 2026, revenue per transaction rose 18.9% at NTE, 11.7% at LBJ, and 17.3% at NTE 35W. On the back of this robust operating performance, all three Dallas-Fort Worth Managed Lanes paid higher dividend distributions in the first half of the year. NTE distributed $118 million, LBJ $61 million, and NTE 35W $143 million. All of these figures are at the 100% level. Turning now to I-66, traffic increased 8.5% in the first half of the year, driven by greater traffic in the corridor and despite adverse weather conditions. Revenue per transaction climbed 8.7% in the first half of the year, and total revenue rose 17.9%, driven by higher toll rates, with adjusted EBITDA up 20.4%. On dividends, I-66 distributed $80 million at the 100% level. At I-77, traffic fell 4.8% in the second quarter and 5.2% in the first half, primarily reflecting less congestion in the corridor.
Ignacio Madridejos
executiveResults were likewise influenced by a tough comparison with early 2025, a period when our traffic got a boost from closures of alternative lanes after Hurricane Helene, plus poor weather across the first half of 2026. Even so, revenue per transaction rose 11.8% during the first half of the year, driven by higher toll rates. Adjusted EBITDA, on the other hand, fell 5.4% versus first half of 2025, hurt by the revenue share band stepping up from 25% to 50%. That is mostly a first-year effect and should normalize as revenues keep growing inside the new share band. First half adjusted EBITDA contained an accrual of $15.6 million of revenue share. I-77 also distributed $18 million in dividends. Moving to Airports, beginning with New Terminal One at JFK, NTO has filed a completion remedial plan setting March 2027 as the date for Phase A date of beneficial occupancy. By the close of the first half of 2026, the project stood at roughly 92% construction progress. What remains is primarily systems integration, testing, and commissioning. Airline engagement is ongoing, with commitments now from 32 airlines, comprising 24 executed agreements and eight letters of intent. On equity, we put in the remaining €63 million, which completes all equity commitments and lifts total investment to €1,041 million.
Ignacio Madridejos
executiveDalaman Airport saw its first six months hit by the Middle East conflict, which brought total passengers to 1.8 million — an 8.1% decrease versus the first half of 2025, driven largely by international travelers. Adjusted EBITDA came in 13.7% below the first half of last year. Turning to Construction, the business delivered solid results: revenue rose 7.1% on a reported basis and 9.7% like-for-like across the first six months of the year, with margins holding steady at a 3.5% adjusted EBIT margin. Budimex kept healthy margins at 6.9% adjusted EBIT and posted higher like-for-like revenues. Webber carried on benefiting from strong growth, with a 24.2% like-for-like revenue increase, which drove higher profitability and a 3.4% adjusted EBIT margin thanks to positive operating leverage. Ferrovial Construction's margins held stable, with revenues up 4% like-for-like against the first half of last year. The order book stayed at a record €18 billion, 2.8% higher like-for-like than December 2025, excluding roughly €2.6 billion of extra pre-awarded contracts awaiting financial close as of June 2026. Operating cash flow for the division reached €329 million in the first half of the year, versus a negative operating cash flow a year earlier, mainly on prepayments and compensations received in North America.
Ignacio Madridejos
executiveNow Ernesto will go on with the main financial information. Thanks, Ignacio, and
Ernesto López-Mozo
executiveGood morning, everyone joining the call. I'll begin with the consolidated P&L, and I'll walk through the lines beneath the EBITDA level. Depreciation has risen, consistent with greater capex in Construction. In that segment we're seeing more activity as well as an increase in self-performance, and also a traffic profile in Highways under which traffic carries more weight in the earlier years of the present business plan. On the disposal and impairments line, we have smaller divestments in 2026 compared with 2025. Chiefly in '26, there's a transmission line in Chile that was sold, plus Silvertown Tunnel, an availability payment concession in the UK. In 2025, bear in mind that we had the sale of AGS in Airports. Turning to financial results from infrastructure projects, that figure is more or less flat versus a year earlier, as a few small effects offset one another. We benefit from somewhat lower expenses due to a weaker US dollar FX rate, but there's somewhat higher inflation expense at the Autema concession. Financial results ex-infrastructure projects got a boost in 2025 from the ticking fee on the sale of the final stake in Heathrow that was divested. That stake was treated as a financial investment all through 2025. Within the equity-accounted affiliate results, we see growth that tracks the operating results growth at 407.
