executiveGood afternoon, everyone. Silvia Ruiz here. I'd like to welcome all of you to Ferrovial's conference call, where we'll go over the company's operating results for the third quarter of 2026, along with the dedicated presentations on the recent awards in Nashville and Atlanta. With me today are our CEO, Ignacio Madridejos, and our CFO, Ernesto López Mozo. As a quick reminder, both the presentations and the results report can be found on our website. Once today's presentation wraps up, we'll hold a Q&A session. Just like on earlier calls, you'll be able to ask questions live. To do that, you'll need to join through the conference call channel and press star five on your phone keypad. Alternatively, you can submit questions via the forum included in the webcast, and I'll read them out loud when the Q&A session ends. Before we begin, please take a moment to review the safe harbor statement included in the presentations, and keep in mind that the presentations contain forward-looking statements and expectations that are subject to certain risks and uncertainties, so actual figures may differ. During this call, we will also discuss non-IFRS financial measures, which are defined and reconciled to the most comparable IFRS measures in our results report and on our website.
Silvia Ruiz
executiveSo taking all of that into account, I'll now pass things over to Ernesto, who will walk us through the operating results for the third quarter. Ernesto, over to you.
Ernesto López-Mozo
executiveThanks, Silvia, and good morning or good afternoon to all of you. We appreciate you being with us today as we go over Ferrovial's operating results for the first nine months of 2026. On the whole, the first nine months of 2026 delivered strong growth throughout our core businesses, especially Highways and Construction. Within Highways, 407 ETR produced robust revenue growth even though traffic was lower, and every one of our US managed lanes recorded double-digit growth in revenue per transaction. Construction kept enhancing profitability, with the adjusted EBIT margin hitting 4.1% during the first nine months. Turning to Airports, March 2027 is still the Phase A DBO, which depends on, among other factors, the contractor fulfilling the remediation plan that was submitted to the authority. On the cash side, we ended September with a net cash position of €1,660 million — €1.66 billion — excluding infrastructure project companies. Cash came primarily from €604 million in dividends from projects and €591 million in construction operating cash flow, excluding tax payments and dividends. Divestments brought in another €96 million, chiefly Silvertown Tunnel and Transchile. Among the main cash outflows were the €63 million equity contribution to New Terminal One and €461 million tied to the cash dividend and treasury share purchases. As for recent developments, our consortium won I-24 Southeast Choice Lanes in August and achieved commercial close in September.
Ernesto López-Mozo
executiveBack in October, we were also granted the I-285 East Express Lanes, and our consortium was picked to deliver the D35 highway P3 project over in the Czech Republic. On top of that, we've declared the second scrip dividend, totaling €600 million in aggregate, which shareholders can elect to receive either in cash or in Ferrovial shares. Let's turn now to the 407 ETR. During the period, the 407 ETR posted solid revenue growth even though traffic was lower. Across the first nine months, revenue rose 18.4%. The increase in toll revenue came mainly from higher toll rates, which took effect on January 1st, 2026. EBITDA was up 21% over the first nine months. That figure includes a Schedule 22 payment provision of CAD12.6 million, versus CAD35.4 million a year earlier. In Q3, EBITDA rose 15.8%, a result affected by the CAD7.1 million provision booked in Q3 2026, compared with a CAD9.8 million recovery, or reversal, in Q3 2025. If you set aside the Schedule 22 payment effect in both periods, EBITDA was up 19.4% in Q3 and up 18.7% across the first nine months. Traffic fell 7.1% in the third quarter. In the year-on-year comparison, it's important to keep in mind the change in promotional approach, since promotions in 2026 were more targeted than those in 2025.
Ernesto López-Mozo
executiveTraffic took a hit as well from slower economic expansion, with heavy vehicles feeling it most in sectors that tariffs touch and on discretionary journeys. Regional GDP is essentially unchanged for 2026, while the big Canadian banks are projecting 1% to 2% growth in 2027. Unfavorable weather, the timing of holidays, and reduced maintenance work on alternative roads also weighed on traffic. Dividend payouts are still robust. During the first nine months, 407 ETR handed out CAD1.05 billion, and another CAD1.05 billion dividend got approved for the fourth quarter. That lifts total dividends approved in 2026 to CAD2.1 billion, versus CAD1.5 billion in 2025. Moving to the next slide on Dallas-Fort Worth Managed Lanes, demand stayed solid and operating performance remained strong at the managed lanes, even with construction activity and capacity limits in certain parts of the network. On operating results, all three projects delivered solid growth against last year, in both revenue and EBITDA, despite the higher revenue share. Taking each asset in turn, at NTE traffic fell 2.5% for the quarter and 2.2% across the first nine months, which reflects the effect of capacity improvement works. Those works went into service ahead of schedule on September 25th, apart from two additional ramp projects still being built.
Ernesto López-Mozo
executiveEven with traffic lower, NTE revenue rose 14.8% across the first nine months. Year-to-date adjusted EBITDA was up 12.3%, and $9.8 million of revenue share weighed on it. Over at LBJ, once the I-635 feeder corridor was finished, traffic trends picked up markedly, which shows the managed lanes are being used more. Transactions were up 5.6% for the quarter and 3.9% across the first nine months. Revenue climbed 16.3%, with adjusted EBITDA at 15.9% in the first nine months. Turning to NTE 35W, transactions fell 1.1% in Q3 and 0.2% over the first nine months. Capacity constraints beginning to appear in certain managed lane sections as congestion rose affected traffic performance. Revenue was up 15.8% in the first nine months, while adjusted EBITDA rose 15.1%, with $23.5 million of revenue share weighing on it. The next slide shows every one of our Dallas-Fort Worth managed lanes posting double-digit growth in revenue per transaction, well ahead of inflation. Several factors drove this: a favorable traffic mix, with higher heavy vehicle volumes, owing mostly to technology enhancements in camera recognition that began being implemented in 2025 — this improved vehicle classification; plus a greater number of mandatory mode events at NTE and NTE 35W. Across the first nine months, revenue per transaction rose 17.1% at NTE, 12% at LBJ, and 15.6% at NTE 35W.
Ernesto López-Mozo
executiveTurning to how revenue per transaction grew in Q3 versus Q2, at NTE the softer increase largely mirrors the fact that mandatory mode events were fewer and less intensive across the third quarter. For NTE 35W, the comparative base is getting tougher, since gains from better vehicle classification started to show through in September 2025, and mandatory mode events likewise grew more prominent around the same time a year earlier. Consequently, the year-over-year contribution of these two effects is beginning to normalize. Operating performance at the portfolio level underpinned larger distributions. At a 100% stake, dividend distributions over the first nine months came to $118 million for NTE, $61 million for LBJ, and $143 million for NTE 35W. That is unchanged from June, since these projects typically pay dividends in June and December. Moving on to I-66 and I-77: I-66 posted an excellent result. Transactions rose 4.1% in the third quarter and 7% across the first nine months. Revenue per transaction climbed 10% during the first nine months of the year, while revenue was up 17.7%, helped by higher toll rates, and adjusted EBITDA rose 18.1%. During Q3, the adjusted EBITDA margin came in below the level seen across the first nine months of the year, chiefly because of a larger provision for doubtful accounts tied to video transactions.
Ernesto López-Mozo
executiveOn dividends: I-66 paid out $80 million across the first nine months at 100%, versus $64 million during the same stretch a year earlier. Over at I-77, traffic was down 5.3% for the quarter and 5.2% year-to-date. Several things weighed on performance — heavy vehicles moving onto alternative routes, which added capacity in the corridor, and summer travel with fewer leisure trips during the third quarter. Revenue per transaction rose 11% through the first nine months, and revenue was up 5.4%. Adjusted EBITDA, though, fell 6.1%, largely because the revenue share band stepped up from 25% to 50%. Much of that EBITDA hit is a first-year effect and should normalize as revenue grows within the new band. I-77 paid out $18 million in the first nine months at 100%, versus $22 million last year. Moving to Airports and beginning with New Terminal One at JFK, March 2027 is still the Phase A DBO date. That depends on contractor execution and other factors, among them the sequencing of remaining activities, hitting the required KPIs, and coordination with key stakeholders, including CBP and TSA. The first set of basic trials is done, and what remains centers on systems integration, testing, and commissioning.
