What were the key takeaways from Freeport-McMoRan Inc.'s April 23, 2026 earnings call?
In the first quarter of 2026, Freeport-McMoRan Inc. (FCX) reported revenues of $5.2 billion and earnings of $0.45 per share, reflecting a strong performance despite operational challenges at Grasberg. The company noted a significant increase in operating income from U.S. mining operations, which contributed 2.5 times more compared to the prior year. Management has adjusted its guidance for Grasberg, now expecting ramp-up to approximately 60,000 tonnes per day in the second half of 2026, down from a previous target of 100,000 tonnes, due to material handling bottlenecks. Overall, the outlook remains positive, driven by strong copper demand and ongoing growth initiatives.
What topics did Freeport-McMoRan Inc. cover?
- Grasberg Production Challenges: Freeport has encountered material handling bottlenecks at Grasberg, limiting production to approximately 60,000 tonnes per day in the second half of 2026, down from a previously targeted 100,000 tonnes. Management stated, "The challenge we are currently addressing is downstream of the extraction level and relates to the material handling systems for loading ore onto our automated trains."
- Strong U.S. Operations Performance: U.S. mining operations significantly outperformed expectations, contributing 2.5 times more operating income compared to the same quarter last year. This performance was attributed to operational excellence and improved mining rates, particularly at Morenci, which saw a 19% increase in mining rates year-over-year.
- Copper Demand Outlook: Management highlighted a robust outlook for copper demand, driven by electrification and infrastructure needs. They noted, "Demand signals remain strong... with significant power grid spending and significant draws on Chinese exchange inventories in recent weeks."
- Capital Expenditures and Growth Initiatives: Freeport plans to maintain capital expenditures at approximately $4.3 billion for 2026, focusing on growth projects such as the Kucing Liar development and the Bagdad mine expansion. The company is also advancing its innovative leach initiative, aiming for significant production increases by 2027 and 2028.
- Cost Pressures and Guidance Adjustments: Management acknowledged rising cost pressures, particularly from diesel fuel, which has increased projected unit costs to $1.95 per pound of copper for the year. They stated, "A sharp rise in diesel prices in March equates to an approximate $500 million cost increase on an annualized basis."
What were Freeport-McMoRan Inc.'s April 23, 2026 results?
- Operating Income from U.S. Operations: 2.5x more (compared to last year's first quarter)
- Copper Production Target: 60,000 tonnes per day
- Projected Unit Costs: $1.95 per pound (compared to prior estimate of $1.75)
Freeport-McMoRan's first quarter results reflect strong operational performance in the U.S. but highlight significant challenges at Grasberg that could impact short-term production. The company remains well-positioned for long-term growth driven by robust copper demand and ongoing investments in innovative projects. Investors should monitor the progress of the Grasberg ramp-up and the impact of rising operational costs on profitability.
Earnings Call Speaker Segments
David Joint
executiveHello, everybody, and thank you for joining the Freeport earnings call. This morning, FCX released its operating and financial results for the first quarter. You can find a copy of today's press release, along with supplemental schedules and slides, on our website, fcx.com. This call is being webcast live. To listen, simply visit our website home page and click the webcast link; analysts, investors, and members of the financial press have all been invited to tune in. A replay of the webcast will be posted on our site later today. Before we get into our remarks, we want to remind everyone that today's press release and some of what we say on this call include non-GAAP measures and forward-looking statements, and actual results could differ materially. Please see the cautionary language in our press release and slides, as well as the risk factors in our SEC filings, all of which can be found on our website. Joining me on the call today are Richard Adkerson, Chairman of the Board; Kathleen Quirk, President and Chief Executive Officer; Maree Robertson, Executive Vice President and Chief Financial Officer; and other senior members of our management team. Richard will offer some opening comments. Kathleen will walk through our slide materials, and then Maree will speak, after which we'll take questions. Richard?
Richard Adkerson
executiveThank you, David, and hello to all of you joining us. Twenty years have now passed since Freeport merged with Phelps Dodge, building today's Freeport and establishing a worldwide copper powerhouse. The approach we adopted once I took the CEO role in 2003 lined up with China becoming the leading driver of copper consumption. Choosing to center our business on copper made sense back then, and it has only proven stronger as time has gone on. Last week we were in Chile for the Annual Global Copper Conference — my first time attending was 2004 — and that's where I came to understand that the supply reaction anticipated at the time to China's demand would end up weaker than people thought. At this year's event, those present shared a firmly optimistic view regarding where copper is headed. We've entered a fresh period of expansion in copper that touches many sectors and stems from rising electricity needs. Put plainly, copper is electricity. Freeport's assets have long lives and carry substantial built-in growth possibilities that we're pushing forward for what lies ahead. In the Americas, we have thrilling expansion coming, with considerable chances to boost earnings through contemporary technology. Grasberg will remain a key long-term source of both our expansion and our earnings, thanks to its rich copper and gold grades. Extending our operating rights past 2041, in line with the MOU we recently signed with Indonesia's Government, supports keeping these advantages flowing from this extraordinary, world-class asset. We've just marked 59 years of running operations successfully in Indonesia. My own involvement stretches back to 1988. The team we have there leads the field in large-scale Block Cave mining. Kathleen will walk you through our operating results and outlook, including how we intend to bring Grasberg back to full production. I have total faith in our teams as they take on the present difficulties. Freeport's worldwide team makes me genuinely proud, and our company stands exceptionally well placed for what's coming. Kathleen?
