FTAI Aviation Ltd. (FTAI) Earnings Call Transcript & Summary

October 30, 2020

NASDAQ US Industrials Aerospace and Defense earnings 67 min

Earnings Call Speaker Segments

Alan Andreini

executive
#1

Thanks, operator. Everyone here joins me in welcoming you to Fortress Transportation and Infrastructure's call discussing what we achieved in 2020's third quarter. Joining us are our Chief Executive Officer, Joe Adams, and our Chief Financial Officer, Scott Christopher. You can find an investor presentation and our press release posted on our website, and we'd suggest downloading those if you haven't already. Also, please note this call is webcast and open to the public in listen-only mode; in addition, we'll be touching on certain non-GAAP financial measures today, FAD included. A reconciliation linking those metrics to the closest GAAP equivalents is available in the earnings supplement. Prior to passing the discussion to Joe, I should mention that some of what we say today constitutes forward-looking statements, future earnings among them. Statements of that kind are inherently uncertain and could end up differing substantially from what actually happens. We ask that you look over the disclaimers about non-GAAP financial measures and forward-looking statements found in our press release and investor presentation, as well as the risk factors laid out in the quarterly report we filed with the SEC. At this point, I'll hand the call over to Joe.

Joe Adams

executive
#2

Thanks, Alan. I’d like to begin by announcing our 22nd dividend since becoming a public company, and the 37th consecutive one since we were founded. The payout of $0.33 per share is scheduled for November 30, with a record date of November 16. Now let’s get into the figures. The metrics that matter most to us are adjusted EBITDA and FAD, which stands for funds available for distribution. For Q3 2020, adjusted EBITDA came in at $58.6 million, versus $66.5 million in Q2 2020 and $112 million in Q3 2019. After normalizing for gains or losses tied to sales, Q3 2020 adjusted EBITDA was $59.7 million, compared with $65.7 million in Q2 2020 and $74.9 million in Q3 2019. FAD totaled $39.9 million in Q3 2020, against $47.3 million in Q2 2020 and $120.7 million in Q3 2019. On a normalized basis, removing sale proceeds and nonrecurring items, Q3 2020 FAD was $23.9 million, versus $38.2 million in Q2 2020 and $48.7 million in Q3 2019. Within the third quarter, that $39.9 million FAD figure broke down as $74.5 million from our aviation leasing portfolio, negative $300,000 from infrastructure, and negative $34.3 million from corporate and other. Let’s move to aviation. The third quarter was fairly solid for that segment. On the financial side, cargo continued to perform very well, but the passenger recovery lost momentum, so we ended up slightly below what we had anticipated. Passenger flight hours across our fleet have risen each month since April, and we believe that pattern will persist as countries and economies keep fighting the virus and work toward an effective vaccine. As we thought would happen, demand for engine leasing is increasing across all engine types because airlines are sharply reducing optional maintenance restoration shop visits until they use up available green time. We finished the quarter with roughly 60% engine utilization on our fleet, and we are currently talking with several airlines about setting up leasing programs for 2021. Looking ahead to 2021, our total existing fleet of about $1.5 billion in invested capital should produce approximately $375 million of EBITDA per year, which matches our 25% target. We are also aiming at new investments in CFM56 engines and related aircraft, and we have roughly 70 engines, 7 to 0, under LOI, representing about $200 million of capital. We would expect that added investment to yield a higher EBITDA return of around 35% per year, or $70 million in 2021, which would take total aviation EBITDA to approximately $450 million per year. And with $120 million of cash at September 30 plus a $250 million undrawn revolver, we have plenty of liquidity to take advantage of these highly attractive investment opportunities. Also, last week we entered into an exciting maintenance partnership with Lockheed Martin. That agreement will give FTAI a range of benefits and advantages in managing and expanding our owned CFM56 fleet and in providing third-party services to airlines, while Lockheed Martin gets a reliable flow of shop visits for their outstanding Montreal facility. Financially, FTAI should begin seeing the payoff from this partnership quite early in 2021. First, we think we’ll avoid roughly $500,000 per shop visit during 2021, and since our owned fleet is more than 200 engines, equivalent to 40 shop visits each year, that translates to $20 million of savings in 2021. Second, by launching The Module Factory, we can get better value from parting out engines, and we’re aiming to monetize the equivalent of 20 engines at about $1 million of gain per engine, which adds another $20 million in 2021. Finally, we intend to put CFM56 programs in place with airlines, and in many cases discussions and negotiations have already started; with cash conservation programs for airlines at an all-time high and available spares with green time running down, the timing for us could not be better. For 2021, we want to sign programs with 2 to 3 airlines covering 250 engines, or 50 annual shop visits. Under our existing practices and contracts, we’re targeting a profit of $1 million per shop visit for FTAI, with the airline’s savings above that level, while also giving the airline much faster turn times because of our new, innovative Module Factory approach; so overall, we’re aiming to create an incremental $100 million per annum beginning in 2021. Also, our advanced engine repair joint venture is very exciting. Just to remind you, if and when we secure approval for all 5 parts, we’ll save more than $2 million per shop visit and gain a proprietary position to perform a $6 million average shop visit for about $2.5 million. And the first of these products is now in the final stage and should be commercially available very soon. Turning now to Jefferson and infrastructure. The major story at Jefferson remains the substantial progress on the 3 major pipeline connection projects, both in terms of construction management and in the commercial discussions with Motiva, owned by Saudi Aramco; Exxon; and other creditworthy third parties. As a reminder, these 3 major projects, which are now 2 to 3 months away from completion and operation, will connect or hardwire the Jefferson Terminal with the 2 largest refineries in North America. Because of that, we have been and continue to be actively engaged with both refineries on many possible opportunities to receive, blend, store and export a wide variety of crudes and refined products. And as the projects move closer to actual operation, the number of options and combinations keeps expanding. We’re also considering further pipeline connections to strengthen our market position and competitive advantages even more; in Q3, Jefferson posted its third consecutive quarter with positive EBITDA of $4.3 million, up from $3 million in Q2. The improvement came from cost rationalization during the pandemic-driven downturn, higher refined product volumes, and 100% utilization of our storage. It’s worth pointing out that we managed this even though no crude-by-rail shipments moved into the terminal during Q3, because WCS versus WTI spreads had tightened and refinery demand had fallen. Now, with spreads widening again, demand is picking up, and we already have trains scheduled for waxy crude out of Utah in Q4 of this year. Activity in the Canadian market is also returning, both for the near term and over the longer term. At least one diluent recovery unit, or DRU project, is going ahead with planned movements to the Gulf Coast in the second half of 2021, and we are well positioned to handle that business. DRUs will create a steady, regular flow of heavy crude-by-rail, and Jefferson is fully capable today of receiving, storing, blending and shipping that volume. So overall, Q3 was not a bad result given an extremely challenging demand environment, with major advances in connectivity and optionality almost here — and we can’t wait for 2021. Moving on to Repauno. Construction of our Phase 1 NGL, natural gas liquids train to ship loading, transloading operation is now complete. The work took longer than originally scheduled because of COVID-related issues, but with construction finished, we are now in the process of testing and commissioning the system.

