Silvia Ruiz
executiveGood afternoon, everyone. Silvia Ruiz here, and I'd like to welcome all of you to the Ferrovial Conference Call, where we'll be discussing the financial results for the first half of 2025. With me today are our CEO, Ignacio Madridejos, and our CFO, Ernesto López Mozo. As a quick reminder, both the results report and the presentation have been up on our website since last night, after the U.S. market closed. A Q&A session will follow at the end of the presentation. Like on previous calls, you'll be able to ask questions live. To do that, you'll need to join through the conference call channel and press star five on your phone keypad. Alternatively, you can submit them via the forum included in the webcast, and I'll read them out loud at the end of the Q&A session. With that, I'll hand things over to Ignacio. Ignacio, the floor is yours.
Ignacio Madridejos
executiveThanks, Silvia, and good morning, everyone. I'm glad to walk you through our results for the first half of 2025, a period in which every one of our business divisions turned in robust performance. In Highways, we posted strong revenue and EBITDA growth from our North American assets. Over in airports, work on the new Terminal 1 at New York's JFK International Airport keeps moving forward. In construction, we achieved solid profitability, with an Adjusted EBIT margin of 3.5% for the first half of the year, which is in line with our long term target. We finished the first half with a net debt position of negative EUR 223 million for ex infrastructure project companies — a figure that leaves out proceeds from the Heathrow divestment, which closed in early July. On capital allocation, we achieved a good mix of growth investments, divestment proceeds and project dividends, along with distributions to shareholders. We completed the purchase of an additional stake in 407 ETR for EUR 1.3 billion, while selling our entire stake in AGS Airports for EUR 533 million and putting an additional EUR 244 million of equity into the New Terminal One. We received EUR 323 million from our infrastructure projects and paid out EUR 334 million to total holders during the first half of the year.
Ignacio Madridejos
executiveNow, on to the major corporate events of Q2. In June, we closed on buying an extra 5.06% stake in 407 ETR from AtkinsRéalis for CAD 1.99 billion, which lifted our holding in that Canadian highway from 43.23% to 48.29%. This investment shows the confidence we have in the long-term growth outlook for the Greater Toronto Area and in the long-term value of this asset. We also wrapped up the sale of our mining services business in Chile for EUR 42 million, which was one of the few services businesses still waiting to be sold. Earlier this month, we announced that we had completed the sale of our whole remaining 5.25% stake in Heathrow Airport for EUR 466 million. Finally, some good news on the pipeline: a Ferrovial-led consortium has been shortlisted to bid for the I-24 Southeast Choice Lanes in Tennessee. Moving to our highways business division, Highways revenues rose 14.9% in the first half on a like-for-like basis, while Adjusted EBITDA was up 17.1%, driven by a strong performance from U.S. assets. Our U.S. highways grew revenue by 15.9% in the first half. Adjusted EBITDA rose 14%, in both cases on a like-for-like basis. U.S. highways accounted for 88% of total Highways revenues and 97% of total Adjusted EBITDA. Dividends from our North American highways came to EUR 240 million in the first half of the year, versus EUR 339 million in the same period last year, when we paid a larger first dividend at the I-77.
Ignacio Madridejos
executiveNow on the 407 ETR — that asset has performed really well, with EBITDA rising at a double-digit pace even with the Schedule 22 provision. Revenue was up 19.7% in the first half of the year versus the same period a year earlier. Toll revenue rose 19.3%, mainly on account of higher toll rates that took effect on January 1st, 2025. Fee revenue climbed 25.4% in the first half, driven by higher account fees stemming from greater traffic volumes, along with higher lease fees and enforcement fees. Traffic was up 5.8% in the second quarter, helped by more targeted rush hour driving offers that started in March, partly offset by bad weather and a construction delay. Activities in the alternative Highway 401. In Q2 we booked a provision of CAD 19.3 million for expected Schedule 22 payments, totaling CAD 45.2 million. CAD 1 million in the first half of the year. Even with operating expenses higher because of the Schedule 22 provision. The 407 managed to deliver double-digit EBITDA growth of 13% in the first half of the year. Promotions are performing well, and we'll keep refining demand segmentation, which we see as key to enhancing value for 407 users and maximizing EBITDA growth.
Ignacio Madridejos
executiveOn dividends, we paid CAD 200 million during the first half, and an additional CAD 250 million was approved for distribution in the third quarter. Together, that CAD 450 million is up 12.5% versus what was distributed in the same period a year earlier. Turning to U.S. Managed lanes, every asset has done very well in the first half of the year, and revenue per transaction keeps growing faster than both inflation and GDP. I want to point out that adverse weather events, mainly heavy rain, hurt the performance of these assets in the first half of 2025 relative to the same period last year. At NTE, traffic was affected by the capacity improvement construction works, falling 3.9% in the second quarter and 4.8% in the first half of the year. Revenue per transaction rose a healthy 13.5% in the first half, helped by favorable traffic mix and more mandatory Mode events. Adjusted EBITDA, which grew 6.3% in the first half, took a $2.7 million hit from revenue share. NTE distributed $108 million in dividends in the first half at 100%. LBJ grew transactions 1.3% in the first half despite increasing affection from construction activities in nearby corridors.
