Good morning, everyone, and thank you for joining the FTG Q3 2023 Analyst Call. <<operator_script>> Today is Thursday, October 12, 2023, and this session is being recorded. At this point I'd like to hand things over to Mr. Brad Bourne, FTG's President and Chief Executive Officer. Mr. Bourne, the floor is yours.

Bradley Bourne

executive
#2

Thank you. Good morning. I'm Brad Bourne, President and CEO of Firan Technology Group Corporation, or FTG. Joining me on today's call is Jamie Crichton, our Chief Financial Officer. Before proceeding any further, I need to warn you that forward-looking statements may be included in this call. Management of the company bases such statements on its present expectations, and by their nature they carry many risks and uncertainties, both known and unknown, including general economic conditions within the company's industry. That list is not complete, and other factors may also apply. Forward-looking statements of this kind do not promise future performance, and the company's actual events and results may differ materially from what those statements express or imply. Listeners are advised to weigh these and other factors with care when deciding about the company, and not to rely unduly on forward-looking statements. The company does not commit, and has no specific plan, to update any forward-looking statements, whether written or oral, that it or anyone on its behalf may make from time to time, whether because of new information, future events or otherwise. Our third quarter came out well. There were certainly some challenges during the quarter. And of course, the summer months of June, July and August make up our third quarter, so summer holidays cost us production days.

Bradley Bourne

executive
#3

Even so, the folks at FTG pushed through those difficulties, and the outcome makes me proud. Solid bookings kept coming in over the quarter, and we moved forward on increasing output to keep pace with demand. In Q3 of 2023, FTG hit a number of targets aimed at strengthening the company and preparing it for what lies ahead — among them, bookings for the third quarter came to $35.7 million, a 28% gain versus Q3 of last year. Third-quarter revenues reached $36.6 million, 59% higher than Q3 a year earlier, as FTG scales up production to satisfy customer demand. That revenue figure contained $9.2 million contributed by the recently acquired sites in Minnetonka, Minnesota and Haverhill, Massachusetts. Net earnings for this year's Q3 came in at $1.3 million, an increase of $600,000 compared with Q3 last year. Net debt on our balance sheet at the close of Q3 stands at $5.7 million — $700,000 lower than the prior quarter and equal to 0.36x adjusted EBITDA. We advanced considerably in bringing our 2 new acquisitions together and carried out the plans meant to lift performance and deliver the operational and financial results we're after. We closed Q3 with a backlog of $98 million, versus $65.5 million at the end of 2022.

Bradley Bourne

executive
#4

The backlog at the close of Q3 had $18.2 million attributable to the recently acquired locations. Following the addition of personnel during the first 9 months of 2023, and with the inclusion of certain executive leaders at the Circuits Minnetonka site to assist with raising throughput and enhancing operations, FTG now has roughly 700 employees. I'll say more about that later. Under the Canadian Aerospace Regional Recovery program, FTG collected $700,000 during the quarter, bringing the cumulative amount received to date to $4.4 million. In June, FTG secured approval for a second NCIB, which followed the one that had been in effect during the prior 12 months. FTG repurchased 6,200 common shares in Q3. Demand in our end markets is still robust. Air travel keeps recovering. Turning to aircraft deliveries, Airbus is pushing to ramp output and aims for 50 planes per month in 2023, then 65 planes per month down the road. They would prefer to ramp more quickly in order to satisfy customer demand, yet supply chain constraints are holding back their growth. At Boeing, the plan is to raise 737 output from 31 aircraft per month at present to 38 in the near future, and afterward to 50 within the next few years. In business jets, Bombardier issued guidance pointing to a 15% to 20% increase for 2023.