Joe Adams

executive
#3

And as we told you during the prior quarter, a successful pressure test has been completed on our cavern of 186,000 barrels, which verifies that we can keep propane stored inside it. That matters a great deal to us, since the propane market's size far exceeds that of butane. Right now we're negotiating with producers as well as offtakers regarding propane delivery that would start in early Q2 2021. Talks are proceeding favorably, and we anticipate securing firm commitments in either late Q4 of 2020 or early Q1 of 2021. Our expectation is that we'll ship our initial propane cargoes in early Q2 of 2021. Turning to other possibilities at Repauno, talks are ongoing with the manufacturer of wind farm components and, as an alternative, with biofuel producers. Last, construction of the road for the bypass into Repauno is moving along nicely and should wrap up during Q2 of 2021. The key takeaway here is that COVID-19 has created extra difficulties at Repauno, yet where commercial discussions are concerned, we're observing parties coming back to the table and those talks are going well. Regarding Long Ridge, Q3 proved to be a solid quarter for our frac sand operation, especially given the slowdown across the industry in natural gas drilling activity; we transloaded more than 200,000 tons of frac sand, which matched budget. And across the first 3 quarters of 2020, our frac sand transloading exceeded 700,000 tons, roughly 14% better than budget. Because of Long Ridge's strategic position in the heart of the Marcellus and Utica shale regions, one of our biggest customers has expressed interest in extending our current contract by a 5-year term. Beyond that, during the third quarter, Long Ridge entered a second 2-year contract with a commodities trading company for transloading and storing road salt. Construction of the power plant remains on budget and is on track to finish sooner than November 2021, the date guaranteed by our construction firm. On top of that, we keep seeing strong interest from power-intensive industries that want to locate new facilities at Long Ridge. We also have many ongoing conversations with data centers, whose interest stems partly from our recently announced initiative with GE and New Fortress Energy's Zero division to blend carbon-free hydrogen as fuel for our power plant as early as next year; this initiative has us very excited, since Long Ridge will become the first purpose-built hydrogen burning power plant in the United States and worldwide to blend hydrogen in a GE H-class gas turbine. To wrap up, like most companies, we keep seeing pressure on our businesses in Q3. Decision times have definitely shifted to the right, but we keep making solid progress on all of our long-term plans; we spent 2 years searching for the right MRO partner; and with Lockheed Martin, we believe that partner has been found. Working together, we can reshape the CFM56 to 5B, 7B maintenance sector over the coming 20 years; pairing this partnership with our PMA effort means we'll hold offerings for airlines that nobody else can equal. Reaching this point demanded years of effort, concentration, and commitment from numerous gifted individuals, yet the plan we envisioned and launched 4 years back is nearly real. Regarding Long Ridge, the hydrogen project we unveiled alongside GE and New Fortress Energy's Zero division is already generating market response. Our discussions with large data center operators have picked up pace and grown more substantive. There will be a significant financial effect on our remaining 50% stake in Long Ridge. Just as crucial in our view is that this pioneering hydrogen power effort will mark a major advance toward the planet's 0 emissions objective; certainly, the monetary rewards from this project aren't overlooked, but equally significant is that we now hold a key role in the ambitious target of 0 carbon emissions globally. And we trust that what we learn from this endeavor will bring us toward additional carbon-free power project investments. At Jefferson, we've aimed to establish a foundational business delivering a reasonable return while unlocking, once that infrastructure exists, numerous further high-margin growth possibilities. Currently, we're working on several significant projects alongside our neighbors, which could and will produce that kind of result. Reflecting on Q3 and setting it against every quarter since our public listing, I believe we'll recall it as among the most pivotal for strategic initiatives. From the MRO agreement with Lockheed Martin to the PMA deal hopefully just days off to the hydrogen project at Long Ridge and to the aviation growth chance I brought up earlier, FTAI will emerge from this pandemic as a superior, more robust enterprise. With that, I'll hand the call back to Alan.