Ernesto López-Mozo
executiveAs of when the results were published, New Terminal One has signed 32 airline agreements — 24 executed and 8 letters of intent. Geopolitical developments have weighed on international traffic performance at JFK, along with FAA steps aimed at managing airspace capacity constraints in New York. Those steps relate chiefly to air traffic controller staffing. In light of present market conditions, the Port Authority's Board of Commissioners gave the green light to extensions of the Phase B1 and B2 construction milestones, pushing the notice to proceed deadline to September 2030 for Phase B1 and to June 2033 for B2. Our equity commitments are now complete after the €63 million contribution invested during the second quarter. Equity invested totals €1,042 million. Turning to Dalaman, passenger traffic hit 4.5 million across the first nine months. That is 4% below last year, driven largely by weaker international volumes amid geopolitical challenges in the Middle East, though strong growth in domestic traffic partly offset it. Revenue fell 7.1%, and adjusted EBITDA was down 7.7% over the first nine months, mirroring softer international traffic levels. Now on to Construction, where the business division posted strong profitability and a record order book. Revenue came to €5.8 billion in the first nine months, up 9.1% like-for-like, with the adjusted EBIT margin rising to 4.1% from 3.7% a year earlier, and a solid 5.1% adjusted EBIT margin was recorded for the third quarter as well.
Ernesto López-Mozo
executiveBudimex kept up solid profitability, posting a 6.9% adjusted EBIT margin across the first nine months of the year, and it turned in greater like-for-like revenues. At Webber, the adjusted EBIT margin rose to 3.6% during the first nine months of the year, helped along by 17% like-for-like revenue growth and efficiencies in operations. Ferrovial Construction lifted its adjusted EBIT margin to 2.6%, up from 1.7%, for the first nine months of the year. That came from stronger execution across North America, the United Kingdom, and Spain, along with reduced bidding costs after major bids were submitted in July and greater revenue. Our order book hit a fresh all-time high of €19 billion, rising 8.2% like-for-like versus December 2025. The makeup of that order book stays very healthy. It leaves out approximately €8.7 billion of contracts that are pre-awards or awaiting financial close as of September 2026. Those relate chiefly to the I-24 and Budimex contracts. Our core US and Canada market accounts for half of the backlog, and we expect it will keep fueling future growth. A quick recap of the main operating results: the figures appear here on this slide — strong revenue and profitability for the first nine months, with very strong results across the board, and double-digit like-for-like growth in revenue, adjusted EBITDA, and adjusted EBIT.
Ernesto López-Mozo
executiveSo, to wrap up the results presentation, let's turn our attention to net debt excluding infrastructure projects. We closed the first nine months of the year with a net cash position of roughly €1.7 billion, versus €1.3 billion at the end of 2025. That reflects strong cash generation, disciplined investment, and the impact of recent divestments. The main components were €604 million of dividends from projects, primarily from Highways, with €315 million from the 407 ETR, €159 million from the Dallas-Fort Worth managed lanes, and €38 million from I-66 and €11 million from the I-77. The next block is construction operating cash flow, which, excluding tax payments and dividends, reached €591 million and reflects a strong operating performance, along with some compensation received in the US and Canada, and it also benefited from some prepayments received earlier than usual at Budimex. These inflows were partially offset by €71 million of other operating cash outflows and €56 million of tax payments, mainly in Poland. On investments, we had €231 million, including mainly the last equity injection in NTO, €63 million, together with investments in Energy of €75 million, of which €42 million are related to the Leon County solar project plant in Texas, and Construction invested €71 million.
Ernesto López-Mozo
executiveNext, looking at interest earned through other investing activities, that cash flow came to €85 million — essentially, as noted, the return on the liquidity we hold. Divestments totaled €96 million, driven mainly by Silvertown Tunnel and the transmission lines in Chile. Shareholder distributions, which cover cash as well as share buybacks, came to €461 million. Moving on, cash flow from financing activities was €612 million, tied principally to repaying a €780 million corporate bond, issuing a new one, along with dividends paid to minorities at Budimex, financial leases, and interest payments. Finally, in the cash breakdown, exchange rate effects on cash equivalents contributed €23 million. On the whole, the group keeps a robust net cash position and financial capacity even as we fund shareholder distributions and invest in our growth opportunities. Thank you for listening. I'll now pass things over to Ignacio, who will cover information on recent awards.
Ignacio Madridejos
executiveThanks, Ernesto. Building on the project overview we gave at commercial close and the details TDOT supplied, we'd like to add some further information about how the concession payments are structured and the revenue-sharing provisions written into the concession agreement. The $24.8 billion number that was published at award blended present value and nominal components, which the RFP required. So that we can offer a consistent comparison, we've now put all payments on a present value basis. On that basis, total payments to TDOT come to $21 billion — the identical value contained in our offer. Under the concession agreement, the payment profile is front-loaded: roughly $7.7 billion of nominal payments occur during construction, from 2027 to 2033, hitting approximately $1.1 billion nominal at peak. The remaining payments will be made over the operating period through 2085. The table sets out the complete payment schedule on a present value basis. That $21 billion is calculated as of the contractual financial close deadline, applying the applicable discount rates, and final amounts remain subject to the financing structure at financial close. Regarding the financial structure, we'll be providing more information at financial close. TIFIA requires maximum leverage of 75% debt and 25% equity.
Ignacio Madridejos
executiveBeyond those payments, the concession also carries two revenue-sharing arrangements with TDOT. Neither one sits inside the $21 billion figure, and each kicks in solely when the project beats specified thresholds. The first of these is an excess revenue share. It starts once cumulative revenues rise above the base case level, and TDOT's portion grows as project IRR surpasses the base case. The second mechanism takes effect when toll rates go above $3.2 per mile in 2025 dollars. Between $3.2 and $4.8 per mile, TDOT gets 50% of revenue; between $4.8 and $6.4, it gets 75%; and above $6.4, it gets 90%. Those toll rates rise each year by the greater of 2.5% versus the average of state GDP, US CPI, and 3%, much like the soft cap. All told, this structure gives TDOT substantial contractual payments while also letting TDOT share in the upside should the project outperform the base case. Next, I will keep presenting the I-285 East Express Lanes project in Atlanta — a key addition to our managed lanes portfolio and one with the potential to generate meaningful long-term value. This presentation mirrors what I shared a few weeks ago regarding the I-24 project in Tennessee. The I-285 East program is set up in separate phases under a Comprehensive Development Agreement with GDOT.
Ignacio Madridejos
executiveFerrovial heads the project consortium, holding a 90% ownership stake. The committed phase is Phase 1. Roughly 23 miles are covered by it, including the SR 400 and I-85 extensions, which add two westbound express lanes along the I-285 East corridor. Design and build activities are part of the Phase 1 agreement, along with a 50-year operation and maintenance period. An estimated construction cost of about $8.9 billion applies to the project, with a construction period expected to last 6.5 years and service commencement anticipated in 2034. The proposed concession payment stands at $23.1 billion, a final figure that remains subject to interest rate movements and financial restructuring ahead of financial close, which is expected by October 2027. In addition, $515 million is to be paid at financial close as reimbursement of state cost. Phase 2 covers the matching eastbound alignment across approximately 23 miles, including the extensions already mentioned. This second phase is partially committed. Traffic and revenue assumptions plus design and construction parameters are already defined, whereas construction cost stays adjustable for inflation and the contractual parameters described in the agreement. Financial close for Phase 2 is expected in 2029, with opening expected in 2036. Phase 3 is indicative at present. It covers approximately 40 miles in both directions along I-285 and SR 141. Scope, economics, and timing remain estimates to be developed through the CDA.
