Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

August 11, 2022

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 55 min

Earnings Call Speaker Segments

Karl Fredrik

executive
#1

Thanks, everyone, and welcome to the Q2 earnings results presentation for Golar LNG. Karl Fredrik Staubo here, CEO of Golar LNG. Before diving into the presentation, I'd ask you to take note of the forward-looking statements on slide two. Joining me today to walk through this quarter's results is our CFO, Mr. Eduardo Maranhão. If you turn to slide four, you'll see an overview of where Golar stands today. After a group simplification and the sale of roughly $6.8 billion in assets over the past 18 months, we've become a focused FLNG owner and operator. We hold two FLNG vessels: the Hilli, operating since 2018 under a contract with Perenco in Cameroon. Looking at the global picture, she stands out as the top-performing FLNG vessel, having achieved 100% operational utilization from the moment she was delivered. Next, we have the FLNG Gimi, which is currently 86% complete and being built at Keppel Shipyard in Singapore. For BP, she will launch a 20-year contract on the Tortue field situated offshore Mauritania and Senegal, which opens up an EBITDA earnings backlog worth $3 billion for Golar — equivalent to $151 million in EBITDA each year, starting next year and continuing through 2043. Our focus is squarely on FLNG growth projects, and we have come up with three separate FLNG designs. All three rely on the same proven liquefaction technology and maritime interface. What sets them apart, though, is liquefaction capacity and where they are built in terms of shipyard location. Up to 2.7 million tons per annum of liquefaction capacity is what the Mark I can deliver. Both of the units we already have, Hilli and Gimi, are FLNGs of the Mark I design, and each was constructed by converting an existing LNG Moss tanker. As for the Golar Gandria, it stays a conversion candidate owned by Golar for possible future Mark I units added incrementally. When it comes to the Mark II design, its liquefaction capacity reaches as high as 3.5 million tons. Converting an existing LNG carrier is also how Mark II works, but instead of putting liquefaction equipment along the ship's width, a new midsection is added to an existing carrier, with the liquefaction topside placed on it. Larger liquefaction capacity becomes possible that way, and the time needed for conversion construction goes down. To wrap up, the Mark III design for new vessels is something we spent over ten years creating. With the capacity to liquefy as much as 5 million tons, Mark III is built on a newly constructed hull that allows for more storage and deck area. Because of the corporate streamlining we've completed during the past 18 months, we also hold three notable publicly traded stakes; right now we possess roughly 6% of New Fortress Energy, which was worth approximately $700 million as of yesterday's close. In Cool Company, the shipping business we spun off in Q1 of this year, we hold a 31% interest. We also own approximately 24% of Avenir LNG, which operates in small-scale LNG shipping and terminals. Altogether, these holdings are valued at more than $850 million. Moving on to slide five. Thanks to streamlining the company and focusing on FLNG, our balance sheet is now set up to support FLNG expansion. We closed the quarter with $602 million in cash. Add to that the publicly traded securities we just went over. That gives us total liquidity of around $1.5 billion, or roughly $14 per Golar share. Net debt declined from $1.7 billion last quarter to about $1 billion by the end of Q2. This came from selling vessels and regular amortization. As a result, we currently sit at a net cash position of $500 million. From our current FLNG portfolio, we anticipate EBITDA output will grow fourfold between 2021 levels and 2024; that figure might rise substantially more as further FLNG growth projects get announced. We now possess both cash and debt capacity to support FLNG expansion using internal resources, and that will be the main priority for the company's next phase. Finally, no debt refinancings are due before 2025, and we anticipate producing considerable quarterly cash flow to equity from operations moving forward. I'll pass things to Eduardo now so he can walk us through our Q2 numbers.