Bradley Bourne

executive
#5

Everything here is encouraging when we consider what demand will look like during Q4 of 2023 and afterward. We have examined figures from major defense contractors too — take Lockheed, for instance, the biggest one in defense, whose sales have climbed 5% thus far in 2023. Government money funds this defense market, and it looks solidly backed for the near term given rising geopolitical strains around the world. Naturally, a bit of uncertainty exists in the U.S. over the short run while its government wrestles with the debt ceiling. Over a longer horizon, Boeing's latest 20-year projection indicates industry expansion across the long term and keeps showing that 40% of all deliveries of new aircraft are headed to Asia, just as their recent forecast has indicated. Traffic has already bounced back in the business jet market. A fresh forecast for that business jet market from Honeywell likewise anticipates expansion there over the years ahead. The simulator market reflects the end market application. Yet, as we keep reminding everyone regarding this market, it is lumpy. Consequently, we do witness sizable variations from one year to the next. So, as we have stated for many years, FTG's aim is to take part in every segment of the aerospace and defense markets as each one works through its own separate business cycles.

Bradley Bourne

executive
#6

That keeps working well. And past all that, I want to give a fast update on several important metrics for 2023 — specifically Q3 2023. To start, as I mentioned, bookings, meaning new orders, serve as the key leading indicator for our business. Bookings in the third quarter rose 28% versus Q3 of last year, and our total backlog stands at $98 million. Sales during Q3 '23 came in at $36.3 million, against 23.1% in the third quarter a year earlier. That works out to a 59% increase. Roughly 39% of the increase comes from the 2 acquisitions, and the remaining growth — about 19% — was organic growth from the rest of our business. Looking into each segment: within our Aerospace business segment, sales rose 4%, or $400,000, in Q3 this year versus the same quarter last year. Both the Toronto and Tianjin sites were each up 13%, while a component delay pushed the Chatsworth site down 13% against Q3 a year ago. Chatsworth's Q3 last year ranked among their strongest quarters, so that made for a hard comparison for them to beat. On the Circuit side of our business, Q3 sales increased $12.7 million, or 87%, year over year.

Bradley Bourne

executive
#7

63% of that growth was contributed by the 2 acquisitions, while 24% came from organic growth. At FTG overall, our top 5 customers represented 55.6% of total revenue for the quarter, matching what we saw in Q3 last year. Even though that percentage hasn't moved, the actual companies involved are different. Another point worth noting: among the top 10 customers, 7 are shared between circuits and aerospace. As we've said before, we're always glad to see customers shared across both, because it shows we're getting the most out of our penetration with these accounts by selling them both cockpit products and circuit boards. During Q3 2023, our Aerospace business generated 26.9% of total revenues, versus 39.8% a year earlier. That decline in Aerospace's share stems partly from the acquisitions, since both of them sit on the circuit side of the business, and partly from slower growth in that segment during the quarter. At this point I'd like to hand the call to Jamie, who will walk through our financial results for the third quarter. After that, I'll discuss a few key priorities we're focused on. Jamie?

Jamie Crichton

executive
#8

Thanks, Brad, and good morning, everyone. I'd like to give you some additional detail on how we performed financially in Q3. With sales of $36.6 million, FTG posted a gross margin of $8.8 million, or 24%, versus $5.7 million, or 24.7%, on sales of $23.1 million in Q3 2022. Higher sales volumes are what drove the increase in gross margin dollars. The gross margin rate, though, was weighed down somewhat by lower gross margins at the Circuits Minnetonka site. We expect margins at that site to rise over time as we ramp up throughput, achieve material cost savings and adjust price. The average exchange rate we experienced in Q3 2023 was $1.33, compared with $1.29 in Q3 2022, which is a 3.3% increase. Our focus on operational efficiency continues. Revenue per employee is one metric we use to measure this. For Q3 2023, annualized revenue per employee is approximately $211,000, which is an increase of 3% over the comparable quarter of 2022. Given the current pressures on both the supply and cost of labor at all of our manufacturing sites, we will keep this focus through automating manufacturing processes and investing in capital equipment. Geographically, FTG saw revenue growth in all of its regions.