Ignacio Madridejos
executiveRight now, the milestones we expect are financial close in 2032 and opening in 2040. What matters is this: Phase 2 and 3 are not committed automatically. Those have to be negotiated and developed through the CDA, and each will be executed under separate phase agreements. Turning to the metro area's economic fundamentals, Atlanta already ranks among the largest metropolitan areas in the US, with approximately 6.5 million residents, while continuing to grow at around 1.3% per year over the last decade. Alongside that population growth, economic performance has been strong. Real GDP has grown at approximately 3.5% annually, supported by a large and diversified employment base. The region also benefits from relatively high household incomes, with median household income of approximately $92,000, around 13% above the US average. Atlanta is a major economic center, representing approximately 70% of Georgia's GDP, and home to 14 Fortune 500 headquarters, with a significant development pipeline of around 500 to 600 new projects per year. Importantly, this economic base is supported by a strong talent pipeline, with more than 300,000 college students enrolled and approximately 64,000 degrees awarded annually, providing a continuous source of skilled labor for the regional economy.
Ignacio Madridejos
executiveAtlanta also stands as a key hub for transportation and logistics, backed by the busiest airport anywhere in the world plus important interstate links. Taken together, Atlanta pairs considerable existing scale with a history of steady gains in population and economic output, elevated incomes, and a substantial talent pool, which underpins employment, mobility, and travel demand over the long run throughout the region. Turning to the corridor, I-285 unites jobs, housing, and freight movement on one heavily traveled ring road. Roughly 200,000 to 240,000 vehicles use I-285 daily, ranking it among the region's busiest corridors. I-285 links major employment and residential centers, and short trips account for most of the demand. End-to-end trips make up under 3%, and a typical trip runs about 5 miles, which underscores how much multiple access points matter along the corridor. I-285 serves a vital function in the region's freight and logistics network. Truck traffic passing through gets routed off central Atlanta and onto the ring road and its interchanges, which produces a significant heavy vehicle share of roughly 10% to 12% of corridor traffic. The corridor additionally acts as a major regional link among Atlanta's principal interstate highways. About 20% of truck trips move between I-285 and I-75, which reinforces I-285's part as a crucial freight bypass.
Ignacio Madridejos
executivePast freight, I-285 also serves a lot of commuting and business needs, which gives it a varied user mix across the day. Taken together, that blend of local, commuting, business, freight, and regional traffic produces a wide and diversified demand base, and connectivity is essential to capturing it. Moving to the next slide, we illustrate how congested I-285 is, with a duration and intensity that other highways don't show. As we said earlier, the corridor handles roughly 200,000 to 240,000 vehicles each day. Up to 8 hours of congestion occur daily along the corridor. During peak periods, speeds may drop to about 20 miles per hour, and daily peak lasts 4 to 5 hours by direction. Crucially, this pattern is neither recent nor temporary. Congestion has persisted throughout the corridor for over 10 years. To give this congestion profile some context, SR 400 is a helpful benchmark, since it has a comparable managed lanes framework in the Atlanta market. The heat maps set weekday traffic conditions in 2025 side by side for I-285 and SR 400. Red-colored areas signal heavier congestion and longer delays. The notably stronger congestion profile of I-285 East is what stands out. Congestion stretches across more hours of the day and in both directions, whereas SR 400 is more concentrated around peak hours and peak duration, with less intensity.
Ignacio Madridejos
executiveI-285 East is more heavily exposed to freight movement. Roughly 10% to 12% of its traffic consists of trucks, versus about 3% on SR 400. I-285 East likewise has notably more extended vehicles exposure, in line with the truck traffic. Although the tolling frameworks are similar, underlying demand on I-285 East is materially stronger, which produces a deeper requirement for dependable travel times across the day and raises the potential value express lanes can deliver to drivers. Going forward, the traffic case rests on a mix of robust existing demand, suppressed demand, and anticipated continued regional growth. Beginning with the regional outlook, third-party forecasts covering 2025 to 2034 indicate expected yearly growth of about 1.1% for population, 1.9% for real income per capita, and 2.6% for real GDP. Crucially, the traffic case does not depend on future growth to generate demand. As the previous slides showed, demand is already established, and the corridor runs under significant capacity constraints. We also observe signs of suppressed demand. From 2012 to 2023, traffic on I-285 between I-75 and I-85 rose by roughly 0.4% annually, versus approximately 1.1% on regional freeways. Yet growth on I-285 has been concentrated in off-peak periods, where capacity is still available, while peak period traffic has been held back by congestion.
Ignacio Madridejos
executiveSo what we take from that lower observed growth is that it points to capacity constraints, not weak underlying demand. That tells us there's latent demand that could come back to the corridor once more capacity is in place. From what we've seen in our managed lanes portfolio, it usually takes users about 2 to 3 years to get familiar with a new road configuration and the benefits it offers, which supports progressive adoption after opening. Taken together, strong existing demand, the release of suppressed demand, anticipated continued regional growth, and expected progressive user adoption all support the long-term traffic assumptions for I-285 East following its expected opening in 2034. Turning to connectivity, as I mentioned earlier, it matters especially on I-285, given that demand is predominantly local and average trip length is relatively short. So this has been a key focus of our design and one of its principal differentiators. Against the GDOT reference design, our solution raises allowable movements from 42 to 117 and entries and exits per mile from 2.3 to 3.1. Most importantly, the share of corridor trips served goes up from 55% in the reference design to 95% in our design. That works out to approximately 1.7 times more in-scope trips. One particular focus has been freeway-to-freeway connectivity at SR 400 and I-85.
Ignacio Madridejos
executiveDrawing on what we've learned from our managed lanes portfolio, we regard that connectivity as essential for network performance, and our design delivers complete connectivity at both interchanges. The design also offers direct access to major cross streets, truck-friendly connections, and it further improves access across the entire corridor. Beyond that, the design carries the corridor through additional mileage along I-285 and at the SR 400 and I-85 connections. All in all, improved access lets more drivers take the express lanes for their daily trips, while delivering smooth connections across Atlanta's wider highway network. Turning to the pricing framework, the goal is simple: to keep travel times reliable and give users a predictable, free-flowing experience as traffic conditions change. The framework begins with an OTR soft cap of $2.01 per mile in 2025 dollars, alongside a corresponding hard cap equal to two times the OTR soft cap, or $4.02 per mile. Pricing adjusts dynamically to real-time traffic conditions in order to protect travel speeds. When volumes rise above 1,500 passenger car equivalents per lane per hour, or speeds drop below 55 miles per hour, tolls may rise by as much as two times the OTR hard cap. This pricing response can apply not only to the segment affected, but also to as many as two preceding segments, which helps ease demand before congestion reaches the bottleneck.
Ignacio Madridejos
executiveThe second key element is how the OTR soft cap grows in a predictable way. Each year, that OTR soft cap rises by whichever is larger: 2%, or the average of nominal GSP, CPI, and 3% — which gives it built-in escalation. Beyond that, the framework builds in soft cap adjustments tied to performance, reviewed every 6 months and connected directly to what users actually experience in service. Under the traffic conditions we expect, those adjustments could be essential for keeping travel times reliable. When sustained demand holds tolls above the soft cap for more than 20% of the defined peak periods in a segment, a 3% congestion adjustment can kick in, which triggers a change to the OTR soft cap for that whole phase. There is also a separate 18% target speed adjustment, which can apply if speeds stay under 45 miles per hour for more than 10% of the defined peak periods in a segment — and that again triggers an adjustment covering the entire phase. The aim here is to bring service back to the target level. Such adjustments raise the OTR soft cap itself, and along with it the corresponding two times hard cap, so the pricing framework can respond as traffic and congestion change. Last, pricing by vehicle class safeguards lane capacity, with toll multipliers reaching as high as five times for extended vehicles.
