Thanks, operator, and hello everyone — welcome to this presentation of Golar LNG's results for the first quarter of 2023. I'm Karl Fredrik Staubo, CEO of Golar LNG, and with me today is our CFO, Mr. Eduardo Maranhão, and together we'll go through this quarter's results. Before we get into the presentation, please take note of the forward-looking statements that appear on Slide 2. On Slide 3, we set out our company overview. In this quarter, we exited our investments in Cool Company Limited and New Fortress Energy; on top of that, we bought back New Fortress's equity stake in the FLNG Hilli. We also divested the LNG carrier Golar Gandria and acquired the LNG carrier Fuji LNG, which is intended for FLNG conversion. To start, the FLNG Hilli is still one of our main assets, and it's currently in operation for Perenco over in Cameroon. Then there's the FLNG Gimi, which we'll hand over before this year is out so it can kick off a 20-year agreement with BP at the Tortue field, located offshore Mauritania and Senegal. Thanks to the Fuji LNG purchase, we're making progress toward possibly placing an order for a third FLNG — our plan is for that to be a Mark II FLNG capable of liquefying 3.5 MTPA each year. Let's turn to Slide 4 now, where the quarter's highlights are laid out. Starting on the left with Hilli: we've now bought back NFE's equity position in that unit, as we'd signaled earlier. The total consideration came to $100 million, along with the 4.1 million NFE shares we still held, and we assumed $323 million in debt tied to New Fortress Energy's interest in the vessel. In addition, we closed out our TTF hedges, which let us lock in $140 million in operating cash flow from those hedges while keeping our exposure to production linked to TTF. We further agreed to make up the 0.04 tons of underproduction from '22 by producing a comparable extra amount in 2023. And we're happy to report that we've secured credit approval, and reached agreement, on better terms for the debt financing we already have in place on Hilli. Doing this reduces the margin on our debt and boosts the free cash flow to equity coming out of that unit. Later in the presentation, Eduardo will walk through the amendments in more detail. Technical completion on Gimi now stands at 94%. Sail away dates, previously set for the first half of this year, have moved to Q3 of this year, which gives us room to finish the vessel completely, run additional testing at the yard, and stay aligned with the project's overall schedule. On the business development front, recent months have brought a notable surge in interest in our FLNG offerings — particularly regarding a new contract for the FLNG Hilli, since she becomes available in the second half of 2016 and has a demonstrated operational track record; talks are underway right now with multiple owners of gas resources. During the quarter, this included putting our signature on a memorandum of understanding with NMTC to look into deploying FLNG at specific proven gas resources in Nigeria controlled by NNPC; with commercial engagement around FLNG deployment growing, we have moved forward on yard and financing talks for the Mark II FLNG and picked up the Fuji LNG, as covered earlier. Now shifting to the right-hand side and corporate and others. When we look at Q1, the numbers tell a story of strength: we held more than a billion dollars in cash, adjusted EBITDA for the quarter came to $84 million, and leaving NFE and Cool Company generated $102 million in net cash proceeds. A $20 million chunk of our unsecured bonds was bought back at par, and we secured a deal to modify those bonds, which adds to our financial flexibility. Following that amendment, dividend payments resumed, with $0.25 per share greenlit for Q1. Our goal is a quarterly dividend that stays steady while increasing as time goes on, and we'll share more on our ambitions for the dividend later in this presentation; a $150 million share buyback program also got the