Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

February 24, 2022

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 52 min

Earnings Call Speaker Segments

Karl Fredrik Staubo

executive
#1

We're glad you could be with us, and it's a pleasure to welcome everyone to Golar LNG's Q4 results presentation. Thank you for taking the time to join the call. My name is Karl Fredrik Staubo, and I'm the CEO of Golar LNG. Before we get into the presentation, please take a moment to review the forward-looking statements on slide two. Joining me is our CFO, Eduardo Maranhão. Because this is a Q4 presentation, we want to start by reviewing the major developments from 2021, which you'll find on slide four. The year got underway in January, when we announced that Golar's two subsidiaries, GMLP and Hygo Energy Transition, would be sold to New Fortress Energy. The deal wrapped up in April, bringing Golar $130 million in cash proceeds as well as 18.6 million shares of New Fortress Energy — a stake equal to 8.9% ownership in NFE. Following the divestiture of those two subsidiaries in May and June, we carried out a corporate reorganization, beginning with adjustments to corporate management. I shifted from Golar's CFO role into the CEO position at Golar, and Eduardo went from CFO of Hygo to CFO of Golar. Beyond that, we aligned our shore-based organization with the company's new structure, cutting run rate G&A by roughly $5 million, though the impact won't show until 2022 because redundancy packages cover most of 2021. Back in July, we shared news about boosting the FLNG Hilli's capacity utilization by 1.2 million tons of extra production, taking effect from January 1 of this year. That additional output carries a tariff tied to TTF gas prices. With TTF prices where they stand now, this development means roughly $80 million more in earnings for Hilli during 2022, and it comes without any added CapEx for Golar. During Q3, we announced a refinancing involving $682 million in new and refinancing debt facilities, secured on better terms than the ones being retired, while also pushing out our debt maturities. And finally, in December, we revealed the creation of Cool Company, which separates out our eight LNG carriers as a distinct business. After that, we brought in $275 million of outside equity for that business, along with $570 million in fresh bank loans for the shipping fleet. All told, these moves entail selling assets and subsidiaries at an enterprise value of roughly $6.2 billion, plus refinancing about $1 billion in debt. Taken together, they've made Golar simpler, brought out the true worth of our asset portfolio, and given our balance sheet a substantial boost. Now let's look at slide five. Under Golar's new corporate setup, we have our two FLNGs: Hilli, which is already producing, and Gimi, which stands at 80% technically complete and is set to begin its 20-year contract with BP during the second half of 2023. Our portfolio still includes a pair of LNG midstream vessels: the Golar Arctic, a steam-powered carrier, and the Golar Tundra, which ranks among the most up-to-date FSRUs on the market at present. At the moment, that vessel is operating as an LNG carrier. On top of that, we've developed three separate FLNG designs, all built around the same liquefaction technology and design approach, yet each varies in liquefaction and storage capacity, allowing them to support prospective new FLNG projects across a range of sizes. Because of the deals we closed in 2021, we now own three sizable positions in publicly traded LNG infrastructure businesses. As we've previously stated, we hold roughly 9% of New Fortress Energy, about 31% of Cool Company, and approximately 24% of Avenir LNG. When you add up all three of those investments, they come to about $600 million in value. If you turn to slide six, we've highlighted several of the main effects on the balance sheet resulting from what we did in 2021. As things stand now, cash plus marketable securities are above $1.1 billion. Contractual net debt is right around $500 million. After including what's left to spend on CapEx for FLNG Gimi, combining net debt with that remaining CapEx gets you to slightly below $1 billion. Looking ahead, we expect EBITDA from the FLNGs we already have to increase fourfold over the coming three years. Over on the right side, you'll see that we've completed a restructuring of every one of our debt facilities, and we don't have any significant debt coming due before 2025 — that's comfortably past when Gimi is slated to come online in 2023. Turning to slide seven, our view is that we're now in a position no one else occupies when it comes to FLNG expansion, because our FLNG design is proven. When it comes to operations, our track record is the best in the business: commercial uptime has been 100% from the moment Hilli started its contract back in 2018. On top of that, we've now delivered 5 million tons of LNG, a figure no other FLNG anywhere has matched. Then, at the lower left, you'll find that our carbon footprint leads the market, as does our CapEx per ton of liquefaction. To wrap up, favorable conditions in worldwide gas markets make spending on upstream projects worthwhile. We're quite optimistic about how things are advancing on fresh FLNG ventures, both with clients we already serve and ones we might serve down the road, and we anticipate securing an additional FLNG deal at some point during 2022. When it comes to tolling fees, our FLNG offering stays competitive at roughly $2 to $3 for each MMBTU. That makes it possible to bring stranded and associated gas fields into production. As we've said before, we're looking at ways to gain exposure to commodity price upside while keeping a base tariff comparable to the arrangement we currently use for FLNG Hilli. Given where commodities and prices stand right now, Hilli generates a liquefied tariff of approximately $6 to $7 per MMBTU. Eduardo will take it from here to walk us through the fourth-quarter numbers.

