Golar LNG Limited (GLNG) Earnings Call Transcript & Summary

November 16, 2022

NASDAQ US Energy Oil, Gas and Consumable Fuels earnings 48 min

Earnings Call Speaker Segments

Karl Fredrik Staubo

executive
#1

Thanks, operator, and greetings everyone, morning or afternoon depending on where you are. This is Golar LNG's Q3 earnings results presentation, and you're all welcome here. Karl Fredrik Staubo here, serving as CEO of Golar LNG. Joining me is our CFO, Mr. Eduardo Maranhão, and together we'll walk through the results for this quarter. On slide two, you'll find our forward-looking statement, so please take note of that. An overview of Golar appears on slide three. Two FLNGs are in our ownership: the Hilli, which operates for Perenco over in Cameroon, plus the Gimi, set to begin a 20-year contract with BP in the coming year. Our attention is directed toward expanding FLNG projects, and we've created three distinct FLNG designs. A common proven liquefaction technology and maritime interface underpin all three designs, though each varies when it comes to liquefaction capacity. This quarter, we placed orders for long-lead items tied to a new MKII FLNG, which has a total liquefaction capacity reaching 3.5 million tons. Compared with prior quarters, the biggest shift in our company overview involves share sales amounting to $430 million, which brought our CoolCo stake down from 31.3% to 8.3%, along with the sale of NFE shares, taking our holding from roughly 6% to a bit under 3%. Now let's look at slide four and this quarter's highlights. From Hilli, EBITDA to Golar came in at $64.1 million, which is 2.6x higher than Q3 of last year. Perenco announced an added 0.2 million tons of production running from January 2023 through the contract's conclusion in July 2026, so production will stay at 1.4 million tons per annum across that stretch. A tariff tied to TTF gas prices applies to this incremental volume. In the quarter, we secured hedges covering 50% of our Q4 2022 exposure at $70 per MMBtu. For our 2023 exposure, we hedged 100% at $50 per MMBtu, while 60% of our 2024 gas exposure was hedged at $51.2 per MMBtu. Altogether, these hedges gave us cash flow visibility for EBITDA to Golar of roughly $260 million. Currently, the TTF hedges sit at approximately $75 million in the money. Moving to Gimi, completion now stands at 90% and the schedule is unchanged. Our pre-operations have begun, and by year-end roughly 120 persons comprising a maritime crew will be mobilized aboard the vessel; regarding FLNG growth, client interaction keeps rising and we're seeing solid advancement on possible new FLNG projects. Throughout the quarter, we worked alongside an upstream partner on a highly appealing potential integrated FLNG project. Two development agreements were also signed by us — one involving a super major, the other with an independent E&P company. Through these development agreements, each party commits to completing a defined scope of work by set deadlines so potential new FLNG opportunities can move forward, and to settle on key steps toward reaching FIDs. We're of the view that locking in an attractive delivery for our next FLNG unit will strengthen Golar's capacity to generate value with prospective FLNG clients; that's why the long-lead items were ordered, ensuring delivery during 2025. When it comes to what we've been doing on the corporate side, 8 million CoolCo shares have been sold, along with 6.3 million NFE shares. Those sales brought Golar net proceeds of $430 million, which aligns with the strategy we've communicated of trimming our holdings in financial investments so we can fund FLNG growth. During the quarter, we also repurchased 400,000 shares at an average price of $23.25 each, which puts our share count at 107.5 million shares. We've made a commitment to put as much as $10 million into Macaw Energies, a small-scale LNG liquefaction company that was recently established and is focused on land-based stranded gas and associated gas resources, plus biogas. The Macaw Energies team has a strong track record, and that gets us excited — we think Golar's liquefaction know-how, paired with Macaw's focus on small scale land projects, can form a successful combination for small-scale liquefaction opportunities. On top of that, we're looking opportunistically at strategic partnerships or M&A across the LNG value chain. At this point, I'll pass the call to Eduardo, who will walk through our Q3 results.