Ignacio Madridejos
executiveSo all told, those 3 mechanisms operate in tandem to control demand, safeguard travel speeds, and give express lane users dependable service along with trips they can predict. Turning to construction and design, what we do is concentrate on pulling scope forward while making delivery simpler and lowering execution risk. By our method, more scope gets pulled forward, with an extra 8.5 lane miles folded into Phases 1 and 2, and at the same time we simplify the overall phasing strategy, cutting down on construction interfaces, remobilization, and handoffs between them. Another key piece is access that is both expanded and optimized. The design builds in wider, better-quality connections, and it aims to fold this added scope into the construction program efficiently. Structurally speaking, the design likewise cuts back on elevated and steel structures, and that raises constructability while supporting stronger certainty on schedule, and it also lowers what future maintenance will require. Roughly 30% of advance design development is done across Phases 1 and 2, along with further design work on critical components. That gives us more visibility into pricing and schedule. The delivery platform gains from a substantial local subcontractor network, self-perform activities, and over 10 years of experience in the corridor. Inflation risk gets mitigated via developer and grantor protection plus added cost contingency. With more scope delivered upfront, fewer interfaces, advance design, and a solid local delivery platform all combined, we have more confidence in construction execution, schedule, and cost certainty.
Ignacio Madridejos
executiveTurning to the following slide, in addition to the design work, the I-285 East bid draws on analysis of operating data and lessons from our whole managed lanes portfolio, which gives us distinctive data insights on the main traffic and pricing variables. That lets us benchmark the bid’s key assumptions against what operations have shown us. Regarding traffic, we draw on portfolio experience to evaluate how capture rates shift across vehicle class and time period, how connectivity influences network usage, how fast users take up a new toll road, and how suppressed demand comes back once new capacity is in place. Likewise for pricing, we examine observed behavior around cap triggers and pricing above the OTR soft cap, how customers respond to toll rate changes, and how toll segmentation and differentiated vehicle pricing can be set up to manage demand and preserve service quality. In short, proprietary analysis, proven operating experience, and a detailed grasp of managed lanes customer behavior in practice underpin the I-285 East bid. Turning to the following slide, the next steps, this slide lays out the main expected milestones for Phase 1. Commercial close is expected in December 2026. Financial close is the next major milestone. The contractual deadline is October 2027, and we currently expect to complete it before that date.
Ignacio Madridejos
executiveConstruction is slated to begin in the first quarter of 2028, and early works are anticipated to take place in the period between commercial and financial close, prior to that start date. We expect full service to commence in 2034. As we detailed in I-24 as well, the financing framework provides for agreed interest rate protection with GDOT running from bid through financial close, with differences by instrument. Under private activity bonds, GDOT carries 100% of base rate risk along with 85% of margin risk, and the developer carries the remaining 15% of margin risk. With taxable debt, GDOT carries 100% of base rate risk along with 85% of margin risk. Volume risk falls to the developer, as does the remaining 15% of margin risk. On TIFIA debt, GDOT carries volume risk and base rate risk, as the slide shows. GDOT further requires an investment-grade credit rating for project debt submitted in the proposal. Taken as a whole, this framework offers meaningful protection against financial market movements in the window between bid and financial close. Information on final concession value and final structure will be shared by us following financial close. To close, let me pull together the key messages from today's presentation. I-285 East is a heavily congested, multipurpose ring road and serves as Atlanta's principal freight bypass. The congestion is longstanding, spans the entire day, and impacts both directions, which supports a significant base of suppressed demand.
Ignacio Madridejos
executiveThe Atlanta metro area has strong prospects for demographic and economic growth, thanks to a diversified employment base, household income that is above average, and strategic transport connectivity. A differentiated design that is expected to serve 95% of corridor trips, versus 55% in the reference design, supported our best-value award. The pricing framework gives us considerable flexibility to respond to congestion and to grow pricing over time, starting with an OTR soft cap of $2.01 per mile based on 2025 dollars, dynamic pricing that allows real-time pricing of up to two times the OTR soft cap, including annual and performance-based adjustments that support progressive OTR growth, and toll multipliers that reach as high as five times the light vehicle rate for extended vehicles. The CDA offers a structured framework for negotiating and developing Phases 2 and 3. Those potential phases constitute an additional growth pipeline, but they remain subject to separate development negotiation and our processes. As we shared during the I-24 presentation, we have kept our disciplined approach to capital allocation, targeting a double-digit equity IRR calibrated to the project's risk profile and complexity, given that these types of projects are riskier than others. We continue to have strong balance sheet capacity, and we intend to source the funds for the equity commitments for both I-24 and Phases 1 and 2 of I-285 East mainly with cash generated in our operations and to a lesser degree with additional corporate debt, all within the framework of our BBB rating and excluding any equity raise at the Ferrovial level.
Ignacio Madridejos
executiveMuch appreciated for listening, and at this point I’ll turn the presentation over to Silvia so we can take questions.
Operator
operatorLadies and gentlemen, the Q&A session is starting now. Should you wish to pose a question, kindly press star five on your telephone keypad. If you decide against it, just press star five once more. Before you proceed with your question, please make sure your device is unmuted locally. We have our first question from Luis Prieto of Kepler Cheuvreux. Your line is now open. Please go ahead.
Luis Prieto
analystThanks. Good afternoon, and I appreciate you taking my questions today. I had several questions that are related. First, what prompted TDOT and your team to disclose the concession value payment schedule for the I-24 before financial close? Given that, can we take it that this schedule came out of a negotiation that wrapped up with a commercial close agreement? As for the I-285E, should we anticipate a similar pattern when it comes to negotiating the schedule, getting to commercial close, and revealing the structure? Thank you for that.
Ignacio Madridejos
executiveThanks, Luis, for those questions. Like with every one of these processes, we’re bound by certain NDA provisions — confidentiality limits — so there’s information we aren’t able to share. That’s the reason we didn’t disclose some of the concession payments tied to I-24. When TDOT allowed us to release that information, we made it public, drawing on the press release they issued on Monday. We communicated it right after that. On I-285 East, I should note that these are separate projects, each negotiated on its own terms. For that particular one, you shouldn’t expect any further information before financial close, at which point you’ll receive full details on equity and concession payments.
Luis Prieto
analystAppreciate that, Ignacio. If I could fit one more in, and this one's more technical: in what way ought we to read the interest risk on I-24 and 285E that the grantor has taken on? Where interest rates move away from the commercial close guidelines, does the grantor have to cover the extra financing costs up until the facilities get refinanced at lower pricing? Is that a fair way to see it, or is it entirely different? Thank you.
Ernesto López-Mozo
executiveHere's how I'd frame it, Luis — this is Ernesto — you evaluate the impact of the interest rate on a present-value basis, and the payments get adjusted to match. The adjustment happens in terms of concession value.
Luis Prieto
analystAlright. I get it. Thanks.
Operator
operatorCristian Nedelcu of UBS has our next question. Your line is open now. Please proceed.
Cristian Nedelcu
analystHello, and thanks so much for taking my question. First, on the I-285 — I believe the grantor slides referred to concession payments being made across the 6 years of construction. Can you help us understand whether that is fixed in stone, or is it open to negotiation, and might we see a payment structure like the one on I-24? Second, just to clarify on the I-285 Phase 2 concession payment — I realize you can't disclose any value, but it's the same road in the opposite direction. You've committed to a traffic and revenue forecast. Would it be fair to assume a similar concession payment in order of magnitude, or could there be no concession payment at all for Phase 2? Any color just so we can grasp the magnitude a bit? Third, if I may, perhaps on the NTE — I think it's now 1 month since the new capacity was added, and I was wondering whether you can share any conclusions regarding the net impact on revenue growth there — less mandatory modes, more volumes, any color you could give us at this stage? Thank you.
Ignacio Madridejos
executiveThank you, Cristian. The first two questions are mine to handle, and Ernesto will cover the third. Yes, I believe during the conference call — no, GDOT made clear there are 6 equal payments over the construction period, though they also noted those could shift depending on changes in interest rates or the final financial structure. As was mentioned earlier, final figures won't be discussed until financial close. On the second question, regarding Phase 2, please don't assume things will be similar. Yes, it's a different direction, but my view is the development could involve a different cost profile and different revenue streams. Financial close comes in 2 years, so for now, don't assume it will be exactly the same. There may be some differences.
Ernesto López-Mozo
executiveYeah, thanks. On the NTE impact, there’s only so much we can say at this point — it’s quite limited. Yes, we’re seeing additional traffic return to the corridor. As for mandatory modes, that’s something that will need to be assessed next year, given how the contract is written following the opening. We’ll provide information on that next year.
Cristian Nedelcu
analystI appreciate that.