Eduardo Maranhão

executive
#2

Thank you, Karl, and hello everyone, good morning. It's my pleasure to share an update regarding our group's results for Q2 of 2022. If you'll turn to slide 7, I'd like to highlight a few things from this quarter. To begin with our FLNG vessels. Hilli, our first unit, keeps running with outstanding performance, achieving 100% uptime during this quarter; we keep gaining from robust tailwinds tied to elevated Brent and TTF prices, which create additional earnings for our commodity-linked tariff without adding any OpEx on our side. Because of this, our portion of Hilli's distributable adjusted EBITDA rose substantially, reaching $62 million for this quarter, which is an increase of nearly 150% versus the same period last year; we're also delighted to report that Perenco has exercised its option to boost production by an extra 0.2 million tons of TTF-linked output starting in 2023 through 2026. Work on the Gimi, our second FLNG unit, is ongoing in Singapore and stands at 86% technically complete; we've reached agreements with Keppel Shipyard on measures to ensure the unit's sail away happens within the first half of 2023. We've also moved forward on several efforts toward creating a new Mark II unit, which would be able to produce 3.5 million tons of LNG and might be delivered as soon as 2025. We'll cover more on that later in this presentation. We reaffirm our goal of announcing a new FLNG project before the end of 2022. Now turning to shipping. The final stages of spinning off our TFDE fleet wrapped up during this quarter. Cool Company purchased the remaining four vessels, and the handover of our shipping and FSRU management organization has now been finalized. Consistent with our simplification push and our aim to concentrate on FLNG, we were granted a conversion contract for Golar Arctic worth EUR 269 million and divested our FSRU Tundra to Snam for $350 million. These moves and divestments generated net cash proceeds of roughly $0.5 billion during this quarter and let us bring our contractual debt down from $1.7 billion to $1 billion by quarter's end; we've also kept up our share buyback program, buying back 0.2 million shares this quarter, leaving us with 107.8 million shares outstanding following that. Let's move to slide 8. Thanks to strong commodity prices and extra earnings from Hilli, our total FLNG tariffs nearly doubled, hitting $108 million this quarter, up from $55 million in Q1 of last year. During this quarter, we posted an adjusted EBITDA of $101 million. On a year-over-year comparison, that amounted to a rise of $153 million relative to Q2 2021. We reported net income of $230 million for this quarter, which includes a $122 million gain from discontinued operations, covering the sale of Golar Tundra to Snam along with the remaining vessels, plus management companies to Cool Company. There's also a $182 million gain on TTF-linked derivatives and swaps. And a $76 million impairment of Golar Arctic. We took a $49 million hit on NFE shares, which were priced at $39.57 in Q1 2022 compared with $42.61 in Q1 2021. Our balance sheet keeps getting stronger as we deleverage. At the close of Q2, our portion of contractual debt came to $1 billion — that's a drop of over 54% from the same quarter a year earlier, when the figure stood at $2.2 billion. We ended Q2 with $604 million in total cash. On top of that, factoring in the worth of our listed shares in NFE Cool Company in Avenir, our overall liquidity sits at roughly $1.5 billion, and after subtracting our share of contractual debt, we're at a net cash position of $500,000; in our estimation, that gives us room to finance two new FLNG growth projects. Let's turn to slide number 10. We want to add some detail on how our earnings from Hilli break down. Since its delivery in 2018, this FLNG has maintained a flawless operating record, the best in the world for FLNG operations. Hilli's tariff has three pieces: a fixed tariff, one tied to Brent, and one tied to TTF, which began on the first of January this year. As commodity prices have climbed, we keep seeing a big jump in Hilli's EBITDA generation — up two and a half times compared with a year ago, or 9.5% versus the prior quarter — and we anticipate that trend carrying into 2023, with more detail coming on slide number 11. It's worth noting that these higher earnings required no extra OpEx from us. The base tariff matched what we saw in earlier quarters, while Brent-linked revenues brought in $29 million and TTF-linked revenues contributed close to $20 million during Q2. I'll pass the call to Karl now, who will go into that a bit further.