Alan Andreini

executive
#4

Thank you, Joe. Operator, you may now open the call to Q&A.

Giuliano Anderes-Bologna

analyst
#5

I suppose we could begin with a couple of connected subjects here. Regarding the Lockheed deal and the savings of approximately $500,000 for each shop visit, will that be part of what you refer to as the $375 million EBITDA you're talking about for fiscal '21 in aviation?

Joe Adams

executive
#6

No, no, that was intended to be the additional amount — the 3 components of Lockheed came to $100 million altogether, and that is on top of the $375 million.

Giuliano Anderes-Bologna

analyst
#7

Got it, that's really clear. So when I consider the accretion topic you mentioned, all of that would come through the aviation segment, right, and it would add to the guidance of roughly $375 million, and then the $450 million if we counted the extra engines you intend to buy?

Joe Adams

executive
#8

Yes.

Giuliano Anderes-Bologna

analyst
#9

Excellent. Let me push this a bit further and consider the timing angle for several initiatives and key catalysts on the horizon. You said the PMA approval is hopefully just days away. Could you give us a brief update on where things stand in that process? My understanding is that the application for the first part has been submitted and you're waiting on approval for that first part. I'm also curious about the second part — whether its application is in, and whether you have any sense of the timeline for it.

Joe Adams

executive
#10

Right. Regarding the first part — there are 2 parts that we began 3 years ago, and both are basically fully engineered, built and developed. For the first part, the application is complete. As I said, we're waiting, and the FAA has been with us throughout the entire process. So we don't expect any significant delays from this point. That one, we're very hopeful, will be days away. As for the second part — it will be finalized in the fourth quarter. The final application ought to be submitted by the end of this year. And likewise, the FAA has been involved throughout the entire process. So we don't expect major delays beyond that. Those are the first 2. Then, as you recall, we began work on 3 additional parts last year; so those we would expect to be done in 2022.

Giuliano Anderes-Bologna

analyst
#11

That's quite logical. Now, shifting to a somewhat separate subject. Regarding LREG and that remaining 50.1% stake, clearly, the nearer you get to finishing it, the motivation to maybe divest that holding likely rises sharply; therefore, what intrigued me on that front was how you would view that asset through a monetization lens? And clearly, one can consider finished projects and their substantially greater multiples, obviously, compared with that initial roughly 49.9% portion that got sold. Yet simply considering monetization possibilities and what you might aim for there. And clearly, Jefferson presents a somewhat distinct case since you likely require somewhat more advancement before it can be sold off in part. But just considering asset monetizations on the infrastructure side.

Joe Adams

executive
#12

That — you're correct. I mean that's — certainly would be a thing we would examine and contemplate. It ought to be operational in Q3 of next year, 12 months from now or perhaps sooner than 12 months from now. So — and at that moment, that's when you have the greatest amount of contracted revenue. Thus, there are numerous folks we've spoken with across earlier years who showed interest, yet they solely wish to put money in once something was up and running and operating, not under construction. Consequently, the market widens out. And I also believe, as I noted, that should we have a carbon-free path to power generation via hydrogen, that too is going to be considerably more valuable than a carbon power plant, of which there are many; so I think combining those 2 factors would make it something we will consider sooner than probably the other 2 that you referenced.

Josh Sullivan

analyst
#13

On the subject of how constrained the aerospace engine market is over the next few quarters — what’s your read on total industry green time still available? Beyond air traffic, are there any signals that reassure you that we’re actually working through that cushion? And are shop visit windows getting narrower, or are secondary market part prices moving? I’m just wondering what makes you confident this trend is really happening.

Joe Adams

executive
#14

Well, we examine all the data, and we see what everyone else sees, and earlier we had said our figures point to spare engine capacity being exhausted by Q2 of 2021. That assumes engines can be shifted easily between one airline and another, but they can’t. So I’d say the freshest sign we have comes from actual customers — airlines we’re talking with right now — where those carriers are reviewing their own schedules and realizing they may need engines sooner than that date, which is why those conversations are underway now about programs beginning in 2021. I think they’re going to find quickly that the available capacity they want might not be there. So they’re considering launching programs now because there’s a lead time required to get engines positioned. That’s why I believe our timing on the Lockheed Martin program is ideal, since we’ve already begun moving modules and engines into that site and can start supplying engines to airlines fairly quickly in 2021. We feel the timing of that, together with the consumption of green time, is truly optimal; and airlines, as you know, are trying to preserve cash and save money. So approaching them with a program where we can provide engines without requiring them to put capital into older engines is very appealing. We’re hopeful, as I said, that we can — our target is to sign up 250 engines, which really isn’t a large number given there are more than 20,000 engines worldwide. It’s not a big ask. And the contribution would be significant, plus it would position us as both a service provider and a leasing provider, which I think carries real value.

Josh Sullivan

analyst
#15

Understood. What I'm asking is whether you anticipate additional alliances forming around other components or distribution as you broaden what you can do in that area — the Lockheed MRO tie-up?

Joe Adams

executive
#16

Yeah. There's another piece, in my view, and it involves used serviceable material, which matters a great deal. That's a project currently underway for us, and it would let us deliver a truly complete offering spanning the entire engine. We're familiar with everyone in this space, and we've held substantive conversations about it. We make a compelling partner, given that we hold 200 engines and intend to keep growing that figure. So I'd say this is an area where we've already put in considerable effort, and in my view it represents the final remaining element.

