Ingela Ulfves
executiveGood morning, everyone, and greetings from a chilly Helsinki. A warm welcome to the joint webcast and news conference Fortum is holding today for the investor community and media, covering our financial statements for the full year 2025. I'm Ingela Ulfves, and I head investor relations here at Fortum. As usual, this event is being recorded, and a replay will be available for you later today on our website. Joining me in the studio once again are our CEO, Markus Rauramo, and our CFO, Tiina Tuomela. Markus and Tiina will walk us through the group's financial and operational performance for the fourth quarter and the full year 2025. Now let's move to our presentations, and after that we'll take your questions in the Q&A session. I'll hand over to Markus to begin.
Markus Rauramo
executiveThanks so much, Ingela. On my side as well, a warm welcome to the call covering our full-year 2025 results. I'll begin by walking through the main points from our highlights and our financial performance, and then I'll say a few words regarding the hydrological situation as well as our strategic KPIs. Following that, Tiina will go into more detail on the financials and explain how operational performance fed through into our results. So let me begin with the highlights. Beginning with the outright sales price, the achieved power price for both the fourth quarter and the full year came in a touch under last year's figure: €51.4 per megawatt-hour versus €52.5 per megawatt-hour across the full year. Our realized market price — that is, the blended price for Fortum's price areas — stood at nearly the same level as a year earlier: €38.5 per megawatt-hour in 2025 against €38.4 per megawatt-hour in 2024. A clear standout from last year was the optimization premium. Consistent with the guidance we gave in the autumn, the realized premium in '25 came to €9.7 per megawatt-hour. Generation volumes last year were abnormal. In particular, extended unplanned outages at the Oskarshamn nuclear power plant weighed on volumes. All told, hydro and nuclear volumes ended up 3.9 TWh under 2024 and roughly 6 TWh beneath the level of normal volumes.
Markus Rauramo
executiveOur efficiency improvement program wrapped up at the close of 2025. We cut annual fixed costs by €100 million, inflation excluded. The full run rate takes effect starting at the beginning of 2026, and we anticipate fixed costs of roughly €870 million this year. During 2025, we acquired two renewables development project portfolios in Finland — one from Enersense and one from Abo Energy. Fortum's pipeline of onshore wind and solar projects in the permitting phase now stands at approximately 8 GW, with additional projects in earlier development stages. Our Consumer Solutions unit also completed one acquisition, purchasing Orange Energia in Poland. That deal doubled our Polish Consumer Solutions customer base. On decarbonizing our own fleet, progress is being made via the decarbonization projects in Poland, at both Częstochowa and Zabrze. This aligns with our goal of exiting coal by the end of 2027. Early in the year, we also committed to SBTI-validated short- and long-term targets as well as a net-zero target by 2040. In 2025, 99% of Fortum's power generation originated from renewable or nuclear sources, resulting in one of the lowest specific CO2 emissions among European utilities. At our Investor Day in November, we updated and published new financial targets and new strategic KPIs to support strategy execution going forward.
Markus Rauramo
executiveOur balance sheet is strong and liquidity is good, so our overall financial position is solid. That gives our board the confidence to propose a dividend of 74 euro cents per share, corresponding to a payout of 90% of our comparable earnings per share, consistent with our dividend policy. The proposal is for the dividend to be paid in a single installment in April 2026. Our Annual General Meeting takes place on the 31st of March. The invitation to the AGM was published this morning. Now let me move to our main figures and financial KPIs. Here are the familiar comparable headline KPIs for the group's fourth quarter and for the full year 2025. Nearly all KPIs declined in both periods. The full-year figures reflect the clearly lower generation volumes. In Q4, our comparable earnings per share rose from 18 euro cents to 23 cents per share. Comparable operating profit came to €251 million, whereas in the previous year it was €257 million. Operative cash flow fell clearly, to €53 million. For the full year, the group's comparable operating profit decreased to €924 million. Our comparable EPS went down from €1 to 82 euro cents per share, and operative cash flow dropped from approximately €1.4 billion to €840 million.
Markus Rauramo
executiveThat brings leverage to 1.2 times for the ratio of financial net debt to comparable EBITDA. Tiina will cover the result analysis in greater depth during her section. Now, a brief look at the market environment. We'll begin with the hydro reservoir situation in the Nordic market. It's worth noting this covers the entire market, not just Fortum's reservoirs. In Q4, precipitation came in slightly above normal, particularly in October and December. Hydro inflows ran very high, roughly 11 TWh above normal, driven both by high temperatures — almost 2°C above normal — and by larger-than-usual precipitation amounts. Consequently, spot prices and the development of Nordic near-term futures were soft, especially in the latter part of the fourth quarter, before the weather turned cold and dry over the holidays, which pushed power prices up. On the whole, the Nordic market hydro reservoir situation is near normal right now, as the graph on the left-hand side shows. It appears hydro volumes would be closer to normal in 2026. As we also mentioned at our Investor Day in November, our nuclear volumes are expected to fall below our typical annual level of 26 TWh.