Ernesto López-Mozo
executiveThat tax line shows a 22% corporate rate applied to pre-tax profit. At this point, when you strip out the equity-accounted item—which is already after tax—and factor in that tax on the US concessions has already been accrued, or accounted for, at our ownership percentage, there's no need to subtract minorities, and you arrive at this figure. Net P&L from discontinued operations captures earnouts tied to businesses formerly in the divested Services division. Now let's turn to consolidated net debt. We close the half with a strong net cash position—negative net debt—of roughly €1.3 billion. Beginning on the left: project dividends came to €378 million. That's mostly Highways, including €150 from the 407, €158 million from the Dallas-Fort Worth Managed Lanes, then €38 million from I-66, and finally I-77, which contributed €11 million in dividends. Next is construction operating cash flow, excluding tax payments and dividends. It totaled €329 million. The drivers were prepayments and payments that had been pending from Canada—Ontario, the Ontario Line—plus prepayments in the US and this catch-up in Canada. Tax payments came to €48 million, and the biggest piece there is €26 million from Budimex, its corporate income tax.
Ernesto López-Mozo
executiveWhen it comes to investments, we recorded €187 million. The biggest piece, which Ignacio mentioned earlier, is the latest equity increase in Phase A at €63 million. We also have Energy investments, including some projects in Leon County, Texas — €65 million that we're looking at here, with 35 of that coming from the solar project I referred to. Moving to Construction, we have €49 million. Next is interest received on other investment activities within cash flow: €57 million, essentially remuneration on the cash liquidity we hold. Then divestments total €96 million, driven largely by the Silvertown Tunnel I flagged on the previous slide, plus the transmission business in Chile, correct? That's the key portion — €78 million combined across those two divestments. On cash dividend and treasury share purchases, the figure is €398 million, of which €98 million came from the cash dividend and the remaining 300 from share purchases under the buyback programs we've had running since December 2025. Finally, other cash flows used in financing activities — this is mainly a bond that was raised alongside another that was repaid, and we also have dividends to minorities at Budimex and financial leases.
Ernesto López-Mozo
executiveFinally, within this cash breakdown, there's the impact of exchange rate on cash equivalents amounting to €20 million. Following this review, we're then ready to begin the Q&A session.
Silvia Ruiz
executiveThanks, Ignacio and Ernesto. We'll begin with the question-and-answer portion now. Operator, go right ahead.
Operator
operatorLadies and gentlemen, the Q&A session is starting now. To ask a question, press *5 on your telephone keypad. Should you decide to withdraw it, just press *5 once more. Before asking, kindly make sure your device is unmuted locally. Marc Ip from Citi has our first question. Your line is open now. Please proceed.
Marc Ip
analystHi, guys. Thanks for taking my questions. I've got a couple. The first one just on the JFK New Terminal One delay. Can I ask how much contingency is built into the new March '27 target, and if there are any other critical paths within that timeframe that could slip or how prudent are you being with that timeline, basically? Then the second one on that is around is there any sort of recourse or compensation available from the design-builder as a result of this delay? Then I've got another question just on the Construction business. I've seen the margins returned close to your 3.5% long-term EBIT margin target. Can you share how much in the first half, how much of that margin offset is from the delayed bid costs? Maybe is there potential tailwind in the second half if your bids have now gone in for the I-24 and the I-285 tenders? Thank you. Yeah.
