Freeport-McMoRan Inc. (FCX) Earnings Call Transcript & Summary

January 26, 2022

New York Stock Exchange US Materials Metals and Mining earnings 77 min

Earnings Call Speaker Segments

Kathleen Quirk

executive
#1

Thanks, and good morning, everyone. I'd like to welcome all of you to the Freeport-McMoRan conference call. This morning, we released our operating and financial results for the fourth quarter and for year-end 2021, and you can find a copy of today's press release along with the slides on our website, fcx.com. Today's call is being webcast live, and anyone can listen in by going to our website home page and clicking the webcast link for the conference call. Besides analysts and investors, members of the financial press have been invited to listen today, and a replay of the webcast will be posted on our website later today. Before we dive into today's discussion, a quick reminder: our press release and certain remarks on this call include forward-looking statements, and what actually happens could differ materially. We encourage everyone to review the cautionary language in our press release and presentation materials, along with the risk factors outlined in our SEC filings. On the call with me today are Richard Adkerson, Chairman of the Board and Chief Executive Officer; Mark Johnson, who oversees our Indonesian operations; Josh Olmsted, who oversees our Americas business; and Mike Kendrick, who leads our Molybdenum business. Also joining us are Rick Coleman and Cory Stevens, both of whom back our team in engineering and construction, plus technical services and assistance on our expansion initiatives; and Steve Higgins, who serves as our Chief Administrative Officer. To start, I'll give a quick rundown of where we landed financially, after which I'll turn things over to Richard, who will walk through the slides in our deck, and I'll offer a few remarks, and following that we'll take questions from participants. For the fourth quarter of 2021, FCX posted net income attributable to common stock of $1.1 billion, equal to $0.74 per share, while adjusted net income—arrived at by removing net charges that added up to $0.3 billion, or $0.21 per share—came to $1.4 billion, or $0.96 per share for that quarter. When we look at the twelve months finishing in 2021, net income that can be attributed to common stockholders came to $4.3 billion, which works out to $2.90 for each share. Meanwhile, adjusted net income reached $4.6 billion, equal to $3.13 per share. A reconciliation showing how we arrived at adjusted net income appears on VII in the materials we released today. For the fourth quarter, adjusted earnings before interest, taxes and depreciation came in at $3.2 billion, while the full-year figure was $10.9 billion. You can find a reconciliation of the EBITDA numbers we calculate on Page 43 within our presentation deck. Throughout the year, our team achieved impressive growth in volume. During the fourth quarter, copper sales exceeding 1 billion pounds came in close to the guidance we had provided entering that period. Looking at the full year, copper volumes reached 3.8 billion pounds, which came in 19% higher than what we recorded in 2020. In the fourth quarter of 2021, we sold 395,000 ounces of gold — roughly 5% better than the guidance we had provided entering that period — and that improvement was driven by stronger throughput rates at our Indonesia operations. For the entire year, gold sales came to 1.4 million ounces, a figure that stands 59% above the 2020 total. Stronger copper pricing provided a boost during the quarter. Our average realized price in Q4 was $4.42 per pound, which is more than $1 per pound higher than the level we saw in the fourth quarter of 2020. On the gold side, we realized $1,808 an ounce, which was slightly below what we saw in the same period a year ago, while stronger molybdenum pricing gave our results an additional lift. Our Q4 2021 molybdenum realization exceeded $19 a pound, roughly double the level from twelve months prior. Turning to unit net cash costs, they averaged $1.29 per pound in Q4 — that's per pound of copper. This was marginally higher than the $1.26 guidance we'd set going into the quarter, and it reflected a charge — a nonrecurring one — related to the successful conclusion of our multiyear collective labor agreements at Cerro Verde in Peru. The quarter also delivered another round of robust cash flow generation. When it comes to cash generated by operations, we hit $2.3 billion; across the entire year, that figure was $7.7 billion, which exceeded the $2.1 billion we spent on capital projects during the same period. Back in November of 2021, as you're aware, our Board approved a fresh stock buyback initiative allowing us to acquire up to $3 billion worth of FCX common stock. As of January 25, we had bought 15.4 million shares, spending $600 million in total, which works out to an average of $39 per share. Also in November, the Board approved an increase to our 2022 common stock dividend, which effectively doubles it. Then on December 22, we declared dividends of $0.15 per share, payable February 1 of this year to shareholders of record as of January 14. Our balance sheet remains strong. The results show that: net debt at year-end was $1.4 billion, and since we have no borrowings under our $3.5 billion revolver, our liquidity is strong, with $8 billion in cash at the end of 2021. At this point, I'll turn the call over to Richard, who will be walking through our presentation materials on our website.