Markus Rauramo
executiveTiina will follow up on that. I’d also like to comment briefly on how the Nordic market looks right now. Early this year, weather that was chillier, dryer, and calmer than normal pushed demand up while bringing hydro reservoir levels down. In the first part of January, Finland hit a consumption record, and Sweden and Norway each saw days of exceptionally heavy demand as well. Those weather patterns, the resulting decline in hydro reservoirs, and stronger demand have driven spot and forward electricity prices higher. Across every Nordic country, spot prices have climbed noticeably above €100 per megawatt-hour over recent weeks, and forward prices for the coming quarter are up too. Our attention remains on serving customers across all segments. Activity is consistently strong throughout a range of industrial sectors, particularly in data centers. We recently announced a modest site development project in Finland, where we’ll serve as development partner for a data center running several hundred megawatts. In situations like these, our aim is of course to supply the power as well. Thanks to our efficient and varied generation portfolio, we’re able to provide competitive baseload, low-carbon nuclear and hydro, neither of which depends on the weather or fluctuates with it.
Markus Rauramo
executiveNow let's move on to our strategic KPIs. During the Investor Day, we revised our strategic targets and KPIs in line with our priority areas: operations, commercialization, and development. The purpose is to guarantee the best possible performance, seize long-term opportunities, and handle business and market risks. To start with operations, we track fleet availability along with optimization premium. Regrettably, the past year proved difficult, given the major effect of the unplanned and extended outage, particularly at Oskarshamn 3. That significantly affected our nuclear volumes. As a result, nuclear availability came in at 75%, well under the 90% target. Although our hydro volumes stayed below the normal level, largely because of low inflows early in the year, availability reached 94%, nearly matching the 95% target. Work to secure high availability for both baseload nuclear and flexible hydro will remain very high on our agenda. Our key strength is optimizing our flexible hydro fleet. That was demonstrated by the very high optimization premium of €9.7 per megawatt-hour. For 2026, we anticipate the optimization premium landing in the €8 to €10 range. Projecting the optimization premium gets harder for later years, so we are maintaining our earlier guidance of €6 to €8 per megawatt-hour starting in 2027.
Markus Rauramo
executiveNext, on commercialization, we track two things: the long-term hedging share of rolling outright volumes measured over a 10-year horizon, and CSI, which is our customer satisfaction index. Our goal is for at least 25% of Nordic wholesale electricity production to be hedged across a 10-year period by the close of 2028. As of the end of 2025, the hedged portion of our production on a 10-year view stood at 19%. On CSI, the target for 2028 is 76, and at the end of last year the figure was 76. Turning to the third area, development — which is where growth opportunities come from over time — we've set targets both for the ready-to-build renewables pipeline and for ready-to-deploy flexibility solutions. At the close of last year, ready-to-build wind projects totaled 70 MW. By the end of 2028, we're aiming for 1.2 GW. Development of projects is timed to align with customer demand, should customers ask for new capacity. Any decision on new investments would be tied to a PPA. Across the Nordics, our project development portfolio amounts to roughly 8 GW of renewable power projects currently in the permitting phase, plus additional projects in earlier development stages. For flexibility, our target is readiness to deploy new flexibility services and assets of as much as 2.5 GW by the end of 2028.
Markus Rauramo
executiveBy the close of 2025, our managed portfolio included 730 MW of electricity-based district heating assets and customer assets, covering both market access and demand response. That wraps up my portion, and I'll now pass things to Tiina for more on business performance.
Tiina Tuomela
executiveThank you, Markus. Good morning to all of you, from my side as well. I'll walk you through the details of our financials. Let's begin with the key figures. I'll start with a few of the comparable KPIs. Comparable operating profit came in at €251 million for the fourth quarter, a slight decline versus the prior year. During the fourth quarter, comparable net profit and comparable EPS both went up. Our comparable net profit for the quarter rose to €207 million. As a result, comparable EPS for the fourth quarter climbed to 23 euro cents, up from 18 euro cents a year ago. For the full year 2025, comparable EPS was 82 euro cents. Cash flow in the quarter totaled €53 million, which is €114 million below the previous year, largely reflecting the lower EBITDA and a larger negative working capital change than a year earlier. The primary driver behind the working capital change in 2025 is higher inventory, mostly nuclear fuel at Loviisa. Now let's move to the segment results for comparable operating profit. We'll look at the fourth quarter first. The group result is nearly at the same level as last year, even with the achieved power price being €2.6 per megawatt-hour lower.
Tiina Tuomela
executiveIn our Generation segment, the result went down, whereas both Consumer Solutions and the other operations segment went up. Within Generation, comparable operating profit fell by €20 million to €245 million, primarily because of lower hedge prices, reduced sales of guarantees of origins, and somewhat higher property taxes for nuclear and hydro in Sweden. Higher volumes partly offset that negative effect. The fourth quarter shows a record performance in our Consumer Solutions business. Comparable operating profit hit an all-time high fourth-quarter level of €26 million. That is an increase of €10 million, which mainly relates to improved electricity margins in the Nordics and improved gas margins in the enterprise customer business in Poland. In the other operations segment, comparable operating profit improved by €4 million, showing a negative result of €20 million. The main reason for the improvement was the positive effect from divestment finalized in 2024. Then let's move to the segment waterfall of the full-year result. When looking at the waterfall for the whole year, the comparable operating profit shows the same pattern as for the fourth quarter. Compared to the previous year, the result in our Generation segment decreased, while both Consumer Solutions and other operations segments improved.