Ignacio Madridejos
executiveThanks for your questions, and we'll take both of them, right? On JFK, what we have is this remedial plan that comes with the new schedule of March 2027, and it's based on the best information available today, correct? That's what the plan expects, according to the plan that's been put together with the contractor we have there, right? This is the best information we have available today. As for what we have, since the date was June '26 and beginning in July, there are LDs the contractor should pay because of the delay. That's $500,000 per day, and it will hold until it is open, and of course it will be challenged by the contractor if they believe some of the delays are not due to their cause. In the case of Construction, yes, we have the effect in this first half of the year of the bidding cost, especially for the two large projects where we submitted offers in July, both the I-24 in Nashville and the 285 in Atlanta. If we keep bidding for other projects and we start to have other costs, that will have some effect on our bottom line, but I think that starting will be lower than the spend so far, right?
Ignacio Madridejos
executiveWe’ll find out what impact there is by the time the year wraps up, but as always, the only guidance we provide on the Construction segment is 3.5% as a long-term average.
Marc Ip
analystThanks — that’s very clear.
Operator
operatorOur next question is from Cristian Nedelcu at UBS. Please go ahead.
Cristian Nedelcu
analystHello, and thanks so much for the questions. Starting with LBJ: construction on 635 is nearly complete, and given that LBJ's traffic has trailed the other US lanes across recent years, could you expand a little on how you see volume supporting traffic going forward? And if possible, comment on whether you're near to triggering mandatory modes in any LBJ segments at present? Second, some press pieces lately have suggested you might be looking at putting money into a data center project in Alcobendas, Madrid, at roughly €1 1 billion. Could you share more detail on that project and, more broadly, from a capital allocation standpoint, is this a segment where you're willing to commit more capital over the mid-term? Then maybe one last one, if I may: I think in recent weeks the Washington Airports Authority cleared a $20 billion-plus capex program for one of the airports there. I believe you submitted an unsolicited offer on this project some time ago. Could you tell us a bit more, based on what's publicly available, about the next steps in this process and the timeline from here?
Cristian Nedelcu
analystAppreciate it.
Ignacio Madridejos
executiveThank you, Cristian. Yes, I'll begin with LBJ. Right, as you mentioned — we did observe an uptick in traffic during the last quarter, and that's due to a couple of the segments feeding into LBJ and at 635 being nearly done, though the new managed lanes on 635 won't be finished until the first quarter of next year, right? We're getting some benefit from the near-completion of certain segments of those new managed lanes, correct? And it's not just 635 having an effect — 35 East matters too. There was some work there plus other works in the area, and all of those will wrap up over the coming months, and we don't anticipate any construction-related impact in that area during the first quarter of next year. Some of that benefit is already showing up today with certain segments that have been completed, but the full effect will come in the first quarter of next year. As for the data center, as we said before, we acquired two power lands — one in Alcobendas in Madrid and the other in Warsaw in Poland. The news you saw a few weeks ago about this project is a special project as part of the Comunidad de Madrid.
Ignacio Madridejos
executiveThis is the first phase we're undertaking, totaling 75 megawatts of IT capacity. To begin with, the initial portion will be approximately 45 megawatts IT. You need to keep in mind that this represents the full investment across all phases, and beyond that there will be some leverage involved—we can also bring in partners to take part alongside us and contribute equity. In this business, our approach involves recycling capital and rotating it once an asset reaches maturity, with a lease in place, right? Because of that, the overall equity we'll put into this business will be limited—particularly since we'll rotate once it's mature, meaning construction is complete and then we have a lease in place. We're beginning with Madrid and Poland, and later we'll see how things progress and how well we do with these two sites we're working on first. As for the Washington Airport, what was announced is that the Washington Airport Authority wants to develop a new project. It's true that we took part in a request for ideas and we presented some ideas on how to develop this airport through a P3, but ultimately it won't be carried out as a P3 project—it's going to be done directly by the Washington Airport Authority.
Ignacio Madridejos
executiveWe're viewing this as strictly a construction effort, and our expectation is that no P3 project will come along where we'd be able to put some capital to work.
Cristian Nedelcu
analystThanks a lot — that was really, really useful. Can I just verify something about the LBJ mandatory modes? Are we near that on any segment, or not really? Sorry. That's correct.