Josh Sullivan

analyst
#17

Understood. Then I have a single question regarding the sale leaseback sector. Is it still busy? Given that carriers worldwide are adjusting to the current circumstances, do you anticipate we'll witness yet another surge of interest?

Joe Adams

executive
#18

Indeed. My view is that this winter will prove extremely difficult for airlines. Therefore, regarding cash — they are pursuing every possible measure to stay afloat, and sale leasebacks represent one avenue for generating cash that they will certainly use. I believe that back in the early part of this summer, there was considerable activity. A number of transactions closed, while others, in my view, have simply been postponed, since significant amounts of government funding are flowing to the airlines, and once that happens, everything moves more slowly, as an additional party must be involved in negotiations and in reviewing all details. That said, I believe those transactions have not been abandoned, and in fact — we will see — an active sale leaseback market is going to exist, in my opinion, for a minimum of the coming year.

Chris Wetherbee

analyst
#19

I wanted to ask about the aviation EBITDA forecast for next year. Could you break that down a bit and walk through what exactly is baked into the assumptions? I know you mentioned roughly 70 incremental engines being part of that as well; but can you speak a little about the underlying market conditions that back that up? And then obviously, the last question on sale leasebacks, whether anything is included there. I just want to make sure I understand the step-up from today’s level to what — that $450 million and what you need to see occur to hit that number?

Joe Adams

executive
#20

Yes; so what — if you look at our current fleet, it’s about $1.5 billion, and we should generate approximately $290 million, $300 million of EBITDA this year, which is below our target. And I noted the COVID effect on that is roughly in the $50 million to $60 million impact range for this year. So we see that normalizing. We actually had pre-COVID EBITDA that was climbing into the high 20%, 28%, 29%, 30%, but we’re saying, okay, next year, we believe that with the airlines we’ve backed, they’re survivors and we will see a return to a 25% EBITDA margin based on our portfolio analysis. And we do have a sizable portion of assets in the freight market, which is performing really well and will continue to do so; and we’ve added customers like Air France and a couple of other sovereign airlines. So we feel pretty good about 25% on $1.5 billion, so that’s the $375 million; then moving to this — the incremental investment, we have $200 million of capital under LOI to deploy into about 70 engines, all CFM56 engines. So that’s what we’ve been discussing, what we’ve been aiming for. And the attractive — the pricing on it is very attractive because there are few competitors with capital that are seeking to buy assets at this moment. So we’re able to obtain very good pricing. It’s around $3 million per engine on average; we have some engines we’re buying that are actually as low as $1 million; so there’s a bit of a spread, but at $3 million on average for CFM56, we believe we will generate with — and our utilization assumption for that is about 75%. And I think that could turn out — I think that’s a reasonable assumption. There could be some upside there because I think, as I said, there’s likely to be a tight market. But 75% utilization produces a 35% EBITDA margin on that $200 million. So that’s an additional $70 million. If you combine $375 million with an additional $70 million, the total comes to $450 million, or roughly $450 million per annum in EBITDA for us during 2021. That figure does not include any extra upside from the Lockheed Martin partnership that I referenced earlier, an arrangement we expect will contribute close to $100 million.

Chris Wetherbee

analyst
#21

All right. And nothing additional is coming from a sale leaseback with a national carrier or anything of that sort, correct?

Joe Adams

executive
#22

Correct. I believe we are going to find other strong chances to invest, I genuinely do. The market, as you're aware, is under pressure, and it's probably going to bring other opportunities our way, yet right now we aren't building that into our assumptions.

Chris Wetherbee

analyst
#23

All right. All right. That's quite useful. Thanks for that. Then I suppose I simply wanted to check in regarding Jefferson to get a sense, perhaps, of how that business will trend as it emerges, clearly. As you referenced, I believe, crude-by-rail chances have somewhat eased off and decelerated quite substantially. Could you discuss, say, pipeline linkages and perhaps additional possible openings at Jefferson as we move into 2021?

Joe Adams

executive
#24

Yeah. So those 3 projects are going to deliver substantial connectivity plus upside for us. And it's — 6 pipes ought to be finished in December, linking us to the Exxon refinery. And at first, the intent really is — just one among them is in use right now; that one being refined products to Mexico. So clearly, many discussions are underway concerning putting those remaining pipes to work, which is what I referenced. The chances and the — there's a clear impact whenever you're actually constructing something and are close to finishing it, you receive far more serious attention and dialogue than during the earliest planning phases. So we're optimistic that utilization on those will be considerably greater. Predicting when that happens is tough, and certainly the drop in demand that refineries are experiencing, the destruction of demand has been quite substantial. So timing is likely the difficulty; yet after the pipes are finished, the leverage is considerable. That's one piece of it. Other pieces involve the crude side, where we have an inbound crude pipeline link from Cushing, so that's going to hook up our refinery for crude, which matters greatly for us to blend since, when you bring crude-by-rail in, you must blend it with a different kind of crude. So the crude link to — the pay line connection from Cushing is going to provide us a highly competitive and inexpensive blend stock for crude-by-rail. Then crude-by-rail, as I noted, is displaying signs of activity once more; we have trains booked from Utah into the terminal for Motiva, and Motiva represents the other portion of the outbound — is the other pipeline link. So we're constructing the pipe from Jefferson to Motiva; thus we can blend, bring in crude-by-rail blend and afterward ship via pipe. So it's a highly efficient supply chain. And finally, as I noted, I hinted at, we have additional pipeline links, and the more choices you provide these refineries, the more engaged they get. And so now we'll have multiple links, but we can — if we're able to add further choices, then we deliver a genuinely high-value service since they can change sources as prices fluctuate; so we anticipate considerable upside opportunity once more on the crude side and on the refined product side too. It's just, once again, forecasting the timing is difficult. But after the pipes exist, we're going to use them.