Eduardo Maranhão

executive
#2

Thank you, Karl, and hello everybody. It's a pleasure to walk you through what the group achieved during the third quarter of 2022. On slide six, I want to point out a few of the quarter's financial highlights. Operationally, we continue to perform at a very high level. Our FLNG tariffs came to $109 million in total, representing growth of 181% measured against Q3 2021 on a year-over-year basis. FLNG tariff is made up of all revenue generated by liquefaction services, along with the realized gain on oil and gas derivative instruments. Adjusted EBITDA for this quarter reached $85 million. Compared with Q3 2021, that figure rose by 63% year over year. For the quarter, we posted $141 million in net income. That figure includes $51 million in unrealized gains from NFE shares, plus $25 million in unrealized gains tied to interest rate swaps and other derivative instruments, along with $12 million in unrealized gains on TTF-linked derivatives, and $10 million in net earnings from other equity method investments. At the close of Q3, our share of contractual debt stood at $993 million — a substantial drop from the $2.1 billion in gross debt we carried in the same quarter a year earlier. Now let's turn to slide number seven. We keep making our balance sheet stronger, which positions the company to take on upcoming FLNG growth projects. Right now, we're holding over $1 billion in cash. At the close of Q3, our total cash came to $612 million. Then, after the quarter ended, as Karl noted earlier, we sold 8 million shares of Cool Company along with 6.3 million NFE shares, which brought in roughly $430 million in net proceeds. That puts our total cash on hand above $1.04 billion. If you factor in what our listed securities are worth — NFE, Cool Company, and Avenir — our overall liquidity comes in at just under $1.5 billion. And once you account for the $993 million in contractual debt I mentioned earlier, we're sitting at a net cash position of $452 million. Looking at the right side of this slide, you'll notice that nothing substantial comes due on our debt until 2025 — that's the year our $300 million in bonds reach maturity. Now, moving over to slide eight, we want to give you a bit more detail about what Hilli contributes to our earnings. To quickly recap, the Hilli tariff breaks down into three key pieces: there's a fixed tolling tariff, a tariff tied to Brent, and one linked to TTF, which kicked off at the start of this year. Also, like Karl said earlier, we've been able to hedge our TTF production at a really good level, and because of that, we keep seeing Hilli's EBITDA generation rise very strongly — it came to $64.1 million this quarter, which is 2.6 x what it was a year ago. If you turn to slide 9, I want to share a bit more about our hedging positions. To protect our TTF exposure, we've entered into swap agreements that cover 50% of Q4 2022 at $70 per MMBtu, and for Golar that has locked in $28 million of distributable EBITDA. We've also locked in hedging for all of our 2023 TTF-linked output and half of what we have for 2024, at around $50 per MMBtu for the first year and $51 for the second. Those positions have added $233 million more in distributable adjusted EBITDA for Golar. Given that, the EBITDA we expect Hilli to generate for our account in 2023 comes to $295 million. When we include our roughly $50 million share of debt service next year, that implies free cash flow to equity of about $245 million from Hilli by itself. With that, I'll hand things over to Karl, who can go deeper on the FLNG projects we have coming up.

