Firan Technology Group Corporation (FTG) Earnings Call Transcript & Summary
July 11, 2024
Earnings Call Speaker Segments
Operator
operatorHello, everyone, and good morning. I’m Rochelle, and I’ll be serving as your conference operator for today. I’d like to welcome all of you to the FTG Q2 2024 Analyst Call. Every line has been muted. A question-and-answer session will take place after the call. Should you wish to ask a question at that time, just press star and then the number one on your telephone keypad. To withdraw your question, press star and then the number two. Please be aware that this call is being recorded. At this point, I’d like to hand the call over to Mr. Brad Bourne, President and Chief Executive Officer of FTG. Mr. Bourne, you may go ahead.
Brad Bourne
executiveThank you. Good morning. Brad Bourne here — I serve as President and CEO of Firan Technology Group Corporation, which we call FTG. Joining me on today's call is Jamie Crichton, our Chief Financial Officer. Before we proceed any further, I need to warn you that forward-looking statements may be included on this call. Those statements rest on management's present expectations for the company and by their nature carry many risks and uncertainties, both known and unknown, among them economic factors and the industry the company operates in generally. That list I just gave is not exhaustive of every possible factor. Forward-looking statements of this kind are not promises of future performance, and actual events and results may differ materially from what such statements by the company express or imply. Listeners are advised to weigh these and other factors carefully when making decisions about the company and not to rely unduly on forward-looking statements. The company does not undertake, and has no specific intention, to update any forward-looking statements, whether written or oral, that may be made from time to time by it or on its behalf, whether because of new information, future events, or otherwise. Our positive momentum carried on through Q2. As always, we faced a few challenges that had to be overcome, but we succeeded thanks to the efforts of people throughout FTG.
Brad Bourne
executiveI want to express my gratitude to the entire FTG team for their dedication and the role they played in driving our achievements. Success here comes from collaboration among all 670 employees throughout the company and across the globe. During Q2 2024, FTG posted several impressive financial results, among them Q2 bookings of CAD 58.7 million, which rose 46% compared with Q2 of the prior year. Q2 revenues came in at CAD 38.8 million, a 14% gain versus Q2 last year. Adjusted net earnings for Q2 2024 reached CAD 2.6 million, 13% higher than Q2 2023. We delivered Q2 adjusted EBITDA of CAD 6.5 million, marking a 25% increase versus Q2 last year, and free cash flow for the quarter came to CAD 2 million, which is CAD 2.4 million more than in Q2 2023. Additional Q2 highlights include orders booked during the quarter totaling CAD 58.7 million, yielding a book-to-bill ratio of 1.51:1. Among those, we secured a contract valued at roughly CAD 17 million for cockpit assemblies supporting the C919 aircraft in China. Shipments begin in the second half of 2024 and run through 2026. Manufacturing will occur at FTG's facilities in Toronto, Canada, and Tianjin, China.
Brad Bourne
executiveManufacturing kicks off in Toronto, then shifts to Tianjin over the life of the contract. That comes following 12 years of development work on the program. At our quarter end of May 31, 2024, total backlog stood at roughly CAD 120 million, up 22% versus Q2 of last year. Integration work at Circuits Minnetonka moved ahead nicely during the quarter, and that includes launching the FTG ERP system. The ERP cutover in March and April caused some production effects, though May brought throughput back to the level we expect. Circuits Minnetonka also landed a renewed multi-year deal with one of its biggest customers this quarter, at better pricing. Integration at Circuits Haverhill moved forward as new drill and electrical test equipment arrived. Customer base expansion went well in the quarter. New servers and the FTG ERP software were installed at the site during the quarter. We aim to complete full implementation of our ERP system across the second half of this year. Jamie will walk through our Q2 results in more detail shortly, but first let me address a few external items. Demand in our end markets is still strong. Airbus delivered 735 aircraft last year. Through June 2024, they have shipped 323, a slight rise from year to date June 2023, yet under their planned rate for the year.