go-ahead. Now, business development, and I'll be on Slide 6 with additional Gimi details. The majority of what's left involves piping, along with system testing and pre-commissioning. The sail away date, as I noted, has shifted out of the first half into Q3 '23, and first feed gas on the Tortue project should still be unaffected by this revised schedule. Pre-commissioning contractual cash flows have started, which is a result of delays across the project overall and the FLNG. BP owes Golar a share of those contractual cash flows, and part of that amount is currently in dispute, so we're focused on getting it resolved. The revised sail away timing, as well as the disagreement over cash flow prior to commissioning, won't have any impact on how the broader 20-year project is carried out. That project should release approximately $3 billion in adjusted EBITDA backlog for Golar, which works out to about $150 million in adjusted EBITDA each year. Moving on to Slide 7 and FLNG business development — the area of our business that generates the most excitement — interest from owners of gas resources in our FLNG offering keeps building. At present, we're talking with five to six such owners regarding possible FLNG deployments. The number one thing we're focused on is getting a charter in place for Hilli before the existing contract runs out in July 26. Doing that would lock in better visibility on cash flow and a bigger distribution to shareholders ahead of when we reach FID on our Mark II FLNG. A number of the prospective customers we're talking with control resources large enough to support either Hilli or our Mark II FLNG. We continue to aim for commercial arrangements in which we and the owner of the gas resource concentrate on liquefaction of stranded or associated gas field at appealing cash breakeven levels, and split the fund through commodity price offtakes. If Hilli is fully utilized, and using today's LNG forward prices, its yearly revenue potential tops $1 billion. That amount would be divided between the gas resource owner and Golar in our role as the liquefaction provider. Back in April, we put our signature on a memorandum of understanding alongside NNPC, which is among the five to six owners of gas resources I mentioned before. When it comes to domestic energy companies in Africa, NNPC ranks as the biggest. Right now, Nigeria turns out 33 million tons of LNG each year. Set against that figure is a proven gas reserve exceeding 4 billion tons. That leaves a lot of room, and a lot of drive, to turn those volumes into revenue. Once the MOU had been signed, substantial resources were dedicated by both parties toward establishing a named gas feet for a possible FLNG project. Progress has been made on material, technical, and commercial fronts. All told, this MOU lasts five years, and the two parties share an ambition to investigate the possibility of deploying several FLNG projects across proven and stranded gas fields located in Nigeria. Our preference is to begin with a single named one rather than attempting everything simultaneously. Additional gas export chances in West Africa and South America are also seeing ongoing advancement. Moving to Slide 8; given this rise in charter interest, we chose to upgrade our FLNG conversion candidate. Our decision was to divest Gandria and to eliminate our option to purchase the LNG carrier, Fuji. The upgraded FLNG conversion option brings several key advantages: it's younger, has better sailing conditions, can carry more cargo, offers more deck space, and has lower boil-off. We're continuing to move ahead with yard EPC negotiations and are also making progress on a debt facility for Mark II FLNG projects. When we make the final investment decision, it will depend on charter visibility around recontracting either Hilli or Mark II FLNG. Now on Slide 9, where we highlight the earnings potential from integrated FLNG projects — we're still seeing pretty healthy margins for these kinds of projects.