Eduardo Maranhão

executive
#2

Appreciate that, Karl, and good morning to everyone. I'm delighted to walk you through where we stand on the group's results for the fourth quarter of 2021. If you go to slide number nine, you'll see it's been an extremely active quarter for the company. We posted total operating revenues of $115 million, alongside an adjusted EBITDA of $94 million, which is a 21% increase compared with the same period a year earlier. Over on the FLNG side, Hilli keeps running at 100% commercial uptime. Given the favorable market backdrop, we've also been able to hedge 100% of our TTF-linked production for Q2 and Q3 of this year at approximately $25 per million BTU. Gimi construction now stands at 80% technically complete, and we'll get into more detail on that over the coming slides. We're also seeing substantial momentum commercially. As Karl hinted at, we expect a new FLNG contract award during 2022. Shifting to shipping, the formation of Cool Company that we announced, along with a successful private placement, wrapped up in January. The sale of the eight TFDEs is currently being closed out, and we anticipate financial closing during the first quarter of 2022. Cool Company has additionally obtained a debt facility worth $570 million, which will refinance six of those eight vessels. On the corporate side, so that we can gain additional financial flexibility and back further FLNG growth, we've signed a new bilateral facility of $250 million with a duration of seven years. We've also paid off our existing convertible bonds, meaning we now face no major debt maturities before 2025. Forming Cool Company likewise cuts our contractual debt by $833 million and should boost our liquidity by another $342 million. I'll go deeper into these points later in this presentation. Now on slide 10, I'd like to expand a little on our financial results. As you can see, the group delivered a very strong fourth quarter. Total operating revenues climbed from $107 million in Q3 to $115 million in Q4. That works out to a 7% rise versus the prior quarter. Operational performance was truly robust, and adjusted EBITDA reached $94 million this quarter, which is up 27% from the preceding quarter and up 20% versus the same quarter in 2020. Adjusted EBITDA from shipping came to $43 million this quarter, a 43% gain relative to the prior one. FLNG added $56 million this quarter, which also marks a significant 14% rise compared with the previous one. The growth in total operating revenues stems from higher revenues at our operating FLNG, the Hilli, plus strong results from our shipping assets. TCE earnings across our shipping fleet rose to $557,300 per day in Q4. Total operating revenues from our FLNG Hilli, base tolling fees included, were $57 million in Q4, a 4% increase over the prior quarter. That figure looked even better once realized gains from Brent-linked revenues were factored in. I want to start by reminding everyone that the oil-linked piece of the Hilli brings in extra operating cash flow of roughly $3.1 million for each $1 that Brent crude rises beyond $60 a barrel. Because prices climbed, we saw a realized gain of $12.9 million during the fourth quarter, compared with the $8.9 realized in Q3. For this quarter, net income came in at $7 million. A drop in the NFE share price from October 1st through December 31st produced a non-cash mark-to-market loss of $51.6 million on the 18.6 million NFE shares we hold. That hit, though, was more than covered by realized and unrealized gains of about $55 million on our oil and gas and interest rate derivatives. Thanks to the new financing arrangements made in the fourth quarter — the issuance of a $300 million Norwegian bond, the refinancing of our FSRU Golar Tundra, and repayment in November of the existing $101 million revolving credit facility — we closed out the year with total cash of $360 million. That demonstrates how our financial position keeps getting stronger, and I'll cover more on that during the next slide, along with some key balance sheet developments. Turning to slide 11, we can see that creating Cool Company delivers major advantages to us. To begin with, it will instantly cut our contractual net debt by $833 million. Next, it delivers cash proceeds of $270 million to be received during Q1 2022, while also adding $125 million of marketable securities via our shareholding in Cool Company. As I noted earlier, we've also signed a new corporate bilateral facility that lets us draw as much as $250 million through the end of Q2. Once drawn, it will run seven years with a bullet repayment maturing in 2029. Depending on certain ratios, its cost will range from LIBOR plus 450 to 500 basis points. Given our current cash position, net proceeds received from Cool Company, the new $250 million bilateral facility, plus the existing $200 million revolving credit facility, we now enjoy the right amount of financial flexibility to back future growth. Our total cash and market securities position now sits at $1.1 billion, as shown on the left side of the slide. On that basis, our contractual net debt has also improved considerably. When we factor in the new finances put in place and also adjust for the debt tied to the Cool Company vessels, our contractual net debt comes to $523 million. Beyond that, if we include our pro rata share of the Gimi's remaining CapEx, the contractual net debt attributable to Golar would be roughly $936 million. I'll now hand the call back to Karl.