Karl Fredrik Staubo

executive
#3

Appreciate that, Eduardo. Turning to slide 11, let me walk you through where we are on the Gimi build. That vessel is now 90% complete, and we still expect sail away during the first half of next year, followed by contract startup in the second half. We look for commissioning revenues to start being booked in the second half, with contract startup arriving in Q4 of next year. Keep in mind that once contract startup happens, Gimi will bring Golar $151 million in EBITDA every year over a 20-year period. Slide 12 gives you more color on the steps we're taking around the size of the Gimi construction effort. Our construction team now averages a daily workforce of 4,600, operating 24/7; to date we've logged 26 million man-hours; we've installed 37,000 tons of new steel and equipment on board; and we've laid 1,500 km of cables. That's the same as the distance from London to Rome. Pre-operations have begun, and by year-end we'll have mobilized a crew of more than 120 people to the vessel. Once operational, the unit will produce roughly 2.2 million tons of LNG annually, sufficient to power over 3 million U.S. homes. Moving to slide 13 and an update on long lead and commercial developments for new FLNG projects. Because customers are showing a lot of interest in our FLNG growth projects, we think that locking in a favorable delivery slot for an additional FLNG unit would boost our capacity to create value for prospective FLNG clients. With that in mind, we've ordered the main long lead items required for a new MKII 3.5 million ton FLNG, and the total commitments come to roughly $300 million. As part of this, we've brought on more than 200 engineers from the topside provider, the shipyard, a third-party engineering company, and Golar, and they're all focused on MKII development and on securing an attractive delivery within 2025. When it comes to the commercial side, we're collaborating with an upstream company to build out an attractive integrated FLNG project. We've already talked about those paid development contracts we signed with two potential customers — one is a super major, the other an independent E&P — covering possible FLNG installations tied to big, established gas reserves. In our view, the economics of FLNG still look appealing, both in the integrated cases and in the tolling fee talks we're having right now. If you turn to slide 14, that speaks to what near-term liquefaction capacity is worth. Back in August, Exmar said it was selling its FLNG Tango — a 0.6 MTPA liquefaction unit — to Eni, at a price somewhere between $572 million and $694 million. That works out to roughly a billion dollars for every ton of liquefaction capacity. Back in September, Kinder Morgan divested a 25.5% stake in its Elba liquefaction facility, and that deal likewise came with an implied value of approximately $1 billion per ton. Compare that with the CapEx per ton guidance we've provided, which sits in the $500-$600 per ton range. What we're seeing is that the appeal — whether from charterers or from parties interested in acquiring — is that liquefaction assets are being valued on near-term cash flows, and that reinforces our confidence in the decision to place the long lead items. Moving to slide 15, we've put together a historical overview of liquefaction FIDs organized by year. From that overview, you can see that through 2022 so far, 26 million tons of liquefaction capacity has been committed. Some might find that a bit surprising, considering the geopolitical backdrop and where gas prices stand in both Europe and Asia. We're less taken aback, because we understand how much time FLNG projects require — environmental sign-off, governmental approvals, and simply the enormous scale of engineering that large offshore infrastructure projects demand. That said, the level of activity is very encouraging to us, and we share S&P Connect's expectation that liquefaction FIDs will rise significantly next year, with a meaningful share of those hopefully being FLNGs. What's interesting is that the U.S. The bulk of additional supply — 95 million tons of the 148 million tons in new liquefaction capacity expected by 2030 — comes from that. Turning to slide 16, African LNG projects stay our top priority, and there are three reasons why. Three main cost components go into an FLNG project: the source gas, what liquefaction costs, and how far ships must travel to reach end users. We believe African gas reserves can be obtained for about $1-$2 per MMBtu, whereas Henry Hub prices sit at $6 right now. When 65% of new liquefaction projects start out costing 2x-4x what our input costs are, that advantage, in our view, belongs to us. To recap, what we spend on capital projects for each ton is below the figures our rivals deal with, whether they're using offshore or onshore liquefaction methods. On top of that, West Africa is positioned nearer to the buyers we serve in Europe and Asia. If your approach depends on three main cost drivers and you achieve better numbers on each one, we view that as a genuine edge right from the start. As a final point, please look at slide 18 — it's one you've seen in every quarterly deck we've done, but it captures the entire company on just one page. Our adjusted EBITDA for 2021 came to $74 million. Throw in the crude oil benefit and the TTF connection that Eduardo described. We anticipate an additional $200+ million coming from production tied to commodities. Once Gimi starts operating, that adds $151 million in contracted EBITDA, pushing our adjusted EBITDA, at today's market rates, well past $400 million. Our cash plus listed securities, as we've said, comes to $1.4 billion — $1 billion in cash, with listed securities making up the rest. Contractual debt sits just under $1 billion, so net cash works out to roughly $500 million. When it comes to FLNG expansion, we believe our standing is unmatched, and slide 19 shows why. Across our portfolio we have three FLNG designs, ranging from 2.7 million to 5 million tons. Moving one slide over to the right, the global FLNG track record is laid out for you. For any liquefaction project, stability along with production reliability matters most, and Hilli's output has been extremely steady from startup, unlike what other FLNG solutions have shown across that same stretch. Our CapEx per ton is the lowest, and we also boast the smallest carbon footprint per ton of liquefaction generated, and together that makes a persuasive case for anyone weighing FLNG. In summary, our attention is on appealing FLNG growth projects, and we've now secured orders for MKII long-lead items. From 2021 to 2024 levels, we anticipate our earnings growth will quadruple. Cash and listed securities total $1.4 billion for us. Our book value stands at $2.8 billion and keeps climbing as we generate solid free cash flow to equity. Golar's history spans 75 years, 50 of them in LNG, and in FLNG we've been a market leader, thanks to our proven design and robust operational track record. Taken together, that's the basis for our confidence in directing growth efforts toward FLNG. That wraps up the prepared remarks, so I'll pass it to the operator for questions.

Chris Tsung

analyst
#4

Hey there. Karl, good afternoon to you. How's it going?

Karl Fredrik Staubo

executive
#5

Doing well, thank you.