Karl Fredrik Staubo

executive
#2

In our view, natural gas pricing has returned to a sustainable point, which provides an advantage on cost versus dirtier fuels, and the forward curves for the commodity give us confidence over the longer term. During the quarterly presentation we gave previously, we noted that opportunities in stranded or associated gas upstream can be brought online with upstream expenses ranging from $1 to $3 per MMBtu. When fuel is included, FLNG OpEx totals about $0.60 per MMBtu. After factoring in what it takes to ship to customers in Europe or Asia, the delivered cash breakeven lands somewhere between $3 and $5 per MMBtu. Compare that to forward pricing above ten dollars for each MMBtu, which implies yearly EBITDA of five hundred fifty million dollars when a Hilli runs at full capacity, or eight hundred seventy-five million dollars in the case of Mark II FLNG. Confidence in our approach to doing business has not faded, given that the bulk of added supply during the coming five to ten years is expected to originate in the U.S. So when a company faces three main expense categories — what it pays for feed gas, what liquefaction costs, and what shipping runs — and it comes out ahead on every one of them, that strikes us as a favorable position competitively. The upper right section shows how, judged against history, this way of operating offers a compelling balance of risk and reward, capping losses while leaving plenty of room for gains. Today's forward curves sit well above where LNG prices have historically been. If you'll turn to Slide 10. More LNG, and more affordable LNG, is what the world requires. When you examine how gas prices have moved during the last twelve months, the conclusion is unmistakable: a broader set of suppliers, delivering at levels that can compete on cost, is what's needed. People once might have described LNG as a bridge fuel, yet what happened in 2022 makes plain that natural gas and LNG form an essential element of solutions for the long run, guaranteeing energy security. Even so, the plants already producing plus those presently under construction won't be enough to satisfy the demand increase anticipated over the next ten years. S&P Global projects that LNG demand will rise from roughly 400 million tons in 2023 to somewhere near 630 million tons by 2035 — a compound annual growth rate of 3.5%. On the slide's right-hand side, we've laid out the estimated CapEx for liquefaction projects that are presently being built. The sharp cost inflation we've seen lately is driving costs up, which moves the supply cost higher. As you can tell from most of the U.S. liquefaction projects, we're talking about CapEx per ton of liquefaction capacity well above $1 billion. A liquefaction project's final financial picture depends on multiple variables, yet holding down the capital expenditure for liquefaction ranks among the three expense levers for an LNG export venture and stands as the crucial ingredient for success, which is why our belief in Golar's FLNG offerings remains strong. Now let's look at Slide 11 for news about Macaw Energies. This company is a newly formed venture that applies Golar's approach to processing and liquefying gas that would otherwise be flared or left stranded, though it operates on land rather than at sea. The same people who built Golar Power—renamed Hygo afterward—also founded Macaw. Golar put in $5 million at the start, and that business grew through a joint venture between Golar and Stonepeak. Five years after launch, it was sold for three to four times the money that had gone in. Golar has now committed as much as $25 million so the team can concentrate on two things: creating a proprietary small-scale liquefaction unit built in a modular way, and partnering with small-scale LNG companies that complement what they do, in order to build out LNG-to-EV charging in areas where flaring is high, trucking demand is significant, and the grid today is unable to support supercharging for electric trucks. That takes in spots like the Permian in the U.S., along with several stranded gas resources across South America. Provided Macaw keeps developing, a spin-off of Macaw Energies will be looked into by the Macaw management team and Golar at some later stage. This is a business we have faith in. This is a team that has demonstrated it delivers for us in the past, and the model duplicates what we do offshore at a bigger scale, yet no significant CapEx requirement funded by Golar's balance sheet will be involved here. Capital markets will fund it once it gets lifted off the balance sheet. Eduardo will now take over the call to walk us through our Q1 results.

