GDS Holdings Limited (GDS) Earnings Call Transcript & Summary

March 19, 2020

NASDAQ US Information Technology IT Services earnings 73 min

Earnings Call Speaker Segments

Laura Chen

executive
#1

Hi, everybody. Thanks for joining us on GDS Holdings Limited's call covering the fourth quarter and full year of 2019 results. We sincerely apologize for making all of you wait such a long time, but a few technical problems cropped up at the very last minute involving — up to now, our filing with the SEC. So please rest assured nothing is wrong. Earlier today the company's results went out through Newswire services and can be found online. A summary presentation, which we will reference on this call, should be viewable and downloadable shortly from our IR website, investors.gds-services.com. Mr. William Huang, GDS Founder, Chairman and CEO, is leading today's call, and he will give an overview of our business strategy and performance. Mr. Dan Newman, GDS CFO, will next go through the financial and operating results. Ms. Jamie Khoo, our COO, is also here to take questions. Before we go on, please be aware that today's discussion will include forward-looking statements made under the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements carry inherent risks and uncertainties. Because of that, the company's results could differ materially from the views expressed today. Additional information about these and other risks and uncertainties appears in the company's prospectus as filed with the U.S. SEC. The company undertakes no obligation to update any forward-looking statements, except as applicable law requires. Please also be aware that GDS' earnings press release and this conference call include discussions of unaudited GAAP financial information as well as unaudited non-GAAP financial measures. GDS press release contains a reconciliation of the unaudited non-GAAP measures to the unaudited most directly comparable GAAP measures. I will now hand the call over to GDS Founder, Chairman and CEO, William Huang. Please go ahead, William.

William Huang

executive
#2

Hi, everybody. William speaking. Dan, Jamie, and I are all here in Hong Kong. We appreciate you being with us on the call today. Given everything that has happened recently, 2019 can seem like a distant memory, yet let me start by discussing the remarkable accomplishment we delivered during the past year. To begin with, we achieved our sales goal, bringing in more than 81,000 square meters, equivalent to 174 megawatts, of fresh customer commitments. Once these are completely handed over, they will contribute RMB 2.4 billion, or USD 345 million, in annual recurring revenue. We increased our data center capacity to match sales, putting more than 90,000 square meters into service and under construction; beyond that, we grew our development pipeline. Right now we hold over 320,000 square meters secured for development down the road, which is significantly greater than what anyone else in the market possesses. That is extremely valuable and essential to our continued success. Every bit of our sales and all capacity we added landed in Tier 1 markets. Our financial performance was strong. Revenue rose by 47.6% and adjusted EBITDA climbed by 74.3% compared with the prior year. Based on this guidance for both measures, our adjusted EBITDA margin ended up almost 7 percentage points greater. We brought in USD 900 million of equity so that we can sustain growth at today's rate or even quicker. On top of that, we formed a creative, strategic alliance with GIC, which broadens our addressable market and provides an additional equity source. Now let's move to Slide 5. Demand stayed robust all through 2019. What is behind that? Above all, it's cloud adoption. AliCloud, which leads the market, announced revenue growth exceeding 60% for the most recent quarter. Tencent Cloud has just announced growth of almost 90%. When it comes to penetrating large enterprises, the cloud in China remains at an early phase. Besides cloud, we have lately begun noticing our customers preparing themselves for the arrival of 5G. Now let's go to our customer franchise on Slide 6. The biggest standout is the growth of our hyperscale customer base. On one side, demand from our top 2 customers held up very well and keeps generating roughly 50% of our sales. On the other side, we achieved breakthroughs with a number of key accounts. Because of that, we are now a major service provider to virtually every hyperscale customer in China. The factors behind these wins are our multimarket platform, uninterrupted supply, a long-term track record, a reputation for operational excellence, transparency, and financial stability; these differentiators took years to build and cannot easily be replicated. We think our market share in Tier 1 markets has grown. With the customer mix we have now, we are positioned for growth throughout the digital economy. Beyond hyperscale, we brought in some highly prestigious new logos. During the last quarter, we signed a master sales