Brad Bourne
executiveHowever, in that context, during Q2 they achieved an annualized delivery rate of 724 aircraft, which comes quite near their goal. Airbus's Q2 shipments rose 27% compared with Q1. Over the coming few years they aim to climb toward nearly 1,000 aircraft per year, representing a 35% increase in production rate. Airbus holds a backlog exceeding 8,000 aircraft on order, which at present production rates amounts to more than a decade of output. Turning to Boeing, they delivered slightly fewer than 500 planes last year and intend to raise output by 40% to nearly 700 planes annually over the next few years. Boeing's backlog stands at almost 6,000 planes, which likewise represents more than ten years of orders at current production rates. Yet the FAA has instructed Boeing to cap production while it makes certain there is adequate emphasis on quality. During Q2, Boeing handed over merely 92 aircraft, which, surprisingly, reflects an 11% gain over Q1. Across the initial six months of 2024, Boeing's shipments fell 33% relative to the first half of the prior year, largely because of the fallout from the Alaska Airlines incident. In the business jet segment, Bombardier posted low single-digit shipment growth for 2023, and forecasts for 2024 point to a comparable growth level.
Brad Bourne
executiveIt was encouraging to see the labor dispute resolved yesterday. For 2024, Gulfstream anticipates growth at the high single-digit level. This industry is still expanding. On the helicopter side, Bell Helicopter posted 31% revenue growth in 2023 and expects growth of close to 10% this year. Even so, new aircraft shipments declined slightly in Q1 2024. We stay optimistic about future demand across various market segments over the years ahead. I'm also watching results from major defense contractors, and notably, Lockheed Martin's revenues in Q1 of this year — or rather Q2 of this year — rose a surprising 14% versus last year. Persistent political tensions around the world will keep defense spending elevated for some time. Over the longer term, Boeing's latest 20-year forecast indicates long-term industry growth, and it again showed 20% of all new aircraft deliveries heading to China and nearly 40% going to Asia, consistent with all of their recent forecasts. Traffic in the business jet market has already recovered. A recent longer-term business jet forecast from Honeywell likewise projects growth for this market in the years ahead, with growth rates near double digits for the sector.
Brad Bourne
executiveThe simulator market reflects the end-market applications, but as we consistently point out regarding this market, it's uneven, meaning bigger fluctuations from one year to the next do happen. For a long time we've stated that FTG aims to take part in every segment of the aerospace and defense market as each one works through its own separate business cycles. It's rare that all segments expand simultaneously. That appears to be happening at present. On top of that, allow me to provide a brief update on several important metrics for FTG in Q2 2024. To begin, the primary forward-looking measure of our business is bookings, meaning new orders. As mentioned before, bookings came in at CAD 58.7 million during Q2. That produced a backlog of CAD 120 million when the quarter closed. Once more, the substantial order for cockpit products on the C919 aircraft was the driver behind the quarter's orders and the growth in our backlog. During Q2 2024, sales rose, reaching CAD 38.8 million, an increase of CAD 4.8 million, or 14%, over Q2 of the prior year. Our aerospace business declined by CAD 3.6 million in Q2 compared with Q2 of last year, owing to a mix of weaker simulator sales during the quarter and certain customer-driven delays involving new assemblies that we were unable to ship in Q2.
Brad Bourne
executiveThe backlog is still solid for this business. In the quarter, our circuits business increased by CAD 8.4 million, or 40%, mostly because of the acquisitions, since we held them for one month in Q2 of last year and for all three months in Q2 of this year. At Circuits Minnetonka, the Q2 run rate came in at roughly $25.4 million to $27.5 million annualized. That shows solid movement toward reaching revenue levels at which they will meaningfully add to FTG's sales and profitability. It is all the more impressive considering that they went live with the new ERP system during the quarter. Although this did affect production levels early in the quarter, Q2 sales rose 6% from Q1 to Q2. They also posted strong bookings again in Q2. After a somewhat slow beginning to 2024, Circuits Haverhill ramped up 60% in Q2 versus Q1 of this year. Across FTG overall, our five largest customers represented 55.9% of total revenue in the quarter. That compares with 52.6% a year ago. Notably, though, two of the top five are new this year, and both stem from sales at our Minnetonka site. One was an existing customer that expanded through the Minnetonka acquisition, and the other is a new customer for FTG.
