Good morning, all. I'm Karina, and I'll be handling the conference lines for you today. Welcome, everyone, to the FTG Q1 2024 Analyst Call. <<operator_script>> Kindly be aware that this call is being recorded. At this point I'll hand things over to Mr. Brad Bourne, FTG's President and Chief Executive Officer. Mr. Bourne, the floor is yours.

Bradley Bourne

executive
#2

Thank you. Good morning. Brad Bourne here — I serve as President and CEO of Firan Technology Group Corporation, which we call FTG. Joining us on today's call is Jamie Crichton, our Chief Financial Officer. Before we proceed any further, I need to warn you that forward-looking statements may appear on this call. Those statements rest on management's present expectations for the company and by their nature carry many risks and uncertainties, both known and unknown, among them economic factors affecting the company's industry in general. That list of factors is not complete. Forward-looking statements like these do not promise future performance, and real events and results may differ materially from what such statements express or imply. Listeners should weigh these and other factors with care when making decisions about the company and should not rely unduly on forward-looking statements. The company neither undertakes nor specifically intends to update any forward-looking statements, whether written or oral, that it or anyone on its behalf may make from time to time, whether because of new information, future events or otherwise. So despite a few challenges in our first quarter, I'd say 2024 is off to an excellent start.

Bradley Bourne

executive
#3

Before we get into the specifics, I want to express appreciation to the entire FTG team for their dedication and for what they contribute to our success. That success comes from a team effort involving all 690 employees throughout the company and across the globe. During Q1 2024, FTG delivered several solid financial metrics, among them first quarter bookings of $37.5 million, a 14% increase over Q1 2023. Revenues at FTG for the first quarter came in at $35 million, 42% higher than Q1 2023. FTG posted net earnings of $1.1 million in Q1 2024, and FTG recorded adjusted EBITDA of $4.6 million, 42% above Q1 last year, matching the revenue growth. Additional Q1 accomplishments include integration work on both acquisitions that closed last year, which moved forward well during Q1 this year with better throughput, better pricing, and cost savings, all well underway at Circuits Minnetonka, and as of the beginning of Q2, the FTG ERP system is now live there as well. At Circuit Haverhill, the targeted cost savings have been realized, and targeted equipment investments and growth plans for the site are well underway. Further activities and the full ERP implementation for Circuits Haverhill are planned for the remainder of 2024. Additionally, to support the new acquisitions and FTG's overall growth, Leo LaCroix was brought on as Executive Vice President of Circuits to oversee FTG's U.S.

Bradley Bourne

executive
#4

Operations for Circuits, which include the site we recently acquired. Leo brings a wealth of senior management background in the circuit board sector, with sales into the defense market. FTG navigated a 6-week strike involving 67 unionized workers at the FTG Aerospace Firan facility, and that led to roughly $2 million less in product shipments during Q1. That revenue decline hurt net earnings by about $1 million. A fresh 4-year deal with those employees was reached during the quarter, and they came back to work on January 23. That new contract runs out in August 2027. As mentioned, customer orders booked in Q1 came to $37.5 million, giving us a book-to-bill ratio of 1.07:1. As of March 1, 2024, FTG's total backlog stood above $99 million, marking a 34% rise versus Q1 of last year. Jamie will share a few more specifics on our Q1 2024 results in a moment. But before that, let me address a few external matters, beginning with end market demand, which continues to be strong. Airbus delivered 735 aircraft in 2023, but even more significant is that they aim to ramp up to nearly 1,000 aircraft each year over the next few years, representing a 35% production rate increase. Airbus holds a backlog exceeding 8,000 orders, which amounts to more than a decade of production at current production rates.