Kathleen Quirk
executiveAlright, thanks Richard, and I appreciate everyone joining the call today. We'll go over how we performed in the first quarter, then bring you up to date on what we're doing with our initiatives, projects, and what we see ahead. Things are busy right now for our teams throughout the worldwide business as we work to bring back large-scale output at Grasberg in a way that's safe and sustainable, create value by running operations exceptionally well and pursuing new technology efforts in the U.S., and get ready for an exciting new stage of organic growth. If you turn to Slide 3, we've laid out the first-quarter highlights. Our copper and gold sales along with unit costs came in ahead of what we had forecast, and with metal prices being favorable, we were able to deliver increases in revenues, EBITDA, and cash flow versus the first quarter a year ago, even though our Indonesia operations were running below full capacity. You can see the portfolio's strength and diversity in these results: our U.S. mining operations delivered 2.5x more operating income this first quarter than they did in last year's first quarter, with solid flow-through to the bottom line. We successfully finished the remediation work required at Grasberg so we could begin the phased ramp-up, starting with production blocks 2 and 3 in the Grasberg Block Cave. That marked a significant milestone, and our team executed impressively. I'll get into more detail about the material handling bottlenecks and initial ramp-up difficulties we ran into, what we're doing about them, and how they affect our ramp-up forecast. As Richard noted, one standout item this quarter was the memorandum of understanding we reached in February with the Government of Indonesia to extend their operating rights for the life of the resource. That's a major long-term value driver for Freeport, for the government, and for the many stakeholders who benefit from our operations in Indonesia that have been in place a long time. We're moving ahead with plans for future growth and filed an environmental impact statement in March for a major expansion project in Chile. We're making progress on a number of initiatives to scale up our innovative leach project, and we're finishing the work needed so that later this year we could potentially give the go-ahead to our brownfield expansion project at the Bagdad mine in Arizona. We returned roughly $300 million to shareholders during the first quarter, which includes common stock dividends and buying back 1.7 million shares of our common stock. Our balance sheet is in good shape, and we're well positioned to put money into future growth while also giving cash back to shareholders. Now on Slide 4. We've summarized our priorities for 2026; these match the priorities we established when the year began, and every one of them represents an area where we can create meaningful value. Executing our plans well — including getting a successful ramp-up at Grasberg, realizing the value of our leach opportunity, bringing in new technologies to boost performance, and investing in profitable growth — will let us build substantial value in our business. Naturally, there will be obstacles to navigate, as the present circumstances at Grasberg make clear, yet I have every confidence that our deeply seasoned team will tackle and triumph over whatever comes our way, acting swiftly and with resolve. Now, moving to the markets, which you'll find on Slide 5. Freeport stands as a top-tier worldwide provider of copper, and we gain from the metal's growing and essential place in the world economy. Looking ahead, copper demand is climbing, driven by enormous power grid needs that underpin emerging technologies. Thanks to its exceptional conductivity, copper is the go-to metal for electrification, and electrification across the globe is accelerating sharply. So far this year, copper prices have averaged above $5.80 per pound and hit a record peak, climbing past $6 per pound during the first quarter. The demand signals are still robust. Our U.S. customers keep telling us demand is growing because of AI data centers and the energy infrastructure tied to them, and that has more than made up for softness in private construction as well as the auto sector. Fresh data out of China points to a major demand comeback, with substantial power grid expenditures and substantial withdrawals from Chinese exchange inventories over the past few weeks. When we take a broader view of the fundamentals, we anticipate the market will need more copper supply to satisfy expanding demand. Here at Freeport, we hold a precious, geographically varied set of copper assets and sit in a strategically strong position for the long haul, with large-scale production sites, reserves and resources that last for decades, plus a collection of low-risk brownfield growth prospects, all aimed at serving a market that keeps growing. Shifting to operations, on Slide 6, we lay out the operating highlights broken down by geographic region. Starting with the U.S., output came in above the same quarter a year earlier, though somewhat below the prior quarter relative to the fourth quarter of 2025 and our own projections. Our operating crews remain dedicated to our operating disciplines, cutting unplanned downtime and delivering consistent peak output from the assets we already have. We're genuinely heartened by the latest gains in our mining rate, especially at Morenci, where rates rose 19% versus last year's first quarter. Keeping those higher mining rates going will lead to better copper production down the road, and we anticipate copper production will rise as the year progresses. Our inventive leach program keeps demonstrating genuine potential. We're rolling out our first additive developed in-house and can foresee a new additive that looks very promising in lab testing. We've started a pilot at Morenci where we're raising stockpile temperatures by adding a heated leaching solution to them; it's known that recoveries improve at higher temperatures, and our efforts are aimed at identifying the engineering approach and cost structure that works best to get there; we're still encouraged about being able to scale up to 300 million to 400 million pounds per annum during the 2026, 2027 time frame, which opens the door to reaching 800 million pounds per annum through this initiative; we keep pushing hard to bring innovation into our everyday mining operations and believe AI and other tools hold significant promise for boosting operating performance. Down in South America, the Cerro Verde team handled a tough first quarter very well, dealing with serious flooding around Arequipa and mill efficiency issues; our expectation remains stable output at Cerro Verde along with modest growth at El Abra, a Chilean project we're doing with CODELCO, across the coming couple of years. At El Abra there's plenty happening right now, including a leach pad expansion and scheduled testing in late '26 of heated stockpile injections aimed at improving leach recoveries. As I noted, we submitted our environmental impact statement in March for a significant El Abra expansion. That project is set to turn El Abra from a fairly small producer into a large-scale contributor inside the Freeport portfolio; we went through the Grasberg restart highlights, and I'll give you additional detail on where we stand in the upcoming slides. During the quarter we came to terms with our insurers on a $700 million insurance recovery, the full maximum limit allowed under the policy. We anticipate receiving those proceeds in the second quarter.