Karl Fredrik Staubo

executive
#3

Thank you, Eduardo. Moving to FLNG, which you'll find on slide 13. The impact of stronger commodity prices is beginning to show up in Hilli's earnings. For Q4, Hilli's adjusted EBITDA rose to $57.57 million, driven by higher Brent-linked revenues along with billing of $1.9 million for overproduction. We anticipate Hilli's earnings will keep climbing, supported by increased Brent-linked earnings — which we estimate at $17 million for Q1 2022 — and by the TTF-linked production we discussed previously, which starts up in Q1 of this year and continues from there. The unit is still running at a strong 100% operational utilization and, as mentioned earlier, has offloaded 68 cargoes since it started up in 2018. Slide 14 goes into more detail on the embedded upside in the commodity exposure of the Hilli tariff. Over the last 12 months, Golar's pro rata share of Hilli's EBITDA came to $99 million; we expect that to grow by roughly 2.6x for 2022, driven by those higher Brent-linked earnings, where Golar generates $2.7 million of EBITDA for each $1 that Brent is above $60. That will contribute roughly $80 million in year-over-year earnings. On top of that, the start-up of our TTF link production unlocks another $80 million of Golar's pro rata Hilli earnings. As Eduardo walked through, during the quarter we hedged Q2 and Q3 TTF gas prices, since the summer months are typically the seasonally soft quarters, and we've stayed open to Q4 2022 TTF gas exposure. Perenco, Hilli's charterer, holds a one-time three-year option to declare up to 0.4 million tons of additional production from 2023 through the end of the contract in July 2026. The tariff applied to that volume rests on the same TTF link as the 0.2 million tons of additional capacity utilization in 2022. That option can be declared by the end of July this year, and Perenco is currently running a drilling campaign aimed at proving up more gas reserves, with a target of raising the gas flow to Hilli. Even if forward curves point to a decline in the TTF price from where it sits today, Hilli's earnings remain sustainable thanks to the offsetting effect of higher utilization if Perenco declares its option. Now to slide 15 and an update on Gimi's construction. The unit is now 80% technically complete, with 16 million man-hours worked on the conversion so far. What's left of the build mainly involves construction, installation, and testing of equipment ahead of a 2023 sail away and contract start-up. The contract will unlock annual EBITDA to Golar of $151 million per year, each year across its 20-year term; on slide 16, natural gas market fundamentals keep improving for new upstream and liquefaction projects. COVID-related effects have held back new gas upstream infrastructure projects, which has created an anticipated shortage of LNG supply against the continued strong rise in LNG demand. All of this—combined with weather-related impacts and the continuing worsening of the geopolitical situation among major natural gas exporting nations—has pushed up both spot and forward gas prices. That has made the economics of LNG upstream projects more attractive, and it has also fueled a growing appetite to diversify where gas supply comes from. Let's shift now to shipping and take a closer look at Cool Company, which makes up the bulk of our shipping portfolio. On slide 18, we give you more detail on the charter profile across our shipping fleet. The light blue shading shows our spot market exposure, and there we are fully covered for Q1 of this year, though exposure rises as we anticipate stronger LNG freight rates beginning in Q2 of this quarter and continuing afterward. In the slightly darker blue, you'll see our floating rate charters, which move with quoted spot market rates inside a band that has both a floor and a ceiling. The bottom two columns show our fixed and charter options fixtures, which produce an average time charter equivalent of a little more than $60,000 per day, as the table at the bottom makes clear. Even with near-term pressure on LNG spot rates, term rates remain at healthy levels, well above the rates we achieved in 2021. As a result, we expect Cool Company earnings to rise substantially as the fleet gets recontracted into higher charter parties. On slide 19, we lay out what that might mean for dividend potential at Cool Company. Cool Company has a straightforward plan to pay quarterly dividends once it is listed in New York, which we expect later this year. If average spot rates for 2021 were $91,000 per day, the dividend potential would work out to a dividend yield of 15% for 2022, or 24% in 2023, as a larger share of the fleet becomes exposed to higher recontracting rates further out in time. On slide 20, the LNG freight market has expanded by roughly 7% cumulative aggregate growth over the past 20 years. That trend should persist, driven by new liquefaction projects reaching operation and by longer transportation distances, since most of that new capacity is starting up in the U.S.; and the fastest-growing demand is located in the Far East. A U.S. to Far East voyage uses about twice the vessel demand of a U.S.-Europe round trip. Turning to the supply side on slide 21, as we've discussed before on earlier earnings calls, new environmental regulations taking effect from January 1st, 2023 will probably render a large portion of the fleet on the water uneconomical for international long-haul trade; specifically, steam-propelled vessels built before 2007 face elevated risk of leaving international trade, which amounts to roughly 30% of the fleet on the water. The order book currently stands at more than 160 vessels, mostly built against charters to serve new liquefaction projects, and just 21 of the hundred and sixty ships on order are uncommitted at present. So, that gives us a market situation where demand is expanding roughly 7% annually, while on the supply side there's a danger that new environmental rules could render 30% of the vessels currently afloat obsolete, and there's limited room to add more supply, and that situation persists well into 2025 because of constraints on yard capacity. All of that points toward tighter LNG shipping freight rates, and in our view Cool Company is positioned well to gain from this trend thanks to growing exposure to the spot market. Now for corporate matters. Capital Finance International named Golar the winner of the best ESG strategy award for North America in 2021. We've long acted as an entrepreneur in the LNG market, leading the way on several major technological leaps in the LNG sector, among them being the first to move into FSRUs and afterward FLNGs. Giving assets new purposes and innovating with a focus on energy efficiency is financially sound for Golar and for its customers, and it shrinks LNG's environmental footprint; we're thankful that CFI has acknowledged our many years of work helping make LNG comparatively more competitive in the worldwide energy market. Let's go to slide 24; most of you know this slide, since we've presented it in nearly all of our earlier quarterly results, but it has now been updated to reflect how the Cool Company transaction affects our earnings and our balance sheet. Let's begin with Hilli. As we've said, this unit carries built-in upside potential, and that ought to produce a 2.6x rise in earnings compared with a year earlier, driven by commodity exposure and higher production.