Richard Adkerson

executive
#2

Appreciate that, Kathleen, and greetings to all of you. For the Freeport team, the close of 2021 represents a very meaningful moment. A set of difficult, multiyear undertakings has been handled by us with tremendous success. Consider first the debt situation Kathleen brought up. Only 6 years back, we carried $20 billion in debt, and how we would handle it was genuinely uncertain; today we've arrived at a place where that debt is de minimis. A shareholder return program has been launched by us featuring larger dividends plus share buybacks. Our assets and outlook will let us grow those as time passes. Two of the agencies have now lifted our credit rating to investment grade. Next, consider the Grasberg underground project, whose origins stretch back much further. Our first plans for this underground mine were made in the mid-1990s. Capital spending began 20 years ago. By the time the year closed, we hit our objective of achieving our long-term metal run rate. We are progressing successfully and possess the path ahead to lift our mining rate to well over 200,000 tonnes per day from underground. That is simply extraordinary. While Grasberg was being ramped up during this stretch, difficulties arose in our dealings with the Indonesian government concerning our contract of work. Those were settled 3 years ago, and I'm happy to say our ties with Indonesia's government are now cooperative, with both sides working jointly toward shared objectives. The relationship has never been stronger. Then, 2 years ago, COVID arrived. For us that brought enormous uncertainty. Back then, we took forceful measures so we'd be ready to handle the risks that were surfacing; we came through it successfully and from that standpoint delivered our debt reduction at Grasberg underground. These days ESG occupies everyone's thoughts. Given the character of our operations, it has always resided within Freeport's psyche, yet we've launched forceful initiatives addressing how climate change is affected by what we do. Alongside the copper sector we're engaged with the Copper Mark designation, where we've been a leader, and with ICMM on communities. Roughly a year ago I became Chairman. I pledged to myself that Freeport's Board would be strengthened. This year we've brought on 6 new directors. Four of them are widely recognized, highly esteemed CEOs possessing broad international business expertise, and they contribute a great deal to our Board. The 2 women we brought in are both finance experts with Audit Committee experience. One is likely Hispanic; our team has simply done great work. We feel genuine accomplishment, and we're eagerly looking toward what's ahead with optimism, dedication and enthusiasm. Now to our results. Copper volumes rose 19% against the previous year, a reflection of the ramp-up in Indonesia. Our unit costs fell even as energy costs climbed in other units along with other input costs. The team has handled supply chain issues and rising costs really well. Our margins are robust. EBITDA and cash flow were 2.5x higher than in 2020. We closed out the year with net debt of slightly more than $1 billion. With our long-life reserves and resources, we're in a strong position to keep advancing organic growth down the road. Now that the ramp-up at Grasberg has reached the stage it has, we're turning our attention to the Americas for growth going forward. It's pleasant to discuss what we've achieved, but everyone here is thinking about what comes next, how we create additional value for the company, and we have a tremendous chance to do so. Copper. More than 20 years ago, this company committed itself to copper, and the reason was the supply side limitations we identified in the world market back then, along with China's growth; and we've stayed fundamentally committed to that. Our Board took a detour with that oil and gas transaction, though that's in the past now. Yet copper's fundamental outlook, as favorable as it was 20 years ago, has become even more favorable today and keeps getting more favorable. That's because of copper's place in the world economy, quite simply, the demand for copper as the world progresses; we witnessed it in China. China remains a key segment of the market. Growth globally will happen beyond China, but the fresh drivers of demand are truly substantial. Any spending on carbon reduction, and everybody's discussing carbon reduction, calls for far more copper than the world needed before. Electrification is central to tackling climate change, and between 2/3 and 3/4 of copper consumed relates to electrification. Be it electric vehicles, alternative energy generation, all of these demand considerably more copper than conventional power; then beyond that you have technological progress in communications, artificial intelligence, growing connectivity as infrastructure gets built worldwide, public health efforts. All of this is producing what I refer to as a new era of copper demand. And these forces are broad-based and unavoidable. From time to time, copper will be impacted by risks to the world economy, yet beneath all that lies a very positive long-term outlook for copper, and our company is firmly positioned to gain from it. Combine that with supply scarcity and the demand drivers, and you get a genuinely compelling argument for putting money into our company. We're witnessing growing supply scarcity at a moment when demand is expanding so dramatically. Only a small number of projects exist, ones that have been in development for quite a while, that are set to begin production soon; but looking past those, actionable projects that could be developed in a very brief window are hard to locate. It simply requires a great deal of time. On top of that, you've got growing political uncertainty across the globe, and that's going to affect how copper supply gets developed. Take Chile and Peru in particular — that's where 40% of the world's copper is produced — and both now have new presidents whose agendas center on social programs, which need greater revenues to be put into effect. How the industry and those governments work through this is going to matter a great deal; and it doesn't stop there, since you're also seeing it in places such as the United States. You're seeing other nations hold back new supply development because of community social issues. All over the world, miners are being asked for more in the way of revenues, and that extends past Chile and Peru, stretching from Asia all the way through Central America and on to Africa. Every one of these factors feeds into supply constraints at the very moment the world requires additional copper. Our attention is on the long-term outlook for the markets we serve. We constantly get ourselves ready and acknowledge that near-term risks could crop up for the global economy; at present we're financially strong enough to handle those risks. We've set up our business so that we have flexibilities in how we manage it. As a result, we're far more at ease today regarding whether our company is positioned to capitalize on what we expect will be a highly favorable view of copper as a commodity. If you turn to our reserve base, we report reserves this year on the basis of mine plans of $2.50 copper.

