Ferrovial N.V. (FER) Earnings Call Transcript & Summary

May 8, 2026

Bolsa de Madrid ES Industrials Construction and Engineering earnings 52 min

What were the key takeaways from Ferrovial N.V.'s May 8, 2026 earnings call?

In the first quarter of 2026, Ferrovial N.V. reported a solid performance with revenue growth of 10.2% year-over-year, reaching EUR 1.2 billion in net cash. Adjusted EBITDA increased by 15%, driven by strong growth in North American highways and the 407 ETR asset. Management maintained a positive outlook, with a CAD 500 million dividend approved for the second quarter, indicating confidence in cash flow generation despite ongoing construction challenges.

What topics did Ferrovial N.V. cover?

  • Revenue Growth: Ferrovial achieved a revenue increase of 10.2% year-over-year, supported by strong performance in North American highways and the 407 ETR. Management stated, "the first quarter was a solid start to the year with strong growth across our core businesses."
  • Adjusted EBITDA Performance: Adjusted EBITDA rose by 15% year-over-year, reflecting effective cost management and revenue growth strategies. The CFO noted, "EBITDA increased by 25.4% versus the first quarter of 2025" for the 407 ETR, highlighting its strong contribution.
  • Traffic Performance: Traffic on the 407 ETR increased by 8.2%, driven by targeted promotions and higher mobility. However, adverse winter weather partially offset these gains, as noted in the call, "this was partially offset by unfavorable winter weather."
  • Dividend Announcement: The Board approved a CAD 500 million dividend to be paid in Q2 2026, signaling strong cash flow confidence. Management emphasized, "the 407 had a higher dividend, both related to performance and better financing."
  • Construction Margins Stability: Construction margins remained stable year-on-year despite higher bidding and IT costs. The CFO stated, "margins remained stable year-on-year, while there were higher bidding and IT costs aimed at supporting future growth."

What were Ferrovial N.V.'s May 8, 2026 results?

  • Revenue: EUR 1.2B (vs EUR 1.09B est, +10.2% YoY)
  • Adjusted EBITDA: EUR 144M (vs EUR 125M est, +15% YoY)
  • Net Debt: EUR 1.2B (net cash) (vs EUR 1.0B est, improved position)
  • Traffic Growth (407 ETR): 8.2% (vs 5% est, driven by promotions)
  • Dividend: CAD 500M (approved for Q2 2026)
  • Construction Order Book: EUR 17.6B (up 0.5% like-for-like)

Ferrovial's strong Q1 performance, highlighted by revenue and EBITDA growth, supports a positive investment thesis. The approved dividend and robust order book are key catalysts, while rising fuel prices and construction delays pose risks to monitor going forward.

Earnings Call Speaker Segments

Silvia Ruiz

executive
#1

Good morning, or good afternoon to all of you. Silvia Ruiz here, and I want to thank you for joining us and welcome you to the Ferrovial conference call, where we'll be discussing the company's operating results for the first quarter of 2026. Our CFO, Ernesto López Mozo, is with me today. As a quick reminder, the results report and the presentation were both posted on our website yesterday evening, after the US market had closed. On a separate note, we'd like to point out that the company's 2026 investor presentation and fact book should be up on the company's website soon after this conference call wraps up. At the close of today's presentation, we'll hold a Q&A session. You'll be able to ask questions live. To do that, you'll need to be connected via the conference call channel and press *5 on your phone keypad. Alternatively, you can submit questions through the forum included in the webcast, and I'll read them aloud at the end of the Q&A session. Before we begin, please take a moment to review the safe harbor statement included in the presentation, and please keep in mind that the presentation contains forward-looking statements and expectations that are subject to certain risks and uncertainties, so actual figures may differ.

Silvia Ruiz

executive
#2

On today's call, we'll go over some non-IFRS financial measures. You can find those defined and reconciled to the most comparable IFRS measures in our results report as well as on our website. With that said, I'll turn things over to Ernesto. Ernesto, over to you.