Bradley Bourne

executive
#5

During the first quarter of 2024, Airbus handed over 142 aircraft, falling short of the delivery pace it aims for this year. March, however, accounted for nearly half of those handovers, which is an encouraging signal for the remainder of the year. Over at Boeing, just under 500 planes were shipped in the prior year, and the company intends to boost output by 40%, reaching close to 700 aircraft within the coming few years. Boeing's order backlog stands at nearly 6,000 planes, which at present build rates represents more than decades of work. The FAA, though, has instructed Boeing to pause any increases in its production rate while it makes certain there is adequate attention paid to quality. During Q1, Boeing handed over a mere 83 aircraft, a consequence of continuing examinations of the 737 mishap involving Alaska Air a few months back. That incident aside, the rationale behind both manufacturers' push to raise output is obvious. Turning to business jets, Bombardier posted low double-digit growth in shipments for last year, and projections for 2024 point to growth at a comparable level. Gulfspring anticipates a high single-digit growth level for 2024. This industry continues to operate in a strong growth mode. In helicopters, Bell Helicopter recorded 31% revenue growth last year and expects close to 10% for 2024.

Bradley Bourne

executive
#6

Every one of these points is encouraging as we think about what lies ahead and about demand in the years to come. We also examine the numbers coming from the major defense contractors — and every one of them posted revenue growth last year of between 2% and 7.5% versus the year before. As of today, I haven't yet seen the Q1 figures from the leading players, but the geopolitical difficulties persisting around the globe are going to keep defense budgets elevated for some time. Over a longer horizon, the latest 20-year forecast from Boeing points to long-term growth for the industry, and it still showed 20% of all new aircraft deliveries heading to China and close to 40% going to Asia, just as prior versions of that forecast have indicated. A recent forecast of the business jet market from Honeywell likewise calls for expansion in that market over the next several years, with double-digit growth rates for this sector in the near term. The simulator market <<inaudible>> the end market applications. Yet, as we never fail to remind everyone regarding this market, it is lumpy. Consequently, big swings from one year to the next do happen. As we've stated for many years, the aim at FTG is to take part in every segment of the aerospace and defense markets, since each of them follows its own separate business cycle.

Bradley Bourne

executive
#7

Having every segment expand simultaneously is a rarity, yet that appears to be exactly what we're seeing at present. With that said, I'd like to walk you through a brief update on several important FTG metrics for Q1 2024. To start, as I mentioned before, bookings — our new orders — serve as the business's leading indicator. Our bookings came to $37.5 million during the quarter, as I noted earlier. That left us with a backlog exceeding $99 million when the quarter closed. Since we've shortened our lead times, you'd normally expect that to dampen orders in the near term, but the results we're seeing don't suggest that's happening. Sales in Q1 2024 reached $35 million, which is $10.3 million higher than Q1 of last year. Acquisitions account for the bulk of that growth. Clearly, the 6-week strike at our <<inaudible>> site hurt orders to the tune of $3 million during the quarter. Even so, the remaining aerospace sites posted substantial gains — close to 80% at Aerospace Chatsworth and close to 45% at Aerospace Tianjin. At Circus Minnetonka, the Q1 run rate worked out to roughly $26 million on an annualized basis. That reflects solid progress toward bringing them to revenue levels at which they'll meaningfully add to FTG's sales and profitability.

Bradley Bourne

executive
#8

They saw robust bookings in Q1. If we look at each business individually, sales for our Aerospace segment — for Aerospace, sales stayed level at roughly $10 million in Q1 versus Q1 of last year. The strike at Aerospace-Toronto weighed heavily on what would otherwise have been a really strong quarter. Turning to the Circuit side, Q1 2024 sales rose $10.3 million, or 66%, against Q1 a year earlier. About 93% of that growth was driven by the 2 acquisitions. Sales declined at Circuits Fredericksburg while every other legacy site posted gains. At FTG overall, our top 5 customers represented 66.5% of total revenue for the quarter. That compares with 58.6% a year ago. It's also worth noting that among the top 10 customers, 6 are shared between Circuits and Aerospace. We especially like seeing the <<inaudible>> customers, since it shows we're maximizing penetration of those customers by selling both compete products and circuit ports. During Q1 2024, 27.7% of total revenues came from the Aerospace business, versus 39.1% the prior year. Aerospace's share declined, in part because of the acquisitions' impact — both were in the Circuits business — along with a 6-week strike at the Aerospace-Toronto site.