Brad Bourne
executiveOne more point worth highlighting: among our top 10 customers, five are shared between Circuits and Aerospace. That shared-customer dynamic is encouraging to us, because it shows we're getting the most out of our penetration of those accounts by selling both cockpit products and circuit boards. Another notable item: one of our top 10 customers in Q2 2024 purchases aftermarket defense items. During Q2 2024, our aerospace business accounted for 25.5% of total revenues, versus 39.2% a year earlier. That lower share of the aerospace business stemmed partly from the impact of the acquisitions, both of which sit in the circuits business, and partly from a decline in the simulator business. At this point I'd like to hand the call to Jamie, who will walk through our financial results for Q2 2024, and after that I'll discuss a few key priorities—priorities that we're actively working on. Jamie?
Jamie Crichton
executiveThanks, Brad, and good morning, everyone. With sales of CAD 38.8 million, FTG posted a gross margin of CAD 10.8 million, or 27.9%, in Q2 2024, versus CAD 10.1 million, or 29.4%, on sales of CAD 34 million in Q2 2023. The rise in gross margin dollars stems from higher sales volumes at the recently acquired circuits sites along with operational improvements. Adjusted for government assistance of CAD 0.3 million, the gross margin rate for Q2 2024 came in 0.7 margin points below the prior year quarter. Several factors weighed on the gross margin rate in Q2 2024: softer sales of simulator products, which tend to be lumpy, and reduced productivity early in the quarter at Circuits Minnetonka while an ERP system implementation was underway. By the third month of Q2 2024, that ERP implementation was largely finished, and weekly productivity at the Minnetonka site had surpassed the levels achieved before the system went in. Sequentially, gross margin in Q2 2024 rose by CAD 1.9 million, or 2.4 margin points, against Q1 2024, on a sales increase of CAD 3.8 million. Q1 2024 gross margin took a negative hit from a six-week strike at FTG Aerospace Toronto, which was settled in January 2024.
Jamie Crichton
executiveIn the second quarter of 2024, the average foreign exchange rate came in at CAD 0.7, which was 0.5% more favorable than in Q2 2023, so it didn't play a material role in our results. Annualized revenue per employee for Q2 2024 stood at CAD 234 thousand, a decline of 0.4% versus Q2 2023. Once again, simulator products revenue was lower in Q2 2024, and those assemblies carry a high content of purchased components. SG&A expense came to CAD 4.8 million, or 12.3% of sales, in Q2 2024, compared with CAD 4.4 million, or 13.0% of sales, in Q2 2023. The rise in SG&A is mainly attributable to picking up three months of SG&A at the acquired sites this year, versus one month in the prior year quarter. As sales have increased, SG&A as a percentage of sales has come down. R&D costs in Q2 2024 were CAD 1.6 million, or 4.1% of sales, versus CAD 1.6 million, or 4.8% of sales, in the prior year quarter. R&D efforts encompass process development within the Circuit segment as well as work to develop and qualify products for future aerospace programs. Adjusted EBITDA for Q2 2024 was CAD 6.5 million, or 16.7% of sales, compared with CAD 5.2 million, or 15.3% of sales, for Q2 2023.
Jamie Crichton
executiveIn the prior-year quarter, EBITDA adjustments were minimal, related to government assistance and acquisition costs. For the trailing twelve months ended Q2 2024, adjusted EBITDA comes to CAD 22.0 million, which is 14.6% of sales, on sales of CAD 150.4 million, and net debt has now been brought down to 0.24 times adjusted EBITDA for that trailing twelve-month period. Free cash flow — defined as net cash from operations and investing activities, including activity effects of foreign exchange, excluding acquisitions, less lease liability payment — stood at CAD 2.0 million for Q2 2024, versus CAD -0.4 million in the prior year quarter. That rise in free cash flow stems from higher operating cash flow and lower capital expenditures. For the second half of 2024, CapEx investment is expected to be in line with our long-term target of 8% of revenue, excluding approximately $1.1 million for a partial roof replacement at the FTG Circuits Toronto facility. We head into the second half of 2024 with a record backlog of nearly $120 million. Delivering quality products to our customers on a timely basis and improving the efficiency of our operations will be our focus. Our complete set of Q2 filings is now available on SEDAR+.com. With that, I'll turn things back to Brad.