Tiina Tuomela
executiveWithin the Generation segment, comparable operating profit fell sharply, down €325 million, landing at €893 million. Lower hydro and nuclear volumes were the primary drivers. The outcome was additionally affected by reduced hedge power prices, greater property taxes on nuclear and hydro in Sweden, and rising nuclear fuel costs. During the comparison period, the renewables business result got a positive boost from a €16 million sales gain tied to divesting the Indian solar power portfolio. Consumer Solutions comparable operating profit also hit an all-time high for the full year, rising by €46 million to reach €122 million. Each quarter delivered a record-high result. The gain came chiefly from better gas margins in the enterprise customer business in Poland, stronger electricity margins in the Nordics, and roughly €13 million in cost synergies. Turning to the other operations segment, comparable operating profit rose by €25 million, coming in at -€91 million. This was mostly due to the positive effect of a divestment completed in the Circular Solutions business in 2024. Now moving to the balance sheet, leverage, and liquidity. Our financial position remains strong, mainly supporting our goal of keeping a credit rating of at least BBB.
Tiina Tuomela
executiveIt also gives us a solid financial footing in this highly uncertain and turbulent market environment, while at the same time supporting growth and shareholder returns. Consistent with our capital allocation principles, we balance leverage, investments, and dividends, and we always keep the credit rating in mind. We're very pleased that Fortum's current long-term credit rating from both S&P Global Ratings and Fitch Ratings is BBB+ with a stable outlook. For the fourth quarter, I'd like to walk through the reconciliation of our financial net debt. As you can see, it rose slightly. At the close of the third quarter, our financial net debt stood at roughly €1.3 billion. During the fourth quarter, operating cash flow came to €53 million, and investments were €189 million. The change in interest-bearing receivables was €47 million, while FX and other effects accounted for €13 million. As a result, at year-end our financial net debt was approximately €1.5 billion, and the leverage ratio of financial net debt to comparable EBITDA was 1.2 times. Turning to our debt portfolio and the loan maturity profile, I'd like to point out a few things. At the end of the year, our gross debt, excluding leases, came to €4.6 billion.
Tiina Tuomela
executiveOur maturity schedule is quite well spread out, and no single year carries large maturities. In February, a €750 million bond comes due and will be repaid. Bonds remain, and will keep being, our main funding source. We still hold substantial liquidity reserves: €6.8 billion, made up of €2.9 billion in liquid funds plus €3.9 billion of undrawn committed credit facilities and overdrafts. On our €4.6 billion loan portfolio, the cost stands at 3.1%, whereas the interest income earned on our €2.9 billion of liquid funds is unchanged at 2.1%. Given this strong liquidity position, we keep optimizing our cash and credit lines. The overarching aim is to hold enough liquidity while fine-tuning the mix of debt and cash so that funding costs stay as low as possible. Now to the last section: the outlook. That section includes guidance elements for outright portfolio, taxes, capex, and costs. Let's begin with the hedges. At year-end, the hedge price for 2026 stood at €41 and the hedge ratio at 75%. Since the previous report, the hedge ratio has risen by 5 percentage points, and the hedge price is unchanged. For 2027, the hedge price is €40, which is €1 above the figure disclosed last time, and the hedge ratio has gone up by 10 percentage points, reaching 55%.
Tiina Tuomela
executiveFor 2026, we estimate the optimization premium at €8 to €10 per megawatt-hour, and from 2027 onward, €6 to €8 per megawatt-hour. Our annual outright volume in a normal year comes to roughly 47 TWh. Given the outages that have been announced, nuclear output for 2026 is projected to fall below the normal level of 26 TWh. Using the market information we have today, we estimate nuclear volume in 2026 will land between 24 to 24.5 TWh. As a result, variable procurement cost will come in higher than the 2025 level, driven by greater generation volume from the associated nuclear units. Our capital expenditure guidance has not changed: €550 million committed for the year 2026, covering maintenance and excluding potential acquisitions. Capex guidance for the period 2026 to 2030 stands at €2 billion, of which €750 million is growth. Maintenance is expected to run at €250 million annually. Our fixed cost reduction program has now been concluded. Fixed costs totaled €873 million for the year 2025. In 2026, the new run rate for our fixed cost base will be approximately €870 million. That figure includes a €20 million fixed cost increase in the Swedish property tax. While staying disciplined, we continue to allocate development costs for growth.
Tiina Tuomela
executiveThose items include, for instance, renewable energy projects, site development, expansion of our commercial organization, and the hydrogen pilot at Loviisa. Our guidance on the corporate tax rate for 2026 also stayed the same. We anticipate the comparable effective income tax rate will fall within a range of 18% to 20%. Finland's government intends to cut the corporate tax rate from 20% to 18% starting at the beginning of 2027. No official legislation exists as of yet, however. According to our very preliminary estimate, that change would reduce the comparable effective income tax by 1 percentage point beginning in 2027. That concludes my presentation, and now we're glad to take your questions. With that, Ingela, I'll hand it over to you.