Ignacio Madridejos
executiveDuring the first half, revenue per transaction rose 8.8%, and Adjusted EBITDA was up 10.8%. The LBJ paid out $52 million in dividends. In the first half of 2025. NTE 35West stands as the sole project in Dallas unaffected by nearby construction activity, and it posted a solid 3.9% increase in transactions in the first half, with revenue climbing 13.5% and revenue per transaction improving 9.2% over that same period. Adjusted EBITDA, up 9.7% in the first half, took a hit from $9.9 million in revenue sharing. Dividends came to $99 million in the first half. Turning to the I-66, transactions rose a healthy 6.9% in the quarter and 5.5% in the first half, while revenue per transaction was up 20.1% in the second quarter and 22.5% in the first half. This strong growth came from expansion in the corridor, especially during peak hours, notwithstanding adverse weather. I-66 distributed $64 million in dividends at 100%. The I-77 lifted transactions 2.3% in the second quarter and 1.4% in the first half. That's despite adverse weather, and the favorable effect from alternative lane closures seen in earlier quarters has largely faded. Revenue per transaction rose 23.8% in the first half, and Adjusted EBITDA by 22%.
Ignacio Madridejos
executiveAdjusted EBITDA took a hit from $10.3 million of revenue sharing during the first half, including revenue sharing tied to extended vehicles. I-77 paid out $22 million in dividends at 100%. Now on to airports: our New Terminal One project at JFK Airport is still on schedule and on budget, and construction was 72% complete as of the close of the second quarter. 2025 is a pivotal year for NTO, with key project milestones, system integrations, and advanced negotiations underway with several airlines. We've locked in commitments from 21 airlines — 13 executed agreements plus eight letters of intent. This month NTO issued $1.4 billion in long-term green bonds, which completes the refinancing of phase A. We put EUR 244 million to work in the first half of the year, and an additional EUR 63 million will be injected next year. At Dalaman Airport in Turkey, traffic dipped slightly, by 0.3%, in the first half, weighed down by lower domestic passenger volumes. With international traffic matching 2024 levels, first half revenue rose 10.4% while Adjusted EBITDA climbed 10.9%, lifted by higher commercial income per passenger and partly offset by higher OpEx from inflation. Over in construction, revenues hit EUR 3,453 million in the first half, 2.6% above the same period last year.
Ignacio Madridejos
executiveIf you look at it on a like for like basis, Adjusted EBITDA came in at EUR 191 million, which is up 4.2%, and Adjusted EBIT totaled EUR 119 million, an increase of 11.2%. On that same like for like basis, the Adjusted EBIT margin stood at 3.5%, in line with our long term target. Budimex is still delivering a strong performance, with a 7.3% Adjusted EBIT margin. Webber held a stable margin of 2.7%, and Ferrovial Construction improved to 1.6%, up 50 basis points year-over-year. We closed the first half with an order book at a record high of EUR 17.3 billion, 45% of it in North America, along with EUR 2.7 billion in pre awards. Every project still waiting on a financial clause is not included in the second quarter. Our operating cash flow was negative EUR 104 million in the first half, versus negative EUR 53 million in the same period last year. That's mainly because of the absence of advance payments during the first half of the year. We're keeping our average long term Adjusted EBIT margin target of 3.5%. Now Ernesto will go on with the main financial information.
Ernesto Mozo
executiveThanks, Ignacio. Yes, in the operating part I'll be going through the various P&L lines. I'll also address other businesses within EBITDA. There's the effect of an energy from waste plant at Allerton in the U.K., which had unplanned downtime during the first half of 2025 because of leaks in the boiler system's superheater. Repairs have been completed and the plant is operating again. We've made provisions for this stoppage as well as for replacing the superheater tubes eventually down the road. On depreciation, what we reflect here is the increased traffic across all our operations that has followed the growth of these assets. On disposals and impairments, the impact comes mainly from the divestment of AGS, and there's also an effect from the divestment of mining services in Chile. On financial results, for the financial results from infrastructure projects in the first half, we see somewhat higher expense stemming from a lower net cash position at the project level. For the financial results from ex-infrastructure, you can see that in the second quarter there's growth versus the last quarter last year. The key component there is the ticking fee on the divestment of Heathrow, which is carried at fair value.