Karl Fredrik

executive
#3

Thanks, Eduardo. Now let's look at slide 11. Perenco, as Eduardo said, chose to exercise its option for output of 0.2 million tons covering 2023 through 2026. So Hilli keeps contributing three elements to its EBITDA. Golar's portion of Hilli EBITDA came to $95 million in 2021. For 2022, we anticipate Golar's share landing near $270 million. That rise in earnings stems from stronger Brent pricing plus the launch of production tied to TTF. For 2022, we locked in the TTF price exposure for Q3 at $25.37 per MMBtu. That yields $19 million in TTF-linked EBITDA for Golar during the quarter. Q4 2022 stays unhedged. Based on current Q4 forwards, we anticipate earning roughly $47 million in EBITDA for Q4 by itself; for 2023, we've just signed a TTF price swap covering 50% of the TTF exposure at $49.5 per MMBtu. That equates in energy terms to crude Brent at $291 a barrel. Assuming TTF holds at $49.5 during 2023, that produces about $160 million of EBITDA for Golar, with half of it now locked in on price. Along with the Brent forward for 2023, presently at $88 a barrel, we anticipate generating $305 million as Golar's portion of Hilli EBITDA in the coming year. Golar's share of Hilli carries total debt service of $50 million. So Hilli by itself will throw off free cash flow to equity of $255 million in 2023, equivalent to $2.35 per Golar share. Now to slide 12 and Gimi. Gimi stands at 86% technically complete in its conversion to an FLNG at Keppel Shipyard in Singapore; to date we've logged more than 22 million man-hours on that conversion, with a daily construction crew now totaling 4,200 workers. What's left of the build centers mostly on construction, installation and testing of equipment before the 2023 sail away, which unlocks $151 million in yearly EBITDA for Golar across 20 years. During the quarter, Golar and Keppel Capital, who jointly own Gimi, settled on a $50 million incentive payment to Keppel Shipyard for efforts to protect sail away within the first half of 2023. That incentive payment comes due at specific milestones, and a portion of it can be clawed back should milestones slip past agreed dates. Because Golar holds 70% of Gimi, $35 million out of that $50 million incentive payment falls to Golar. Gimi remains on schedule to sail away from the yard in the first half and begin contract start-up in the second half of 2023. Now to slide 13 and a few of the most notable things that unfolded for Golar this quarter. We've witnessed a notable surge of interest from new customers exploring FLNG solutions for gas field developments. Today's and future gas commodity pricing, paired with the energy shortage, appear to have driven efficiencies in how gas field development decisions get made. The same trend shows up in the FLNG growth projects already in our pipeline, which made very strong headway this quarter—across both tolling and integrated structures. Given that momentum, we moved proactively to lock down yard slots and refresh CapEx figures for all three of our FLNG designs. For Mark one and Mark two, we now have firm pricing and confirmed yard availability, and talks are underway with the Mark three shipyard regarding cost and slot availability for a 5 million ton new build. Even with yards stretched and costs rising, we're pleased to report that we can hand over FLNGs in 2025, provided we take a final investment decision in the back half of this year. The updated CapEx figures do reflect inflation, yet they still sit inside $500-$600 million per ton of liquefaction capacity—something we view as extremely competitive against other maritime and shore-based liquefaction options. That also stacks up favorably next to Eni's recently announced deal to buy the Exmar Tango FLNG, at an implied $950 million-$1.1 billion per ton of liquefaction capacity. That's roughly exactly twice the CapEx we would incur. On top of that, with the Exmar Tango now acquired, Golar stands as the sole FLNG service provider worldwide with a demonstrated track record. We've likewise obtained financing term sheets covering construction and long-term lease financing for prospective FLNG new builds, coming from a lease counterpart we already work with. As Eduardo mentioned, we're holding to our goal of announcing FLNG projects within 2022, and we believe our organization and balance sheet are positioned to carry out as many as 2 to 3 FLNG projects simultaneously, depending on the specifics of each one. Moving to slide 14, let me expand further on what we did this quarter. With the FLNG growth pipeline expanding, we're stepping up engineering work and intend to place orders for long lead items on a Mark II FLNG in the back half of this year, protecting a 2025 vessel delivery. Most of those long lead items under discussion can equally be used across our other FLNG solutions. The Mark II design offers liquefaction capacity reaching 3.5 million tons and, as noted, relies on converting an existing carrier; we've located and inspected a suitable vessel candidate for that conversion. Yard selection is finished, and the financing term sheet is in hand. That term sheet doesn't hinge on a charter or long-term offtake when the project is integrated. We're enthusiastic about how the Mark II project is advancing and the appealing delivery window we've had confirmed. Along with charter interest—which spans continuing talks for an integrated field development project plus multiple clients seeking charter alternatives—we're confident that moving ahead with Mark II is the right path for the company going forward. To expand on when we expect delivery and why getting in early matters, take a look at slide 15. During past quarterly calls, we've noted that even ahead of Europe's geopolitical tensions, the gas market was already stretched; during last year's Q4, LNG prices climbed past $50 per MMBtu. With countries worldwide seeking dependable energy supplies that also carry appealing environmental qualities, LNG demand should keep growing. Over the first half of this decade, fresh liquefaction capacity arriving is quite scarce, and the bulk of added output won't show up until late 2025 and after. That's why bringing an FLNG project online sooner becomes more and more compelling, whether you look at it through demand or through LNG pricing. Between 2021 and 2030, new liquefaction capacity sits at 130 million tons when counting FID or projects already being built. To satisfy projected demand growth across that stretch, another 42 million tons of liquefaction projects must be added from now through 2030 — and that figure doesn't even factor in what might happen if Europe and other areas cut back their reliance on Russian gas supplied from a single source. What's more, digging deeper into that anticipated 130 million tons of new liquefaction projects due to start up, roughly 12 million tons of it is projected to originate in Russia, where geopolitical circumstances will probably make execution and schedules harder.