Justin Long

analyst
#25

I just wanted to revisit aviation and a few of the 2021 remarks, Joe. I believe you mentioned, regarding the LOIs that you anticipate closing, the presumption is 75% utilization. I was hoping you could clarify: when you provided that 2021 guidance, is your presumption that utilization for the assets already in place will be at a comparable level? And regarding utilization trends in October, is there anything you're able to share?

Joe Adams

executive
#26

Yes. Yes, for the portfolio already in place the presumption is identical, roughly 75%; and on the freighter fleet we are witnessing extremely high utilization. And as I said, we finished the quarter in September with 60% utilization overall on the engine portfolio already in place; so each quarter it has been rising. For the quarter, the average sits in the low 40s. So it began on the lower side and has been climbing. And as I said, one factor making Q3 difficult is that it didn't — during July and August, it didn't accelerate until later in the quarter, nearer to September. So we anticipate that trend in — there are engines we delivered; delivering engines also took more time during Q3, because of travel restrictions and simply getting items relocated. But during the fourth quarter, we anticipate that 60% will be trending, remaining at that level or increasing; and then as I said, we expect, as we place the new engines and we encounter a market that is tightening more, we expect 2021 will be at 75%.

Justin Long

analyst
#27

All right. And when it comes to October, has that 60% exit rate stayed consistent? Or has any improvement shown up?

Joe Adams

executive
#28

I'd call it consistent.

Justin Long

analyst
#29

All right. And you brought up during this quarter that you'd sold off a few noncore aviation assets. I'm wondering whether we ought to anticipate more of that down the road, or whether it was a one-off thing that only happened in Q3. Also, could you perhaps give us an update on what the aviation assets look like broken out by customer at present?

Joe Adams

executive
#30

Certainly. So what happened is we sold off a few engines, and for the most part these were CF6 to 80 and Pratt 4000s — engines that mainly power 747s, or 767s used in freight operations. The rationale behind selling them was that instead of putting money in — since nearly all of them were unserviceable — you're faced with either funding yet another shop visit or offloading them to the parts market. Demand for freight flying has made that parts market quite robust; so looking at it from an investment standpoint, offloading them for part-out made far more sense than running them through a complete restoration and committing capital for yet another 4- to 5-year cycle; so really it came down to timing — accepting a stronger offer from the parts market rather than making an investment and sending them in for another 4- or 5-year shop visit, and whether that pays off or not — the outlook over 12 to 24 months for those engines looks pretty favorable. When you stretch it to 60 months, it gets a bit less clear — a bit cloudier; as for the portfolio, roughly 20% of it sits in the freighter market, and that portion is performing well. So as — clearly, that represents a larger share of our revenues. Around 60% is in the narrow-body market, meaning A320s and 737s and CFM engines; and roughly 20% is in the 757 and 76 market, which is supported by — most of what we hold in that 75 and 76 aren't cargo planes right now, but cargo companies are bidding aggressively to buy those planes and convert them; so the overall portfolio looks much like it did in Q3. On customer concentration, Air France is our biggest customer now. And we've brought in a couple of state-owned sovereign credit. So on the narrow-body side, I'd say there's been somewhat of a shift in that direction. And we're fairly far along on another deal that's close, which would drive that figure up even further. So I think the trend line is that you'll see — we'll see more state-owned sovereign credits on the narrow-body side.

Devin Ryan

analyst
#31

I've really just got one question, and it concerns aviation once again. One aspect of putting together a Lockheed program that strikes us as quite compelling is how vertically integrated the business is. In my view, that hands the platform several competitive edges that other lessors don't have. Over time, I suspect it might also shift how the valuation framework works compared with peers. So I'm wondering if you would ever look at splitting aviation off from the infrastructure operation, particularly if you hit the kinds of FAD figures that are being forecast for next year, given that this represents a pretty significant amount of scale within the industry; and so I'm just considering whether the platforms could be separated in order to tidy up the corporate structure and clearly make the story simpler, and whether the existing debt structure actually permits doing that, or whether it's even something you'd be willing to explore.

Joe Adams

executive
#32

Yes. That's come up in prior discussions, and we're open to examining it. I believe we stated our aim that, were we to split them apart, aviation and infrastructure each carry a $1 billion market cap tied to them. So both have sufficient liquidity. That's one objective. And I think we could handle it given the debt structure, and we have some thoughts, but right now there's no specific time line or action plan in place. I think that — over the longer term, it's something we feel would make a great deal of sense, and it's something we'll keep considering and work out the optimal timing for.

David Zazula

analyst
#33

Regarding aviation, my question is whether the engine harvesting this quarter, plus the Air France transaction from the prior quarter, has changed your geographic end markets, and how would you characterize the advantages and drawbacks of the current geographic end market mix going forward?