Bradley Bourne

executive
#9

At this point I'd like to hand things over to Jamie, who'll give a summary of our Q1 2024 financial results, and after that I'll discuss a few key priorities we're focused on. Jamie?

Jamie Crichton

executive
#10

Thanks, Brad, and good morning, everyone. I want to give you a bit more color on how we performed financially in Q1. FTG posted a gross margin of $8.9 million, or 25.5%, in Q1, versus $9.8 million, or 39.7%, in Q1 2023. That said, gross margin in Q1 '23 did include $2.9 million tied to the U.S. employee retention credit program, or ERC. If you set aside the effect of government systems, gross profit for Q1 '23 came to $6.9 million, or 28%. As a result, we brought in an extra $2 million of gross margin on incremental sales of 10.3. The gross margin rate fell 2.5 percentage points, and that comes from a couple of things. Product mix is less favorable, since we had $3 million of high-margin simulator product shipments in the prior year quarter and very little simulator revenue this quarter. That factor will carry into our Q2 2024 as well. The 6-week strike at Aero-Toronto led to lower fixed cost absorption and, in turn, a reduced gross margin rate. That item, though, is nonrecurring. Annualized revenue per employee came to $214,000 in Q1 2024, roughly 3% better than Q1 '23. If you exclude the impact of the strike at Aero-Toronto, we believe the increase would have exceeded 10%. The average exchange rate in both Q1 '24 and the prior year quarter was $1.35.

Jamie Crichton

executive
#11

So that's not something affecting our results. SG&A expense came in at $4.8 million in Q1 '24, compared with $3.8 million in '23, though measured against sales it fell to 13.7% from 15.2%. The dollar figure rose because of $0.7 million tied to the 2 acquisitions, which weren't part of the Q1 '23 results, plus the fact that government assistance cut SG&A by $0.5 million in Q1 2023. Some other operating expense line items went up, and for amortization of intangibles, interest expense and accretion on lease liabilities, that's a direct consequence of the acquisitions. For stock-based compensation, it's mainly a higher stock price. EBITDA was $4.6 million, or 13.0% of sales, for Q1 '24, and no adjustments were made this quarter. That said, we do believe the strike cost Q1 '24 EBITDA roughly $1 million. Adjusted EBITDA for Q1 '23, which included adjustments for government assistance and acquisition costs, came to $3.2 million, also 13.0% of sales. Over a trailing 12-month basis, revenue reached $145.5 million and adjusted EBITDA was $20.7 million, or 14.2% of sales. Net debt at Q1 '24 stood at $7.2 million versus $3.6 million at the end of Q4 -- the end of the 2023 year-end, which works out to 0.35x adjusted EBITDA.

Jamie Crichton

executive
#12

Free cash flow — which we define as cash from operating and investing activities, excluding acquisitions, less lease liability payments — showed an outflow of $3.4 million for Q1 '24. Capital expenditures for Q1 '24 came in at $3.4 million, versus $0.6 million in Q1 '23. We accelerated some capital expenditures to support efforts aimed at completing FTG's scope work tied to the Government of Canada's Aerie program, which carried a completion date of March 31, '24. Q1 2024 cash flow took a further hit of $2.3 million for income tax payments, along with performance compensation payments of $1.6 million, and both of those were driven by strong operating results in 2023. We also incurred $258,000 to settle the obligation of performance share units -- sorry, <<inaudible>> cash. The corporation used cash to buy shares in the market rather than issuing additional shares, in order to avoid dilution. FTG's total backlog stood at $99.3 million as of Q1 '24. Our focus will be on delivering quality products to our customers on a timely basis and on improving the efficiency of our operations. Our complete set of filings is now available on sedar+.com. Back to Brad.