Ignacio Madridejos
executiveYeah, sorry. Yeah. It's accurate that during recent months, Segment 3 of LBJ has triggered certain mandatory speed modes, though I'd say those are not significant and don't meaningfully affect revenues at LBJ. As we've said on several occasions previously, capacity is available at LBJ, and we don't anticipate mandatory modes having a significant impact over the coming months or years, right? We don't expect that. Even if sporadic events occur, my view is they won't significantly affect the short term.
Cristian Nedelcu
analystThanks so much.
Operator
operatorElodie Rall of JPMorgan has our next question. Go ahead, please.
Elodie Rall
analystHello, and good afternoon. Thank you for taking my questions. To return to the NTO, I wanted to ask whether, in light of the Phase 1 delays, you might look for a different contractor to handle the work on Phase B1 and B2? My second question concerns the US managed lanes and, more broadly, your exposure to tolls. Traffic generally appears fairly resilient despite all the macro headwinds. What do you believe is driving that overall traffic strength, and should we keep gas oil in mind? It doesn't appear to have had any effect, but could you share your perspective on the correlation between traffic and oil price for the US assets? Finally, I believe you're planning a CMD at some stage — could you perhaps tell us your agenda for it, if it's going ahead, when it's likely to take place, and what it would cover? Thank you.
Ignacio Madridejos
executiveThanks, Elodie. On the NTO for B1 and B2, we're still only engaged in design work, with the emphasis on DBO for Phase 1, correct? No decision has been made as of now on which contractor will handle the later phases, and what we're doing at present is simply the design work. On managed lanes, what we're seeing looks good. The economy is doing well, particularly in the markets where our assets sit — Dallas-Fort Worth, the Washington area, and Charlotte. Broadly speaking, those markets are performing strongly from an economic standpoint. We aren't seeing any meaningful impact from oil prices, at least right now. That said, over the longer term the key correlation is with local GDP, and if oil prices stay elevated for an extended period, that could feed through to local GDP, right? As things stand, as I mentioned, we haven't observed any significant effect or impact from oil prices. What we are seeing is solid local activity in the markets where our assets are located. As for the Capital Markets Day, no decision has been taken yet on when we will hold it.
Ignacio Madridejos
executiveWe said that our Horizon 26 strategic plan is wrapping up this year, and internally we're working on a new Horizon plan for the years ahead, and we haven't yet made a decision on when or how we'll communicate that plan externally. As soon as we decide, we'll let you know.
Elodie Rall
analystThanks.
Operator
operatorOur following question is from Ruairi Cullinane at RBC Capital Markets. You have the floor. Hello.
Ruairi Cullinane
analystGood afternoon. To start, might you give us an update on I-77 South and the US managed lane pipeline, in light of media reports about local votes against that project? Second, regarding 407 ETR, net financial expenses rose 25% in Q2. Is that a sensible run rate for Q3, or did anything one-off occur there? Also on 407 ETR, the quarterly dividend rose by CAD 300 million in Q2 and Q3. Should we consider that run rate potentially carrying into Q4, which would make the 407 ETR dividend less Q4 weighted than in 2025? Thank you.
Ignacio Madridejos
executiveThanks for those questions. I'll handle the first one, which is about the pipeline, and then Ernesto will take the two on the 407 — no, on the financial expenses and the opex. On I-77 South, we've been told that this project has been delayed, but we did prequalify alongside three other groups. What we know as of today is that for the time being this project is on hold, and we're awaiting word from the North Carolina DOT on what the next steps will be for this project, and whether they will issue an RFP and what the new timeline will look like. We are still waiting on this project. Ernesto?
Ernesto López-Mozo
executiveAll right. So when it comes to financial expenses on the 407, two things are at play. First, there's extra debt and additional issuance, which naturally push costs up. Second, inflation has had an impact on the concession's inflation-linked bonds and derivatives. Because of that second factor, I wouldn't rely on a running rate. That inflation piece needs a closer look in the analysis before anyone extrapolates it. On dividends, the 407 hasn't given any guidance. We don't offer guidance on that here, so I'm sorry, but that's where we have to leave it. As for the final question, could you rephrase it once more? It concerned opex. Would you mind restating that?
