Golar LNG Limited (GLNG) Earnings Call Transcript & Summary
May 26, 2022
Earnings Call Speaker Segments
Karl Fredrik Staubo
executiveThanks, everyone, and welcome to Golar LNG's presentation of our Q1 earnings results. I appreciate you joining us on the call. I'm Karl Fredrik Staubo, the CEO of Golar LNG. Before we dive into the presentation, I'd like to point out the forward-looking statements on slide 2. Joining me today is our CFO, Mr. Eduardo Maranhão, and together we'll walk through this quarter's results. Moving to slide 4, we've laid out the company overview. Golar currently owns two FLNGs: the Golar Hilli, which is operating in Cameroon, and the Golar Gimi, which is under construction and will begin a 20-year contract with BP starting in Q4 of next year. In addition, we own an LNG steam carrier called the Golar Arctic, and last week we announced that we've agreed with Snam to forward sell that vessel as a converted FSRU. Finally, we hold the Golar Tundra, the most modern, promptly available FSRU anywhere in the world, which is presently serving as an LNG carrier. We've created three FLNG designs that underpin our growth strategy. Each of these designs relies on the same proven liquefaction technology, and later in this presentation we'll walk through some of the key characteristics of the units' different capacities. Thanks to major corporate transactions completed over the past 12 months, we now hold three listed shareholdings. We have 6% of New Fortress Energy, which was worth $558 million as of yesterday's close. We hold roughly 31% of Cool Company Ltd., the shipping spin-off we set up during Q1 of this year; and we have approximately 24% of Avenir LNG, a small-scale LNG shipping and terminal business. Altogether, these investments are valued at around $720 million. This year marks Golar's 75th year of operation, and 50 of those years have seen us actively involved with LNG maritime infrastructure assets. Throughout its history, Golar has pioneered several key developments in the sector, such as the industry's first FSRU, the first FLNG, and the first ever integrated FSRU to power plant projects; we have market-leading operations and have achieved 100% commercial uptime since Hilli started up in 2018. We're now concentrating the company on FLNG growth opportunities. Now turning to slide five, and again, because of the M&A activities over the past 12 months, with a total enterprise value of $6.2 billion at the time of sales, we've substantially strengthened our balance sheet. At present we hold $1.4 billion of cash and listed securities, split about evenly between cash and listed securities. We currently sit in a net cash position. If we adjust for the remaining CapEx on the FLNG Gimi, we have a total net debt position of $300 million following delivery of Gimi; that figure doesn't include operating profits between now and Gimi's delivery, so we expect that number to come in lower. Given increased capacity utilization of Hilli, commodity upside on the tolling fee, and Gimi's startup in Q4 of next year, we expect EBITDA generation to quadruple in 2024 compared to 2021 levels; we've also refinanced corporate facilities, and right now we have no debt maturities until 2025. At this point, I'll pass things along to Eduardo, who will walk everyone through what we recorded for Q1.
Eduardo Maranhão
executiveThank you, Karl, and hello everyone. It's a pleasure to walk you through our group's performance for Q1 2022. If you'll turn to slide 7, I'd like to highlight a few key items from the quarter. Beginning with our FLNG vessels, the Hilli — our first unit — keeps running with excellent reliability, posting 100% uptime. The Brent-linked component of its contract brought in extra EBITDA totaling $16 million during this quarter, which works out to 36% higher versus Q4 of last year. As of January 1, we began capturing TTF-linked output from Train 3, contributing an additional $22 million in EBITDA. I'll go into these various components with more depth later on in this deck. Our second FLNG unit, Gimi, is still under construction in Singapore and now stands at 83% technically complete; we're making meaningful headway on commercial negotiations regarding upcoming FLNG units, and our growth project opportunity pipeline remains robust. Now for shipping and FSRUs. Cool Company's formation wrapped up successfully during this quarter; we brought in $275 million through a private placement in January, and its shares were subsequently listed on the Euronext exchange in Oslo. As part of that transaction, Cool Company picked up eight of our TFDE vessels. During May, we disclosed the award of a EUR 269 million contract with Snam covering the conversion of the Golar Arctic into an FSRU. Given the present geopolitical climate in Europe, the FSRU market remains very busy, and multiple European counterparts have approached us about deploying the Golar Tundra, our final unit; we're also continuing to reinforce our balance sheet, and since the beginning of this year we've unlocked $470 million in cash proceeds from the Cool Company spin-off along with the sale of part of our NFE stake. In