Ernesto Mozo
executiveHeathrow’s sale went through at the start of July, yet that ticking fee shows up because it’s carried at fair value in the first-half accounts. If you look at the first half overall in terms of financial results for infrastructure projects, you’ll notice a somewhat reduced return on the cash we hold. That ties to things such as the shareholder loans extended to AGS that aren’t in place. It’s a return on cash held in deposits. Turning to equity accounted affiliates, 407 has increased its results right through to the bottom line. If you’re seeing a modest decline, that’s due to certain other projects being phased out. One example would be the maintenance and operation of the M-30 in Madrid. The key piece is that 407 continues growing through to the bottom line. Beneath that, income tax expense comes in lower than last year. Here, essentially a portion of the results isn’t subject to taxes, such as capital gains on disposals. We have net profit from continuing operations, with added income beneath that from discontinued operations. That relates to earnouts from the services business that was divested.
Ernesto Mozo
executiveThere are still some earnouts that we continue to deal with. Moving to the next slide to look at the net cash position, as Ignacio introduced, we can see solid performance from dividends coming out of project construction. Operating cash flow has been significantly impacted, as Ignacio mentioned, by the absence of advance payments. Working capital likewise carries a seasonality that all of you are familiar with. On other activities, we also see some cash consumption related to tax payments. That is essentially tied to Budimex. We have been investing for growth. This shows up in the cash flow used in investing activities. The largest item here is the purchase of 5.06% in the 407 ETR and, naturally, the investments in NTO. For the rest of this year, NTO has no further capital investment. Some will come in 2026, but not in what remains of this year. We have interest received on our cash and divestments, with AGS being the main one here. Naturally, we have shareholder distributions split between cash and share buybacks. We have the impact on financing activities from paying down debt interest and the effect of FX translation on cash on hand. At the bottom, we also show hedging positions in Canadian and U.S.
Ernesto Mozo
executivein dollars, not pounds sterling. That will show up once you look at the third quarter results, with the sale of the remaining stake and Heathrow at 5.25%. These hedges that we have here. For dividends and investment, those aren't included in the P&L and aren't part of the net cash position we present here. I mean, for your perusal, we show the mark to market they had at the end of the quarter. Okay. After reviewing the net cash position, I'll hand over to Ignacio for the closing remarks.
Ignacio Madridejos
executiveThanks, Ernesto. To sum up, we turned in a strong performance during the second quarter and the first half of 2025, backed by healthy revenue and profitability growth from our North American assets. That growth comes from increased customer segmentation as well as continued underlying growth in the local economies where those assets sit. Going forward, we still see an attractive pipeline of U.S. highways assets, with bids and medals for the I-24 in Nashville and the I-285 East in Atlanta, both expected in first half of 2026. The makeup of our construction order book remains healthy, and we anticipate limited exposure to inflation. We keep delivering on our Strategic Horizon plan. We'll keep updating you on the progress. We will move to the Q&A session and answer any questions that you may have. Thank you. You.
Silvia Ruiz
executiveThanks, Ignacio and Ernesto. Let’s begin with the Q&A. Operator, please go ahead.
Operator
operatorLadies and gentlemen, the Q&A portion starts now. To pose a question, hit star five on your phone's keypad. Should you decide against it, just hit star five once more. Before you proceed with your question, kindly make sure your device is unmuted locally. Luis Prieto of Kepler Cheuvreux has our first question. Go ahead, please.
Luis Prieto
analystGood afternoon, and thank you very much for taking our questions today. I have a couple, if I may, and apologies, because I know you addressed this to some degree last quarter, but I was hoping you could shed a little more light and walk through the moving parts behind the very strong growth in average revenue per transaction on both the I-77 and the I-66. My second question is along the same lines: I'm still fairly surprised by the 13% increase in average tariff, or average revenue per transaction, on the NTE despite the 4% decline in traffic. If you could give us a bit more insight into why there are more mandatory events in a declining traffic environment, that would be very helpful. Thank you.
Ignacio Madridejos
executiveThank you. Thanks, Luis, for those questions. Yes, I'll begin with the I-77. I-66 is relevant as well, and it's also part of 820. I believe a portion of that growth comes from what we're seeing in the metro area where our assets are located — economic activity and population growth — and also from our ability to capture the value we deliver to users in terms of traffic savings, reliability, convenience, or safety. In this particular case, though, after I-77 and I-66, as you know, here we don't have a soft cap, so we're able to raise toll rates based on what we believe is the value we provide to customers. Most of the increase stems from higher toll revenues and also from dynamic price adjustments. Depending on behavior and the value we observe with customers every minute, we adjust the tariff accordingly, and through that we've managed to capture the value that we give to users. With the NTE, the difference is that we do have a soft cap. Here the increase also comes from mandatory modes, and what we've observed is heavy traffic, particularly at peaks.