agreement with Apple and secured our first piece of business from PayPal. We began this year with tremendous sales momentum. So because of all this, our 2020 sales goal has been lifted to 100 square meters of net additions—80,000 square meters coming from organic growth, plus 20,000 square meters tied to the pending Beijing acquisition. That figure doesn't include any benefit from higher use of digital services during the current period. During 1Q '20, we're set to comfortably exceed 20,000 square meters of net add, and the following quarter also looks quite robust. What this shows is that customers aren't hesitating. By midyear, we expect to move a long way toward that 100,000 target. Now to Slide 7. Demand isn't just strong—it's also quite clear that customers have shifted how they operate. They're committing sooner to lock in their supply. You can see that in the rising precommitment rate. Honestly, nearly all of what we do is shaped by specific customer needs. On Slide 9. As we've said for some time, the hardest part is matching demand in Tier 1 markets. Our response has been to change how we source projects in 3 significant ways. First, since data center development in urban areas has been restructured, we've set up an additional presence on the outskirts of town—Langfang, for instance, serving Beijing, and Kunshan and Changsu serving Shanghai. Second, we've expanded our property ownership, both existing buildings in cities and greenfield land on the edge of town. Today we hold more than 50% of all our capacity, development pipeline included. That compares with roughly 20% at the close of 2018, and greater ownership gives us far more flexibility plus certainty of supply. And third, we've devoted enormous effort to growing our pipeline of future projects. Our goal is at least 3 years' supply in every market, and we've made excellent progress toward it. This new approach is already producing strong results. Let's go to Page 10. Consider Langfang on Slide 10; it sits 50 kilometers from Beijing and is a viable edge-of-town site thanks to the existing cluster of carrier data centers; we chose Langfang with backing from our top customers and spent a long time negotiating a framework agreement with the local government covering power, land and investment. 1 year ago, Langfang had nothing. Today, we have 30,000 square meters of capacity in service and under construction across 5 data centers, every one of which is 100% committed by our top customers, and we've locked in another 83,000 square meters of developable capacity; our aim is to replicate this success in other Tier 1 markets. Another shift in our approach concerns acquisitions. We began a few years back, seeing M&A as a way to add to our supply. We also see this as a method to strengthen our footprint in important markets, deepen ties with key strategic clients, and speed up our expansion under highly favorable conditions. Our M&A activity has intensified. Should the right chance arise, our intention is to complete additional transactions. Right now, we are in active pursuit of multiple targets. Before passing things to Dan, I want to offer a few remarks regarding where we stand today. Since the very beginning of the coronavirus outbreak, our foremost priorities have been, first, ensuring safety — protecting the health and welfare of our team members and everyone we come into contact with; and second, running operations without any incidents. Up to this point, I am happy to report that we have met both objectives, with zero infections and zero SLA breaches. This has not been simple. We implemented numerous adjustments to our policies, procedures, and communications, yet keeping the business running continuously is our foundation. It is embedded in our DNA. The actions we have taken have drawn considerable appreciation from our clients; we have gotten plenty of favorable responses. It is during moments like these that you are put to the test, that the standard of our operations distinguishes us, that clients recall the reason they work with us. Our standing has been strengthened. As we entered 2020, we sensed that our competitive position and our capabilities had become significantly stronger during the previous year. Although the chance before us continues to grow larger, the viral outbreak is a tragedy, and our thoughts and prayers go out to everyone who has been impacted. Throughout this difficult period, digital service has been essential; all of us have needed to alter our behavior, and this could lead to a lasting change in the way we live and work. The significance of the foundational infrastructure has been acknowledged at the top levels of the Chinese government and could lead to beneficial new policies; we are awaiting the details. No matter how long it takes to emerge from this stretch, we are confident that the basics of our market position and opportunity will stay unchanged, or perhaps become even stronger. With that said, I will pass it to Dan for the financial and operating review. Thank you.