Richard Adkerson

executive
#3

We don't restrict our project evaluations to that criterion, since our outlook on copper is quite bullish. Yet at a copper price of $2.50, our approved and probable reserves give us a reserve life exceeding 25 years. On top of that, within our incremental mineral resources, there's a tremendous quantity of copper that will gradually be converted into reserves through delineation drilling and engineering work, eventually feeding into reserves and ultimately new projects; for Freeport this is truly a cornerstone asset. It gives us numerous options down the road, especially considering how scarce development opportunities have become in the industry. Freeport doesn't have to depend on acquisitions to underpin our long-term future. We constantly watch for opportunities, but we possess the internal assets needed to sustain our business and expand it substantially over time. Given these favorable markets, our margins and cash flows are expanding. We have solid plans in place. Our entire global team is committed to carrying out those plans to generate more copper at a reduced cost. We've laid a strong foundation for what lies ahead. Sales rose considerably during 2021. We've incorporated growth for the near term, an extra 13% in 2022, with further improvement in 2023. We've derisked our plans, anticipate rising margins, and are genuinely ready to execute in order to generate the cash that supports shareholder returns while we invest in future growth. Turning to the slide that illustrates the successful ramp-up of the Grasberg underground, I only wish all of you could see me, because a big smile spreads across my face whenever I look at it. What we've accomplished there is truly remarkable. Our team on site really deserves praise for overcoming all these challenges. It was nothing less than a monumental undertaking. As I said before, it took years to get here. The underground development, moving to the next slide, includes over 350 miles of tunnels, 7 miles of an underground railroad with 10 electric trains operating, 4 enormous crushers, 5 miles of conveyor belts, and shafts designed to carry large numbers of people underground — all of it beneath the surface. More than 500 drawbells have been opened, and almost 350,000 meters of undercut. And we're genuinely on track to reach long-term sustainable rates exceeding 200,000 tonnes per day from our mines through our mills; this provides us a very strong long-term base. We've now done this to create — to return Grasberg to being the second largest copper mine worldwide. The largest single gold mine, even though gold is a byproduct. Consider the fourth quarter, when our net cash cost, despite all this inflation, came in at only $0.08 per pound for the second largest copper mine in the world. We are on track to hit our long-term run rate of 1.6 billion pounds of copper per year, over 750,000 tonnes. On paper, this all seems straightforward, but getting it finished was tough, and the team deserves enormous praise for pulling it off. So now we're asking where future growth will come from. What will keep our business going down the road? The new leaching methods we're developing in the Americas represent a massive opening for Freeport. Historically, our company led the way in advancing leaching. In today's worldwide copper market, our Morenci operation in Arizona ranks as the biggest leaching site anywhere. And the technology we'll need in order to boost recovery rates and pull recovery from old waste stacks — essentially generating copper that nobody believed could be recovered — matters enormously to us. Next, there's our Bagdad operation in northwestern Arizona, which has a lengthy reserve life and is ideally configured for a mill expansion, allowing us to get higher volumes from it in a fairly uncomplicated manner. Over in eastern Arizona sits the Lone Star operation, which I genuinely expect will one day become Freeport's standout asset. We're working to increase recovery from the oxide ore located there, leveraging close-by infrastructure at the Safford operation, where core output is dropping off as planned; yet beneath that, Lone Star holds a sulfide resource that I'm confident will turn it into our flagship operation. There's a solid project in Chile that the world is going to require. We're watching to see how that situation develops; and the Kucing Liar operation, still undeveloped at Grasberg, is set to play a major role in our future there. On its own, this will rank among the biggest block cave operations globally, at 80,000 tonnes per day. We hold a resource of 6 billion pounds of copper along with 5 million ounces of gold extending through 2041. We're in early discussions with the government about prolonging our rights past that point. And that operation will keep producing well after 2041. Once it's running, we're aiming to reach as much as 240,000 tonnes per day in combined mine and mill rate from the Grasberg operations. There's a slide about Lone Star I mentioned before. You can look at the figures showing how we're scaling it up. Yet the true payoff there — the oxide development — will generate profit, add volume, and come with appealing costs. But the genuine long-term product is the sulfide resource sitting beneath the oxide; it's extremely large. It'll take time to develop, though we think it will ultimately be a complicated operation comparable to Morenci, currently the biggest mine in North America. You'll be hearing plenty from us about this leach technology across the energy sector; we intend to lead in this area. We're examining multiple kinds of technology. Each one is thrilling. Cory heads up our team on this, and it truly represents a fresh source of demand. Within the waste stacks we already have, our estimate is that those stacks hold close to 40 billion pounds of copper. Recovering even modest amounts from that could yield copper comparable to what a brand-new mine would produce. So this technology is at an early stage, there's plenty of work ahead, and our team is quite enthusiastic about pursuing it. That's genuinely encouraging. To wrap up, I'd like to acknowledge our people across the globe. Being on this team makes me extremely proud. We have individuals who are technically sure of themselves, strongly driven, who collaborate well with one another, who are committing themselves to establishing Freeport as the top copper company worldwide and to keeping it in that position; and the abilities we possess right now let us reach and surpass what we're aiming for, with remarkable possibilities ahead for our company. And I'd like you to understand that no matter what you might see coming out of London, my plan is to remain a member of this team for as long as God permits me to. I'm enjoying myself more at this moment than I have in years, and I'm truly thrilled to be with this team going forward. So, Kathleen?