Chris Tsung

analyst
#6

So, turning to the sale of CoolCo and NFE shares, which I assume was done to fund the FLNG project. Are you planning to sell off the remainder for upcoming projects, or is there a certain percentage of these companies you intend to keep? And what about Avenir?

Karl Fredrik Staubo

executive
#7

I believe what we've stated before, and we certainly still hold to, is that we look at every one of our equity stakes as appealing financial investments. We'll cut back on financial investments to concentrate on core growth, whenever we have core growth. Given our present cash situation, we feel very at ease financing the MKII project that we're now taking on. It's fair to say that none of our shares need to be sold to fund that project. Should we pursue other growth initiatives, we'll look at trimming our shareholdings further. Right now, as we've said in the past, we're content being shareholders in all those names and see holding those shares as preferable to just having cash sit idle.

Chris Tsung

analyst
#8

Right. Okay, thank you. The other thing is, I realize that in this press release, you folks have placed orders for the MKII long lead items. Does that roughly lock in the timing for a 2025 delivery, or is it contingent on when you take FID?

Karl Fredrik Staubo

executive
#9

That's exactly what's needed to make sure you can still deliver in 2025. A long lead, by definition, is the critical timeline. If you lock in delivery of those, you guarantee you can still take delivery in 2025. Naturally, you have to move forward with MKII investments to protect that delivery. That also means a formal FID at some point. At this stage, we've done everything needed to make sure we're on track for delivery in 2025.

Chris Tsung

analyst
#10

OK, got it. Thanks. I just want to make sure about MKII — it's an integrated model, correct?

Karl Fredrik Staubo

executive
#11

That unit works in either integrated or floating setups. A vessel isn't built specifically around the commercial model it will operate under. Ultimately, a ship is hardware; when it comes to MKII, we're in talks regarding both integrated and floating configurations. MKII has multiple appealing aspects. One of them is when it can be built. Given how the engineering has been assembled, the response we've gotten to that design has been very positive.

Chris Tsung

analyst
#12

Okay, sounds good. Thanks a lot. I have nothing further. Appreciate it, Karl.

Karl Fredrik Staubo

executive
#13

Thanks.

Frank Galanti

analyst
#14

Yeah. Hi, this is Frank Galanti, filling in for Ben. I'd like to really get into what Chris asked most recently, regarding the MKII design, and particularly the vessel. Since that involves a conversion, have you kind of... Could you explain which type of vessel is required? Have you fellas already made that selection, and could you discuss roughly what the expense will be?

Karl Fredrik Staubo

executive
#15

Essentially, a Moss-designed ship is what gets used. An existing carrier can be taken. Moss designs are available in large numbers out there. A drawback of Moss as a shipping vessel is that steam-fired is what all of them are, which means, particularly given new regulations taking effect from 1st of January next year, when compared with more modern ships for shipping activities, these ships are far less competitive. That means, should you wish to acquire them for conversion, picking them up ought to be possible. Several suitable candidates have been inspected by us, and whether and when a ship will be acquired by us for conversion is being discussed. The Gandria, which is ours, can also be used, so that one is available to us too. Buying another ship is not something we're 100% dependent on. One with somewhat higher storage capacity is what we'd like to buy, though a requirement it is not.

Frank Galanti

analyst
#16

All right, that helps. Yes. Excellent. I'd like to shift focus somewhat to the Hilli. Given, clearly, the extremely high LNG prices worldwide, plus greater demand from Europe, could you discuss whether output at the Hilli might be raised? Is there feed gas nearby that could be accessed without much trouble? Also, is there anything new you can share regarding boosting Hilli production prior to the conclusion of the present agreement?

Karl Fredrik Staubo

executive
#17

Yes, certainly. Perenco picked up the 0.2, so our current output is 1.4. Two things limit any capacity increase: first, how large the current gas reserve is, and second, how much gas flows from the wells. Raising production would serve everyone's interests, I believe. It would be good for us, and good for Perenco. The offtaker, formerly Gazprom, was nationalized by Germany and renamed SEFE. That name means Securing Energy for Europe. With all else unchanged, Europe desires more energy rather than less; a triple win could emerge, with SEFE receiving greater volume while Perenco and we raise output. The real issue lies in the upstream portion, which Perenco controls; at present, it sits at 1.4 million tons. It's reasonable to say everyone is attempting to push for higher production and explore what can be done. Offering any guidance on whether we believe that will occur doesn't seem appropriate, since it's somewhat too soon to tell, though it certainly represents possible upside.