Jamie Crichton

executive
#9

Measured in dollars, our Q3 2023 revenue from U.S. customers rose $11.3 million versus the same quarter a year earlier, driven mainly by the 2 U.S. acquisitions. Even so, the share of total sales going to U.S. customers edged up just slightly, to 79% from 76%. On a percentage basis, sales into Asia climbed 95% versus Q3 2022. Asian activity has picked up as integrated supply chains serving commercial aerospace keep expanding offshore. SG&A expense came to $4.1 million, or 11.1% of sales, in Q3 2023, versus $3.3 million, or 14.1% of sales, in the earlier period. That higher expense figure reflects $635,000 in SG&A incurred at the newly acquired sites plus $79,000 in field costs tied to the acquisitions. R&D costs for 2023 totaled $1.6 million, or 4.4% of sales, against $1.4 million, or 6% of sales, for Q3 2022. R&D work covers product and process improvements within the Circuits segment as well as efforts to develop and qualify products for upcoming aerospace programs. At the close of Q3 '23 the exchange rate stood at $1.36, compared with $1.34 at Q2 2023, representing a weakening of the Canadian dollar. FTG's balance sheet carries assets and liabilities denominated in U.S.

Jamie Crichton

executive
#10

We held a net asset balance of about USD 3.6 million in currency. When our net U.S. dollar assets and liabilities were translated into Canadian currency at the close of Q3 '23, that produced foreign exchange losses of $100,000 for the quarter, versus foreign exchange gains of $300,000 in the same quarter a year earlier. EBITDA, as described in the press release, came to $4.9 million for Q3 '23, compared with $2.8 million in Q3 2022. Adjusted EBITDA was $5 million for Q3 '23 and $2.8 million for the prior year quarter, and in both periods the adjustments were limited to deal costs. For the trailing 12-month period that ended Q3 '23, adjusted EBITDA reached $15.9 million, which works out to an adjusted EBITDA margin of 13.3% on sales. In Q3 '23, FTG recorded earnings before income taxes of $2.3 million, or 6.3% of the sales, compared with EBIT for Q3 '22 of $1.3 million, or 5.4% of sales. The Q3 '23 income tax provision of $0.9 million, or 40% of pretax earnings, reflects that the corporation's Canadian and Chinese operations were profitable and that deferred tax assets on certain foreign operating losses were not recognized during the quarter. Working capital at the end of the Q3 quarter was $35.2 million, compared with $30.5 million at the 2022 year-end.

Jamie Crichton

executive
#11

On accounts receivable days, we saw 68 in Q3 versus 64 a year earlier — sorry, at the end of the '22 year. Inventory turns came in at 3.1 for the Q3 quarter, compared with 3.7 at the close of '22. Accounts payable days outstanding stood at 79 versus 73 at the '22 year-end. We finished Q3 '23 with a backlog of $98 million. A significant portion of that backlog is slated for Q4 '23, which sets up the potential for a very strong quarter. We remain focused on cash management on the balance sheet, cost control and operating efficiency. Our full set of Q3 filings is now available on sedar.com. With that, I'll turn things back to Brad.

Bradley Bourne

executive
#12

Thank you, Jamie. I'd like to go over a few key matters for the quarter and/or regarding FTG's future performance. The first 9 months of 2023 were strong. Our sales climbed substantially. We're still putting in serious effort to expand capacity further to meet the demand we're seeing. That involves hiring additional staff. Across the company, we're now close to our target head count to serve present demand. Going forward we may adjust head count a little at individual sites, but we don't view that as one of our big future challenges. Ahead of us, a handful of key items still need our attention, chiefly integrating IMI and Holaday. Regarding IMI, we bought them to expand our position in the RF circuit board market serving aerospace and defense applications. Although they're small, with a historic run rate of $4 million to $5 million, we value their capabilities. Integration ought to be fairly simple, since we plan to keep operating at its current facility with the existing staff. Our emphasis will be on connecting our sales team with them to identify new customers and expand the business. That won't happen overnight, but it's something through which we can produce incremental margin and profitability to FTG's benefit.