Kathleen Quirk

executive
#4

Okay, thanks, Richard. I'll begin with Slide 17 and offer a few remarks about our operational and financial matters, after which we can open things up for your questions. On Slide 17, we're giving you some extra information regarding what happened in our fourth quarter operations; and like Richard mentioned, the Lone Star mine — he's calling it the all-star mine now — keeps delivering beyond what it was designed to achieve. As you may remember, we brought that mine into service during the back half of 2020; and during the past year, we turned out 265 million pounds of copper, which came in 30% above the initial design figure of 200 million pounds annually. We've now built an additional, incremental expansion into our plans, and that will lift us to 300 million pounds each year by 2023, requiring roughly $250 million of investment; and as Richard noted, speeding up the extraction of oxide ores will open the door for us to the bigger sulfide chance. Over at Morenci, our leach programs are building steam; we have a considerable amount of material already sitting on leach stockpiles, and that creates a chance to boost our copper output at a modest incremental cost and, importantly, with a small carbon footprint; we're deploying new technologies along with data analytics and sensing to gauge how well we're doing, and the early wins have us quite encouraged and optimistic that far more is on the way. The reason we kicked off this effort at Morenci was its importance, yet those early wins there have enabled the Morenci team to spread what it has learned throughout the portfolio. That hands us a major value opportunity at Freeport, and we're hoping to update you on our progress — continuing progress — as the year unfolds. We're also still increasing mining and milling rates at Morenci; and we figure copper output there will be roughly 10% greater in 2022 than in 2021; down in South America, our people are doing excellent work to bring production back to where it stood before the pandemic. Sales from South America during 2021 came in around 8% above 2020, and we expect yet another rise in 2022. We remain focused on fully restoring mill operations at Cerro Verde sometime this year, and we'll be moving toward returning to 1 billion pounds per annum at this large-scale operation. Our Cerro Verde team keeps performing exceptionally well in handling the pandemic and delivered a truly excellent fourth quarter. We also managed to complete our multiyear labor agreement at Cerro Verde in 2021. Over at El Abra in Chile, things are moving along well — we're pushing up the rates at which we stack material onto the leach pads, and at the same time we're building a new leach pad so we can handle those higher rates. For 2022, we look for a 30% rise in output at El Abra coming off a fairly low base, though our plan is to hold at 200 million to 250 million pounds annually over the coming years while we evaluate future growth opportunities there. Turning to Grasberg, like Richard said, hitting our targeted metal run rate during the fourth quarter was truly the year's standout moment. That marked a huge success milestone for us. Everyone here takes pride in it; our attention now is on keeping that going through 2022; and come the second half of next year, once our new SAG circuit is finished — it's being built right now — we'll have chances to raise mill throughput rates. The Grasberg team remains as fired up as ever, pushing Kucing Liar forward along with a number of other projects in the portfolio. Our following slide, Slide 18, simply gives an update on how we're progressing toward building new smelting capacity in Indonesia so we meet what we've committed to the government. You can see from the photo on that slide that the site for the new smelter is beginning to take shape. During the fourth quarter, we finished the pile support for the flash furnace and have begun pouring concrete. We also wrapped up agreements in the fourth quarter with our Japanese partner to expand the smelter that already exists at PT Smelting. Our focus is on finishing these projects as efficiently and on as timely a basis as we can. The smelter's cost has been funded through a $1 billion bank credit facility that PT-FI secured, and at PT-FI we're planning additional debt financing, obtainable at attractive rates, to finish the project. As the slide indicates, a phaseout of the 5% export duty would essentially offset the long-term cost of financing the smelter, so the economic impact is not material. On Slide 19, we give a 3-year outlook for volumes, and we're happy to say our execution is on track. There are some minor offsetting changes to our earlier guidance for copper sales in 2022 and 2023, and we've now added our current outlook for 2024. Having delivered a 19% increase in copper during 2021, we project a 13% increase for 2022, and that reflects higher production across the portfolio. Additional growth is planned for 2023 under our existing plans; for copper sales in 2022, we estimate roughly 36% will originate in the U.S., 27% from South America and about 37% from Grasberg. Slide 20 shows how the quarterly volumes — how they work out. At several of our sites in the Americas, we expect grades to be lower in the first half, then rise as the year goes on. Our gold sales remain pretty consistent, at about 400,000 ounces each quarter in 2022. Slide 21 gives you a side-by-side look at net unit cash costs for 2021, carried forward into 2022, and the two years come out quite close. For a while now, the global team has concentrated on managing costs and on efficiency efforts — extending how long equipment lasts, getting more out of energy, refining maintenance approaches, and applying technology across all of it. That's paying off handsomely given today's conditions. We also have the backing of an outstanding worldwide supply chain group, which is doing excellent work alongside site operations leadership and via relationships with long-term vendors to meet what the business requires. As the slide indicates, consolidated unit net cash costs on an estimated basis for 2022 should land quite near 2021. We are seeing input cost increases, among them energy and sulfuric acid. Labor and outside services run higher in 2022 than in 2021, and materials and supplies cost more too; however, greater volumes essentially cancel that out. We will keep emphasizing cost management and give our operators technology-based answers to help with today's cost strain and inflation. Richard brought up the robust cash flows we're producing, and we expect that to carry on going forward; Slide 22 illustrates how meaningful our cash flow is, based on volume and cost assumptions plus prices from $4 to $5 for copper, with gold held unchanged at $1,800 per ounce and molybdenum at $19 per pound.

Kathleen Quirk

executive
#5

We present modeled figures that average the years '23 and '24, and what you can observe here is that yearly EBITDA across this timeframe would fall between $12 billion each year when copper sits at $4 and more than $16 billion every year if copper reaches $5. In addition, under these scenarios our cash flow from operations would span from just under $9 billion annually up to $12 billion each year. Just as the prior few quarters have made clear, we are producing substantial free cash flow, and we anticipate this pattern will persist, with cash flow running well ahead of what we spend on capital. Turning to capital spending, Slide 23 lays out our capital forecast. During 2021, our capital expenditures, once smelter costs are excluded, came to $1.9 billion, which was a bit under the guidance figure of $2 billion that also excluded the smelter; for 2022 we expect capital of $3.3 billion, and for 2023, $2.7 billion. What mainly differs from the guidance we gave before — our earlier 2022 guidance — comes from adding the incremental Lone Star expansion together with our intention to move the CirCular Project at Atlantic Copper forward. You should also notice how much less will be spent on the Grasberg Block Cave and Deep MLZ starting in 2023; in addition, you can see the discretionary projects we are pushing ahead with to boost profitability and value going forward. Roughly 20% of capital across the coming 2 years consists of recently added, value-enhancing items. Slide 24 provides more detail on these, summarizing the discretionary capital. Since we hit our net debt goals last year and began our shareholder return policy, we have expanded our plan. Every one of these projects offers strong financial returns and excellent operational advantages, and once again they amount to value-enhancing investments funded by part of the 50% of free cash flow we set aside for organic investments and strengthening the balance sheet. The free cash flow we generate is considerable, backed by rising volumes, favorable markets and modest capital needs. On Slide 25, as Richard pointed out, you will see not only what we accomplished across the past several years but also, during 2021 by itself, we brought net debt down by close to $5 billion while our EBITDA keeps climbing; we are genuinely positioned extremely well to carry out our strategy, keep a strong balance sheet and give back significant cash to shareholders. Slide 26 summarizes our financial policy. It revolves around a robust balance sheet paired with a performance-based payout policy allowing as much as 50% of free cash flow to go toward shareholder returns, while the remainder funds growth and additional balance sheet gains. As Slide 27 shows, we began putting the policy into effect after our Board acted in November of last year; during the fourth quarter we bought close to $500 million of stock, and from January through today our cumulative purchases have reached $600 million, so we are making good progress toward utilizing our $3 billion authorization. Additionally, our Board gave the green light to a variable dividend tied to 2022, effectively paying out twice what we do on our common stock dividend. By pairing the share repurchase program with our dividend payouts, the goal is to hand out 50% of the cash flow we generate, all while keeping the balance sheet extraordinarily robust and leaving room to maneuver for investments over the long haul. So to wrap up, I simply want to repeat Richard's point. We're set up well to succeed in 2022 and going forward. Execution is something our team feels deeply about; momentum is on our side, and we're eager to keep building on that success. And operator, at this point we'd like to hand the call back to you so the Q&A session can begin.