Dan Newman

executive
#3

Thanks, William. If you go to Slide 15, this is where we've taken out what equipment sales contributed and removed the impact from FX movements. We had a strong close to FY '19, and I'm happy to report that revenue and adjusted EBITDA both came in above the guidance we had given. During 4Q '19, service revenue was up 9.5%, underlying adjusted NOI rose 7.4%, and underlying adjusted EBITDA increased 8.8%, marking consecutive quarters of growth. For the most recent quarter, our underlying adjusted EBITDA margin slipped slightly to 45.6%; for the whole year, though, that margin came in much higher, at 44.7%, versus 37% in FY '18. Now to Slide 16. Growth in service revenue comes primarily from customers occupying space they had already committed to. Move-in for 4Q '19 totaled 18,000 square meters, of which 7,800 square meters came from BJ9. BJ9 is an acquisition we signed up for last year. It hasn't closed yet, as we're waiting on a final CP. As an interim measure, the current customers have signed new contracts straight with us, and we've assumed the data center's operations through a management contract. Our MSR stayed fairly steady throughout 2019. That said, we anticipate a modest decline in 2020, largely because of the mix of customers and locations, acquisitions, and when move-ins occur. On Slide 17, you can see how margins have trended by quarter. Underlying adjusted NOI margin fell 1 percentage point in 4Q '19, chiefly because 45,000 square meters of fresh capacity was brought into service across the last 2 quarters. On top of that, through the BJ9 arrangement, we're receiving a low double-digit profit margin until the deal closes, and that's a modest drag. Partly offsetting the decline was leverage on SG&A, which dropped to 7.8% of service revenue, down from 8.4% the quarter before. Taking everything together, our 4Q underlying adjusted EBITDA margin was only 0.3 percentage points lower. Looking at FY '20, we're expecting roughly a 1 percentage point gain at the NOI level plus another 1% from SG&A leverage, though the quarterly pattern may fluctuate somewhat. Let's move to Slide 20. Total CapEx for FY '19 came to CNY 5.3 billion, which includes CNY 1.5 billion tied to data center, property and land acquisitions. During 4Q '19, we made payment for the Hong Kong 2 site and the Shanghai 14 building, along with the bulk of the consideration for buying Guangzhou 6. Through the end of last year, we also disbursed RMB 270 million for build-to-suit joint venture projects, an amount that will be reversed once we sell the 9% equity interest to GIC. Plant and equipment makes up most of our CapEx, and it's essentially identical across each data center, with costs that are easy to benchmark. Over recent years, we've managed to bring down our unit CapEx for P&E by 3% to 4% annually, and we expect that to keep going. The rest of the capital expenditure is tied to the building, whether leased or owned, as well as to external power infrastructure. For this portion, unit CapEx may differ based on the particulars of each project, yet on average it has remained roughly flat; on Slide 22, we closed 2019 with gross debt totaling RMB 16.2 billion, or USD 2.3 billion, and roughly 80% of that came as project term loans and finance leases, mostly denominated in local currency. Such debt is arranged to match project cash flows and is largely backed by our multiyear contracts with investment-grade customers. These term loans are either covenant-light or carry no covenants whatsoever. The other 20% of our debt consists of the CB at holdco level, which is unsecured and carries a remaining term exceeding 5 years, plus working capital facilities that we have repeatedly rolled over; for 2020, our CapEx guidance stands at RMB 7.5 billion, a higher figure driven by payments tied to pending data center and property acquisitions. If we assume a conservative financing mix of 40 to 60 equity to debt, financing our CapEx will require RMB 3 billion of equity and RMB 4.5 billion of debt; on the equity side, we hold CNY 5.8 billion in cash, so we anticipate positive operating cash flow during this year; on the debt side, the majority of facilities are already arranged; we have RMB 2.5 billion committed yet undrawn, which leaves roughly RMB 2 billion that we are currently pursuing through 7 facilities with domestic and international banks. To give a sense of scale for that remaining need, during the prior year we obtained close to RMB 6.5 billion in new debt facilities. China's banking market is extremely supportive. Our borrowing record is strong, and we have built excellent banking relationships. I see absolutely no reason this would not persist. Last, we formed partnerships with Ping An and GIC so that we can tap varied funding sources and avoid dependence on the public market. No matter what the present circumstances are, we continually evaluate alternative funding possibilities with these and other prospective partners in order to optimize our capital structure and cost. Moving to Slide 23. Our contract backlog has grown quarter after quarter. We closed FY '19 with 108,000 square meters, which equals 70% of our revenue-generation area. A portion of the backlog involves data centers in service. That figure has stayed within the 40,000 to 50,000 square meter range across the last 5 quarters, fueling organic move-in of roughly 10,000 square meters each quarter, implying a move-in period of about 4 to 5 quarters. The other portion of the backlog involves data centers under construction. That figure rose substantially, from slightly more than 31,000 square meters at the close of 2018 to slightly more than 57,000 square meters at the close of last year. There are 2 reasons behind this. First, like William said, buyers are locking in orders sooner and on a far larger scale; second, as the table on Page 21 shows, we're taking on additional greenfield developments, and those have a build timeline roughly 6 months longer. As the backlog tied to data centers in service grows, our expectation is that quarterly move-in will rise. That said, it depends on when projects finish and on other variables in today's uncertain operating climate. Let me wrap up with guidance on Slide 24. We're just about through the first quarter of 2020. So prior to discussing our outlook, I ought to note what we've already observed in the year-to-date. The COVID-19 epidemic is hitting us in 2 primary ways: construction and move-in. At the end of January, work on all 16 of our self-developed and build-to-suit projects stopped for Chinese New Year and only restarted recently because of government restrictions; our supply chain isn't giving us major trouble since we'd put orders in well ahead of time. Even so, we've lost a couple of months, and we'll attempt to recover that time. A delay of this sort won't meaningfully affect our financial results for the current year.