Kathleen Quirk
executiveIn Indonesia, one of our two smelters is still running, using the concentrate we have on hand, while the new smelter sits idle and should come back online at some point later in this year. Across the next few slides, we'll walk you through an update on Grasberg, what has been achieved so far, and where things are headed as we progress through 2026. Slide 7 gives a summary of where the Grasberg Block Cave stands right now. During the past few months, we managed to finish the work needed to bring mining and production blocks 2 and 3 back into service, and in March we began mining there on a limited basis. As a bit of background, production blocks 2 and 3 had no direct link to the external mud rush that took place in production block 1C, which sits nearer to the surface and below the low point of the old open pit. When it comes to the potential for an external mud rush, the position and features of production blocks 2 and 3 are not the same as what we saw in production Block 1C. That said, during September 2025 we did pause work in production blocks 2 and 3 for a while. The reason was to put concrete plugs in place, sealing off the panels in production block 1C, and to make certain nothing connected to the surface. This also allowed us to complete clearing material from the extraction and service levels, bring back infrastructure at the service level, and reinforce our case management plans. It was a massive undertaking, and the team executed this plan very well. After completing those projects and getting back into the area, we inspected and sampled over 600 draw points throughout production blocks 2 and 3. What we found was that conditions inside the cave had changed a lot while work was stopped. Wet ore now accounts for a bigger portion of the cave's contents than it did back in September 2025, when we halted operations. That increase in wet material came from surface water, which seeps down through the mine's pave rock and gets taken out of the mine by gravity drainage. When conditions are normal, active mining helps in managing the water that accumulates within the cave; we have considerable experience mining wet material, and our systems for extracting ore from the draw points rely fully on autonomous remote loaders, which can safely handle that material. The problem we are dealing with at present lies downstream of the extraction level and has to do with the material handling systems used to load ore onto our automated trains. In the past, we had a greater share of dry material, which let us handle the wet material by blending it to a consistency appropriate for loading through chutes onto the trains; given the conditions now, we will have to install specialized equipment on the chutes to control the flow of ore for train loading. We have spent the past few years testing this equipment as part of our long-range planning, anticipating that ore conditions could change over time. We're aware of the engineering solution for this issue, but implementing those changes takes time, and in the interim, PB 2 and PB 3 production is limited to the capacity of our current chute configurations. We anticipate clearing most of these constraints by the middle of 2027. As we work through the shot infrastructure challenges in PB 2 and PB 3, we're also continuing to advance planning for a future ramp-up of production block 1 south, along with a series of derisking efforts focused on surface drainage and other risk reduction measures — among them the imaging technology we brought in recently to enhance cave monitoring. The forecast we have now captures our best estimate of how long it will take to resolve the bottleneck we're facing. We're still at a very early stage of our initial ramp-up, and various factors could push rates up or down over the months ahead. What we're dealing with is a timing matter tied to an engineered design solution — it isn't a major cost problem, and it doesn't alter the ultimate recovery of the resource. We have confidence in our ability to bring large sale production back safely and efficiently going forward; on Slide 8, just to give some background, we summarize what we presented in January along with an update on where we stand now. Looking at that slide, you can see the restart happened slightly earlier than we had planned. Our earlier goal for output from PB 2 and PB 3 had been to climb to 100,000 tonnes per day during this year's second half. But because of the material handling limits we're dealing with now, we anticipate being capped at about 60,000 tonnes per day out of production blocks 2 and 3 in the back half of 2026. That figure should move into the 90,000 tonne per day neighborhood by the middle of 2027, once the ore loading infrastructure changes are wrapped up across the coming months. Page 39 of the reference materials contains further detail spelling out the ramp-up specifics. Looking at Slide 9, this graphic puts our current draw points side by side with where things stood in September 2025. It offers a planned perspective on the withdraw points at the GBC extraction level within PB 2 and 3, using color coding to indicate the counts of wet versus dry draw points prior to the mining halt in September 2025, and how that compares to the present situation. The data shows that back in September 2025, out of 635 active draw points in total, 30% were wet. Today that figure sits at 45%, which works out to a 50% rise in wet draw points. When it comes to blending, our existing shot design requires us to hit a minimum 1:1 ratio of dry material to wet material as measured within each panel. Right now, 10 of the 23 panels fail to satisfy the 1:1 dry-to-wet ratio requirement, versus just 1 back in September, which forces us to reduce production until the chute modifications are operational; we keep watching the draw points to figure out what else might change and whether things might get drier as mining rates go on. Still, we believe pushing forward with these adjustments will leave us with more robust material handling systems and more flexibility later on. On Slide 10, there's a diagram that lays out the mine and the changes we plan downstream of the extraction level. That diagram makes clear that mining happens on the extraction level, and that's not where the issue is. The problem centers on the ore that reaches the haulage level through ore passes and chute passes. The bottleneck we're addressing involves the loading shots that fill the automated trains down at the haulage level, and we've included photos showing both the current shot design and the new equipment intended to regulate material flow into the railcars. This is a robust fix. Slide 37 in the reference materials provides additional detail on how those regulators are engineered. In closing, Slide 11 presents reports on PTFI's updated 5-year production forecast. We've incorporated changes to our ramp-up schedule. Looking at that five-year span, the change affecting the Grasberg district works out to about a 9% decrease in copper and 7% in gold, and those impacts land hardest during 2026 and 2027. Again, none of this material disappears — it ought to be recovered down the road.
Kathleen Quirk
executiveLike I said, the ramp up is at an early point right now. A variety of things could push these estimates higher, and there are also a variety of risks. To repeat, what we're dealing with isn't a resource recovery problem or a major cost problem that needs fixing; it comes down to timing, and as we move ahead we'll work to optimize the plans. Our team brings a great deal of experience, and we have confidence in our capacity to successfully tackle the bottlenecks we currently face and bring large-scale production back safely and efficiently. Turning to our growth, which is a really exciting part of the report. As I said, we're examining copper's fundamental outlook. It's quite evident that more copper supply is needed to underpin energy infrastructure, new technologies and more advanced societies. Here at Freeport, we gain from a portfolio of organic growth opportunities, which can be built out from our known resources in jurisdictions where we've built up a history and experience. Our Indonesian projects additionally carry the advantage of high gold content alongside the copper. Since our projects are brownfield in nature, we gain from leveraging infrastructure that already exists, economies of scale, workforces with experience and relationships with key stakeholders, allowing us to move faster with less risk than a greenfield project would involve. We're now entering a growth period in our Americas business, with near- and medium-term chances to scale our leach initiative and double production at our Bagdad mine in Arizona; we have longer-term growth in the Safford/Lone Star District and an exciting project at El Abra in Chile; we're applying innovative approaches across our projects to improve efficiencies, lower costs and lower capital intensity while shortening the lead times for our projects. The high potential low-cost innovative leach initiative is a prime example of this, and it's probably among the highest NPV opportunities in the entire industry. We have projects in the 2026 pipeline to test injection of heated solutions into our stockpiles, which along with additives could deliver significant recovery gains. This year, especially in the second half, will matter a great deal as we obtain results from our heat trials, push forward our additive deployment and work to scale next year to 400 million pounds per annum from this initiative and to define our path to 800 million pounds by as soon as 2030. The expansion opportunity at Bagdad is heading toward an investment decision. We're advancing engineering, retesting our capital cost estimates and economic evaluations and working with our vendors to lock in pricing on major components. We're continuing to advance our work on tailings infrastructure there to further enhance optionality on the timing of the project. As a reminder, no permitting hurdles exist, and we've completed a significant amount of work, planning and early works so that we can finish the project within a 3- to 4-year time frame. Work is ongoing in the Safford/Lone Star District, where we're assessing the best ways to expand and develop, and we keep pushing to make the most of the sizable undeveloped resource sitting at Safford/Lone Star within an established U.S. mining district. Over at El Abra, together with our partner CODELCO, we have a tremendous chance to build out a large-scale expansion. That's a substantial resource — total copper reserves at El Abra come close to matching the scale of the big position we hold at Cerro Verde. Like Richard said, we visited Chile last week, and our stakeholders have responded very favorably to this project. The Chilean government is excited about it and is collaborating with us so the application gets a timely review. We're also making headway on the Kucing Liar project over in Indonesia, which supports a low-cost, long-term production profile in that prolific district; on Slide 13 — wrapping up what I have to say before Maree walks through the financials — a meaningful share of our reserves, resources and future growth sits in the United States. Freeport is a major copper — an important American copper producer and, by a wide margin, the biggest supplier into the U.S. copper market, with a proven, successful franchise whose roots go back to the late 1800. We refer to ourselves as America's Copper Champion, and we're vigorously carrying out a set of initiatives aimed at strengthening our U.S. business via innovation, automation and putting investment into expanded facilities. Those initiatives are meant to bring on additional production at a low incremental cost while boosting profitability and resiliency across our valuable U.S. business. In a sector where development timelines can stretch beyond 10 years, our U.S. business holds a strong position, with the potential for a 60% rise in copper production across the next several years. Our team is enthusiastic about these opportunities, and for all of Freeport they amount to a significant value driver. As I noted, they were working to better our cost position in the U.S., and we've set our sights on targeted reductions as we move into 2027 and beyond. Although we're currently up against some fresh challenges from rising energy costs and other consumables, the work we're doing within our control will make our U.S. business more resilient, more profitable and meaningfully more valuable. I'll hand the call over to Maree, who will go through our outlook, and after that we'll take our questions — your questions. Thanks.