Emily Chieng

analyst
#6

I'd like to ask about the Bagdad expansion. On your slide, I noticed a remark about the possibility of building getting underway in 2023, with a possible 2026 startup. Could you maybe discuss how far you've come so far in moving technical studies forward, and also any remaining obstacles that need to be cleared prior to project sanction? And is there any early sense of what CapEx this project might potentially need — for this project?

Kathleen Quirk

executive
#7

Emily, feasibility for that project is now getting started, and as we've mentioned, we've spent the last several years working on studies at various scoping levels; but the feasibility study is underway, and that's what will truly pin down the final cost estimates. Still, we expect it to be efficient, since a great deal of infrastructure is already in place there. We're putting in a new concentrator that will genuinely reflect the efficiency gains we've achieved over recent years at the existing Bagdad concentrator. And once we proceed and finish those feasibility studies, our belief is that permitting will be limited, and that's the reason we have hope that, that project might be operating in 2026. In our view, its economics will be positive as it advances production in a truly efficient way — doubling output at that site, because its reserve life is very long, at approximately 80 years; so we're looking to carry that value forward.

Lawson Winder

analyst
#8

Could I perhaps follow up regarding the all-star mine? Would you mind also bringing us up to date on your perspective concerning what is behind the current outperformance? Is it simply improved recoveries, or are there additional factors involved? And after that, when we consider the existing Lone Star mine, with your expansion to 300 million pounds, I mean, it is exceeding expectations by 5% or 6%; so in what way should we regard that 300 million pounds? Ought we to view it as more in the vicinity of 318 million to 320 million pounds?

Kathleen Quirk

executive
#9

Josh, do you want to handle that?

Richard Adkerson

executive
#10

Sure. Josh, would you take that one? Josh serves as our Chief Operating Officer for the Americas.

Josh Olmsted

executive
#11

Yeah. If you think about Lone Star in practical terms and what we've managed to accomplish from the point we launched it, a great deal of what we drew on came from lessons we picked up through the exercises and the experience we had at Bagdad — specifically around pinpointing where the process gets constrained and getting the workforce engaged through an agile style of working. Through that effort, the folks at Lone Star have managed to spot chances to remove those constraints, which let us pursue incremental improvements as time went on. When we consider what comes next, it's simply carrying that same approach forward — figuring out what stands in the way of getting the most production possible out of the site. The team has done a tremendous job working through the whole system and determining where those constraints sit. Then we launched projects aimed squarely at those constraints so we could push our current position as far as it will go. That 300 million pounds is likely right at the ceiling of what our existing Hydromet facilities and the tank house capacity can handle. So going past that figure would present some difficulty — though I won't claim the people there will stop hunting for ways to tack on more incremental pounds. Still, my sense is that the 300 million pound target we're moving toward sits quite near that ceiling, given what we have in place right now.

Christopher LaFemina

analyst
#12

If you take a look at how Freeport has advanced over the past 5 or 6 years, clearly you've gotten past some very significant obstacles, and the company has — you now find yourselves clearly in a strong position, and you're essentially setting loose what amounts to a huge organic growth pipeline, with likely even more growth than any of us know about right now simply because the resources are so enormous. And Richard, today you discussed leaching technologies, which you also brought up last quarter, but you described this as an enormous opportunity. My question on that is, first, what level of production potential might these new leaching technologies deliver? What's the timeline? Is any of it reflected in your guidance yet? What kind of operating costs? Basically the economic benefit you'll get from this leaching. I suppose the reason I'm asking is that many other large copper miners are discussing different new leaching technologies as being significant. And ultimately it comes down to — there will be an economic benefit from having additional volumes, but then the question is what it means for total copper supply and demand. So how much? When does it come online? Is it included in your guidance and what kind of operating costs?

Kathleen Quirk

executive
#13

We do have a modest amount of benefit built into our guidance from the early successes at Morenci. But that represents only a very small portion of what we anticipate achieving. We do have some, and Chris, this is still developing, so it will keep evolving as we proceed; but internally we've essentially said, let's aim to capture 100 million to 200 million pounds from this in the near term. And so we intend to steadily improve from where we are in 2022 and you'll hear more about it. But on the cost side, if you consider where the incremental cost of this sits, much of this material is already in our leach stockpiles; so we've already spent the funds to mine it and it's sitting in stockpiles. And so the incremental cost to recover it is very low. So that's the opportunity for us when we look at it, having low incremental capital to pursue it, low incremental operating costs. We have unused tank house capacity. Josh mentioned, we're filling the tank house at Safford. But at every one of our mines, we have some tank house capacity we can fill if we can achieve greater recoveries; so from an economic standpoint, this is a genuine opportunity for us. But when you're talking about 100 million to 200 million pounds and we have 38 billion pounds of material in stockpiles, that's a small amount; but it does carry value for us and we hope to go capture it. When it comes to whether this represents a fundamental shift in industry supply, we simply don't see that happening; it's going to require time and will emerge gradually; however, for us as a business, it's a significant value opportunity, considering the position we're in with those substantial stockpiles and the unused tank house capacity. And Cory, I'm not sure if there's anything you'd like to add, but that's the situation as we see it.