Ingela Ulfves
executiveThanks, Tiina, and thanks, Markus. With that, we're ready to take your questions. A queue has already formed, so let's start the Q&A session now. Moderator, please go ahead.
Operator
operatorShould you wish to pose a question, kindly press *5 on your phone's keypad to join the queue. Should you wish to take back your question, kindly press *6 on your phone's keypad. Harry Wyburd from BNP Paribas Exane has the next question. Please proceed.
Harry Wyburd
analystHello there. Good morning, all. Appreciate you taking my questions. I have three items to begin with, unfortunately. First, I believe Microsoft ran a tender in December for a data center PPA, and I was wondering whether you took part in it, and regardless of that, when the outcome of that tender is likely to come through, and if you did secure capacity there, when you might be able to make an announcement about it. Second, on the debt side. Debt ended up somewhat above what I had anticipated, and I think above consensus too. You referenced working capital. You referenced nuclear fuel purchases. I was hoping you could put a number on that, what sort of unusual working capital movements have occurred this year, so it helps us model working capital for next year and the years beyond. Third, is there any news regarding the Uniper Nordic assets, on which you hold a right of first refusal until, I believe, the end of this year? Were that right of first refusal to lapse, would that alter how you think about other uses of the balance sheet, for example, something like a special dividend? Thank you.
Markus Rauramo
executiveAlright, thanks a lot for those questions. At the start we ran into a technical problem — we caught your second question, on debt, working capital and fuel purchases, along with the third one about the Uniper Nordic assets, but the first one we actually missed. If you wouldn't mind repeating it, please.
Harry Wyburd
analystAlright, no, I’ll go ahead.
Markus Rauramo
executiveSince I believe
Harry Wyburd
analystThat's the one that folks —
Markus Rauramo
executiveMy apologies — could you also say who you are, since we didn’t catch that either? Sorry about that.
Harry Wyburd
analystSorry. Sorry — this is Harry Wyburd at BNP Paribas Exane. I'm assuming you've already had the second two, which I think you said. On the first one, which I think matters because it's the one people most want to hear about: my understanding is that a Microsoft PPA tender took place in December. The question was whether you took part in it. Whether you did or not, when do you think the results will be made public, and if you did secure capacity through it, when would you be in a position to tell the market about that? Then I believe you've had the second two, correct?
Markus Rauramo
executiveRight, yes. So I'll cover the Uniper Nordic assets and the Microsoft tender, and Tiina, maybe you can add on working capital. Starting with the tender: the question there concerns which capacities are being tendered, and we didn't take part in the final stages of it, so we don't know when results might come out. As for the Uniper Nordic assets, our interest in nuclear and hydro in the Nordics remains, and if those assets became available, we would definitely take a look, though we've heard nothing new from the German side. Tiina, over to you on working capital.
Tiina Tuomela
executiveRight. Working capital went up in 2025. Part of that came from the usual price-driven swings in receivables and payables — just ordinary price-related movements. The rest of the increase was tied to Loviisa, where we've built up inventory levels; some of that reflects higher prices, but the bigger driver is higher volume, and it came to roughly €100 million.
Harry Wyburd
analystGot it. Thanks.
Operator
operatorJulius Nicholson from Bank of America has the next question. Go ahead.
Julius Nicholson
analystThanks. Julius from BofA here. I have a few questions about the pricing situation in Q1. Maybe first, could you share some detail on where your hedges stand at the moment and at what price levels? And then, since prices were clearly quite elevated but also seem to have been rather volatile, perhaps you could give us some color on how the opportunities for the optimization premium are shaping up in the first quarter — at least for the weeks that have gone by so far? That would be really helpful. Thank you.
Markus Rauramo
executiveAlright, I'll begin, and Tiina, feel free to jump in if there's anything to add. So yes, January has been extremely cold across the Nordics. We hit consumption records in Finland, and consumption in both Norway and Sweden has also been elevated, while near-term forwards have risen considerably. There's very little change as we move toward 2027. Should we be able to lock in those elevated prices through our open position in Q1, that would benefit the results. By year-end we had hedged 75% for the whole of '26, and the open position for the first quarter is now the key question. On hedging, prices for the second quarter and partly for the later portion of the year have gone up, which creates short-term hedging potential for us. Turning to the optimization premium, price volatility is naturally favorable for our assets, provided we hold hydropower or hydro in the reservoirs that we can regulate. Overall, volatility works in our favor, though the actual outcome will only become clear later, and naturally we report only on a full-year basis. Current guidance stands at €8 to €10 per megawatt-hour for the optimization premium.
Julius Nicholson
analystGot it. Thanks.
Operator
operatorWe’ll now take the next question from Pavan Mahbubani at JPMorgan. Please proceed.
Pavan Mahbubani
analystMorning, everyone, and thanks for taking my questions. I've got three as well. First, it's encouraging to see the forward selling price move higher, especially for 2027. I understand there's considerable rounding in the hedging figures you report. Could you tell us with somewhat more precision where forward sales stood for 2027 as of Q3 versus today? That's my first one. Second, regarding the development agreement with Day One — you noted in your opening remarks that it's your ambition to sign PPAs alongside the work you're doing with them — can you share any color on when you expect this data center to be commissioned, and any indication of a timeline for when a PPA tender might come? Lastly, to follow up on Harry's question about the Microsoft data center PPA, I appreciate these are commercial discussions, but could you give us a bit of flavor as to why you didn't take part in the later rounds? Thank you.