Maree Robertson
executiveThanks, Kathleen. On Slide 14, we lay out our three-year projection for sales volumes across copper, gold, and molybdenum. This outlook factors in the revised ramp-up timeline at Grasberg that Kathleen walked through earlier, and that represents the main difference versus what we had previously estimated. As was mentioned before, these shifts relate to timing and will be made up later on. We anticipate volumes climbing in 2027 and 2028 as Grasberg returns to full recovery. Quarterly figures can be found on Page 27 in the reference materials. With ramp-up moving forward, our second-half volumes should come in roughly 30% above the first half for copper and roughly 50% above it for gold, which will fuel earnings and cash flow over the remainder of the year. Turning to Slide 15, we call out fresh cost pressures that have emerged since the conflict with Iran began in late February. Diesel fuel — which powers our haul trucks throughout the Americas and part of our power plant in Indonesia — has seen its price climb, with the heaviest impact falling on Indonesia. So far this has been more a matter of cost than of supply, though we keep watching the situation closely. For context, the sharp diesel price spike in March works out to roughly $500 million in additional costs on an annualized basis. We're also keeping an eye on sulfuric acid, where spot market prices have more than doubled. Our exposure to the spot market is not significant, and we're further shielded from sulfuric acid market swings thanks to the natural hedge provided by our smelters; we've built recent diesel prices into our updated forecast, along with revised assumptions for higher gold and molybdenum prices. Taking these updates together with the revised production profile, our present outlook calls for net unit costs to average $1.95 per pound of copper this year, versus the earlier estimate of $1.75 per pound. The main reason for this shift is Grasberg's smaller volume contribution. Combining our projected volumes with our cost estimates gives the modeled results on Slide 16 for EBITDA and cash flow across a range of copper prices from $5 to $7. While we don't forecast prices ourselves, we widened the range to illustrate sensitivities both above and below current levels; these modeled results use the average of 2027 and 2028 with current volume and cost estimates, holding gold flat at $4,500 per ounce and molybdenum flat at $25 per pound. Annual EBITDA would run from roughly $14 billion per annum at $5 copper up to $21 billion at $7 copper, with operating cash flows running from approximately $10 billion per year at $5 up to $16 billion at $7 copper. On the right, we show sensitivities to various commodities. You'll see that we're highly leveraged to copper prices, with every $0.10 per pound move translating to about $400 million in annual EBITDA during the 2027, '28 period. Higher gold prices will work in our favor as well, since for every $100 per ounce shift in the price, we get roughly $110 million in annual EBITDA. Thanks to our long lead reserves and large-scale production, we're in a strong position to produce considerable cash flow that can fund both future organic growth and cash returns under our performance-based payout framework. On Slide 17, you can see our current capital expenditure forecast for 2026 and 2027. Capex is in line with what we previously estimated, and it should come to about $4.3 billion in 2026 and $4.5 billion in 2027. For the discretionary projects, we expect roughly $1.6 billion to $1.7 billion each year in 2026 and 2027; about 50% of that relates to the Kucing Liar development and the LNG project at Grasberg. The rest covers acceleration of tailings and other infrastructure supporting the Bagdad expansion, the Atlantic Copper Circular Project, which should be finished during 2026, and capitalized interest. The discretionary category represents the capital investments we're making in new projects that, under our financial policy, get funded with the 50% of available cash that isn't distributed. These projects are value-enhancing initiatives, and Slide 37 in our reference materials has the details. We keep managing capital expenditure carefully, and we'll keep deploying capital strategically toward projects offering the best return and risk reward profiles. Last, on Slide 18, we restate the financial policy priorities: a strong balance sheet, cash returns to shareholders and investments in value-enhancing growth projects. Our balance sheet is solid, with investment-grade ratings, strong credit metrics and flexibility within our debt targets to execute on our projects. We face no significant debt maturities through 2026 and have considerable flexibility for funding the 2027 maturities. Since we adopted our financial policy in 2021, we've distributed $6 billion to shareholders via dividends and share purchases, and we hold an attractive future long-term portfolio that will let us keep building long-term value for shareholders. Our global team is focused on driving value in our business, committed to strong execution of our plans, providing cash to invest in profitable growth and return cash to shareholders. Thank you for your attention; we'll now take your questions.
Carlos de Alba
analystI'd like to dig a bit deeper into how confident you are regarding the fresh guidance for Grasberg. Clearly, the reservations caught people off guard. Yet looking ahead, are there particular items or zones where you'd flag a greater chance of possible cutbacks to output or to the ramp-up that we ought to know about — things that may or may not pan out — but perhaps Kathleen could point out for us which ones those are? That would be helpful.
Kathleen Quirk
executiveSure. Thanks, Carlos. What we're chiefly undertaking to fix this problem is putting those regulators inside the shoe calories. At present, we can mine the material, yet we're constrained by the requirement for a particular kind of consistency to pass through the chutes. So when we consider where the ramp-up risk stands today, it truly comes down to a construction schedule and a delivery schedule from the vendor we've already been dealing with; part of the equipment has already arrived on site. Installation will happen in phases. Over the months ahead, more equipment will reach us, allowing us to fit these — we refer to them as spilmenators — into the shots; so really, the bottlenecks are going to be solved once this equipment gets installed; and we have equipment here now. Equipment is on order, and it comes down to hitting that execution timetable. I want to return to this team and what it achieves when it comes to building things at Grasberg. This isn't much different from many tasks the team has handled before. Their work getting ready for restart involved a very packed schedule, many moving parts, and with backing from our centralized team, the team performed superbly in carrying out the plan, and we'll take the same approach here. Getting this operational currently holds one of the business's top net present values. And our team is fully engaged; we're confident in our ability to hit the plan. The risks now are possible delays in receiving materials. Construction delays could occur too, but we have — we've handled that through the plan we've set out, and we'll keep monitoring it right through to completion. Mark Johnson is also on the call. And Mark, should you wish to give more detail on what we're doing there, please go ahead.