Karl Fredrik

executive
#4

Also, out of the total 130 million tons, 65 million tons should come from U.S. exports. Right now, source cost in the U.S. sits at $8.5 per MMBtu, while long-term forward prices point to $4-$5 in gas source cost prior to liquefaction. On top of that, the majority of U.S. volumes are committed under long-term offtake contracts. Moving to slide 16. This development encourages us, and we're also encouraged by the shortage of liquefaction projects drawing on what we consider the world's cheapest gas resource; our primary focus is on African proven or stranded gas reserves, since we observe very favorable traits across the three key components that drive delivered cost of LNG. The three main factors are what you pay for the source gas, what liquefaction runs you, and how far the product has to travel by ship to reach the buyer. In our view, you can get a steady feed gas price somewhere in the range of one to three dollars in lifting cost, with the exact figure tied to how big the field is. That comes in well below Henry Hub pricing, both today's level and the longer-term outlook. Next, compared with other liquefaction options, whether floating or land-based, Golar's technology needs less CapEx for each ton of capacity. And lastly, gas from Africa simply has a shorter voyage to reach the people buying it, no matter whether those customers sit in Europe or in Asia. So when the three biggest cost drivers for LNG all come in lower, we see that as a strong competitive edge. Turning to slide 17, here's a slide you've seen from us before, though we've now updated it to lay out potential Mark II FLNG expansion projects. Take an African project with source gas at $1 per MMBtu, a tolling fee in the $2-$3 per MMBtu range like the one we charge BP, and shipping at $1.50 — that gets LNG to end users for roughly $5. Set against gas prices both past and present, that's a very strong economic case. To give you a sense of what this looks like, we've put together a few Mark II tolling fee cases. At the low end, that's $2 per MMBtu — cheaper than what most recent U.S. shore-based liquefaction projects charge. Even so, Golar would see a CapEx to EBITDA ratio of roughly 5x on capital employed, which works out to a 20% unlevered return. If tolling rates came in around what Hilli gets at today's commodity prices, that CapEx to EBITDA multiple drops to 2x capital employed. And if you move even closer to the hydrocarbons and pursue integrated projects at current gas prices, you'd be looking at payback in under six months right now. That explains why we're so focused on delivering early and shifting toward the integrated side. Our view is that you're able to remove a great deal of the price swings tied to hydrocarbons by locking in forward prices, much like the approach we took with our TTF exposure on Hilli. Changing topics now, and this will be the final time we provide an update on our FSRU business. If you look at slide 19, you'll see the two asset sales that closed during the quarter. First, we agreed to sell our steam LNG carrier, the Golar Arctic, to Snam for EUR 269 million. As part of that transaction, Golar will handle the vessel's conversion and deliver the FSRU in Italy. For that unit, the anticipated conversion expense comes to roughly $160 million, prior to the vessel's cost and any contingencies. Our expectation is that Snam will issue the final notice to proceed around the close of this year or at the start of next year. This project closely mirrors the earlier conversion of a vessel into an FSRU, when the Golar Viking was converted and then sold by us to LNG Croatia. The other transaction we made public with Snam involved selling the FSRU Tundra for $350 million. That deal was announced and completed on May 31st, bringing net proceeds to Golar of $193 million. Starting when the deal closed and running until the middle of November, we've arranged to lease the Tundra again, and we expect that period to generate extra positive cash flow. In addition, we're close to wrapping up a development agreement in which Golar will assist Snam with small-scale upgrades to the vessel, before the unit is scheduled to begin FSRU operations during the first half of next year. That development agreement is likely to deliver added value for Golar. Turning now to corporate items and the earnings potential that exists within our present asset portfolio. This is yet another slide you've encountered previously, though it's growing more streamlined as we shed the non-core assets. When you look at 2021, our adjusted EBITDA came from subtracting G&A from what Hilli earned, and that left us with $74 million. Beyond that, there's upside tied to commodities through Hilli's output, which is linked to Brent as well as TTF. Looking ahead to 2023, we anticipate Hilli's earnings will be $220 million higher than they were in 2021. Once Gimi comes online in the second half of next year, factoring in its contracted EBITDA, we see a run rate exceeding $400 million, assuming commodity prices stay within the 400 to 500 band. As for net debt, ours is negative — in other words, we're sitting on $500 million in net cash. From where we sit, the business is really well positioned — whether you look at cash flow, debt, or liquidity — to pursue growth. And finally, to close out the company highlights on slide 22: FLNG growth is our top priority, and our target is to make an FLNG announcement at some point in 2022. Before that growth arrives, we anticipate our EBITDA earnings will increase fourfold from 2021 to 2024. We've set aside $1.5 billion in cash and listed securities to fund FLNG growth projects, and on top of that we'll have considerable free cash flow to equity being generated along the way. Our book value stands at $2.7 billion, and as I said, that figure ought to continue climbing given that we're free cash flow to equity positive. This year marks a milestone for Golar as we proudly celebrate 75 years since our founding, and 50 of those have been spent in LNG. In that space, we've established ourselves as a genuine market pioneer and a first mover across FSRU, FLNG, and integrated FSRU-to-power projects. That brings our Q2 earnings presentation to a close. We appreciate you spending the time to tune in, and at this point we'll pass things to the operator so any questions can be taken.