Ruairi Cullinane
analystNope, that covers everything I asked. It tied back to that dividend question, so thanks a lot.
Ernesto López-Mozo
executiveAppreciate it.
Operator
operatorOur following question is from Luis Prieto at Kepler Cheuvreux. You have the floor.
Luis Prieto
analystGood afternoon, everyone, and thanks a lot for taking my questions. I have a couple of quick ones. First, regarding the fact that you've previously acknowledged balance sheet headroom at 407 ETR — on top of which the Q3 dividend grew very significantly year-on-year — can we extrapolate this step-up in remuneration to the last quarter of 2026? My second question concerns the favorable working capital performance, which seems very meaningful given the seasonality of this variable historically. Are we going to see more of the same in H2, or is this purely exceptional? Thank you.
Ernesto López-Mozo
executiveHi, Luis. I’ll handle those. On the dividend, it’s similar to the last question. We aren’t giving any guidance on the dividend for the year. The 407 doesn’t provide that, correct? We’ll leave it at that. As for working capital in Construction, it’s true that the first semester benefited from what I mentioned when I was going over the cash. There were some, let’s say, collections or payments that had been somewhat delayed and were basically cashed in during this semester. That was specific to this semester. Yes, the second half of the year typically has some positive working capital effect toward year-end. We don’t give any guidance, but there’s no reason not to expect some seasonality there at the very end of the year, as in other years.
Luis Prieto
analystThat's very clear. Thanks.
Operator
operatorOur next question is from Graham Hunt at Jefferies. Go ahead, please.
Graham Hunt
analystThanks. Thank you, team, and I appreciate you hosting this call. I have just 2 questions. Looking back at the 407, I believe in the past you discussed recovering some of the pricing that was given up when prices were frozen during the COVID period. I was wondering whether that remains part of your thinking, or whether we're now in a different pricing environment, with a different strategy around promotions and similar items. I'm simply hoping for a bit of an update on your thinking in that area. We've clearly seen several years of very strong pricing, along with the promotions. Just an update on how you view that catch-up in terms of real pricing. Then my second question, I'll return to dividends, though not for the 407, perhaps just for the group, Ernesto. Any assistance you can offer regarding how you're approaching the final portion of your overall returns guidance for 2026 in the second half, the shape of it, and how we ought to be modeling it, would be helpful. Thank you.
Ignacio Madridejos
executiveThank you, Graham. I'll take the first question regarding the 407, and then Ernesto will follow up on the dividends. On the 407, no, our view is really about value for users and how we can capture that value for users while at the same time relieving congestion, no, in the area, right? From an internal standpoint, of maximizing EBITDA, no? When we think about this, all of these have to be taken into consideration. There are different parts, and one of those parts concerns the toll rate that we raise at the beginning or that we announce in November, but implement at the start of the year. We also offer promotions to different types of users that help with congestion relief, but also help, no, with some users who have a different point of elasticity. All of that combined with maximizing EBITDA and reducing Schedule 22 payments. That's a separate matter, that as it is traffic at the peak and is tied to the thresholds and the different segments, and how we are more effective with promotions reducing Schedule 22 payments as we have managed to achieve in this second year, no?
Ignacio Madridejos
executiveYeah, I believe that given all of this, our approach to pricing differs from how we thought about it before. It isn't just a matter of a single increase; we're also taking into account the role promotions play, and we're getting the most out of various effects — easing congestion, optimizing revenues and EBITDA — no, in different ways. Yes, I think you should anticipate that this is the new logic and that it's how we'll act going forward. It will rest on those variables I mentioned earlier, right? I think that's unlike what we did previously, but ultimately the emphasis will be on maximizing EBITDA, and that ties to value for users and economic growth in the Toronto area, and population growth will help us raise that value. Ernesto?
Ernesto López-Mozo
executiveThanks, Graham. On the dividends question, there's nothing new at this point. The board will likely take the decision on the second dividend in October and provide an update then, but until that time, we have no updates.
Graham Hunt
analystUnderstood. Thanks, everyone. That was quite useful.
Operator
operatorOur following question is from Dario Maglione at BNP Paribas. Go right ahead.