Ignacio Madridejos
executiveAnd beyond that, what we've observed is a combination of peak hours plus heavier traffic, which has managed to lift revenue per transaction at the NTE. On top of that, as you're aware, each year the Dallas managed lanes see an increase tied to inflation along with some modestly dynamic pricing. My sense is that across the years we've gotten better at adjusting that. At the NTE, the primary impact has come from the traffic mix — particularly heavy vehicles and peak hours.
Luis Prieto
analystThat's very clear — thanks.
Operator
operatorRuairi Cullinane from RBC Capital Markets has our next question. Your line is open now. Go ahead, please.
Ruairi Cullinane
analystGood afternoon. My first question concerns earnings from Ferrovial Construction. They increased during H1, yet fell year-over-year in Q2. Was that purely because certain contracts reached their end, or did other factors play a part? Could you offer some commentary on the tax rate? Several of the elements behind that low tax rate appear quite sustainable. Thank you.
Ignacio Madridejos
executiveThanks, and good afternoon. Appreciate the question. I'll take the first part on the federal cost reduction, and Ernesto will speak to the tax effect in the first half of the year. On construction, we've achieved a 3.5% EBIT margin. That's the figure we communicated. It's the long-term average target for this business division. This 3.5% is higher than where it stood in the first half of the prior year. It's fair to say that for Ferrovial Construction, the margin in Q2 of this year came in below the prior year level. The main driver ties to some added cost around utilization and IT systems. Bidding as well. We're seeing bidding cost rise at Ferrovial Construction, which sits in overheads, and that's something we'll also see in the quarters ahead. Because our pipeline is very good, but it's also expensive when it comes to bidding costs and tendering for these projects. Ernesto, over to you.
Ernesto Mozo
executiveYes, thank you. On the tax side, I said earlier that essentially none of the capital gains get taxed. That had a real effect on how the numbers came out in the first half of this year and in this quarter. What's important to grasp is that the underlying average is probably about 20%. You can find more detail on that in the financial information we've filed. There's an order in there where you can see it's closer to 20%. Turning to cash, what you should expect if we continue investing in the U.S. is that the U.S., across all these large infrastructure projects, permits accelerated depreciation, and that creates a delay in those tax outflows. That essentially applies throughout our group. I mean, just keep in mind that roughly 20%, as we state in the note, would be the average from an accrual standpoint.
Ruairi Cullinane
analystMuch appreciated.
Operator
operatorThe next person in the queue is Graham Hunt with Jefferies. Your line is live now, so please proceed.
Graham Hunt
analystThanks a lot for those questions. I have just two, please. First, regarding the upstream dividends, they appear to be running ahead of what at least we had anticipated. You mentioned that they should typically track dividends up to shareholders. I was wondering whether we might see any sort of increase to your shareholder returns policy or expectations going forward as those assets outperform. My second question is just on U.S. policy. I wanted to ask if you had any comment on both the expansion of the TIFIA framework by the DOT, which I believe is helpful for your projects, and also to some extent what we've been hearing about some of the environmental headcount being stripped back in the administration, whether that has any impact on NEPA approvals and whether that has any flow-through impact to your projects. I'd just be interested to hear your perspective on those administration points. Thank you. Thank you. Graham, on these questions. I think the dividends coming from our infra projects are tied to the performance of the asset, as you have seen, as they are improving versus the previous year. That is why we are seeing more dividends, with the exception of the jumbo.
Graham Hunt
analystI mean, the dividend we got from I-77 came after five years — that was the first one. As for the remaining assets, the dividends flowing from those projects will depend mainly on how they perform over the coming months, and so far that has been positive and rising when it comes to shareholder distribution. As you know, we gave guidance a couple of years back, which we raised recently in February, and we mentioned EUR 2.2 billion of dividends for the period 2024 and 2026, and that is what we are aiming for at the end of next year.
Ignacio Madridejos
executiveOn the TIFIA expansion front, I'd call that quite encouraging news. The CapEx label is going from 33% to 49%, so that's an improvement for the big projects we're handling. We view that as a very favorable development for the upcoming projects in our pipeline. Regarding environmental matters, I'd say we haven't observed any effect as of yet, but we regard it as a more favorable possibility that could materialize over the coming months—particularly in terms of streamlining some of the environmental permits our large projects require. That's something also occurring with digital infra, though we anticipate it will spread to other infra projects, and through that we'll cut down project timelines as well as the associated cost. We look at that as a positive step. Up to now, we haven't encountered delays stemming from staffing shortages at the environmental agencies.
Graham Hunt
analystMuch appreciated. Thanks.
Operator
operatorThe following question is from Dario Maglione of BNP Paribas. You have the floor.