Mark Johnson
executiveRight, Kathleen. So we had a prototype of one of these silminators roughly 12 months back — we refer to it as Version 1. The unit going in at present is a redesigned iteration, Version 1.5. The initial one went in last week, separate from part of this newer understanding regarding the change in material types. So testing on that begins this weekend. Like you said, we have several additional units on hand. Fabrication is happening over in Indonesia. And the outfit handling that work has responded really well to what we need. We're aiming to finish out the capacity at that Indonesian facility. Beyond that, the team is exploring other approaches to cut down the construction cycle time for the chutes. So I — what we've incorporated and what we've placed into the plan reflects what we're confident we can achieve based on prior experience. And then, as you pointed out, we'll keep searching for opportunities to optimize and make that installation even simpler and faster.
Kathleen Quirk
executiveCarlos, one more point — Mark may have something to add here — but we'd like to stress that we're only at the beginning of this ramp-up. So the sampling we carried out across all the draw points is, right now, we have a process in which we sample and inspect those draw points on a routine basis. As mining continues, it's possible that part of this bottleneck could be worked out and our usual blending systems might be able to handle the material; that possibility is not something we've factored into this forecast. What we have factored in is relying on this more robust approach to controlling the flow in the chute, though there could be a case where the material gets drier as it's mined. And Mark, feel free to add to that.
Mark Johnson
executiveYeah, it was just an unlucky bit of timing that we were ramping up right when the forecast process was happening, really at the start of March. I believe our forecast, given what we knew back then, would have come out very close to the earlier estimate. So what we did, like Kathleen said, is once we started mucking, we saw a greater frequency of spills. A portion of the material we started mucking turned into a weather material, so we took what we know now and made that our foundation. What we do know is that once we mark the porosity, the material above it will get better. And that's the potential upside we could have — as our footprint gets wider, as we start mining additional draw points and additional panels, some of these might go back to how they were before. It's a process in which, while mucking, we assess things very often. So it's quite a dynamic process. As Kathleen said, we already mine every panel remotely. It takes only 1 wet draw point inside a panel for us to switch to remote mining. So we were ready for that from the start; and now it's simply a question of that ratio in each panel. There are also consequences from panels next to a wet panel. The team has been really inventive about remotely handling other things inside the panel, such as rock breakage and hung up panels; so it's not only the remote mucking. We're pursuing a number of other initiatives that will boost the availability of the draw points.
Carlos de Alba
analystJust one more thing, and I'll keep it brief. If that ratio gets better as time goes on, are the regulators able to work with a material that's drier?
Mark Johnson
executiveCorrect. Indeed. The key issue is having the ability to cut the flow when it becomes extremely runny. This is a highly inventive setup in which the gate and the hydraulic grams, in fact, once the material begins moving, help us stop that flow whenever necessary. So the point is to keep spills from occurring at our haulage level and reaching the trains. That said, dry material can be managed as well.
Kathleen Quirk
executiveThis system offers a great deal of flexibility and robustness. As we noted, our intention had been to put it in place across the long term, but at this point we are speeding that up so the system can be more flexible and robust enough to manage material of any kind.
Alex Hacking
analystI don't want to second-guess after the fact, but you have a highly seasoned crew at Grasberg. Why did the initial evaluation overlook this problem of water accumulating once mining stopped; and, to put it simply, why isn't more drainage being added to the mine?
Kathleen Quirk
executiveMark, could you handle that final portion and our efforts; regarding the earlier portion, Alex, we track water entering and leaving the cave. So nothing of any consequence or notable worry was picked up. It simply comes down to reaching every one of those draw points so they can be examined, and that wasn't possible until we gained entry around March. The — it doesn't require much for a transition from dry to wet to happen, and only a tiny bit of dampness is needed. So this isn't some huge amount of water or an enormous overwhelming scenario, it's merely the character of what's damp or wet compared with what's fully dry; however we do have several programs, and that's why I wanted Mark to go over several programs we launched following last September's incident to create a sturdier drainage setup; yet the current one inside the Block Cave, in terms of gravity drainage, works very well. The one we're now working toward is extra drainage coming from the surface. But Mark, please walk through that, and we've included some details about it in the supplemental thoughts too.
Mark Johnson
executiveCorrect, yes. That slide shows 41%. However, Alex, the situation today—and something we've had for a long time—is a fairly thorough surface drainage system in the open pit, an area the pit itself hasn't affected. You know that when we Block Cave, a subsidence zone forms where rock fractures. The wet muck originates from rain landing on that fractured material. Our drainage network, covering both groundwater and the untouched surface, is quite strong. It has been operating there. Yet wet muck is produced by everyday rainfall hitting that rock, then migrating downward through the cave. Once it reaches a draw point, that draw point becomes something like a funnel, concentrating part of the flow present inside the broken rock. As Kathleen said, just a couple of percent shift in moisture content can turn material from dry, easily handled, into weather material requiring far more significant management. So drainage isn't truly the issue. What we're doing instead, following the external mud rush—the other incident, clearly, that created the situation in the PB 1 area—is trying to drain away water accumulating inside the cave, basically within that old pit shape. So we're drilling into broken rock above PB 1; we're already seeing initial signs, even using smaller diameter drill holes, that we can reach some of that water, which is encouraging; we have additional drills that will bore those kinds of holes far faster and at a larger diameter; they remain on schedule. They're arriving and should begin drilling by the end of June. Then we have further initiatives centered more on PB 1, reopening it to remove surface water that ponds or pools, plus any mud-like material, any liquefiable material that could collect at the pit bottom.
Christopher LaFemina
analystA few more questions regarding Grasberg, continuing from Alex's earlier point. When we examine the share of wet draw points prior to the mud rush, I believe you mentioned 30%, and now it stands at 45%. So my first question: how much variation exists around that figure? Put differently, it was 30%, yet at times 35%, at times 25%. How confident are you in today's dry-to-wet ratio? That's question one. Question two concerns — when exactly did you determine that — there were an excessive number of wet draw points? About two weeks back, I think a media report suggested Freeport was in fact ahead of schedule on the blockade ramp. Perhaps that media report was wrong, but I'm curious whether this is something you discovered only very recently and wasn't an evident issue merely a few weeks ago.