Operator
operatorHarishankar Ramamoorthy from Deutsche Bank has the next question. Your line is open now, so please proceed.
Harishankar Ramamoorthy
analystGood afternoon, everyone, and thanks for taking my questions. I have a couple from my side. How should we think about the legal challenge concerning I-24? What does the process look like from here on? At some point, does the award become irreversible? If it doesn't, and if the decision ends up being overturned, then what would the exposure be for Ferrovial? That's the first one. Then, secondly, regarding 407 ETR, is it fair to say that outside of the COVID period, the traffic decline there has been the steepest in the last quarter? I do get the point on several external factors, tariffs and whatnot. Thinking about the levers that you have at your disposal, how should we think about pricing freezes next year, and would you dismiss the possibility of, say, reducing the tolls? Thank you.
Ignacio Madridejos
executiveThanks. I’ll start with the question on the I-24. We have zero concern regarding any legal challenge. Naturally, we’re unable to comment since litigation is ongoing — no — involving TDOT and the consortium that took part in that challenge. My expectation is that it will be resolved quickly, and as I mentioned at the outset, we have zero concern regarding this legal challenge.
Ernesto López-Mozo
executiveOn the 407, as I said earlier in the presentation, traffic has clearly been impacted by the way we've handled promotions, targeted promotions, and so forth. We continue to see that the product is well valued. Revenue growth this year is substantial. We don't give specific guidance, but I rule out lowering prices as you were suggesting.
Harishankar Ramamoorthy
analystAppreciate it. Thank you.
Operator
operatorOur following question is from Elodie Rall at J.P. Morgan. Your line is open now. Kindly proceed.
Elodie Rall
analystHello, and thank you for taking my questions. I'd like to follow up on that 5.2% discount rate. I believe this was brought up earlier, but I didn't fully grasp how it might be adjusted upward at financial close, and what effect that would have on the project's NPV at this point. If you could help me get a clearer picture of that, I'd appreciate it. Also, regarding I-285 East, you brought in a new partner for 10%, so I think you're now at 90%. Are you seeking a third partner? What's the end goal there? And maybe finally, on construction margin, performance in Q3 was clearly very strong. You're above the 3.5% margin target — does 3.5% remain a valid target over the mid-term? If you could comment on that, thank you.
Ernesto López-Mozo
executiveHi, Elodie, Ernesto here. I'll give a bit more detail on the interest rate and margin compensation. Basically, we submitted a financial structure whose terms reflected what was prevailing at the time for debt, right? Picture that base rates and spreads have risen, right? So when we get to financial close, the capital structure we submitted is now different at that point. It carries a higher interest rate and wider spreads. The grantor covers the rise in the base rate plus 85% of the margin. The way the adjustment works is there's a formula that essentially says, okay, these extra payments carry an NPV value of X, right? That's the amount that gets compensated, right? It's compensated through, let's say, concession value.
Ignacio Madridejos
executiveOn your second question, no—concerning the partners in the 285, yes, we hold 90%. That's above what we typically have had, no, and at some point we might choose to bring our stake down, no, toward a more comparable participation, always keeping a majority, but comparable to what we have in other managed lanes, no. The timing is the question, no—we haven't made a decision on whether we'd do it before, after financial close, or after construction. Naturally, the more you lower this project's risk, the more its value rises, no. No decision has been made as of yet, but at a minimum we'll look at it, since usually we might cut our participation so it's more comparable to what we hold in other assets.
Ernesto López-Mozo
executiveOn the construction margin, we have consistently said this is an average over the long term, correct? At certain points we might be above it, naturally, and at other points we could be below. As a long-term margin, we believe this is a sensible margin for the construction business.
Elodie Rall
analystThanks.
Operator
operatorThe next question is from Ruairi Cullinane at RBC Capital Markets. Your line is now open. Please go ahead.
Ruairi Cullinane
analystHello. Yeah, starting with the I-77: do you believe some of the traffic decline we've seen so far this year came from price elasticity — whether that's heavy goods vehicles or leisure traffic? Second, could you maybe discuss how interested you are in taking on additional managed lanes after this year's awards? And then, going back to the results, what was behind the better energy performance this quarter? Thank you.
Ernesto López-Mozo
executiveNow, about how I-77 has been doing — if you examine that region, there are 2 long-haul routes carrying heavy traffic. The first is the 85, which then feeds into the I-95, that Northeast Corridor, and then on the other side you've got the I-77 connecting up with the I-81, correct? I-81, I-85, and I-95 run roughly parallel, right? The I-85 and I-95, let's say, are the denser ones. What's happening with the I-85 — sorry, with the I-81 — is that it's currently undergoing major construction, right? We're seeing a lot of traffic now utilizing the I-85, which links into the I-95, instead of the I-77 and I-81. For the duration of that construction work, our expectation is that heavy traffic will keep shifting, just as it has this year, over to that alternate corridor, right? When there are fewer heavies on the road, capacity clearly goes up, right? Because of that, our capture rate takes a hit, right? That could be viewed as a significant factor behind the performance. It may persist for a while, but when it comes to the Charlotte region's growth and all of that, growth is still anticipated.
Ignacio Madridejos
executiveOn your second question — no, I mean yes, we have prequalified for I-77 South. We're awaiting the RFP. Yes, we will take part and will submit a bid for these new managed lanes. We take an active part in the requalification process for further managed lanes going forward. Yes, we have full appetite for projects of this kind, which we believe can generate very good value for the company down the road.
Ernesto López-Mozo
executiveOn the energy performance question — well, I’d frame it as a comparison with a year in which the energy division was still developing some construction projects on EPC plants and transmission lines as well. Once transmission lines are operating, or once you finalize EPC contracts, you get a better margin. It comes down to scale and how the portfolio evolves.
Ruairi Cullinane
analystThanks.
Operator
operatorGraham Hunt from Jefferies has the next question. Your line is open now. Go ahead, please.
Graham Hunt
analystThank you so much for the questions. Let me begin with the 407 and see if I can go a little deeper on that Q3 volume decline. Based on what it appears and what we observe, the discounts you had been providing during Q3 were substantially reduced. That stands in pretty sharp contrast to, I believe, last year's strategy, when they were really ramped up. I'm simply attempting to figure out what the reasoning and thinking is behind that. I guess how much of the minus 7 on volumes resulted from modifications in how you were offering promotions as opposed to what you might call one-offs or macro weakness? I'm just trying to wrap my head around the pricing strategy you're following on that asset. And then my second question, if I may ask about the 285, the references to heavy vehicle percentage on the corridor and the five times multipliers, and so on. I'm just trying to understand apples-to-apples numbers here, because from what I understand, the I-285 cannot take heavy vehicle traffic. Is the 10% to 12% of heavy vehicles a reference to the vehicles that are able to travel on the corridor, or are you saying that heavy vehicle traffic on the corridor in general will push more light vehicles onto the road?
Graham Hunt
analystI’m just trying to understand, among the vehicles in the corridor that are allowed to use the 285 express lane, what share would meet the criteria for the higher multipliers — the 5x multipliers you mentioned in the deck. Sorry the question was so long. Thanks.
Ernesto López-Mozo
executiveThanks, Graham, for those questions. I'll address the first one regarding the 407. During the previous year, promotions were, in effect, made available on a wide basis, and various times of day and various segments could be applied. At present, our approach is more targeted. This means there is a form of commitment involved. You drive X, and then the promotion becomes available to you, or the promotion holds good provided you finish spending a certain amount — that type of thing, correct? One well-targeted idea is also, as you can see, that we have lowered overall expenditure for Schedule 22 while revenues are much higher, correct? This means that even in segments where our steering of traffic was not particularly strong, we are now steering traffic, correct? It is a combination of delivering value to customers — they appreciate that — and also simply controlling the cost element, correct? That is what we refer to as targeted promotions; that is the explanation.