Karl Fredrik Staubo

executive
#4

At the close of Q4, the portion of net debt attributable to Golar for Hilli is $317 million. Construction is still underway on Gimi, so this vessel isn't producing earnings yet. Late in 2023, she should begin her contract, contributing $151 million toward Golar's pro rata share of EBITDA. Debt for Q4 totals $287 million, and Golar's portion of the CapEx that remains is roughly $410 million, with existing debt facility covering about half and equity covering the other half. During 2021, our two remaining shipping and FSRU assets brought in $24 million of EBITDA, and we anticipate growing appeal for the FSRU Tundra among prospective FSRU charters, which could boost EBITDA generation along with earnings visibility from this unit. Combined net debt for our two assets is $187 million as of quarter end. Finally, G&A for 2021 landed at -$18 million, alongside cash and marketable securities exceeding $1.1 billion. All told, we anticipate earnings will quadruple by 2024 relative to 2021 levels. Total net debt, factoring in remaining CapEx, comes to under $1 billion, or roughly 2x fully invested run rate EBITDA. Given our present cash position and contract profile, we're able to fund new FLNG projects while also initiating a dividend once Gimi's contract begins. Wrapping up on slide 25. The group simplification has now been carried out through 2021. We anticipate a quadrupling in our FLNG earnings from existing assets in 2024 compared with 2021 levels. Our balance sheet is strong, with $1.1 billion in cash and marketable securities and fully delivered net interest bearing debt below 2x; we think we're positioned uniquely for FLNG growth, and we're confident a contract award will come within 2022. That wraps up our Q4 2021 earnings presentation. Thanks once more to everyone for joining the call, and now we'd like to hand things to the operator for questions.