Kathleen Quirk
executiveChris, regarding the diagram on Slide 9, where we present the count of draw points in the dry-to-wet comparison, what also matters here is the panel. In September, just 1 panel within PB 2 and 3 failed to meet the ratio. We were handling that through lending, so only one was being addressed. Today, 10 of the 23 fail to meet the one-to-one. What that does is derate output from the entire panel, since you can only produce at the 1:1 level until those enhanced material handling systems are in place. So that's a key element in what's happening inside each panel. On variability, Mark can add more. We wouldn't have seen meaningful variability previously, yet we do have continuous monitoring that examines, for our processes, how to track these draw points for planning and management systems. However, from the time mining began, certain draw points that were wet in March have turned dry and the reverse. So it's somewhat of a shifting picture at present, in these very early stages of the ramp-up. As Mark said before, regarding timing, we had only just begun the ramp-up, so fresh information came to us during April while we moved through the forecasting process. At Freeport, we didn't change any guidance; the real progress achieved on the ramp-up in terms of — or the products being made on the restart was quite strong. As I noted, we completed that ahead of schedule. Certain press stories you might be pointing to have to do with conversations over in Indonesia, where government officials could be raising questions regarding the plan, or reporters could be inquiring about it; those would have drawn on the plan as we originally had it, since we hadn't locked in our forecast until not long ago. Once more, the rebound and the readiness to reach the ramp-up were proceeding extremely, extremely smoothly, and it is solely this fresh information that has been surfacing over the last few weeks that forced us to tackle the forecast. Once more, it remains quite early and circumstances may shift from this point, yet we do possess a solution. That solution is what we intend to carry out, and it is a beneficial long-term answer that grants us flexibility to handle such matters as we move ahead across the long term.
Mark Johnson
executiveLet me just jump in here — ever since Grasberg first came online, we've had a predictive tool for how that wet-to-dry ratio will evolve. And across the entire lifespan of PB 2 and 3, that ratio typically comes out at 2:1, meaning 2 draw points of drive for every 1 wet. A few panels would be — they differ — you see more variation spread over the footprint. But on the whole, we had a considerably improved ratio that we'd been projecting and factoring into our mine plans, and that's a major factor in why we designed GBC so it could be operated remotely right from the beginning. So this is something we've been developing for a good while. The model is somewhat intricate. It involves both the material's properties in terms of size and then controlling how water travels through the fragmented rock mass. So what we were seeing pointed to something quite different over the longer horizon. It didn't point to needing the stilminators at this stage of the mine. As Kathleen said, we were addressing that and identified specific panels that would call for it; but what we've now done is far more about taking what exists today and simply applying it, ensuring the chutes themselves aren't the constraint; so under the present plan, that will swap out every chute, which will provide that extra flexibility.
Nick Cash
analystI'd like to shift topics somewhat here. You brought up that you're rolling out the first additive you developed and also working on a second one up in North America. For both of those, how mature are the supply chains? Also, what's the timeline for scaling those additives up, and what portion of that $800 million guidance for incremental leaching comes from these new additives? And finally, with deal costs rising and global supply chain strain, could the $2.50 unit cost targets for North America in '27 be at risk?
Kathleen Quirk
executiveThanks, Nick. Regarding the additive — the one going into use right now — we began with a single stockpile at Morenci, and at this point we're applying it across more of the stockpiles there, and it's readily available; we have a supply chain in place for it, it's being applied, and results will keep developing over the course of the year, which is the data we're after. When it comes to the lab, the additive I'm talking about — we're focused on two more additives, and perhaps additional ones beyond those. We refer to them as our next-generation additives. With these extra additives, we've observed lab performance showing a multiplier effect of benefit compared with what we're using today. So we've been engaged with possible suppliers on them; sourcing them isn't as simple, and they might need to be manufactured the way the current ones are; but we've held some meetings over recent months expecting that we'll commercialize one or more of these additives, and it's genuinely demonstrating potential. As for your scaling question, it's additives combined with heat that will bring us to the 800 million pounds. So at present levels, every initiative on precision leaching, all of that, everything we're doing on leach everywhere, we've got helicopters installing irrigation lines in spots we previously couldn't reach. All of that is essentially operational work we're carrying out, and it will let us land in that 250 million pound to 300 million pound range. What remains really comes from the additives and heat. And neither works alone, since combining an additive with heat might deliver 1 plus 1 equals 2.5 or 3. That's why the heat work matters greatly too for reaching our ramp-up rates; we've only just begun at Morenci. We have a pilot heating the rafinite — we've really only just started this, heating the rafinite to try to boost temperatures inside the stockpile. We are testing this approach. Our concept involves installing certain modular heating units that might be deployed across every one of our stockpiles. At first, we're heating with natural gas, though we're quite enthusiastic about the possibility of geothermal heat at Morenci, and there's promise there. In fact, we're drilling right now to characterize a geothermal resource, which would offer a cheap method for heating the stockpiles. So we understand heat is effective—elevating a stockpile's temperature will contribute meaningful volumes. That, when paired with the additive, gives us a route to reach 800. We still need to determine which additive suits each distinct material type. We also need to work out the engineering for how best to raise temperatures within the stockpile. Cory Stevens is here. He and his group are heading up this initiative, and I'll invite Cory to offer any — and I'll return to your 250 question, Nick. But Cory, should you wish to add any color regarding what I just described, that would be useful.
Cory Stevens
executiveRight. Appreciate that, Kathleen. So as Kathleen mentioned, a pilot is underway. That's what we're relying on to tune or heat models and what we'd anticipate observing at Morenci. At the same time, a larger initiative is in motion in which we'll be tripling that scale for our El Abra operation, which will contribute some volumes there. Beyond that, quite a few other targets exist where we're evaluating a modularized version that could be rolled out more easily throughout the portfolio, especially in North America. We're quite enthusiastic about the direction we're taking there. On top of that, there are possibilities involving chemical heat through pyrite and air. During the second quarter, we'll be kicking off our — the term we use is our perfect pile in New Mexico, and that's going to feature a next-generation design for being able to harness heat from the natural pyrite that arrives with the process there?