February, we paid back $317 million of our convertible bonds that were outstanding, and afterward also secured a new bilateral corporate facility worth $250 million. Our share buyback program has carried on, and to date we've bought back roughly 400,000 shares during this quarter, which leaves 108 million shares outstanding. Now turning to slide 8. For this quarter, we posted adjusted EBITDA of $93 million. That figure covers Hilli, Arctic, and Tundra, but leaves out the eight TFDE vessels sold to Cool Company. Measured on a like-for-like basis against the prior quarter, that amounted to a 55% rise. Net income attributable to Golar came to $345 million this quarter, which includes a $168 million non-cash gain recognized on our Hilli Brent oil and TTF linked derivative, plus a $344 million non-cash market gain recognized on our NFE shares, based on a March 31 position, which carried a value of $42.61 per share. Our share of contractual debt at quarter's end was $1.7 billion; however, half a billion of that is tied to four TFDE vessels sold to Cool Company in April. So after we finish selling those eight vessels, we're left with $1.2 billion in contractual debt. Cash totaled $329 million when Q1 wrapped up. Then, looking at all the things that have happened since the quarter closed — say, the $253 million from selling our NFE shares — our overall cash, once you add what we can draw on revolving credit facilities, came to roughly $870 million. On top of that, factoring in what our listed securities in NFE, Cool Company and Avenir LNG are worth, liquidity sits at just about $1.4 billion; in our estimation, that sum would let us finance two new FLNG growth projects. Let's turn to slide number 10. I'd like to give you a little more detail on how our portion of distributable earnings from Hilli breaks down. Thanks to Brent and TTF prices running higher, our piece of Hilli's EBITDA nearly doubled versus the prior quarter, hitting $57 million in Q1 of 2022. Worth pointing out: that jump of almost 3.5x compared with Q1 of 2021 required no extra CapEx from Golar. The base tariff matched what we saw in earlier quarters, but we booked an additional $16 million tied to Brent-linked revenues plus nearly $23 million from TTF-linked earnings, already net of the interest on the swaps we've entered into. Assuming forward commodity prices hold, our share of Hilli's 2022 adjusted EBITDA is still tracking toward roughly $245 million for 2022. Now I'll pass it to Karl, who can expand a bit on that forward-looking estimate.
Karl Fredrik Staubo
executiveThanks, Eduardo. If we move over to slide 11, we can dig into the extra potential that comes from the commodity-linked side of Hilli's tariff. During 2021, Golar's pro rata portion of Hilli's EBITDA came to $99 million, as the slide shows. For 2022, that figure should rise by a factor of 2.5, driven by stronger earnings tied to Brent, since Golar earns $2.7 million of EBITDA for each dollar that Brent sits above 60. That should produce roughly $91 million of EBITDA in 2022. On top of that, when the additional 0.2 million tons of TTF-linked production started up in January, it contributed a further $22.6 million to Golar's share of Hilli Q1 EBITDA. Across the whole year, that TTF-linked output is projected to bring in $81 million of extra revenue, with the TTF gas price exposure for Q2 and Q3 already hedged at $25.38 per MMBtu; for Q4, our TTF gas price exposure stays open. Perenco, which charters the unit, holds a one-time three-year option allowing it to declare as much as 0.4 million tons of additional production beginning in 2023 through the contract's end in July 2026, priced on the same TTF-linked tariff that applies to the current 0.2 produced this year. That option can be declared by the end of July, and given strong gas prices, we view it as increasingly probable that Perenco will exercise it — though that depends on how the drilling program to tie more reserves into Hilli finally turns out. Our expectation is that Perenco won't exercise the option until nearer its July expiry. Because of the commodity exposure on Hilli, we as an FLNG provider can charge tolling fees that are significantly higher than those under traditional long-term tolling arrangements. The boxes on the slide show that Hilli's effective tolling fee was $3 per MMBtu during 2021, and that has climbed to an effective tolling fee of $13 per MMBtu during 2022. So when it comes to the commodity exposure in our FLNG contracts — both the existing ones and those we'll pursue going forward — we see an extremely compelling risk-reward, and we will keep targeting similar types of structures. Now on slide twelve, an update on building the FLNG Gimi. Her conversion at Keppel Shipyard in Singapore is now 83% technically complete, and we have worked over 19 million man-hours on it so far. What's left of the build mostly involves construction, installation, and testing of equipment before her 2023 sail away and Q4 2023 startup. Given the recent resurgence of COVID in certain parts of Asia, we keep monitoring closely and taking precautions against any potential COVID impacts for the 3,500 