Markus Rauramo
executiveThanks. Tiina, could you handle the hedging one, and I’ll take the last two?
Tiina Tuomela
executiveRight. So, as I said, the hedge price we have for 2027 stands at €40, and that's €1 higher — up €1 versus the prior quarter — with a hedge ratio of 55%. I think it's worth keeping in mind that both the hedge price and the ratio cover the spot as well as the area. It isn't just spot prices; the area is in there too, and in our experience that has fluctuated fairly widely historically. On the rounding — yes, we round figures to every 5 percentage points, and we haven't provided any further quarterly figures broken out by individual hedge period; we've only done so at the yearly level.
Markus Rauramo
executiveAlright, moving on to Day One. We've been working on a site in Nurmijärvi, which isn't far from Helsinki. As for the data center development, that's really for Day One to speak to regarding when they anticipate commissioning at that site. And on the municipal permitting and zoning side, this had to be made public since it went into City Council handling. Now on the PPA tendering, we don't have visibility into when Day One might tender or whether they'd be tendering for their energy procurement. If and when we gain clarity and there are contracts of a scale that would warrant announcement, naturally we'll update the market. Turning to the Microsoft PPA, from where I sit that ties to the renewable pipeline we hold, and our aim is to have a relevant solar or wind offering that would satisfy the additionality requirements and timelines that industries require. In this instance, we lacked capacity that could be offered at the right moment in that tender — it came down to availability in our pipeline. That's precisely the reason we hold the target of developing our 8 GW in permitting, with a goal of having 1.2 GW of ready-to-build assets in 2028.
Pavan Mahbubani
analystThanks.
Operator
operatorJames Brand from Deutsche Bank has the next question. Go ahead.
James Brand
analystHello. I suppose I'll take a shot at three questions too. There's plenty to discuss, plenty going on. I'm not sure how straightforward this one is to pose, but I was curious whether you could take a broader view of the whole PPAs situation, and possibly site sales, that everybody has been so enthusiastic about when it comes to data centers, since we've been hoping for this for a good while, and you made encouraging remarks in Q4, yet we're still essentially waiting on a major deal. In Q4, I believe you indicated that a few of the negotiations you were involved in had started to feel somewhat more tangible and somewhat more serious. Does that remain true today — do you sense the momentum behind these matters has picked up, or has there perhaps been some slowdown once more? That's my first question. My second concerns demand growth. Clearly, forecasting demand growth isn't really your line of business, but as you pointed out in your statement, we saw no demand growth at all in the Nordics last year.
James Brand
analystWhat are your expectations for this year? Do you anticipate demand growth speeding up, or is it plausible that we again see no growth at all and that demand growth only arrives further out? My third question — apologies, these are all big-picture ones — concerns the Q1 prices. You offered a fairly good explanation of what happened there, but it was pretty dramatic given, I suppose, obviously the cold weather and, I guess, poor wind, though hydro appears to have been broadly okay. It's not as if we entered Q1 with especially low reservoir levels. How exceptional would you say Q1 is? It's quite notable that we haven't seen any rise in the forward curve following this. The market appears to assume — although you always point out it's illiquid — the market appears to assume this is merely a one-off, yet market conditions don't seem unusual enough for us to simply call it entirely a one-off. Thank you very much.
Markus Rauramo
executiveThanks. Those are good high-level questions, and all three tie together. I'd share the view you hinted at in that last question — the jump in prices we're seeing is a situational thing. Right now it's exceptionally cold; this isn't a typical January. Across the Nordics, temperatures have sat at roughly -10 to -30 through all of January, and from what the one-to-two-week forecast shows, they look set to carry into February as well. That, I'd say, is also the reason we aren't seeing an effect on 20 2027 prices. In fact, thinking back to what we said about hydro reservoirs, we entered this period in a fairly balanced position. Capacity is there, but as usually happens when it gets very cold, wind speeds drop off — of Finland's 9 GW of wind capacity, daily output has been a few gigawatts, far from the maximum possible. That connects partly to the demand growth, PPA sales and overall momentum question. Looking at what the TSOs project for demand, based on demand connection inquiries, and at what customers are asking us, we see room for a solid number of financial investment decisions in 2026.
Markus Rauramo
executiveCompared with Q3 and Q4, the momentum is still favorable; progress is happening, though it appears to take time. On the whole, I'd say the sentiment is good. I wouldn't call the broader geopolitical environment supportive, so that likely contributes to the fact that decisions might be heading in the right direction, yet they require time. So how does that feed through into demand growth? Our estimate is that if customers reach FIDs during this year, the resulting new demand will genuinely start accelerating in 2029 and 2030. Beyond that, we obviously see smaller additions—data centers and similar projects—that have already been decided and are under construction. Those will become operational later this year, in 2027 and '28. Demand would rise on that basis. Lastly, turning more specifically to your first question—where the PPAs and site sales originate—we observe once more that although data centers grab the headlines, we are seeing solid activity in steel, aluminum, hydrogen, data centers, and other sectors. I'd put it this way: within those sectors too, you have incumbents making their own decarbonization choices, and you also have new entrants arriving with potentially a different business model.