Dan Newman

executive
#4

In the near term, move-in matters far more, since it's what mainly fuels both our top-line and bottom-line expansion. For our business, Q1 tends to be the softest period seasonally, and that showed up in the assumptions behind our initial guidance for this year. Based on where things stand right now, it appears our 1Q '20 move-in will come in a few or several thousand square meters below what we first targeted. Even so, we ought to still deliver 1Q '20 revenue and EBITDA growth quarter-on-quarter in the mid- to high single digits. Going forward, here's the situation: a substantial volume of capacity and service sits ready, awaiting our customers' arrival. Our customers are eager to come in, yet plenty of operational constraints and uncertainties persist in their supply chains, especially when it comes to IT hardware. China seems headed toward recovery. That said, what happens with suppliers both within and beyond the country will shape this. Because visibility into how quickly recovery unfolds is so limited, we decided to lower our move-in assumption by several thousand square meters more each quarter. No other forecast assumptions have been altered. Feeding this into our model, at the midpoint we guide toward revenue of RMB 5.63 billion, which implies 36.6% growth year-on-year, along with adjusted EBITDA of RMB 2.61 billion at the midpoint, implying 43.1% growth year-on-year. Compared with what we had originally planned to guide, these growth rates sit roughly 5 percentage points lower. Our feeling is that this guidance leans conservative, yet it fits the circumstances. In our view, upside risk outweighs downside risk. I already noted our CapEx guidance of roughly RMB 7.5 billion, of which CNY 2.5 billion mostly pertains to the pending acquisitions of BJ9, BJ10, 11, 12 and the building in Minhang District, Shanghai. Let me restate that every one of our fundamentals stays intact. Plans on the customer side remain unchanged. And even with these difficult conditions, we anticipate our business performance will prove highly resilient; our confidence in medium and long-term growth prospects has never been stronger; with that, the formal portion of my presentation concludes, and we'd like to take questions now. Operator?

Yang Liu

analyst
#5

Yang here, calling in from Morgan Stanley. Two things I'd like to ask. First, William, this is about government policy. We've seen that China's central government just gave its backing to data centers as a new infrastructure category — that's a first. So what sort of policy help do you anticipate going forward? Might we get additional power quota, or extra funding? And would that kind of policy shift alter the returns this industry can generate? Then my second question concerns the new booking target. Regarding that acquisition announced in December of last year — I'm unclear whether it gets divided between 2019 and 2020, or whether the whole roughly 20,000 square meters lands in 2020 new bookings?

William Huang

executive
#6

All right. Let me take the first one. Yes, you've got it right. Data centers have just been classified by the central government as a new strategic infrastructure in China. The main force behind that is the 5G strategy, correct? So as I see it, the impact on us — well, it's early days, so it's hard to predict what specifically the new policy will bring. That said, we were asked by the central government to come discuss how to assist you, how to offer them further suggestions on restoring growth in this industry. What I can share is that we've covered a wide range of topics with the central government. Worth noting — we're the sole data center vendor they invited. So first, one thing we addressed is releasing some carbon quota within a Tier 1 market, to free up supply somewhat, though the government remains worried about deploying the overall carbon quota. So we talked over how to appropriately loosen some carbon quota for the data center sector. Second, we covered topics concerning lowering power costs going forward, and bringing down the loan interest rate. All of that came up. Overall, I'd call it favorable for us, and the central government does want to see this industry grow. But as of now, as you put it, at this stage it's too soon to make any assumptions. That's my take, yes. Your second question?

Dan Newman

executive
#7

Yeah. During the prior year, we completed 3 acquisitions. A pair of them got folded into what counted as new business for that period. Guangzhou 6 has closed; with Beijing 9, we assumed control in the manner I outlined. Regarding the third one — the deal we refer to as Beijing 10, 11, 12, which we announced in December — we're pushing hard to get it finalized, ideally by the middle of this year. So if you look at the 100,000 square meter sales goal we've set for this year, the breakdown will be 80,000 square meters coming organically plus 20,000 square meters derived from that particular M&A transaction. That 80,000 square meters organic figure represents a substantial increase over anything we've previously achieved organically, and our view is that 80,000 square meters organic can be sustained. So that becomes the new normal. Anything past 80,000 square meters comes either from M&A or perhaps some additional upside, yes.

William Huang

executive
#8

Correct — and one more thing on that: we've also been in discussions with the central government about the way to retire, or shut down, certain inefficient smaller data centers and in-house data centers, so as to push, or compel, adoption of professional data centers such as ours.

Jon Atkin

analyst
#9

Dan, you already addressed part of what I was going to ask — that 100,000 figure now being the standard. My question is whether you see room to exceed that number, considering how much demand has picked up in the current environment, whether that comes organically or by way of M&A. I also wanted to shift gears a bit and ask about what's been happening at CyrusOne, plus any effect on Board membership and how the overall relationship stands. I'm aware that Tesh, who is now their CEO, has logged considerable time in China. Still, any thoughts you could offer on CyrusOne would be of interest.

Dan Newman

executive
#10

Two — yes. Can we do more? That's the first part.

William Huang

executive
#11

Right, I'd say our perspective hasn't shifted. In fact, during the prior quarter when we discussed demand in the market, our stance remains the same. Within China, the data center sector is speeding up; it wasn't — the virus didn't hit it, since we see that virus-related issues are only a near-term effect. Therefore, over the medium and longer horizons, we feel — our belief is still that the overall market will speed up. That's the first point; it means we'll have an opportunity to accomplish more down the road. However, this year — the opening six months, perhaps somewhat challenging, yet that won't alter our outlook on the market ahead, as we hold that digitalization is a — within China it's a dominant force, and even across the worldwide market, correct?

Dan Newman

executive
#12

Yes. Regarding your second question, that's about CyrusOne.