Joe Adams

executive
#34

Well, we haven't — I mean, with Air France added, we've moved a bit toward Europe, yet we remain reasonably diversified across Asia, Europe and the U.S., with the U.S. — North America — being the smallest. The assets, though, are extremely, extremely fungible. That, I think, is what's great about aviation: you're able to relocate them. And at present, we don't see — the worldwide market is largely moving in tandem. Sometimes particular regions outperform others, and assets flow that way. But at the moment, it's relatively — whether you're in 1 market or another isn't hugely meaningful; so I think we're pleased with the mix we've got. And as I mentioned, I think a larger move toward state-owned or sovereign airlines is coming, simply because those carriers are the ones receiving government funding, and that's where assets will be most stable and most solid; so we're trying — we're specifically going after those carriers; so as I'm sure anyone would — so it would be logical. So we'll see a move toward sovereign credits rather than any particular region.

David Zazula

analyst
#35

Then regarding maintenance, with the FAA's approval schedule seemingly accelerating, have orders come in? If they have, how fast could you scale up to begin handling those orders?

Joe Adams

executive
#36

Right. Manufacturing is underway, so inventory can be available quite fast. Orders for parts exist already. So the moment the part gets approved, it can be produced very rapidly; plus we've signaled our desire for orders too, considering our orders for aircraft we own — or engines we own for next year. So the delay isn't substantial. Getting approval has been — it's been a lengthy process. That means there's been ample opportunity to plan production.

Ari Rosa

analyst
#37

So it seems you're quite sure about that — about the $450 million EBITDA number for next year. Along the lines of what Chris asked, how much does that depend on passenger traffic bouncing back or anything like that? And related to that, do you view this quarter as a low point for what we ought to expect going forward when it comes to EBITDA and FAD? Because clearly, you're still covering the dividend, which is great; but I believe, as you said in your prepared remarks, this was likely somewhat weaker than what some of us had anticipated. Turning to 2021, can you give us a sense of how solid that $450 million number looks and what it implies for FAD across the whole business?

Joe Adams

executive
#38

Obviously, our confidence level is fairly high, though COVID hasn't gone away, and you're seeing Germany, France, and Europe reinstituting shutdown measures. On the other hand, places like Taiwan in Asia have recorded zero infections. Meanwhile, China's flying volume has returned to where it was before COVID. So conditions differ a lot by region; even so, folks are working out ways to cope, and they are getting on planes. September saw 1 million passengers in the U.S. My take is that people are managing this without waiting for a vaccine. Clearly, a lot of carriers are really leaning into the hope that vaccines and therapeutics will come through. Folks who understand this area far better than I do sound quite upbeat that we'll have something on hand before long — though whether it works well or not, and how fast, is still unclear. Beyond that, you're now seeing airlines roll out rapid testing: British Airways, for instance, on its London route, offers a quick test three days a week to every passenger aboard. So the carriers are putting in the effort, and nations are attempting to work out how this all fits together, because folks genuinely want to get back to flying and traveling. There's definitely some chance of a bounce-back, so we're not ignoring that possibility, but the trajectory seems to be upward and improving. I think what we saw in Q3 was mainly a matter of things taking more time than expected. The pace at which people were moving wasn't as fast as it initially appeared, so the uncertainty we face has more to do with when things happen rather than whether they will. Still, we're fairly optimistic — folks are getting better, and their management approaches are improving too. There are plenty of encouraging indicators out there, even if this particular week makes it tough to feel that optimistic. Still, the sense is that folks can get a grip on things, and our hope is that 2021 turns out considerably stronger.

Ari Rosa

analyst
#39

Got it, that makes sense. Now, regarding the MRO agreement, Lockheed clearly has a strong reputation in that area. Could you perhaps share some detail on what those conversations with them were like? And if you're willing to guess, what do you figure made them pick FTAI as their partner?

Joe Adams

executive
#40

Sure — this has been under discussion between us for 2 years. We've been exploring how to locate the ideal collaborator for our company. What we sought was a party that saw real worth in the business volume we generate; as I noted earlier, we hold 200 engines, meaning 40 shop visits annually right now. Both they and we recognize the chance for that figure to climb; that's the appealing part. That's our contribution to the arrangement; plenty of others expressed interest too. In fact, we held talks with numerous parties across the globe; however, Lockheed carries a stellar reputation; as you mention, their facility is superb; among all the ones we toured, theirs is likely the finest, handling 300 shop visits per year. It's the former Air Canada engine shop. As for their situation, they required — they lack substantial flow at that location. And following COVID, the projections have been delayed even more. So I believe that's the appeal from their side. What we sought was the chance to become a significant customer and to establish this Module Factory, which we'd discussed previously, since having modules on hand lets you sidestep — before COVID, a complete restoration shop visit could take as long as 9 months in certain cases. So if your work is limited to the low-pressure turbine and you require one — you require a module, you can obtain it and get an engine delivered inside 30 days. That means you can sharply cut how long an engine sits idle. Getting that from many MROs proved difficult for us, since they wouldn't permit it, or lacked the room, or didn't have availability. So that formed a major topic in our talks, and they possessed the space; they have the skill set, and they're genuinely enthusiastic about this capability and what it means for their operations and their capacity to draw in additional business. Plus we completed that deal without putting money into their shop. They had no interest in us purchasing a stake. With certain other deals we examined, capital investment would have been required from us. Tooling purchases would have been necessary. An equity stake purchase would have been necessary, and we managed to sidestep every one of those. So I'd say we ended up with exactly what was required, and we didn't have to go and do anything we had no interest in doing.

Frank Galanti

analyst
#41

Yes. Actually, I'd like to build on what was asked earlier regarding the Lockheed partnership. So I understand that you folks can supply volume to the MRO operation, which needs shop visits. But what's the reason Lockheed isn't handling that on their own? You had mentioned a goal of 250 engines, 50 visits per year, plus being able to save $1 million, or I suppose over $1 million, on the proprietary — or rather, on the module side. Still, it seems as though Lockheed is conceding too much. Perhaps I'm overanalyzing it. Are they truly that hard up for shop visits, or — yes.