Chris Tsung

analyst
#5

Hello there. Karl and Eduardo, good afternoon to you both. How are things with you?

Karl Fredrik

executive
#6

Doing well, thank you. And yourself?

Chris Tsung

analyst
#7

Alright, thank you. I was hoping we could spend a moment discussing Gimi. You've noted the intended date for sailing away.

Karl Fredrik

executive
#8

Apologies, your audio is cutting out. Could you possibly move nearer to the microphone when you talk?

Chris Tsung

analyst
#9

Is this better?

Karl Fredrik

executive
#10

Yes, please.

Chris Tsung

analyst
#11

Yeah, apologies. What I was getting at is that the Gimi's expected sail-away window has moved from Q1 2023 to the first half of 2023, and on top of that there's now a $50 million incentive payment going to Keppel to hold that first half 2023 date. Could you give us some sense of whether the danger of Gimi slipping further would be measured in months or in quarters?

Karl Fredrik

executive
#12

Well, if you tuned into the Kosmos Energy earnings call on the eighth earlier this week, I believe they gave some updates too on where things stand, both regarding FPSO progress, which has fallen somewhat behind, and they restated the contract start-up date. To address your question, I'd say it comes down to a mix of ensuring we construct the highest-quality unit and getting the schedule lined up with BP. No additional delays are anticipated on our side. As we've pointed out across a number of our earlier quarterly calls, we've pursued quite aggressive measures to protect the existing timeline, and that timeline is essentially what's behind the $50 million cost increase, which in turn protects it. Progress we're seeing, essentially day by day, leaves us quite pleased, and we feel very at ease with the delivery date we currently have.

Chris Tsung

analyst
#13

Excellent, thank you. This wasn't a systemic issue affecting conversion projects generally. It was simply a one-time situation involving coordination of the timeline with Kosmos.

Karl Fredrik

executive
#14

Correct.

Chris Tsung

analyst
#15

Alright. My apologies — that was my second question, and this is the final one. So at what point would you have to book slots at the yard for the Mark I and Mark II? And, say, if the order doesn't get placed during this year, would you be at risk of losing that space?

Karl Fredrik

executive
#16

Well, what today's call has confirmed, I believe, is that agreements exist between us and the shipyard that would build the Mark I and Mark II, and in those we've also nailed down the slot capacity that's available. We've said this a handful of times, but our aim is to come out with an FLNG announcement at some point in the second half of this year. My sense is that you can hold the slot for a bit beyond this year alone, but any day of delay pushes delivery back too, and early delivery is going to matter to us as we move forward.

Chris Tsung

analyst
#17

absolutely. Karl, I appreciate the additional detail. I'll pick up this thread at this point.

Karl Fredrik

executive
#18

I'm grateful.

Ben Nolan

analyst
#19

Thanks, operator, and hello, Eduardo. First, I'd like to check something so I'm certain I've got it right regarding placing an order for an FLNG conversion. Is it correct that your team would be prepared to commit to a conversion on spec — meaning no contract in hand — if that's what you're suggesting?

Karl Fredrik

executive
#20

That's right. It would be comparable to the way we looked at Hilli back when the initial order was placed. That order wasn't tied to a contract, yet we had a strong sense of where the unit would probably be deployed. Back then the risk was greater, since the technology hadn't been proven. Now, with everyone racing to lock in new liquefaction — most recently ENI's decision to buy an idle FLNG at a very high price — we can see that timing is the market's key attribute, and that's true of every chartering discussion we're having too. Our thinking is that if we proceed on this basis, the negotiating power would shift slightly in our favor. We have a very clear view of where it will end up.

Ben Nolan

analyst
#21

All right, that's useful.

Karl Fredrik

executive
#22

Regardless of whether that contract gets locked in beforehand, at the same moment, or at a point not too far off right after, our confidence in the position we hold today is quite strong.