Eduardo Maranhão

executive
#3

Thank you, Karl, and hello everybody on this call. It's a real pleasure to walk you through where we stand on the group's results for Q1 2023; let's move to Slide 13, where I'd like to highlight a few of the financial points from the quarter. Our total operating revenues came in at $74 million, which represents a 25% increase over Q4 2022. On top of that, FLNG tariffs reached $110 million, a rise of 15% versus Q4 2022. LNG tariffs is an important non-GAAP measure made up of overall revenues from liquefaction services plus realized gains on derivative instruments tied to oil and gas. Our FLNG operations delivered a very solid contribution during this quarter, and earnings from Hilli rose to approximately $98 million, which is 23% higher than Q4 2022. Looking at the consolidated picture, adjusted EBITDA for the quarter was $84 million. Because of noncash mark-to-market charges totaling $188 million, we posted a net loss attributable to us of $102 million for the quarter. Within those charges were movements in the value of our TTF and Brent derivatives amounting to $115 million, changes in listed equity securities of $62 million, and interest rate swaps of $100 million. Following the closing in March of our purchase of NFE's stake in Hilli, our total share of contractual debt came to $1.1 billion. We still enjoy access to substantial liquidity, and our cash position finished the quarter at slightly more than $1 billion. Let's now turn to Slide 14. I'd like to give you more detail on our larger shareholding in the FLNG Hilli; in return for 50% of the common units, which we did not control, we paid NFE total consideration of $100 million in cash, plus our remaining stake of 4.1 million shares, and we also took on $300 million of debt. As we announced previously, buying Hilli is anticipated to lift our run rate adjusted EBITDA by $70 million each year; the deal closed on March 15. Even so, the economic benefit applies to us as of January 1 of this year. Thanks to our robust operational track record, corporate simplification, and confidence in the unit recontracting, we obtained management approval from the existing lender to enhance certain key terms under the current financial facility. Combining lower interest margins, a longer maturity, and a lighter amortization schedule should produce additional distributable cash flows to us of roughly $75 million through the end of the current contract. Those changes are expected to take effect in Q3 of this year. Turning to Slide 15. I'd like to recap our historical earnings from Hilli. As this slide shows, Hilli tariffs break down into three main components: a fixed tolling tariff, a fee linked to Brent, and a fee linked to TTF that began on January 1 of last year. Fixed tolling fees brought in over twice as much this quarter, hitting $34 million, thanks to the transaction with NFE being completed. This quarter's weaker gas and oil prices pushed down what we earned from the TTF and Brent-linked fees to $37 million and $18 million, respectively; altogether, adjusted EBITDA from Hilli came to $88 million this quarter, which is an increase of over 55% compared with the same quarter of 2022. Turning to Slide 16. I'd like to share a few more specifics regarding the debt optimization strategy for Hilli that I mentioned earlier; so, as I said previously, our existing lender has granted management approval for us to optimize certain terms of our existing facility. We don't intend to raise the overall leverage of the units, but those modifications by themselves ought to let us boost our free cash flow to equity generation by about $26 million annually, or roughly $75 million through the end of the current contract; during Q1 2023, we crystallized gains of approximately $140 million under our TTF hedging program; however, it's important to point out that we stay open and exposed to TTF prices from March through December of this year, and 100% between 2024 and 2026, when the current contract expires. Each incremental dollar of change in TTF prices will add $3.2 million of earnings to Golar. Beyond that, each dollar of change in Brent prices above $60 a barrel will produce $2.7 million per year for us. Turning to Slide 17. Our balance sheet keeps getting stronger, and we now enjoy greater flexibility, which lets us pursue shareholder returns while also funding our FLNG growth program. After adjusting for our cash receivables from unwinding our TTF hedges, we are essentially debt-free now, with a net debt position of only $25 million. Of the original issuance amount of $300 million, we have repurchased $161 million, and roughly $139 million is held by public bondholders; on May 25, we got approval to amend certain distribution conditions under those bonds, which will now let us bring forward shareholder returns, including the ability to distribute as much as 51% of total Cool Company cash proceeds, which came to $371 million, plus up to 50% of the last 12 months adjusted net income. Given that, we're delighted to announce that we're reinstating our dividend distribution, driven by strong cash flow visibility from our contracted assets Hilli and Gimi, along with the creation of a $150 million share buyback program. Now turning to Slide 18. Looking at the implied dollar per ton cost of liquefaction, we think Golar is attractively priced given our share of net liquefaction capacity from both Hilli and Gimi. At just 590 dollars per ton, the FLNG technology we've proven is highly competitive and delivers the top floating LNG liquefaction solution available anywhere in the market; that underpins our buyback approach, and it was among the factors behind our decision to announce an update to our capital allocation strategy. At this point I'll pass the call to Karl, who can say a little more about how we handle shareholder returns and also offer some closing remarks.