Dario Maglione
analystHello, I’ve got a couple of questions. First, specifically about the I-77 in Q2: revenue growth was impressive at 28%. Year on year, it accelerated versus Q1, and that’s even though Q1 got a boost from alternative roads closing. Could you perhaps explain what caused such a large increase, and whether there’s a one-off in there or whether this is sustainable performance? My second question is broader: if you could just talk about the traffic and revenue trends on your U.S. managed lanes in July. Thank you.
Ignacio Madridejos
executiveThanks. Dario. Yeah. Regarding the I-77, as you observed, revenue per transaction increased in this second quarter compared with — sorry, transaction count and traffic both rose in the second quarter compared with the first quarter. It was a limited number. Most of that 28% revenue growth you are mentioning comes from toll revenue, from the higher toll rates on the I-77. What we have seen is a lot of additional mobility value for the I-77. Because of that, we have seen revenue per transaction rise, and that is translating into growing revenues. Not for the I-77. Still, when you look at the toll rates of I-77, they are much lower than other assets that we have in our portfolio, and we do not give guidance about revenue per transaction. Sorry. About traffic or revenue for the month of July. We cannot disclose any figure about that. You have to wait until we have the results of the third quarter to get some information about what is going on in the traffic.
Dario Maglione
analystAlright, thanks a lot.
Operator
operatorElodie Rall from JPMorgan has our next question. The line is yours.
Elodie Rall
analystGood afternoon, and thanks for taking my questions. My first one concerns the Schedule 22. Even though revenues came in higher, the provision in Q2 was lower than in Q1. So we're wondering how we should think about that for the full year, and what made Q2 come in below Q1. My second question is about the pipeline for U.S. managed lanes projects. I believe you said there are six ongoing. So I was wondering whether you could give us a bit of an update on how the competitive environment is shaping up and how you see the prospects for you. My last question is about the progress regarding liquidity on the U.S. line, and whether you think inclusion in the Nasdaq 100 this year is likely. Thank you very much.
Ignacio Madridejos
executiveThank you, Elodie. I'll handle the first question, and Ernesto will take the last one. Regarding the Schedule 22 provision, as you're aware, in the first quarter we recorded a provision using the best data available to us at that moment, but that covered only the month of March. Typically, that provision is calculated for Schedule 22 peak-hour days across the full year. At this point we have additional information, since three more months have passed. As a result, we've lowered it. During the quarter, the provision was set based on the expectations we hold, and it will be for year-end, tied to the revenues we anticipate. I'd say this reflects improved information. The reaction is also occurring because promotions are performing well over the three months we had in the second quarter. We're observing a favorable impact from attracting new users at peak time as well. The 407, and because of that, Schedule 22 payments are being reduced. These figures still need confirmation in the quarters ahead, but as more information comes in, we'll monitor how things develop. On the pipeline side, as you know, it's quite encouraging that, as you pointed out, we have six managed lanes in the coming years.
Ignacio Madridejos
executiveThere are two that we're developing during the first half of next year — I-285 East and also I-24 — and for those we've officially been prequalified, and we're bidding next year as well. Our competitor count is comparable to what we've seen historically, though I'm certain they'll be pursuing those assets, which in our experience have proven extremely successful and delivered strong value. We anticipate competition similar to what we've faced before. As I mentioned, it will be costly, since we'll incur additional bidding expenses to tender for these projects. If we're able to win these projects, I believe there could be substantial value for the company. Ernesto will now go on with liquidity.
Ernesto Mozo
executiveOkay, thanks, Ignacio. Elodie, as you're aware, Nasdaq has various criteria, and one of those involves average daily liquidity over the three months leading up to the November rebalancing. Yes, at present we're above the required liquidity level and intend to continue improving on that. Inclusion hinges on relative performance. Additionally, companies currently in the Nasdaq 100 index can fall as far as the 125th position and still stay in the index. Right. It will depend on relative performance. I mean, we're monitoring that, but I can't say anything further. Just one final point. Regarding how the Schedule 22 accrues, please keep in mind that you need to add the provision for the entire half against the revenues for the entire half. Right. It's lower, yes, in the quarter, but I mean, don't take the Schedule 22 percentage in the quarter against the quarter's revenues. You have to factor in the whole half.
Elodie Rall
analystAlright, thank you very much.
Operator
operatorÁlvaro Llorente with Alantra Equities has our next question. The line is yours.
Alvaro Llorente
executiveHello, and thank you for the question. I'd like to follow up regarding Schedule 22. As you work through the recalculation of the estimate, what exactly is behind the drop in the total expected payment for the year? Is it that you now expect traffic to be more spread out, or better distributed among segments and hours? Is it due to your seeing higher revenues overall from mix? Or is it because you're seeing higher volumes overall across the board, which lowers the Schedule 22 payments? I'm just trying to get a sense of what the primary factor is behind that downward revision in Q2.