Kathleen Quirk
executiveNick, regarding your 250 question and the shifts we're seeing in consumable and energy expenses, we're still evaluating the full implications, and conditions have been quite volatile. As far as where we stood on that, when you consider energy expenses, asset expenses, and the different consumables we've had in recent quarters, plus adding those inexpensive incremental pounds needed to reach our 400 target at some point next year — that would get us — so we had a route to reach 250. What we need to do now is assess what the appropriate environment looks like for factors beyond our control, such as diesel prices or other inputs; that will lead us to revisit the 250, but here's the key: with the input expenses we've experienced across the past several quarters and the addition of those extremely inexpensive incremental pounds, we believe we can bring our U.S. cost down much closer to where we stand in South America. So that remains unchanged. We simply have to keep tracking how these commodity input expenses affect our cost structure. As for what's within our control, we're putting in significant effort and feel confident that our unit cost will move lower, assuming everything else stays the same. On the sulfuric acid matter, as Maree mentioned, our spot exposure is limited this year, and we'll need to observe how that develops as we move into next year. And although we're naturally hedged thanks to our smelters, the expense of the assets we purchase will appear in the U.S. operating cost, and we'll have a corresponding offset elsewhere through the smelters we operate where we actually produce and sell assets. So I hope that gives you some useful perspective on that.
Bob Brackett
analystContinuing with the leaching topic. All of you have been doing extremely well when it comes to securing patents. My impression is that over the past 3 years you've obtained a couple of dozen, whereas during the prior 10 you had far fewer, and a great many of them involve leaching. What's the thinking behind those patents? Are they mainly defensive, so you can be certain of executing on your inventory and your resource, or might they also be offensive, in the sense that you could bring in a partner and gain access to further resources using your technology?
Kathleen Quirk
executiveI'll let Cory chime in on this too, but honestly it's both. Where we're focused — we hold 40 billion pounds-plus of copper in these stockpiles, which historically were regarded as waste. That creates an enormous value opportunity for us, and recovering some of that copper sitting in stockpiles is our immediate priority, since it requires a catalyst to produce it. So that comes first for us. The second piece is, yes, we might take the technologies we develop and use them to potentially partner with others, possibly creating synergies in an M&A transaction, et cetera; but our first priority is to maximize the value of our own work here. As for the team handling this, we have a technology center in Tucson, and the group working on it is genuinely, genuinely strong. We've grown the team, recently bringing in some chemists and people from some other disciplines. So we now have a multi-disciplined team, working not only on what's the best additive, but also on what's the best way to commercialize, and our corporate development team has been actively involved in that as well. So it's — as I said, it's a project with a very high net present value that would transform our U.S. business and something we're making a lot of advances on, and we're going to crack the code as we go forward.
Cory Stevens
executiveAbsolutely, Kathleen — you've got it exactly right. We're pressing ahead with this impressive team of innovators and building out what's in the pipeline. That 42 billion pounds sitting in our current stockpiles doesn't factor in the additional possibilities we hold inside the company for material below cut-off grade, which we're actively looking at right now and which could prove highly valuable down the road once those possibilities take shape. This is a fiercely competitive space, so as we develop these innovations, we're taking great care to safeguard what matters to us.
Lawson Winder
analystIf it's okay, I'd like to build on what we were discussing regarding pressures on industry costs, and simply understand what you gave us in the slides — and perhaps <<inaudible>> is the best person to answer this — specifically around how sensitive diesel is. So here's what's interesting: compared with the Q4 slides, the sensitivity to diesel appears to have gone up. Could you perhaps explain the reason for that, and why the effect on EBITDA would be bigger today than it was 3 months back?
Kathleen Quirk
executiveSure. That review Maree did covers our sensitivities to copper along with every one of our input costs, and so on. To work out those sensitivities, we take the diesel price assumptions contained in that forecast and then look at a 10 — a change of plus or minus 10% applied to it. What's happened is we've now built a higher diesel cost into our assumptions than we had before, which explains why a 10% change carries more weight than it used to. Was that what you were getting at?
Lawson Winder
analystYep, yep. No, you've got that right. It simply appears somewhat uneven. So that's all. I suppose you're now just treating significantly elevated diesel as the baseline scenario?
Kathleen Quirk
executiveCorrect, yes. So we'll need to keep watching that. We'll need to keep watching it as things develop. But when we forecast, we generally rely on the prices in place around the business has been volatile, yet the price in place when the forecast is made; therefore those '27, '28 carry higher diesel costs than would have been the case 3 months ago.
Lawson Winder
analystAll right. That's completely clear. Now, if we consider the pressure on industry costs — I mean, we've been told about higher explosive expenses, grinding media, and you brought up some insulation from sulfuric acid. Looking at the other major cost categories in your operations, are there additional areas where you believe some insulation exists? And conversely, which other items lack that protection and might carry greater exposure?
Kathleen Quirk
executiveThis has varied quite a bit by region, Lawson. As Maree said, diesel prices have climbed considerably for us, yet the heaviest effect landed in Indonesia, and elsewhere in Asia those regions felt that inflation more acutely. Regarding what we purchase, we haven't observed much adjustment yet. That said, it tends to lag, and we'll need to watch how long this persists and whether it begins to move through other parts of our cost base; however, certain items traded on the spot market have clearly responded; still, many of our consumables get negotiated through contracts. So we'll simply need to keep tracking them.
Katja Jancic
analystNot long ago, we noticed a modification regarding Section 232 tariffs that affects derivative goods. Are you observing any effect from this, or do you anticipate one?
Kathleen Quirk
executiveIt has nothing to do with the products we offer. A great many codes for items subject to tariffs have been altered by us. As things stand, nothing changed concerning refined copper cathodes. And as you're aware, the government actually stated they would potentially be examining that around the midpoint of this year.
Katja Jancic
analystAnd so perhaps just briefly — I realize you brought up the support acid, and that you're hedged, but could you tell us what portion of it you actually buy inside the U.S. to supply your U.S. operations?
Kathleen Quirk
executiveIt differs, though we do buy certain assets within the U.S. We also have — naturally, the smelter is there, and it gives a base load of asset to our operations in the U.S. At our Safford operation, we actually run a sulfur burner, where sulfur is purchased and turned into acid. So the quantity of assets we purchase <<inaudible>> differs. A large share of what the U.S. requires, we produce ourselves; and then naturally, in Spain, at the smelter we have there, all of that goes to outside buyers. Then in Indonesia, acid is sold by us, and as Grasberg ramps up, we'll sell more of it, since we'll begin running both smelters in Indonesia; as a result, we're net long. And we do have — down in South America, acid is something we purchase. And like we've said, our exposure to the spot market right now isn't large. Yet should this keep going, we'll need to examine what that means for 2027.