Karl Fredrik Staubo

executive
#4

Thanks, Eduardo. Now, moving on to Slide 20, and as Eduardo pointed out, the capital allocation update—how we approach it is that with solid visibility into cash flow, since over 70% of what we expect to earn in 2024 comes from fixed tariffs, plus additional upside from commodity exposure, we have clear sight of cash flow across the years ahead. On top of that, the Gimi delivery further boosts cash flow. There's also considerable additional upside from FLNG projects. Our view is that the dividend ought to be funded by operating cash flows, while the strong balance sheet should support FLNG growth. As has been repeated many times on this call, we now hold a cash position exceeding $1 billion. We're essentially free of debt, and we have attractive pricing in the capital markets. So we believe the present balance sheet supports FLNG growth, a buyback program, plus debt optimization of Gimi after delivery and securing a debt facility for the possible construction of a Mark II FLNG. So, to restate again, operating cash flow is for the steady quarterly dividend distributions that grow alongside Gimi's delivery and additional upside in Hilli. And the balance sheet will be deployed for FLNG growth. Moving to Slide 21 and the summary; we have started a quarterly dividend distribution, We anticipate embedded earnings growth after Gimi delivery, greater Hilli commodity exposure and 2026 recontracting opportunities and, naturally, further earnings growth potential from new FLNG projects. We view the current valuation as attractive and so have implemented a $150 million share buyback program. The balance sheet has the capacity to fund FLNG growth. As a result, we exercised the option to acquire the Fuji LNG; and we see growing engagement with prospective FLNG clients, including the signed MOU with NNPC and building momentum, which gives us added confidence of attractive recontracting of Hilli and commercial opportunities for Mark II. That wraps up our Q1 earnings presentation. Thanks for dialing in, and we'll now turn the call over to the operator for any questions.

Chris Robertson

analyst
#5

You've frequently brought up how African gas has a cost edge. Yet I believe you said one of the five or six parties you're talking with right now is located in South America. Could you quickly address whether there might be any cost gap between those two regions? And does that push you toward one region or the other while these talks are ongoing?

Karl Fredrik Staubo

executive
#6

Chris, what we observe in the South American opportunities is plentiful gas reserves, a domestic market unable to absorb the volume of potential gas development, and a source cost fairly similar to what we see for the West African opportunities. That said, depending on what end users ultimately receive, sailing distances are somewhat longer. Beyond that, we view them as another area of interest for FLNG development. That is also why we're concentrating on both South America and at Africa.

Chris Robertson

analyst
#7

Yeah, that's clear. That's helpful. So I suppose my follow-up is about the MOU — perhaps not tied to the one in front of us right now, but more generally, could you walk through what an MOU has to go through before it becomes a contract, and how long that usually takes? What are the usual milestones along the way? Just a bit more color on that would be great.

Eduardo Maranhão

executive
#8

Thanks, Chris. I'd say ever since we put pen to paper on the MOU, that's the thing people ask about most. And as the sole FLNG service provider globally, I don't believe a playbook exists for how these transactions unfold. It gets tailored between our team and whichever counterparty, depending on the situation, and it's only happened twice before. So whether it's standard or not is honestly somewhat tough to characterize. As for the particular MOU with NNPC, that MOU is needed to free up meaningful resources on the NNPC side, and we've definitely noticed a shift before versus after the NNPC — pardon me, after the MOU was signed. That being said, we have other prospective charters among the group of five to six we referenced, where no MOU has formalized the talks, yet we're at minimum just as far along as we are with NNPC. So really, it comes down to the procurement process on the charter side too. And since NNPC is an NOC, the MOU is a necessity. What gives us confidence is that neither side signed that MOU just to sign it, and genuine momentum, with some impartial deadlines to hit, has been established, and I believe we're on schedule to hit them. That's where we've gotten ahead. Nailing down an exact timeline is tough, but the two of us would like to see this resolved sooner rather than later.

Ben Nolan

analyst
#9

Eduardo, Karl, good to hear from you both, hope all is well. My question concerns the Hilli and its recontracting. Should we take it as a given that, for the asset to be fully utilized, a relocation is probably required? And related to that, what's your thinking on how the contracting timeline plays out? Clearly, a move would mean some infrastructure has to be in place beforehand, so is this something we should be marking as a 2023 event, or is there somewhat more runway on the contracting side?