Randy Giveans

analyst
#5

Howdy, gentlemen. How's it going?

Karl Fredrik Staubo

executive
#6

Hey, Randy.

Eduardo Maranhão

executive
#7

Hi, Randy.

Randy Giveans

analyst
#8

All right. Congratulations on the Cool Company spin. I'm aware that took quite a while to arrive. Good job on that. I suppose I'll begin with FLNG — you continue to reference, sort of, a potential project in 2022. What exactly is behind that confidence? Could you give a bit more information about it? Perhaps the schedule and the obstacles. Still on FLNG, is there anything new regarding the Hilli expansion? I realize it's more or less the same wording you had a few months back, but I'm just curious how probable that extra option is, what Perenco is up to. If you could offer any further color there, that would be wonderful.

Karl Fredrik Staubo

executive
#9

Randy. Regarding FLNG projects, once again, the majority of FLNG projects are big infrastructure undertakings that clearly need a gas resource and an FLNG, yet they additionally need governmental approvals, environmental approvals, and a number of rather lengthy processes that frequently lie outside our control and at times outside our charter's control. Even when both we and the prospective charter are prepared to engage, there remain obstacles we must get past on timelines over which we have less control. Still, I would say we are very confident because of the progress achieved through 2021, and also especially in this quarter, both with current and also new prospective clients; for a few of the clients, we have a target timeline that ought to bring new or contract awards quite comfortably within this year; that is essentially what gives us the confidence to state that we will secure the award within 2022. Turning to the second part of your question, with respect to Hilli, at this gas price, I believe it is basically a no-brainer to boost production. The unit is there, she can produce more, and upstream economics are quite incredible at present gas prices; so I think the sole hold up, if there is one, is the results of the drilling campaign. Once more, the option is the carrier build up until July. And we anticipate a decision being made near the end of that option window.

Randy Giveans

analyst
#10

Understood. Yes, I'm with you. That's completely reasonable. For my second question, I wanted to ask about a few of your other assets. Regarding the Golar Arctic, what's happening with that vessel? And the Golar Tundra — it looks like there may be a chance for an FSRU at the Barcarena project. Could you give us some detail on both of those?

Karl Fredrik Staubo

executive
#11

Arctic, I believe, is the final ship we still own. It's a steamer, and as we've said, we expect it to be heavily penalized starting January 1st, 2023 because of the new rules. We're considering essentially three options for that vessel: selling it outright, chartering it as a ship, or possibly converting it into an FSRU. Our expectation is that we'll reach a decision on one of those three options comfortably before this year ends. We currently have separate processes running for each of those three paths. As for Tundra, it ranks among the most advanced FSRUs on the market right now. Given what recent geopolitical developments have shown, having a diversified supply of natural gas could prove beneficial, and we believe our relative appeal has grown — both for major projects such as the one you mentioned in Brazil and for additional projects in other locations.

Randy Giveans

analyst
#12

Understood. Okay then. Well, hey, I've got nothing else. Congratulations once more. Appreciate it.

Karl Fredrik Staubo

executive
#13

Thank you.

Ken Hoexter

analyst
#14

Hello there, and good morning. Karl, you brought up 3 separate possible FLNG designs, as I understand it. Does that mean we're returning to your Mark III? Is there, I suppose, some fresh progress in perhaps a midsize option as opposed to the large and small ones you've discussed? Perhaps you could just explain — it appears you're making headway on sales — maybe address the optionality in that area, or what sets them apart.

Karl Fredrik Staubo

executive
#15

When it comes to Hilli and Gimi, Mark I is pretty much the design we've got in place. Its liquefaction capacity comes in at plus or minus 2.5 million tons, and it relies on converting a vessel that already exists. Mark II gives you a bit more flexibility, capable of somewhere between 2 and 3 million tons. That one also leans heavily on a conversion, though it takes less time to construct and can be handled at shipyards offering appealing financing terms. Then there's Mark III, a design for a brand-new build, normally put together at a shipyard located in Korea, and it's able to reach as much as 5 million tons; this one suits bigger projects, and on top of that it comes with substantially greater storage capacity.