Ignacio Madridejos
executiveOn the 285 and heavy and extended vehicles, what we were saying in the presentation is that heavy vehicles on the 285 currently make up roughly 12% to 14%, and we brought up that number since it's publicly available information, right? We also noted that only a few of them travel the entire route — the majority simply get on at one interchange and get off at another. Shorter trips, interchange to interchange, but that kind of traffic creates a great deal of congestion on the 285 in the general-purpose lanes. Managed lanes are off-limits to heavy vehicles, though extended vehicles are permitted. With extended vehicles, what's different here and what you need to factor in is the definition first, which is broader than for the Texas managed lanes — it differs from the I-24. In this instance, the definition of extended vehicles is broader. The multiplier is higher as well. Another thing that's relevant relative to others such as SR 400 and other kinds of highways is that extended vehicles are significant in number. We haven't provided a figure — we want to protect intellectual property and information that we may have from our own analysis and research and knowledge.
Ignacio Madridejos
executiveWe believe it matters a lot, given how many of them there are, the way they act, and the fact that saving time is really important to them.
Graham Hunt
analystGot it, and thanks. I appreciate the extra details on I-24 too — that's really useful. Thanks.
Operator
operatorMarc Manduca with Citi has the next question. Your line is open now. Go ahead, please.
Marc Ip Tat Kuen
analystHi, thanks for taking my questions. I have a few, all regarding the I-24. First, just a clarification on the I-24 timeline. I believe it may have shifted somewhat since the analyst call earlier this month. Before, you mentioned first service commencement in 2034 and full operation in 2035, but the concession payment schedule indicates your payments begin in 2036. Could you clarify that timeline for me, please? Second, regarding the maximum leverage 75/25 cap structure on the TIFIA term sheet: does that apply only at the start of operations, or must you comply with it across the entire concession? Then the last one — I can't recall whether you've shared this before — but could you share what unlevered project IRR you're targeting for the I-24? Is it in the single-digit or double-digit range, please? Thank you.
Ignacio Madridejos
executiveApologies. Regarding that first question, if we understand it correctly, it concerns the payment in 2036 — and our thinking is that this is the first year of operations, a full year of operation. That's the reason it's the first payment, though I'm not certain whether we're addressing the question you're asking or not. Hopefully, yes.
Marc Ip Tat Kuen
analystI thought the start year in the October 5 presentation was 2035. Has it now moved to 2036, based on the concession payment schedule?
Ignacio Madridejos
executiveThe 36 will be the first complete year in operation, the entire year, the 2036; whereas the 35 will only have been running for a few years—a few months, sorry—so it won't constitute a full year. I'm not sure whether that distinction comes across, does it?
Ernesto López-Mozo
executiveOn the other two, the first involved the TIFIA condition of at least 25% equity, and that applies at financial close. No particular requirement exists for a project that takes a long time to develop — it's only tied to financial close. As for the IRR type we need at the project level, it's near double-digit. I'd call it very high single-digit, and typically the aim is to turn that into a very healthy levered double-digit IRR, as we said, though naturally, for a project to be solid, you also need a quite high project-level IRR. That's roughly how it works out.
Marc Ip Tat Kuen
analystThat's great. Thanks a lot.
Operator
operatorMarcin Wojtal from Bank of America has the next question. Your line is open now. Go ahead. Yes.
Marcin Wojtal
analystThanks a lot. I have a few questions here. First, regarding I-24 and the capital structure: you mentioned that the TIFIA documentation allows debt to cover as much as 75% of that project, with just 25% equity required. Is that really the capital structure you intend to use for this particular project? From what I understand, historically the equity portion has been nearer 40. Could you clarify whether that represents a significant shift from the historical run rate? My second question concerns I-285. Are there any revenue-sharing clauses in place? Nothing like that appears in the disclosures — is it that they don't exist, or simply that they haven't been disclosed yet at this point? Perhaps question three, which is somewhat open-ended: you said you view the legal risk and litigation risk on this project as very, very low, and that you expect a quick resolution. Any extra detail you can offer on what gives you confidence in a speedy resolution, if possible?
Ernesto López-Mozo
executiveMarcin, on the structure side, if you remember, TIFIA historically financed a narrower set of cost categories, correct? Their term sheet now, as the grantor's presentation shows, covers as much as 49% of various concepts, right? So they've broadened the scope, correct? That's what creates the potential for greater leverage, since TIFIA financing makes any structure that much more robust, right? It's precisely that shift in TIFIA's scope which has altered these leverage dynamics.
Ignacio Madridejos
executiveOn your second question, no — as for the revenue share, this will be a very standard arrangement, no, much like what you find in other managed lanes, where once you exceed your base case, you begin sharing with the grantor. I think it won't differ from other managed lanes. On the legal risk, yes, we said we aren't worried. In this particular case, of course, there is ongoing litigation, and we can't comment or offer further arguments in a litigation, especially since we aren't part of it, or we're not directly involved, no? We can't provide more information on that.
Marcin Wojtal
analystAlright.
Operator
operatorEddy Diamantis of Green Street Infrastructure has our next question. Your line is open now. Go right ahead. Certainly.
Eddy Diamantis
unknownThanks a lot. By way of introduction, I’m Eddy Diamantis, a senior reporter focused on infrastructure across North America and the Americas more broadly. I’m really looking forward to learning more about the I-24 and I-285 transactions, and I appreciate you taking my question today. My question centers more on the financing side. I’m wondering how the project financing for I-24 and I-285 East will be put together. Which financial and legal advisors are you working with, and who do you expect to supply that project financing? Thank you very much.
Ernesto López-Mozo
executiveHi, Eddy. Normally this call is aimed at investors and analysts, but I'm glad to take your questions. On the structure side, as I said earlier, the debt piece is driven mainly by TIFIA funds. After that come private activity bonds, which have essentially been allocated to the states and give them an amount they can draw on, and then taxable bonds. As I mentioned, TIFIA financing is the biggest component. Those, say, taxable bonds and the like get assessed together with financial advisors. The financial advisors aren't disclosed publicly, but they give us a sense of, say, market appetite or capacity at the time we submit the bid, correct? As I said, TIFIA makes up the bulk, and then naturally the remainder is equity. I believe that covers your question, hopefully.
Eddy Diamantis
unknownYeah. Yeah, and just so I’m clear as well — and I realize this is aimed at investors, so it may be a bit out of place here. As for who’s going to supply that financing for these private activity bonds and taxable bonds, will those be listed on public markets? Oh, yeah,
Ernesto López-Mozo
executiveYeah. This is a capital markets transaction, and it's the standard muni bond issues and taxable bonds that are listed on capital markets, and yeah, along with their prospectus. It's all public financing.
Eddy Diamantis
unknownThanks, that’s helpful. You said earlier that you have full appetite for additional P3 projects. Beyond I-77 in the United States, can you confirm whether there are any other projects you’re currently looking at?
Ernesto López-Mozo
executiveWe'll weigh in once they reach out for qualification or something along those lines at that moment, and once we plan to make it public. Thanks, Eddy, and apologies — as I said earlier, this session is mainly for investors and analysts, so thank you for joining.
Eddy Diamantis
unknownAbsolutely — thanks.
Operator
operatorJosé Manuel Arroyas from Santander, your line is open now — go ahead with your question.
José Arroyas
analystThanks, Ernesto and Ignacio. I've got three questions. The first concerns I-285 East. I'd like to revisit what Cristian asked earlier and get some clarification. A few days ago, the Georgia Department of Transportation stated that concession fees must be paid across seven installments. I just want to clarify: is it possible, or is it not, that at financial close—or perhaps earlier—this seven-payment schedule could be modified and ultimately spread across the concession life, as with I-24? That's my first question. My second question concerns I-24 and the revenue-sharing payments, which are tied to IRRs—I'm just trying to gauge how probable those payments are, or aren't. Are the IRR triggers here higher or lower than, say, those on I-66? Finally, on NTO, you said there's been a change to when development of Phase 1B and 1 and 1C begins. My understanding was that this came at the Port Authority's request. Could the concession be extended to compensate for the 3-year delay? Thank you.