Bradley Bourne

executive
#13

Along those lines, we will be making some targeted CapEx investments to tackle a handful of production constraints and to support this growth down the road. And lastly, we're moving them onto our standard ERP system during the first part of next year. Holaday represented a bigger acquisition. Its sales exceeded USD 30 million prior to the pandemic. The pandemic hurt them the same way it hurt us. We view Holaday's long-term positioning as a provider of high-technology circuit boards comparable to what we produce at our Toronto facility, yet with a U.S. footprint. That U.S. footprint matters greatly as we aim to expand our share of the U.S.-only advanced circuit board market serving defense applications. Near term, we have 3 priorities as we bring Holaday into FTG. First, we must ramp up their throughput and sales. Since February, they have brought on roughly 20 staff, moving from 150 people to around 170. However, we experienced a bit of a setback early in Q3 when their VP of Operations at the site ran into some medical issues and has since retired. We moved quickly and chose to bring known and proven operations management expertise to that site.

Bradley Bourne

executive
#14

We brought Paul Godbout back — he'd been running our Fredericksburg Facility until early in the pandemic. He's with us on a temporary basis, but his operational skills are already making a difference. And in August, his first full month on the job in Minnetonka, they shipped at a $28 million to $29 million annualized run rate, which was great to see. That was their best month since before the pandemic. But as I said, Paul is back on a temporary basis. It will give us time to find the right person to run that site for the long term. In Minnetonka, our second priority is to reduce material costs. We have identified cost savings that can benefit the site as they are now part of a larger company. It will take some time to achieve these savings as in some cases, it will require customer approvals, and it will require some internal engineering efforts as well. But when complete, we expect to achieve savings on the order of $1 million annually. We continue to make progress on this initiative. And our third priority is to improve pricing. We believe Holaday had not been sufficiently proactive in adjusting prices up as possible enough over the past few years.

Bradley Bourne

executive
#15

We’ve already managed to push through some price increases, and we’ll keep working on that. Our goal is to make sure that any inflationary expenses that site has taken on in recent years — whether for materials, labor, or anything else — get passed along to customers rather than eating into our margin. And finally, we’ve made the decision to move them onto our standard ERP system, and that effort is already in motion. Speaking of pricing, I’ve been really impressed by how proactively everyone at FTG involved in this has gone after better pricing with customers. Throughout FTG, we’ve done well at preventing any margin compression caused by higher costs during the recent stretch of elevated inflation. We took a close look at several of our major contracts and at the price changes we achieved, and the total increase came in around 30%. That review covered roughly 20% of our overall revenue. Separately from pricing specifically, we’ve gotten some sizable expedite purchase orders from customers who needed our products urgently. Most of those expedite fees haven’t shown up in our P&L yet, but we do expect to realize more of them in Q4.

Bradley Bourne

executive
#16

Turning to Q4, demand remains robust at the majority of our sites. Our backlog scheduled for the quarter exceeds $50 million, and that figure includes the new locations. Although it isn't a great metric, we came into the quarter carrying more than $18 million of past due orders. We fully hope and anticipate reducing those past due orders during Q4. As usual, there are potential headwinds or downside risks that might affect the quarter. To begin with, our Q4 backlog for simulator products is fairly low. Still, when you look at total backlog, that shouldn't be a major worry. In addition, the agreement covering our represented staff in Aerospace Toronto has lapsed. We are now in negotiations, though both the timing and the result remain uncertain, and production disruption is a possibility. And so everyone is clear, we have now raised our financing costs and amortization of intangibles in our P&L because of the acquisition. Together, amortization and interest costs come to roughly $350,000 for the quarter, which is above what we recorded in Q1. That affects our earnings, though it has no effect on our EBITDA. Looking past Q3, we clearly expect growth. It stems from robust customer demand, advances and rising throughput at Holaday as well as our other sites, somewhat better pricing, and several significant program wins throughout the company.