Karl Fredrik Staubo

executive
#16

Ken Hoexter's asking about the sale — Karl Fredrik Staubo jumps in: picture it in three sizes, small, mid, and large.

Ken Hoexter

analyst
#17

So with CoolCo being sold — that was sort of the built-in pool of ships you might have tapped for certain conversion possibilities — my guess is it doesn't change much, since you noted how many vessels will be leaving international trade down the road. Is that the area you'd be hunting for conversion chances, or is it more about building out Mark III projects from here?

Karl Fredrik Staubo

executive
#18

When it comes to conversion, our attention will be on Moss-type LNG carriers. Every vessel that was contributed to Cool Company is membrane type, which means it isn't appropriate for FLNG conversion. On the FLNG side of the business, there is no effect from Cool Company in terms of candidates for conversion.

Ken Hoexter

analyst
#19

So I suppose we can move on to what's happening right now, and perhaps discuss how the situation in Ukraine is affecting Europe's growing demand for gas, and what that might mean in terms of possible chances or talks as you think ahead to 2022 and 2023.

Karl Fredrik Staubo

executive
#20

To my mind, the most immediate item is clearly the possible boost — or actual boost — in output at Hilli tied to TTF. For Perenco, that's logical. For us, it's logical too. When the gas price runs higher, the appeal only grows. That, I'd say, is the nearest-term one. Then over a somewhat longer horizon, the requirement to diversify where LNG comes from strikes me as quite, well, pertinent for essentially every participant in the market, and it ought to bode well for measures backing new FLNG projects.

Ken Hoexter

analyst
#21

And finally from my side, a question that’s more about the figures — perhaps now we could discuss what you expect for direct interest expense. You mentioned the refinancings. Could you perhaps describe how interest expense is shaping up as we head into 2023, taking those refinancings into account?

Karl Fredrik Staubo

executive
#22

Eduardo, would you like to handle that?

Eduardo Maranhão

executive
#23

Absolutely. Hey, Ken. As we head into 2023, like we said earlier, we successfully issued $300 million in bonds back in October, and those proceeds went primarily toward paying off the convertible bonds in February of this year. When we look ahead at 2023, our interest expense should be roughly consistent with what we saw before. The biggest driver from the various refinancings that occurred and from Cool Company being formed will actually show up through the deconsolidation of $833 million of debt, which kicks in when the deal closes for Cool Company's purchase of the eight vessels. To me, that's really the most significant effect on us.

Ken Hoexter

analyst
#24

Alright. There are a few other smaller items we'll take up with Stuart afterward, but thank you — we appreciate you making the time — and congratulations on the Cool Co spin, plus best of luck with the upcoming FLNG project.

Eduardo Maranhão

executive
#25

Thank you.

Chris Tsung

analyst
#26

Hi there, good afternoon, Karl and Eduardo. How are you doing?

Eduardo Maranhão

executive
#27

Doing well, thank you. And you?

Karl Fredrik Staubo

executive
#28

Agreed.

Chris Tsung

analyst
#29

To build on what we discussed regarding the possible paths for the Golar Arctic — I recall you mentioned selling it, chartering it, or converting it into an FSRU. If we're talking about that last one, could the approach resemble the Golar Viking situation, where you carried out a conversion for a customer, then disposed of the vessel, and afterward took on its management?

Karl Fredrik Staubo

executive
#30

That would be correct.

Chris Tsung

analyst
#31

Oh, so that's something you might consider? Is that what you're evaluating at this point? Or simply-

Karl Fredrik Staubo

executive
#32

That is one possible location, and indeed, certain projects would fit that.

Chris Tsung

analyst
#33

Okay, all right, that went smoothly. Thanks. When we talk about the LNG Croatia, as far as I understand it, Golar receives roughly $2 million each year to handle management of it, and, you know, now that the carrier has been spun down into CoolCo, plus the commercial and technical team, does that $2 million remain with Golar, or is it divided with CoolCo, or does the whole thing move down to CoolCo?

Karl Fredrik Staubo

executive
#34

An overwhelming portion of it remains with Golar and continues to stay with Golar.

Chris Tsung

analyst
#35

All right. And then finally, regarding the Hilli extension — I'm aware there's a Perenco option for July 2022, and no talks about potential expansions, or rather no extensions, will happen until Perenco until Hilli is completely contracted, correct? Is the target essentially the entire 2.4 million tons, or is it just somewhat above the current level?