William Huang

executive
#13

CyrusOne — first off, our connection with that company remains intact. There are still things we're looking at, and we continue discussing them jointly. That won't shift. Gary resigned, or whoever else — when we work with an organization, we aren't working with one person, correct? So my view is our ties with CyrusOne stay the same; we continue assisting one another. Tesh and Jonathan reached out to me once the news came out. And with Gary as well — we've had that conversation. So first, we aren't making any change to the Board seat at this moment, and Gary commands respect as a professional within this industry; they — he consistently delivers worthwhile perspectives for GDS. That's something we value. Then, looking at the other side, I'd say we — like I mentioned, our dealings are with the organization, not with an individual. So my view is the CyrusOne and GDS connection is going to remain unchanged.

Jon Atkin

analyst
#14

Then I'd like to possibly discuss, or rather ask you, whether you've noticed any variation in how quickly the rest of the industry is delivering and building. You mentioned the way the virus has impacted you basically from a labor perspective, along with the slowdowns tied to that. But has it been hitting competitors the same way, or less, or more? Your view on that would interest me. And you also brought up, once more, the rise in demand; so how does that shape your thinking regarding moving into new markets? Previously, you kind of hinted at a couple of new metros in China where you'd consider putting money in. Is the desire for that just as strong at this point? Or have customer demand trends shifted your thinking there?

Dan Newman

executive
#15

William, the first question was whether competitors have been affected like us or to a less or greater extent.

William Huang

executive
#16

I mean the — our competitors affected — been affected...

Dan Newman

executive
#17

In light of what's going on right now, has there been any impact on them — things like how long construction takes, when they can move in, that sort of thing?

William Huang

executive
#18

Honestly, I'd say the conditions right now affect every one of the companies we're up against in the same way, correct? That, to me, is the key point. What GDS has going for it, then, is sheer size. We operate more smoothly and are run more efficiently on the inside, as I see it, correct? So when it comes to building things out, my belief is that we do a better job of it than our rivals do — that's how I look at it.

Dan Newman

executive
#19

Yeah, regarding Jon's second question — do we see demand rising in other markets, in new markets, and do we feel like entering those places?

William Huang

executive
#20

Absolutely. Our intention is to enter any fresh Tier 1 market as soon as we're prepared to do so, correct? Therefore, our perspective remains unchanged. We will move into certain additional markets. During the past several quarters, we've stated that Hong Kong, Chongqing, and newer locations such as Nanjing and Hangzhou are what we aim for going forward. At the same time, we're also considering — taking into account what customers in our existing installed base need — we are giving genuine thought to how we might expand into Southeast Asia.

Colby Synesael

analyst
#21

From Cowen, yes. Two questions, if I can. First, I believe during your prepared remarks, you provided some detail about how leasing has been trending. I wasn't sure whether that applied only to Q1, only to Q2, or to both. My hope was that you could go a bit further into what you are seeing at present; and second, regarding the move-in rate, I appreciate that you are taking a more conservative stance on that figure at the moment. Yet would you anticipate at some later date, and I understand you won't say which quarter that is or may not even know which quarter it is; but would you anticipate all of this eventually catching up? Put differently, do you expect that at some stage we will get a very substantial quarter or 2 that essentially compensates, so to speak, for what was lost, given that these developments are in fact still underway, and eventually everything will be finished and reach a state where every install is essentially back on schedule? And if that happens, would you then anticipate a meaningful effect on outer-year expectations? Or is this essentially centered on a weaker 2020, while by '21 we are essentially back on the path we might have assumed earlier?

Dan Newman

executive
#22

Yes. Good. Thanks, Colby. On the first point, with Q1 almost finished, we already know what we accomplished on the sales side during Q1, and it's — we just said comfortably above 20,000 square meters organic. And we already possess, I would say, a very solid sense of what we will be able to achieve during Q2. Beyond that, hopefully the BJ10, 11, 12 acquisition will close during Q2, and that represents 20,000 square meters as well. So if you total all of that against a full-year goal of 100,000, we said we will be a long way, which I — yes, and certainly means beyond halfway, perhaps considerably beyond halfway toward that goal. I bring that up because we know it as a fact and to provide some confidence regarding what we are stating about our sales targets. The second part, yes, what you described could quite possibly be the situation. We examined various scenarios; we talk with our customers and listen to other earnings calls. Nobody is forecasting what the shape of the recovery will be. One option was to figure there'd be hardly any move-in during Q2, followed by a massive ramp in Q3 and Q4. In the end, though, we chose simply to apply a haircut to the figures for every quarter — it amounts to only a few thousand square meters. And that cut — the drop in revenue and EBITDA that came out of it was roughly identical, whether you model it as a V shape, a U shape, or anything else. Here's an interesting statistic I'll share. Over the last, I'd say, 5 or 6 weeks, starting just before Chinese New Year and running until a few weeks back, zero move-in occurred; as a result, the utilized capacity across our data centers stayed flat. Yet across that same stretch, power consumption by our customers climbed by almost 4 percentage points, which in plain terms means their servers are operating at a greater utilization rate — above typical levels and above what they'd ordinarily run at given their operational parameters, more or less. That signals a need to bring more capacity online. It's the reason we've said customers are eager to move in; so really, the issue is whether they're able to. My view is that the bulk of the service inventory available right now has already been deployed. That makes the following wave of move-in contingent on production and supply. Should that arrive rather fast or at scale, then yes, I'd genuinely anticipate a fairly steep ramp-up in move-in; and that could be the thing we've labeled as risk to the upside.