Ben Nolan

analyst
#23

All right, that's useful. Let me attempt to fit two questions into one here. Regarding those contract talks, I understand that one item you've highlighted is the desire for a certain amount of commodity exposure, comparable to what exists on the Hilli, though smaller on the Gimi. First, do gas owners agree to that, or are they more inclined to do so now compared with how things stood previously? Related to that, you specifically mention a Mark II, yet I'm aware you already possess the Gandria. Why does there appear to be a greater emphasis on a Mark II rather than a Mark I, which could be, you know, somewhat more of a sure thing?

Karl Fredrik

executive
#24

Yeah. All right. That's two questions. For the first part, yes, we believe that discussions about production tied to commodities are simpler to hold today than they were before. The gas fields we're aiming at are, in our view, either stranded or associated gas; we don't believe the owners of those resources possess many, if any, other options for using those fields. So it comes down to either an FLNG or leaving the unit unmonetized. Given how much pressure there is to lock in new liquefaction at present, we believe the setting makes those negotiations simpler. It's also reasonable to say that the more you move toward oil majors and the longer the duration, the less incentive they have, or the less willing they are, to provide commodity exposure. We believe we can secure appealing commodity exposure with strong counterparties. On the second part of your question, as we've pointed out, we have locked in price and yard availability for both Mark I and II. What strikes us as a main draw of the Mark II is that it offers somewhat greater liquefaction capacity, somewhat greater storage capacity, and because of how the vessel gets converted, a faster conversion period. We also hold a reasonably clear picture of the FLNG growth pipeline, and we're sure that placing an order for a Mark II offers a highly appealing risk reward, which is why we intend to move forward with that. That said, we wouldn't exclude constructing another Mark I beginning from Gandria, but Gandria cannot accommodate a Mark II.

Ben Nolan

analyst
#25

Okay. I'm grateful that you fielded the pair of them, even though the two questions were a bit unlike each other. That's right, thanks.

Karl Fredrik

executive
#26

First one, that's a fine one.

Craig Shere

analyst
#27

Hi. Good morning, New York time.

Karl Fredrik

executive
#28

Good morning.

Craig Shere

analyst
#29

When it comes to where we stand on raising capital going forward and our liquidity situation, uh, the first thing I'd ask is whether it's fair to figure that you might pull out more than $500 million altogether through inexpensive refinancings on both Hilli and Gimi? And after that, could you share your view on when liquidity would be required and how much of it, in the case of a build done to an initial FID spec compared with one that has a contract in place from the start?

Karl Fredrik

executive
#30

On your first question, the answer is affirmative. If we refinanced Hilli and Gimi at present, my expectation would be an amount above $500,000. Our perspective is basically this: our cash plus listed securities are in solid shape, and we believe there is room to further optimize the debt tied to those two units — once Gimi no longer carries construction risk, and once recontracting risk is removed from Hilli. That is precisely why we aren't moving ahead with it at this moment. Between the cash we currently hold and the term sheets we've gotten for both Mark I and Mark II new builds, we have enough to move forward with the spec build, drawing only on our cash position and available credit, or on the term sheets received for possible new credit facilities.

Craig Shere

analyst
#31

Suppose someone decides to construct without a confirmed buyer — would the yard still permit the buyer to contribute capital gradually across the schedule? That way, there wouldn't be an instant problem of requiring extra cash right away?

Karl Fredrik

executive
#32

That's correct.

Craig Shere

analyst
#33

Thank you.

Sean Morgan

analyst
#34

Hi, Karl. As we increase volumes going from a Mark II to a Mark III at 5 MTPA, will that mean we need offtaker work done beforehand? Or do you figure the E&P partner chosen for that project's development could essentially handle full offtake at 5 MTPA?

Karl Fredrik

executive
#35

To be clear, we wouldn't build a Mark III on spec, since that's a big volume and the effect is larger. That leans more toward tolling arranged contracts, where our expectation would be that the offtaker locks in a portion of the production volume.

Sean Morgan

analyst
#36

All right. So during the presentation, you mentioned how inexpensive it is to develop assets off Africa's western coast and how close that is to Europe. That would suggest Europe should be the main market for such projects. Has it caught you off guard that Europe has been so slow to commit to long-term SPAs — thinking about what share of SPAs got signed in 2022 after the war began, compared with Asia, for instance? Do you figure carbon is behind that, or what else explains this holdup in heavy European contracting?