Cory Stevens

executive
#14

Nope, Kathleen, you nailed it.

Richard Adkerson

executive
#15

By the way, Cory Stevens is moving up to take charge of project development and engineering for us, and he's the central figure guiding this deal. And Chris, going back to an earlier chapter of my career in the '80s, I was in oil and gas when shale first really started taking off. So his team can confirm, I'm constantly scanning for what's ahead, asking whether some form of shale oil and gas breakthrough might transform the industry the way it did for petroleum. This represents an enormous opportunity for us — enormous meaning we can create substantial value. But when it comes to being the sort of shale oil sea change for the industry, as Kathleen described it, our view is that won't happen.

Michael Dudas

analyst
#16

What I want to ask about is this — you pointed to how hard it is to grow supply, with the pipeline looking rather sparse. Could you describe how things looked to you 12 months back versus now, in light of the political situation, particularly in the 2 countries that produce the most copper, and in light of where you sit in what appear to be far better jurisdictions? Does that mean things get pushed back even more over just the next 6 to 12 months, while the industry works out the best way to strike an agreement with those 2 governments? And of course, there may be additional chances across the coming several quarters on those matters in limiting — or even bringing some of these badly needed projects to market by the close of this decade.

Richard Adkerson

executive
#17

Absolutely, no doubt about it. Take what's happening with us at El Abra. Our circumstances at El Abra would look different if the politics surrounding royalties and the fiscal regime governing copper output in Chile had gone another way. We'd be acting with greater urgency on El Abra at this moment. As it stands, we're getting ourselves ready to proceed, yet we aren't — any call on proceeding is being put off until the government in Chile gives us some clarity; so that's merely one illustration. Without a doubt, it's having an impact on people. Certain companies hold stability agreements; and the real question becomes whether the government will stand by stability agreements. Lately you've witnessed situations in other nations where mining companies wound up having to revisit and alter arrangements they believed were locked in by contract. In Indonesia, we ended up giving up certain things to settle our dispute with the government there, and we accomplished that on terms that worked in our favor. Still, that's simply how the world works these days.

Michael Dudas

analyst
#18

Relative to certain other nations, does America appear to be a far superior location? Your investment — what you're discussing today — certainly suggests you aim to strengthen and speed that up within your asset mix.

Richard Adkerson

executive
#19

Indeed. Now, within America, I'd separate greenfield projects from brownfield ones. Every development we pursue is brownfield — sites where operations already exist, where we've built a strong record of conducting ourselves properly, and where we've cultivated constructive ties with nearby communities, with state and local authorities, and with indigenous populations. That differs greatly from attempting to enter and build a brand-new mine at a location lacking an existing one, since mines — especially sizable ones — always affect the surrounding natural environment and the communities nearby. Water supplies become contested. Complications arise from historical circumstances involving indigenous peoples, and all of that renders such efforts far more difficult. You could rattle off a series of American projects of that sort, yet international projects encounter the very same challenges. Consequently, for us, America stands out as especially appealing: advantageous tax treatment, plus community backing for our operations. Elsewhere, that isn't the case regarding community school systems and health care systems; abroad, we actually supply every one of those ourselves. Thus it's highly appealing to us. In America, we hold virtually all our acreage outright in fee, so no royalties apply; consider the royalty percentages being raised globally — that represents an enormous contrast. Beyond that, we enjoy a company-specific advantage: a substantial net operating loss carryforward — possibly the sole — I'm attempting to recall another — possibly the sole positive outcome of the oil and gas transaction. We secured a sizable NOL shielding us from taxes for years ahead, despite America fundamentally having lower tax rates than what we face internationally. So given each of those factors, our long-established American footprint is truly the foremost one rendering it so appealing to us.

Alex Hacking

analyst
#20

I’d like to build on a few things asked earlier. Regarding Bagdad’s CapEx, if that project goes forward, would it fall under planned CapEx or discretionary? My assumption is discretionary. Then, briefly on Lone Star: the higher output level you’ve reached and disclosed—does that significantly accelerate the timeline for the sulfide project by several years, or is it basically irrelevant?

Richard Adkerson

executive
#21

No. Bagdad is entirely discretionary. What I mean is, we could keep running the business there at its current size, if that turned out to be the sensible choice. Given the market conditions we’re up against and the possibilities they create, it’s very likely we’ll proceed. Still, it is discretionary, and we’ll give the market an update on our plans when we commit to moving ahead, which I anticipate doing. On Lone Star, consider other big projects globally where reaching the mineral resource often requires years of spending on stripping to clear the overburden and reach the ore. In this case, we can profitably mine the overburden, which is oxide ore. By doing so, we’re removing that material sitting above the sulfide resource. That makes it enormously advantageous for developing this opportunity over the long term. As I mentioned, we’ll generate profits from the SOx side. Ultimately, drilling continues and economic studies continue, but I foresee constructing a large mill complex at Lone Star for processing; it holds extremely large sulfide resources—we’re discussing 50 billion tons of ore.

Kathleen Quirk

executive
#22

So Alex, regarding your question on bad debt specifically in connection with the financial policy — yes, that's how we'll handle it. Of the free cash flow, the 50% portion we keep is being set aside for upcoming investments and growth, and also to keep our balance sheet strong. That's the way we're looking at it.

Carlos de Alba

analyst
#23

My question concerns cash costs, both for the full year and, I suppose, for Q1. Could you give us some additional detail? Given the remark about lower grades anticipated during the first half, I would have thought guidance would be for a higher cost in Q1, above $1.35 per pound. Are there other elements that might offset the adverse effects on cost stemming from those lower grades expected in the first semester?