Bradley Bourne

executive
#17

There are a few examples of sales wins I can point to, such as securing new cockpit panels for the Boeing 737 program and new cockpit assemblies for both Airbus and Boeing aircraft. Those wins, along with others, are growing our market share and could mean $5 million to $10 million in incremental sales in 2024 and beyond. Given the more complicated geopolitical circumstances in China, I'm certain concerns remain about what we do there. As I've said before, in 2022 both of our operations in China had their best sales year ever, and both were profitable, and that has carried on through the first 9 months of 2023. We repatriated cash back to Canada last year and a bit more this year. Altogether, we have now returned $2.2 million in cash. Through that, we've lowered the surplus cash stranded in China and cut our exposure should things worsen between China and the West for any reason. On a brighter note in China, the C919 development program obtained CAAC certification last year, and after a 10-year development program we are seeing production orders. We got our first production orders in early Q3 this year -- or Q2 this year, worth roughly $2.8 million, and every bit of that is deliverable in 2023.

Bradley Bourne

executive
#18

Seeing the results of a decade of work on this program is gratifying. Our Chinese operations will gain from this moving forward, and they will be less exposed to geopolitical uncertainty. Even with that positive development, though, we remain prudent regarding our business in China and any additional rise in friction between China and other nations that might affect those operations down the road. We keep evaluating potential corporate development opportunities that could suit either of our businesses, yet our near-term focus is clearly on successfully integrating the IMI and Holaday acquisitions. Given our emphasis on operational excellence across all of FTG, the strong financial results we delivered in the first 9 months of this year, our recent acquisitions, and our key sales wins, we are confident that we are on a solid long-term growth trajectory. That brings our presentation to a close. Thank you for your attention. At this point I would like to open the lines for questions. Lara?

Operator

operator
#19

<<operator_script>> Our initial question is from Nick Corcoran of Acumen Capital.

Nick Corcoran

analyst
#20

Nice work on the third quarter, and the prepared remarks definitely gave us good color. Maybe just to begin, backlog came in flat from one quarter to the next, and the book-to-bill ratio — it stayed right around 1x. Does that come down to the timing of orders? Or is there something else we ought to be thinking about?

Bradley Bourne

executive
#21

Yes. I mean, there's always going to be some unevenness when it comes to orders — that's just how it is. The main factor there is simulators. Whenever simulator orders show up, they can distort the book-to-bill. But I suppose right now I'm viewing this in a more favorable light. So over the last several quarters, we've consistently reported bookings that exceeded our sales, yet we've also been saying that ramping production has been a struggle. But looking at Q3 this year, my read on it is that our production ramp has caught up with the orders we're booking, and that's why you end up with a book-to-bill of 1. Maybe I can put it this way, as I mentioned before: we've got roughly the right headcount, perhaps the right production level, and we're able to support our customer demand going forward.

Nick Corcoran

analyst
#22

And I suppose the question tied to that is this: from the level it sits at right now, how much growth do you figure we can expect in the backlog?

Bradley Bourne

executive
#23

Honestly, I’m not really sure — the size of further backlog growth worries me less. What concerns me more is what I mentioned for Q4: I received over $50 million in backlog, which is substantial, yet I also have $18 million past due. My aim is to work on reducing those past-due orders. Doing so will actually lower my backlog, but it could also mean I get some additional sales.

Nick Corcoran

analyst
#24

Thanks, that's useful. Now, there's been some discussion in the news about Boeing pushing back aircraft deliveries. Has that had any effect on Firan at all?

Bradley Bourne

executive
#25

Definitely not. Boeing's overarching aim, in fact, is to shield its supply chain from what happens on the delivery side. As a result, the pace of production and the pace of deliveries aren't tied together one-to-one in an exact way. What they aim for, then, is a steady output level that holds regardless of whatever is going on with deliveries.

Nick Corcoran

analyst
#26

That's useful. Do you have any thoughts on how the outlook looks for sim orders?

Bradley Bourne

executive
#27

We're seeing some smaller orders come through. I don't see any significantly large orders that I expect to materialize in the near term. But I just want to comment a little bit — the sim orders are good, obviously, and they tend to be high-value assemblies. But what I'm starting to see, which I actually like even better, is — I mentioned we won some new orders this year that were for some cockpit assemblies for Boeing and Airbus, and these are also high-value assemblies. They go into production aircraft, and it actually becomes a more stable revenue stream because I'm supporting a product in line, not a simulator individual order. So I'm seeing more aircraft high-value assemblies as opposed to simulator high-value assemblies. And I think that's better for FTG for the long term.