Gokul Hariharan

analyst
#23

I hope everyone's doing well and staying safe. To start with my first question — William, maybe you could share some perspective on how you view the tension between stronger-than-anticipated demand stemming from remote work and increased digital usage, and on the other side, the limited capacity to carry out move-ins or a shortage of components? For instance, Tencent and similar companies said just yesterday that they're running into some level of constraint, whether on certain capacity or some piece of hardware. Could you describe how both your customers and your own team are handling this situation? What steps are they taking to lessen the impact? Are there any short-term actions that could help ease things? And how do you think this will — what's your expectation for how this plays out across the coming months? Do you believe we've already passed the worst of it? Or will we remain in this sort of situation for the next few months? My second question relates to some of your remote sites. If you could use Langfang as an example — you already have one data center in service there. Could you discuss how things are developing when it comes to running a data center in a remote area, how you handle bringing capacity online, and how the situation differs for that type of facility versus one located in a city center? And a final question, if I may. Regarding financing, you laid out clearly where you stand on access to both equity and debt; this is a sector that attracted a great deal of funding over the past few years, including for your rivals, particularly from private equity and other funding sources. Could you speak about what you're observing industry-wide when it comes to financing pipelines? Are they still holding up? Are we noticing any degree of tightening in financing across the industry?

Dan Newman

executive
#24

William? Yes. First question — sorry, go ahead. The first question was about what can be done regarding the supply chain problems? Have our customers come up with any fixes? Have we come up with any fixes to...

William Huang

executive
#25

Yes, customers dealing with the servers?

Dan Newman

executive
#26

Yes.

William Huang

executive
#27

What is it you're asking?

Dan Newman

executive
#28

What Gokul wanted to know is whether there's any way to fix that issue. Is there any action we're able to take...

William Huang

executive
#29

Honestly, there's not much we can do — we aren't part of that business, the server business, correct? From what I've gathered, our customers are attempting to secure as many servers as they can given today's market conditions, right? They've therefore been pressing many suppliers to obtain inventory from another nation or another region, hoping to lessen the supply-related impact. That's their approach; however, up to this point, we have no idea what share of the goal they'll be able to reach, right? So overall, per what our customer has told us, they're making every effort at present. It seems Q2 might bring a modest revenue recovery. That's my take, as things stand now.

Dan Newman

executive
#30

All right. The second thing relates to how we run Langfang. Perhaps I should begin, and then William, feel free to jump in. Sure — Gokul, around late 2016, the Beijing municipal government began putting limits on approvals for new data centers, I believe. Then during 2017 it turned out that keeping up enough supply to meet demand inside the urban area wouldn't be achievable. At that point we began working on the contingency plan. I would say roughly 2 years went into talks, back-and-forth engagement and so on with the Langfang government, and that produced a framework agreement covering the allocation of a considerable quantity of power — indeed, a considerable quantity of power — that exists in that location, plus the purchase of greenfield land and investment. The reason we picked Langfang was that the telecom carriers had already built major data center hubs in that market. As a result, connectivity from at least that portion of Langfang — not all of Langfang, just that portion — into Beijing is extremely strong. So where latency is concerned, there is merely a slight decline compared with latency inside Beijing. Still, to move forward we truly had to satisfy 2 sides. The first was the government, and the second was our customers. We needed to persuade our biggest customers, since with a place like this you aren't seeking merely a single order from a customer — you're seeking a customer who will deploy a major portion of their own capacity. So once the framework agreement concluded, we were able to buy the greenfield land and begin development, but we had genuinely gotten our customers enthusiastic. Consequently, we realized we had to speed up our time to market. In practice, then, the very first step we took was buying the land intended for Langfang 3, 4 and 5. It ought to have been 1, 2 and 3. Yet given the time-to-market need, we took leases on several buildings. We leased Langfang 1. We leased Langfang 2. We leased Langfang 6. We leased Langfang 7 — which explains why we have 5 data centers in that location, all 100% committees. Looking ahead, the plan and the superior route would be to place all of our development on the greenfield sites across the campus. So in this instance, it was purely a matter of necessity. Regarding your third question on financing — yes. I'm certain of where we stand ourselves. I mean, we can reach the public market periodically, yet we can also reach partners and several very substantial institutions, PRC institutions, that have likewise shown interest in collaborating with us. So I believe there is considerable room in that strategy for obtaining equity and other value add. When it comes to competition, I mean nobody is even remotely near our scale. Foreign PE and domestic PE have participated in private equity only to a limited degree. Looking at what we've seen in the histories of the companies we've bought, a fair number of projects are getting done without any equity at all, and honestly without formal debt too — they just lean on credit from suppliers. So overall, I wouldn't say our rivals are especially well capitalized or well financed, though I don't want to condemn every one of them. There are certainly solid businesses in that group.