Ernesto López-Mozo

executive
#3

Thanks, Silvia, and good morning or good afternoon to everybody. We appreciate your time today as we walk through Ferrovial's first-quarter 2026 results. All told, Q1 represented a solid beginning to the year, with robust expansion across our core operations, most notably in North American Highways. We also saw ongoing advancement on the New Terminal One at JFK, construction margins that held steady even with elevated upfront bidding and IT spending aimed at underpinning future growth, and on the financial side, net debt excluding infrastructure projects came in as negative net debt, meaning net cash, of €1.2 billion. Construction operating cash flow of €144 million stood as the main inflow. Conversely, the largest outflow was treasury share purchases, which came to €162 million. Consolidated revenue rose 10.2% like-for-like, adjusted EBITDA was up 15%, likewise like-for-like, and adjusted EBIT climbed 10.6%, again like-for-like. Turning next to 407 ETR, this asset turned in another robust quarter. Traffic rose 8.2% during the first quarter of 2026, supported by sustained uptake of targeted driving offers and by greater mobility and rush-hour commuting as a larger share of employees worked on-site.

Ernesto López-Mozo

executive
#4

Unfavorable winter weather partly offset that. Revenue rose 20%, and toll revenues were up 22.1% for the quarter, which reflects both higher toll rates in effect since January 1, 2026 and greater traffic volumes. Consequently, EBITDA went up 25.4% compared with the first quarter of 2025, and that includes a Schedule 22 provision of 8.1 million Canadian dollars, much lower than the figure we booked in Q1 last year. Conversely, operating costs came in higher, pushed by greater customer operations, plus increased highway operations tied to worse weather that demanded more winter maintenance, along with higher system operations that rose as more segmented promotions were implemented. When you look at monthly traffic performance against 2025, as the graph shows, keep in mind that traffic performance in the first quarter of 2026 reflects three months of targeted promotions, whereas in the first quarter of 2025 promotions began in March on a broad basis. That was just one month, and it affects how comparable the traffic numbers are. I'd also point out that the demand segmentation strategy keeps performing very well. It helps us balance pricing, traffic distribution, and service levels while maximizing EBITDA, which remains the key financial performance metric for the asset.

Ernesto López-Mozo

executive
#5

This more segmented approach could skew how we compare traffic moving forward, since last year's promotions were spread broadly across the board. On dividend distribution, we didn't pay any dividends in the first quarter, though the board did approve a dividend of 500 million Canadian dollars, payable in the second quarter of 2026. Now let's turn to Dallas-Fort Worth, where the managed lanes delivered double-digit growth in revenue per transaction, well ahead of US inflation. That came even with the negative traffic effect from bad weather, especially in January, including a higher number of managed lanes closures than we saw in the first quarter of 2025. Let's go through each of the assets. At NTE, traffic fell 3.6%, which reflects the impact of capacity improvement construction works and adverse weather, particularly in January. Those works should wrap up by year-end, with the exception of two additional ramps where construction started last year. Even with lower traffic, revenue rose 13.1% in the first quarter, and adjusted EBITDA climbed 11.2%, including accrual of $2.4 million of revenue share during the quarter. Turning to LBJ, traffic dropped 1.5% because of construction works in adjacent corridors and weather impacts. Revenue grew 9.8%, and adjusted EBITDA was up 8.9%. At NTE 35W, traffic rose 1%, and that too despite adverse weather and congestion at certain entry and exit points, along with the finalization of capacity restrictions tied to construction works on the competing nearby Road 121.

Ernesto López-Mozo

executive
#6

Revenue rose 18.3%, adjusted EBITDA was up 18.1%, and that figure includes $7.5 million of revenue share accrued during the quarter. When we look at revenue per transaction, every asset posted gains well ahead of inflation. NTE revenue per transaction climbed 18.3%, LBJ rose 11.5%, and NTE 35W was up 17.3%. Several factors drove this: a favorable traffic mix, with heavier heavy-traffic volumes, thanks largely to technology enhancements in camera recognition rolled out across 2025 and 2026. Along with that improved vehicle classification and a higher overall count of commercial and heavy vehicles, we also saw more mandatory mode events at NTE and NTE 35W. Let's move now to I-66 and I-77, our managed lanes in Virginia and North Carolina. At I-66, we had a very solid quarter. Traffic was up 8.3% versus the first quarter of last year, demonstrating strong resilience despite adverse weather. Growth in mobility along the corridor supported this, as did our ability to capture value through dynamic pricing. Revenue per transaction grew close to 5% — 4.9% — in the quarter, and total revenue for the quarter grew 13.6% versus last year. Adjusted EBITDA rose 16.1% in the quarter. At I-77, traffic fell 5.6% versus last year, mainly because of adverse weather, along with the exceptional performance in the first quarter of last year.