Nick Corcoran

analyst
#28

Appreciate that. Can you shed any light on the headcount you brought on during the quarter?

Bradley Bourne

executive
#29

Actually, perhaps Jamie is able to. There was a figure we had—I simply can't recall what that figure was.

Jamie Crichton

executive
#30

Regarding that, Nick — roughly 12. We had been around 680-ish, and at this point we sit just below 700.

Nick Corcoran

analyst
#31

All right, that clears things up. One final question from my side. You mentioned that $50 million in backlog is scheduled for the fourth quarter. How should we approach thinking about revenue and EBITDA for Q4?

Bradley Bourne

executive
#32

Yes. You've posed this question to me before, and I've consistently tried to sidestep it. But here's how I see it — and this is purely arithmetic at this point, correct? So I have $50 million in backlog, and you have $18 million in past due orders. If, at the close of Q4, I still carry $18 million of past due orders, I'll ship $32 million, which isn't a great number. Conversely, if by some magic I could collect all of my past dues, I would ship 50. But I'm not going to land on either. It won't be 32 and it won't be 50. And so that — the million-dollar question is how much of these past due orders is going to burn down in Q4. Without a doubt, I expect to burn it down. Generally speaking, Q4 is stronger than Q3. Q3, 36 and change. So what does that mean? I don't know, we're going to be above 36, below 50.

Operator

operator
#33

<<operator_script>> Our following question is from Paul Steep of Dunlop Capital.

Paul Steep

analyst
#34

Let me just address what Nick asked at the end there. What is it that's holding things up? Since you'd assume some amount of overdue orders is always sitting in the system. Does it tie back to that component problem you mentioned before? And I have one short follow-up too.

Bradley Bourne

executive
#35

Absolutely. I'd say there is certainly more than a single gating item. Different circumstances exist across various segments of the business. And as I mentioned regarding Aero-Chatsworth, component deliveries coming to us are certainly affecting the shipments we make to customers. So that has an impact on them. At Aero-Toronto, I have some — what I just referenced, some of these new cockpit assemblies going into aircraft — I've essentially completed development, but I need Transport Canada, TSO approval before production units can be shipped. I am awaiting that TSO approval. My hope is to receive it in Q4, but Transport Canada is not something I control. So that could be a gating item, and it has definitely held up some revenue right now. It's just those kinds of things. The one thing I'd say is less of an issue now is due to staffing. As I said, I believe we're at a reasonable staffing level, so that is not impacting — nor is it a gating item for — what we get out the door in the near future.

Paul Steep

analyst
#36

Thanks. Then perhaps a follow-up for either of you — probably more for Jamie. How should we think about the working capital unwind? Obviously, you added the acquisitions, but Brad just briefly mentioned how we're going to see shipments and that presumably unwinds some of the working cap. Could you talk through that? And then maybe CapEx as well. I know Brad called out some investments earlier on that front too — is there anything unusual or noteworthy there?

Bradley Bourne

executive
#37

Perhaps I'll address CapEx. Jamie might cover working capital. But let me begin with the CapEx side. So this year, our CapEx rose largely because of funding we got from the Canadian Federal Government and the Ontario Provincial Government. They backed us with interest-free financing, but we're required to spend that money. Those programs conclude next year. Consequently, we're pulling forward some CapEx, especially in Canada. So it's higher this year. Beyond this year, I expect -- we've definitely begun planning for next year already, aiming to return to our longer-term target of 3% of sales for our CapEx figure. That isn't an exact number, but it's the target we use when planning CapEx. And I suppose, Jamie, over to you regarding working capital.