Karl Fredrik Staubo

executive
#36

It's true that we've taken a very firm stance. Previously, we weren't willing to discuss an extension before they had at least declared 0.4; for any extension, we must see that we get paid for the unit's full capacity. Given gas flow, we consider it improbable that the unit will generate as much as 2.4 million tons where it currently sits. Currently, or rather last year, we generated 1.2 million tons. This year, because of the TTF link, we generated 1.4 million tons. Potentially next year, that rises to as much as 1.6 million tons. Should that be declared, the unit will be earning reasonable money through July 2026, and past that point, we would seek a contract compensating the entire 2.4 of capacity, and we must see the 1.6 before we're willing to even have that conversation with Perenco. Another point to note, I think, is that building new FLNGs takes some time. Very soon, Hilli will be the fastest available FLNG globally. She carries no construction risk and boasts the market's best operational track record; we think her relative appeal is only growing as we approach the contract's end, not shrinking.

Chris Tsung

analyst
#37

OK, that's all clear. I appreciate the additional detail. I have nothing further. Thanks.

Karl Fredrik Staubo

executive
#38

Thanks.

Analyst

analyst
#39

Hi everyone. This is James stepping in for Chris. I just wanted to ask about a remark you made regarding a possible FLNG development coming up and securing a customer order for it. If we assume it's a Mark III, what would the economics look like on the cost side, particularly with inflation where it is and the likely timing of delivery, and is there anything else we ought to be considering compared with the Hilli or the other projects you currently have operating?

Karl Fredrik Staubo

executive
#40

On CapEx, I'd say we're basically still applying the same rough guideline of $500 million dollars for each ton of liquefaction capacity. For a 5 million unit, that comes to about $2.5 billion, approximately. There is indeed some inflationary pressure on shipyard pricing right now, yet you also gain certain economies of scale when moving from 2.5 million tons of production on a single hull up to 5 million tons of production on a single hull. That rough guideline, in my view, remains applicable here, so let's say roughly $500 million in CapEx per ton of liquefaction.

Analyst

analyst
#41

Understood. And regarding when it might actually be delivered — assuming someone places an order right now, taking into account the specs and how packed the order book is across shipping overall, what kind of delivery date could you expect if the order came in around the middle of this year?

Karl Fredrik Staubo

executive
#42

Roughly 4 years from the point of starting.

Analyst

analyst
#43

Understood.

Karl Fredrik Staubo

executive
#44

Just to clarify, that figure applies to a 5 million ton vessel. With the Mark II version, the timeline can be cut considerably — down to 2.5 to three years.

Analyst

analyst
#45

Okay, I see. You brought up what amounts to three fairly large equity stakes. I was hoping to get a sense of what you intend to do with those down the road. You described them as strategic, but with a good chunk of the wider refinancing and restructuring now behind you, where do they fit in your thinking? Are these things you basically want to keep, or might you trim them to help fund building another FLNG project? I'm just trying to grasp your strategic view on them and whether you have any longer-term intentions for them.

Karl Fredrik Staubo

executive
#46

Before we get into what comes next, it's worth understanding why we landed on these particular holdings. Each one strikes us as a highly appealing business, and at today's share prices, each offers an especially compelling risk-reward setup. The reason we chose to become significant shareholders comes down to this: our efforts have centered on streamlining Golar into a pure play FLNG owner and operator, which lets us unlock the value underneath, shore up our balance sheet, and free ourselves up to pursue additional FLNG projects. At this point, we're holding these positions, and our expectation is to keep holding them until one of two things happens first: either the share prices start to better capture what these businesses are actually worth, or we get the chance to redeploy that money into FLNG expansion. Thanks to the new credit arrangements Eduardo walked through on this call, there's essentially nothing we have to do as long as we're moving ahead with a single FLNG project. Should we take on additional ones, that's when we'd need to begin thinking it through.

Analyst

analyst
#47

Understood. Just one brief thing, really, regarding that $250 million delayed draw. Are there any particular purposes set aside for it? And then, more generally, I suppose, is there anything else coming up that you have in mind when it comes to debt financing, anything you want to tackle? That's everything from me. Goodbye.