Kathleen Quirk

executive
#24

Yes. Well, another piece of it is the weighting of Indonesia's low cost against the higher costs in the U.S. and South America. That explains why you don't see much variation between Q1 and the full year.

Richard Adkerson

executive
#25

Just consider this: with Indonesia increasing output, Q4 came in at $0.08 per pound, while across the entire year it ran at under $0.20 — I'm not certain of the exact figure, maybe $0.18 or $0.19 per pound — and looking ahead, with greater volumes in Indonesia, we expect costs to stay within that same band. So this played a major role in our business. Our team has managed costs well, but we're no different from anyone else. Energy expenses are higher for us, and other input costs keep climbing. That's simply something we have to contend with, yet this was precisely the rationale behind combining these companies back in 2007 — pairing the Indonesian assets, which are unique thanks to their copper grades and gold content, with those lower-grade American mines that are profitable but carry higher costs. And so that's merely a lingering advantage from what we did all those years ago.

Richard Adkerson

executive
#26

I need to fix something I just stated. What I referred to as 50 billion tonnes of ore at Lone Star — that figure should actually be 50 billion pounds of copper resource.

Michael Glick

analyst
#27

Regarding your financial policy, could you remind us how frequently, in practical terms, you'll revisit the variable portion of that policy?

Kathleen Quirk

executive
#28

It gets reviewed by our Board on a regular basis. On a formal schedule, that happens no less than once a year, though it's also something we go over with the Board on a continuing basis.

Richard Adkerson

executive
#29

Take what happened in Q3 as an illustration: that's when we introduced the variable dividend policy and began repurchasing shares. When we first examined this a year back, the intention had been to act at our initial 2022 meeting. Yet our progress was so strong, and market conditions so favorable, that we moved things forward. So, a bit of insight into how Freeport operates: there's no yearly planning cycle for us. Each quarter we refresh our long-range plans, following a highly disciplined approach, which keeps everything current. So although we discussed reviewing this financial policy once a year, as Kathleen mentioned, we're constantly discussing it with our Board. And should circumstances shift, we won't box ourselves in with any rigid timeline.

Abhi Agarwal

analyst
#30

Richard, you said you're holding early-stage discussions with the Indonesian government about pushing the contract past 2041. Could you give us a little more insight into what the essential path looks like before that deal gets signed?

Richard Adkerson

executive
#31

Yes. Calling them preliminary talks is accurate — and unusual. We genuinely attempted to tackle this several years back, but completing all the other items proved simply too complex; a continuation of operations past 2041 serves the interests of everyone involved, every stakeholder. Nobody benefits — certainly not us — from running this business against some kind of drop-dead date. So there's widespread agreement that this needs to happen. Because we're at such an early stage, I can't answer your questions regarding how we'd structure it or what we would require. What I can tell you is that these initial conversations have gotten a very favorable response, and people recognize that going beyond 2041 is in everybody's interest.

John Tumazos

analyst
#32

I have two things I'd like to ask. To start with, molybdenum. Back in 2017 and 2018, we saw 95 million pounds produced. Industry figures show a 5.4% drop in global mine supply during last year through November, so my guess is that many copper operations are dealing with declining moly grades. Meanwhile, world output of steel and stainless steel keeps climbing. Is there any way for you to push moly throughput higher to make up for weaker grades at Cerro Verde or at other copper mines?

Kathleen Quirk

executive
#33

John, as you're aware, we operate two primary molybdenum mines in Colorado — Climax and Henderson. When the market looked different from how it does now, we reduced output at those operations. That said, we can grow production from our primary mines, Climax in particular. Right now we're working on advancing stripping activities, which gives us greater flexibility down the road to lift output at our primary molybdenum mines in response to stronger demand and tight molybdenum supply; so our primary molybdenum mines offer us considerable optionality.

John Tumazos

analyst
#34

About the expenses in Indonesia related to smelting — you've given $0.24 for treatment charges and $0.20 for export duties. My understanding, though, is that these represent averages, since a portion of output sits domestically at Gresik while another portion leaves as exported concentrates. Suppose the split were fifty-fifty between domestic and export — would it make sense to view the cost as roughly $0.18 for concentrates shipped to Asia, and $0.30 for treatment at your own smelter? And in that case, export duties would be zero for material processed at your own smelter, yet exceed $0.20 on the portion you ship abroad? Perhaps $0.40?

Richard Adkerson

executive
#35

Yes. You've got the direction right, John — and we may follow up with specifics, because I believe the export figures you're referring to fall within the range of what we're currently doing, at $0.16 to $0.18. And yes, we do incur this export duty. Meanwhile, domestic processing costs at the smelter will run considerably higher, especially once you account for some form of capital cost factor tied to the investment, but it will remove the export duty. Consequently, the net economic impact on PT-FI — combined with the smelter's costs being captured within PT-FI's consolidated tax return, meaning any expense flowing through there works to lower taxes — means that the tax reduction plus avoiding the export duty, broadly speaking, counterbalances the economics for PT-FI of constructing a smelter.

Kathleen Quirk

executive
#36

Right, John — the way we see it, spreading the smelter's capital expense across a lengthy horizon basically cancels out the duty. After that, if you examine the operating side of things, the cash costs to run the smelter really ought not to diverge much from what exporting plus TCRCs would give you. That's more or less our take on those 2 pieces.

Richard Adkerson

executive
#37

And that's something I think — John, I don't have those figures right here with me, but my sense is the processing expense at PT Smelting isn't as large as what you mentioned for the existing arrangement. Plus, as part of working toward in-country processing, we're also growing that smelter capacity by 30%. Still, it's an extremely efficient smelter — we constructed it during the mid-90s — and when it comes to managing costs, it's essentially world-class.

John Tumazos

analyst
#38

That's a lot of complicated details.

Richard Adkerson

executive
#39

Yes.