Brad Bourne
executiveThanks, Jamie. I'd like to go over a few other matters from the quarter and/or regarding how FTG will perform going forward. Our belief remains that staffing is roughly where it needs to be in order to meet the demand we currently have. Although we may make small adjustments site by site in the future, most of the staffing difficulties we faced are now resolved. We never lose sight of the fact that our profits come from building and shipping products, so we devote considerable time and money to pushing process and productivity gains at every site. That can mean improvements to manufacturing processes, and it can also mean things such as automation. At this point we have several robotic systems up and running at our Circuits Toronto facility and, perhaps to some surprise, at our Aerospace Tianjin facility. We're installing robotic process at our Aerospace Toronto facility, and during the quarter it turned out some production parts, though it isn't fully operational yet. Yet automation extends far past robotics. Across our Circuit sites we have plenty of highly automated equipment that assists in driving productivity as well as process control. Investment in automation will remain a major focus throughout the company. Going forward, integrating our new sites stays the key item for us.
Brad Bourne
executiveSo for Haverhill, the reason we bought them was to expand our footprint in the RF circuit board market serving aerospace and defense applications. They're small — the historical run rate is roughly CAD 4 million to 5 million — but we genuinely like what their capabilities bring. Integration should be fairly simple, since our plan is to keep operating them out of the facility they're in today with the staff they already have. What we'll concentrate on is getting our sales team working with them to bring in new customers and expand the business. That won't happen overnight, but it's an opportunity for us to deliver incremental margins and profitability that benefit FTG. Alongside that, there will be some targeted CapEx aimed at a few production constraints so future growth is possible. During the quarter, two new drills and an electrical test machine were installed at the site. We also captured some targeted material savings, and those will help us going forward too. And last, we'll eventually migrate them onto FTG's ERP system. That project is only just beginning. The bigger acquisition was FTG Circuits Minnetonka. Before the pandemic, their sales exceeded $31 million. The pandemic hit them the way it hit us. We view Minnetonka's long-term positioning as a source of high technology circuit boards, comparable to our Toronto facility, except with a U.S.
Brad Bourne
executiveOur footprint here in the U.S. matters a great deal, since we intend to expand our position in the American-only advanced circuit board market serving defense. As we bring Minnetonka into FTG, three priorities guide us over the near term. The first is ramping production and throughput at that site. They have narrowed the gap by roughly 50% to return to the run rate they had before the pandemic. Demand continues to look strong, so raising throughput stays at the top of our list for this site. The second priority in Minnetonka involves lowering material costs. We have found opportunities for cost savings that can help this site now that it belongs to a bigger company. Achieving those savings is taking some time, and in certain cases it calls for customer approvals along with internal engineering work. Once finished, we anticipate savings of approximately CAD 1 million each year. Improving pricing is our third priority. We have already had a few successes and will keep working on this. We want to make sure that any inflationary costs that site absorbed over the past few years — whether material, labor, or other — get passed through to our customers rather than compressing our margin. During our Q2, we renewed a contract with one of our key customers that included higher pricing and incremental revenue.
Brad Bourne
executiveOn top of those steps, we had planned to shift them onto FTG's standard ERP platform, and we went live at the beginning of Q2 of this year. A transition period follows as we finish running jobs out of the legacy system while ramping jobs up in the new one. We did hit some inefficiencies and had trouble with throughput in March, though April came in better and by May throughput and revenue were back to the levels we expect. Our results also carry some noise, since this implementation took us from a rather simplistic method of valuing WIP and finished goods to a more sophisticated standard costing model. Finally, though it wasn't an integration item right away, at the time we acquired the site we thought we could broaden and grow its customer base, which centers on the U.S. defense market. That has already begun. We're seeing genuine interest from a number of customers about putting this site on their approved supplier list. So that's the good news. The bad news is that getting a new site approved usually takes a long time, but we'll remain focused on it so this site grows over the years ahead past its pre-pandemic high point. Across most sites in Q2, we saw demand stay strong.