workers on site. Right now, we have no material impact on site. Again, this is a situation we are watching closely, and we feel comfortable with where it stands today. Moving on to slide 13, and just like I said we would do earlier in this presentation, I'll now go into more detail about the various FLNG designs that are on offer. We've come up with three separate designs, and each one is built off a generic design, which means they aren't customized for any particular field — instead, they can be moved elsewhere or swapped in, which gives you more flexibility in operations and lowers the risk tied to residual value. On top of that, all of them rely on the same liquefaction topside that's already proven, and they represent a further extension of the strong operational record Golar has established. With the Mark I, you get liquefaction capacity reaching as high as 2.7 million tons per year, and it fits stranded as well as associated gas resources. Hilli and Gimi are both FLNGs of the Mark I design, and they come from converting LNG Moss carriers that already exist. Golar Gandria continues to be a conversion candidate owned by Golar for possible future incremental Mark I units. When it comes to the Mark II design, it too involves converting an LNG carrier that's already in service into an FLNG. But rather than putting liquefaction equipment along the ship's width, the Mark II approach positions the liquefaction topside on a brand-new midsection of the ship that gets added to a carrier that already exists. That makes room for bigger liquefaction capacities, up to 3.5 million tons, and it cuts down the time needed for conversion construction. So for somewhat larger production projects than Mark I would handle, this serves as a fast-track option. Finally, there's our Mark III newbuild design, something we've spent over a decade working to develop. The Mark III offers liquefaction capacity of as much as 5 million tons and can compete with larger shore-based liquefaction solutions as well. Thanks to lower CapEx per ton and a smaller carbon footprint — even when measured against land-based options — the Mark III becomes a liquefaction solution that's more economical and quicker to deploy for large liquefaction projects anywhere in the world. The newbuild hull additionally provides more storage and deck space. Going forward, our main priority is to develop projects that fit one of these three design alternatives. Over on page 14, we explain why our growth pipeline mostly centers on floating African LNG projects. In looking at FLNG growth projects, three key input factors drive the delivered cost of LNG: source gas, liquefaction cost, and finally, the shipping distance — or shipping costs — from the production site to the end user. If you aim at African gas, we think a stable source gas price somewhere between $1-$3 per MMBtu can be achieved, depending on how large the field in question is. Compare that with today's spot prices for Henry Hub source gas in the U.S., where the bulk of incremental liquefaction projects are planned, sitting at roughly $9 per MMBtu right now. Second, since we're constructing a fit-for-purpose, efficient liquefaction design in Asia, Golar's CapEx per ton stands as very competitive against other floating or shore-based liquefaction solutions. And finally, when you look at African gas from a geo-geographical standpoint, the sailing distance to end users is shorter — whether those end users are located in Europe or in Asia — than what you'd see with U.S. liquefaction projects. So when you combine cheaper feedstock, reduced capital expenditure for each ton, and a shorter route for transport, the economics behind incremental growth projects should give you a serious edge over competitors. Let me walk through that in more detail on slide 15. This is another slide you've seen before, since we've shown it at prior events, but it paints a clear picture of the LNG value chain alongside the economics that an FLNG project involves. If your source gas comes from Africa at roughly $1 per MMBtu, your liquefaction expense under a tolling fee arrangement comparable to the one we apply to BP on the Gimi falls somewhere between $2-$3 per MMBtu, and your shipping outlay sits near $1.50, then African FLNG developments are able, in today's conditions, to get LNG into the hands of end users at roughly $5 per MMBtu. Put that next to where gas prices stand right now, and such projects pay themselves back in under one year given the present market. That context is what propels our pipeline of FLNG projects for prospective charters, and it also clarifies why Golar concentrates on opportunities allowing us to capture exposure to commodity pricing, which pushes the effective tolling fees far above what long-term tolling fees would bring, something the FLNG Hilli has demonstrated; this approach to doing business isn't limited to working only when gas prices are elevated. Over on the right-hand side, we've called attention to the $5 MMBtu landed LNG price set against LNG prices from the past. Under the majority of historical LNG price conditions, this business model still generates profit.