Karl Fredrik

executive
#37

It doesn't catch me off guard, since we understand what's required to get an FLNG project moving, and offtake is just one piece of the puzzle. In my view, even with offtake secured, you still require development plans, regulatory approvals — all the things necessary to get gas produced. Actually, I'd argue that to some degree the opposite is true: European nations have moved quite quickly on FSRU, and pretty quickly on LNG carriers too. As I see it, at this moment they're busy figuring out how to boost gas production. Another sign of that is Senegal getting invited to the G7. When I last checked, at the earlier meeting, Senegal had no invitation to the G7. It seems they're beginning to grasp what's happening here. My sense is this isn't simply about offtake. There's far more to it. You must embrace the whole project and every scope within it, rather than assuming that locking in offtake fixes everything. I'm aware that a number of European nations are examining offtake and financing as a way to help get some of these projects off the ground. On top of that, you need a stable geopolitical setting in whichever country you intend to operate, if you're going to place billions of dollars of infrastructure there. What works in our favor, naturally, is that an FLNG floats, meaning the infrastructure sits mostly upstream. The unit is always able to be redeployed, and as you're aware, it's a generic asset for us, so it isn't tailored to particular feeds; we believe our technology fits nicely for projects of that kind.

Chris Tsung

analyst
#38

All right. Thanks, Karl. Appreciate it.

Karl Fredrik

executive
#39

Thank you.

Wayne Cooperman

analyst
#40

Hello, everyone. I've got two brief items. Regarding Hilli, was Perenco unwilling to purchase the full volume they were after? Could you possibly secure additional capacity from another party, or is that essentially on hold until the contract with them runs out? And second, given that you divested one-third of the NFE at a reduced valuation, is the intention to keep cashing in on that, particularly since their share price has climbed significantly?

Karl Fredrik

executive
#41

Thanks. Regarding the initial portion of your inquiry, as you're aware, incremental production volumes are tied to TTF. Should you load a TTF cargo and sell it on a spot basis in Europe right now, you'd face a pretty sharp markdown, roughly in the $5-$10 band. So it wasn't beneficial for the Perenco offtaker to substantially raise volumes at the contracted tariff. Neither Golar nor Perenco had any motivation to enter negotiations aimed at lifting volumes past the 0.2 mark, if doing so required reopening the tariff tied to TTF. Our perspective has been to simply observe how the option that was exercised at 0.2 plays out. There may be room to push output higher, though that would probably involve a tariff subject to negotiation. In theory, there's available capacity to sell elsewhere, away from the existing offtaker. In practice, doing so would be extremely challenging. The fix here, I believe, requires the offtaker, Perenco, and ourselves to gather at the table and determine whether a workable arrangement exists for all three sides. If that doesn't happen, present TTF pricing covers Hilli's earnings, yet I'd say everybody shares the goal of finding ways to lift that even more. Turning to your latter question, yes, we did divest one-third of our NFE stake. We've also indicated a preference for holding NFE over holding cash. So far, that call has proven wise. We're pleased with NFE's trajectory, and at present we hold ample cash plus accessible liquidity to pursue our objectives. As things stand, that stance is unchanged, though naturally we monitor how the company evolves. In their most recent quarter alone, they've done a great job delivering major upgrades to the business. We're happy with how things are going. Okay. Thanks, and congratulations. Thank you.

Barry Haimes

analyst
#42

Thank you very much, and congratulations on everything that's been accomplished. My question is this — you mentioned having sufficient capital for a pair of extra FLNGs. Would a Mark II and a Mark III both fall under that? Could you actually finance a Mark III? And perhaps you could explain the comparative expenses of 1 versus 2 versus 3, since those figures weren't included on that particular slide where you set out the distinctions. Many thanks.

Karl Fredrik

executive
#43

I believe that if you look at the liquefaction capacity and multiply it by the $500 million-$600 million a ton guidance, that should get you to the price. That's what it would cost. Sorry, what else did you ask?

Barry Haimes

analyst
#44

Might the money be there for a Mark II plus a Mark III, drawing on what you already have-

Karl Fredrik

executive
#45

Yes, yes. Essentially, it varies by project. With certain of these efforts, when you've secured offtake over the long term, the financing terms become quite favorable, and in that case, handling both is no problem. Under a number of those extended agreements, we're aware that the charterer would be interested in holding an ownership stake in the unit as well, particularly when it's signed up for the unit's entire operating life. That, in turn, would let us advance those two projects. Still, my sense is that at this point, Mark II stands as the one most likely to move forward, and we carry a sizable backlog of interested parties spanning all three designs. Altogether, we're able to operate two to three of them. What it comes down to is ranking the options with the strongest economics and the strongest overall scope.