Brad Bourne
executiveOur total backlog stands at CAD 120 million, and more than CAD 50 million of that is scheduled for Q3. Although it isn't a great metric, we finished the quarter with slightly above CAD 12 million in past due orders — however, that's lower than the CAD 14 million we had at the close of Q1 and also below the CAD 18 million recorded at the end of Q3 last year. More than half of those past due orders sit at our Aero Toronto facility. Deliveries there were affected by the strike during Q1. They likewise had certain past due assembly orders stemming from design changes requested by our customers, so although those orders appear late, customer decisions are what drive that. For remaining work at our Aerospace Toronto facility, in order to bring past due orders down as quickly as we can, we've coordinated with our customers to move a portion of production from Toronto over to our other aerospace site, at minimum for the near term. We've made the decision to bring on some extra staff. That ought to assist in Q3 and afterward in getting back to solid on-time performance at that location. What makes Q3 difficult for us is the number of available production days. Q3 for us spans June, July, and August, when certain plants close for a week while others experience greater vacation-related absences.
Brad Bourne
executiveUsually, we figure we lose roughly one week's worth of production during the quarter, which works out to around 8%. We expect growth in 2024 versus 2023, the same as we saw during the first half. The simplest part of that growth will come from having the acquisitions for a full 12 months rather than seven months in 2023. That ought to contribute an estimated CAD 12 million in sales to this year. Should we manage to ramp production and sales at the newly acquired sites, that would add even more growth. We keep winning new programs throughout the company, which will layer on incremental organic growth. At our U.S. sites, we've secured some initial orders for a new defense program, with those initial orders valued at roughly CAD 1 million, deliverable in 2024. That program is expected to ramp to full-scale production in 2025 and beyond. We'll see additional benefit from the higher value cockpit product assembly orders first booked in 2023 once we finish the redesign the customer requested. These assemblies go on Boeing and Airbus aircraft, and we will see the benefit of the C919 program in China moving into production. We shipped our first production orders last year, and we now hold over $17 million in orders due through 2026.
Brad Bourne
executiveGiven the increasingly complicated geopolitical climate in China, people might have worries regarding what we do there. Even so, in 2023 our two operations each enjoyed their strongest sales year on record. That momentum carried into Q2, when the site recorded growth of 30 and 66% versus the same quarter a year earlier. As I noted in earlier quarters, over the past two years we have moved cash back to Canada, and altogether we have now repatriated $2.2 million. Through these actions, no excess cash sits stranded in China, which lowers our exposure should relations between China and the West worsen. We are striving to repatriate additional cash during Q3 of this year, though we remain cautious regarding our Chinese operations, since any further rise in tensions pitting China against other nations might affect what we do there down the road. We keep evaluating potential corporate development opportunities that might suit either of our businesses. Such opportunities exist, yet it is too soon to tell whether they would prove a good fit and a good deal for FTG. With operational excellence as the focus across every part of FTG, together with our robust financial results last year and in the first half of this year, our acquisitions, and our key sales wins, we feel confident that we are on a solid long-term growth trajectory.
Brad Bourne
executiveThat brings our presentation to a close. Thank you for listening. At this point, I'd like to take questions from the phone lines. Rochelle?
Operator
operatorThank you. Ladies and gentlemen, we will now begin the question-and-answer session. Should you have a question, please press the star followed by one on your touchtone phone. You will hear a prompt that your hand has been raised. Should you wish to decline from the polling process, please press the star followed by two. If you are using a speakerphone, please leave the handset before pressing any keys. One moment, please, for your first question. Your first question comes from the line of Nick Corcoran from Acumen Capital. Your line is now open.
Nick Corcoran
analystMorning, everyone. Nice work on a solid quarter and that record backlog — congratulations.
Brad Bourne
executiveI appreciate that.
Nick Corcoran
analystMy first question is about the bookings for the 919 or C919. Is that tracking in line with, or ahead of, what you originally expected?
Brad Bourne
executiveThat's a good question. When we launched that program 12 years ago, it has clearly fallen roughly seven years short of what we expected. On a more recent basis, though, it is running ahead when it comes to the production ramp. And I don't recall the precise figure — I'd say it's roughly 170 ship sets across the coming 2.5 years, and that ramp is quicker than what they had projected for quite a while. And certainly, COMAC is exploring ways to speed up their production so more aircraft get into the field.