Karl Fredrik Staubo
executiveEven so, we firmly believe that over the coming 10 years, prices for energy and gas are going to be substantially above where they sat during the prior 10 years. So FLNG ought to be a still stronger business ahead than what history has shown us. Take illustrative economics: a tolling fee built around a big Mark III 5 million ton FLNG unit, with a $3 tolling fee. From a unit like that, we can produce EBITDA of roughly $750 million each year, against CapEx of about $2.5 billion for a unit of that large size. Now take integrated projects, using a 2.5 million ton Mark I design as the example, with a landed gas price of $25 per MMBtu. In today's gas price environment, that would deliver annual EBITDA of $2.5 billion for the project owners, which we would aim to have divided between the upstream provider and the FLNG owner. Whichever route you take, integrated or tolling, the business is attractive. Should you share our view that energy prices will climb, then integrated exposures are where you want your focus. Now shifting attention to FSRUs and what has unfolded in Europe so far this year, we've pointed out on slide 17 just how much the FSRU market has transformed. As 2022 began, Europe counted 32 import facilities in total, with 29 of them land-based and three being FSRUs. So far this year, 22 potential FSRU projects have come to the surface, with eight having already locked in an FSRU and 14 still sitting at the planning stage. Compare that with a worldwide FSRU fleet of 46 units and an estimated three to five additional units becoming available in total from now through 2025. As we see it, that's three to five units able to serve as many as 14 of the incrementally planned FSRU projects. Here at Golar, several European countries have shown strong interest in our open modern FSRU, the Golar Tundra. Moving to slide 18, it's clear the gas price fundamentals continue to strengthen and continue to provide lift. Beginning at the far left, you can see forward prices from May last year, January this year, and the 20th of May. One point is that the front month keeps lifting, yet what encourages us is seeing future gas prices lift as well, which gives added visibility for potential FLNG charters. In the middle, you can see the liquefaction projects expected to come on stream between now and 2028. These are essentially liquefaction projects from before the Ukraine-Russia situation. They will appear necessary to satisfy a balanced LNG market ahead. On the far right, we've gathered some statistics to demonstrate how significant the effect of the Ukraine-Russia situation could be on liquefaction needs going forward. Global LNG market volume last year was 400 million tons. Russian pipeline gas exports into Europe last year totaled about 115 million tons, equivalent to 25% of the global LNG market. So for European nations to actually achieve their goal of swapping out Russian gas for LNG sourced internationally, there has to be a substantial increase—not just in regasification terminals, which is where the main attention sits at the moment, but also in where the gas comes from. Remember that December's gas price stood much higher than the level we see now, even with everything currently going on; that tells you this market was already fundamentally tight before any geopolitical shocks hit. And afterward, we anticipate it will be considerably stronger for a longer stretch. Moving to slide 19 for some additional context regarding the forward sale of the Golar Arctic that we announced last week. Within our fleet, the Golar Arctic stands as the sole remaining steam LNG carrier. It's far and away the least competitive vessel we own. We signed an agreement with Snam, under which they'll work on developing a virtual pipeline serving Sardinia. Snam trades on the Italian exchange, with a market capitalization near EUR 18.7 billion. This deal is a forward sale of the Golar Arctic for EUR 269 million, paid through installments tied to specified milestones. We estimate conversion CapEx at $160 million, not counting contingencies and vessel costs. So through this move, we believe we've substantially upgraded the ship's value; we secured a long-term purpose for a steam carrier, and we benefit from what we learned during a similar recent conversion—the Golar Viking, which went to LNG Hrvatska. Now to corporate matters and slide 21. Golar just put out our 2021 ESG report, which you can find on our website; our safety record remains very strong; we've brought down lost time injuries; our AER data has been upgraded; and we take pride in saying that all through the pandemic, our retention stayed very high. Over 70% of cadets continue to work with us. Among senior officers, retention exceeds 94%. That matters not only for sustaining high-quality operations but also for supporting future growth, particularly given the LNG newbuilds that will be entering service down the road. On slide 22, we highlight the earnings potential within our current asset portfolio. Over the last 12 months, EBITDA came to $148 million. Add the contractual EBITDA from Gimi beginning in Q4 of next year, plus commodity upside from Hilli's commodity-linked production. From 2024 onward, we anticipate our run rate EBITDA will exceed $400 million. So once everything is fully delivered, we're trading at an EV/EBITDA of slightly under 7x, with room to add no fewer than two more FLNG growth projects using only our present balance sheet position. To wrap up on slide 23, we rank as a top owner and operator of pioneering maritime LNG infrastructure. Compared with 2021 levels, our EBITDA should quadruple in 2024. We hold cash and listed securities totaling $1.4 billion, along with fully delivered net debt below $300 million. Right now, the book value we have outstanding sits at $2.54 billion, and our attention is squarely on expanding the FLNG growth pipeline as we move ahead. That wraps up the presentation for Q1, and at this point I'll pass things to the operator so we can take questions.
Chris Tsung
analystHello there, and good afternoon to both Karl and Eduardo. How are things with you?
Karl Fredrik Staubo
executiveHey there, Chris.
Eduardo Maranhão
executiveHey.
Chris Tsung
analystHi. Thanks for the question. Could you give us some insight into why Snam chose to convert the Golar Arctic instead of purchasing the Golar Tundra? Did price play a role, or was it about when it could be deployed, or possibly Golar's interest in offloading its last steam vessel?
Karl Fredrik Staubo
executiveWe've been working on this project together with Snam for quite a while; it actually goes back before the geopolitical developments in Europe. In my view, what's driving their choice is how well LNG Hrvatska has performed and the capacity requirements in Sardinia, along with the fact that this option would cost less than acquiring newer tonnage for that particular project.