Jamie Crichton

executive
#38

Sure. Thank you, Paul, for those questions. So I suppose my view would be that I think working capital is going to decrease in Q4. My reasoning is that strong revenues during Q3 should lead to solid collections in Q4. In Q4, I believe inventory will decline since, as Brad explained, we're set to have a fairly strong quarter on the shipment side. That should bring inventory down, though it will likely end up mostly tied up in higher accounts receivable at year-end. So it will come down somewhat in Q4; I think more so in the first part of 2024.

Operator

operator
#39

Peter Imhof, a private investor of yours, has the next question on the line.

Peter Emhoff

unknown
#40

Brad, this is Peter Imhof. I previously held your stock in the funds I managed at <<inaudible>> and I still hold it. So yes, a good quarter for you folks. Most of my questions have already been answered. But just regarding Minnetonka, what would you say capacity utilization looks like there in terms of the ramp-up? I believe you mentioned which month was a record for you guys in terms of throughput? Was that September? Or was it August?

Bradley Bourne

executive
#41

That happened back in August.

Shareholder

unknown
#42

August, all right.

Bradley Bourne

executive
#43

That's a fair question. Let me take you back through some historical figures for a moment. And Peter, good to hear from you, by the way. In Minnetonka, the peak revenue year came in 2019, prior to the pandemic, at USD 31 million in sales. My sense is they weren't at capacity, but they clearly showed they can ship USD 31 million. Now, looking ahead — and sorry, on utilization, over the last couple of years their revenue ran around $22 million to $23 million in annual sales. Much like what we went through during the pandemic, their revenue fell roughly 30%. That pulls their utilization down quite a lot. A run rate of $22 million to $23 million isn't a good run rate for them. At that kind of run rate, it's not a winning business. So we need to get them back into the 30s. And then I compare Minnetonka with Toronto — very similar plant sizes, very similar headcount, very similar equipment set. And Toronto — now I'll switch currencies, which just complicates things — but Toronto can ship $1 million a week, and they've shipped in the low 50s.

Bradley Bourne

executive
#44

Back in 2019, they shipped — I think it was $52 million, $53 million in sales. With a bit of effort and some modest upgrades to how they operate and manage things, I believe they could turn out what Toronto turned out.

Peter Emhoff

unknown
#45

All right. So turning to Toronto and the Aerospace side — you mentioned that negotiations are underway. I'm not clear whether that's a unionized situation or not, and how long have those talks been going on? And how near do you think you are to possibly reaching an agreement there?

Bradley Bourne

executive
#46

Yeah. The surprising part is that our contract expired in August, and it's unionized — it's Unifor. We didn't negotiate at all, and really it was more driven by Unifor than by us. They asked for meeting dates, but no negotiation happened on our side before the contract expired. We've now started negotiating. We held a couple of meetings in September, but we're still early in the process.

Peter Emhoff

unknown
#47

All right. So looking at it, you folks have completed quite a few acquisitions across the last 2 years and such. Are you still finding other opportunities out there? Or are you mainly working on consolidating what you've already done? Or — I don't know what the landscape looks like and what sort of multiples you'd need to pay?

Bradley Bourne

executive
#48

Okay, so yes — there are opportunities available right now. That said, as far as things are within my ability to manage, I don't intend to finalize any further deals until I feel confident — especially regarding Minnetonka — that this one is handled, that we have the proper management team established there, and that we've made progress on our 3 initiatives: improving operations, achieving material savings, and securing price increases. Once I feel assured that this is taking place and is well underway, I would then be more inclined to consider the next deal. So some do exist out there, but if I'm able to slow-play them or persuade people to hold off, that is definitely my first choice.

Operator

operator
#49

<<operator_script>> At this point we have no more questions. I'll hand the call back to Mr. Bourne now for any closing comments.

Bradley Bourne

executive
#50

All right, thanks. Until November 12, you can access a replay of this call at the phone numbers shown in our press release. In a few days, that replay will also be posted on our website. I appreciate everyone's interest and everyone taking part. Thank you.

Operator

operator
#51

Appreciate that, sir. Everyone, that brings today's conference call to a close. Thanks so much for joining us, and please go ahead and disconnect your lines. Have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Firan Technology Group Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Firan Technology Group Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Firan Technology Group Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.