Dario Maglione
analystGood afternoon, and thanks. I have three questions. First, on the US Texas Managed Lanes, which delivered pretty impressive revenue growth in Q2 — nearly 20% across all three assets — even with the bad weather. You cited several drivers behind that growth. Could you rank them? For instance, you brought up technology for classifying heavy vehicles. How big a factor was that? My second question follows from the first, on tech-based classification of heavy vehicles: as I understand it, it was rolled out during 2025, with different dates for each asset. Could you give us a little more detail there? Third, on the 407 ETR: traffic declined in the quarter in Q2, and as you said, there were various effects. You didn't really discuss the promotion or the different kinds of promotions — more the impact of the macroeconomic situation and traffic on alternative routes. Given that, what does it imply for the potential toll increase in 2027 if traffic isn't growing? Thanks.
Ignacio Madridejos
executiveThank you, Dario. I'll begin with Texas Managed Lanes and the revenue growth—well, that we've observed across the three assets, right? In terms of importance, the classification of vehicles has probably been the most significant. Since they carry a multiplier, the new technology we've rolled out across the different managed lanes has allowed us to spot more heavy vehicles, so those are now paying more than they did previously. That's been the primary effect for us. With NTE and 35W as well, we also had more mandatory modes than before, which gave a positive boost to revenue per transaction. Naturally, there are always some mix effects, and inflation always plays a role too, since we raise the soft cap at the start of the year, right? I'd probably rank those by priority—what's been most relevant—and then the other effects that also fed into that 20% growth in revenue per transaction. What you said about vehicle classification is relevant too, yes, because we put that in place last year, and we began by deploying new technology in the different countries, starting with 35W, then NTE, and we'll finish with LBJ, right?
Ignacio Madridejos
executiveRegarding how these vehicles are classified, we've applied that from the very start across all 3 managed lanes, correct? Part of that impact is already baked into each of them, right? It's accurate that the second-half comparison, on a like-for-like basis, will already reflect this effect that we began seeing in the second half of last year, right, and that needs to be factored in. Then there's the other impact on the managed lanes related to traffic, which is construction, correct? When we look at the completion of construction at LBJ and also at NTE, right, for the capacity improvement, the effects will be, in NTE's case, more traffic and less mandatory mode, while for LBJ, once construction wraps up, some traffic is expected to return to the corridor. As for the 407, the impact of promotions has been quite limited, I'd say slightly greater than the prior year in terms of traffic affected by promotions in Q2 of '26 versus Q2 of 25. It's true that with somewhat more traffic affected by promotions, we've been more effective in Schedule 22, and in that sense, we have some sectors where traffic exceeds the threshold, and in those cases, we've cut back on promotions.
Ignacio Madridejos
executiveOther segments were also under the threshold, and in those instances, well, we've had greater success introducing certain promotions that assisted us in lowering Schedule 22 payments. I'd note that this isn't a significant impact; the significant impacts on our traffic this quarter versus the prior year come from economic activity, and that's chiefly tied to certain industries—no—that face uncertainty, the uncertainty around tariffs; the overall economy is expanding at roughly 1%, yet we still observe some industries and sectors that are hit harder, and that will weigh on traffic. We've also observed a meaningful impact in terms of maintenance delays on some competing highways, particularly the 401, owing to the FIFA World Cup, since they didn't want to carry out certain construction works during that stretch of time, and as is typical, you can only perform this kind of maintenance when the weather is good in spring and summer, and this year, all of that construction activity was pushed back. Third, weather as well—we had a negative weather impact that was widespread. It wasn't just the 407; it was also in the managed lanes and other assets we hold that felt that negative effect.
Ignacio Madridejos
executiveLooking ahead—since we don’t provide guidance—whether we raise prices will hinge on the value that we see the 407 delivering for customers, and we’ll aim to capture as much of that value as possible. That’s what we’re doing through a mix of higher toll rates at the start of the year and the promotions we run during the year for different segments, right? We’ll keep doing that, and we’ll try to capture the value we provide to users, as we’ve done before.