Chris Tsung
analystGot it. OK, thank you. One more thing on that. Should we look at the gap between the sale price — that EUR 269 million — and the conversion cost of EUR 100 and change? Does that represent the vessel sale price? Is that how we ought to frame it?
Karl Fredrik Staubo
executiveApologies, you're cutting out somewhat. What you mentioned was the gap between-
Chris Tsung
analystthat figure of EUR 269 million along with the conversion expense — would that essentially be the same as what the vessel sells for?
Karl Fredrik Staubo
executiveYes, that is certainly a way of describing it. When you subtract one from the other and then deduct remaining debt of roughly $30 million, what remains is the equity balance ownership.
Chris Tsung
analystAll right, excellent. Okay, thank you. Just a final quick question. Regarding the three designs — the Mark I, II, and III — which one would be able to be deployed the quickest?
Karl Fredrik Staubo
executiveWe are right now working on.
Chris Tsung
analystSorry.
Karl Fredrik Staubo
executiveAt the moment, we have projects underway that operate on a tolling fee basis for Mark III, handled in an integrated manner, and within that we're weighing the choice between Mark I and II. Which of those comes first is hard to predict. Right now, the inclination is to say Mark I or II.
Chris Tsung
analystAlright, thanks. I'll hand things over. Appreciate it, everyone.
Karl Fredrik Staubo
executiveThank you.
Sean Morgan
analystHi Karl and Eduardo. I have a question about the possible conversions and the new FLNGs. You mentioned that the net debt balance is really pretty low, so you might be able to fund these from cash. Would you want to take that route, or would you consider a more balanced method that brings in additional debt? Or do you see potential expansion of FLNGs as a means of deleveraging while you grow?
Karl Fredrik Staubo
executiveFirst off, I'd say we hold cash and listed securities totaling $1.4 billion, and given how the group is performing now, the company will be free cash flow positive each quarter moving ahead. So all of that money can go toward growth, and roughly 50% of it is already held as cash. As we currently see things, we can finance one FLNG project using only the cash we have available. If we were to have more than one FLNG project, we might consider the listed securities position or add leverage back onto Hilli and Gimi, which today carry very low leverage on average.
Sean Morgan
analystAll right. So, here's something else that comes up frequently, and it's kind of hard to pin down — I mean regarding the parties we'd be dealing with near Africa's coastline. You mentioned how cheaply the gas reserves in that area can be extracted. But if you're putting together a contract for a brand-new FLNG, is your first move to approach the nation-state holding the oil field, or would there instead be some set of E&P partners you'd negotiate with initially? And what does that whole process look like when you're turning a concept into, well, a real FLNG project?
Karl Fredrik Staubo
executiveThink about it this way — BP is our client. Well, in Africa we're on the verge of beginning work for BP, and we also serve Perenco there. Those two relationships tell you exactly who the counterparties are. In this case, that means BP and Perenco, and they're the ones who handle engagement with the local government. To a degree, they nicely illustrate the range of different opportunities out there. One involves a fixed tolling fee with a strong counterparty over a long period, while the other carries more commodity exposure. Our approach here is primarily through partners who have a substantial in-country footprint. This also sheds light on part of the reason why it can occasionally be tricky to give guidance on precise sanction dates for projects — because we'd love to have finished it yesterday, and the charter would too, yet you're dependent on government entities, environmental approvals and upstream being ready. That's genuinely what shapes the schedule far more than any appetite from the charter or from us.
Sean Morgan
analystAll right. Yeah. Aside from the 2 counterparties you already have, are there perhaps, you know, 5 or 6 additional E&Ps active in that area? Or would the pool of possible partners be smaller than that?
Karl Fredrik Staubo
executiveThat's a reasonable point, that there are several other players working in that region. There are plenty of proven and associated gas reserves, and given the current market, that amounts to squandering a resource.
Sean Morgan
analystOkay. All right. Thanks, Karl.
Karl Fredrik Staubo
executiveThank you.
Ben Nolan
analystYeah, thanks. I suppose I'll begin once more with the FLNG topic. So, you know, you folks have been at this for some time now. Could you perhaps describe how the discussions look at present with your clients compared to around 12 months back? Since clearly there's been a notion that certain favorable shifts might occur, yet no significant additional progress has materialized over the past several years. So I suppose the question is, why do you view the current moment as different?