William Huang

executive
#31

Gokul, I’ll give you a fuller answer on your second question. In the original approach, we intended to add supply alongside what Beijing already has, correct? The reason is that — around 2 years back, we noticed the carbon allowance in the Tier 1 urban market was becoming tighter, while demand remained enormous, right? So under that first plan, we tried to persuade our customer to relocate slightly, pushing some demand toward the city’s outskirts. Yet today, both our customers and we understand those offerings aren’t the same. They still face identical latency-sensitive requirements from our customers. However, our customers need larger scale and greater power capacity. They wish to install higher power density. We now see that this kind of campus — and hyperscale campuses generally — constitutes a separate product. It will satisfy our customers’ latency sensitivity while providing strong visibility into future supply, hyperscale growth, and hyperscale power capacity. Within an urban area, nothing can take its place; that’s how I see it; so at this point, in our view, it has emerged as a new product, correct?

John Wang

analyst
#32

Nice work on those solid numbers. My first thing, then: GDS has historically handled financial leverage extremely well. It looks like you're steering toward a really hefty CapEx figure for 2020. Building on what was asked earlier, I'd like to know whether that CapEx gets funded entirely through bank loans, or whether we'll also need to bring in equity this year. Then my second thing: could management give us some insight into whether the pandemic is genuinely boosting the pace at which utilization ramps up during Q1, or holding it back?

Dan Newman

executive
#33

Alright. Dan, regarding your first thing, what we do is bring in equity capital before it's actually needed, so when we kick off new projects, we're able to draw on the funds already on hand to capitalize each new project one at a time. Our aim is to keep enough capital available to capitalize roughly 2 years' worth of new projects. When last year closed, we had CNY 5.8 billion in cash. Effectively, the bulk of that serves as equity for upcoming projects. I mentioned that new projects in 2020 would call for roughly CNY 3 billion of equity, which means about half of it gets used. That said, operating cash flow also keeps coming in, so it appears we hold enough equity to carry us through 2 years. Turning to debt, under ordinary conditions it comes down to execution — relationships, a solid track record, sound project fundamentals, that sort of thing. As things stand now, we actually need roughly RMB 4.5 billion in extra debt to fund our CapEx for this year. Of that, CNY 2.5 billion already sits in committed but undrawn facilities. For the other CNY 2 billion, we're currently pursuing CNY 3 billion in new debt facilities, and a few are nearly finalized, so there's essentially no financing risk attached to our plans, at minimum across the coming 1 to 2 years. On your second thing — is the virus actually making things slower or faster — I'd say you could probably frame it as slower on the move-in side, yet perhaps faster where demand is concerned.

William Huang

executive
#34

Okay, my take is that it's neutral. I mean, things are shifting somewhat, but they remain around where they are now. What I can tell you is that the supply chain for servers appears unpredictable, correct? Consequently, there will be an effect on our move-in — our customers' move-in during this quarter, or perhaps somewhat into the following quarter. However, what I can share is that within China, manufacturing is currently bouncing back, so I'd say that's somewhat favorable for Q2, as I said earlier; regarding the entire year — on the demand side, I believe everyone is aware that this present circumstance has meant many Internet SaaS companies, many Internet firms, and many e-commerce businesses, along with numerous applications, became well acquainted with — were brought into the market. Thus, I believe over the medium term and long term, it might generate additional demand going forward.

Arthur Lai

analyst
#35

Arthur Lai here, calling in from Citi. Two questions, and they're both fairly brief — possibly for Dan. First off, could you walk us through how the contract renewal calendar looks? We're asking because, going back to the IPO period, you mentioned contracts that ran 4 years, or in some cases even lengthier. Are negotiations currently underway with clients? And if we look closely at a Tier 1 city or a retailer client, has pricing been moving upward? Or is it possible to secure an improved EBITDA margin on a new contract? That's all from me.