Bradley Bourne

executive
#13

Thanks, Jamie. I'd like to go through a few key matters from the quarter and talk about growth for FTG's future performance. Our view remains that staffing levels are at, or at the proper level, to meet demand as it stands. Although we may adjust things a bit site by site down the road, most of the staffing difficulties are now behind us. We keep in mind at all times that building and shipping products is how we earn money. So we devoted considerable time, money, and investment to pushing process and productivity gains at every site. That can mean improvements to manufacturing processes, but it can also take in things such as automation. At our Circuits Toronto facility we now run a robotic system, and perhaps surprisingly, so do we at our Aerospace Tianjin facility. During Q2 of this year, we're aiming to bring the robotic process into our Aerospace-Toronto facility. Yet automation extends far past robots. Across our circuit sites we also have plenty of highly automated equipment that assists in driving productivity and process control. Investment across the company will keep flowing into automation. Going forward, integrating our new sites stays a key item for us. As for Haverhill, we bought them to expand our presence in the RF circuit board market for aerospace and defense applications.

Bradley Bourne

executive
#14

Even though they're small, with a historical run rate of roughly $4 million to $5 million, we do like what they can do. Integration should be fairly simple, since our plan is to keep operating out of their current facility with the staff they already have. Our emphasis will be on connecting our sales team with theirs to bring in new customers and expand the business. That won't happen overnight, but it's a process through which we can produce incremental margin and profitability that benefits FTG. Alongside that, there will be some targeted CapEx aimed at a few production constraints so growth becomes possible. We did capture some material savings we had targeted, and those will help us going forward. And lastly, in the future we'll transition them onto the FTG standard ERP system. This project is only now getting started. Holaday — our FTG Circus Minnetonka — was the bigger acquisition. Its sales exceeded USD 31 million before the pandemic. The pandemic hurt them the way it hurt us. We view Minnetonka's long-term positioning as a source of high-technology circuit boards, much like our Tornoto facility, except with a U.S. footprint. That U.S. footprint matters greatly, because we'll be seeking to grow our share of U.S.-only advanced circuit boards in the defense market.

Bradley Bourne

executive
#15

For the near term, there are 3 priorities for us as Minnetonka gets integrated into FTG. First, their throughput and revenues need to be ramped up. During Q3 of last year, we brought on 2 key individuals. To start, we hired Paul Godbout, who had operated our Fredericksburg facility until early in the pandemic. He is back with us on a temporary basis, and his operational expertise has assisted us beyond measure. That gives us time to locate the right person for the long term. Then, as mentioned earlier, Leo LaCroix joined us. He is a senior executive drawn from the circuit board industry, with strong aerospace and defense experience. The <<inaudible>> was also centered on Minnetonka, but he has since stepped into the larger role and now oversees FTG's U.S.-based circuit board business. I am confident that he will be a tremendous asset to FTG over the long term. Regarding Circuits Minnetonka, throughputs and -- Minnetonka's throughputs and revenues, roughly 50% of the gap has been closed toward returning to the pre-pandemic run rate. Strong demand is still what we see, so ramping throughput stays a priority item for this site. At Minnetonka, the second priority is cutting material costs.

Bradley Bourne

executive
#16

We’ve found opportunities to cut costs that can help this site, since it’s now part of a bigger company. Reaching those savings will take a while, because in certain cases it calls for customer approvals and engineering work internally. Once finished, though, we anticipate savings of roughly $1 million each year. Improving pricing is our third priority. In our view, Minnetonka hasn’t been proactive enough about raising prices while costs climbed over the last few years. We’ve already had a few wins, and we’ll keep working on this. We want to make sure that any inflationary costs that site has taken on in the last few years — whether material, labor, or something else — get passed through to customers rather than squeezing our margins. Beyond those steps, we intend to migrate them onto FTG’s standard ERP system, and at the beginning of Q2 this year, the online. There’s a transition period while we finish old jobs on the old system and build up jobs on the new one. Once that’s fully done, they’ll make sure the site runs and reports under our established standard methodology. And finally, though it isn’t an integration item right away, when we acquired the site, we believed we could broaden and grow its customer base with a focus on the U.S.