Karl Fredrik Staubo
executiveI believe what took place — though at present this is largely something propelled by gas supply-demand basics, along with the reality that pricing for gas and the gas marketplace remain tight. You simply observe the level of appetite. Whenever gas prices are elevated, this project's economics become much stronger, and that is what generated the step-up in attention during the initial six — well, up to what we'd call the Russia-Ukraine circumstances. Following the Russia-Ukraine circumstances, what you witnessed first was an enormous rush out of Europe to lock down FSRUs; at this point they are gradually shifting toward the LNG carrier segment, and you can observe term rates running at nearly twice those of spot rates even while we move into the softer stretch of the calendar, since Europe is hurrying to lock down energy security. In the end, they now grasp that the marketplace had been tight. They have built the import terminals, yet they have not managed to get their hands on the hydrocarbon itself. At this point you see plenty of these nations taking the lead. You have witnessed players such as Germany initially turn to Qatar, afterward to the U.S., and as of yesterday they stated their view that West African gas represents a meaningful component of Europe's energy answer. That is on its way, and when it comes to European nations, you can obtain offtake and financing with greater ease than was possible prior to the Russia-Ukraine circumstances.
Ben Nolan
analystAll right. It sounds like folks are treating this with greater seriousness. Would that be the main point?
Karl Fredrik Staubo
executiveThe financial returns are stronger.
Ben Nolan
analystYeah.
Karl Fredrik Staubo
executiveThere's never been a time when financing and offtake were easier to secure.
Ben Nolan
analystAll right. For my follow-up, I may combine two things into this one. You focused mostly on Africa, and you provided the examples regarding Africa, even though, you know, previously, your team has mentioned other areas such as the Middle East, the Mediterranean, various other locations. How do those remain in play, first off, or are they considerably further back? For the second part, you mention two, being able to finance two additional units, but a Mark III, the cost differs considerably from a Mark I, so does that mean, like, one Mark III and one Mark I, or how should we consider how you're approaching two units?
Karl Fredrik Staubo
executiveThe first part of your question is, yes, it's also geographies beyond West Africa; that's why we say mostly African gas, because we observe the appeal of the input and the distance. There are other regions, for instance, in the Middle East, where the gas is basically free. That's clearly still among the projects being considered or developed; we are concentrated mostly on African, but there are other projects too, both in the Middle East and other places. Sorry, the second part of your question?
Ben Nolan
analystSo, when you mention being able to finance two projects internally — Mark I, Mark II, or some mix of them — how should we think about that?
Karl Fredrik Staubo
executiveOn the capital expenditure for those, naturally, debt funding is an option you can tap. Take Hilli as an illustration: at the time we constructed it, the CapEx stood at $1.4 billion, and $960 million in debt was accessible to us. That leaves what you might call a $500 million equity portion. Given the $1.4 billion in cash plus listed securities on hand, along with an operation generating free cash flow to equity that's positive, we're able to cover it via the balance sheet. For bigger assets, yard financing is usually obtainable — something that's not as readily available when you're doing a conversion.
Ben Nolan
analystAll right. So when you mention funding a pair of these on our own, that means one of each type, correct? Is that the right way to look at it?
Karl Fredrik Staubo
executiveThe project we select will be the one with the strongest economics, in our view. Whether that turns out to be a pair of Mark IIs, or a Mark III alongside a Mark I, we won't know until the project is announced.
Ben Nolan
analystAll right, so the main point here is capacity — just 2 in general, correct? Okay, got it. Thanks.
Karl Fredrik Staubo
executiveFunding 2 is well within reach using our existing balance sheet, while the remainder comes down to timing.
Ben Nolan
analystMm-hmm.
Karl Fredrik Staubo
executiveCash flow comes in from our operations essentially daily, so the exact moment when we add vessels past those 2 hinges on scheduling. My view is that once the FLNG fleet has been doubled, we can reassess where we stand. At present, our attention remains fixed on completing the next 2.
Ben Nolan
analystYes, of course. Sounds good. Thanks, I’m grateful.
Karl Fredrik Staubo
executiveThanks.
Greg Wasikowski
analystYes, thanks, and a good afternoon to all of you.
Karl Fredrik Staubo
executiveHello, Greg.
Greg Wasikowski
analystKarl, I'd love it if you could say a bit about that drilling campaign you mentioned in the press release, plus the well testing happening over in West Africa. What I'm really wondering — and maybe it's a mix of the two — is whether the driver, or the customers running those campaigns, might end up bringing more volumes to the Hilli, or could it possibly result in some kind of extension on the Hilli with Perenco?
Karl Fredrik Staubo
executiveThat's a fair question, and the answer is sort of yes on both counts. From what we understand, the main aim of the drilling campaign is to hook up additional proven reserves, which boosts the gas flow and makes that 0.4 million in added production possible. We've been very clear in public — both to the market and naturally to Perenco and SNH, the government entity in Cameroon — that no extension talks will happen until they declare that 0.4, since right now we've obviously paid for equipment that isn't being fully used, and each extra unit of production goes straight into net income, or free cash flow to equity, if you prefer. Until we're making better use of the equipment we already have, we don't want to be pursuing any extensions. And if we uncover a possible gap, that ought to trigger extension discussions too. From our standpoint, it's like you have to deal with one hurdle at a time, and at this moment the higher production is the main thing driving Hilli.