Ernesto López-Mozo

executive
#7

Keep in mind as well that at that time, some other roads were still partly shut because of hurricane-related incidents. Even with that drop in traffic, revenue for each transaction rose 14.2%, which reflects toll rates being higher. Adjusted EBITDA fell 11.9% versus the first quarter of last year. The step-up in the revenue share band, from 25% to 55% revenue share, had a negative effect on this. That is mostly a first-year effect, and it should normalize as revenues keep growing inside the new share band. First quarter 2026 adjusted EBITDA included the accrual of $8 million of revenue share. Turning to airports, beginning with the New Terminal One at JFK, the project is still moving through a crucial year for construction and integration. On schedule, as we explained in the full-year 2025 earnings, the contractor has communicated an updated target under which the completion date for the first phase falls in the fall of 2026. In the first quarter of 2026, the first operational readiness and airport transfer trials got underway during the quarter, and the project reached 87% construction progress. Airline engagement continues against a challenging backdrop. We have secured commitments with 30 airlines, including 21 executed agreements and 9 letters of intent. As of March 2026, total equity invested stands at €978 million, and we have €64 million pending that are expected to be injected in 2026.

Ernesto López-Mozo

executive
#8

Dalaman’s first quarter is, as usual, the off-peak period. Domestic traffic helped results, rising 9.8%, whereas international volumes were hit by geopolitical difficulties in the Middle East. Across the full year, the airport is still mainly international, with the peak season getting underway in late March, and it is likely to feel the effects of instability in the Middle East. Turning to construction, margins held steady compared with a year earlier. Although bidding and IT costs came in higher as we invest in future growth, as discussed in earlier quarters with respect to operations across the different geographies, Budimex kept margins stable at 6.5% EBIT even with lower volumes caused by bad weather. Webber posted improved margins, helped by greater production and operating leverage. Margins at Ferrovial Construction dipped slightly because of higher investment costs tied to bidding and IT, while revenues were flat. Our order book stayed at a record €17.6 billion, an increase of 0.5% like-for-like against December, excluding roughly €1.3 billion of extra projects that are not yet counted since they await award or financial close. The mix of that order book is still very healthy, since large design-and-build projects with non-group companies carry less weight, and close to half of our backlog sits in our core US and Canada market, which we believe will keep supporting growth ahead.

Ernesto López-Mozo

executive
#9

Operating cash flow from construction, before tax and dividends, came to €144 million for the quarter, driven primarily by advance payments and compensations collected in the US and Canada. Turning now to net debt and cash flow: net debt excluding infrastructure projects stood at negative — in other words, net cash — of €1.2 billion as of the close of first quarter 2026. As the bridge illustrates, dividends from projects are modest, and they include certain dividends from IRB in India and Silvertown Tunnel in the UK. Keep in mind that dividends in managed lanes also arrive later in the year, in June and at year-end, plus throughout the year in the 407. We likewise generated solid cash flow from construction, which I referenced on the prior slide, reflecting advance payments received along with the compensations and, broadly speaking, strong operational performance. Tax payments are mostly tied to Budimex. On investments, these chiefly involve construction and equity put into energy projects, whereas divestments mostly concern services business sales, earnouts, and similar items. In addition, we bought back treasury shares totaling €162 million during the quarter. Finally, other cash flows from or used in financing activities came to €421 million.

Ernesto López-Mozo

executive
#10

That covered issuing a €500 million bond, which happened in March. We didn't put a slide in about the scrip dividend, though I'm sure all of you have that information. Yesterday we also announced the first scrip dividend, for an amount of €100 million. Okay. Thanks for listening, and I'll now hand things back to Silvia to open the Q&A session.