Bradley Bourne

executive
#17

On the defense side of the market, that process is already underway. A number of customers have shown genuine interest in putting this site onto their approved supplier lists. That's the positive side. The negative side is that clearing a new site for approval usually takes quite a while. Even so, we'll keep our attention on it so the site can grow over the next several years past the high point reached before the pandemic. During Q1, demand remained strong at most of our sites. Our backlog increased in Q2 to more than $53 million, with the new site included. It isn't a great metric, but we closed Q1 with more than $14 million of past due orders, which is below the $18 million we had at the close of Q3 last year yet above the $12.5 million recorded at year-end. More than half of those past-due orders sit at Aero-Toronto. The labor strike at Aero-Toronto contributed heavily to that rise. To bring the number down as quickly as we can, we've coordinated with our customers to move a portion of production out of our Aerospace-Toronto facility and into other aerospace facilities, at least over the near term. That ought to help us in Q2 and afterward get back to solid on-time performance at every FTG site. As is always the case, possible downsizing or headwinds might affect how we perform going forward.

Bradley Bourne

executive
#18

Now that the labor contract at Aero-Toronto is finalized, we have just 3 years remaining until the next one comes up for expiration. That means this risk is taken care of for 2 years. We keep as close an eye as we can on the Canadian-U.S. dollar exchange rate. Even so, for quite a while now it has held fairly steady at favorable levels. The risk from supply changes is getting smaller. We do see certain items with long lead times, but it's not as pronounced as what we saw early in 2023. And just so everybody is clear, we've raised our SG&A costs by roughly $1 million to $1.5 million each quarter, on approximately $10 million of additional sales coming from the acquisition. Those costs include about $400 million per quarter along with higher financing costs than in Q1 of last year, plus greater labor costs for SG&A staff at the new locations, and increased lease accretion costs from the new leases associated with the new acquisitions. We expect growth in 2024 versus 2023, just as we achieved in Q1. The simplest part of our growth will come from owning the acquisitions for the entire 12 months this year, rather than just 7 months in 2023. That ought to contribute an estimated $12 million in additional sales for 2024.

Bradley Bourne

executive
#19

If we can increase output and sales at the sites we recently acquired, that would contribute even more to our growth. And we keep securing new programs throughout the company that will add incremental organic growth on top of everything else. In addition to that, as I mentioned earlier, customer demand remains strong. And we will continue to realize further gains from the high-value assembly orders we booked early in 2023, since those will be full year benefits for us in 2024. Those assemblies are on Boeing and Airbus aircraft. And we will see the benefit of the C919 program in China as it moves into production. We shipped our first production orders last year, and we expect significant production rate increases later in 2024. Given the more complex geopolitical situation in China, I'm sure concerns remain about our activities there. But in 2023, both of our operations in China had their best sales year ever. That continued in Q1, with the site seeing 13% and 45% growth compared to Q1 last year. As I've mentioned in previous quarters, we <<inaudible>> cash back to Canada during 2022 and 2023. In total, we've now brought back $2.2 million in cash.

Bradley Bourne

executive
#20

This approach means we avoid having excess funds stuck inside China, and it lowers the risk we face from anything that might worsen in relations between Canada — or China and the West. We expect to repatriate additional cash during 2024. That said, we're taking a careful approach to our Chinese operations, since any additional rise in friction between China and other nations might affect what we do there. We keep evaluating potential corporate development opportunities that could suit either of our businesses. Such opportunities do exist, though it's premature to say whether they'd represent a solid fit and a solid deal for FTG. Given our emphasis on operational excellence across every part of FTG, our robust financial results last year and in Q1 this year, our recent acquisitions and our major sales wins, we feel confident that we're on a powerful long-term growth path. That brings our presentation to a close. Thank you for listening. At this point I'd like to take your questions by phone. Karina?

Operator

operator
#21

<<operator_script>> Our initial question is from Acumen's Nick Corcoran.