Greg Wasikowski
analystYeah, no, that's great. Thanks for explaining that. So, when we consider that the Arctic was sold, and you're clearly pointing to the Tundra and what it could offer, I suppose my question has two parts. First, as we look at what lies ahead for the Tundra, does that lean more toward selling the asset, or might we simply see it get contracted and stay a central piece of the fleet? And building on that, does Golar have chances to grow its FSRU presence?
Karl Fredrik Staubo
executiveAll right. Regarding your first point. As this year got underway, a number of FSRU projects were in progress, and none were located in Europe. Given the geopolitical events that unfolded, and as we attempted to make clear on the slide, the added number of new FSRU projects stemming from Europe is unlike anything seen before. All things considered, we have strong confidence that this unit will ultimately be placed in Europe rather than somewhere else. If you consider what different European governments have stated, certain ones are pursuing chartering options, while others are pursuing buying units. From our standpoint, we stay neutral on whether to sell or charter; we'll act in whatever way we believe delivers the best risk-adjusted economics. That is what we aim for. Given the level of interest and the Tundra's specifications, we feel quite at ease with that scenario. As for your second point, what we intend to prioritize moving forward is FLNG projects, since we believe we hold a distinctive competitive advantage, and we continue to believe that FLNG project economics are the most attractive within the LNG value chain, at least for roughly the coming 10 years. That said, we have no non-compete tied to any of the corporate transactions we've closed during the past 12 months. If an appealing FSRU project were to arise, there's no reason we shouldn't pursue it; even so, I'd emphasize that FLNG growth is our focus; we stay open to anyone wishing to speak with us about any appealing LNG infrastructure business.
Greg Wasikowski
analystGreat. Hey, I appreciate the detail from all of you. Enjoy the rest of your day.
Karl Fredrik Staubo
executiveThanks.
Craig Shere
analystHello, and thank you for taking my questions. In addition to the Golar Gandria, which you already possess, what is your view regarding the availability of ships that could be purchased for further Mark I or Mark II conversions? Do you have any perspective on when an announcement might come concerning a complete 2.4 MTPA deployment of the Hilli, following the expiration of your Perenco contract in mid-2026?
Karl Fredrik Staubo
executiveAlright, hi, Craig Shere. So, regarding what you asked about source vessels for Mark I or Mark II — most likely these would be built on a carrier designed by Moss, you know, the type with the spheres sitting on the deck. Those vessels are predominantly steam-driven, and they're going to run into serious operational difficulties because of the incoming environmental rules that kick in from the first of January — essentially the new EEXI and CII requirements. So as a result, these ships won't be as well-suited for service as LNG carriers, and instead they'll be better fits for floating storage work or as candidates for conversion, whether that's into an FSRU or an FLNG. Given how many of those vessels are going to lose their competitive edge in shipping and therefore will need to look for different employment, combined with the fact that only a small number of companies have a proven record of successfully redeploying or recharacterizing those kinds of ships, we're quite confident there will be plenty of vessels out there available as conversion candidates. Now, on the second part of what you asked, when it comes to Hilli, I think our approach is always to try to accomplish A before moving to B, before moving to C, and so on. From our perspective, the next thing on Hilli is to lock in the 0.4 million tons in July of this year. Once that's done, I think it's definitely up to Perenco and Cameroon's government to work out ways to keep that unit in the country. For both of them, this has been an enormous economic win, and we believe both have an interest in retaining the unit in country; on the other side of that, I think the operational track record, plus the fact that the unit carries no construction risk, and finally, that it's very soon going to be the fastest FLNG you can get your hands on anywhere in the world — we think that in this gas price environment, her appeal for potential work outside of Cameroon grows more attractive by the day. To try to offer some guidance on when we think we'll have development there, we'd say it's hard to pin down, but probably up to 12 months after the point forward, so by summer next year or thereabouts, in that window.
Craig Shere
analystAlright, one final question regarding FLNG talks for new developments. I believe everyone gets that the upstream folks, you know, the producers, are the parties you're dealing with. How many upstream producers across Africa actually have locked-in arrangements when it comes to, you know, royalties, profit sharing, and so forth, with the governments of the countries where they operate? If a play gets significantly scaled up with, let's say, your FLNG, does that cause those agreements to be reopened and lead to highly intricate negotiations, where clearly the host governments are looking to capture as much value as they can from the present market?