Frank Galanti

analyst
#18

Perfect. Thank you very much.

Karl Fredrik Staubo

executive
#19

Thank you.

Craig Shere

analyst
#20

Hello from New York’s morning hours. Regarding MKII, as you get ready now, does it have to focus on a single one among those possible super major independent E&P FLNG clients you are in talks with? Or, if things go as well as possible, might you see a path to perhaps 3 FIDs within the coming 18 months?

Karl Fredrik Staubo

executive
#21

Let's take these one by one. Without a doubt, FLNG and expanding that business is what we do. We're pleased with how both potential customers and projects are developing. As you've seen, we're stepping up activity on two fronts — placing orders for long-lead items, and just as importantly, bringing a sizable engineering group on board; it's certainly possible there could be more than a single one of these. My view is we should handle them one at a time, since each is a major project. So yes, let's concentrate on a single one at a time; we're here to pursue this opportunity. Our balance sheet can back it, our organization can back it, and the whole company is focused on it.

Craig Shere

analyst
#22

You're right to flag that these are big undertakings, and nobody wants to, you know, lean too far forward and lose their balance. You also mentioned that the talks covered both integrated deals and, you know, tolling structures, with the second type resembling your BP Gimi a bit more, I'd assume. So here's what I want to ask: since you've got a solid track record building these facilities, plus shipyard appetite and the chance for yet another toll deal that's highly rated, you know, investment grade, and, you know, running for decades, how are you weighing your options for funding the capital if you landed a toll that's attractive over the long haul? I mean, with the capacity to leverage that much more effectively than your initial Gimi contract, could that take a lot of the investment worries off your plate?

Karl Fredrik Staubo

executive
#23

Yeah, that's the quick response. I suppose there are a few factors. Clearly, we're holding $1 billion in cash. On top of that, we've got roughly $450 million in listed securities. It seems reasonable to state that substantial refinancing opportunities exist, especially for Hilli and Gimi, once they're delivered, which might unlock cash and lead to better terms. In the Q2 presentation, where we also discussed FLNG growth, we mentioned that we've gotten term sheets for financing FLNG growth projects, even while construction is ongoing, with appealing conditions and a solid LTV. We don't anticipate any balance sheet limitations for FLNG growth, up to the unit we can handle. The real constraint on capacity is engineering and operations, not the balance sheet.

Craig Shere

analyst
#24

Thanks.

Liam Burke

analyst
#25

Thanks. Karl, good afternoon. Pardon me.

Karl Fredrik Staubo

executive
#26

Hello, everyone.

Liam Burke

analyst
#27

Karl, turning to slide 16, you point out that the production source is African gas, compared with Henry Hub. Regarding the FLNG output, considering only the process itself, do your next generation FLNGs operate more efficiently, and are they able to bring down the production cost per MMBtu compared with Hilli or Gimi?

Karl Fredrik Staubo

executive
#28

Similar to when an automaker introduces a refreshed version of a vehicle, that updated iteration typically delivers better efficiency compared to the one it replaces. We are always making enhancements. It is a bit more efficient. Ultimately, I don't believe that factor alone determines success or failure. Regarding operating expenses, MKII comes in at 3.5 million tons while MK I's sit at roughly 2.5 million tons. Certain economies of scale exist since you don't have to add staff proportionally. So to speak, the operating costs for each MMBtu generated should be somewhat better thanks to economies of scale along with modest efficiency gains achieved over time.

Liam Burke

analyst
#29

Is anyone else making strides on FLNG development that you're seeing? It looks like your output is climbing, your efficiency is climbing, and the energy majors along with independent E&P companies appear to be showing a lot of interest in what you're doing.

Karl Fredrik Staubo

executive
#30

Sure. At this moment, Golar stands alone in offering FLNG as a service. Every other FLNG operating globally belongs to oil and gas firms that hold those units on their own balance sheets to serve their own needs. Nobody besides Golar is providing this on a service basis right now. From what we observe in the market, others are chasing the same space. NFE's work on liquefaction solutions stands out as the most prominent example. We welcome that development, since we believe the industry requires it to deliver quicker timelines and fresh liquefaction options. Their emphasis, too, is on generating hydrocarbons primarily for their own merchant purposes and for use within their downstream development or portfolio. When it comes to service provision, we see only limited competition at the scale of liquefaction solutions we offer from credible rivals.