Dario Maglione
analystThanks. Thanks, Ignacio.
Operator
operatorOur following question is from Marcin Wojtal at Bank of America. The line is yours.
Marcin Wojtal
analystYes, hello, and thanks for taking my questions. My first one concerns your share buyback. As I understand it, you have authorization to repurchase as much as €800 million through October of this year, and from what the latest disclosure indicates, €340 million of that authorization has been used so far. I'm just wondering whether you intend to use the full 800 authorization, and whether that's even feasible given the stock's liquidity? My second question, if I may, returns to those promotions on the 407 ETR. I'm wondering whether the promotions you're currently offering are very, very similar to those offered at the start of the process a year ago, or whether the company has been on a learning curve? Do you also see promotions going forward as an important yield management tool, and as a tool that will let you extract additional revenue and EBITDA beyond Schedule 22 management? Might you perhaps keep promotions going over the longer term, even once Schedule 22 is no longer an issue? Thank you.
Ernesto López-Mozo
executiveThanks, Marcin. On the buyback, we aren't giving any specific guidance. What we do guide on is remuneration — that is, distributions and remuneration to shareholders over time. We don't offer any particular guidance on how the buyback is managed. As you can imagine, that could be quite sensitive. Yes, we do have guidance on what gets delivered to our final investors in terms of distributions. That's everything we have.
Ignacio Madridejos
executiveOn the promotions side, yes — the plan is to keep running promotions going forward regardless of Schedule 22, and I think that's a really good approach, right, for bringing in new customers and getting the most value we can capture for every user of the 407. As for the ones tied to Schedule 22, I'd say they're broadly quite similar. Probably not in the same sectors or with the same kinds of users, though — we've learned, right, which users are most effective when it comes to reducing Schedule 22 across the different segments, and we're more selective in that sense, offering the ones that create the most value for us, right, and bringing in some new users that weren't being offered before in certain other sectors where we were paying some Schedule 22. Now, from there, I think since some of these promotions are free, the question is how much we can get for them, right, because maybe users are open to paying something for them. Right now we're piloting and running other kinds of different promotions to understand the value for users, and we're trying and testing different things, and we'll keep doing these kinds of promotions and learning from them.
Ignacio Madridejos
executiveThat's one method for carrying out segmentation, and we'll keep doing so going forward. It's a lengthy process where we have to gain insights from users, and because of that, my view is that maximizing EBITDA through promotions—and getting a solid grasp of what the 407 is worth to the various users—will require several years.
Operator
operatorThe following question is from Harishankar Ramamoorthy at Deutsche Bank. You have the floor.
Harishankar Ramamoorthy
analystHello, and good afternoon to all of you. Thank you for taking my questions. So, perhaps starting with 407 ETR. It appears that VKTs declined this quarter versus the same period a year earlier, yet you still were able to reverse certain Schedule 22 provisions. It seems 407 ETR has truly become expert at handling promotions, perhaps for peak and off-peak hours. Is that all there is to it, or is there some segment where you've reached the maximum throughput achievable and, because of that, you don't really need to put effort into managing the promotions? I wasn't quite able to reconcile how VKTs could be down while provisions were still reversed. Is it simply that you've gotten so skilled at managing the promotions, or is there some other element involved? That's my first question. Second, when we examine the traffic mix with promotions and without, do you have any plan to publish or obtain some data on how this divides between those two segments for 407 ETR? What portion of traffic is without promotions, and what are the promotion volumes?
Ignacio Madridejos
executiveThanks for the questions. No, we won’t disclose traffic that comes from promotions — that is, traffic paying the toll at the standard price. You need to look at the traffic figures and the revenue separately, and that’s something we’re not going to give any further detail on. Another thing to consider is that when you compare quarter two of last year with this year, the traffic effect from promotions has been slightly positive — we have a bit more promotion-related traffic this quarter than in the same quarter last year. With that slightly higher traffic, we’ve been able to cut Schedule 22 payments significantly, because we targeted better the users who are helping lower those Schedule 22 payments, and in other cases where certain segments had more traffic than they needed for the threshold, we scaled back the promotions. We’ve been more effective at identifying which promotions help us reduce Schedule 22 with an almost similar — slightly above — number of promotion-related traffic versus the prior year. We’ve been more effective, but overall I’d say the traffic effect from promotions has been slightly greater than last year, though not significant.