Silvia Ruiz

executive
#11

Thanks a lot, Ernesto. We'll begin the Q&A portion at this point. Operator, go right ahead.

Operator

operator
#12

Ladies and gentlemen, the Q&A portion of today's call starts now. Should you wish to pose a question, just hit *5 on your phone's keypad. If you decide you'd rather not, hitting *5 once more will withdraw it. Before you proceed with your question, kindly make sure your device is not muted locally. Cristian Nedelcu from UBS has our first question. Please go ahead.

Cristian Nedelcu

analyst
#13

Thank you very much. If you'll permit me, I'd like to pose three questions. The first concerns Texas lanes: you cited technology, vehicle mix, and mandatory modes as the building blocks behind the price increases. Could you provide a little more detail on how much each of those blocks contributes, and on whether those tailwinds can be sustained in the second quarter and the fourth quarter? The second one is again about US lanes. If we look closely at the last couple of months, when gasoline prices in the US are up 30% to 50%, could you tell us a bit more about how traffic appears against that backdrop, and any color you could offer? Is off-peak traffic suffering, or is leisure traffic somewhat weaker, or are there any other shifts in how users behave? The last one, please, is ETR 407: you speak of launching a loyalty program going forward. Could you elaborate a bit on the start date, the rationale for introducing it, and any details on how it will operate? Thank you.

Ernesto López-Mozo

executive
#14

All right, thank you, Cristian. Let me figure out how much detail I can share without actually handing over hard figures. On revenue per transaction, the technology is now in place. Some work still remains, though it's largely finished on the tech side for identifying cars better. That was the primary factor — it began last year, as I mentioned, and continued through this quarter too. It's the biggest contributor, but in second spot, yes, we've observed improved underlying results in heavies and commercial. The scale isn't the same, yet it did add something. Third would be mandatory modes. Please let me hold back on breaking that down here. These matters tend to be commercially sensitive. The first item, yes, should ease its effect over the next few months. As for the others, we'll see. We need to watch the economy, and that ties into the second question. Yes, gasoline prices have been climbing. We haven't spotted any meaningful shift. Naturally, whenever gasoline prices rise there is an impact, but people tend to make the trips they must make. A sustained stretch of higher prices would be needed before we might see a different pattern. We'll need to keep watching, but up to now, nothing truly significant has shown up.

Ernesto López-Mozo

executive
#15

And it's also the case that the economy—which matters—has continued to perform, correct? No updates so far. We'll continue watching it. As for 407 ETR, I can't share any specifics about loyalty programs, though typically these sorts of programs involve delivering value through trips to customers who hit certain consumption thresholds, that sort of thing. It's still in the design stage and, shall we say, commercially sensitive. We'll share more at launch, and we'll keep providing updates in future quarters. Those are roughly the fundamentals, as I said.

Operator

operator
#16

Elodie Rall of JPMorgan has the next question. Go right ahead.

Elodie Rall

analyst
#17

Good afternoon, and thank you for taking my questions. I believe I have three. First, regarding the US managed lanes in Q1, you said traffic was affected by one-offs during Q1. Could you help us understand what impact those one-offs had on Q1 traffic and revenues? Second, could you update us on the US managed lane pipeline and the bidding process? Third, related to that second question, I was wondering whether your shareholder return policy depends on any managed lane wins, and therefore whether we need to wait until you have more visibility on that, until we get an update on your shareholder return policy, which I think was last guided on at the last CMD for '24-'26? Basically, the question is, when will we get an update? Are you planning to do something at the end of this year, perhaps the beginning of '27? Is this dependent on winning any new projects? Thanks a lot. Okay.