Markus Rauramo
executiveThis describes the market overall. Momentum is steady and keeps moving forward without interruption, and we expect customers to be making decisions this year.
James Brand
analystThat was really interesting. Thanks a lot.
Operator
operatorDeepa Venkateswaran from Bernstein has the following question. Your line is open now. Go ahead. Anna Webb from UBS is next with a question. Please proceed.
Anna Webb
analystHello, and good morning. Thanks for taking my questions. I have two. First, regarding the optimization premium guidance you provide—roughly €8 to €10 for this year, and then what you'd describe as more normalized starting in 2027—given your remarks about power demand, and I know in the report you put it in the first line of your statement, Markus, that you expect power demand growth in the Nordics, that would imply such volatility would persist, and if the power market is tighter, then the chance to optimize with your hydro would be greater, or at least stay at the same level. So my question is whether this lower optimization premium guidance reflects conservatism, or is there a reason you believe volatility will be lower? Second, returning to the question about the tender, and you commented that you didn't have the renewable pipeline ready to match what was being demanded—is there a reason you couldn't fulfill that using your existing power capacity? I'm assuming toward the end of the decade you still have a lot of uncontracted or unhedged volume.
Anna Webb
analystCould you explain why that particular tender required new capacity specifically? That would be very helpful. Thanks.
Markus Rauramo
executiveThanks. There are two questions. Tiina, would you like to handle the one about the optimization premium? I can take the tender one. From what I understand, it was a tender specifically for new renewables, so our capacity, which otherwise would of course technically fit what customers need, didn't qualify for it. That was a particular feature, if I've got that right, but we don't have the full details, since we weren't there in the final rounds.
Tiina Tuomela
executiveCorrect.
Markus Rauramo
executiveOver to you, Tiina.
Tiina Tuomela
executiveThank you. The optimization premium really comes from volatility. Looking at the 2025 figures, we see that Finland has had the highest volatility, slightly lower in the last quarter but still at a high level, while in the other markets, Sweden and Norway, volatility has actually risen a bit. I think that's a major factor and so it also provides solid support for our optimization premium forecast, or guidance, for this year of €8 to €10 per megawatt-hour. As we've said, going further with guidance is harder to forecast, since volatility and how it develops remain somewhat uncertain. I'd say it leans toward the conservative side, and we'll refine our guidance further once we have more visibility and see how our optimization performs.
Anna Webb
analystThanks a lot. That's much appreciated.
Operator
operatorHarrison Williams with Morgan Stanley has the next question. Go right ahead.
Harrison Williams
analystHello there, and thanks for taking my questions. There are two from me. First, perhaps picking up again on the Microsoft tender, I'm afraid. You had previously indicated that the lifetime extension at your Loviisa power plant would qualify for additionality. I just want to confirm, in this particular tender, is it that they explicitly ruled out nuclear, or does this now apply to every potential tender where they seek additionality? Then maybe a second, as a follow-up to that: if these new data centers are explicitly seeking new renewable capacity, and that is mostly wind in Finland, then looking at capture prices for wind in Finland in 2025, they came in below 60%, which is causing a fairly heavy distortion in the market and pushing up volatility quite significantly. Is that feeding into any of these questions and debates with these offtakers? That's kind of the first one — apologies, quite a long-winded question. The second, just on nuclear volumes: I appreciate the additional guidance for volumes for 2026. That is now two years where we are relatively meaningfully below your kind of 26 TWh long-term guidance. Can you remind us of the outages this year and what gives you conviction that 26 is still the right number going forward? Thanks.
Markus Rauramo
executiveI can handle the first two, the first two, and then if you look at the nuclear volume.
Tiina Tuomela
executiveYes.
Markus Rauramo
executiveYes. Regarding the Microsoft tender and the broader matter of lifetime extension additionality — absolutely, when customers specifically need it, we are able to supply extra lifetime-extended nuclear. Naturally, that product differs greatly from intermittent, volatile renewables. Those are distinct things, and from what I understand, that was definitely not the subject tendered here. It is on offer, and this particular tender concerns renewables. Then on capture prices and the way new renewables will raise volatility — that is definitely acknowledged in the conversations we hold with customers needing additional renewables. We keep discussing how we can jointly bring storage, flexible demand, and flexible assets to market as well. This ties into backup power and similar needs, and such talks are underway throughout our customer sectors; it also connects to our 2.5 GW of flexible ready-to-deploy assets by 2028. I believe that conveys the scale we are aiming at, since the bulk of that 2.5 would be customer assets, spanning both industrial and consumer. Yes, that is very much part of discussions with the different customer segments. Now, on nuclear volume.
Tiina Tuomela
executiveYeah. For nuclear in 2025, I'd describe it as unusually low, largely due to the extended outage at Oskarshamn. Things look better going into 2026. Based on the outage plans we currently have, we're indicating production volume of roughly 24 to 24.5. There are still some lengthy outages in 2026, and the larger ones are once again at Oskarshamn, at approximately 2 months. At Loviisa as well, Loviisa 2, there's a 1.5-month outage this year, and then Forsmark 1 and 1 and 2 have outages of nearly 3 3 months. Those are still going to affect production volumes this year.