Dan Newman

executive
#36

Appreciate that, Arthur. If you turn to Page 36 in our earnings presentation, you'll find a breakdown of how much capacity is scheduled to come up for renewal annually; for this year, that figure stands at 23,000 square meters. That represents 8.9% of the total area we've committed, and the level stays roughly comparable across each of the coming years. When you examine the contracts one by one and look at who the customers are, almost no cloud or Internet business is due for renewal. Enterprise business makes up the bulk of it, and those contracts run 1, 3, 5 years; as a result, they turn over more frequently, and typically they roll over automatically. So I suspect this line of questioning comes from analysts and investors. I understand the point you're trying to reach, which is wanting some reference points for where pricing lands once we reach renewal — the meaningful renewals involving the big cloud and Internet customers — but that won't occur during this year. So I couldn't provide you with any hard data on that front. That said, returning to what William noted regarding our current kind of layout, our configuration when it comes to downtown versus the edge of town. Should customers be unwilling to pay downtown rates, we can offer them a different choice at the edge of town. We certainly hold the view that downtown capacity has appreciated considerably in value, and perhaps our capacity to command higher selling prices there as well. So indeed, that's an option we can put in front of customers. As for the second question, right — regarding price, you actually brought up EBITDA margin. The thing is, price has to be discussed alongside unit CapEx, and then from the standpoint of return on investment. For us, we approach this very fundamentally. We focus on IRR; discussing it through EBITDA margin doesn't work, since that won't actually reveal what's going on with project returns; so unit CapEx has been declining. As I mentioned, the bulk of it — the P&E — has been falling at roughly 3% to 4% each year. Meanwhile, MSR revenue per square meter, at least specifically over something like 2 or 3 years, has dropped by approximately 5% per annum. So the drop is roughly comparable in size, and what that indicates is that our returns really have to be holding up fairly well when the yield and the investment costs are shifting together. And that's exactly what's happening. So when it comes to IRR, looking at it through an NOI yield lens, we're still delivering the same sort of returns across the past 2 to 3 years, which is precisely what we aim to do.

William Huang

executive
#37

Sure, I can respond to that, and I’ll try to give you a bit more detail. First, our customers currently share the exact same perspective on the data center as we do. To begin with, they require the urban town data center, since going forward any workload that moves to the edge data center will create stronger demand for edge data centers; at the same time, edge of town sites continue to support their mission-critical systems, as we said earlier; therefore, in my view, edge-of-town data centers are going to become more valuable down the road. When our customers are comfortable with low latency — or can put up with a small amount of latency — and they’re looking for large scale near the Tier 1 market, we’re able to provide them the edge-of-town offering. If what they care about is purely cost-effectiveness, then I believe they already — we’ve already established a build-to-suit model for that — for our customers located in remote areas, correct? These are 3 distinct products that we’ve put together; it’s a structure that fits our customers well.

Frank Louthan

analyst
#38

Thanks. I want to circle back to what you mentioned before regarding how the government views data centers as critical infrastructure. In your view, will this fresh stance boost competition within the industry? Might it bring in new players, or ease restrictions on overseas firms' capacity to possess and run data centers? Then, regarding the point you raised a moment ago about pricing and your cost inputs, do you expect your expenses to rise near term should labor become scarce?

Dan Newman

executive
#39

On the initial question — could government policies result in stronger and broader competition?

William Huang

executive
#40

So my take is this: if the government frees up — if they allow a more flexible release of carbon quotas within a Tier 1 market, then our belief is this. Take GDS in Beijing as an example. In Beijing over the past couple of years, we walked away from or lost many deals, and the reason was that we held back on that carbon quota. So should the government loosen things and put out additional carbon quota, we think we'd capture more business and gain additional share in that Tier 1 market. The logic being that when the value of the carbon quota is the same across the board, customers shift their attention toward — they concentrate more on what the service provider brings to the table. So our clients — our biggest customers — currently see us as a service vendor rather than merely capacity. They weigh plenty of other criteria. Which means that as the carbon quota's value declines, those other criteria draw more attention from our customers, and we're strongly positioned on those other forms of value, correct? Dan, anything you'd like to add?

Dan Newman

executive
#41

Sure, Frank — on the labor cost question, I'm not sure if you're asking about cost of revenue or how it played into construction costs. When it comes to cost of revenue, most of our employees, by head count, work in data center operations; that runs somewhere in the mid- to high single-digit percentage of revenue, so it isn't our largest cost line. This area of our cost base is actually delivering a fair amount of operating leverage for us. You need a certain group of staff assigned to every single data center, but a large portion of the work can be handled centrally — so nothing unusual is showing up on the inflation front there. As for our workforce, the majority have returned to their jobs; I'd say our data centers are adequately staffed. Turning to construction, the earliest holdups came from government limits on activity. After building work started up again, laborers arriving from elsewhere in the country first had to complete quarantine. Getting all the workers back on location happened gradually. That process isn't finished yet. Across the 16 sites we're running, our contractors have somewhere between 25 and 5,000 to 6,000 construction workers on the job. Roughly 75% of them have returned, so my read is that this isn't some deep-rooted labor shortage. It's more of a temporary situation tied to employees returning to their workplaces.

Laura Chen

executive
#42

Appreciate everyone for being here once more. Should anything else come up that you'd like to ask, you're welcome to reach out to GDS' Investor Relations using the details listed on our site, or to the Piacente Group Investor Relations. Thanks, everyone. Take care.

Operator

operator
#43

This concludes this conference call. You may now disconnect your line. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete GDS Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to GDS Holdings Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in GDS Holdings Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.