Ernesto López-Mozo

executive
#18

Thanks, Elodie. On weather, I can't share much detail or numbers. January was worse. We don't disclose that specific detail, but it contributed to the traffic decline. The construction works were the most relevant factor, really affecting the overall corridor, right? Yes, it had a negative impact, but if I were to set aside the NTE, LBJ is more affected by the construction, whether in the corridor or on the adjacent corridors. On the bidding process, we expect news on the awards, and well, this is, I guess, public information, from Tennessee in late August and from Atlanta in October, mid- to late October. That's the current expectation for the awards. Then, on the, let's say, the future strategy, yes, we are finalizing 2026. It was the last one provided. Yes, the strategy of growth and remuneration are linked. We're not talking only about these projects, but growth in general. We'll shape our distribution in line with the growth we expect in the different business and perspectives. When will we update that? Just probably it will have to be not this year, but early next year. This has to be decided, and yes, we will have to see how we balance growth and remuneration.

Elodie Rall

analyst
#19

Alright, thank you so much.

Ernesto López-Mozo

executive
#20

Thanks.

Operator

operator
#21

The next question is from Luis Prieto at Kepler Cheuvreux. Go ahead, please.

Luis Prieto

analyst
#22

Good afternoon, and thank you for taking our questions. I apologize if my questions have already been addressed — I ran into some technical difficulties. There are three questions I'd like to ask. First, Ernesto, is there anything we can read into the sizable dividend increase at 407 ETR compared with last year? Is it possible to extrapolate that for the remainder of the year? My second question: are there any penalties tied to the contractor's late completion of the NTO project — penalties, or essentially payments made to you? And the last question: average revenue per transaction on I-66 trailed the other assets when it comes to year-on-year growth. Could you shed some light on what is driving that? Thank you.

Ernesto López-Mozo

executive
#23

All right, thanks, Luis. Yes, the 407 dividend came in higher, tied both to performance and to better financing—additional debt, let's say. We've talked about this on other conference calls. The 407 gives us some flexibility, and we'd need to watch over a long period how we're optimizing that. Forgive me for not giving guidance on this year's dividends, but clearly it has started higher and that performance is very good. As for the rest of the year, we'll see how it finalizes. Then, yes, the second question was on NTO, right? Any potential penalties fall to us, not the contractor. If they fall to us, there would have to be a huge delay before any sort of penalties kick in, right? It would have to go beyond June 2027 for us to get some sort of small penalty. Not expected to happen. Yes, with the contractor, we can apply LDs if there's no fulfillment, and that, of course, has to be settled over a long period. Then, regarding I-66, yes, it has lower revenue per transaction. I wouldn't try to read anything into that regarding elasticity. We've seen traffic more widespread throughout the day.

Ernesto López-Mozo

executive
#24

That region is seeing increased commercial activity around midday. In my view, the asset is performing well, and we shouldn't overinterpret this sort of deceleration in revenue per transaction. We'll need to continue monitoring it as we move ahead.

Luis Prieto

analyst
#25

That’s great. Thanks a lot.

Ernesto López-Mozo

executive
#26

Appreciate it.

Operator

operator
#27

The following question is from Jefferies analyst Graham Hunt. You have the floor.

Graham Hunt

analyst
#28

Thanks a lot. I think I have two questions. The first is me trying to wrap my head around some of these bottlenecks and congestion zones near the Texas lanes and how much of an impact they could be having on traffic. I'm not sure whether you can add any more detail on some of the nearby activity that is affecting your assets in Texas, and any timing you're hearing about on the ground for when that might ease, which clearly would be a negative from your side, or just a bit more detail from the ground, since it appears a number of different factors are at play there and that is helping performance today. Then the second question is really on the managed lanes market beyond what you've already covered in the report; I think the Maryland PPP market seems to be warming up after being very cold for a long time. Pennsylvania has been mentioned, other airports. Any detail on the project pipeline you're seeing beyond what's been announced that might be adding into the funnel further up would be interesting.

Graham Hunt

analyst
#29

Thanks.

Ernesto López-Mozo

executive
#30

Alright, let me share what I can on this. So traffic on NTE is having a direct effect on the corridor, correct? It's also true that during peak hours, we could have mandatory modes tied to reduced width or road capacity, right? Once it opens — yes — the corridor ought to recover, and yeah, it has dropped substantially over the past 3 years, right? We'll need to see how that shakes out. On 35W, yes, your capture is limited somewhat because of these bottlenecks. It's also true that congestion runs higher, and you have some mandatory modes, right? We have no visibility into when a fix for these bottlenecks will come. We'll update as soon as we do. On LBJ, there are various roads that ought to impact LBJ through 2026. These are roads that aren't, shall we say, under our control. Yes, the expectation is they'll be finished during 2026 and open in 2027, but that's information the grantor provides. We'll have to see whether it materializes. But 2026 should definitely still be affected, right? I don't know, Graham — did that cover what we were addressing? Sorry, I can't provide more specific details.