Timna Tanners
analystI have two things to ask. First, I'd like to revisit the Grasberg projection. You described it as a matter of timing, I realize, but I happened to see that a few of the adjustments appear to reach as far as 2029, even if only slightly. So I was hoping for a bit more detail on that. Then, turning to Peru, I'd be curious to hear how you view the election that's coming up politically, since you have operations at Cerro Verde.
Kathleen Quirk
executiveRegarding Grasberg, the meaningful effects — the genuinely substantial ones — fell in '26 and '27. There is a minor effect for us in '28 and '29, though it sits right at the edge, and honestly there was nothing much there. As we move into those years, we aren't expecting any kind of problem tied to this material handling matter. What you're seeing is simply routine forecast revisions, and the figure is quite near where it previously stood.
Timna Tanners
analystUnderstood. Alright, moving on, I'd like to hear your perspective regarding Peru, if that's alright.
Kathleen Quirk
executiveWhen it comes to politics, we collaborate with whatever government is in place. As you're aware, Peru has seen quite a number of presidents over the past several years. So whoever steps in, we're ready to engage with them; plus our ties are genuinely strong with the nearby communities, which matters a great deal in Peru. We recognize that trust must be earned daily, yet that's extremely important at the grassroots level too in Peru as we handle our exposure there — maintaining that connection and the collaboration we share around water that we provide to Arakuipa has proven very favorable for Cerro Verde; however, regarding shifts in leadership, we'll simply keep working, acting properly, being a solid corporate citizen in Peru while delivering substantial advantages to the community. Thus this has been a genuine plus for Cerro Verde across many years, and we anticipate the same going forward.
Richard Adkerson
executiveYeah, I'd like to add something to what Kathleen said — our connection with Arakuipa is genuinely unique, and the folks on our team there really deserve recognition for how they've cultivated ties with the community, especially when so many other mining operations in that region run into serious problems with the community. So that's — and we've worked with a wide variety of presidents, politics get very complex, but if you look at how we've run things, you can see the way we've operated at Cerro Verde through all of that, and I'm confident we'll keep doing so.
Orest Wowkodaw
analystTwo things from me, if you don't mind. I saw that the idle cost recovery figure at Grasberg climbed to $1.3 billion, up from $900 million before, when it comes to expenses being left out of the cash costs you report. Is that — what I'm trying to figure out is whether that's extra money actually being spent, or whether you're simply keeping more of it away from the cash cost calculation?
Kathleen Quirk
executiveThe main reason is that — since we aren't running at full capacity during part of the second half, and it's going to become — it'll begin to be only a shrinking share, but some of our costs get expensed and never flow through inventory and cost of sales; so really — this isn't a rise in costs; it's actually about how it gets characterized, whether it lands in our unit costs, or the way it's handled for accounting purposes; so we're simply complying with the accounting guidance, and since we adjusted the ramp-up schedule because we're still not at capacity, some of our costs get classified as idle and are expensed immediately. So that's essentially the situation; there's really no difference in absolute absolute costs apart from the input cost we face with <<inaudible>>, and so on. But when it comes to how idle costs are determined, that hasn't changed.
Orest Wowkodaw
analystAll right, that makes sense. Now, turning back to how operations are bouncing back at Grasberg — you pointed to the chutes as the constraint when it comes to handling a greater volume of wet ore. Once that gets fixed, are there other places where things could get backed up that might affect how quickly recovery rates improve?
Kathleen Quirk
executiveThat's the main one. Like Mark mentioned, when it comes to mining, we've designed our mining and loading capabilities at the extraction level around processing that material. So really, it's just a matter of logistics — figuring out how to get it onto the trains. Resolving that problem is what's going to bring us to the point we need to reach for the big ramp-up.
Orest Wowkodaw
analystAll right. Yet whether it's wet or dry, that has no effect on how much the trains can carry. Is that right?
Kathleen Quirk
executiveCorrect.
Daniel Major
analystTwo fast follow-ups. First, taking another look at Slide 9 from the deck. There doesn't appear to have been much movement in the wet-to-dry ratio in PB 1S or the other sections. Is that the correct interpretation, meaning nothing has changed there?
Kathleen Quirk
executiveWell, that comparison in PB 2 and PB 3 of wet to dry was really what this was about; as for PB 1, our work there continues so that we can restart PB 1 South by the middle of next year. So this chart only addresses wet to dry in PB 2 and 3. Regarding the overall contribution from PB 1 and eventually PB 1C, what we have in these forecasts is fairly small. So our focus — our initial focus is on getting scale from PB 2 and PB 3, and then optimizing things at PB 1S. And then, as Mark said, once more of our derisking is complete through the drainage work we're doing at the surface, we'd consider reopening PB 1C. But this plan, especially in the '26, '27, '28 time frame, comes mainly from the PB 2, PB 3 ramp-up.
Mark Johnson
executiveI apologize — please continue.
Daniel Major
analystActually, perhaps you were the one responding to that. What I meant to ask is whether you're likewise putting in comparable changes to the equipment in PB 1S, so that nameplate capacity can still be reached even if that zone's ratio comes in greater too.
Kathleen Quirk
executiveCorrect. That had already been scheduled; having those devices in the panels along with the chutes and PB 1, 2 calories in PB 1 was already included in what we intended; however, please go on, Mark.
Mark Johnson
executiveThat's the point I intended to make. My intent was simply to inform them, and Daniel as well, that the chutes at PB 1 sustained damage because of the mud rush from outside; therefore, the intention was to swap them out for the more modern technology.
Daniel Major
analystAll right, and one last item from me. How much capital expenditure do these changes involve? And is the guidance for group CapEx still unchanged? Also, if CapEx has been pushed back, does that affect the mine plan past 2030 in any way?
Kathleen Quirk
executiveThe equipment we're putting in isn't very costly. We've added roughly $60 million to $70 million of CapEx tied to this, and timing differences elsewhere in the plan offset it. So it isn't a significant cost driver, especially given the amount of copper and gold output this delivers. So it wasn't a large expense, didn't appear as a major capital cost for those paying.
Kathleen Quirk
executiveAlright, I appreciate all of you, and I’m grateful you devoted this much time to being with us. As we move ahead, we’ll keep sharing updates on how things are progressing, and if anyone has any follow-up questions, we’re here. Thanks so much.
Richard Adkerson
executiveMuch appreciated, everybody. You have my word that we will be open about everything happening as this ramp up unfolds. Many thanks.
Operator
operatorThat brings us to the end of today's call. We appreciate everyone for being with us. You're free to disconnect at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.