Harrison Williams
analystThat's great — that helps a lot. Thank you.
Operator
operatorOur following question is from Iiris Tieman at DNB Carnegie. The floor is yours.
Iiris Tieman
analystHey there. Appreciate you fielding these. I've got a couple. First one, still on that Microsoft tender — did hydro get left out of it as well? And then second, what's your outlook for how market supply shapes up this year, and really, how do you view the supply-demand picture overall in Finland for this year? Thanks.
Markus Rauramo
executiveAlright. Tiina, could you take the supply-demand question? And on that Microsoft tender, let me return to it. What we understand is that it concerned new renewables. Had it been hydro, naturally we would have been well qualified for a tender like that.
Tiina Tuomela
executiveYeah. The market situation really hinges on demand and supply, plus how the project starts moving forward. As Markus mentioned, yes, something will probably happen this year, but when and in what way is still uncertain, of course. Another supply-side factor is the hydro balance, and as we see it right now, hydro reservoir levels across the Nordic region are about at the average, which would suggest the supply side is fairly normal. As we've seen, the hydro balance can shift very quickly over the course of the year. Nuclear is also better than the prior year, though still somewhat lower. It's really the balance between those two and how they develop going forward — I'd say the overall situation is better, but of course it remains to be seen.
Iiris Tieman
analystAppreciate it.
Operator
operatorOur next question is from Piotr Dzieciolowski at Citi. You have the floor.
Piotr Dzieciolowski
analystHello, and thanks for the presentation. Could I ask two questions, please? First, I'd like to return to the data center subject. Whenever the next tender comes along, would additionality apply to it as well, and could a nuclear extension qualify — or do you view this as something decided tender by tender? Or was this Microsoft tender simply a modest one for new renewables, with future tenders possibly structured quite differently? How do you see the ability to bid your nuclear capacity into tenders going forward? My second question concerns RWE's assets: RWE sold some Swedish wind business recently. Did you take a look at it? More broadly, looking at your pipeline, do you consider it to be of good size and maturity, and are you seeking something additional — was the RWE offer simply not the right price — or do you feel you are good to go with regard to your development pipeline?
Markus Rauramo
executiveThank you. When it comes to data center and other tenders, the requirements differ from customer to customer—some simply want a straightforward profile exactly as they specify it. The sole criterion might be that it is CO2-free, whether from existing nuclear or hydro, and beyond that they have special requirements to varying degrees: it might need to be RFNBO qualified or compatible, it could involve new renewables, or it could be additional nuclear. What we are doing is precisely trying to meet the customer needs we observe, and the 8 GW renewable pipeline under permitting has been built around what we perceive those customer needs to be. Then, to qualify in those tenders, you must be capable of delivering a project that starts when the customer needs it. Our philosophy as a backdrop is also this: if we tender—and historically we have done so outside the Nordics as well—if we tender, then we want certainty on permitting, zoning, grid connection, and equipment tenders, and that of course requires a lot of effort. Again, this brings us back to our 1.2 GW ready-to-build target, and ready to build then truly means we know the investment parameters and can match the customer's timing and need, and then start a project.
Markus Rauramo
executiveNow, regarding the Swedish wind operations: over recent years, wind assets and wind development portfolios have been offered for sale. Essentially, we evaluate every relevant opportunity available in the market. As things stand today, following the acquisitions of the Enersense and Abo wind development portfolios, we are in a very strong position when it comes to our development portfolio in Finland — ours is the largest portfolio. In Sweden, we could accommodate additional development. And should operating assets become available, those are of interest to us provided the price is right. If opportunities arise that satisfy our profitability criteria — factoring in what was mentioned earlier, capture rates and so forth — then operating assets are something we would also pursue.
Piotr Dzieciolowski
analystAlright, thanks a lot.
Operator
operatorOur next question is from Louis Boujard at ODDO BHF. You have the floor.
Louis Boujard
analystYes. Hello there. Good morning. I appreciate you taking my question, and thanks for the release. I have perhaps two questions on my end. The first concerns nuclear availability, particularly maybe past 2026, if you could provide us with a bit more visibility on that. Right now you're at 75% availability. We understand you'll still fall short of your 90% target in 2026, since you've already said as much. As for 2027, should we expect you to actually be at 90%, or are there still some expected outages that would be factored in, given that you will indeed hit the 90% target in 2028? My second question concerns the flexibility assets. I understand you have 730 MW ready to deploy. At the same time, we're seeing enormous volatility, notably with the spot price at the moment, but it's also quite recurring that volatility is very strong in your region. Is there any way you might eventually consider taking a final investment decision on a new flexible asset even if it isn't tied to a specific contract or a specific client? Would you eventually make some deployment and some capex extension in order to take the position and to improve your capacity to reach and eventually go beyond your current flexible assets?
Louis Boujard
analystThat's what I'd like to ask about next. Thanks so much.
Markus Rauramo
executiveAll right, thanks a lot. I’ll address the second question, and Tiina, feel free to weigh in on nuclear availability if you’d like.
Tiina Tuomela
executiveCorrect.