Ignacio Madridejos
executiveThanks, Jose Manuel. Let me begin with the 285 — no, sorry — and those six payments made during construction. Right, that's what GDOT mentioned, and in that same presentation they also noted it could shift depending on interest rate differences as well as the final financial structure. I'm simply repeating what they said at that point — there's nothing further to add, right? As I said, we'll find out at the end, and once financial close happens, we'll see the final figures. On the revenue share, and whether it's easy to get to that point — I believe if we do hit the revenue share, all of us will be quite happy, since it would mean I-24 is outperforming. Hopefully that's what happens, right? I think it is outperforming, and hopefully we get to that level. If so, I'd say it's performing even better than a few of the other managed lanes we currently have.
Ernesto López-Mozo
executiveOn the question of whether NTO might be extended — no, at this moment that isn't included in the contract.
José Arroyas
analystThanks.
Operator
operatorCristian Nedelcu from UBS has the next question. Your line is open now. Go ahead, please.
Cristian Nedelcu
analystThanks so much for letting me ask a follow-up. On the current portfolio, could I pose a question? From what you said earlier, I think with I-77 there are some headwinds from heavy trucks leaving that corridor. I believe you mentioned that you're lapsing somewhat the technology benefit in Dallas when it comes to pricing, better segmenting pricing. With NTE capacity, it's unclear what the revenue impact is. Those three levers appear to be somewhat of a headwind, or they suggest some deceleration in how fast revenue is growing. So my question is really this: what is offsetting that? Perhaps you could talk a bit about the positives? I take it LBJ traffic is good, but I'm trying to understand, looking ahead over the next few quarters, what headwinds and tailwinds do you see in front of you? The second one, if I may, what's the range for a cost of equity on this kind of project — I-24, I-285, I suppose — at this point, when we have construction risk and traffic ramp-up risk, and once those have been derisked, could you help frame a rough range for an appropriate cost of equity there? The third one, and the last one, is just a small clarification — apologies.
Cristian Nedelcu
analystLet me return to I-285 Phase 2. Just so we grasp the mechanics of how that concession payment gets set: is it right that you've locked in a revenue projection across Phase 2, you've locked in a CapEx projection, and also the point that the equity IRR you can achieve there is capped at Phase 1's level? So, working backwards from those three inputs, the concession payment owed to the grantor gets computed that way? Is my grasp broadly correct, or is there something I'm overlooking? A number of investors hold the view that no concession payment attaches to Phase 2, or that it's a very symbolic one. I just wanted to get a sense of that direction of travel. Thank you very much.
Ernesto López-Mozo
executiveOn revenues, ongoing — yes, you're correct that the LBJ is displaying corridor growth, and that lifts our performance following the opening of the 635. That ought to continue rising. Then regarding the I-66, we're also seeing the corridor expand more than we had anticipated. There are probably developments in the western portion of the corridor. Previously, it was more concentrated in the eastern portion, much nearer to the Beltway. That's likewise providing some support for growth there. In Canada, as we noted, this has been a very super-soft year when it comes to economic performance. As economic growth comes back, population growth comes back — those are drivers that assist growth in that market. Those are solid drivers of growth. On other news, yes, we will be phasing out the technology impact on the Dallas-Fort Worth concessions. The economy there — the background growth remains good. As the areas continue growing, revenue growth also keeps performing, correct? I'd say that's a good balance for the current portfolio. The cost of equity — that's a very good question. If we take most of the business plans we're seeing in the market that sit well below ours, that would probably warrant a very low discount rate, single-digit after opening, right?
Ernesto López-Mozo
executiveWe’ll find out. That question remains undecided.
Ignacio Madridejos
executiveOn the Phase 2 question — no. In this phase, yes, we did provide traffic and revenue figures, but those don't have to match Phase 1. Same story with CapEx: we also gave a CapEx number that can be adjusted for inflation and other factors, and it doesn't have to equal Phase 1 — it could be a different figure that you include in the bid offer. Then financial close takes place in 2029, right? A lot can happen between now and then, correct? Assuming Phase 2 will be identical to Phase 1 is not the situation. What we've said is only that you must wait until that point to grasp the numbers and the figures, and we can't claim it will be the same as Phase 1 — you have to wait until then, since that's a long stretch of time, and plenty of things could occur before it.
Cristian Nedelcu
analystThanks a lot.
Operator
operatorOur following question is from Dario Maglione of BNP Paribas. Your line is open at this time. Kindly proceed.
Dario Maglione
analystGood afternoon, and thank you for all the presentations today. I have four questions. First, on the I-285 project: what's the likelihood that Ferrovial secures an extra partner for this project, say, before the road opens? Second: what happens if no partner is found before financial close? Would Ferrovial still sign the contract? Could you walk away from it? Third, on the I-24 payment schedule, the payments appear heavily back-end loaded — is it fair to expect that this fixed concession payment would be under $200 million once the road opens in 2036, and then climb progressively toward $5 billion, and $10 billion by the end of the concession? And my last question concerns the discount rate you agreed with the DOT for the NPV calculation on these concession payments — a 5.2% blended average discount rate, if I understand correctly. How did you arrive at this discount rate, because it seems quite low? Thanks.
Ignacio Madridejos
executiveThank you, Dario. Regarding partners, as we said before, no, we haven't made a decision, no, on when we will bring partners in, and if they come in at different points in time, the pricing will be different, right? If it's after operations begin, then of course you carry most of the risk, and you have revenues, and so the value of the road at that moment will be much higher. Of course, if you do it after financial close, you have the risk — a lot — plus the financial risk that may exist at that point in time, right? What I'm saying is that we may reduce, we don't know when, and of course, depending on when we do it, the value will be different, and we'll ask for a premium that will differ depending on the timing of the sale of our participation. In the case of no partners and that we can walk away, it's independently — it's not that we need partners in order to reach financial close. We can do it without additional partners, but we always have the option to withdraw, though we don't see that as a probability, because we think this may be a good project for us.
Ignacio Madridejos
executiveOn the I-24 question and the assumption you raised — I believe we provided present value figures, and with that number plus the discount rate you can apply your own assumptions. I'm confident you won't end up too far off, since the range of difference you might see isn't large. The discount rate is tied to the TIFIA cost, correct? What serves as the reference throughout is the TIFIA cost for projects of this kind.
Dario Maglione
analystAll right. Thanks — that’s very clear.
Operator
operatorLuis Prieto from Kepler Cheuvreux has the next question. Your line is open now, so please proceed.
Luis Prieto
analystAppreciate you coming back with that follow-up. Setting aside the funding capacity, when you look at it from a risk and resource management standpoint, is there a cap on how many US managed lane projects you're able to develop at the same time?
Ignacio Madridejos
executiveI believe I'd concur with your point that construction is the primary risk — and having enough resources to handle all of these projects simultaneously. We need to determine whether we're ready for that, or perhaps we bring in partners to develop some of those projects, right? We'll see. As things stand, with these two projects, we're capable of doing them on our own given the capabilities we possess. For other ones, if we sense we might require extra resources, we could team up with others, correct? That's a call we need to make at a later point, not today. We're comfortable with these two managed lanes, and also with bidding on the I-77 South, where we've had prior experience in this geography — in this location where we previously developed the I-77.
Luis Prieto
analystThat's very clear. Thanks.
Operator
operatorMarcin Wojtal from Bank of America has the next question. Your line is open now — go ahead. Yes,
Marcin Wojtal
analystThanks for letting me ask a follow-up. I have two quick questions. Regarding the 407 ETR asset, I understand the dividend was raised by roughly 40% for 2026. Do you think this dividend increase means the asset has already arrived at its optimal capital structure, or is there still more releveraging work ahead in 2027? Also, could you remind us which key credit metrics we should be watching to judge whether additional leverage room exists? My second question goes back to the new managed lanes: how should we think about when equity gets injected into these two very large projects? In the end, is there anything meaningful that would actually be put in before 2030 as construction ramps up, or is it heavily weighted toward the back end?
Ernesto López-Mozo
executiveThanks, Marcin. Ernesto here. I'll handle the question about the 407. For the 407, the credit metric that probably counts the most is the debt service coverage ratio, and that sits at roughly 2.6. As you can see, there's always room. Like I've said all along, don't expect big bangs in the 407, but it's definitely super-solid, right? You've got a good angle there.