Graham Hunt

analyst
#31

No, that helps. Thanks. Thanks, Ernesto. Then just regarding the pipeline, I suppose.

Ernesto López-Mozo

executive
#32

As far as the pipeline goes, all I can really say is that P3s are generally getting more backing. We’ll see how that plays out and speeds up. Yes, the backdrop has improved. I think Tennessee and Atlanta really are bringing forward some projects that other people are watching, and the fact that much-needed infrastructure can be delivered through P3s while easing pressure on government or state finances is appealing. The only thing I can say is that there is some momentum, but we don’t have visibility on whether they will ultimately reach the market or on dates or anything like that, though we will keep updating.

Graham Hunt

analyst
#33

Got it. Thanks so much. I appreciate that.

Ernesto López-Mozo

executive
#34

Appreciate it.

Operator

operator
#35

The next question is from Harishankar Ramamoorthy at Deutsche Bank. Please go ahead.

Harishankar Ramamoorthy

analyst
#36

Hello, and good afternoon to everyone. I appreciate you taking my questions. There are a couple, if that's all right. You gave a monthly traffic breakdown for 407 ETR, which is really useful. Will we receive something comparable for the US managed lanes, please? Second, looking at the 407 ETR traffic figures, you clearly noted that since the base lacked the promotions, that effect is coming through. If you were to remove that, would traffic growth then look roughly in line with what you're seeing in March? Or what has the underlying momentum been for, say, January, February, and March? Thank you.

Ernesto López-Mozo

executive
#37

Thanks for the questions. No, we won't give more granularity on the managed lanes. I realize that may be a bit frustrating, but it's commercially sensitive for the different things we've mentioned — lights, heavies, and monthly traffic as well. No, we don't have plans to provide that information as in the 407. On the 407 traffic, please keep something in mind. Last year, we had promotions that were very broad; people were getting the same kind of promotions. That didn't really address segmentation properly. Now our promotions are targeted, and that could distort traffic comparisons. Really, we have to focus more on revenue growth, specifically on toll revenue growth. That could come with not necessarily higher traffic, right? Just keep in mind that the comparison will be distorted. I'm sorry we cannot provide more information — also, this is commercially sensitive — but traffic is not going to be a driver. Segmentation is different this year.

Harishankar Ramamoorthy

analyst
#38

Sure thing, Ernesto. Appreciate it. I was only hoping to find whatever detail might be available about the effect that fuel prices at the pump could have had on traffic. Is anything like that showing up for March and so on?

Ernesto López-Mozo

executive
#39

Not really something we could separate out. You always get a bit of slight negative elasticity. Honestly, that occasionally occurs when an economy is doing well, and those effects usually wash out. So far, the economies where we operate have been okay; we'll have to see whether this lingers and how it could affect things, but there's nothing we can really point to in the first quarter.

Harishankar Ramamoorthy

analyst
#40

Much appreciated.

Ernesto López-Mozo

executive
#41

I appreciate that.

Operator

operator
#42

The following question is from Dario Maglione at BNP Paribas. You have the floor.

Dario Maglione

analyst
#43

Hi, Ernesto. Three questions from me. Apologies for returning to this topic, but if I heard you right, you said higher fuel prices hadn't had much effect on the US express lanes. Could you perhaps speak to the 407 ETR, in light of the 1% traffic growth in March? My second question concerns NTO. On construction, you said the operational readiness trials have begun. That sounds encouraging. I'm just wondering whether you feel more confident now that this terminal will open on the fall of 2026 timeline? Third and final question, somewhat technical, about the tax expense on the P&L — it came in at a positive 60 million for the full year 2025. What should we expect for '26? Thanks, Ernesto.