Karl Fredrik Staubo

executive
#10

Yes, in all likelihood it leaves where it sits today. Other fields in Cameroon might hold the resources needed to support the Hilli. So it could — chances are very high it won't remain at the current location. Remaining in Cameroon is possible, and it could just as easily head somewhere else, such as the MOU signed with NNPC. On timing, from the operational and engineering side, my sense is you'd want clarity by around mid '24; that ought to allow enough planning for relocation and getting a site ready ahead of recontracting. And clearly, commercial reasons exist for wanting to see it sooner, but purely from operations and engineering, mid-'24 is when a fairly clear picture should be available to us.

Ben Nolan

analyst
#11

All right, that's useful. And now for my second question, I suppose. Is my understanding correct that the sequence of priorities starts with getting the Hilli recontracted, and after that comes a contract for the second vessel, which you'd require in order to move to FID? So I'm just attempting to reason through the timeline. So if it falls somewhere within, say, the coming 12 months, though it might take as long as 12 months for the Hilli, ought we to anticipate that the Mark II contract comes at center point afterward? Or is it not strictly required to follow that sequence?

Karl Fredrik Staubo

executive
#12

Broadly speaking, you've got it right. So the number one priority is recontracting the Hilli, and following that is to FID the Mark II. The logic driving this is that we'd rather not have exposure to the Hilli rolling off contract in July 26 at roughly the same moment a Mark II would also be delivered. So at minimum, you want to lock in one of those two ahead of FID Mark II. And judging by the discussions we're having now, we think it's considerably more probable that we secure the Hilli before we secure the Mark II. However, if you secure the Hilli on attractive terms, there's enough charter interest that you'd proceed with the Mark II even without a contract from day one.

Craig Shere

analyst
#13

Nice work on the advancement. To follow up on what Ben asked, how are things looking with shipyard capacity and that queue? And roughly when is the latest point by which you must secure and commit those slots so your Mark II schedule, the one you had in mind from the start, stays intact?

Karl Fredrik Staubo

executive
#14

That's a fair question — obtaining yard slots is getting harder, I'd say, throughout the entire maritime sector. Our attention is on shipyards, clearly those in Singapore, since that's where Hilli and Gimi were constructed and I believe our ties there are solid. Beyond that, we've looked into yard possibilities in China, and we think we'd have the right crew there to build a Mark II unit as well. As you're aware, we've already locked in long lead items for the Mark II build, which gives the schedule a degree of protection; even so, naturally, the more you delay FID, the further delivery gets pushed. Given how things stand right now, a single day of FID slippage translates to possibly just under a day of delivery — day two delivery — since we keep advancing engineering and preparation efforts, such as securing the Fuji.

Craig Shere

analyst
#15

Understood. Then, when you consider the Mark II conversion along with the other opportunities in the pipeline — I'd imagine that given those half dozen discussions, it isn't out of the question that you might land something in addition to recontracting the Hilli and deploying the Mark II. So, just to be ready for a scenario like that, what level of liquidity must you keep on your balance sheet?

Karl Fredrik Staubo

executive
#16

Eduardo, would you like to take that one?

Eduardo Maranhão

executive
#17

Right, absolutely. So Craig, as you're able to see, under the amendment as it stands, we've likewise made a commitment to keep an ongoing reserve — a cash floor of $100 million minimum — once a dividend has been paid out. We've said that our intention is to bring the dividend program back on a quarterly schedule. So I think this gets done, as Karl said on today's call, in a way that's sustainable, funded by our cash flow from operations. Our view is that the liquidity we currently hold is more than sufficient for us to advance the Mark II project. You should also keep in mind that the CapEx is going to be distributed across a span of time, and in that situation not only do we gain from the liquidity we have right now, but we'll be producing cash throughout that stretch as well; so we're pretty confident that where we stand today is more than sufficient to cover the dividend program together with the buildout of Mark II.

Karl Fredrik Staubo

executive
#18

And then, on top of that, I'd say there are a number of liquidity options available to us, obviously including refinancing Gimi once it's completed. That represents a $3 billion EBITDA backlog, and against it there's currently $700 million in total debt. On top of that, there's the possibility of raising leverage on Hilli when it's recontracted. I'd say that through the refinancing we announced today, the backing we're getting from the existing lenders is really substantial. And we're also seeing strong support for debt facilities even while a Mark II unit is under construction; so, taken together, including the cash flows that Eduardo mentioned, we're confident in our ability to fund the growth we can foresee.