Karl Fredrik Staubo
executiveThat is a very well-informed inquiry, and I believe you're getting at something central to why it's somewhat hard to give precise guidance on the timing of some of these projects. I'd say it's reasonable to note that neither Golar nor any of the upstream partners would move ahead with projects like these absent a very explicit understanding with the host governments regarding the particular matters you mention, such as arrangements for how things get shared, flexibility, and similar items. Essentially, this is the primary gating factor when it comes to the schedule for new FIDs. On the other hand, I'd argue that these are proven stranded gas reserves, and nobody possesses the technology needed to monetize those fields. That's the need we serve. At present, we don't observe anyone else providing FLNG or floating liquefaction as a service, at least not with a demonstrated track record. So I'd say we represent the answer for monetizing the unit, and what remains is to identify a fair framework acceptable to the government, the upstream partner, and ourselves.
Craig Shere
analystGreat. Thank you.
Chris Robertson
analystHello, good morning, Karl. I appreciate you taking my question. I should warn you beforehand that this is somewhat boring. Regarding the NFE shares, what is your approach toward them? Do you simply intend to keep them until you require liquidity before launching another FLNG project, or is there a different plan?
Karl Fredrik Staubo
executiveGood question, Chris. As you're aware, the consideration we received from selling Hygo included a stock portion totaling 18.6 million shares. Back in May, we divested a third of that position, which generated $253 million in cash. We're optimistic about how NFE is progressing. Their strategy for running the business is something we view favorably. That said, we don't have a lockup agreement, we don't hold a board position, and we can't see any information that isn't public. Because of that, we have essentially complete freedom regarding what we do with those shares. Our current thinking is that holding NFE beats holding cash by a wide margin. On our balance sheet we have considerable flexibility, enough to finance at minimum one LNG or FLNG project while leaving that facility untouched. Apologies — I meant those shares; as things stand, we remain holders of the name.
Chris Robertson
analystAll right. Now that New Fortress is moving into floating LNG involving offshore rigs, do you see potential for a bigger partnership there? Could Golar bring any know-how to the table, or are talks happening?
Karl Fredrik Staubo
executiveAs NFE and Wes Edens mentioned on his earnings call, Golar is collaborating with NFE to assist them in building out their fast LNG solution, covering both engineering and operations. Remember, Golar continues to run every maritime asset, including the vessels and FSRUs, that were sold to NFE, and our relationship across essentially every tier of both companies is strong. No particular initiatives exist at this moment, though we would definitely be willing to join forces once suitable chances come up.
Chris Robertson
analystUnderstood. I really value you making room for us, and I'm grateful for what you shared on that topic, Karl.
Karl Fredrik Staubo
executiveThanks.
Nick Linnane
analystHello, and thank you for fielding my question. Regarding yards capable of performing Mark I or Mark II conversions, what number do you estimate there is, and what number do you believe could handle Mark III new builds? Are there any assured Slots for either category of work, and if there are, until when do your options on those slots run? It appears yards are becoming rather busy.
Karl Fredrik Staubo
executiveYour observation is spot on. Yards are becoming exceptionally busy. In some ways, that's somewhat atypical for, I believe, anybody involved in maritime. We haven't witnessed that since roughly the 2006 to 2008 cycle. Yard capacity has shrunk dramatically since that time, and the rebound in activity has produced extended lead times along with, clearly, the broad global supply crunch. Regarding your Mark III question, our view is that it's basically one shipyard we consider capable. On that front, we are engaged in detailed discussion about locking in slots. Shipyards approach this by, naturally, selling the bulk of capacity to rather aggressive, LNG carrier and container orders, yet they keep some room for what they refer to as large offshore infrastructure projects; over time they've learned, like most others, that shipping markets move in cycles, and it isn't sensible for them to shut down engineering and offshore capabilities since you never know when demand will appear and when activity will pick up. They hold some slots for bigger projects, though there's a cap on how long they retain those slots because of pressure from container and LNG carrier orders. Even so, I believe we possess long-standing relationships with the key yards concerned and we are presently working to lock in slot options for Mark III. As for Mark ones, we have constructed at Keppel in Singapore, and our view is that it's the finest shipyard for building Mark one's; we have not skipped looking into others, and we likewise have no plan to look into others for Mark one's. As for Mark two's, that is regarded as being carried out at a shipyard separate from both Mark one's and Mark three's. In essence, we have one chosen shipyard we've collaborated with for a good while on Mark II and III, and we already maintain a deeply established relationship with Keppel on Mark one's.
Nick Linnane
analystAlright. Alright, I appreciate that thorough response.
Karl Fredrik Staubo
executiveThanks to everyone for tuning in and for the solid questions, and we’re eager to speak with all of you again in the next quarter. Enjoy the rest of your day.
Operator
operatorThat brings today's call to a close. We appreciate everyone for joining in. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.