Nick Corcoran

analyst
#22

I have a couple of questions. First, regarding the backlog of roughly $99 million, what portion do you anticipate completing during the second quarter?

Bradley Bourne

executive
#23

All right, so backlog overall sits at $99 million, and the portion due in Q2 is 53.. I believe I mentioned that we won't be shipping 53, — that much I can guarantee. That said, I do think there are a couple of factors to consider for Q2. Q2 tends to be among our stronger quarters. Fewer holidays, fewer vacation days. There's no Christmas shutdown, so we end up with essentially the maximum number of production days, and that works in our favor. So my hope would be that Q2 this year comes in around the same level as Q4 last year, or perhaps slightly above it.

Nick Corcoran

analyst
#24

Thanks. Now, regarding the troubles at Boeing, have you noticed anything in the supply chain suggesting they could be reducing any of their orders?

Bradley Bourne

executive
#25

No. As of right now, we haven't seen any impact. A few things do happen, but in this industry, altering production rates is a major undertaking, whether you're raising them or lowering them. So at this point, Boeing hasn't made any effort or attempt to change production rates on its aircraft. They're keeping them where they are. They may not be shipping planes out to customers, but production rates remain unaffected. And I think they believe they'll get through the reviews — and they really are through most of the reviews — and get back to shipping product to customers. So as long as the production rate holds, we see no impact.

Nick Corcoran

analyst
#26

Also, something you brought up in your prepared remarks is that you've managed to get better pricing. At this point, how much of that pricing do you figure you've passed through?

Bradley Bourne

executive
#27

That's a fair question, and I'll give you a straight answer, Nick — for Q1, I don't have a figure. We examine this daily, both in terms of opportunities and in terms of contracts coming up for renewal, and we establish target margins for what we aim to accomplish. So when a contract is renewing, we go through margins on a part-by-part basis and confirm that we're hitting our objective. Alongside that, we're being quite cautious as we move forward, and we've been operating this way for over a year now. When we renew agreements with customers, we're either using annual pricing, which lets us revisit it every year, or we'll build an escalation clause into the pricing or the contract, giving us a mechanism to adjust prices automatically going forward. So these are the steps we're taking to ensure we can consistently pass along any incremental cost increases to the customer and avoid having our margin squeezed.

Nick Corcoran

analyst
#28

Thanks. I’ll wrap up with one final question from my side. Regarding CapEx for fiscal ’24, can you give any indication of what you expect for the year?

Jamie Crichton

executive
#29

For the remainder of the year, Nick, I'd describe CapEx as normal — except that we have one more maintenance capital item. There's a roof we need to deal with, along with <<inaudible>>, and that's a fairly significant item. It comes in at roughly the $1 million level, and it will happen around the Q2, Q3 timeframe. Apart from that, CapEx for the rest of the year should be pretty much normal.

Operator

operator
#30

<<operator_script>> Our following question is from Eric Chu.

Analyst

analyst
#31

Nice quarter, congratulations. I’ve got a quick question about your exposure in Asia and to COMAC. Would you expect that to provide a meaningful boost over the next year or the next 2 years? And if it does, do you have a rough idea of how large that amount might be?

Bradley Bourne

executive
#32

In short, yes. Though — and this is worth noting — we've now been involved with the C919 program for 10 years. When we began, I think we expected the development timeline to move much more quickly. Regardless, it is finished. And — but right from the start, there were forecasts that this aircraft's output would climb toward roughly 140 planes annually. That remains their intention. As for us, that won't be the case in the current year, to be clear, but they are increasing output. They've moved into genuine production, and it will rise every year. From our perspective, it's a meaningful amount — perhaps not transformative — but I think it would come to around $5 million in added revenue beginning soon and growing from there.

Operator

operator
#33

<<operator_script>> Our following question is from Alan Jacobs.