Liam Burke

analyst
#31

Thanks a lot, Karl.

Sean Morgan

analyst
#32

Hi Karl and Eduardo. Appreciate you both fielding this. During our prior quarterly discussion, regarding 2Q, we mentioned aiming to announce a fresh FID by the close of 2022, and with roughly six weeks remaining, clearly that outcome is still on the table. When you consider the primary obstacles standing in the way of finalizing terms and, I suppose, reaching FID on a brand-new project, does the difficulty lie mainly in talks upstream with the partners pulling those molecules out of the ground, or is it the sovereign state, meaning you'd need to engage the national oil companies in those West African nations? What would you say are the biggest obstacles that are causing the timeline for new announcements to be pushed back?

Karl Fredrik Staubo

executive
#33

What really controls the schedule on this entire project is the engineering work linking upstream and midstream — the technical side of designing it and getting it to function. After a plan exists that everyone can live with, governmental and environmental sign-offs become necessary. Depending on which jurisdiction applies, approval may stretch out considerably, though in some cases it moves along fairly smoothly. Ultimately, commercial terms matter enormously, yet they aren't the difficult part. Assuming everything else falls into place, it simply comes down to splitting the cake. What consumes time is baking that cake, not carving it up, to frame it that way. Regarding timing, our view — and we're attempting to make this somewhat clearer in the presentation — is that locking in attractive delivery matters, and we genuinely believe our capacity to generate value alongside these clients carries more weight. When demand for something exceeds what's on offer, that generally pushes value in our direction. At present, our attention is mostly on executing correctly so as to generate value, rather than committing to a hard deadline and getting boxed in.

Sean Morgan

analyst
#34

Right. Right, so I suppose that's fairly self-evident. Nobody wants to lock in unfavorable business conditions; and then, well, clearly there's been considerable achievement in pre-selling portions of your, presumably, variable-volume positions tied to TTF and crude. I'm just somewhat interested in, I suppose, and it likely varies between TTF and crude regarding pre-selling a portion of that commodities exposure you hold. You've already reached 2024. When you consider the forward curves ahead, say across the coming months, might you attempt to pre-sell additional exposure by the close of 2024, right, the close of 2024, into 2025? And just how far might such an approach actually extend from the point where we currently stand?

Karl Fredrik Staubo

executive
#35

On Hilli, the commodity linkages sit there, and that vessel holds its contract through July 2026. Our intention is that we have the ability, and in all likelihood will, to hedge TTF volumes right out to that point, provided the total price appeals to us. The real question for us is balancing where market prices are going against what we're able to secure and thereby give visibility into cash flow. There's also the need to connect that to the margin, or value at risk, that exists from today until the moment those forward volumes begin flowing. Given the balance sheet we have today, that isn't much of a limitation; as for Brent, no hedging has been done by us so far. One reason is that a $102 cap applies to our Brent tariffs. Should you pursue it, some kind of collar is necessary so that you avoid landing with excessively large margin calls, and the potential margin volumes are greater there; if the overall price level looks appealing, we're inclined to do more TTF; on the Brent side, we're presently less inclined to act, though that could shift. For instance, were we able to secure $102 across a lengthy period, you'd take it, since that represents your maximum earnings in any case.

Sean Morgan

analyst
#36

Okay. That's really helpful for understanding that. Thank you.

Karl Fredrik Staubo

executive
#37

Thank you.

Greg Lewis

analyst
#38

Hi there, and thanks. Good afternoon to everyone. Karl, I wanted to ask something. You brought up — and I recognize that right now you're sitting in a fairly solid cash position — but you brought up the possibility of, you know, refinancing projects that already exist. When we consider what you said regarding loan to value, and I can understand the earlier slide where you were sort of noting where other projects have been resold, might we see possible financing tied to an implied value, one that could be greater than the construction cost?

Eduardo Maranhão

executive
#39

Hello, Greg; Eduardo speaking. Yes. I'd say the brief response to what you asked is affirmative. As Karl mentioned, we've gotten signals from a handful of prospective lenders for new FLNG projects, and those signals suggest they might be open to examining and providing funding at leverage above the vessel's actual construction price. Take the Gimi, for example — since we hold a 20-year contract, and with a duration that long, we truly can consider leverage past what a typical lender would accept under a standard loan to value, or 70% or 75% LTV. In that situation, I think what we're really assessing is the contract's capacity to service the debt. For example, we think financing above $1.5 billion-$1.6 billion might be achievable by considering the Gimi by itself. Other banks take a different tack and evaluate those assets using a loan to value approach. In those cases, we think levels of roughly 70%-80% of the asset's value might be reached.