Harishankar Ramamoorthy
analystThat makes sense. Perhaps just one quick follow-up on that. None of the segments inside the 407 ETR have reached a point where the throughput targets are now sitting at the maximum limit, correct?
Ignacio Madridejos
executiveSo if you're asking whether we’ve got traffic exceeding the thresholds in certain segments, then yes, that’s correct. Otherwise, a payment would be owed, right? What you’re really asking is whether, in those segments, we’re running promotions that aren’t actually necessary for staying above the thresholds. That’s a separate matter, and yes, some segments fit that description — but we don’t reveal which ones or how the mix of that effect breaks down, whether promotions or no promotions are what gets us to the threshold. Schedule 22 is paid only when we fall below the threshold; everywhere else we’re above it, and in certain of those we’re above with no promotions at all, while in others we got there because of promotions.
Harishankar Ramamoorthy
analystThat makes sense. Thanks.
Operator
operatorLadies and gentlemen, a quick reminder: to ask a question, just press *5 on your phone's keypad. Cristian Nedelcu of UBS has our final question. The line is yours.
Cristian Nedelcu
analystThanks so much for letting me ask a follow-up. On the Texas Managed Lanes, you said earlier that the mandatory modes on LBJ aren't anything imminent, and you noted that on the NTE, the capacity expansion could be a headwind when it comes to triggering mandatory modes. With that in mind and thinking about '27, could we talk a bit about the growth levers for pricing on the Texas Managed Lanes? We know pricing is near the soft cap, or at the soft cap, at peak for most segments. Could you elaborate directionally on what other levers exist to improve? Is it off-peak pricing — is there room to raise that — anything further on trucks, or any other levers that could help you grow pricing beyond the soft cap next year? Sorry, one follow-up on the ETR 407. I think you've been trialing the loyalty program for frequent users. I believe some trials have been in place over the last few months. I was curious what the plans are for the second half. Will you roll this loyalty program out more widely, and how should we think about potential dilution to revenue per transaction from the loyalty program?
Cristian Nedelcu
analystThank you.
Ignacio Madridejos
executiveThanks for the questions. Yes, where the managed lanes are concerned, pricing is going to depend on a few factors. The first one is inflation, which will push up the soft cap at the start of the year — that's something we do annually. Then there's the mandatory modes piece, which could work in our favor, but as you said earlier, we expect that 35W will keep having more mandatory modes as long as congestion keeps rising and economic activity in that area keeps rising. With NTE, we won't see that. What we'll see there, rather than mandatory modes, is more traffic. And with LBJ, much like this year, we don't expect mandatory modes that will be significant or relevant, but next year we'll see more traffic on LBJ, similar to NTE, right? All of it, of course, hinges on how economic activity develops and on other variables that could come into play at that point. We may also get some mix effect, as usual — that mix effect means more traffic at peak, and the other piece is having more trucks, right, since with greater economic activity there tend to be more trucks than in the past.
Ignacio Madridejos
executiveSo those are the impacts we will see next year, and they’re going to affect the revenue we see in the Texas Managed Lanes next year. On the 407, yes, we did begin with some loyalty program pilots, and we haven’t made a decision yet on how we’ll proceed with those pilots. We’re running pilots with various kinds of promotions — some are working, others are not — and we make decisions based on the results, and we have not yet decided how we’ll move forward with loyalty programs.
Cristian Nedelcu
analystThat was quite useful. Many thanks.
Operator
operatorThat brings us to the end of the question-and-answer portion of today's conference call. At this point, I'll turn things back over to Silvia Ruiz, our Head of IR.
Ignacio Madridejos
executiveThis is Ignacio speaking, not Silvia Ruiz — but thanks for keeping up with us, and I hope the remainder of your summer goes well. We really appreciate you being on the call with us.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research