Joe Adams

executive
#42

Well, I'd say MRO is going through a tough stretch right now, so I wouldn't — I mean, I don't — calling them desperate isn't how I'd put it, though I do believe it's a help to them at a pivotal moment. Yet when you consider the maintenance MRO sector, we've discussed how many of these airlines — hardly any of them actually own engines. That means to set up a Module Factory, you require inventory, you require engine ownership, and you require a critical mass. I'm not claiming the MRO shops are incapable of doing it, but the fact is they don't. Rarely does one approach its Board and say, I'd like to enter the engine leasing space and commit several hundred million dollars to build that business, especially with no track record, no capability, no leasing team, or anything like that. So this is vertical integration. That's how we approached it, and we already conduct quite a bit of business with other MRO shops, acting as a private label engine supplier. What happens is an MRO pitches its shop visit services to an airline, the airline asks whether they can provide an engine while theirs is being serviced, and frequently those MROs reach out to us asking if we have an engine available; essentially, we function as a private label lessor of spares. So we've been — and we cater to the aftermarket. So we aren't — we're not the OEM. That means you also need to locate an MRO that leans aftermarket rather than OEM, which narrows even further the pool of players who have — who participate in that space; so the search took a long time, but the timing worked out wonderfully for us. And I genuinely believe it's a solid arrangement for Lockheed too, since a great deal of flow will come from it, and ideally this launches them toward attracting additional customers and other business. And should we begin doing PMA and build out a program alongside an airline, that might ultimately benefit them as well. So my sense is they view the upside as something additive; this isn't merely an obligation they felt compelled to take on.

Frank Galanti

analyst
#43

All right. That's genuinely fantastic detail. I appreciate it. So basically, the — you folks are deploying CapEx through engines, and in a sense you're leasing out space. So what's that going to run you? And what are the minimum volumes? Also, is there any kind of economic split with Lockheed under this arrangement?

Joe Adams

executive
#44

We aren't renting space. So — but we do have certain minimum volume commitments extending into the 7 year, and I'd describe that as modest and quite manageable from where we sit. But that was something extremely important to them, and we've committed to it, but rent isn't something we pay. So we're simply going to be utilizing the shop for shop visits, and we'll also be able to store modules and keep modules in that location. So that's quite appealing on that front. And we are — if you look at the industry, airlines lack capital, maintenance shops lack capital, and we're among the few that actually are willing to put money into engines. So that hands us a huge kick — a boost to the business right now that we didn't anticipate or we didn't see a year ago, but the timing on that, if we can approach airlines and partner and say, we can cover all of your needs and do it at a lower cost and save you capital, that's a pretty compelling proposition and I believe it's going to be very significant for us going forward.

Frank Galanti

analyst
#45

Yeah, that sounds like a really strong deal. Let me squeeze in one final question. I want to build on that 75% utilization figure you're projecting for your engines in 2021. What I'm mainly wondering about is pricing power. In that kind of scenario, where utilization recovers somewhat next year, are you finding yourselves forced to lower prices?

Joe Adams

executive
#46

No. From our standpoint, the engine leasing side has never truly been a business where price sensitivity drives things. What happens is the OEMs generally determine the pricing, and they price very high, since they constantly charge heavily for parts and keep pushing prices upward. So we sit beneath that umbrella. Typically, when an engine is needed, the customer doesn't issue an RFP — instead they ring up a few contacts and secure an engine. And usually it isn't the CFO handling the negotiation with you; it's someone who must obtain an engine because a plane needs to fly on the maintenance side. So what I'm getting at is that cutting the price is a very tough way to move engines. The decision is far more tied to demand and need-based factors, and honestly we haven't observed any pressure on rents, plus maintenance reserves continue climbing annually since the OEMs keep hiking prices.

Randy Binner

analyst
#47

So let's move on from aviation. I appreciate what was said about Jefferson Terminal and the pipes wrapping up in December. Yeah, sorry if I overlooked this, but was there — did you provide any sort of quantification regarding the financial impact of that, over a longer horizon? I realize it isn't as well-defined as all the aviation items we discussed. But a few parameters on that, and then maybe likewise on the Long Ridge data center savings opportunity. Perhaps just sort of exploring the timing and the financial impact over the longer term, if you would.

Joe Adams

executive
#48

Yes. So as we've stated, Jefferson, once those pipelines are constructed and running, should sit at roughly an $80 million EBITDA run rate. What's somewhat more difficult, because of the COVID delays affecting the refineries, is forecasting precisely when that happens, but the pipes will be finished within the next 2 to 3 months, and we're hopeful commercial deals will be secured soon after to bring us to those — to that figure or perhaps beyond. Regarding Long Ridge, we've engaged a number of data centers and spoken with them about supplying the site along with the power. And so we have several proposals outstanding and I believe the hydrogen play is one that's genuinely quite beneficial since it's no longer just any data site at that stage, it's a data center featuring a hydrogen story or hydrogen play, which helps a great deal; so we start up the power plant in the third quarter of next year. And so we're hopeful that prior to starting it up, we'll have actually signed for a tenant as well as a construction project by that point. And ideally, early in 2021 is what we're aiming for.

Randy Binner

analyst
#49

All right. Yet as things stand, are there any figures — any rough figures you could share, given that talks are still ongoing?