Karl Fredrik Staubo

executive
#40

To put it briefly, what drives this isn't anything to do with the people putting forward that kind of financing — on this deal, the contract value is the driver, not the LTV.

Greg Lewis

analyst
#41

All right, I appreciate that, and it's encouraging to hear. I also wanted to follow up on something—you brought up the money being put into Macaw Energies. I understand this is small-scale LNG, so is there any sort of schedule or set of milestones you could share about where things currently sit? Put another way, might we be looking at a project from this business within two to three years, or is there a chance it happens faster? I suppose what I'm really asking is how much activity is going on at Macaw. That company isn't one I know much about.

Karl Fredrik Staubo

executive
#42

What draws us to it, I'd say, is their aim of doing liquefaction on a small scale, modularized and located onshore. Going smaller and building in modules has the benefit of getting to cash flow faster. There are lots of instances of stranded gas and flare gas out there right now. Should you be able to turn that flare gas into liquid and put it toward a productive use, that's not just appealing from an economic standpoint—it's also the correct choice for the environment. Their attention would be mostly on Latin America and the U.S. The intention is for the modularized design to be finished, without question, inside 12 months. Depending on how that design turns out in practice, we'll proceed to the following stages on it. Everything else being equal, it mirrors precisely what we do on the floating side, except we're working at a smaller scale.

Greg Lewis

analyst
#43

That really sounds quite fascinating. So I had just one more thing to ask. As a follow-up to an earlier question regarding the quantity of units — clearly, up to now we've sort of been constructing, doing a single project at a time. Karl, when you consider the market and make those choices, or perhaps the better word is opportunities, to handle more than a single project simultaneously — or what are the limiting factors? Would those limiting factors be the shipyards, the supply chains, the labor? I mean, as you think about that and the possibility of having several projects lined up, under construction simultaneously, any kind of detail you could provide on that?

Karl Fredrik Staubo

executive
#44

Yeah; it's sort of a yes to every one of those. You require all of that in order to move an FLNG project forward. Ultimately, it comes down to clients who are willing and a project mature enough that you're actually building it. The somewhat irritating aspect, when you think about it, is how much time it takes to reach FID. Once at FID, the FLNG is the long lead item. It isn't the upstream infrastructure. So that's partly what has driven us to place the orders for the MKII long leads, since we can see how near some of these projects are to development or FID. If we then have an FLNG ready considerably sooner than if you were to go out and place the order, that delivery position becomes more attractive.

Greg Lewis

analyst
#45

All right, so I want to make sure I've got this right — that $300 million for long lead time items, that's really tied specifically to the MKII, right? Whereas with a MKIII design, I suppose you could always step down to the MKI, and that would likely need less kit. But if we did need that MKIII design, do you have any rough sense of what those long lead time items would cost all-in?

Karl Fredrik Staubo

executive
#46

What it really comes down to is that the majority of the equipment we've already pre-ordered can be used across our designs, since they share the same topsides.

Greg Lewis

analyst
#47

Sure.

Karl Fredrik Staubo

executive
#48

What we've actually progressed on — in case that's of real interest — includes gas turbines, centrifugal compressors, cold boxes, and heat recovery steam generators. Those rank among the longest-lead, largest pieces of the top side package. Our orders for them assume the MKII, since customer demand is strongest there. Should circumstances ever require placing such equipment on a MKI or MKIII, nearly all of it would fit either of those two designs.

Greg Lewis

analyst
#49

Alright, that's really useful. Thanks a lot.

Karl Fredrik Staubo

executive
#50

Naturally, a larger share relates to MKIII, since its liquefaction capacity is greater, yet it remains unchanged.

Greg Lewis

analyst
#51

Sure. Okay. Thank you.

Karl Fredrik Staubo

executive
#52

Thank you.

Karl Fredrik Staubo

executive
#53

I appreciate everyone joining us for the third-quarter results. Take care, and I look forward to talking with all of you before long. Bye now.

Operator

operator
#54

That wraps up the conference call for today. We appreciate everyone joining in. You're free to disconnect at this point. Presenters, kindly remain on the line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.