Greg Lewis

analyst
#19

I was hoping we could get a bit more detail — and, I guess, congratulations on launching the dividend. I was hoping for a little additional detail regarding — and I realize it's still early, but how are we approaching the Gimi debt optimization? Really, just whatever broad strokes you can provide as we attempt to work out the potential cash flow that will be available once that unit begins operating, as we consider the dividend rate next year. So really, yes, any type — I mean, what kinds of interest rates are we observing for that kind of unit, what kind of debt duration are we contemplating? How much will this be, like 60% financed or possibly more? Any broad strokes you can provide, I think, would be extremely helpful.

Karl Fredrik Staubo

executive
#20

Eduardo?

Eduardo Maranhão

executive
#21

Yes. Absolutely, Greg — I believe I can give you an update on that. So, looking at the main options available to us regarding Gimi, at a high level, given that we currently carry $700 million in debt, this unit is significantly under-leveraged. I think that's something we can all agree on. And over the past several months, we've been examining a handful of possibilities, which include things like extending or increasing the existing bank facility. Right now, we have a syndicate of roughly 11 banks in that facility. We could potentially look at growing it to somewhere between $1 billion and $1.2 billion. As for tenor, that would likely fall somewhere in the range of eight to 12 years; however, I'd say this isn't the most appealing option in terms of either the potential volume or the cost. So turning to the other possibilities, a potential sale leaseback also stands out as one of the most attractive routes. We've looked into the possibility of signing a leasing agreement, which might free up somewhere between $1.2 billion and $1.3 billion in total financing. On tenors, I'd say this would likely run longer than bank financing — so somewhere from 12 up to 15 years. That still leaves a remaining tail relative to the contract duration of 20 years. But we also view the potential issuance of U.S. private placement bonds as another option, one where we could take full advantage of the entire contract duration and the contract backlog. We think this route could give us the largest and highest volume while also providing a very competitive cost. Naturally, that depends on where the market stands when we issue. But since the total amount would be sized according to the project's potential cash flows, and looking at it on an SCR basis, we believe this option could raise somewhere between $1.5 billion and $1.7 billion; so as you can see, these alternatives vary quite a bit when it comes to both volume and tenor; but we think we'd benefit most by waiting until we reach COD. At that point, we'll then make a decision to proceed with refinancing Gimi.

Greg Lewis

analyst
#22

Yes, absolutely — 100%. Appreciate that, Eduardo. And Karl, I suppose you just came out with the buyback, which was nice to see. When you're out there engaging with investors, obviously the company trades below $600 per ton of liquefaction capacity. I believe there was that — not a — I think it was a sizable one, but even so, it was well above $1,000 a ton. What sort of feedback are you hearing, given that we clearly think the equity is undervalued? Any thoughts on what's behind that gap between where some market deals have printed and where Golar sits today?

Karl Fredrik Staubo

executive
#23

That's among the questions we field most often — why the share price is where it is. Ultimately, we have to try to operate the company as well as we can, and after that the market has to determine the price. Based on what we're seeing, not only in dollars per ton, but also in cash flow multiples once Gimi is delivered and through a sum-of-the-parts analysis, at least management and the Board consider the valuation highly attractive, and that's the reason we implemented the buyback program; and that's what we plan to do. Certain investors, of course, would like us to make the buyback program considerably bigger, if you look at some of the market share and what people are speculating about. But ultimately, from our standpoint, I'd say $150 million is significant. And beyond that, we launched the dividend, and taken together, both of these; this is, naturally, the beginning of shareholder returns, which we've built simply on visible cash flows and substantial upside, as we've described, and which ought to be able to expand considerably in the quarters and years ahead.