Ignacio Madridejos
executiveThank you. Thanks for the question. No, I think, as you're aware, the way Schedule 22 operates is that we have specific hours of the day, morning and afternoon, in certain sectors where we need to hit certain traffic thresholds. What we're doing is calculating, across different sectors at this point in time, how near we are to those thresholds. On that basis, plus estimates for the days of the months we have so far — we've been through June, but in the next three months we have another three quarter. We have another three months during which we can make that calculation. On that basis, and taking into account prior years — which days of the year were the ones we calculated — Schedule 22 helps give us a sense of how close we'll be and how much we'll need to pay. It isn't a simple calculation, because you have to estimate how those days will play out in the coming quarters. Compared with the performance of the previous. Year and the number we have of what was potentially scheduled for payment last year, we can estimate how much it will be by the end of the year.
Ignacio Madridejos
executiveHere's what we can report: during those particular hours that feed into the Schedule 22 calculation, peak-period traffic is outperforming the expectations we formed using the information available from March. Part of the reason — mainly — is that the promotions are performing well, and we're drawing more users into those specific segments and those particular times of day that matter for Schedule 22. That's how we do the calculation. Naturally, it's an estimate. It could also shift in the third quarter of the year. Naturally, as more and more information comes in, it gets closer to the final figure that will stand at year-end. It rests on the information we have from the prior year and on how this year is tracking against that prior one. It isn't a simple calculation.
Alvaro Llorente
executiveAll right, thank you. Got it.
Operator
operatorThe following question is from Marcin Wojtal of Bank of America. You have the floor.
Marcin Wojtal
analystYes, thank you so much for the presentation. My first question concerns the ETR 407. I believe at the start of June, the Province of Ontario eliminated tolls on the road known as 407 East, which is basically an extension and a road adjacent to it. Have you observed any benefit when it comes to traffic on the asset you operate? Do you anticipate any benefit going forward? Or is that overall very marginal? My second question: do you have any additional thoughts regarding a potential switch to full U.S. GAAP reporting, and would that be helpful when it comes to your U.S. listing and potentially index membership? Thank you.
Ignacio Madridejos
executiveThanks, Marcin. I'll handle the first question, and Ernesto will take the second. Yes, as you mentioned, the tolls on the 407 extension were removed at the start of June. It's still too soon to tell how that might bring additional traffic to the 407. Previously, when tolls were removed on other toll roads nearer to the 407, we observed a favorable trend, but at this point it's too early to predict how things will develop this time around.
Ernesto Mozo
executiveYes, thank you, Marcin. On the subject of U.S. GAAP, the U.S. investors we are currently meeting with aren't really enthusiastic about it. It's true that, at some point, inclusion in most U.S. indices requires reporting under U.S. GAAP. At present, we are simply examining the implications and how that might be automated down the road, but we have no near-term plan to make that change.
Marcin Wojtal
analystAlright, thanks a lot.
Operator
operatorThe next person to ask something is Harishankar Ramamoorthy of Deutsche Bank. You have the floor.
Harishankar Ramamoorthy
analystYeah. Appreciate you taking the questions. I've got a few of my own on 407 ETR — it really does seem like the promotions are doing a good job of boosting traffic growth. Do you think things have tipped too far toward driving volumes rather than keeping pricing high? Or to put it another way, should we expect fewer promotions over the next few quarters, or would you still rather have volume growth than pricing? And maybe off on a tangent, does this response to promotions also suggest that demand isn't as inelastic as we assume? Does that concern you? Perhaps one last one on Budimex — order inflows look pretty weak this half. I understand these can be lumpy, but is there anything other than timing behind the inflows here. Thanks.
Ignacio Madridejos
executiveThanks. Regarding promotions — no, first, let me address the question of what strategy we're pursuing. Our goal is to keep service for regular users of the 407 at the same level, in terms of the value we provide them: speed, reliability, safety, and so forth. We want to ensure we sustain that. We also want the 407 to help relieve congestion, ease traffic in the area, lower Schedule 22 payments through that, and at the same time maximize revenues and EBITDA — and promotions, as you mentioned, are performing very well. I'd say it's still very early days for what we're doing, but the response has been quite positive, and we can see in the results that both revenue and EBITDA are rising. What we're trying to accomplish with the promotions, at least initially, is to attract users who have never used the 407 before, in these particular segments at this particular time of day. It doesn't affect regular users, since it doesn't affect the level of service, but we are reducing congestion in the area by bringing in some users that.