Ernesto López-Mozo

executive
#44

Alright. Thank you, Dario. On the subject of fuel prices, my point was that indeed, higher fuel costs do produce a certain negative elasticity. Over the near term, provided the economy keeps performing, that economic performance generally washes out — it offsets the effect — and people still take the journeys they need to take. Whether this persists for longer remains to be seen, and yes, there could be an effect. So far, we see no evidence of any impact during the first quarter, correct? We'll need to continue watching that closely. It's a similar story with the 407, in Toronto. Mobility has risen alongside more people returning to the office. Admittedly, where the economy is concerned in heavies, construction, and trucks tied to car parts movements — that sort of business — things have been slower, yet the broader economy has shown greater mobility. When we discuss traffic in relation to the 407 and March, I'll once more point back to the explanation I've given repeatedly during this call. Promotions look very different this year, right? A year ago, they were broad-based. Today they're more segmented, correct? Perhaps we find ourselves in a situation where revenues are growing handsomely, yet traffic isn't growing much, or even declines, right?

Ernesto López-Mozo

executive
#45

Promotions have clearly had an effect on traffic. That's a lever we manage and aim, correct? We gained plenty of experience over the course of last year, but at this point they're more targeted. Our attention should really be on the financial results, since segmentation will produce differing traffic patterns. Then, on the NTO question: yes, the contractor has given the finalization date for Phase A as fall of 2026. With the right resources, it can be accomplished. That part isn't within our control. We are pushing for it. Ultimately, the contractor needs to deliver using their resources. Yes, we expect it to occur at that point, and should any slippage happen, we don't want it to be lengthy. Yes, when we discuss construction finalization, we're also discussing the start of operations. Those two go hand-in-hand, because operational readiness is done in the months prior, right? We're not discussing civil works. What we mean is the entire construction and operations beginning, with, let's say, no lead time between construction finalization and operations starting. That's the concept. Fall 2026 is the expectation, as we said. Then, on taxes: well, in the last year, the accounting figure you brought up relates to some one-offs.

Ernesto López-Mozo

executive
#46

Honestly, looking at the cash piece, the way the tax groups work so efficiently means that as we build out new projects, we don’t anticipate any real effect in the US. Our taxes are paid mostly in Canada and Poland, and a little bit in Spain, correct? As we grow the business in the US, that isn’t occurring, right? I’m not able to give you any guidance—just this sort of framework for whatever model you might be putting together.

Dario Maglione

analyst
#47

Thanks, Ernesto.

Ernesto López-Mozo

executive
#48

Appreciate it.

Operator

operator
#49

Marcin Wojtal from Bank of America has our next question. The line is yours.

Marcin Wojtal

analyst
#50

Good afternoon, and thanks. First question: you're clearly still rolling out customer discounts on the 407 ETR, but is there any news on whether something similar — discounts, incentives, or loyalty programs — might come to the US managed lanes? Do you see a path where that could help you optimize EBITDA on those assets? Second question: you mentioned technology enhancements boosting revenue per transaction on the US managed lanes. Do you mean things like cutting toll evasion, or making sure more trips get billed correctly, or are you speaking more broadly about upgrading your pricing mechanism and pricing algorithm? If I can squeeze in one more very quickly — thinking about higher dividends and possible recaps of infrastructure assets, is the I-66 another asset, besides the 407 ETR, where you see some headroom on the balance sheet and room to pay more generous dividends? Thank you.

Ernesto López-Mozo

executive
#51

Thanks, Marcin. And thanks for all the questions. That's not something we have readily available, but we're looking into the possibility of promotions and, because of that, more segmentation across all the US highways. Yes, we're working on it, and in the future that could help, yes. We're not there yet. Once we reach something, we'll update the market. On the technology side, what it has helped with is identifying commercial vehicles and heavies that weren't properly identified before. Nothing to do with evasion. We don't face any, let's say, collecting risk in the express lanes in Dallas-Fort Worth. It has been about identification of commercials and heavies. Then the third question, yes, I-66 has potential for a recap, as was in the, let's say, bid business plan that was submitted for reference. It won't be this year, nor the next. It's not far away, but it's not this year or the next that we'll see a recap in the I-66.