Jatinder Goel

analyst
#40

Regarding your 2024 copper guidance, a question. Please tell us where — which operations are going to have lower volumes, given that 2024 brings a decrease of 300 million pounds compared with the prior year, and Grasberg is now holding steady. So which operations are going to experience that decline? And is this merely a blip lasting 1 year, or does the trend continue, just so we understand, since Grasberg will also shed 150 million pounds during 2025? But I'm simply attempting to set that discretionary and growth CapEx alongside the guidance and what remains invisible to us past 2024.

Richard Adkerson

executive
#41

I'll let Kathleen, and perhaps Josh, address that. But I'd simply note that constant adjustments get made to these mine plan projections for a variety of reasons that — and a few of them lead to certain volumes moving between 1 year and another, yet every one of them represents steps taken to maximize the long-term values of the mines. We don't operate these mines in order to hit any sort of targeted — predetermined volume targets. But as I mentioned, our planning process is dynamic and real-time, and our aim across that entire planning process is how do we maximize the long-term NPV along with the resources we hold; and so you will — if you look back at our history, volumes keep shifting from 1 year to the next, and then additional factors enter the picture.

Kathleen Quirk

executive
#42

When you compare 2023 with 2024, we are seeing reduced grades at certain U.S. sites, most notably Morenci, plus somewhat weaker grades at Cerro Verde between those two years. However, as we mentioned before, nothing of significance is included here for the leaching opportunity, so everyone is driven to secure extra volumes with minimal capital intensity from that leaching opportunity. After that, Bagdad enters the picture. We also have a whole set of other opportunities. Still, as Richard mentioned, grade does shift annually, and in 2024 versus 2023 we are dealing with somewhat lower grades.

Alex Terentiew

analyst
#43

Just a few things I'd like to add on top of what's already been discussed. To start with, regarding Kucing Liar and the Indonesian licensing talks that go past 2041 — does how quickly we put money into that project hinge on how those negotiations turn out? Then, if I could squeeze in a second one, it's about the moly business. Pricing has clearly been pretty robust over the last year, climbing from roughly $12 up to $19. Could you share any perspective on where demand is headed? My understanding is that you have a chance, and you see chances, to grow. But is there anything you can tell us regarding the demand picture over the coming 1 or 2 years?

Kathleen Quirk

executive
#44

Regarding KL, every bit of our economics was built around the 2041 date; so should we manage to get an extension, there will be significantly more reserves coming from KL as well as other ore bodies. That said, the economics in our plans were run using the 2041 date, and it's a highly appealing project, and Mark can go into greater detail on that; but we're truly capitalizing on everything we learned from Deep MLZ and Grasberg Block Cave to keep up our momentum in pushing development forward; and it draws on all the infrastructure that's already in place there, so on its own it's genuinely a solid project, and it becomes even stronger should we succeed in extending past 2041.

Richard Adkerson

executive
#45

And only a brief remark regarding that: given every one of these years of ambiguity surrounding our agreement with the Indonesian government, now through 2041, we have done — plus the reality that we already had such resources discovered to supply our mill and so on, we have not performed much exploratory-type drilling in the Grasberg district for quite a while now. So that is among the primary factors that would make it appealing for all stakeholders for us to secure an agreement extending past 2041, which would then permit us to carry out more delineation core drilling or exploratory core drilling. Simply look at that schematic we had showing the ore bodies that exist there, where they sit, where they originated from, and historically. And it is simply evident that although we do not know as of yet since we have not drilled it, the strong probability is that far more resources exist there that have not yet been identified.

Alex Terentiew

analyst
#46

Alright, that sounds excellent.

Kathleen Quirk

executive
#47

Mike Kendrick has joined the call, and he's able to give you a sense of where we stand regarding expected moly demand.

Mike Kendrick

executive
#48

Absolutely. Kathleen, thank you for that. So, a handful of observations regarding it — we hold a favorable view when it comes to molybdenum's prospects across the coming several years. Areas such as energy, be it conventional forms that call for steels containing moly, or alternatively renewables, are each looking quite encouraging at present. Building out infrastructure worldwide relies on moly. And as has become clear, in this country, in Europe, in China, in Asia, every one of those signals looks quite encouraging. Beyond that, controlling pollution generally consumes a great deal of stainless steel, and once again, the signals we observe are quite encouraging. Among our buyers, in both Europe and the United States, there are — they hold encouraging expectations for the several years ahead. And beyond that, when you examine China's 5-year plan, there is unquestionably an upgrading of the materials being deployed across their economy and of what they are prioritizing. Consequently, we lean fairly optimistic regarding demand.

Carlos de Alba

analyst
#49

Thanks for letting me join again for a second time. If I could just ask about working capital, perhaps Kathleen — regarding the sensitivity of that figure you gave guidance on for cash from operations, it's roughly $8 billion for this year, and that's net of $1.3 billion in working capital and other uses. So I'm not sure precisely what portion is working capital, but if we assume that accounts for most of the $1.3 billion, might you provide some insight there? That is, for working capital, it's a larger figure than I had anticipated.

Kathleen Quirk

executive
#50

Yes. And as you observed, during 2021 we enjoyed a benefit, a substantial one. A significant share of that relates to when our international tax payments occur. Typically you're remitting based on a prior year, the schedule, so timing differences arise whenever volumes are rising or profitability is rising. So it simply comes down to when tax payments are made.

Richard Adkerson

executive
#51

Absolutely. I appreciate everyone joining us on today's call. It's genuinely a pleasure to share the strong headway our team has been achieving, and we're eager to keep building on that momentum — we're truly enthusiastic about what's coming next for us. So thanks for taking an interest; and should you have additional questions or require any follow-up, please reach out to David Joint, and we'll get back to you. Everyone, have a great day.

Operator

operator
#52

Everyone, that brings today’s call to a close. We appreciate your joining us. You’re welcome to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.