Analyst

analyst
#34

Brad, my question concerns how the strike affected things. If sales come to $3 million, how is it that the hit to net income could reach as much as $1 million — that works out to roughly a 33% margin. I mean, did something out of the ordinary occur, because even assuming that facility carried margins above the average, 32% just strikes me as a large figure when measured as a percentage of the sales that were lost.

Bradley Bourne

executive
#35

Yes. But honestly, that really comes down to FTG's economics. At every one of our sites, we carry fixed costs of roughly 30%, and those stay put whether you move nothing at all or send a large volume to particular locations — that's why they're called fixed. As a result, the contribution margin we get on incremental revenue, whether that revenue rises or falls, lands closer to 33%, somewhere around there. So to be clear, that figure is our own estimate, since we lack an exact number for what didn't ship and, by extension, for the margin that wasn't achieved. The important thing, though, is the contribution margin effect on the site and on FTG, rather than just a normalized margin applied across the whole business.

Analyst

analyst
#36

And what about all the costs — taxes and everything else — or how taxes would affect that $1 million?

Bradley Bourne

executive
#37

Right, and taxes do have an effect. Still, in fairness, we aren't aiming for a very exact figure here. What we want is a rough estimate. So what we're saying is roughly 1/3 of the revenue represented the bottom line impact on us. If you'd prefer to assume somewhat lower or somewhat higher, that's fair. I hear you. Still, I'd call that a fairly reasonable estimate. It falls somewhere in that ballpark.

Jamie Crichton

executive
#38

For clarity’s sake, that $1 million figure is on a pretax basis. In addition, we describe <<inaudible>> million as the projected impact after taxes.

Operator

operator
#39

<<operator_script>> Our following question is from Eric Chu.

Analyst

analyst
#40

Brad, do you expect to make any acquisitions this year or over the next couple of years, particularly in North America? Or are the targets you're evaluating mostly Chinese corporate development ones?

Bradley Bourne

executive
#41

Our track record and our strategy as we move ahead is that we're going to attempt to expand this business. We're going to attempt to grow it organically, and we're trying to — we would like to add acquisitions on top. The timing of those is always unpredictable. We have to locate targets, they have to be open to a conversation. There has to be a transaction that makes sense. So will one occur this year or next year? I hope so. But certainly, there are no guarantees. Regarding what we would be examining, I'd say it could be several things. In certain cases, we're seeking to bring in technology. I think if you look at the IMI acquisition last year, we're trying to bring some RF circuit board technology into the business. So that was an acquisition for technology. At some point, and again, I don't know whether it would be this year, next year or beyond, at some point, I believe it's in FTG's interest to have a footprint in Europe. Good or bad, Airbus is outperforming Boeing these days. And if you want to grow your share with Airbus, it's easier to do it from a U.S. — or from a European footprint.

Bradley Bourne

executive
#42

In the same way, defense budgets have been rising considerably across Europe. They are nearer to certain of the active conflicts. If you consider European defense spending collectively rather than country by country, that amount is substantial—approaching the level of U.S. expenditure. That's essentially the second rationale for having a presence in Europe. And building on that same point, India is another geography that might interest us down the road. When we examine defense spending globally, the U.S. is clearly first. Europe is substantial. Russia and China are markets we won't pursue, and India comes next on that list. So the Indian market is one we could potentially address at some point too. There are therefore multiple factors we're weighing regarding what potential acquisitions might accomplish, and we have to connect that to what's actually available and what constitutes a sensible transaction. So we're looking. We would be glad to complete one within the coming couple of years.

Operator

operator
#43

That brings us to the end of the question-and-answer session. At this point, I'll hand things back over to Mr. Brad Bourne. Please go ahead.

Bradley Bourne

executive
#44

Thank you. A recording of this call can be accessed through Sunday, May 12, by dialing the numbers listed in our press release. That recording will also be posted on our website within a few days. I appreciate everyone's interest and for joining us. Thank you.

Operator

operator
#45

That brings us to the end of today's conference call. We appreciate everyone for joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Firan Technology Group Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Firan Technology Group Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Firan Technology Group Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.