Marcin Wojtal

analyst
#52

Alright, thanks a lot.

Operator

operator
#53

Ladies and gentlemen, a quick reminder: to ask a question, press *5 on your telephone keypad. Nicolas Mora of Morgan Stanley has our last question. Go ahead.

Nicolas Mora

analyst
#54

Good afternoon. One quick question about the 407, and I just want to make sure I understand it correctly. Essentially, you're getting us ready for traffic that could be somewhat softer in sequence, but with considerably greater capture of the price increases you've implemented from 2025 to 2026. Does that mean discounting on an absolute basis will be lower from this point on, since it's more targeted? And does it also suggest that, at today's traffic levels, you feel quite comfortable with where that traffic leaves you relative to the Schedule 22 risk?

Ernesto López-Mozo

executive
#55

Thanks, Nicolas. You're reading too much into my comment. I'm neither confirming nor denying it. What I'm saying is that traffic shouldn't be compared directly. Sure, our traffic could be lower, but it's possible we're performing better. I'm not stating whether it will end up lower or higher — only that tracking the other metric matters more, as you correctly note. On Schedule 22, yes, we've made provision for an amount that factors in all the effects we had in mind while budgeting. Yes, that's what we expect Schedule 22 to show.

Nicolas Mora

analyst
#56

Okay, thank you. If I could, one final question about the reopening, or the completion of construction on NTE and perhaps the section next to LBJ, going into late '26 and '27 — do you have any sense of how much traffic you might have lost relative to trend, and how much you could recover once that asset returns to normal?

Ernesto López-Mozo

executive
#57

We won't give out numbers for the corridor, since doing so would also require disclosing our capture rate. At this point we're dealing with commercially sensitive matters. No, that isn't something we're sharing. What I can say is that at NTE, yes, the drop in traffic over the last three years along the corridor has been significant. Our capture rate has remained solid. That's the extent of what I'm able to say.

Nicolas Mora

analyst
#58

Okay, that's fair. Thanks a lot.

Ernesto López-Mozo

executive
#59

I appreciate it.

Operator

operator
#60

The last question is from Mark Ip at Citi. Go ahead.

Mark Ip

analyst
#61

Hello, and thank you for the opportunity to ask. I have a question specifically regarding the construction segment. With EBIT margins at 3.1% during the first quarter, I would like to understand how we ought to view that figure across the remainder of the year and relative to your longer-term objective of 3.5%. Building on that, perhaps concerning the Ferrovial Construction operations, could you elaborate a bit further on the elevated costs you have observed there and on whether that might produce some margin upside in subsequent periods? Thank you.

Ernesto López-Mozo

executive
#62

Hello, and thank you. On the subject of construction margins, the sole guidance we can offer is what I would call our usual long-term average of 3.5% EBIT margin. As I mentioned, that figure is an average. The backlog is in good shape. We aren't giving, shall we say, any margin guidance for this year, yet the cash performance shows you one thing — that the backlog is healthy. Long term is the only guidance we have, and we're holding to it. Apologies — what was the second question again?

Mark Ip

analyst
#63

I can add a little more detail regarding the costs at Ferrovial Construction. When it comes to those costs,

Ernesto López-Mozo

executive
#64

On the cost side — yeah, sorry about that. Essentially, every one of those costs ties back to bidding. It's accurate that we bid as we do in any year, but at the same time we continue to watch all the other developments. This year will be shaped by that sort of bidding along with IT costs. As we move forward, things may look different, depending on how successful we are, yes.

Mark Ip

analyst
#65

Thanks.

Ernesto López-Mozo

executive
#66

Appreciate it.

Operator

operator
#67

That brings us to the end of the question-and-answer portion. At this point, I'll return the call to the Ferrovial team. Your line is open.

Silvia Ruiz

executive
#68

Thanks. Thanks to everyone for your questions. A few questions came in through the webcast, but as we understand it, those have all been answered already. There are no further questions.

Ernesto López-Mozo

executive
#69

Much appreciated. I'm grateful that you joined the call, and I look forward to seeing you soon. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.