Markus Rauramo
executiveLet me begin with flexibility. We've indeed been building out flexible consumption assets, along with small-scale batteries and customer-side flexibility. Electrified heating is our largest source of flexible electricity use. Looking at Espoo by itself, we have over 400 MW of electrified heating capacity that is either running or being built — electric boilers, water-to-water heat pumps, and air-to-water heat pumps. These pair extremely well with volatile, intermittent renewables. Payback periods have been quite short and highly competitive. That's another element that comes into play when we weigh the value of flexibility. When there's a great deal of volatile generation, a business case will also exist for volatile or flexible consumption. Looking ahead, our thinking is indeed that developing storage or flexible assets doesn't require customer PPAs or customer contracts. They slot in very well with the portfolio we already have, and they can complement hydro nicely. Conventional hydro, that is. What it might be is batteries — and in fact we've been doing this for a very long time already, though at smaller scale — and then at large scale, long duration, the opportunity lies in pumped hydro, where we have a development pipeline at our co-owned company Kemijoki in Finland, plus three sites in Sweden.
Markus Rauramo
executiveAll told, we're looking at roughly 2 GW of flexible pumped hydro potential, which exceeds our 2.5 GW target, since the timeline actually stretches beyond that. Returning to the 2.5 GW figure, we figure a substantial share of it would come from customer flexibility, spanning various customer segments: steel, aluminum, hydrogen, and data centers too, where in conversations with customers we're showing them what their flexibility is worth. We can reach a different price point if a customer is willing to flex, let's say, 10%, 20%. We're able to bring down the cost of delivering the firm profile considerably, and through that also speed up renewables deployment. Perhaps that's the picture at broad scale when it comes to flexibility. Then Tiina on the nuclear side. The
Tiina Tuomela
executiveOn nuclear availability — yes, that 90% goal is a very, very ambitious target overall when you compare nuclear availabilities worldwide, but in the Nordics, I think we have good records and all the possibilities to achieve it. The path toward 90%, I would say, is more gradual rather than an immediate jump. From last year's 75%, which was exceptionally low. Based on the current UMM, this year should take us over 80, and I would say it would then gradually increase to 90% toward the end of 2030. That said, some of the units, like our Loviisa, were already very close to 90% last year, and likewise Olkiluoto 1, very, very good performance. There are units achieving this 90% earlier, but when we look at the overall portfolio, it will take a bit more time.
Louis Boujard
analystI appreciate that.
Operator
operatorOur following question is from Deepa Venkateswaran at Bernstein. Please proceed.
Deepa Venkateswaran
analystHello there. I’m hoping my voice is coming through clearly at this point.
Markus Rauramo
executiveYes.
Tiina Tuomela
executiveYes, we can.
Deepa Venkateswaran
analystYes, and sorry for coming back to the PPA data center demand. There were two things I wanted to ask. First, regarding that deal you announced with Day One — we saw a comparable deal that RWE did for one of its UK sites. But in that case they handled permitting and then sold the land to the hyperscaler, and they booked a tidy gain from it. Could you clarify whether you'll take part in some form of gain down the road, or did you simply sell the land for a nominal amount? I just want to understand what happens if you don't secure a PPA. Second, on the PPA point: many investors have liked your stock because they anticipate you'll sign PPAs for your nuclear fleet at a premium to forward prices. So far, it appears Microsoft wants new clean energy generation, which is probably going to be wind. Are those investors mistaken in hoping you'll eventually sign PPAs for existing nuclear sites, or how would you describe the situation with the nuclear plants you own? Thank you.
Markus Rauramo
executiveThanks. Okay, let me take the second part first and return to the various sectors. Across steel, aluminum, chemicals, hydrogen, and data centers, we're seeing a substantial demand portfolio and pipeline, and there appears to be appetite for essentially every product we currently offer, plus additionality. To describe it, customers are requesting baseload — indications for mid- to long-term baseload PPAs — they want additional renewables, pay-as-produced, and some are seeking quotes for additional nuclear. That applies across the board. And then, for instance, RFNBO-compatible supply as well. Everything in our portfolio is being discussed. Then, on the second good question about site development: we take various approaches to developing sites, ranging from fully owned sites where we control and own the land, and if we sell, we can sell at a price that matches customer needs. Then, more from a demand-creation standpoint, we develop land jointly with municipalities — as is the case, for example, in Nurmijärvi with Day One, where we've developed the land in agreement with the municipality so that if we find an investor, we can then buy and sell that land to an investor.
Markus Rauramo
executiveSo the premiums are usually modest, then. And when it's land we fully own and control, the situation can be different. Our interest in these sites, naturally, is that we're able to combine them and offer customers several features and services. Ideally, of course, what we'd like is to bring together land development and grid access with PPAs, with additional new supply, and to lock in our existing supply at attractive prices.
Deepa Venkateswaran
analystThanks.
Ingela Ulfves
executiveThanks. We're actually running a little past our allotted time now, and there were plenty of questions. Appreciate all of them. If anything else comes up, the IR team will be glad to assist you with it afterward. Right now, I'd like to thank each of you for joining us today, and I hope the rest of your day goes very well.
Markus Rauramo
executiveMuch appreciated. Have a good day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Fortum Oyj transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Fortum Oyj earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Fortum Oyj or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.