Joe Adams

executive
#50

Correct. We did mention that, assuming we could get someone signed, since bringing a tenant onto our site would mean we'd bring in something nearer to mid-40s in dollars per megawatt hour, compared with high 20s at present. So that's a notably bigger power revenue. And assuming we could contract half the power output, then EBITDA across the whole power plant would rise from $120 million to somewhere between $140 million and $150 million; and clearly, should a hydrogen play or component be part of it, we believe the multiple — the valuation multiple — would be considerably greater as well.

Rob Salmon

analyst
#51

When we consider the utilization projection for 2021 sitting at 75%, could you walk us through how we get from approximately 60% in September to that 75%? Was our run rate exiting September stronger than the overall average? Does this tie to the scheduling of certain recent deals? Or is there a vaccine-related element built into your guidance?

Joe Adams

executive
#52

Absolutely. We closed out the quarter averaging around 60%, and it has been climbing steadily. Looking month by month over the period starting in April, the trend has been upward. Beyond that, several programs have been picked up by certain airlines across the coming months. When we discuss early 2021, we're already seeing demand for engines that we have on hand. So we took those figures, and before COVID, our engine utilization reached as high as 80%; essentially we laid out a plan, and we keep observing strong utilization across freighter fleets, and it's truly the rebound in passenger markets that is pushing the numbers back up to the levels seen historically. Part of this, as I noted, comes from the reality that shop visits have dropped dramatically; so when you have surplus engines available and you halt all shop visits, you rapidly exhaust the available engines, and you'll observe engine utilizations rising considerably ahead of aircraft utilization, since aircraft endure for a very long time, whereas engines must enter the shop every 5 years.

Rob Salmon

analyst
#53

Well, Joe, that actually leads nicely into what I wanted to ask next about the MRO arrangement with Lockheed. Your capacity has been raised to as much as 300 units each year. Could you tell us what that floor looks like? I know you likely aren't able to discuss the precise figure, but obviously there will be a requirement for 40 shop visits per year — roughly how many visits beyond that, or beyond that figure, must you be able to handle at the module factory's facility?

Joe Adams

executive
#54

That floor sits far under that figure, rather than over it. So I don't view it as a major obligation or something that concerns me regarding our ability to hit that floor.

Rob Salmon

analyst
#55

However, the figure I had in mind is, like, yours — basically, you have to do 40 store visits each year. My guess is that it's more than 40, though clearly a lot less than 300.

Joe Adams

executive
#56

Are you asking about what our fleet would be?

Rob Salmon

analyst
#57

Right, yes. For instance, what annual throughput would you need regardless? Or, put another way, what's the required minimum?

Joe Adams

executive
#58

Well, when you talk about required, the minimum committed amount we must provide under the deal is going to be quite low — far under what we currently need; so you can estimate how many shop visits you'll get by simply taking 20% of all the CFM engines we own, which, as I mentioned, if we had 200 engines, 20% comes to roughly 40 shop visits per year today, and we anticipate that growing; but the minimum we've committed is significantly under that figure.

Rob Salmon

analyst
#59

All right. That's quite useful, since it lets us grasp the risk-and-return aspect involved; and the last thing I want to ask concerns those $200 million of LOIs — could you tell us roughly when you anticipate putting that capital to work, so that we build in the appropriate EBITDA figure tied to the LOIs for 2021? Would some of it land in the first half?

Joe Adams

executive
#60

Well, my sense is that it will come in late Q4 and early Q1.

Robert Dodd

analyst
#61

To start, a quick follow-up on that, and then one more thing, this shouldn't take long. Joe, regarding the MROs and those minimums — does that floor include an escalator as time goes on? Or is there, like, growth assumed in there? Or does the minimum stay, well, the minimum...

Joe Adams

executive
#62

No, no.

Robert Dodd

analyst
#63

Alright, understood.

Joe Adams

executive
#64

there are also rollover points attached to it. That means any unused portion can be carried over. It's quite adaptable as a result. My sense is this won't amount to much — I'm hardly worried at all about that floor, and I doubt we'll ever come close to hitting it.

Robert Dodd

analyst
#65

Alright, that's great. Now, regarding the second item, touching on the different pieces you brought up — clearly, the $450 million in EBITDA that comes from the equipment, and the Lockheed-related parts of that which you laid out, which could eventually total roughly an extra $100 million annually. When you described that, you noted it was tied to current contracts, approvals, and so on. So my question is whether any upside from the parts approval was factored into that figure. Put differently, if that first part were cleared by the FDA — I mean the FAA — say tomorrow, would the effect of that already be baked into what you've described? Or would it come on top as additional? And if it would be additional, could you give us a rough estimate?

Joe Adams

executive
#66

Well, I'd say when you break down the components, the piece I believe would be made easier — though not strictly necessary to achieve that — is the ability to oversee shop visits for other carriers. I brought up the arrangement involving 250 engines, or 50 shop visits annually. Getting those parts approved would assist us in reaching that $1 million and in saving the airline $1 million. So it isn't completely out of the question that we couldn't do it absent that, but the approval would make it easier. Therefore, I'd characterize part of that $100 million as really stemming from having these first 2 parts ready next year.

Alan Andreini

executive
#67

Appreciate it, operator, and thanks to everyone for joining us on this call today. We're eager to bring you our next update following Q4. Thanks.

Operator

operator
#68

This concludes today's conference. You may disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete FTAI Aviation Ltd. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to FTAI Aviation Ltd. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in FTAI Aviation Ltd. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.