Karl Fredrik Staubo

executive
#48

Regarding the $250, I'd say it's a corporate facility with fairly appealing pricing. Repayment comes as a bullet, with a duration of seven years; it lets us pursue FLNG growth without dipping into our publicly listed stocks. From our perspective, locking in that facility offers an appealing risk reward, with a flexible draw over the next six months, and ideally timed alongside new FLNG projects. Experience has taught us that the projects we're taking on are fairly capital-intensive, and it's beneficial to have secured long-term appealing facilities prior to FIDs rather than afterward. That, really, is the main rationale, you should see. Until 2025, we have no other debt maturities at all, and we have no near-term ambition to carry out any additional debt optimizations. There is, we believe, potential to substantially enhance the debt facility on Gimi at or near delivery, but at this moment there's neither need nor desire to do so.

Analyst

analyst
#49

Thanks.

Omar Nokta

analyst
#50

Thanks. Hey, Karl, Eduardo. Also, congratulations on the Golar simplification process officially wrapping up. I just wanted to ask — I had a couple of questions, but first, just regarding the FLNG contract award you expect this year. Could you maybe talk about what kind of contract you think that would look like? Would it be one similar to that 20-year BP contract on the Gimi? Or do you kind of want to have a bit more skin in the game, as you've talked about in the past, and something that maybe emulates the Hilli contract?

Karl Fredrik Staubo

executive
#51

My view is that, all things considered, this leans toward being a tolling arrangement with fees over a long horizon, closer in nature to Gimi. During the presentation we laid out how we're aiming to pick up a degree of commodity exposure, and we're making efforts to determine whether we can secure the same in connection with the award anticipated in 2022.

Omar Nokta

analyst
#52

Appreciate that, Karl. So I suppose when it comes to Gimi, which you brought up — you know, putting a dividend in place once that's up and running. Have you given any thought to the shape that dividend might take? Do you picture it as a steady quarterly distribution, or are you expecting something along the lines of a securitization of that $3 billion backlog, perhaps through a special dividend or some form of dividend recap?

Karl Fredrik Staubo

executive
#53

When we discuss giving cash back to shareholders and how we deploy capital, there's still roughly $25 million in buybacks we could put to work. Because of the bond we finished last year, we're barred from paying dividends until Gimi is delivered, even though Hilli's earnings on their own would let us do so. The intention, though, is to launch a regular quarterly dividend once Gimi has been delivered. Since we generate these returns that resemble infrastructure over time, we ought to build this into a stable yield play. Given the liquidity we hold, we're able to cover that dividend and at the same time fund FLNG growth projects from our cash position.

Omar Nokta

analyst
#54

All right. Thank you, Karl. Then regarding Gimi, that project—since, you know, considering the forward curves for LNG prices across the coming several years—are there any kinds of updates you're observing from Greater Tortue about that being expanded? Might that perhaps result in additional business for Golar?

Karl Fredrik Staubo

executive
#55

My view is that this is a really massive gas find. A plan has been made public to ultimately bring that up to a minimum of 10 million tons of output. Through Gimi, we move them one-quarter of the distance toward that; all things considered, they are much nearer to the point where cash flows begin. My sense is that the gas price is considerably above the baseline forecast the GTA partners had in mind at the moment they reached FID. Taking everything together, being nearer to cash flow, having infrastructure already built, and seeing stronger economics than what was expected at the time of FID ought to underpin growth, in our opinion.

Omar Nokta

analyst
#56

Okay, fine. Karl, here's one last item, and maybe you've covered it before, but I just wanted to ask about the Brent-linked piece of the Hilli. That $3 million in incremental EBITDA for each dollar above $60 — the dollar of incremental, sorry — it carries you up to a contractual cap. Have you said what that cap is?

Karl Fredrik Staubo

executive
#57

We did back in 50, and it's just over $100.

Omar Nokta

analyst
#58

All right. Oh, thanks.

Karl Fredrik Staubo

executive
#59

For Golar's pro rata portion, that comes to $32.27.

Omar Nokta

analyst
#60

Got it. Thanks very much.

Karl Fredrik Staubo

executive
#61

Thanks, Omar.

Karl Fredrik Staubo

executive
#62

Thanks.

Karl Fredrik Staubo

executive
#63

All right, we appreciate everyone joining today's call, and we're eager to talk with you once more when we report next quarter's results. If anything else comes up that you'd like to ask about, please don't hesitate to get in touch. Enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.