Ignacio Madridejos
executiveOn that note, the final question is that most of the cash flows come in later — quite limited, very limited prior to 2030, and the bulk of them in '33, '34, or even '35, correct? That's a long stretch.
Marcin Wojtal
analystAlright.
Operator
operatorThe final question is from Nicolas Mora at Morgan Stanley. Your line is open now. Go ahead. Yes,
Nicolas Mora
analystGood afternoon, gentlemen. Just a couple of things. Going back a little to the specifics on I-285 — I realize you don't want to say much about the light vehicles, the light trucks. At minimum, a ballpark number on whether traffic from those users actually matters. Are we talking, no, 1%, 2% of traffic, or no, 5, 10, 15? Because that shifts the economics considerably, particularly given the tariff multiplier. That would help a lot. Second, under what scenario do you fail to get Phase 2 on I-285? It needn't be Armageddon, but in which situation would you essentially walk away from what you've committed to the GDOT? Then, could you help us grasp, on the tariff side, how you anticipate, say, the extra kickers on mandatory pricing to arrive? I believe you have the plus 3% and the plus 18%. How realistic is that? How central is it to your bidding? Then the last item on TIFIA — maybe I've misunderstood, but I thought every state-level infra project goes into one pot and basically, you share TIFIA availability each year. Your two projects here, if TIFIA mostly funds them, would need a TIFIA quantum that is 2, 3, 4, 5 times larger than what SR 400 did.
Nicolas Mora
analystI'm not quite certain where you're getting the capacity figure for the TIFIA market as it applies to your two projects. Maybe I'm mistaken, but I'd appreciate it if you could clarify that for me. That would be really helpful.
Ignacio Madridejos
executiveTo address those questions, starting with extended vehicles: as we mentioned during the presentation, we are seeing a meaningful presence of extended vehicles, and we also noted that, versus the SR 400, there is materially higher exposure to extended vehicles, right? We have observed this as well on our Dallas managed lanes, right, where we tested how relevant this could be, and I think it could be a relevant factor, right? As was commented earlier, it comes down to how they are defined and what the multiplier is, and they are also typically business-related, and they likely behave differently when it comes to time savings, right? Phase 2, I think, is also going to add value, and there is still a long period of time needed in order to negotiate and to reach a financial close, but we expect it is going to create value for the company. Of course, at some point, we may withdraw if we think that is not the case, right? This increase in the mechanism through which you can raise, every 6 months, right, the soft cap by 3%, right, which you can do, 6% in total during the year, or if it is tied to speed, which is 18%, as we have commented, is what we see in this 285, that it is today highly congested.
Ignacio Madridejos
executiveFor the past 10 years, it has been extremely congested, and there is a lot of suppressed demand—people aren't using it because there's no reliability at all. We also see short-distance trips in the corridor. As mentioned, we see plenty of business here, such as extended vehicles. We also see high income per capita, and I think with all these ingredients, what may happen is that to improve the level of service, you need to apply these things, right? We expect that something will happen, and that's because it's highly congested, right? It's going to be relevant, and it's a mechanism that will help us maintain the level of service at the managed lanes that, because of all the ingredients I mentioned earlier, is highly congested for 8 to 10 hours—4 or 5 hours of peak time—so I think the level of congestion is relevant, and it could happen that the level of service won't be so good in these managed lanes for the reasons I explained before. Thanks.
Ernesto López-Mozo
executiveOn TIFIA, it isn’t our role to say what the capacity would be, given how the contract is structured. If the TIFIA amount we require in the proposal isn’t there, then the grantor must determine how that risk gets resolved, correct? As I mentioned, discussing the capacity isn’t something for us to do.
Operator
operatorThat brings us to the end of the question-and-answer portion of today's call. At this point, I'll return the floor to Silvia Ruiz with the Ferrovial team. Your line is open.
Silvia Ruiz
executiveThanks. I'll begin by reading questions submitted through the webcast. The first one is from Dominique Schmidt at Asteris. With the I-24 and I-285 concessions having recently been awarded, how should we view the balance sheet as it relates to growing cash distributions from the infrastructure assets you already hold versus the equity funding needs for new projects across the next 3 to 5 years? More specifically, how much cash do you anticipate will still be available for shareholder returns?
Ignacio Madridejos
executiveAs I mentioned before, no, the equity required for these two projects is heavily weighted toward the later years, right? Most of it, or the big amounts, starts in '33 and '34 — it's very long-dated, no? In the meantime, we'll keep receiving distributions from dividends and cash that the business collects, plus the regular rotations we carry out with mature assets, and all of this, of course — what we do is we have a 10-year plan, we look at what the commitments will be, what cash we expect to receive, and on that basis the board decides each year what the dividends for shareholders will be, no? Historically, we have paid dividends to shareholders, even through COVID, but we want to preserve that flexibility depending on how things make sense at any given time.
Ernesto López-Mozo
executiveAlright, so
Silvia Ruiz
executiveLucas Tomany from Bayshore Capital has the next question. Given the company's share price has fallen recently, how are you thinking about your buyback strategy? For instance, would you consider speeding up share repurchases in order to capitalize on that price?
Ernesto López-Mozo
executiveSo we do have a buyback program in place. That program is fully compliant with every market abuse regulation, correct? We aren't focused on any specific execution. It's been agreed — a bank has been mandated and has agreed — and when the share price is lower, we purchase more shares. Absolutely, that gets factored in, and lower share prices mean more buyback. Yes, we are taking advantage of those lower prices.
Silvia Ruiz
executiveFilipe Leite from CaixaBank BPI has two questions for us. On the first one, about I-24 and the payment schedule for the operating period: what's the gap between the investment-grade rated payments, discounted at 5% to 5.5%, and the $0.5 billion US dollars that sit outside the investment-grade rating, discounted at 8%?
Ernesto López-Mozo
executiveSo essentially, at the time we submit the bid, TIFIA funding calls for two investment-grade ratings on the debt structure, correct? In effect, you've got all the senior payments there, right? Which means the majority of those payments sit at the senior level, and as Ignacio explained earlier, they get discounted using costs comparable to the TIFIA cost. The outside investment rating means those payments rank junior to the remaining debt payments and to the payments made to the grantor, so they're small, but naturally they carry a higher discount rate.
Silvia Ruiz
executiveFilipe also has a second question: do I-24 and I-285 East include any provisions allowing the contracts to be terminated early, and if so, how would pricing be determined under those early termination clauses?
Ignacio Madridejos
executiveNo, thanks, Filipe. This is quite standard — actually, it's fair market value, just as we have in most of our agreements. It's a clause that's similar and standard across the entire industry.
Silvia Ruiz
executiveThe final question in the webcast is from Igor Zanin at AlphaValue. On page 6, you state that the dividend lockup for NTO now extends until the Phase B2 notice to proceed, which carries a deadline of June 2033, rather than B1. Until Ferrovial commits to the second expansion, it cannot receive a single cent from JFK. In which year do you now expect NTO's first distribution, and is there any time-based fallback should B2 never be launched?
Ernesto López-Mozo
executiveYou're correct that no dividends can be paid out before June 2033. That matches the commitment NTO made after Phase 1 B1 construction was pushed back to September 2030. We don't give any guidance on dividends. NTO has to issue the notice to proceed for Phase B2 by June 2033 at the latest, and there's no fallback option. If this commitment is to be changed in any way, it has to be discussed and agreed with the Port Authority.
Silvia Ruiz
executiveWe have one final question from the webcast, and it's from Roberto Sanchez at Notrock. When should we expect the new business plan?
Ignacio Madridejos
executiveWe’re working on that, and at the end of December we’ll bring it to the board for approval, so it will be in place at the start of next year, since the one we currently have runs until 2026. What hasn’t been decided yet is how and when we’ll communicate it externally, though internally, of course, we’re already providing some guidance on what we intend to do in the years ahead.
Silvia Ruiz
executiveI believe we've reached the end of the questions.
Ignacio Madridejos
executiveThanks a lot, everyone, for joining this earnings conference call and for the presentation on I-24 and 285. Once more, many thanks to all of you. Goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.