Ignacio Madridejos
executiveWe would never do that at any particular moment. Within those particular segments. It's performing really well. We're at a very early stage. Regarding promotions and segmentation, we're gathering a great deal of data — a lot. Of information from our users, and this could change down the road in order to hit the goals I laid out at the start. On elasticity, here's what I can say. For regular and historical users, it's. Very much like it was previously. Elasticity is very low, with no real shift versus what we observed in. Earlier increases over the course of last year. We feel comfortable with where we stand today, and what we're seeing with promotions is not just that they work — it's also creating new opportunities going forward for further cementation. As I said earlier and in the. Case of the question regarding Budimex, what we're seeing is yes, we saw a reduced number of hours during this first half of the year. A slight reduction in the total order book. Since the start of the year, but I mean in the quarters that follow we're optimistic about Poland broadly, with the European funds, investment in infrastructure and energy, particularly data centers as well, and also further out perhaps Ukraine reconstruction.
Ignacio Madridejos
executiveOur view on Poland is upbeat, and we see opportunities there. It's accurate, nonetheless, that awards in the first half of the year came in below the first half of last year, and that the order book has come down relative to where it stood at the start of the year. We remain optimistic about Poland going forward.
Harishankar Ramamoorthy
analystThat's very clear. Thank you.
Operator
operatorLadies and gentlemen, a quick reminder: to ask a question, just press star five on your telephone keypad. We now have our next question from José Manuel Arroyas at Santander. Please go ahead.
José Arroyas
analystThank you. I have three questions, please. The first one concerns NTO. I’d like confirmation that the project is still on schedule and within budget. On schedule, meaning it opens in June 2026. My second question is a clarification regarding the dividend from the energy segment. I believe EUR 54 billion in dividends were paid. A year ago, there were nil. Could you explain where those dividends came from and whether they might recur? Lastly, regarding NTE 35W, I noticed a bond issuance of about $400 million was raised in June. I’d like to understand whether this bond may be used for general corporate purposes, including dividend payments, or whether it is solely a refinancing exercise. Thank you.
Ignacio Madridejos
executiveThank you, Jose Manuel. I’ll handle the first question, and then Ernesto will take the remaining two. Regarding NTO, as we mentioned in our presentation, the project is on budget and on schedule. That said, as we always point out, the final year is the hardest for a project such as the New Terminal One, and that is where we have a great deal of system integration, more resources working simultaneously, and coordination across different groups of people. I believe we are where we wanted to be when we launched this project. In any case, the last year is the most challenging. Even so, until we open and do not close it, we will never say that we are finally on budget and on the schedule. I think so far we are in a good position.
Ernesto Mozo
executiveRegarding that $54 million dividend from energy — we closed project finance on one of the projects, and the equity we had invested came back. Right. That's a return of capital. As for the NTE 35W refinancing, essentially the TIFIA loan has been refinanced. What this refinancing gives you is extended maturities. TIFIA will carry an accelerated repayment schedule, and you stretch out how long the financing runs.
Operator
operatorThe final question is from Christian Nedelcu with UBS. Christian, you have the floor.
Cristian Nedelcu
analystHi, and thanks so much for taking my questions. First, on ETR, could you discuss which factors get taken into account when the dividend is set? I believe the ETR debt service coverage ratio has been declining, and many years ago ETR paid out roughly 100% of its EBITDA in dividends, versus about 75% last year. I'm trying to understand what is preventing ETR from reaching that kind of dividend distribution. Second, coming back to the Schedule 22 provisions, if I understand correctly that traffic at the peak of the peak appears to be about 2% under the threshold in Q2, I'm just trying to understand — can you help us with how much this threshold rises each year? I know you have a range, but is it fair to say it's more like a 1% increase in the threshold every year? I'm just trying to think how many years you may need until you go above that threshold. The last one, if you'll allow me, on the U.S. managed lanes, on the dividends for I-66 and I-77, if I take a step back and look at the I-66 and I-77 capital structure, the equity represents around 35%-45%.
Cristian Nedelcu
analystSo is there anything that would prevent the capital structure from shifting, over the medium term, nearer to what we observe in the Dallas-Fort Worth lanes, where the split is 20% equity and 80% debt? Could you expand a bit on whether any constraints stand in the way of that during the midterm? Thank you.
Ernesto Mozo
executiveAlright, and thanks for all those questions. So on the 407 headroom when it comes to coverage — that's actually something the rating agency reports have pointed out. They anticipate that a portion of that headroom might get used. It's just the normal way business and conversations around this tend to go. There could be some headroom with I-66 as well down the road. Yes, some room exists there. Both of the assets you brought up do have space for additional rigorians toward a capital structure that aligns more closely with others. As for I-77, there's likely a bit less margin in terms of restructuring the capital there. I'd put more emphasis on what's available with 407 and I-66.