Greg Lewis

analyst
#24

Yes. So when I consider that, suppose we chose to proceed with something like the Fuji as the conversion candidate — given that inflation exists, shipyard slots are limited, and all the factors involved in a mega project of that kind — do you have any sense of what it might cost to bring that unit into operation?

Karl Fredrik Staubo

executive
#25

Yes. Inflation is certainly something we're seeing. I believe it's visible to everyone, in every market. Still, given what we observe today, taking into account the EPC contract and the spots where we've secured the long lead items, our view is that it can be done at roughly Golar's present pricing — so roughly $600 a ton. Keep in mind, though, that figure comes with construction risk and a couple of years with no cash flow. If someone purchases Golar right now, Hilli has already been delivered and is producing cash flow, while Gimi begins generating cash flow this year. Taking all of that into consideration, pursuing a new build costs more, yet the integrated contract possibilities we're seeing also offer better economics than the existing Hilli and Gimi contracts, which explains why you conclude it doesn't make sense — and you can cover it from the balance sheet with no effect on the dividend, provided your base dividend is tied to operating cash flow.

Sean Morgan

analyst
#26

So, coming back to Hilli again, my understanding is that the contract ends in July of '26. What kinds of logistical issues arise when relocating an FLNG unit? I'd guess there aren't many prior examples of this kind of thing — are there environmental worries? And on the expense side, is it mostly Perenco that carries the cost as the customer doing the disconnection? Also, once the undersea equipment is no longer tied to the FLNG at the surface, what happens to it?

Karl Fredrik Staubo

executive
#27

Honestly, it's remarkably straightforward, since this is a standardised unit built so it can be redeployed at various sites. Basically, all you have to do is detach it from the upstream pipe and the soft yoke — that's the mooring system — and away you go. The unit actually comes with an engine and propeller, so in theory tugs aren't even required, though depending on your destination, you'd likely need a tag. That's all there is to it. The sole item left in the ground that requires decommissioning is the bottom portion, the part of the mooring system fixed to the seabed, and we estimate its total decommissioning at roughly $5 million.

Sean Morgan

analyst
#28

All right. And I suppose based on the calendar, you've got roughly 2 years; however, as a — as those of you running the management team, you fellas clearly understood that equity markets begin looking forward and they typically aren't fond of ambiguity. By that point, you'd have the operation up and running. So it isn't as though you'd lack any assets in production, yet what kind of timeline are you kind of considering internally regarding when this must be finished and relocated so that you don't begin encountering a bit of an ambiguity overhang?

Karl Fredrik Staubo

executive
#29

I believe, like we attempted to clarify before, provided that — from the standpoint of engineering and operations, you enjoy quite a relaxed schedule if you possess charter visibility by the middle of next year concerning where the unit will be recontracted. That provides ample opportunity to arrange decommissioning. Any possible vessel upgrades or amendments and new mooring locations set up a new shore base and all else that's needed. So that's relaxed. It definitely isn't forgotten by us that the capital markets value earlier visibility and honestly neither do we. Yet ultimately, there exists the internal trade-off between what's industrially correct when it comes to optimizing economics of the project versus merely resolving an ambiguity. And given the level of interest we observe around the ship at present, you don't automatically want to marry the first one that appears at the door but have a little round on the dance floor to see who delivers best.

Sean Morgan

analyst
#30

All right. That comparison works really well for me. With any luck, then, this Hilli ends up being the belle of the ball, and we'll enjoy plenty of options regarding where that asset ultimately goes. Many thanks, Karl.

Karl Fredrik Staubo

executive
#31

Once more, thanks to each of you for joining the call, for tuning in, and for the engagement along with the highly pertinent questions, and we'll keep moving the Company forward as best we can. With luck, we'll talk sooner. If that doesn't happen, though, all of you will hear from us again when the next quarter arrives. So thank you one more time, and enjoy the rest of your day.

Operator

operator
#32

Appreciate it. That brings today's conference to a close. Thanks for joining us, and you're free to hang up at this point. Speakers, please remain on the line.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.