Barry Haimes

analyst
#46

Thanks so much.

Karl Fredrik

executive
#47

Thank you.

Frode Morkedal

analyst
#48

Thank you. Hi, Han.

Karl Fredrik

executive
#49

Hi, Frode.

Frode Morkedal

analyst
#50

Yeah, I just have one question. Last week Exmar sold their Tango FLNG, and it looked like they got a pretty solid price for it. Of course, that unit is a barge, and it's on the smaller side. So maybe you could compare the two. If I simply extrapolate toward a 2.5 million ton conversion candidate, the valuation potential looks quite compelling to me. So I'm curious whether you can discuss what sets them apart.

Karl Fredrik

executive
#51

Yeah, if you check the announcement, they state they'll pay somewhere between $572 million and $694 million, contingent on how the unit performs, and that's for 0.6 million tons. So that works out to your $950 million up to $1,150-$1,156 million, if you want the precise figure, on price. Compare that with a Mark I, and let's say it means you could pay somewhere from $2.4 billion to $2.9 billion per unit, or roughly exactly double the CapEx we're guiding to, which sits between $500-$600 million. You're also correct that Tango is a smaller unit, with less liquefaction capacity and considerably less storage than our FLNG technology, and it also lacks the same strong operational track record; they did operate for YPF in Argentina, of course, but she's sat idle for a while since then.

Frode Morkedal

analyst
#52

Great. I appreciate that — that's helpful detail. So it looks like there's pretty substantial room for gains here. Thanks.

Karl Fredrik

executive
#53

Thanks.

Karl Fredrik

executive
#54

Sure, go ahead.

Ben Nolan

analyst
#55

Thanks, and thanks for letting me ask a follow-up. My 2.5 questions last time didn't quite get me enough. I want a bit more on the possible chance to grow in Mauritania and Senegal. Let me make sure I understand: my read was that this would probably be a Mark III design. Can you give any extra detail on the way that might be going?

Karl Fredrik

executive
#56

Typically we avoid speaking about individual projects, I'd say, but we'd point you to the quarterly earnings call Kosmos held earlier this week, where they stated they're aiming for concept select for Tortue phase growth during Q3 of this year. What's notable is that when they last did a concept select, they landed on FLNG, which is the Gimi. Given the CapEx per ton liquefied and the carbon footprints per ton liquefied that our FLNG technology delivers, it's hard for us to see how any other liquefaction solutions could be used at that site and still compete on at least those two parameters. That concept select is something we're looking forward to. That's probably our comment. As for whether they'd like to go from 2.5, which is Gimi, up to 5 using, say, two Mark Is, or instead add a Mark III, that question is better put to Kosmos and BP. We did pick up that Kosmos mentioned both phase two and three of Tortue during 2024.

Ben Nolan

analyst
#57

Yeah, that helps. And then, moving to a different subject entirely — so if I'm covering two things here. You did repurchase some stock, a modest amount of shares, during the quarter. So maybe just on capital allocation. From what I remember, your hands are somewhat tied when it comes to paying dividends before the Gimi is delivered. First off, does that still hold? And how do you view capital allocation over the medium term when it comes to returning money to shareholders?

Karl Fredrik

executive
#58

That's right, Ben. The sole debt facility carrying that kind of restriction is our $300 million unsecured bond, and under it we can't pay a cash dividend until Gimi is delivered. That said, we're permitted to repurchase an additional $15 million of stock beyond where we are now. We're also permitted to distribute either 51% of Cool's total equity value — our stake in Cool Company — whether in the form of shares or cash. Because we sold two-thirds for cash and kept a one-third shareholding, the whole CoolCo position could be monetized and thus paid out in cash, or handed out as shares. On capital allocation, we're producing solid free cash flow each quarter going forward. I'd say we're in active talks with the board about starting cash dividends once Gimi is delivered. At present, there's no intention to seek an amendment to the unsecured bond or to pull that dividend forward in some other way, since we believe our main priority ought to be FLNG growth — though depending on how that plays out across the next six to nine months, that stance might shift.

Ben Nolan

analyst
#59

Alright, that's great. Thanks for letting me ask another question.

Karl Fredrik

executive
#60

At this point, we basically have a hard stop coming up in 1 minute. Thanks to everyone for joining. Should anybody have additional questions they'd like to ask afterward, feel free to get in touch with us. We appreciate you tuning in to hear us today, and enjoy the rest of your day.

Operator

operator
#61

This brings today's call to a close; we're now wrapping up the conference for today. You're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.