Ignacio Madridejos
executiveNow, on Schedule 22 — the question you raised concerns how this is actually calculated, and that isn't clear. The 2% figure, when it sits below the peak of the peak, isn't worked out that way, since it varies across the different segments; some of those are hitting traffic above the threshold while others are not. The time of day matters as well. In my view, it's a good deal more complicated than that. From a calculation standpoint, it isn't that simple. You can do the math, you might come up with some estimates, and in later years you'll have the information we're providing, but arriving at it in that particular fashion — the way those thresholds shift — is neither easy nor straightforward. Every one of them differs depending on the segments and the traffic. They may rise annually by somewhere between 0% and 3%, though it hinges on where the other segment sits, and they keep climbing until the final configuration is reached. Each carries a certain traffic level — the one required to deliver the service level we've committed to giving our users. That's how it evolves. I recognize that Schedule 22 isn't all that easy for everyone to calculate.
Ignacio Madridejos
executiveHonestly, even for us this is really complex, since there are many estimates we have to make and additional information keeps coming in. I believe the provision we're sharing with you, along with the figures you're receiving, is good enough. This reflects the best understanding we currently have of what might come. That final payment at year-end.
Cristian Nedelcu
analystI appreciate it.
Operator
operatorThat brings us to the end of the questions from the conference call. I'll now return the line to Silvia Ruiz in case there are any questions coming in from the webcast. Thank you.
Silvia Ruiz
executiveThanks. We've got a couple of questions from Amigala at Citi. For the first one, could you speak to how pricing and traffic have been trending lately in the U.S. Managed lanes business, and whether the Texas floods have caused any disruption? The second one is about Budimex and Webber. Could you say whether anything is affecting how the order book is phased, and give any color on what will likely be delivered over the longer term past 2026.
Ignacio Madridejos
executiveWhen it comes to traffic on the U.S. managed lanes, across the five of them what we observed is that the cities' underlying economic growth, along with population and economic activity, has been quite positive. That was also true at I-35West, and it's showing up without construction effects. How is the remaining Dallas-Fort Worth 30 doing? We also saw growth at I-66 and I-77, despite negative weather effects at all of them. The second quarter brought a lot of rain across the entire U.S., and particularly in these locations. In Texas there's flooding. Sadly, some people have passed away. Those were very sad incidents that occurred throughout Texas, and we're fortunate that none of our assets were affected. We had some disruptions from weather at certain times during that quarter, which also took place in Charlotte and in Virginia as well. That wasn't a negative in traffic terms — it was positive, thanks to economic activity. The only two where traffic is lower, NTE and LBJ, are both entirely tied to construction. One is the capacity improvement work we're carrying out, and likely because of such heavy traffic, some people are seeking other alternatives and using different corridors.
Ignacio Madridejos
executiveWhen it comes to the LBJ, the reason for this construction is a configuration change at nearby construction works. The LBJ is the I-35 East case, and also the 35 East. Both of those are affecting traffic on the LBJ. What we've observed this last quarter is that they altered the configuration, with a bigger traffic impact than we saw previously. Broadly speaking, the underlying trends across all our assets in terms of economic activity are positive. As a result, pricing is moving the revenue per transaction, and pricing is heading in the right direction, capturing value for users. I believe all of the assets are doing very well when it comes to revenue per transaction. For some of the assets, 35 West and NTE have commented they are capturing from mandatory modes. With the I-66 and I-77, we have complete freedom to set tariffs, toll rates. Thanks to that, we're able to capture most of the value we provide to users. Things are moving in the right direction regarding the order book and how we see that at Budimex and Webber. I spoke earlier about Budimex, which is temporary, as the first half of the year.
Ignacio Madridejos
executiveLooking ahead, I view Poland's prospects as shaping up favorably overall. My hope is that we'll witness a beneficial impact, a constructive one, over the coming years. With respect to Webber, we have the book on record, and I believe it's quite strong. Broadly speaking, what lies ahead past 2025 or 2026, I'd characterize as positives outweighing negatives. There's a really solid pipeline of managed lanes to be won, and a number of those are quite sizable projects. As you're aware, we undertake these alongside Ferrovial Construction, and Webber is also lending support on certain of these bigger efforts. What we must wait to learn next year concerns the surface transportation reauthorization bill — specifically how much funding support it will provide for infrastructure broadly across the U.S. — though it's too soon to predict what next year will bring or what impact it will carry. Regarding our internal pipeline of concession projects, I'd say we're quite bullish on the U.S., and should we manage to secure wins there for Webber as well as for other parts of Ferrovial Construction in the U.S., we'd regard that as a favorable development.
Silvia Ruiz
executiveAll right, thanks. That’s all the questions we have.
Ignacio Madridejos
executiveThanks a lot, everyone, for being on our conference call today. To those of you heading off on vacation, enjoy a great summer and a happy holiday, and we'll talk again next quarter. Many thanks. Bye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ferrovial SE transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ferrovial SE earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial SE or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.