Nick Corcoran
analystGreat. So how should we view that contract? Is it weighted toward the beginning and then reduced across those 2 years, or could there be further renewals prior to its completion?
Brad Bourne
executiveSure, so I'd say there are a couple of points there. First, this is definitely a booking that spans 2.5 years, and we'll be drawing it down over that stretch. That said, those are production orders. They've indicated there will be a need to add some spares orders along the way, so that will generate some add-ons as a result. And then, certainly, before this contract comes to an end, they'll be tacking on additional years at the tail end of it. This is one of those annuity-style programs that ought to deliver continuing revenue over the next 20 years, assuming everything goes to plan.
Nick Corcoran
analystAlright. Turning to headcount, perhaps — what's your sense of productive capacity at the moment?
Brad Bourne
executiveOkay, so I'm comfortable with where our staffing stands right now. That said, as I mentioned, we made some slight adjustments after reviewing conditions at the different sites. And to be sure, we've just agreed to bring on more people at Aero Toronto at this point, since that's where our largest backlogs sit, and the sole way to clear them is to build more. To build more, we'll be adding staff. So we're looking to hire there. I believe there will be modest additions at a few other sites soon. We're pressing Minnetonka to ramp production up further in Q3, and they certainly have the backlog to back that up, so a handful of additions may happen there too. But we aren't discussing 10, or 20s and 30s. What we're discussing is fairly small numbers at every site. And as far as total capacity goes — and again, this isn't something I can pull off overnight — certainly, at FTG, given the equipment and plants throughout the company, our capacity exceeds CAD 200 million.
Brad Bourne
executiveReaching those kinds of figures would certainly require us to bring on more people, though that isn't something that could occur overnight.
Nick Corcoran
analystThanks, good color. And there's been a great deal of news around Boeing lately, and I believe you noted during your prepared remarks that deliveries have decelerated compared with a year earlier. Do you see any signs yet that the supply chain has begun to slow?
Brad Bourne
executiveWell, there is a certain amount of disruption in the supply chain, I'd say. Boeing isn't eager to cut production rates, you know, since ramping output up or down is a major undertaking for a company of that size, and once they bring rates lower, getting them back up again would be, well, difficult for them. So they're taking a careful approach, but this situation has stretched on for longer than they — and I believe everyone — would have liked. As a result, we're noticing some turbulence in our backlog where we supply into Boeing's programs. Still, I would say this isn't a concern for me right now, given how many other things we have underway. My sense is it won't have a material effect on our results over the next few quarters.
Nick Corcoran
analystThanks, that's useful. Perhaps I could squeeze in one final question. For the rest of fiscal 2024 and looking ahead to 2025, what's your thinking on M&A?
Brad Bourne
executiveHonestly, the way the business is operating at the moment sits well with me. Sure, a handful of issues always need attention, but that leaves me room to get more focused on the M&A side of things. Opportunities clearly exist out there. During the latest quarter we looked into and heard about quite a few of them. Some, no question, don't suit us well, so they've dropped away. A few others seem appealing. So we'll keep moving that process along, though as I regularly put it, in the end these things are binary, correct? A 50% acquisition isn't something you can do. It's a one or a zero. So we'll see. Still, certain opportunities are there, and I believe we've got some time on our hands to concentrate on them properly. Without question, our balance sheet lets us act when we reach that stage.
Nick Corcoran
analystAppreciate the detail there. Thanks for fielding my questions.
Brad Bourne
executiveAppreciate it.
Jamie Crichton
executiveAppreciate it, thank you.
Operator
operatorThank you. Just a quick reminder that pressing star one is how you can ask a question. At this point, we have no more questions. Mr. Bourne, please go ahead.
Brad Bourne
executiveAll right, thanks. Until Sunday, August 11, a replay of this call can be accessed at the numbers listed in our press release. Within a few days, that replay will also be posted on our website. I appreciate everyone’s interest and participation. Thanks.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Firan Technology Group Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Firan Technology Group Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Firan Technology Group Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.